Government Property: The New Hot Button

R o b b y R a g o s C P P A

Page 2: Government Property: The New Hot Button Robby Ragos CPPA

This Presentation Will Cover

• What is Government Property?• 5 Classifications of GP• Importance of having an approved Property

Management System• Frequency of a Property Management System

Audit (PMSA)• Relevant GP FAR and DFARS Clauses

Page 3: Government Property: The New Hot Button Robby Ragos CPPA

DFARS 252.211-7007 Reporting GFE in the DoD IUID Registry

Page 4: Government Property: The New Hot Button Robby Ragos CPPA

Scenario• Joe Snuffy the engineer works at Sikorsky• He uses special test equipment (STE) and

special tooling (ST) to work on DoD helicopters• Joe then gets assigned to work on a

commercial contract, and uses the same STE and ST he used on DoD work

Could there be a problem?

Page 5: Government Property: The New Hot Button Robby Ragos CPPA

YES! The USG pays for those tools to be used on that contract, and that contract alone.

Raytheon was charged $18 million by the USAF for working on commercial products

Used tools on a separate contract.

Page 6: Government Property: The New Hot Button Robby Ragos CPPA

What is Government Property?• I’m often asked “What exactly is GFE, or GFP,

or CAP, etc?”

• Good question!!

Page 7: Government Property: The New Hot Button Robby Ragos CPPA

• What are the requirements to call something Government property?

FAR 45.101 States:"Government Property means all property 1. OWNED or 2. LEASED to the Government. Government property includes both Government-furnished and Contractor-acquired

Property.”

Page 8: Government Property: The New Hot Button Robby Ragos CPPA

• DEFINITIONS– Government Furnished Property

• means property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract.

TITLE ALWAYS VESTS IN

GOVERNMENT

Page 9: Government Property: The New Hot Button Robby Ragos CPPA

Contractor Acquired Property (CAP)

• means property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has

title.

NOTE: So when you get right down to it…There is either GFP or CAP!!!

Page 10: Government Property: The New Hot Button Robby Ragos CPPA

• To give a general illustration:– GFE (Government Furnished Equipment)

• Items such as those used for testing and evaluation. (All gadgets and widgets engineers use!)

– GFM (Government Furnished Material) • Consumable materials are expected to be consumed or expended

during performance. Once consumed, it’s gone.

– GFP (Government Furnished Property) regardless of “stuff” being materials or tools, it’s all the same!

Page 11: Government Property: The New Hot Button Robby Ragos CPPA

Government Property• 1.“Stuff” the Government owns.

– Items to which the Government has clear TITLE – Title evidencing the issue of OWNERSHIP. – Made available to the Contractor for use or consumption in the

performance of the contract.

Page 12: Government Property: The New Hot Button Robby Ragos CPPA

Government Property

2.“Stuff” the Government LEASES. The Government leases and then provides/furnishes to the contractor for use (NOT consumption) .

• Even though it’s LEASED, it’s still GP!.

Page 13: Government Property: The New Hot Button Robby Ragos CPPA

“Wait, the Government doesn’t have title to that stuff while leasing. How can you say it is

Government property?”

Page 14: Government Property: The New Hot Button Robby Ragos CPPA

• The Government wants the contractor to MANAGE, CONTROL AND PROTECT that “stuff” in the same fashion as Government property.

If you loaned me a lawn mower to cut my grass, you would want me to take care of that item as

if it were my own, right?

Of course!!!!

Page 15: Government Property: The New Hot Button Robby Ragos CPPA

• Why? Because, the Government has a responsibility to return it to the leasing company.

Page 16: Government Property: The New Hot Button Robby Ragos CPPA

Was this managed and controlled properly?

Speaking of Management and Control…..

Page 17: Government Property: The New Hot Button Robby Ragos CPPA

Classes of Government PropertyMATERIAL52.245-1(a)

45.101

EQUIPMENT52.245-1(a)

45.101

SPECIALTOOLING

2.101

SPECIALTEST

EQUIPMENT2.101

REALPROPERTY52.245-1(a)

45.101

Page 18: Government Property: The New Hot Button Robby Ragos CPPA

Material– Does not include equipment, ST, or STE

• Consumed, expended, and incorporated• Uses a percentage of the remaining balance• Nuts, bolts, screws, washers, batteries, gas, silver, paint

Page 19: Government Property: The New Hot Button Robby Ragos CPPA

Special Tooling• Jigs, dies, fixtures, molds, gauges…Specialized nature• Used to the performance of particular services

Page 20: Government Property: The New Hot Button Robby Ragos CPPA

Special Test Equipment• FAR 2.101 “either single or multipurpose integrated test units

engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract…”

Page 21: Government Property: The New Hot Button Robby Ragos CPPA

Equipment…tangible asset that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract.”

