government of p unjab - punjab roads & …prbdb.gov.in/files/tnm/mpr sep 2016.pdf ·...

117
Re eport pr WORL Punj Outpu Improve T repared MON G D BANK jab Ro ut and ement, Re Sang NM by TNM Monito Con S NTHLY GOVE K FUND oads Perfor ehabilita grur‐M TECHNO MANAG M – ICR oring Con nstruction D.A. Sangrur, Y PROG Septe RNM ED PUN & Bri rmanc ation, Res ansa‐B OLOGY A GEMENT RA Mana nsultant - Division .C Block Punjab - GRESS ember ENT NJAB ST dges ce Base surfacing Bathin AND LTD. agement Project O , PWD B& – 2 148001 S REPO r 2016 OF P TATE RO Deve ed Roa g and Ro da Roa t Consul Office &R ORT N 6 UNJA OAD SEC lopme ad Cont utine Ma ad Net 33 lting Se o. 24 AB CTOR P ent B tract ( aintenan twork 33333333 ervices L ROJECT oard OPRC) ce works 3 Ltd T ) s

Upload: dangdang

Post on 30-Aug-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Rep

 

 

 

 

 

 

eport pr

WORL

Punj

OutpuImprove

T

repared

MON

GD BANK

jab Ro

ut and ement, Re

Sang

 

NM

d by TNM

MonitoCon

S

NTHLY

GOVEK FUND

oads 

Perforehabilita

grur‐M

TECHNOMANAG

M – ICR

oring Connstruction

D.A.Sangrur,

Y PROGSepte

RNMED PUN

& Bri

rmancation, Res

ansa‐B 

 

 

OLOGY AGEMENT

RA Mana

nsultant - Division.C Block Punjab -

GRESSember

ENT NJAB ST

dges 

ce Basesurfacing

Bathin

ANDLTD.

agement

Project O, PWD B&– 2 148001

S REPOr 2016

OF PTATE RO

Deve

ed Roag and Ro

da Roa

t Consul

Office &R

ORT N6 

UNJAOAD SEC

lopme

ad Contutine Ma

ad Net

33

lting Se

o. 24 

AB CTOR P

ent B

tract (aintenan

twork 

33333333

ervices L

ROJECT

oard

OPRC)ce works

 Ltd

T  

) s  

TNM 

 

OPRC WorlMonthly Pro

ABREV

AASHTOAADT  AC  ASTM BANK  Base YeBC  BDS  BM BoQ CBR CoI CQAMPDBM DCP DgMark

DRB  EHS  EIA  EMP  EIRR  ESA ESMF FIDIC  

FWD  FWP  GC or GGDP GOI GOP IBRD  ICB  IDA INR  IRC IRI IRR ITB  JV  JVA  km   LOS MC 

M TECHNOMANAG

ld Bank Project fogress Report No 24

VIATION

O   AmeAnnuAsphAmeWor

ear   Last BitumBid DBitumBill oCalifCorr

P   ContDensDyna

ket  IntergoveDispEnviEnviEnviEconEquiEnviFedeConsFallinForw

GCC  GeneGrosGoveGoveInterInterInterIndiaIndiaInterInterInstrJointJointKilomLeveMon

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

S

erican Assocual Averagehalt Concreterican Socierld Bank Completedminous ConData Sheet minous Maof Quantitiefornia Beariidor of Imptract Qualitse Bituminoamic Cone Prnational poernments anute Reviewronment Heronmental  ronmental nomic Internvalent Stanronmental eration Intesulting Enging Weight Dward Work Peral Conditiss Domesticernment of ernment of rnational Barnational Cornational Dean Rupees an Roads Cornational Rornal Rate ofructions to Bt Venture t Venture Ametre el of Servicenitoring Con

a Bathinda Netwo

ciation of Ste Daily Traffte  ty for Testin

d Financial Yncrete 

cadam es ng Ratio act y Assuranceous MacadaPenetrometortal for tennd   interna

w Board ealth and SaImpact AssManagemenal Rate of ndard AxelSocial Manarnational Dneers DeflectomeProgrammeions of Contc ProductIndia Punjabank for Rehompetitive evelopment

ongressoughness Inf ReturnBidders 

Agreement

e nsultant

ork in Punjab (Ind

tate Highwafic  

ng and Mat

Year at the t

e Managemamter nders and ptional orga

afetysessment ent PlanReturn 

agement FrDes Ingénieu

ter etract 

abilitation aBiddingt Associatio

ndex 

dia) 

ay and Tran

terials 

time of rece

ment Plan 

rocuremennisations (w

ramework urs‐Conseils

and Develo

on 

sportation 

eipt of the B

t opportunwww.dgmar

s ‐ Internatio

pment 

   

Officials 

Bids 

ities from rket.com) 

onal Federa

   

ation of 

TNM 

 

OPRC WorlMonthly Pro

MBCB MDR MEC MOEF MORT&MPa   MPD  MPM MSA NH  NHAI  NPV  ODR  OPRC  PAP  PC  PCU PIRR PSPCB  PWD  PRBDB PSRSP  QA  QC  RAP  RDPM  ROMDAROW RPM RUS&CPSDBC  SH  SIA  TMP TOR UNDB   

WB  

M TECHNOMANAG

ld Bank Project fogress Report No 24

MetaMajoMonMini

&H   MiniMegMeaManMilliNatioNatioNet OtheOutpProjePartPassProjePunjPubl

  PunjPunjQuaQuaReseRoad

AS   RoadRighRaise

PM   RoadSemStateSociaTraffTermUnitonlinWor

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

al Beam Craor District Rnitoring Conistry of Enviistry of RoagaPascal. Unan Profile Denagement Pon (Equivalonal Highwonal HighwPresent Valer District Rput and Perect Affectedicular Condenger Car Uect Internalab State Poic Works Deab Roads aab State Rolity Assuranlity Control ettlement Ad Durabilityd Measuremt of Way ed Pavemend User Servi Dense Bitue Highway al Impact Afic Managemms of Refereed Nations ne rld Bank 

a Bathinda Netwo

ash BarrierRoad nsultant, Emironment and Transportnit of Measuepth erformanceent) Standaay ays Authorilue Road rformance Bd Person itions of CoUnit l Rate of Reollution Conepartmentnd Bridges oad Sector Pnce 

Action Plany Performanment Data A

nt Markerice and Comuminous Co

ssessmentment Planence Developme

ork in Punjab (Ind

mployer, Connd Forestst and Highwurement 

e Measuresard Axels 

ity of India

Based Road 

ontract 

turn (PIRR)ntrol Board

DevelopmeProject 

nce MeasureAcquisition 

mfort Perforoncrete 

ent Busines

dia) 

ntractor

ways

Contract

ent Board

e System 

rmance Me

s online (ww

easure

ww.devbus

   

iness.com) 

   

TNM 

 

OPRC WorlMonthly Pro

TABLE

1  PRO

1.1 

1.2 

1.3 

1.4 

2  PRO

2.1 

2.2 

2.3 

2.4 

2.5 

2.6 

2.7 

2.7

3  WO

3.1 

3.1

3.1

3.1

3.1

3.1

3.1

3.2 

3.2

3.2

3.3 

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

M TECHNOMANAG

ld Bank Project fogress Report No 24

EOFCON

OJECT HIGHL

Significant

Physical Pr

Crash Reco

Snapshots

OJECT OVER

Backgroun

Agencies I

Contract A

Organisati

Responsib

Project Or

Basic Cont

.1  Proje

ORK PROGRE

Improvem

.1  Work

.2  Work

.3  Work

.4  Work

.5  Work

.6  Chang

Road Dura

.1  Roug

.2  Struct

Network P

.1  Pavem

.2  Unsea

.3  Drain

.4  Routi

.5  Obstr

.6  Incide

.7  Veget

.8  Road 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

NTENTS

LIGHTS FOR 

t Events .......

rogress ........

ord Update .

s – Pictorial O

RVIEW .........

nd ................

nvolved in th

Administratio

on & Respon

ilities of the 

ganization ..

tract Feature

ct Brief .......

ESS ‐ SUMMA

ment, Rehabil

ks Done ‐ Firs

ks Done ‐ Sec

k Done ‐ Thir

ks Under ‐ Fo

k Progress ‐ F

ge in Propos

ability’s Over

hness ..........

tural Capacit

Performance

ment Mainte

aled Shoulde

nage Mainten

ne Maintena

ruction on th

ent Response

tation Contr

Signs Maint

a Bathinda Netwo

THE MONTH

....................

....................

....................

Overview ......

...................

....................

he OPRC Pro

on Chart .......

nsibilities – M

Monitoring 

....................

es .................

....................

ARY AND CO

itation and R

st Year .........

cond Year .....

d Year ..........

ourth Year Pr

Fourth Year P

sal: ...............

rview ............

....................

ty Data (Pave

 Works’ Ove

enance (RUS&

er Maintenan

nance (RUS&

ance of Bridg

he Pavement

e and Emerg

ol (RUS&CPM

enance (RUS

ork in Punjab (Ind

H OF SEPTEM

....................

....................

....................

....................

...................

....................

oject .............

....................

Monitoring C

Consultant .

....................

....................

....................

OMMENTS ..

Resurfacing W

....................

....................

....................

rogramme ...

Programme .

....................

....................

....................

ement Defle

rview ..........

&CPM‐1) ....

nce (RUS&CP

&CPM‐3) ......

ges and Othe

t Surface and

gency Works 

M‐7) ............

S&CPM‐8) ...

dia) 

MBER 2016 ..

....................

....................

....................

....................

...................

....................

....................

....................

Consultant ....

....................

....................

....................

....................

...................

Works ..........

....................

....................

....................

....................

....................

....................

....................

....................

ctions) .........

....................

....................

PM‐2) ..........

....................

er Structures

d Shoulders (

Response (R

....................

....................

...................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

s (RUS&CPM

(RUS&CPM‐5

RUS&CPM‐6)

....................

....................

   

...................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

 – 4) ............

5) .................

) ...................

....................

....................

   

........... 9 

............ 9 

............ 9 

............ 9 

.......... 11 

.......... 13 

.......... 13 

.......... 14 

.......... 15 

.......... 15 

.......... 15 

.......... 16 

.......... 16 

.......... 17 

.......... 19 

.......... 19 

.......... 20 

.......... 21 

.......... 21 

.......... 21 

.......... 22 

.......... 22 

.......... 23 

.......... 23 

.......... 24 

.......... 26 

.......... 27 

.......... 27 

.......... 28 

.......... 29 

.......... 29 

.......... 29 

.......... 29 

.......... 30 

TNM 

 

OPRC WorlMonthly Pro

3.3

3.3

3.3

3.3

3.3

3.3

3.4 

3.5 

3.6 

3.6

3.7 

3.7

3.7

3.7

3.7

3.8 

3.9 

4  ENV

4.1 

4.2 

4.3 

4.4 

4.5 

4.6 

5  RO

5.1 

5.2 

5.3 

5.4 

5.5 

5.6 

5.7 

5.8 

5.9 

6  CO

M TECHNOMANAG

ld Bank Project fogress Report No 24

.9  Raise

.10  Pavem

.11  Traffi

.12  Crash

.13  Sight 

.14  Mark

Other Obs

Recomme

Consolidat

6.1  Contr

Summary &

.1  Analy

.2  Mana

.3  Road 

.4  Road 

Verificatio

Audit Insp

VIRONMENT

Environme

Complianc

Status of G

Status of P

Status of S

Future key

AD SAFETY A

Introductio

Crash Reco

Crash Ana

Trend in C

Road Safet

Road Safet

Road Safet

Way Forw

Distributio

NTRACTOR’S

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

d Reflective 

ment Markin

c Island and 

h Barrier Mai

Rail, Hand R

er Post Main

servations on

ndation for N

ted Audit Re

ractor's Audi

& Compariso

ysis and Com

agement Per

Durability P

User Service

on of Contrac

ection Photo

TAL & SOCIA

ental Manag

ce as per Env

General facili

Physical Envi

Statuary Clea

y issues as re

AND TRAFFIC

on ...............

ords .............

lysis ............

rashes .........

ty Audit .......

ty Audit Find

ty Strategies

ard ..............

on of fatal cra

S STAFF AND

a Bathinda Netwo

Pavement M

ng (RUS&CPM

Roundabou

intenance (R

Rail and Pede

ntenance (RU

n Audit Sectio

Network Per

port .............

it Report on 

on of Contra

mments of the

rformance M

erformance 

e and Comfo

ctor’s Audit R

ographic Rec

AL MANAGEM

ement .........

vironmental 

ities at Contr

ronmental A

arances Appl

eviewed from

C MANAGEM

....................

....................

....................

....................

....................

dings ............

s ...................

....................

ashes in the 

D CONSTRUC

ork in Punjab (Ind

Markers (RUS

M‐10) ..........

t Maintenan

RUS&CPM‐12

estrian Barrie

US&CPM‐14)

ons ..............

rformance W

....................

September2

ctor’s Audit 

e Performan

Measures (MP

Measures (R

ort Performa

Report .........

cord of Non‐C

MENT .........

....................

Performance

ractor Camp

Aspects on Si

icable for pr

m the works 

MENT ..........

....................

....................

....................

....................

....................

....................

....................

....................

OPRC netwo

CTION EQUIP

dia) 

S&CPM 9) ....

....................

nce (RUS&CP

2) ..................

er Maintenan

) ...................

....................

Works ............

....................

2016 .............

vs. Monitori

nce Audit Ins

PM’s) ...........

RDPM’S) .......

nce Measure

....................

Conformanc

...................

....................

e Indicators 

 Site .............

te ................

roject and Ca

programme 

...................

....................

....................

....................

....................

....................

....................

....................

....................

ork ...............

PMENTS .....

....................

....................

PM‐11) .........

....................

nce (RUS&CP

....................

....................

....................

....................

....................

ing Consulta

pection .......

....................

....................

es ‐ RUS&CP

....................

es ................

...................

....................

as per World

....................

....................

amp site ......

and work m

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

   

....................

....................

....................

....................

PM‐13) ........

....................

....................

....................

....................

....................

nt’s Audit ....

....................

....................

....................

M ................

....................

....................

...................

....................

d Bank guide

....................

....................

....................

ethod ..........

...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

...................

   

.......... 32 

.......... 33 

.......... 35 

.......... 35 

.......... 35 

.......... 35 

.......... 36 

.......... 44 

.......... 46 

.......... 46 

.......... 49 

.......... 49 

.......... 49 

.......... 50 

.......... 52 

.......... 54 

.......... 70 

.......... 82 

.......... 82 

elines . 82 

.......... 84 

.......... 84 

.......... 86 

.......... 89 

.......... 90 

.......... 90 

.......... 90 

.......... 92 

.......... 95 

.......... 97 

.......... 97 

.......... 98 

.......... 98 

.......... 99 

........ 105 

TNM 

 

OPRC WorlMonthly Pro

6.1 

6.1

6.1

6.2 

6.3 

6.4 

7  PAY

7.1 

7.2 

7.3 

8  CLA

8.1 

8.2 

8.3 

8.4 

9  ME

10  CO

10.1 

10.2 

M TECHNOMANAG

ld Bank Project fogress Report No 24

Contract’s

.1  Key S

.2  Key S

Contractor

Contractor

Review of 

YMENTS .....

Network P

Financial P

Man hours

AIMS AND D

Dispute Re

Arbitration

Minutes o

Minutes o

EETINGS/INS

RRESPONDE

Correspon

Correspon

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

 Staff as per 

taff of Lead 

taff Present 

r’s Construct

r’s Staff Pres

Contractor’s

..................

Performance

Progress of O

s of Monitor

ISPUTES .....

eview Board 

n Tribunal ...

f Arbitral Tri

f Dispute Re

SPECTIONS H

ENCE DONE B

ndence Sent .

ndence Recei

a Bathinda Netwo

Contract Ag

Contractor P

at Site in Se

tion Equipme

sent – Septem

s Staff ..........

...................

 for the mon

OPRC Till Dat

ring Consulta

...................

(DRB) ..........

....................

bunal Meeti

view Board M

HELD DURING

BY THE OFFI

....................

ived .............

ork in Punjab (Ind

greement .....

Present at Sit

ptember 201

ent’s Septem

mber 2016 ..

....................

...................

nth of Septem

e .................

ant Staff .......

...................

....................

....................

ng ...............

Meeting ......

G THE MONT

CE OF MONI

....................

....................

dia) 

....................

te in the mo

16 ................

mber 2016 ....

....................

....................

...................

mber 2016 ...

....................

....................

...................

....................

....................

....................

....................

TH ..............

ITORING CO

....................

....................

....................

nth of Septe

....................

....................

....................

....................

...................

....................

....................

....................

...................

....................

....................

....................

....................

...................

NSULTANT ..

....................

....................

   

....................

ember2016 ...

....................

....................

....................

....................

...................

....................

....................

....................

...................

....................

....................

....................

....................

...................

...................

....................

....................

   

........ 105 

........ 105 

........ 105 

........ 106 

........ 107 

........ 107 

........ 108 

........ 108 

........ 108 

........ 109 

........ 110 

........ 110 

........ 110 

........ 110 

........ 110 

........ 111 

........ 112 

........ 112 

........ 114 

TNM 

 

OPRC WorlMonthly Pro

LISTO

Figure  2Figure  2Figure  2Figure  2Figure  2Figure  3Figure  3Figure  3Figure  3Figure  3Figure  3Figure  3Figure  3Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5

M TECHNOMANAG

ld Bank Project fogress Report No 24

OFFIGUR

2‐1 : OPRC Or2‐2 : Contract2‐3 : Organiza2‐4 :  Major c2‐5 :  OPRC N3‐1 :  Overall 3‐2 :  4th Yea3‐3 : Rutting 3‐4 : Low sho3‐5 : Vegetat3‐6 : Substan3‐7 : Poor Ma3‐8: The defic5‐1: OPRC Ne5‐2: OPRC Ne5‐3: OPRC Ne5‐4: OPRC Ne5‐5: OPRC Ne5‐6 : Fatal Cra5‐7 : Fatal Cra5‐8 : Fatal Cra5‐9 : Fatal Cra5‐10 : Fatal C5‐11 : Fatal C

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

RES

rganization Ct Administraation Chart ocomponents Network MapWork Progr

ar Works (Phand Shovingoulder and reion on shoudard Roadsiaintenance ociency recoretwork – Secetwork – Secetwork – Speetwork – Fatetwork – Craash Locationash Locationash Locationash Locationrash Locatiorash Locatio

a Bathinda Netwo

Chart ...........ation Chart ..of Monitorinof Civil Worp ..................ress (Physicahysical Progreg at Pavemeneverse slopelders at S5 Ride Signs ......of RPMs. ......ded against ction Length ction Length eeding & Aligality Trend ..ash Trend .....ns at Sectionns at Sectionns at Sectionns at Sectionons at Sectioons at Sectio

ork in Punjab (Ind

....................

....................ng Consultanrks under OP....................al Progress) .ess) .............nt observed e on S5 RoadRoad Section........................................Pavement Mv Number ov Number ognment as F........................................ S1 .............. S2 .............. S3 .............. S4 ..............n S5 ............n B8 ............

dia) 

....................

....................nt .................PRC project .............................................................on S2 Road  Section ......n ...........................................................Marking .......of Fatalities&of Crashes& Cactors in Cra................................................................................................................................................................

....................

....................

....................

....................

....................

....................

....................Section ..........................................................................................................& Fatality RaCrash Rates ashes ...........................................................................................................................................................................

   

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................tes .......................................................................................................................................................................................................................

   

.......... 13 

.......... 15 

.......... 16 

.......... 17 

.......... 18 

.......... 20 

.......... 20 

.......... 27 

.......... 28 

.......... 30 

.......... 32 

.......... 33 

.......... 34 

.......... 93 

.......... 94 

.......... 95 

.......... 96 

.......... 96 

.......... 99 

........ 100 

........ 101 

........ 102 

........ 103 

........ 104 

TNM 

 

OPRC WorlMonthly Pro

LISTO

Table  2‐Table  2‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  3‐Table  4‐Table  4‐Table  4‐Table  4‐Table  5‐Table  5‐Table  5‐Table  6‐Table  6‐Table  6‐Table  6‐Table  7‐Table  7‐Table  10Table  10

M TECHNOMANAG

ld Bank Project fogress Report No 24

OFTABLE

‐1 : Agencies‐2 : Network‐1 : Work Pro‐2 : Structura‐3 : Audit Sec‐4 : Accumul‐5 : Summary‐6: Managem‐7: Road Dur‐8 : Road Use‐9 : Summary‐10 : Manage‐11 : Road Du‐12 : Summa‐13 : Verifica‐14 : Verifica‐15 : Verifica‐16 : Verifica‐17 : Verifica‐18 : Verifica‐19 : Verifica‐20: Verificat‐21: Verificat‐22 : Verifica‐23 : Verifica‐24 : Verifica‐25 : Verifica‐26 : Verifica‐27 : Verifica‐28 : Verifica‐1: Complian‐2 : Status of‐3 : Status of‐4 : Status of‐1 : OPRC Ne‐2 : OPRC Ne‐3 : OPRC Ne‐1: Contracto‐2: Key Staff ‐3: Construct‐4 : Contact N‐1 : Man Hou‐2 : Man Hou0‐1 : Corresp0‐2 : Corresp

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

ES

s and Key Pek Road Sectioogram Approal Capacity Dctions for thated Scores y of Networment Performrability Perfoer Service any Non‐Confoement Perfourability Perary of Non–Cation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audition of Audittion of Auditation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audince as per Enf General facf Physical Enf Statuary Cleetwork Crashetwork Fataletwork – Sumor’s Key Stafof Professiotion EquipmNo. of Contrurs (for the murs (for the mpondence Sepondence Re

a Bathinda Netwo

rsons involvons under OPoved vs. AchData (Paveme Month of Submitted bk Performanmance Measormance Mend Comfort Pormances .....ormance Mearformance MConformanceit – Section Sit – Section Sit –Section Sit – Section Sit – Section Sit – Section Sit – Section St – Section St – Section Sit – Section Sit – Section Sit – Section Sit – Section Sit – Section Bit – Section Bit – Section Bnvironmentacilities at Convironmentaearances Aph Details (Upities Details mmary of Craff as per Cononal Engineeent as per Cractor’s Staffmonth of Sepmonth of Sepnt ................eceived ........

ork in Punjab (Ind

ved in the PrPRC projecthieved Progrment DeflectiSeptember 2by Contractonce submittesures (MPM`easures (RDPPerformance....................asures (MPM

Measures (RDes of RUS&CS1 – Km 5.00S2 – Km 2.24S2 – Km 15.0S2 – Km 45.0S2 – Km 60.0S2 – Km 65.0S2 – Km 70.0S2 – Km 75.0S4 – Km 0.00S4 – Km 5.00S4 – Km 15.0S5 – Km 5.00S5 – Km 15.0B8 – Km 15.0B8 – Km 20.0B8 – Km 25.0al Performanntractor Caml Aspects onpplicable for p to Septemb(Up to Septeash Statistictract Agreem

ering Consultontract Agref Present at Sptember 201ptember 201........................................

dia) 

oject ...............................ress ..............ons) ............2016 ............or for Non‐Coed by Contra`S) SubmittePM`S) – Subme Measures –....................M’s) ..............DPM’s) .........PM Measure0 to Km 11.34 to Km 10.00 to Km 20.000 to Km 50.00 to Km 65.00 to Km 70.00 to Km 75.0 to Km 80.0 to Km 5.00 .0 to Km 10.000 to Km 20.0 to Km 10.000 to Km 20.00 to Km 20.00 to Km 25.00 to Km 30.nce Indicatormp Site .........n Site ............project andber 2016) .....ember 2016s ..................ment and Prtant (PEC) ....eement/ PreSite ..............16) – Key Exp16) – Non Ke........................................

....................

....................

....................

....................

....................onformanceactor ............ed by Contramitted by Co– Submitted............................................................es ................300 ...............000 ...............00 ................00 ...............00 ...............00 ...............00 ...............00 ....................................00 .................00 ...............

00 .................000 ..............00 ................000 ..............000 .............rs as per .............................................. Camp site ......................) ......................................esent at Site....................esent at Site ....................perts ...........ey Experts ...........................................

   

....................

....................

....................

....................

....................es ......................................ctor .............ontractor ......d by Contract............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................e ...............................................................................................................................................................

   

.......... 14 

.......... 17 

.......... 19 

.......... 25 

.......... 26 

.......... 46 

.......... 47 

.......... 47 

.......... 47 tor ..... 48 .......... 49 .......... 50 .......... 50 .......... 53 .......... 54 .......... 55 .......... 56 .......... 57 .......... 58 .......... 59 .......... 60 .......... 61 .......... 62 .......... 63 .......... 64 .......... 65 .......... 66 .......... 67 .......... 68 .......... 69 .......... 82 .......... 84 .......... 84 .......... 86 .......... 91 .......... 91 .......... 97 ........ 105 ........ 105 ........ 106 ........ 107 ........ 109 ........ 109 ........ 112 ........ 114 

TNM 

 

OPRC WorlMonthly Pro

1 PR

1.1

1.2

1.3

Progress

M TECHNOMANAG

ld Bank Project fogress Report No 24

ROJECTH

Significan

Monitoring

Leader, Yo

Septembe

Team and 

The Monit

submitted 

the Contra

The Monit

of August 2

PhysicalP

During  th(LHS), kmkm 100.4

CrashRec

Total 8 crash

The total nusame time p

There were 

Whereas S2 crashes and measures, e

While the tofatalities on 

52.42

Improv

Progress

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

HIGHLIGH

ntEvents

g Consultant

ogendra Bhat

r 2016. Findi

Project Man

oring Consu

the non‐con

act Agreeme

oring Consu

2016 on 21 S

Progress

he month  ofm 97.700 to k430 (RHS), km

cordUpdat

hes were rep

mber of crasprevious year

no fatal cras

Section con83.3% of all

especially in t

otal number OPRC Netwo

33.06

vement

a Bathinda Netwo

HTSFOR

t team, consi

tnagar, inspe

ings of their 

nager on 16th

ltant conduc

nformance re

nt. 

ltant submit

September 2

f  Septemberkm 100.430 (m 101.050 to

e

ported on the

shes this year (87).  

shes reported

stitutes 52.1 fatalities in the wake of 

of crashes hork has risen

3.6

Rehab

4th Yea

ork in Punjab (Ind

THEMON

isting of Env

ected the OP

inspection wh September 

cted the mon

eport on 10 S

ted Monthly

2016, in acco

r  2016,  S2  ro(LHS), km 10o km 107.370

 

e network fo

ar (78) is dow

d in the mon

1% of OPRC Nthe 4th Year,ensuing wint

as come down sharply. 

3.41

bilitation

ar Physical P

dia) 

NTHOFS

ironmental E

PRC network 

were discusse

2016. 

nthly audit o

September 2

y Progress Re

ordance with

oad  sections01.050 to km0 were impro

or reporting 

wn by 9, com

nth of Septem

Network, it a, requiring soter/fog seaso

wn from prev

0

Res

Progress

SEPTEMB

Expert, Asha 

and M/s PIP

ed with M/s 

f the OPRC n

2016 to fulfil

eport (MPR) 

 the Contrac

s  from  km  9m 104.850 anoved. 

month of Se

mpared to the

mber 2016.

accounted foome urgent ron. 

vious year, t

0

urfacing

   

BER2016

Sharma and

PL’s camp site

PIPL Environ

network and 

 the require

no 23 for th

ct Agreemen

97.480  to  kmd from km 9

ptember 201

e number of 

or 80.8% of aroad safety 

he number o

Targe

Achie

   

6

d Team 

e on 15 

nmental 

ment of 

e month 

t. 

m  97.570 96.700 to 

 

16.  

crashes 

ll 

of 

et

eved

TNM 

 

OPRC WorlMonthly Pro

Sr. No. 

To

 

Crashes

Fatalitie

M TECHNOMANAG

ld Bank Project fogress Report No 24

There has beof fatalities last year (8)

65% of crashvehicle – lea

Road Name 

M

S1 

S2 

S3 

S4 

S5 

B8 

otal 

Dec  Ja

s  5  6

s  0  0

135

1

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

een fatal crain the 4th Ye. 

hes were attaving the car

OPRC N

Mar. 2013 toNov. 2013 

59 

81 

Cra

n  Feb  M

6  12  9

0  10  1

23

39

11

23

2 3

Total C

a Bathinda Netwo

sh on OPRC ear stands at

ributed to spriageway. 

Network Cra

o  Dec. 201Nov.20

0

78

3

3

1

1

86

ashes 4th Yea

ar  Apr  M

9  8 

1  2

5059

3240

4 5

Crashes

Third

ork in Punjab (Ind

network for t 18, which a

peeding and 

 

ash Details (U

13 to 014 

Dec.No

ar (Dec. 2015

May  June 

9  7 

3 0

6368

4956

6 7

s This Ye

d Year

dia) 

the last twore up by 10 c

overtaking. 

Up to Septem

. 2014 to ov. 2015 

71 

98 

5 to Nov. 20

July  Aug

8  6 

2 0

7481

6470

8 9

ear v Las

Fourth Year

o months; hocompared to

35% of crash

mber 2016)

Dec. 2015 toNov. 2016 

63 

78 

016) 

Sep  O

0

8793

78

10 11

st Year

   

owever, totalo number of 

hes were sin

o Total C

1

2

1

1

1

1

3

Oct  Nov 

   

   

98

12

   

10 

l number deaths 

gle 

Crashes 

19 

71 

17 

10 

11 

15 

43 

Total 

78 

18

TNM 

 

OPRC WorlMonthly Pro

1.4

M TECHNOMANAG

ld Bank Project fogress Report No 24

Snapshot

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

s–Pictoria

Environ

MC a

a Bathinda Netwo

alOverview

mental Inspe

and M/s PIPL

ork in Punjab (Ind

w

 

ection Team

L Joint Inspec

dia) 

m of MC and M

ction of Cam

M/s PIPL 

p Site 

   

   

11 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Minor Junc

Minor Junc

Minor Junc

a Bathinda Netwo

ction Improv

ction Improv

ction Improv

ork in Punjab (Ind

 vement work

vement work

 vement work

dia) 

ks under pro

ks under pro

ks under pro

gress (S2) 

gress (S2)

gress (S2)

   

 

   

12 

TNM 

 

OPRC WorlMonthly Pro

2 PR

2.1

 

M TECHNOMANAG

ld Bank Project fogress Report No 24

ROJECTO

Backgrou

The Goverhas allottePatel  InfraRajkot,  foBathinda cdate on co

This  contManagemMaintenanContractorroutine  mpavement emergency

TechnologConsultingof  the MoBoard,  a  sBoard  ActConsultanc

 The OrganFigure 2‐1

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

OVERVIEW

und

rnment of Pued the worksastructure  Por  203.68  kmcontract areaompletion is 4

ract  is  an ent  Contrance works  or  is responsiaintenance rehabilitatioy works. 

gy  and  Mang Services Ltonitoring Constatutory  bot,  1998  (Pucy services w

isation Chart. 