Page 22: Government Property: The New Hot Button Robby Ragos CPPA

Real Property• Land, rights in land (Mineral rights or riparian rights, ground

improvements), sidewalks, utility distribution systems, and buildings.

• Pretty simple, right?

Page 23: Government Property: The New Hot Button Robby Ragos CPPA

So why should I be concerned with having an adequate property system and stay in compliance with DCMA regulations?

Page 24: Government Property: The New Hot Button Robby Ragos CPPA

DFARS 252.245-7005 (FEB 2012)

• (d) Significant deficiencies• (e)…the Contracting Officer will withhold 5% of

amounts due from progress payments and performance-based payments…

• …direct contractor to withhold 5% from its billings on interim cost vouchers on CR, labor-hour, T&M until the CO has determined that the Ktr has corrected…

Page 25: Government Property: The New Hot Button Robby Ragos CPPA

Don’t panic!

• Steps need to take place before withholds start happening

• DCMA CARS Level I-IV

Page 26: Government Property: The New Hot Button Robby Ragos CPPA

6 Business Systems• The USG expects that every responsible contractor has 6 Business Systems that are

competent and auditable to be compliant and do business.

– 6 Business Systems:

• Material Management and Accounting (252.242-7004)

• Cost Estimating (252.215-7002)

• Earned Value (252.234-7002)

• Contractor Purchasing (252.244-7001)

• Accounting (252.242-7706)

• Contractor Property Management System (252.245-7003)

Page 27: Government Property: The New Hot Button Robby Ragos CPPA

Importance of an Approved/Adequate Property System• If the Government revokes assumption of risk,• Contractor is accountable and financially liable for ALL lost,

damaged, destroyed or stolen property, at FULL cost to the contractor.

VERY Time Consuming and VERY COSTLY !

Page 28: Government Property: The New Hot Button Robby Ragos CPPA

How often does an audit occur?

Page 29: Government Property: The New Hot Button Robby Ragos CPPA

Authority to Audit

• The FAR GP Clause 52.245-1(g) provides us detailed guidance as to the Government’s authorities and

the contractor’s responsibilities in regard to a PMSA (Property Management System Audit). It says…..

Page 30: Government Property: The New Hot Button Robby Ragos CPPA

Authority to Audit

• The Government shall have access to the contractor’s premises and all Government property, AT REASONABLE TIMES, for the purposes of reviewing, inspecting and evaluating the Contractor’s property management plan(s), systems, procedures, records, and supporting documentation that pertains to Gov’t property…..

• What constitutes reasonable?

Page 31: Government Property: The New Hot Button Robby Ragos CPPA

Authority to Audit• (g) Systems analysis.

– (2) Records of Government property shall be readily available (Upon request) to authorized Government personnel and shall be appropriately safeguarded.

Page 32: Government Property: The New Hot Button Robby Ragos CPPA

Requirements for Performing Audits

• FAR 45.105 address the GOVERNMENT’S REQUIREMENT to audit the contractor.

• FAR 52.245-1 addresses the CONTRACTOR’S REQUIREMENT to assess their PMS.

How frequently SHALL a Government PA perform a PMS audit??

IT DEPENDS!!

Page 33: Government Property: The New Hot Button Robby Ragos CPPA

Frequency of PMSA

• The Risk Assessment and Rating affect how FREQUENTLY the Government PA will perform a PMSA: – The type of PMSA they will perform,– The Processes subject to review if a PMSA is performed

Page 34: Government Property: The New Hot Button Robby Ragos CPPA

Levels of Risk• High Risk. Perform a Standard PMSA at least annually until such

time as the contractor improves to at least the moderate risk level and the PA determines that the status of the contractor's system justifies a reduced level of oversight.

• Moderate Risk. Perform a Standard, Limited PMSA or site visit as

frequently as conditions warrant, but at least once every two years. • Low Risk. Perform a Standard, Limited PMSA or site visit as

frequently as conditions warrant, but at least once every three years. http://guidebook.dcma.mil/34/INDEX.CFM

Page 35: Government Property: The New Hot Button Robby Ragos CPPA

Frequency of PMSA• Criteria for assignment of a risk category may include:

– Dollar value of Government Property accountable to that contractor (Higher value, higher risk).

– Historical occurrences of Loss, Theft, Damage, or Destruction.– Physical inventory adjustments– Unauthorized use of Government Property(Scenario 1!)