F

a Bathinda Netwo

W

unjab (GOP)s  for  ImprovPvt.  Ltd  Patcms  of  its  sta. The contr4th Decembe

Output  anact)  for  Imf  roads  andble for the owork,  desigon and  impr

nagement  Litd, India, wansultant  (MCody  establishnjab  Act  N

will be for a p

t of Output a

Figure  2‐1 : O

ork in Punjab (Ind

through Punvement, Rehacon  House, tate  road  nact has starter 2022. 

nd  Performaprovement,   allotted  unoverall manan  and  constrovement wo

imited,  Israes selected aC) on behalfhed  under  thNo.  22  of  1period of five

and Perform

OPRC Organ

dia) 

njab Public Wabilitation a2nd  Floor,  K

network  comted on 5th De

ance  basedRehabilitat

nder  Contracagement of ttruction  of  torks and  the

el,  in  assocs the preferf of Punjab Rhe  Punjab  R1998).  The e (5) years. 

ance based 

ization Char

Works Depand Routine MKotecha  Chomprising  ofecember 20

d  Road  Contion,  Resurfct  no.  PSRSPthe networkthe  requirede manageme

ciation  with red bidder tRoads  and BRoads  and  Binitial  term 

Road Contra

rt 

   

artment, PWMaintenanceowk,  Kalawathe  Sangrur12 and the e

ntract  (OPRfacing  and P/WB/OPRC/k,  including ad  surfacing ent of  any n

ICRA  Manao undertakeBridges DeveBridges  Deve

of  the  Mo

act is given in

   

13 

WD (B&R) e to M/s ad  Road, r‐Mansa‐expected 

RC)(Asset Routine 

/ICB.  The all of the renewal, necessary 

agement e the role elopment elopment onitoring 

n  

TNM 

 

OPRC WorlMonthly Pro

2.2

M TECHNOMANAG

ld Bank Project fogress Report No 24

Agencies

Agencies a

T

 EMPLOYER 

CLIENT 

EMPLOYERREPRESENT

FUNDING A

MONITORICONSULTA

CONTRACT

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Involvedin

nd key perso

Table  2‐1 : A

AGE

R’S TATIVE 

AGENCY 

ING ANT 

TOR 

a Bathinda Netwo

ntheOPRC

ons involved

Agencies and

ENCIES &KEY

 PUNJABPROJEC

PUNJABDEVELO

CONSTR(B&R)  ‐

INTERNDEVELO

TECHNOMANAGMANAGSERVICE

DATE M

DURATI

PATELINLTD 

DURATI

START D

DATE O

END DA

VALUE O

ork in Punjab (Ind

Project

 in OPRC pro

d Key Person

Y PERSONS IN

B STATE ROACT (PSRSP) 

B ROADS ANDOPMENT BOA

RUCTION DIV‐ SANGRUR 

ATIONAL BAOPMENT (IBR

OLOGYAND GEMENT LIMGEMENT CONES LIMITED 

MOBILIZED O

ION OF CONT

NFRAESTRUC

ION

DATE 

F SIGNING O

ATE 

OF CONTRAC

dia) 

oject are pre

ns involved i

NVOLVED IN

AD SECTOR 

D BRIDGES ARD (PRBDB)

VISION PWD 

ANK FOR RECRD) 

MITED ‐ ICRA NSULTING 

N

TRACT

CTURE PVT. 

OF CONTRAC

CT SIGNED

sented in Ta

n the Projec

N THE PROJEC

Mr. YogChief En

Mr. YogProject Mr. AniDeputy 

Mr. GurExecutivMr. PawSub Div

CONSTRUCTIO

Mr. HaiPresidenMr. YogTeam LeManage

Octobe

5 years 

Mr. ArvManagiMr. MuRoad M

10 Year

Decemb

T  Decemb

Decemb

INR 596

   

able 2‐1. 

ct 

CT 

gesh Gupta ngineer‐ PSRS

gesh Gupta Director l Kumar ShaProject Dire

rmukh Singhve Engineer wan Kumar Gvisional Engin

ON AND 

m Bonjack nt gendra Bhatneader/Projecer 

r 7, 2014 

vind Bhai V. Ping Director kesh Kumar 

Manager 

rs 

ber 5, 2012 

ber 10, 2012

ber 4, 2022 

6.36 Crores 

   

14 

SP 

rma ctor 

 

Garg neer 

nagar ct 

Patel 

TNM 

 

OPRC WorlMonthly Pro

2.3

2.4

2.5

M TECHNOMANAG

ld Bank Project fogress Report No 24

ContractA

Contract ad 

Organisat

The  appoRepresentOPRC proje

The  ConsuConditionsof the Conpotential runder the 

As a repreadministraperformedassessmen

Responsib

The Monito

Monitoring

Overall moachieving a

Evaluationconstructe

EvaluationThe Emplo

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Administra

dministratio

tion&Resp

ointed  Monative in impect. 

ultant  will  rs of an Outpnsultant’s rorisk to the Emworks contr

sentative of ation  of  thed by the Contnt of the CE´s

bilitiesofth

oring Consul

g the perform

onitoring of tand maintain

n of the qualied and maint

n and recommoyer. 

a Bathinda Netwo

ationChart

n chart is giv

Figure  2‐2

ponsibilitie

itoring  Conlementing a

represent  thut and Perfole  is  to provmployer by vact within th

the Employe  Contract  atracting Entits technical pe

heMonitor

ltant is respo

mance of the

the road conning the requ

ty and residutained by the

mendation o

ork in Punjab (Ind

ven in Figure

: Contract A

es–Monitor

nsultant  isnd maintain

he  Client  asormance basvide timely averifying the he stipulated

er, the Monand  for  thety for the Civerformance.

ringConsul

onsible for:

e Contractor

nstruction beuired and de

ual life of roae Contractor

of designs pro

dia) 

e 2‐2 

Administratio

ringConsul

responsible ing an appro

s  the  Projeced Road Conand orderly achievemen

d time and bu

itoring Conse  verificationvil Works. Th 

tant

r, based on th

eing done by esigned level

ad pavemenr. 

oposed by th

on Chart 

ltant

for  assistiopriate regim

ct  Manager ntract. Accorrequired advnt of all contrudget. 

ultant will bn  of  works he above inc

he approved

the Contracs of service. 

t, presented

he Contracto

   

ing  the  Emme for mana

under  the rdingly, the ovice to minimractual requ

e responsibland  serviceludes the co

d Work Progr

ctor, based o

d, designed, 

or for accepta

   

15 

mployer’s aging the 

General objective mize any irements 

e for the es  to  be ntinuous 

ram. 

ance to 

TNM 

 

OPRC WorlMonthly Pro

2.6

2.7

M TECHNOMANAG

ld Bank Project fogress Report No 24

Evaluationand Resett

Managing control of 

Monitoringupdating s

The reviewapprovals 

Review anusing tech

ProjectOr

Figure  2‐3Consultant

BasicCon

The OPRC The  Contra

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

n and monitotlement & Re

the Quality Athe Contract

g, overall supsubmitted by

w of all technof the mont

d monitor thnology accep

rganization

3  shows  the t and the rel

Figure  2‐3 

ntractFeatu

methodologactor  is  paid

a Bathinda Netwo

oring of the pehabilitation

Assurance oftor. 

pervision andy the Contrac

nical documehly billing pr

he process leptable to the

n

internal  distationship wi

: Organizati

ures

gy optimisesd  for  output

ork in Punjab (Ind

performancen Plan by the 

f the roads a

d recommenctor. 

entation requesented by t

eading to thee Client. 

tribution  of th the Client

on Chart of 

use of resouts,  the  main

dia) 

e of EnvironmContractor.

and bridges a

ndation for a

uired for paythe Contract

e creation an

all membert and Contra

Monitoring 

urces to provntenance  ser

mental Impac

and monitori

cceptance o

yment and retor. 

d updating o

rs  of  the  stactor. 

Consultant

vide maximarvice  of  ens

   

ct Managem

ing the quali

of data for inv

ecommendat

of the asset d

ff  of  the Mo

al “value for uring  certain

   

16 

ent Plan 

ty 

ventory 

tions for 

database 

onitoring 

money”.  n  quality 

TNM 

 

OPRC WorlMonthly Pro

2.7.1

RoaCod

S1

S2

S3

S4

S5

B8

Tota

M TECHNOMANAG

ld Bank Project fogress Report No 24

levels  on managemehanding ov

1 Projec

AccoWor

Figu

The inte

ad de 

N

1  Sangru

2  BhawanSH13 In(SH12A

3  Barnala

4  Mansa interse

5  Dhanau

8  BathindSabo (u(SH17) 

l Length of c

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

the  roads  (ent of the faver the road 

ctBrief

ording  to  thrk Contract a

ure  2‐4 :  Ma

roads  undrvention are

Table  2‐2

ame of Road

r ‐ Sunam (M

nigarh ‐ Sunantersection ‐A) 

a ‐ Mansa: (S

–Talwandi Sction with B8

ula ‐ Bhikhi: (

da ‐ Kotshamup to interse

contract area

a Bathinda Netwo

(level  of  sercility and asin a certain 

he  Contractoare illustrate

ajor compon

der  the  OPe given in Tab

 : Network R

d Section  

MDR 21) 

am ‐ Bhikhi ‐‐ Kotshamir: 

SH13)

Sabo (up to 8): (ODR9) 

(MDR 14) 

mir–Talwandiction with S4

a (kms) 

ork in Punjab (Ind

rvice)  underssociated righquality to th

or’s  Bidding d in Figure 2

nents of Civil

RC  Contractble  2‐2 and i

Road Section

Classific

MD

‐  SH

SH

OD

MD

i 4): 

SH

dia) 

r  contract  aht of way due Client at th

Document,2‐4. 

l Works unde

t  and  theirllustrated in 

ns under OPR

cation Len(k

DR  1

H  10

H 7

DR  24

DR  25

H  28

203

and  specific uring the conhe end of the

  the  major 

er OPRC pro

r  main  featFigure 2‐5.

RC project 

ngth km) 

Ty

1.3  RehaResu

6.13  Impr(widResu

.29 RehaResu

4.97  Impr(widResu

5.34  RehaResu

8.65  RehaResu

3.68 

   

improvementract periode contract pe

component

oject 

tures  and  t

ype of interv

abilitation anurfacing 

rovement Wening) and urfacing 

abilitation anurfacing 

rovement Wening) and urfacing 

abilitation anurfacing 

abilitation anurfacing 

   

17 

ents,  the d and for eriod. 

ts  of  the 

types  of 

vention 

nd 

Works 

nd 

Works 

nd 

nd 

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

 

 

 

 

 

 

 

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figu

 

ure  2‐5 :  OPRC N

  18

Network Map

   

TNM 

 

OPRC WorlMonthly Pro

3 W

3.1

YEAR  AC

1 (2013) 

2 (2014) 

3 (2015) 

4 (2016) (Balance of 3

rd 

year) 

5 (2017) 

6 (2018) 

7 (2019) 

8 (2020) 

9 (2021) 

10 (2022) 

Contract Total (km) 

1

*Exclper C     

M TECHNOMANAG

ld Bank Project fogress Report No 24

ORKPRO

Improvem

The detailsas per the the achievshown. 

The achievthe table.  

It should bPIPL) from2014. 

The progrework  progeffect on tthe contra

As per ontract 

As ApprWo

Progra

27.20  27.20

47.60 24.9735.84 

54.10  40.87

0.00    52

0.00   

0.00   

0.00   

0.00   

0.00   

0.00   

128.90 

uding the ROontract Agree

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

OGRESS‐

ment,Rehab

s of the appcontract for

ved targets a

ved progress

be noted that December 2

ess of works gramme)  wathe efficiencyct. 

Table  3‐1 : 

IMPROVEMENT 

per roved ork amme 

0 (S2) 

(S4) & (S2) 

7 (S2)  21.100 

.42 

2.52

 

 

 

 

 

 

 105

B length. As pement the RO

a Bathinda Netwo

SUMMAR

bilitationa

roved work r the remainat the end o

s during the 

t the summa2012, prior t

in the seconas  appreciaby and effect

Work Progra

Achieved (kms) 

25.91(S2) 

24.44 (S4) 

(S2) & 0.530 (S4

6.00 (S2) 7.85 (S2) 5.900 (S2) 13.31 (S2) 2 (S2) RHS only 

 

  

  

  

  

  

  

.04 (improved length) 

per site the RB length is 40

ork in Punjab (Ind

RYANDC

andResurfa

programs foning time (6of the first ye

fourth year

ary includes to the mobil

nd year as wbly  behind  sciveness of ro

am Approve 

As per Contract 

0.00 

7.29 

)   0.00 

25.34 

5.05 

2.20 

34.90 

0.00 

0.00 

0.00 

74.78 

OB deck slab 00m. 

dia) 

COMMEN

acingWork

or the first foyears) are sear, second 

r  (balance w

the works caization of M

ell as in the tchedule.    Thoad network

ed vs. Achiev

REHABILITAT

As per ApproveWork Programm

25.34 (S5) 

11.30 (S1) 

7.29 (S3) & 2.20 

 3.6 

  

  

  

  

  

49.73 

length is 590

NTS

ks

our years anummarised year and th

work of 3rd ye

arried out byMonitoring Co

third year (ehis  delay  mak operations 

ved Progress

ION 

ed me 

Achieve

25.34 (S5

0.00

(S2)  11.125 (S

3.41*

  

  

  

  

  

  

39.875

0m which is no

   

nd the work in Table 3‐1e third year 

ear)  is also s

y the contraconsultant in 

extension of ay  have  detover the du

 

d As per Contract 

5)  34.20 

0.00 

1)   0.00 

11.30 

23.60 

10.20 

0.00 

56.00 

68.30 

0.00 

  203.60 

ot rehabilitate

   

19 

program . Further are also 

shown  in 

ctor (M/s October, 

2nd year trimental ration of 

RESURFACING

As per Approved Work 

Programme 

0.00 

0.00 

28.65  

  

  

  

 

 

 

  

28.65 

ed. But as 

Achieved 

0.00 

28.65 (B8) 

0.00  

  

  

  

  

  

  

  

28.65 

TNM 

 

OPRC WorlMonthly Pro

 

 

*ROBAgree

3.1.1

M TECHNOMANAG

ld Bank Project fogress Report No 24

B  length  excluement. 

1 Works

In  tapp(i) Fi.e. imp

WitConBhi

0

Progress

52.42

Impro

Progress

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Figure  3‐

uded  actually

Figure

sDone‐Fir

the  first  yeaproved workFrom km 2.2in village G

provement w

th  regard  tontractor  fulfkhi (S5) (leng

128.9105.

Improvemen

Ov

2

33.06

ovement

a Bathinda Netwo

1 :  Overall W

y  as  per  site 

e  3‐2 :  4th Y

stYear

ar  of  contrack program. It40 to km 18harachon (iiworks in the f

o  the  rehabifilled  the  regth of 25.34

.04

nt R

verall  Work 

3.6

Reha

4th Ye

ork in Punjab (Ind

Work Progre

is  590m  agai

Year Works (

ct,  the  Contt complied w.150 (except) from km 6first year.  

litation  worehabilitation 0 km). 

74.78

39.87

Rehabilitation

 Progress  (P

6 3.41*

abilitation

ear Physical P

dia) 

ess (Physical 

inst  the  less 

Physical Pro

ractor  fulfillwith the imprt the road se7.840 to km

rks  as  per  thpertaining 

20

n R

Physical Prog

0

Re

Progress

Progress) 

ROB  length  4

ogress) 

ed  the  requrovement of ction from k

m 79.000. For

he  approvedto  the  road

03.6

28.65

Resurfacing

gress)

0

surfacing

   

400m  as  per

uirements  asf road sectiokm 8.400 to kr a total of 2

d  work  progd  section  Dh

Tar

Ach

Targ

Ach

   

20 

 

 r  Contract 

s  per  the ns S2 i.e.  km 9.400 26.07 km 

ram,  the hanaula–

rget

hieved

get

ieved

TNM 

 

OPRC WorlMonthly Pro

3.1.2

3.1.3

3.1.4

M TECHNOMANAG

ld Bank Project fogress Report No 24

2 Works

Imp201thethekmclea

Reh2ndythicDis

ReskmwoconAftreh

Duesec

3 WorkD

Duesec(PSsubbalCon0.0Jun

TheyeaS1)

Thepav67.

4 Works

TheexeThewoEmare

As the

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

sDone‐Sec

provement  w14  as  per  the road lengthe work on the  79.000  andarance of for

habilitation wyear  (2014),ckness  of  thpute Review

surfacing  wo37.850). Howrks  executensidered as rer  the  15thhabilitation o

e to the abovctions (S1 and

Done‐Thir

e  to  the  dection,  the  2nd

RSP)  approbmitted  the ance  works ntractor was0 to km 11.3ne, 2015 resp

e balance woar.  The Empl and up to05

e  works  forvement  of  S840 were co

sUnder‐Fo

e  Contractoecuted  in  these works arrk programmployer for ae to be impro

per  the appe 4th year of t

a Bathinda Netwo

condYear

works  of  47he  approvedh of 24.44 kme other roadd  km  108.77rest land. 

work for the  however  thhe  pavemenw Board (DRB

ork  in  the  2wever,  the Cd  from  km rehabilitationh  DRB  meeof B8 road, th

ve reasons, td S2) in the s

rdYear

esign  disputedyear work pved  it  as revised worfor  accepta

s started the300) on 29thpectively.  

orks of S1 anloyer was gr5th Dec, 2015

r  3rd  year S2  road  fromompleted. Th

ourthYear

r  had  subme  4th  year  ore to be execme has beenpproval. Undoved and 3.6

proved work the contract

ork in Punjab (Ind

7.60  km  werwork  progr

m correspondd sections i.e70  (total  29.7

road length he work did nt  overlay.  TB). 

2ndyear  wasContractor h9.200  to  kn or resurfacting  the  dehe resurfacin

the Contractsecond year.

e  of  S1  roaprogramme extension  ork  programmance  of  the e rehabilitatih May, 2015

nd S2, schedranted  the  t5 (for S2) res

(2nd  year  bm  km  45.200he completio

Programm

mitted  the  rof  the  contrcuted in the n accepted byder the 4th y km road len

programme

dia) 

re  planned  tramme.   Howding to Sectioe.  S2 betwee77  km on  ro

of 11.3 km fnot commeThe  Contrac

completed had raised thm  15.000  scing. The casecision  was ng would be 

tor did not fu. 

d  and  non‐was  shiftedof  2nd  year me  in  June, Monitoringon and imprand S2 (from

uled in the 2ime extensiopectively. 

balance  wor0  to  km  54.0on of minor w

e

revised  3rd ract)for  the 4th year of ty the Projecyear work prongths are to b

e  the  followi

to  be  compwever,  the  Con S4 and wen km 32.000oad  section 

for S1 sectionce due to  tctor  forward

in  the  Seche dispute  reection,  whese has been conveyed  tconsidered.

ulfil the work

clearance  o  to  3rd  yearwork  prog

2015  to  comg  Consultantrovement wm km 45.20 t

2nd year, weon up  to 15

rks),  the  im000  and  froworks is still i

year  work acceptancethe contractt Manager aogramme 52be rehabilita

ing works  ar

   

leted  by  NoContractor  im

was unable to0 and km 67S2)  due  to  t

n was plannthe dispute ded  the  case

tion  B8  (kmegarding  theether  this  shreferred to that  the  ins

k programme

f  forest  on r  and Chief gramme.  Complete  the  2t  and  the  Eorks on S1 (to km 67.84)

ere shifted inth August, 2

mprovement m  km  55.70in progress. 

programmeof  Project M. The revisedand forwarde2.42 km roadated. 

re  to be exe

   

21 

ovember, mproved o execute .840 and the  non‐ 

ed in the over  the e  to  the 

m9.200  –e  type of hould  be the DRB. stead  of 

e of road 

S2  road Engineer ontractor 2nd  year mployer. from km ) 0n 03rd 

n the 3rd 2015  (for 

of  road 00  to  km 

e  (to  be Manager. d 3rd year ed to the d lengths 

ecuted  in 

TNM 

 

OPRC WorlMonthly Pro

3.1.5

3.1.6

M TECHNOMANAG

ld Bank Project fogress Report No 24

Improv

Km 8.40

Km 18.

Km 28.5

Km 40.7

Km 79.

Total Le

Rehabi

Km 24.6

Km 26.4

Km 27.6

Total Le

  

5 WorkP

Durto k

Dursec

Durfro

Durkm

Durkm

Dur95.97.

Dur97.km

6 Change

Undhad  Brid

 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

vement of Bh

00 to km 9.4

150 to km 24

500 to km 39

700 to km 45

150 to km 10

ength (kms) 

litation of Su

6 to km 26.4

400 to km 27

600 to km 28

ength (kms) 

Progress‐F

ring the monkm 24.400 w

ring  the  moction from km

ring the monm km 79.000

ring the mon 34.500. 

ring the mon 89.500 to km

ring  the  mo300  (RHS), 700(LHS) we

ring  the  mo570 (LHS), k 96.700 to km

einPropos

der Section Vapproved th

dge Widening

a Bathinda Netwo

hawanigarh‐

4000 

4.5,00 

9.300 

5.200

08.770 

unam portio

400 (less ROB

7.60 (initially

8.600 

FourthYea

nth of Marchwas complete

onth  of  Aprim 24.400 to k

nth of May 0 to km 83.5

nth of June 2

nth of July 20m 95.010 (LH

onth  of  Augufrom  km  9

ere improved

onth  of  Septm 97.700 tom 100.430 (R

sal:

VII – General he variations

g: 

ork in Punjab (Ind

‐Sunam‐Bhik

on S2 road 

B 400m) 

y included as

rProgramm

h 2016, the ed.  

l,  2016,  bitukm 28.600 (l

2016, the bi70 and from

2016, 5.9 km

016, 5.510 kmHS) was com

ust  2016,  S295.010  to  kd. 

tember  2016o km 100.430RHS), km 101

Conditions, s for: 

dia) 

khi‐Kotsham

s improveme

me

bituminous w

uminous  woess the ROB

ituminous wm km 86.200 t

 of S2 road w

m (LHS) bitumpleted. 

2  road  sectikm  95.280 

6,  S2  road  s0 (LHS), km 11.050 to km 

Clause 63, C

mir Road (S2)

1

6

1

4

2

5

1

ent work) 1

1

3

work of S2 r

ork  for  rehab) was compl

work for  imprto km 89.500

was improve

minous work

ons  i.e.  from(LHS)  and  f

sections  from101.050 to k107.370 wer

Change in Pro

   

 

1.0 km 

6.35 km 

10.8 km 

4.5 km 

29.77km 

52.42 

1.4 km 

1.2 km 

1.0km 

3.6  

road from km

bilitation  of eted.  

rovement of0 was compl

ed from km 2

k of S2 road 

m  km  89.50from  96.700

m  km  97.48km 104.850 are improved

oposal, Empl

   

22 

m 18.400 

S2  road 

f S2 road eted. 

28.600 to 

between 

00  to  km 0  to  km 

80  to  km and from . 

oyer 

TNM 

 

OPRC WorlMonthly Pro

3.2 Ro

3.2.1

M TECHNOMANAG

ld Bank Project fogress Report No 24

1.

2.

3.

4.

5.

6.

7.

4‐La

1.

2.

3.

4.

oadDurabi

1 Rough

Concolle

In ththe 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Widening of

Drain crossin

Widening  o

Branch Cana

road (S2). 

Widening of

Drain crossin

Widening  o

Branch  Can

73+450 (ske

Widening/re

14.50m each

Widening of

Bhawanigar

Widening of

Canal Bhaw

20°) in Distr

anning of Ro

For 4‐lannin

Town from C

For  4‐lannin

Town from C

For 4‐lannin

from Ch 84+

For 4‐laning

 

ility’sOverv

hness

tractor has pect the rough

he month of following ro

a Bathinda Netwo

f existing bri

ng Bhawanig

f  existing  br

al at RD 54+0

f existing bri

ng Bathinda‐

f  existing  br

al  crossing 

ew in 250) 

eplacement 

h & 1 Span 1

f Existing Br

h –Sunam‐B

f  Existing Br

anigarh – Su

ict Mansa. 

ad sections:

ng road of Bh

Ch 54+030 to

ng  of  Bhaw

Ch 39+300 to

ng of Bhawan

+030 to Ch 86

 of Barnala –

view

procured thehness (IRI) d

June and Juad sections:

ork in Punjab (Ind

dge at Ch. 1

garh‐Sunam‐

ridge  2  span

040 (Skew in

dge at RD 20

‐Kotshamir‐T

ridge  3  span

Bhawanigar

of  Existing B

13m) on Sang

idge 5 Span 

hikhi‐Kotsha

ridge  3  Span

unam‐ Bhikh

 

hawanigarh‐S

o Ch 55+700

anigarh‐Sun

o Ch 40+700

nigarh‐Sunam

6+060. 

– Mansa Roa

e Profilometata of the OP

uly 2016, Con

dia) 

00+700 (5x9

‐Bhikhi‐Kotsh

n  3.50m  clea

n 250) Bhawa

0+600 (6 spa

Talwandi Sab

n  3.00m  clea

rh‐Sunam‐Bh

Bridge  5  spa

grur‐Sunam 

6.10m c/c o

amir roat (S2

n 3.00m clea

i‐Kotshamir 

Sunam‐Bhikh

0. 

am‐Bhikhi‐K

0. 

m‐Bhikhi‐Kot

d (S3) from 

ter in the moPRC network

ntractor has 

9.5m each cl

hamir road (S

ar  &  3.60m 

anigarh‐Suna

an 8.70 m ea

bo road (B8) 

ar  &  3.60m 

hikhi‐Kotsham

an  (2  Span 1

Road (S1) at 

over Bhadah

) at RD 53+4

ar & 3.60m e

roat (S2) at 

hi‐Kotshamir

otshamir  Ro

tshamir Roa

Km 182+640

onth of Junek roads. 

collected th

   

ear span) ov

S2). 

each  c/c  ov

am‐Bhikhi‐Ko

ach clear) ov

each  c/c  ov

mir  road  (S2

13.50m each

RD 10+200. 

hur Singh Wa

400 in Distric

each  c/c ove

RD 69+800 

r Road (S2) i

oad  (S2)  in 

d (S2) in Ma

0 to 189+970

 2016 and st

e roughness

   

23 

ver Lisara 

ver  Kotla 

otshamir 

ver Lisara 

ver  Kotla 

2)  at  RD 

h,  2  Span 

ala Drain 

t Mansa. 

er Bhaini 

(shew in 

n Bhikihi 

Cheema 

aur Town 

tarted to 

s data for 

TNM 

 

OPRC WorlMonthly Pro

RoadSectioNo. 

S2 

S1 

S2 

S4 

S5 

B8 

3.2.2

M TECHNOMANAG

ld Bank Project fogress Report No 24

d on 

Road S

BhawaBhikhi

Sangru

BhawaBhikhi

Mansa

Dhana 

Bathin

ConprocConfromat threqufulfi

Durithis this 

2 Structu

The of Mi.e. IRC 

The (fromto  7(frombeca

The com95thcurv

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Section Nam

anigarh‐Suna‐Kotshamir 

ur Sunam 

anigarh‐Suna‐Kotshamir

a Talwandi Sa

aulaBhikhi 

nda Talwandi

tractor has cess  the  colsultant (MC)m M/s PIPL tohe OPRC siteuired softwall the contra

ing the 17th issue to suprequiremen

uralCapaci

pavement dMonitoring Co(S1&S2 for 1115: 2014 al

pavement dm km 0.000 79.000)  for  im  km  0.000ause this is a

pavement mplying with h  percentilevature confir

a Bathinda Netwo

am‐

am‐

abo 

iSabo 

procured thlected  roug) has alreadyo arrange the but till datare,  the  IRI dctual require

World Bankpply the softt. 

ityData(Pa

deflections wonsultant wi100 MSA, S4ong the inne

deflection dato km 25.34inner  and  o0  to  km  25.3an intermedi

deflections the requirem

e  value  of rmed as show

ork in Punjab (Ind

Ro

From (km)

24.400 

27.200 

79.000

86.200 

0.000 

2.240 

18.400 

45.200 

55.700

68.000 

0.000 

0.000 

9.200 

e profilomethness  data y conveyed the software ute Contractodata cannot ements. 

k  Implementtware at site

avementDe

were recordeith FWD for t4 & S5 for 50er (LHS & RH

ata was colle40), S2 (fromuter  wheel 340);  the  daate lane road

data  for  tments of Clapavement  cwn in the Tab

dia) 

oad Section

To

26

28

83

89

11.300 (eCh 2+9403+085) 

18

24

54

67

79

24

24.800 (eportion f24.800 to25.340)

37

ter at OPRC has  not  beeto the Contrused to procr fails to do be verified b

ation Missioe but till date

eflections)

ed by Contacthe improve0 MSA) for eHS) and the o

cted for S1 ( km 2.240 topaths  (left  ata was  colled.  

the  above ause 8.2.3 ofcharacteristible 3‐2. 

o (km)

6.400 

8.530 

3.560

9.500 

except from 0 to Ch 

8.150 

4.400 

4.000 

7.800

9.000 

4.970 

except city from km o km 

7.850 

project site en  arrangedactor/emploess the collethe same. Inby the Moni

on, Monitorie the Contra

ctor (PIPL) ud and rehabeach traffic  louter (LHS & 

from km 0.0o km 18.150 and  right  sidected  for  ou

mentioned f the contracc  deflection

   

Rema

Data  collJune 2016

Data  collJuly 2016 

Data  collJuly 2016  

Data  collJuly 2016 

Data  collJuly 2016 

Data  collJuly 2016 

but the sofd  at  site.  Mooyer the requected roughnn the absencitoring Cons

ng Consultaactor has not

nder the supilitated roadloading grouRHS) wheel 

000 to km 11and from kmde  lanes)  anuter  wheel  p

roads  sectct agreemenn  and  chara

   

24 

arks 

ected  in 6 end 

ected  in 

ected  in end 

ected  in end 

ected  in end 

ected  in end. 

ftware to onitoring uirement ness data ce of the ultant to 

nt  raised t fulfilled 

pervision  sections up as per paths. 

1.300), S4 m 68.000 nd  for  S5 path  only 

ions  are nt i.e. the acteristic 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

The km MonAgrechar

Pavement lo

Group  2 (S4,S5,B8) 

Group 3 RoaS2, S3) 

 

The colle

DuriS2 r

Durithe to k

  

S

S

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

FWD data o54+000 andnitoring  Coeement.  Theracteristic cu

Table  3‐2 : S

oading categ

Roads  50 

ads 100 msa

FWD  data ected during

ing the monoad from km

ing the monroad sectionm 89.500. Th

From

1 78+9

2 79+0

3 80+0

4 81+0

5 82+0

6 83+0

From

1 78+9

2 79+0

3 80+0

4 81+0

5 82+0

6 83+0

l No.

l No.

a Bathinda Netwo

on the newly   from km 55nsultant  ane  95th  percurvature conf

Structural Ca

ory  MaxiCent

msa  < 0.8

a (S1,  < 0.8

for  road  seg the month o

th of June 2m 18.400 to k

nth of  June 2ns of S2 roadhe results fo

m To

900 79+000

020 80+000

020 81+000

020 82+000

020 83+000

020 83+560

m To

900 79+000

020 80+000

020 81+000

020 82+000

020 83+000

020 83+560

Chainage

Chainage

ork in Punjab (Ind

constructed5+700  to kmnd  analysedentile  valuefirmed as me

apacity Data 

imum  Cral Deflectio

80 

80 

ection  of  S2of May 2016

2016, the FWkm 24.400. 

2016, the FWd i.e.  from kr the above 

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

0 RHS 0

Oute

Side

Inne

9

Perc

Value

Side 9

Perc

Value

dia) 

d road sectiom 67+850     wd  as  per  t  of  pavemeentioned in t

a (Pavement 

Characteristicon D0 (mm) 

2  road  from6. 

WD data was 

WD data waskm 78.500 tomentioned s

0.66 0

0.65 0

0.61 0

0.65 0

0.62 0

0.54 0

0.63 0

0.69 0

0.65 0

0.6 0

0.6 0

0.53 0

er Wheel Path

Ave

Defle

(m

er Wheel Path

5th 

centile 

e (mm)

5th 

centile 

e (mm)

Ave

Defle

(m

ns of S2 roadwas collectethe  requireent  charactethe Table 3‐2

Deflections)

c  MinimumCurvatur

< 0.1 

<0.1 

  km  18.400

analysed fo

s also collecto km 83.560 sections are 

.08 LHS

.07 LHS

.07 LHS

.07 LHS

.08 LHS

.07 LHS

.08 LHS

.06 LHS

.07 LHS

.07 LHS

.07 LHS

.07 LHS

erage 

ection 

mm)

Side

Sideerage 

ection 

mm)

   

d from km 4d  in  the preements  of ristic  deflec2. 

m  Charae D0‐D200 (m

0  to  km  24.

r the road se

ted and anaand from kmsummarized

0.54

0.65

0.59

0.65

0.6

0.62

0.44

0.65

0.64

0.69

0.63

0.61

95th 

Percentile 

Value (mm)

95th 

Percentile 

Value (mm)

   

25 

5+200 to esence of Contract tion  and 

acteristic mm) 

400  was 

ection of 

lysed for m 86.200 d below: 

0.08

0.07

0.07

0.07

0.07

0.07

0.07

0.08

0.07

0.06

0.07

0.08

Average 

Deflection 

(mm)

Average 

Deflection 

(mm)

TNM 

 

OPRC WorlMonthly Pro

3.3

Sl. No. 