Page 36: Government Property: The New Hot Button Robby Ragos CPPA

Processes and OutcomesThe primary Government Property Clause at 52.245-1

requires the Contractor to develop property management plans, systems, and procedures at the contract, program, site or entity level to enable the ten outcomes/ processes (listed i to x):

(i) Acquisition of Property(ii) Receiving of Government Property(iii) Records(iv) Physical Inventory(v) Subcontractor Control(vi) Reports

Page 37: Government Property: The New Hot Button Robby Ragos CPPA

Processes and Outcomes(vi) Relief of Stewardship Responsibility (Liability)

(vi) Disposition(vii) Cannibalization(viii)Shipping

(vii) Utilization

(vi) Storage(vii) Consumption of Material(viii)Movement

(viii) Maintenance(ix) Property Closeout

Page 38: Government Property: The New Hot Button Robby Ragos CPPA

Acquisition

• Far 52.245-1 (f)• (i) Acquisition of Property. The Contractor shall

document that all property was acquired consistent with its engineering, production planning, and material control operations.

• Is the Ktr following the PROCESS for managing the ACQUISITION of PROPERTY that IS or BECOMES Government Property??

Page 39: Government Property: The New Hot Button Robby Ragos CPPA

Receiving

• Far 52.245-1 (f)• Are you adjusting for overages, shortages,

damages/discrepancies discovered upon receipt?

• How are you handling hazardous materials?– Properly qualified personnel handling it?

• Are you properly documenting all incoming deliveries?

Page 40: Government Property: The New Hot Button Robby Ragos CPPA

Records

• FAR 52.245-1(f)• Records of Government Property. The Contractor shall create and maintain

records of ALL Government property accountable to the contract,

including Government-furnished and Contractor-acquired property.

Regardless of $$ value!!!

Page 41: Government Property: The New Hot Button Robby Ragos CPPA

Physical Inventory• Physically locating and counting Government property?• Comparing the results to the records?• Posting the findings and adjustments?• Reporting the adjustments to the PA (ND and DCMA)?

Page 42: Government Property: The New Hot Button Robby Ragos CPPA

Subcontractor Control• Important!!!

– The flow down of proper clauses, provisions, and requirements, e.g., the requirements of the GP Clause FAR 52.245-1.

– Proper liability provisions- either the FULL risk of loss or the LIMITED risk of loss requirements depending upon the type of contract, listings of GFP, etc.

– The adequacy of the prime contractor’s system of surveillance incorporated in its PMS and applied throughout the life of the subcontract.

Page 43: Government Property: The New Hot Button Robby Ragos CPPA

Relief Stewardship (Liability)• Disposition

– LTDD(Loss, Theft, Damage, Destruction) incidents been reported IAW 52.245-1?

• Cannibalization-NOT the eating of human flesh

• Shipping– Proper paperwork documented? (DD Form 1149)

Page 44: Government Property: The New Hot Button Robby Ragos CPPA

Utilization• Storage

– GP separate from NON GP??– Adequate facilities? (Temperature, size, security, labeled, etc.)

• Consumption-materials– Disclose and report if in excess of contract performance?

• Movement– Contractor moving GP that is authorized only under the contract it’s

authorized for?

Page 45: Government Property: The New Hot Button Robby Ragos CPPA

Maintenance

• Identification, disclosure, and performance of normal and routine preventative maintenance and repair?

• Disclosure and report to the Property Administrator the need for replacement and/or capital rehabilitation

• See the difference?

Page 46: Government Property: The New Hot Button Robby Ragos CPPA

Property Closeout

• Reporting, investigating, and securing closure of all LTDD (Loss, Theft, Damage, and Destruction) cases.

• Physically inventorying all property upon termination or completion of the contract.

• Disposing of items at the time they are determined to be excess to contractual needs.

Page 47: Government Property: The New Hot Button Robby Ragos CPPA

Relevant FAR Property Clauses• 9.104-1 (e) Ktr must have adequate systems• 30.201 Cost Accounting Standards (disclosure

statements)• 31.201-2, -3 &-4 Determining reasonableness,

allowability and allocability• 45.104&107 Which property clause to use• 52.244-2 Subcontracts (ACO approval requirements

to subcontract)

Page 48: Government Property: The New Hot Button Robby Ragos CPPA

Relevant FAR Property Clauses• 52.245-1 Limited risk of loss• 52.245-1 Alt 1• 52.245-9 Use and charges

Page 49: Government Property: The New Hot Button Robby Ragos CPPA

Relevant DFARS Property Clauses• 245.107 When to use DFARS property clauses• 252.211-7007 Reporting GFE in the DoD IUID Registry

(JANUARY 2014!!!!) Word Document• 252.245-7001 Tagging, labeling, and Marking of GFP• 252.245-7002 Reporting Loss of GFP• 252.245-7003 Contractor PMS Administration• 252.245-7004 Reporting, Reutilization, and Disposal• 252.242-7004 Material Management and Accounting

System

Page 50: Government Property: The New Hot Button Robby Ragos CPPA

Was this movement done with “law & regs” in mind?

Page 51: Government Property: The New Hot Button Robby Ragos CPPA

• Questions????