1  S

2  B(S

3  MR

4  D

5  BIn

M TECHNOMANAG

ld Bank Project fogress Report No 24

 

No mor

NetworkP

To fulfil thfor the mo

The  audit Consultantsections. 

angrur ‐ Sun

BhawanigarhS2) 

Mansa‐TalwaRamtirathjaga

Dhanaula‐Bhi

Bathinda‐Kotntersection w

1

2

3

4

1

2

3

4

Sl No

Sl No

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

re FWD data

Performan

e requirementh Septemb

details  ant  against  eac

Table  3‐3 : A

Name of

nam Road (S1

‐Sunam‐Bhik

andi  Saboa (S4) 

ikhi Road (S5

shamir‐Talwwith S4  

From

86+200

87+020

88+020

89+020

From

86+200

87+020

88+020

89+020

o. Cha

o. Cha

a Bathinda Netwo

a has been co

nceWorks’O

ent of the Cober, 2016 ar

nd  summarych  RUS&CPM

Audit Section

f Road

1) 

khi‐Kotsham

o  Road 

5) 

wandi  Sabo 

Total Audit

To

87+000

88+000

89+000

89+500

To

87+000

88+000

89+000

89+500

inage

inage

ork in Punjab (Ind

ollected duri

Overview

ontract Agree summarise

y  of  non‐coM, MPM and

ns for the M

ir  Road 

Up  to 

Road  upto 

t Length (km

RHS

RHS

RHS

RHS

RHS

RHS

RHS

RHS

Oute

Side 9

Per

Valu

Inne

Side 9

Per

Valu

dia) 

ng the mont

eement, the ed below in T

onformancesd  RDPM are 

onth of Sept

Section Code 

S112

S211 

S213 

S219 

S222 

S223 

S224 

S225 

S411

S412 

S414 

S512

S514 

B812

B813 

B814 

ms)

0.51 0

0.60 0

0.62 0

0.52 0

0.51 0

0.59 0

0.56 0

0.6 0

er Wheel Path

95th 

rcentile 

ue (mm)

Ave

Defl

(m

er Wheel Path

95th 

rcentile 

ue (mm)

Ave

Defl

(m

th of Septem

randomly seTable 3‐3: 

s  adjusted explained  i

tember 2016

Cha(from km

5.000 t

2.240  t

15.000 t

45.000 t

60.000 t

65.000 t

70.000 t

75.000 t

0.000   t

5.000    t

15.000   

5.000 t

15.000 t

15.000 t

20.000 t

25.000  

0.07 LHS

0.07 LHS

0.07 LHS

0.07 LHS

0.07 LHS

0.06 LHS

0.07 LHS

0.06 LHS

h

erage 

ection 

mm)

Sid

erage 

ection 

mm)

Sid

   

mber 2016. 

elected audit

by  the  Mon  the  follow

inage m ‐  to km) 

o 11.300 

to 10.000 

to 20.000 

to 50.000 

to 65.000 

to 70.000 

to 75.000 

to 80.000 

to   5.000 

to   10.000 

to  20.000 

o 10.000 

to 20.000 

to 20.000 

to 25.000 

to 30.000 

S 0.63

S 0.61

S 0.57

S 0.58

S 0.56

S 0.59

S 0.57

S 0.56

e 95th

Percent

Value (m

e 95th

Percent

Value (m

   

26 

t  lengths 

onitoring wing  sub‐

Length (kms) 

6.300

7.760 

5.000 

5.000 

5.000 

5.000 

5.000 

5.000 

5.000

5.000 

5.000 

5.000

5.000 

5.000

5.000 

5.000 

84.06

3 0.07

1 0.07

7 0.07

8 0.07

6 0.07

9 0.06

7 0.06

6 0.06

tile 

mm)

Averag

Deflecti

(mm)

tile 

mm)

Averag

Deflecti

(mm)

 

ge 

on 

)

ge 

on 

)

TNM 

 

OPRC WorlMonthly Pro

3.3.1

3.3.2

M TECHNOMANAG

ld Bank Project fogress Report No 24

1 Pavem

During were mfew loca

  On 

obs

The

Figure  3

2 Unseal

Thesho

ThefromobsConexpreq

On was

As shoEmpconthe 

Conmatshosholocaloosinco

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

mentMainte

the  audit  inmaintained  asations in som

S2  road,  berved.   

e deficiencies

 S2: (km 75 to

3‐3 : Rutting 

ledShoulde

e  improvemeulders on all

e extra soil atm the edges erved  at  sontractor  has edite  the wuired ratio a

S5 road, bets observed.  

intimated  bpkeepers  anployers  interducted withdrainage sys

ntactor  also terial in 80/2ulders.  Monuld  be  mixeation  insteadse  milled  monvenience t

a Bathinda Netwo

enance(RU

nspection  fos per  the  reme of the aud

between  km

s recorded u

o km 80) 

and Shoving

erMainten

ent  was  obl road section

t the edge oto facilitateme  of  the  astarted  to  rork and  finiss per the cro

tween km 15It is very mu

by  the  Contnd  the  villarvention  is r the villagersstem of the r

maintaining20 ratio. Thisnitoring  Coned  with  soil d of directly material  obto the road u

ork in Punjab (Ind

US&CPM‐1)

or  the monthquired  leveldit section as

  78.000  to 

nder RUS&C

 

 g at Paveme

 ance(RUS&

served  to  mns.  

of the shoulde the drainagaudit  sectionremove  the sh  the  slopeoss‐sections.

5.000 to km ch required 

tractor  in  hagers  were equired. Thrs and ‘Gram road section

  the  unseales shows the gsultant  adviin  the  propmixing at  siserved  on users. 

dia) 

h  of  Septem of  service. s summarise

km  79.000

CPM‐1 are  pr

ent observed

&CPM‐2)

maintain  the

ders was obsge. The erosns  but  rectifexcess  soil  fes of  the  sho 

20.000, theto maintain 

his  own  audopposed  torough LRC, tPanchayat’ss. 

ed  shouldergood results ce  the  Contposed  rationite. At site  itthe  carriag

mber  2016,  aThe deficien

ed below: 

0,  the  ruttin

resented in F

S2: (km 7

d on S2 Road

e  service  lev

served whichion of shoulfied  by  the from  the  shoulders  and 

e low shouldthe shoulde

dit  that  at o  maintain the consultats’ to find out

s  by mixing for the maintractor  that n  at  the  camt cannot be geway  whic

   

all  the  audit ncy was obs

ng  and  shov

Figure 3.3 

 75 to km 80) 

d Section 

vel  of  the  u

h should be ders due to Contractor oulders  but embankmen

er and reverrs on regular

some  locatthe  shouldtion may net the way to 

the  soil  witntenance of uthe  milling 

mp  site  or  amixed propch  may  cre

   

27 

sections served  at 

ving  was 

unsealed 

removed rain was on  time. need  to nt  in  the 

rse slope r basis.  

ions  the ers.  The eed to be maintain 

th milled unsealed material ny  other erly. The eate  the 

 

TNM 

 

OPRC WorlMonthly Pro

3.3.3

M TECHNOMANAG

ld Bank Project fogress Report No 24

Thenorlocastarsign

The 

S5: (km

Fi

3 Draina

Mosfromfewthe maithe 

At sCongun

On the 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

e road sectiomal  such as ations  the  shrted to mainn of mainten

e deficiencies

 m 15  to km 

 

gure  3‐4 : Lo

ageMainten

st of  the culm debris. New  locations th

parapets  wintain/restorquality of Ha

some culvertntractor  has nny bags. Thi

S5 road, betwaterway w

a Bathinda Netwo

ns where ththe  locationhoulders  be ntain the aboance which n

s recorded u

20) 

S5: (

ow shoulder 

nance(RUS

lvert drains ed to maintahe hazard mwas  missingre the reflecazard marke

t  locations  tstarted  to s exercise sh

tween km 0.0was not clear

ork in Punjab (Ind

he wear and ns near dhamaintained

ove mentionneeds to con

nder RUS&C

 

 (km 15  to km

 and reverse

 S&CPM‐3)

under  this main the emba

marker wereg/damaged. ting tapes, ders. 

he erosion arectify  the  ehould be con

000 to km 5.. 

dia) 

tear of the bas,  schools  on  regular ned locationsntinue. 

CPM 2 are  pr

S5

m 20) 

e slope on S5

month audit ankment adjfound damaThe  imme

delineators o

adjacent to teroded  locaducted on re

.000, some o

unsealed sho and petrol basis.    Nows on regular 

resented in F

 : (km 15  to 

 

5 Road Sectio

sections wejacent to theaged and thediate  attenton the parap

the parapetstions  by  puegular basis.

of the culver

   

oulders is mpumps etc. 

w  the  Contrabasis. This  i

Figure 3.4 

km 20) 

on 

ere cleaned e culvert parae reflective ttion  is  reqpets and to 

s was also otting  the  sa 

rts were choc

   

28 

ore than at  these 

actor  has s a good 

 

and  free apets. At tapes on uired  to maintain 

observed. and  filled 

cked and 

TNM 

 

OPRC WorlMonthly Pro

3.3.4

3.3.5

3.3.6

3.3.7

M TECHNOMANAG

ld Bank Project fogress Report No 24

Conand

In bthe villa

In Bactithe maicooadjawith

Thebe ssolurecoConland

4 Routin

Theand

All locaobs

No 

Themonto m

5 Obstru

The of  tposs

At  sand to st

No 

6 Incide

Conememajo

7 Vegeta

On veg

Conmai

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

ntractor has d the work is 

built up areahigher  leve

agers oppose

Built‐up areavities,  the  CRoW  corri

intenance  wperatively  wacent  landowhin Built‐up z

e impact of  isevere and tutions  for  adognizes  the ntractor  anddowner issue

neMaintena

e bridges andd free from d

the  bridgesations  whererved. 

damage of t

e median manthly audit imaintain. 

uctiononth

unauthorizethe  road  secsible. 

some  locatioin RoW by ttop this type

obstruction 

ntRespons

tractor  has ergency toll for incident w

ationContr

S5 road sectetation was 

ntractor  haintain/contro

a Bathinda Netwo

started  to  jogoing on in f

a,  the water l of  surrouned the activit

s where othContractor  shdor  and  wi

work  that  exwith  the  Emwners  to  seezones. 

nadequate dthe Contractddressing  thdifficulties 

d  the  Empes that may b

anceofBrid

d the other sebris. 

s  and  otherre  the  una

he structure

rkers were it was observ

hePavemen

ed stockpilingctions.  Whe

ons  the wastthe local pube of activities

was found o

seandEme

deputed  thfree contractwas recorded

ol(RUS&CP

tion, betweeobserved on

s  arrangedol the vegeta

ork in Punjab (Ind

oin  the catcfull swing. 

stagnation ding groundties to maint

hers may be hall  be  respoill  inform  thxtends  beyomployer,  otheek  the  best 

drainage on tor  is requirehese  deficieinvolved  inloyer  shall be an imped

dgesandO

structures in

r  structures uthorised  a

s was observ

installed on ved some of

ntSurfacea

g of materiaere  possible 

te  constructblic who needs. 

on the pavem

rgencyWor

he  highway t numbers od during the 

PM‐7)

n km 0 to kmn the shoulde

d  the  manation on the 

dia) 

hpits  to all  t

was observed. Contractortain the drain

responsible onsible  for  ahe  Project ond  the  correr  communsolutions  fo

the pavemeed to give pncies  as  a  pn  implemenwork  coopiment to ach

therStruct

n this month

were  cleanadvertisemen

ved and reco

the footpathf the marker

andShould

ls along therequest  the

ion materiad to monitor

ment surface 

rksRespon

patrolling n each netwmonth. 

m 5, km 15 toer having he

nual  and shoulders. 

the culverts 

ed along  ther has alreadnage. 

for some drall  drainage Manager  ofridor.  The  City  organisator  addressing

ent within tharticular attpriority.  Hownting  these peratively  thieving these

tures(RUS&

h audit sectio

n  and  clear nts  and  wr

orded during

hs of the Mars were miss

ers(RUS&C

shoulders we  owner  to 

l  was  dumpr on regular 

during audit

nse(RUS&C

vehicles  anwork road at s

o km 16 andight more th

mechanical 

   

where  it  is 

e  carriageway  intimated 

rainage mainmaintenancf  the  need Contractor  wtions  (e.g.  Lg  drainage  p

he Built‐up zoention to  idwever  the  Eimproveme

to  resolve e improveme

&CPM–4)

ons were ma

except  froritten  mate

g the monthly

ansa ROB. Dusing which m

CPM‐5)

was observedremove  as 

ed  on  the  sbasis and fo

t visit. 

CPM‐6)

d  also  dispsuitable inte

 km 16 to kmhan 100mm. 

grass  cut

   

29 

required 

y due  to that  the 

ntenance ce within for  any 

will  work LRC)  and problems 

ones can entifying Employer nts.  The adjacent ents.  

aintained 

m  some rial  was 

y audit.  

uring the may need 

d in some soon  as 

houlders rce them 

plays  the rvals. No 

m 17, the 

tters  to 

TNM 

 

OPRC WorlMonthly Pro

3.3.8

M TECHNOMANAG

ld Bank Project fogress Report No 24

At  sposregu

Thevegconwithloca

Thecut zon

Conbranfrom

The 

S5: (k

S5: (k

8 RoadS

Thesect 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

some  locatiots  etc. wereular basis an

e Contractor etation  thattrol  or  simihin  the  subation, area/n

e road‐side tthe vegetate” as per the

ntractor mennches of them the forest 

e deficiencies

km 5 to km 1

m 15 to km 2

Figure  3‐5

SignsMaint

e `deficiency tions. On S4 

a Bathinda Netwo

ons  the  km e not  visible d make the s

shall also idet  have  beenlar  purposebsequent  mnumber and c

rees obstruction and cleae contract ag

ntioned that e trees.  Interdepartment

s recorded u

10) 

20) 

5 : Vegetatio

tenance(RU

to maintain road the sig

ork in Punjab (Ind

stones,  hecdue  the  grasite hazard f

entify any arn  planted  fos  within  theonthly  repocause of the 

ct the visibilar up  to 6m greement. 

the forest drvention of Et.  

nder RUS&C

 

 

on on should

US&CPM‐8)

the sign boan boards we

dia) 

ctometre  stoass.  The  vegfree. 

rea of dead aor  amenity, e  RoW  and ort.  This  infvegetation d

ity of the sigvertically  fr

epartment wEmployer  is 

CPM 7 are pre

S5

S5

ers at S5 Ro

)

ards and posere not as pe

ones,  culvergetation  shou

and dying trelandscapingreport  to  tformation  cdying. 

gn boards, gom ground 

was not allowrequired to 

esented in F

5: (km 15 to k

 

5: (km 15 to k 

ad Section

t was observr IRC standa

   

rt  parapets uld  be  contr

ees, shrubs og,  screening,he  Project learly  ident

gantries etc. the “vegeta

wing them toseek the pe

igure 3.5. 

km 20) 

km 20) 

ved on differrd. 

   

30 

and  sign rolled  on 

or similar ,  erosion Manager ifies  the 

Need to tion  free 

o cut the ermission 

 

 

rent road 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

 

 Momucthe the loca

Thecorr93–

Theroad

Theconholl

Somstan

At  fsho

The 

S4: (

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

ost of the roach required visibility. Ascushion  at 

ations. 

e  Contractoresponding t–1985 and IR

e steel sectiods should be

e traffic signsfirming to ISow section c

me of the signdards. Thes

few  locationuld be replac

e deficiencies

km 0 to km 5

a Bathinda Netwo

o  At km  IRC: 67

o At km sides.

o Schoolo At km 

ad side gantto paste the per the instthe  gantry 

r  should  mto location dC 67–2012.

on used for se compatible

s should be mS: 1239, rectconfirming to

gn boards anse sign board

ns  the  speedced with the

s recorded u

5) 

ork in Punjab (Ind

0.100, RHS, 7‐2012.  1.600, the sp

 sign was no2.010, speed

tries existede reflective ttruction of Wposts.  The 

maintain  thedetails of eac

sign posts ine to IRC: 67‐2

mounted onangular holloo IS: 3589. 

nd sign postsds and posts

d  signs  are  ne suitable spe

nder RUS&C

dia) 

the Major R

peed breake

ot as per IRC:d breaker sig

in the audit tape on  the 

World Bank tecushion  sh

e  sign  detch sign in ac

stalled on th2012 and MO

 the supportow sections 

s are substanshould be re

not  as  per  theed signs. 

CPM 8 are pre

S

Road Ahead S

er sign was n

 67‐2012. gn was not sa

sections wepost of  the eam during thould  be  pro

ails  along cordance wi

he new imprORT&H speci

t posts whicconfirming t

ndard and neplaced at th

he  State Gov

esented in F

S4: (km 0 to k

   

Sign not as p

not the same

ame on both

ere painted. gantries  to their visits toovided  at  a

with  the  dith the stand

roved / rehafications. 

h may be of to IS: 4923 o

ot compatibhe earliest. 

vt. Guideline

igure 3.6. 

km 5) 

   

31 

er  

e on both 

 sides. 

It is very improve 

o provide ll  gantry 

drawings dards IRC 

abilitated 

f GI pipes or square 

ble to IRC 

es.  These 

TNM 

 

OPRC WorlMonthly Pro

3.3.9

M TECHNOMANAG

ld Bank Project fogress Report No 24

S4: (

9 Raised

As  pshoIRC:

On dysf

On mis

On and

On or m

The

S1: (km

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

km 0 to km 5

Fig

dReflective

per  the  Conuld be provi: 79. 

S1  road,  befunctional.  

S2 road, betsing and dys

S5 road betwd missing. Acc

B8 road, betmissing at km

e non‐confor

 m 5 to km 11

 

a Bathinda Netwo

5) 

gure  3‐6 : Su

ePavement

tract  agreemded on all h

etween  km 

tween km 2.sfunction. 

ween km 19cordingly the

tween km 15m 12.000 to k

mance recor

1.3) 

ork in Punjab (Ind

ubstandard R

tMarkers(R

ment  delineaorizontal cu

9.000  to  km

000 to km3.

9.000 to km e non‐confor

5.000 to km km 14.000. 

rded against 

 

dia) 

S

Roadside Sig

RUS&CPM9

ators,  bollarrves on eith

m  10.000,  th

000, km 17.0

20.000, the rmance was 

16.000, the

the RPMs is

S2:

S4: (km 0 to k

gns  

9)

rds  and  the er side of th

he  RPMs  we

000 to km 18

RPMs were recorded fo

 RPMs were

 presented i

  (km 2.24 to

 

   

km 5) 

other  safetye carriagewa

ere  found  m

8.000the RP

found dysfur the same. 

 found dysfu

n the Fig. 3‐7

 km 10) 

   

32 

y  devises ay as per 

issing  or 

Ms were 

unctional 

unctional 

7. 

 

TNM 

 

OPRC WorlMonthly Pro

 

3.3.1

M TECHNOMANAG

ld Bank Project fogress Report No 24

S2: (km

10 Pavem

During pavemeAt  somemaintai10 is sum

On  

On 

On 

On 

As cen

AlsoCon

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

 m 15 to km 2

Fig

mentMarkin

this month ent marking we  locations ned as per tmmarized be

S2 road sect

S4 road, the 

S5 road, the 

B8 road, the

per  the  Clautreline and e

o  as  per  thntractor mus

a Bathinda Netwo

20) 

gure  3‐7 : Po

ng(RUS&CP

audit  inspewas observeit  was  obsehe specificatelow: 

tion, the pave

o  Betweo Betweeo Betweeo Betwee

not mao Betwee

 

pavement mo Betweeo Betwee

 

pavement mo Betweeo Betweeo Betwee

 

e pavement mo Betweeo Betweeo Betwee

 

use  15.13  oedge lines on

he  Clause  1st ensure tha

ork in Punjab (Ind

 

oor Mainten 

PM‐10)

ction  the  deed. The paverved  that  thtions. The no

ement mark

een km 2.240en km 61 to en km 66 to en km 73 toaintained. en km 75 to 

marking was en km 6 to ken km 15 to 

marking was en km 6 to ken km 9 to ken km 16 to 

marking was en km 15.20en km 18 to en km 26 to 

f  the  Contran all state hig

15.3  (last  pat the centre

dia) 

B8

nance of RPM

eficiency  to ment markinhe width  of on‐conforma

ing was miss

0 to km 8.00062 and km 667 

o km 74, the

km 76 

faded/missikm 7  km 16 and k

faded/missikm 7  km 10 km 17 

faded/missi00 to km 17.0km 19 km 28. 

act  Agreemeghways and m

paragraph)of e line and ed

 8: (km 15 to k

 Ms. 

maintainingng was eithethe  pavemeance recorde

sing and dam

0,  63 to km 65, 

 width of pa

ng  

km 19 to km 

ng  

ing 000  

ent  Contractmajor distric

the  Contradge lines me

   

km 20) 

g  the  serviceer faded or dent marking ed against RU

maged. 

 

avement ma

20 

tor  has  to  mct roads.  

act  Agreemeet the speci

   

33 

 

e  level  of damaged. was  not US&CPM 

king was 

mark  the 

ent,  the ifications 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

to othe 

Themoris veThepart

Durpres

S2–(K

S2–(K

B8–(K

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

offer an accetime for con

e roads may rnings, in wiery much reqerefore,  the ticularly at th

ring  this  mosented below

 

m 2.24 to km

 

Km 70 to km 

 

Km 15 to km 

Figure  3‐8

a Bathinda Netwo

eptable levelnstruction to

be hazardounter seasonquired to maContractor he missing a

onth  audit,w in Figure3.

m 10) 

 75) 

m 20) 

8: The defici

ork in Punjab (Ind

l of safety foo commence 

us for the rowhen fog exaintain the sneeds  to  end faded sec

the  record.8. 

 

 

 

ency recorde

dia) 

or the road uor if it is und

oad‐users duxists and duervice level ensure  the ctions as IRC

ed  deficien

ed against P

users at all tderway’. 

e to low visiring the monof pavementnew  set  of‐35. 

cies  in  pav

 

S2–(Km 60 t

 

S2–(Km 75 t

 

B8–(Km 25 t

Pavement Ma

   

times ‘irresp

ibility in nighnsoon seasot marking atf  pavement 

vement  mar

to km 65) 

to km 80) 

to km 30) 

arking 

   

34 

ective of 

hts, early n also. It  all time. marking 

king  are 

 

 

 

TNM 

 

OPRC WorlMonthly Pro

3.3.1

3.3.1

3.3.1

3.3.1

M TECHNOMANAG

ld Bank Project fogress Report No 24

11 Traffic

The  imdeficien

  On 

mai

Thespe     

12 Crash

TheSP:

On accispemak

As instenh

13 SightR

Thebotacco

Theincrto t

14 Marke

Thepillaobs

Stillmai

TheNow

 Theof  dandof vthesmaione

It  isCondeta 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

cIslandand

mprovement ncies were re

S2 road, at kintained as p

e  roundaboucifications. T

BarrierMa

e ends of  th: 73.  

S1 road, betident.  It  is  ined traffic. It ke it safe for 

per  Contractalled on  thehancement w

Rail,HandR

e  sight  rails, h  drivers  anordance with

e  Contractor rease the safhe Project M

erPostMain

e  deficiency ars,  edge maerved along 

  the  boundaintain the se

e delineatorsw the curves 

e concrete pdifferent  road on the otheview. Now thse  pipe  bollintain  and  pes.  

s  very  mucntractor shouail design for

a Bathinda Netwo

dRoundabo

in  the  maiecorded as th

km 67.840, thper IRC: 35. 

ts  in  all  the The road safe

aintenance

e MBCB sho

tween km 9nstalled  alonis very muc traffic.  

ct  Agreemee both  sides will be achiev

RailandPe

hand  rails  and  pedestriah IRC specific

shall  identifety to pedesManager alon

ntenance(R

to  maintainarkers,  culvethe differen

ary  pillars  arvice level of

s are  installe appear very

pipe bollardsad  sections  oer locations ohe new delinlards.  On  thpaint.  The  da

h  required uld need to ir improveme

ork in Punjab (Ind

outMainten

ntenance  ohe non‐confo

he road mar

network  seety on the ro

(RUS&CPM

ould be  flaye

.000 to km ng  the  sharpch required t

nt  the  Metof  the  curv

ved with thei

destrianBa

and  pedestrians.  The  pecations. 

fy  the  locatstrians and ong with an es

RUS&CPM‐1

n  the  kilomert markers,t road sectio

re  not mainf the bounda

ed on both sy nice and sa

s  (roadway  inof  network.of road sectioneators are ihe  other  senamaged  pipe

to  enhanceidentify the sent. 

dia) 

nance(RUS

f  roundabouormance sum

king at traffi

ections  shououndabouts n

M‐12)

er and cover

10.000,  the p  curve whicto increase t

tal  Beam  Crves  and any ir installation

arrierMain

ian  barriers destrian  ba

tions  where other vulnerstimate for in

14)

etre  stones  distance mons of the ne

ntained  alonary pillars als

ides of the cfety also enh

ndicators) arThese wereons which arnstalled at tnsitive  locate  bollards  sh

e  the  safetysensitive loc

S&CPM‐11)

uts  was  obsmmarized be

c Island and 

ld  be maintaneeds to imp

red with the

MBCB was ch  is  not  nethe safety ba

rash  Barrierother  locatin. 

ntenance(R

provide  guirriers  should

the  installatable road usnstallation.

,  hectometrmarkers  and etwork. 

g  the  netwoso. 

curves as pehanced. 

re existed ale  installed  atre sensitive fthe curves soions,  the  pihould  be  rep

y  on  the  encations at its 

   

served  but elow: 

roundabout

ained as  perprove. 

e Fishtails as 

damaged duegotiable  to arrier at the 

  (MBCB)  shon where  th

RUS&CPM‐1

dance  to  rod  be  constr

tion  of  barrsers and repo

re  stones,  bhazard mar

ork.  It  is  req

er  IRC: 79 gu

ong the carrt  the  curve  lfrom the safeo there is nope  bollards placed with 

ntire  road own and su

   

35 

still  few 

t was not 

r  the  IRC 

per  IRC: 

ue  to the the  high curve to 

hould  be he  safety 

13)

oad  users ructed  in 

iers may ort these 

boundary kers  was 

quired  to 

uidelines. 

riageway locations ety point o need of need  to the  new 

network. ubmit the 

TNM 

 

OPRC WorlMonthly Pro

3.4

M TECHNOMANAG

ld Bank Project fogress Report No 24

OtherObs

The obsattentioconform 1. S1 R

  km

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

servations

ervations whon are summmance in the 

Road: 

m 5 – km 11.3

On  LHS,Need to

On LHS,should b

On LHS,the  safestones, 

At  km properlyrequired

At km 7post mu

Some ofnot vert

At culveclear un

The culvto maint

The misimmedia

The  “Pla16.06). 

At  curvmaintain

At  few required

Bounda

Excavate

Paining 

At  km Immedia

Settlem

At  somenight upuniform

Gantry wtrim  therequired

Delineat

The signreplaced

 

a Bathinda Netwo

onAuditSe

hich were nomarized belownext month’

30 

,  the  reflecto restore.  

 the electricbe maintaine

 Vegetation ety  parapetshectometre 

6.590,  LHS, y.  The  heighd. 

.800, RHS, thust be vertica

f the pipe botical. These s

ert 8/5 and 1sealed shou

vert parapettain the sam

ssing medianately. 

ace  Identific

ves,  some  Rn on regular 

culvert  locatd. 

ry pillars nee

ed earth at t

of retaining 

9.800,  RHS,ate action re

ent on pavem

e  locations  tp to 160m. A. Need to re

was not visibe  tree  brand. 

tion at Island

n boards andd immediate

ork in Punjab (Ind

ections

ot the part ow. These obs’s audits. 

tive  tape  on

c poles are ced on the po

on the emb.  The  vegetastones, sign 

the  curve ht  was  also 

he place idenal and mainta

ollards were hould be pa

10/1, the parlder was not

s height shome throughou

n makers  fro

cation  Signs”

RPMs  were basis. The sp

tions  the  ca

ed to mainta

the minor jun

walls along t

,  the  retainequired. 

ment was ob

the  pavemeAt few locatistore immed

ble due to thnches,  co‐or

d was very po

d sign post wely. 

dia) 

of the non‐coservations m

n  the  safety

lose to the cles on regula

ankments anation  shouldposts and cu

sign  post  wmore  than 

ntification sigained as per 

still not maiinted in blac

rapets were t available. 

ould be unifout the netwo

om  the  retai

”  should  be 

missing  andpacing of RP

tch pits  are 

in along the 

nction should

the road sec

ning  wall  st

bserved betw

ent  marking ions the widdiately.  

he obstructiordinate  with

oor. Need to

which are no

onformance may become 

y  parapets  m

carriageway,ar basis. 

nd shouldersd be  removeulvert parape

was  damagethe  required

gn post was MORT&H sp

ntained. Fewck & white. 

close to the 

orm on bothork. 

ining walls  s

as  per  IRC: 

d  dysfunctioMs should b

not  installe

road section

d be remove

tion should b

ructurally  fa

ween km 11.

was  blackisdth of edge l

on by the treh  the  conce

o improve. 

ot as per IRC 

   

but need imthe part of 

missing  or  d

, the reflecti

s (after 1m),ed  and makeets visible. 

ed  and  not d.  Immediat

not vertical.pecifications

w were dama

carriageway

 sides and a

should  be  re

67:  2012,  (r

onal  which be as per IRC.

d.  Immediat

n. 

ed immediate

be done on p

ailed  and  d

200 to km 1

h  and  not  vine marking

ee branches.erned  autho

standards s

   

36 

mmediate the non‐

damaged. 

ive tapes 

 covered e  the  km 

painted te  action 

 The sign . 

aged and 

y and 1m 

also need 

einstalled 

refer  Fig. 

need  to . 

te  action 

ely. 

priority. 

damaged. 

1.300. 

visible  at  was not 

 Need to orities,  if 

hould be 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

2. S2 RKm 

 Km 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Road: 2.240 – km 1

The  delwas mis

The cush

The RPM

3/1, ero

The placMORT&

The  pavcracked 

The  soilwas notwas obs

The  lettnumber

The  dammaintain

3/1, 4/1

The signcrossing

The  “Pla16.06). 

The vegwhich  wdrainage

The sectThese sh

Culvert Need to

The min

At someNeed to

At km 9

At  km  9plate wa

The RPM

Vegetatvisibilityvisible. immedia

At the imwith  theshould b

Bounda

15 – km 20 

The mis

The signcrossing

Between

a Bathinda Netwo

10 

ineators  at  tssing and the

hion (with w

M at the edge

osion adjacen

ce identificat&H specificati

vement  marlocations. 

  and milled  as per the sserved at site

tering  at  curing was don

maged  hazaned. 

1, 5/2, 7/2 cu

n board of pg location as 

ace  Identific

etation trimwill  create  te of water fr

tions used fohould be rep

no.  6/1,  pao maintain. 

nor junctions

e locations tho maintain th

.570, RHS, th

9.620,  RHS, as missing. 

Ms at the ped

ion on the ey of  km  stonThe  road 

ately. 

mproved roae Thermoplabe scarified p

ry pillars nee

sing and dys

n board of pg location as 

n km 17.500

ork in Punjab (Ind

the  Island we Jumbo bolla

waste tyres) a

e line near is

nt the culvert

tion boards ions.  

rking  was  a

material msubmitted me which shou

ulverts  shoue poorly. 

rd  boards  a

ulverts have n

pedestrian crper IRC: 67‐2

cation  Signs”

med from thhe  inconvenom shoulder

or sign posts placed at the

rapet  heigh

 were not im

he pavementhese immedia

he curve sign

the  speed  s

destrian cros

embankmentnes,  hectomefurniture 

ad sections tastic materiaproperly befo

ed to mainta

sfunctional R

pedestrian crper IRC: 67‐2

 to km 17.60

dia) 

were  poorly ard was also

at the Island 

sland were m

t parapets w

were old an

also  not  res

ix  used  to methodology. uld be remov

uld  be  as  p

at  the  culve

no catch pit.

rossing shou2012, Fig 15.

”  should  be 

he shouldersnience  to  thrs. 

were not as earliest.  

t  was  less  a

mproved/ ma

t marking anately. 

n board was 

sign  post  wa

ssing were m

ts and shouetre  stones, should  be 

he pavemenal. The old aore remarkin

in. 

PMs need to

rossing shou2012, Fig: 15

00, the chevr

maintained. damaged. 

need to rest

missing. 

was observed

d the posts 

tored  after 

maintain  theExcess and 

ved from site

per  IRC.  At 

ert  locations 

 

ld be  install.33. 

as  per  IRC: 

s was not rehe  traffic  an

s per the MO

and  not  uni

aintained yet

nd pedestrian

damaged. N

as  damaged

missing and d

lders  (after sign posts  avisible.  Tr

nt marking mand damagedng. 

o maintain at

ld be  install5.33. 

rons should b

   

.  The  reflect

tore at both 

d.  

were also no

the  rectific

e  unsealed  sloose milled e at the earlie

some  culv

should  nee

ed at the pe

67:  2012,  (r

moved fromnd  also  obst

ORT&H specif

form  on  bo

t. 

n crossing wa

eed to maint

  and  supple

dysfunctiona

1m), obstrucand  culvert rim  the  ve

may need to d pavement 

t the earliest

ed at the pe

be installed. 

   

37 

tive  tape 

ends. 

ot as per 

cation  of 

houlders material est. 

verts  the 

ed  to  be 

edestrian 

refer  Fig. 

m the site truct  the 

fications. 

th  sides. 

as faded. 

tain. 

ementary 

l. 

cting the parapets egetation 

maintain marking 

t. 

edestrian 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

Km 

Km 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

The  fadlocation

The imp

The sectThese sh

 The  “Pl16.06). 

Bounda

45‐km 50 

46/1, LHwas obs

 Reflectirestore 

The para

The imp

At Ch 46be  impdelineat

Deficienshould b

Bounda

60 – km 65 

The pain

The parrestricte

At  few  lbe main

The slop

The eroshould bbe done

The heigFRL. Theon both

Culvert Immedia

Culvert width sh

At km 64road. Th

The pipeprovide 

Erosion basis  anthrough

Few  sigspecificaand  noimmedia

a Bathinda Netwo

ded  pavemens should be 

provement of

tions used fohould be rep

ace  Identific

ry pillars nee

HS, the catchserved. 

ive  tape  froimmediately

apets should

provement of

6.620, RHS, proved,  incrtors.  

ncy  in Paintinbe rectifying 

ry pillars nee

nting of Km s

king of trucked. 

locations  thentained at all

pes should be

sion of embbe maintainee properly wi

ght of culvee height of p sides as wel

No. 65/1, thate action re

no.  65/3,  thhould be 12m

4.800, RHS, the permanen

e and slab cuthe wing wa

of embankmnd maintains vegetation 

gn  boards ations. The  sot  comply ately as per t

ork in Punjab (Ind

ent  markingmaintained 

f minor junct

or sign posts placed at the

cation  Signs”

ed to mainta

h pit was dam

om  delineatoy. 

d be plastere

f minor junct

the existing rease  the  h

ng of parapeat the earlie

ed to mainta

stones shoul

ks on both s

e pavement  time. 

e maintained

bankment aded at the earith the suitab

rt parapets parapets sholl throughou

he pipe was pequired. 

he  parapets m and 1m cle

the village pnt solution ne

ulverts, wheralls as per IRC

ment slopes s  these  reguand other su

and  sign  psign boards with  the  sthe specifica

dia) 

g  particularat the earlie

tions was sti

were not as earliest. 

”  should be 

in. 

maged and e

ors  at  the  p

ed from the b

tions was sti

retaining wheight  of  r

et was also oest. 

in. 

d be restore

sides of the 

marking wa

d as per the 

djacent  to  thrliest. The bable material.

was very  lesuld be as pet the networ

partially cho

are  close  toear unsealed

ond is full ofeed to propo

re it is not feC: SP: 13‐200

due to rain sularly.  The  suitable meth

posts  are  nof  junction specificationations. 

rly  at  the st. 

ill pending. 

s per the MO

as per  IRC: 

erosion adja

parapets  wa

back also. 

ill pending.

wall along theretaining  w

observed at 

ed. 

road at HM

as disturbed 

specified cro

he parapets ackfilling of t. 

ss  some havr specificatiork.  

oked and cat

o  the  carriagd shoulder on

f waste wateose and impl

easible to con04. 

should be relope  protectods. 

not  as  per and Place  Ids.  These  s

   

pedestrian 

ORT&H specif

67:  2012,  (r

cent to the 

as  missing. 

e water bodwell  and  ins

few  locatio

P  location sh

and  faded 

oss‐sections.

was observethe catch pit

ve only 360mons and also

ch pit was d

geway.  The n both sides.

er and may tlement. 

nstruct the c

ectifies on thtion  should 

IRC  and  Mdentificationsshould  be 

   

38 

crossing 

fications. 

refer  Fig. 

parapets 

Need  to 

dy should stall  the 

ns which 

hould be 

it  should 

 

ed which ts should 

mm  from o uniform 

damaged. 

roadway  

ouch the 

catch pits 

he urgent be  done 

MORT&H s are old replaced 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

Km 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

The  shonetwork

 Bounda

65 – km 70 

The signThese sh

At few lrestored

The km route m

Betweenaction re

At km 62012; Fi

At km 67

The  cusposts an

The pav

Betweenembank

The mis

The  heigfrom  FRuniform

At  culveunseale

The pipeprovide 

Bounda

Km 70 – km

71/1, cato  mainadjacent

The  extremoved

71/2,  caThe pipe

73/1, 73pit insta2004.  EImmedia

At  few maintain

74/1, 75side alsoImmedia1m clea

It was oAt  some

a Bathinda Netwo

oulders  shok. 

ary pillars ne

n post are oldhould be rep

ocations thed immediate

stones shouarker should

n  km  66‐67,equired. 

67.300, LHS, g 15.15. 

7.400, LHS, t

shion  (with  wnd follow the

ement mark

n km 67.900kment slope 

sing RPMs sh

ght  of  culveRL.  The  heigh on both sid

ert  locationd shoulder o

e and slab cuthe wing wa

ry pillars nee

 75 atch pit requntain  the  ut to the para

tra  soil  (leftd immediate

atch  pit  is  nes chocked w

3/2, catch piallation will nErosion  of  eate rectificat

locations  tn.  

5/2, slab, cato.  Erosion oate rectificatr unsealed s

observed thae  locations  t

ork in Punjab (Ind

uld  be  mai

ed to mainta

d and not coplaced immed

e pavement mly. 

uld be painted be marked 

,  the  shovin

the roundab

the speed sig

waste  tyres)e same throu

king at round

0 to km 68.00and shoulde

hould be rein

ert  parapets ht  of  parapees as well th

s  the  roadwon both sides

ulverts, wheralls as per IRC

ed to mainta

ired. LHS paniformity  inapets was ob

  after  constely. 

ot  attached with silt. 

its required.not be possibembankmenttion required

he  Culvert 

tch pit requiof embankmetion requiredhoulder is no

at the pavemthe width w

dia) 

intained  on

ain. 

ompatible to diately. 

marking was

ed and markon each km 

g  was  obser

bout sign sh

gn board was

)  should  be ughout the n

dabout shoul

00, LHs, the wers need to m

nstalled. 

was  very  leets  should  broughout th

way  width s. At few loca

re it is not feC: SP: 13‐200

in. 

rapet heightn  parapet  hbserved. Imm

truction)  at 

to  the  culv

 The pipe anble provide tt  adjacent  td. 

parapet  pa

red. Parapetent  adjacentd. Parapets aot available.

ment markingwas more  tha

  regular  ba

IRC and MO

s faded and b

ked as per IRstone. 

rved  upto  2

ould be rep

s damaged.

provided  inetwork at ot

d be mainta

water stagnamaintain. 

ess  some  habe  as  per  spe network. 

should  be ations it was

easible to con04. 

t is less as coeight.  Erosi

mediate recti

the  should

vert.  Immedi

nd slab culvethe wing wato  the  para

inting  was 

ts should be t  to  the parare close to 

g was not man  the  requi

   

asis  through

ORT&H specif

blackish. It s

RC specificati

0‐25mm,  im

laced as per

n  from  of  thther gantries

ined as per I

ated in the R

ave  only  300ecifications 

12m  and  1 less than re

nstruct the c

ompare to RHon  of  embfication requ

er  edges  sh

iate  action  r

erts where talls as per IRCpets  was  o

faded  and 

plastered frapets was othe carriage

maintained unired.    The  p

   

39 

hout  the 

fications. 

hould be 

ions. The 

mmediate 

r IRC: 67‐

he  gantry s. 

RC: 35. 

RoW. The 

0‐330mm and  also 

1m  clear quired. 

catch pits 

HS. Need ankment uired. 

hould  be 

required. 

the catch C: SP‐13‐observed. 

need  to 

rom back observed. eway and 

niformly. avement 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

3. S4 RKm 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

markingthe exist

Few  sigshould b

At km 7were  adysfunctold and 

At  few maintain

The roukm ston

At km 7Identific

The  culvmaintain

Betweenobserve

Bounda 

Km 75 – km

At vertic

Culvert parapet also.  

Culvert clear un

At  few improvecatch pit

The  rutshould b

Bounda Road 0 – km 5 

Poor  imjunctionper IRC:

Culvert immedia

Pavemepaint. 

The paraat the ea

Km  stonclearly v

At  the  cshould b

At curve

a Bathinda Netwo

g should be rting old and 

n  boards  wbe replaced i

4.000, the dlso  not  instional RPMs damaged RP

locations,  itned. The pai

te number se, the state 

72.200,  therecation sign” w

vert  parapetn uniform he

n  km  73.90ed. Rectificat

ry pillars nee

 80 

cal curves th

no.  77/1,  th height shou

no. 77/2, 77sealed shou

culvert  loced  yet.  Thest walls shoul

ting  and  shbe done at th

ry pillars nee

mplementation with S3 (i.e 35.  

No.  1/1, ately. 

ent marking 

apet paintinarliest. 

nes  and  hevisible. 

culvert  parabe improved

es the old de

ork in Punjab (Ind

restored witdamaged pa

ere  observeimmediately

elineators wstalled.  Immshould be m

PMs from sit

t  was  obsernting should

should be mehighway rou

e was a speewas there. Im

t  height  shoeight in the e

00  to  km  7ion required

ed to mainta

e road safety

he  parapet  huld be uniform

7/3, the paralder was not

cations  the se  should  beld be above t

hoving  was he earliest.

ed to mainta

on  of  pavem. NH). The ju

the  waterw

should  be m

g of few culv

ctometre  st

apets  the  da at the earlie

lineators sho

dia) 

h the thermavement ma

ed  patched  ay. 

were not maimediate  actimaintained ime. 

ved  that  thd be done at 

entioned onute number w

ed  limit signmmediate ac

ould  be  unifoentire netwo

74.000,  settd. 

in. 

y should be e

height  was m on both si

apets were ct available. Im

old  catch e  maintainedthe adjacent

observed  be

in. 

ment  markiunction pave

way  was  ch

maintained/r

verts was fa

tones  should

amaged  refleest. 

ould be repla

moplastic matrking proper

and  not  app

ntained andon  requiredmmediately 

e  painting  othe earliest.

 each km stowas not men

n 30, but no ction require

orm  on  bothork. 

tlement  at 

enhanced. 

not  uniformides and thro

close to the mmediate ac

pits  were  nd  immediatet earth level.

etween  km 

ng  was  obsment markin

hocked.  It 

restored wit

ded which s

d  be  free  fr

ective  tape 

aced immed

   

terial after srly. 

pearing  goo

 the new ded.  The  missand also rem

of  parapets  

one as per IRntioned. 

built‐up ared. 

h  sides  and 

the  pavem

m  on  both  sioughout the 

carriagewayction require

not  maintainely.  The  leve 

78‐79.  Rect

served  at  kng should be

should  be 

th  the  Therm

hould be ma

rom  vegetat

and  hazard 

iately. 

   

40 

scarifying 

d.  These 

lineators sing  and move the 

was  not 

RC: 8. 5th 

ea “Place 

need  to 

ent  was 

des.  The network 

y and 1m ed. 

ned  and el  of  the 

tification 

m  0.000 e done as 

cleared 

moplastic 

aintained 

tion  and 

markers 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

Km  

Km  

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

At  few  lthe  IRC MORT&

The heigthe  culvheight s

At  horizper IRC:

At few lo

The bou 

5 – km 10 

Culvert as per IR

The baccompac

The “Pla

At  few tape at t

6/5, the

At  curvstandard

The painobservedamagestones s

The “FlaIRC: 67‐

All the s

Bounda 

15 – km 20 

The painobservedamagestones s

Culvert 20/1  anobserve

The baccompac

The “Pla

At  few tape at t

6/5, the

At  curvstandard

The “FlaIRC: 67‐

a Bathinda Netwo

locations,  thand MORT&

&H specificati

ght of culververt  parapethould be ma

zontal  curves 79.  

ocations the

undary pillars

no. 6/1, theRC guidelines

ckfilling of thted properly

ace Identifica

culvert  locatthe parapet 

 catch pit wa

es,  the  heigd height sho

ntings of Kmed  on  theed  and  painshould be as 

ag Type Dire2012 (refer F

signs should 

ry pillars nee

ntings of Kmed  on  the ed  and  painshould be as 

No. 17/1, 18nd  20/4,  the ed at few loca

ckfilling of thted properly

ace Identifica

culvert  locatthe parapet 

 catch pit wa

es,  the  heigd height sho

ag Type Dire2012 (refer F

ork in Punjab (Ind

he section us&H  specificaions Clause 8

rt parapets wts  had  less aintained un

s  the  distan

e pavement m

s should be m

 parapet pais.  

he catch pits y. 

ation Sign” s

tions  the  padelineators s

as not attach

ght  of  the uld be maint

m stones neekm  stones.ting  was  faper IRC. 

ection Signs”Fig. 16.04). 

be as per IRC

ed to mainta

m stones neekm  stones.ting  was  faper IRC. 

8/1, 18/3, 18catch  pits  aations. Imme

he catch pits y. 

ation Sign” s

tions  the  padelineators s

as not attach

ght  of  the uld be maint

ection Signs”Fig. 16.04). 

dia) 

sed  in  the siations.  These801.4. 

was not unifparapet  heigiformly throu

ce  between 

marking was 

maintained a

inting requir

should be d

hould be as 

arapet  paintshould be m

hed. Immedia

chevrons  wtained at the

ed to mainta  Few  hectoded.  The  le

”  should be 

C: 67‐2012.

in. 

ed to mainta  Few  hectoded.  The  le

8/4, 18/5, 18are not  attacediate action

should be d

should be as

arapet  paintshould be m

hed. Immedia

chevrons  wtained at all 

”  should be 

ign posts wae  should  be 

form on botght  than  spughout the n

RPMs  shou

faded and a

at the earlies

red and lette

done with th

per IRC:67:2

ing was  reqaintained at

ate action re

as  less  thane earliest.  

in. The patcometre  stoettering  of  k

installed at 

in. The patcometre  stoettering  of  k

8/6, 19/1, 19ched.  The wn required. 

done with th

 per IRC: 67:

ing was  reqaintained at

ate action re

as  less  thancurves.  

installed at 

   

as not  compreplaced  as

th sides and ecified.  The network. 

uld  be maint

appeared bla

st. 

ering should 

he suitable e

012 (Fig. 16.

uired.  The  rt the earliest

equired. 

n  the  requi

hes of paintnes  were  okm  and  hec

the  Junction

hes of paintnes  were  okm  and  hec

9/2, 19/3, 19water  stagna

he suitable e

 2012 (Fig. 1

uired.  The  rt the earliest

equired. 

n  the  requi

the Junction

   

41 

patible  to s  per  the 

some of parapet 

tained  as 

ckish. 

be done 

earth and 

.06). 

reflective . 

red.  The 

ing were observed ctometre 

ns as per 

ing were observed ctometre 

/4, 19/5, tion was 

earth and 

16.06). 

reflective . 

red.  The 

ns as per 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

4. S5 RKm 

Km 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

All the s

Bounda 

Road: 5 – km 10 

At km 6need to the crac

At km 6trim the

Culvert surroun

At km 6

At km 6erosion.

 Need toIRC: 79. 

Some  osigns.  

At  few maintainshoulde

It was othe villaactivitie

8/2, catc

The heigthrough

The hazmust be

The pain

At  km 9trim the

10/2, ne

Betweencarriage

At  somvegetatihectome

Some  siReplace

 The baccompac

Improve

Km 10; r

The  bouguidelin

15 – km 20 

Km ston

a Bathinda Netwo

signs should 

ry pillars nee

6.050, old  slaplaster, pain

cks develope

6.300,  the vee tree branch

no.  7/1,  8/ding earth le

.410, the con

.450, the 7/2. 

o maintain th

f  the  speed 

locations ned upto 1mrs. 

observed thagers. Need ts in future.

ch pit requir

ght of the cuout the netw

zard markerse replaced im

nting of km a

9.560,  the  vee tree branch

eed to clear t

n  km  9.900eway on regu

e  locations ion.    Need etre stones a

ign  posts we these with s

ck filling of tt it to achiev

ement of min

repair and pa

undary  pillares. 

ne 15, paintin

ork in Punjab (Ind

be as per IRC

ed to mainta

ab culvert, nnt and the nud on paveme

egetation obhes. 

1  needs  to evel and mai

ndition of cu

2, protect th

he RPMs at c

signs  are  ir

it  was  obsm. Vegetation

at the waste to remove an

ed. 

ulvert parapework. 

s  should be mmediately. 

and hectome

egetation obhes. 

the water wa

0  to  km  10ular basis or e

the  parapeto  cut  the  vand parapets

ere  old  and suitable supp

he catch pitsve the requir

nor junctions

ainting of km

rs  need  to m

ng required.

dia) 

C: 67‐2012.

in. 

need  to  cleaumbering alsent. Immedi

bstructs  the 

raise  the  wntain it. 

urve sign was

he parapet si

curves. The s

rrelevant  an

served  that n and loose c

material dund also consu

ets should be

maintained.

etre stones r

bstructs  the 

ay. 

.000,  need execute ano

et  of  the  cuvegetation  is should be v

not  compatport posts as

s should be dred level of c

s was not do

m stone requ

maintain  and

an and maintso to be donate attention

visibility of 

walls  of  the 

s poor. Repla

ides, to cont

spacing of RP

d  need  to  r

the  shouldcompaction 

umped on thult with them

e uniform on

.  The old  an

equired. 

visibility  of 

to  remove ther alternat

ulverts  was in  such  a  mvisible at leas

tible  to MOTs per MORT&

done with thompaction.

one. Immedia

uired. 

d  should  be 

   

tain  it.  The ne. At the culn required. 

the Gentry. 

catch  pit  ab

acement req

trol the emb

PMs should b

replace with

der  width  wwas observe

he shoulder em to stop thi

n both sides 

nd  damaged 

the Gentry; 

the  dust  ftive. 

not  visiblemanner  that st from 100m

TH&H  specif&H Clause 80

he suitable e

ate action re

installed  as

   

42 

parapets lvert slab 

Need  to 

bove  the 

uired.  

ankment 

be as per 

  suitable 

was  not ed on the 

edges by is type of 

and also 

markers 

need  to 

from  the 

e  due  to the  km, 

m.   

fications. 01.4. 

earth and 

quired. 

s  per  IRC 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

5. B8 RKm 

Km 

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

At  few maintainshoulde

16/3,  Rcarriage

16/4, pa

At km 16

At km 1action re

17/1, neand mai

Some  osigns. 

The min

Some  sspecificaClause 8

At  km  1install as

Bounda 

Road 15 – km 20 –

The km the earl

Some  sspecificaClause 8

At few lthat thewhich ca

 At someat the ea

At  few maintain

The dam

The  “Plajunction

At  few cImmedia

Culvert installed

The spe

Bounda 

25 – km 30 

The km the earl

Some  sspecificaClause 8

a Bathinda Netwo

locations ned upto 1mrs. 

RHS  parapeteway clearan

arapets need

6.250, RHS, r

6.800, the dequired. 

eeds to raiseintain it. 

f  the  speed 

nor junctions

sign  supportations.  Repla801.4. 

18.580, MBCs per IRC: SP

ry pillars nee

– km 25 

and 5th km siest. The lett

sign  supportations.  Repla801.4. 

ocations it we required. Nan be mainta

e curve locatarliest. The s

locations  tn the service

maged hazard

ace  Identificns as per IRC:

curve  locatioate action re

no.  17/1,  thd. Need to pl

ed limit sign

ry pillars nee

and 5th km siest. The lett

sign  supportations.  Repla801.4. 

ork in Punjab (Ind

it  was  obsm. Vegetation

t  needs  to ce. 

ds to shift to 

roads crossin

elineators w

e the walls of

signs  are  ir

 were not im

t  posts  weace  these  w

CB was  not P: 73 guidelin

ed to mainta

stone were ntering should

t  posts  weace  these  w

was observedNeed to mainained. 

tions the fewspacing of RP

he  pavemee level of the

d markers sh

cation  Signs”:67:2012.  

ons  the  chevequired. 

he water walaster the ba

s should be a

ed to mainta

stone were ntering should

t  posts  weace  these  w

dia) 

served  that n and loose c

shift  on  c

clear the roa

ng sign board

were not visib

f the catch p

rrelevant  an

mproved. 

re  old  andwith  suitable 

rectified.    Nnes. 

in. 

not as per thed be done as

re  old  andwith  suitable 

d that the unntain the uns

w RPMs werePMs should b

nt  marking e pavement m

hould be rep

”  should  be

vrons  and  cr

y was not  cck side of th

as per State 

in. 

not as per thed be done as

re  old  andwith  suitable 

the  shouldcompaction 

catch  pit  w

adway width

d was in poo

ble due to ve

pit above the

d  need  to  r

  not  compsupport  po

Need  to  incr

e IRC standa per IRC stan

  not  compsupport  po

nsealed shousealed shoul

e missing whbe as per IRC

was  faded marking.  

laced at the 

  placed  at  a

rash barriers

clear  and  thee parapet al

Govt. Guide

e IRC standa per IRC stan

  not  compsupport  po

   

der  width  wwas observe

wall  to  incre

h. 

or condition. 

egetation. Im

e adjacent ea

replace with

patible  to  Mosts  as  per M

ease  the  he

rds. Replacendards. 

patible  to  Mosts  as  per M

ulder drop wders upto th

hich need to C. 

/blackish. 

earliest. 

all  minor  an

s were not  i

e  catch was so.  

lines. 

rds. Replacendards. 

patible  to  Mosts  as  per M

   

43 

was  not ed on the 

ease  the 

mmediate 

arth level 

  suitable 

MOTH&H MORT&H 

eight  and 

e these at 

MOTH&H MORT&H 

was more he extent 

maintain 

Need  to 

nd  major 

installed. 

not also 

e these at 

MOTH&H MORT&H 

TNM 

 

OPRC WorlMonthly Pro

3.5

M TECHNOMANAG

ld Bank Project fogress Report No 24

Recomme

Momaipainnee

Moeffeirre

Mopavan a

ThesectTheIdenIden

 At reqheigIRC 

TheentinewThebe p

Theavaeros

In  teffefromsho

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

At few lthat thewhich ca

 At someat the ea

At  few maintain

The dam

The  “Plajunction

At  few cImmedia

Some  orequired

Some of

Bounda

endationfo

nitoring  Conintain  the  pnting  and  cueds to mainta

nitoring  Conectively  and spective of t

nitoring Conement markacceptable le

e deficiency ttions used foe  old  and ntification  Sntification Si

some of  theuired  or  lesght of the sig: 67 guidelin

e  catchpits  sire  road  netw catch pits e slab and thpossible prov

e  embankmeilable with  Psion cuts. 

the  view  of ectively  and m safety poiuld be maint

a Bathinda Netwo

ocations it we required. Nan be mainta

e curve locatarliest. The s

locations  tn the service

maged hazard

ace  Identificns as per IRC:

curve  locatioate action re

of  the  culvd. 

f the culverts

ry pillars nee

orNetwork

nsultant  haspavement  mulvert  parapeain. 

nsultant  recmaintain  t

the monthly 

nsultant alsokings meet tevel of safety

to maintain tor sign suppoout  dated Signs  were gns should b

e road sectios  than  thatgn posts as pnes. 

should  be  ptwork.  Contrbut at the se pipe (morevide the wing

ent  slopes  shPWD.  Need 

the  upcomiput  close wnt of view. Ttained at all 

ork in Punjab (Ind

was observedNeed to mainained. 

tions the fewspacing of RP

the  pavemee level of the

d markers sh

cation  Signs”:67:2012.  

ons  the  chevequired. 

vert  parapet

s had no catc

ed to mainta

Performan

s  observed  tmarking,  roaets  painting 

commends  tthe  service audit section

 recommendhe IRC speciy and service

the sing boaort post wersign  supponot  as  per

be installed. 

ons either  th.  Contractorper IRC guide

rovided  at  eractor  has  stame time nee than 2 nosg wall as per

hould  be mato  ensure  t

ng winter  sewatch  on  theThe pavemetime to incre

dia) 

d that the unntain the uns

w RPMs werePMs should b

ent  markinge pavement m

hould be rep

”  should  be

vrons  and  cr

ts  had  fade

ch pit. Attach

in. 

nceWorks

that  there  iad  signs,  ais  required.

that  the  CMlevel  of  thens.  

ds that the Cifications ane for the road

rds and signre not compaort  posts  shr  IRC.  At  e

he height of r  needs  to  celines and al

each  culverttated  to  exeeeds to imps.), where ther IRC:SP:13‐2

aintained  in that  the  emb

eason;  the  Ce  sensitive  lont marking, ease the nigh

nsealed shousealed shoul

e missing whbe as per IRC

g  was  fadedmarking.  

laced at the 

  placed  at  a

rash barriers

ed  painting

h the catch p

is  a  scope  fnd  bridge  m.  This  is  a  co

MU  team  nee  entire  net

Contractor md contractuad users at all

 support posatible to MOhould  be  reach  minor 

the sign pocheck  and  mso maintain 

t  location  onecute  the wrove the exie installation2014. 

a  good manbankments  s

CMU  team  nocations whidelineators,ht visibility.

   

ulder drop wders upto th

hich need to C. 

d/blackish. 

earliest. 

all  minor  an

s were not  i

.  Immediate

pit to all the 

for  improvemaintenanceontinue  pro

eeds  to  wotwork  at  ea

must ensure al obligationl times. 

st was obserORT&H specifreplaced.  Thjunction  th

sts  is more maintain  thethe sign pos

n  both  sidesork  to  conststing catch pn of catch pit

nner within should  be  fr

needs  to  woich may  be  chevrons a

   

44 

was more he extent 

maintain 

Need  to 

nd  major 

installed. 

e  action 

culverts. 

ement  to e,  island cess  and 

ork  more ach  time 

that the n to offer 

rved. The fications. he  Place he  Place 

than the e  desired sts as per 

s  on  the truct  the pits also. t will not 

the  land ree  from 

ork more sensitive nd RPMs 

TNM 

 

OPRC WorlMonthly Pro

M TECHNOMANAG

ld Bank Project fogress Report No 24

  Thnot sho

Spemaispesafe

Convegthe 

Thepho

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

e water bodoverflow anuld be remo

ed  zoning  ointain the roed limit signety measures

ntractor  has etation on scontinuity. 

e  detailed  aotographs is p

a Bathinda Netwo

dies exist alond enters on ved to facilit

of  the  entirad signs acc boards. In ts and prepar

arranged  thhoulders. Th

audit  reporpresented in

ork in Punjab (Ind

ong the netwthe networktate the drai

re  road  netordingly. Cohe built‐up are the propo

he manual  ahis is a good 

rt  with  scon Para 3.6. 

dia) 

work need tok roads. Thenage.  

work  is  verntractor hasareas it is versal according

and mechansign of impr

ores,  un‐rep

o protect so extra soil on

ry  much  req started the ry much reqgly. 

ical  grass  curovement an

ported  non‐

   

o  that the wan the should

quired  and activity to inuired to enh

utters  to  connd needs to 

‐conformanc

   

45 

ater may der edges 

need  to nstall the ance the 

ntrol  the maintain 

ces  with 

TNM 

 

OPRC WorlMonthly Pro

3.6

3.6.1

T

T

T

A

Acc

M TECHNOMANAG

ld Bank Project fogress Report No 24

Consolida

1 Contra

Table  3‐4 :

Month

Mar‐13

Jul‐13

Aug‐13

Sep‐13

Oct‐13

Nov‐13

Dec‐13

Total – 2013

Jan‐14

Feb‐14

Mar‐14

Apr‐14

May‐14

Jun‐14

Jul‐14

Aug‐14

Sep‐14

Oct‐14

Nov‐14

Dec‐14

Total – 2014

Jan‐15

Feb‐15

Mar‐15

Apr‐15

May‐15

Jun‐15

Jul‐15

Aug‐15

Sep‐15

Oct‐15

Nov‐15

Dec‐15

Total – 2015

Jan – 2016

Feb – 2016

Mar – 2016

April – 2016

May – 2016

Jun‐16

Jul‐16

Aug‐16

Sep‐16

umulated Total

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

atedAuditR

actor'sAud

: Accumulate

S1 S2

2 12

2 12

2 11

1 14

2 16

1 12

2 13

12 90

0 9

1 9

1 17

1 11

1 10

1 7

0 5

0 3

1 9

1 13

7 20

14 42

28 155

2 13

2 7

40 31

4 44

24 16

0 36

0 35

0 131

2 87

2 65

0 32

0 26

76 523

0 8

2 43

2 2

0 43

1 16

14 29

4 43

8 24

14 29

161 100

a Bathinda Netwo

Report

itReporto

ed Scores Su

2 S3

2 0

2 0

1 1

4 0

6 0

2 0

3 0

0 1

3

0

7 0

1 0

0 0

0

0

0

0

3 1

0 0

2 3

5 7

3 1

1

1 0

4 0

6 53

6 0

5 55

1 0

7 0

5 11

2 0

6 4

3 125

0

3 39

0

3 0

6 0

9 8

3 0

4 2

9 0

05 182

ork in Punjab (Ind

nSeptembe

ubmitted by  

S4 S5

10 6

6 1

2 3

10 2

4 0

5 1

4 2

41 15

3 3

2 2

2 2

1 3

3 2

0 0

0 0

0 0

6 4

1 3

13 1

11 24

42 44

0 3

4 4

20 40

22 20

11 10

2 28

3 0

6 0

6 18

15 2

23 4

2 8

114 137

8 0

2 10

53 0

0 20

0 46

19 0

4 4

22 12

4 11

309 299

dia) 

er2016

Contractor f

5 B8

4

4

5

6

5

5

5

5 34

6

6

4

4

5

1

0

3

3

2

17

4 35

4 86

4

4

0 39

0 69

0 31

8 44

17

0

8 21

19

5

5

7 258

26

0 20

44

0 14

6 2

36

10

2 14

1 30

9 574

for Non‐Con

MPM RDP

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

16 0

16 0

24 0

0 0

0 0

6 0

22 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

52 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

68 0

   

nformances 

PMNon – 

Conforma

34

25

24

33

27

24

26

193

24

20

26

20

21

9

5

6

23

21

58

145

378

47

22

170

165

167

110

110

137

134

114

64

45

1285

42

116

101

77

65

106

65

82

88

2598

   

46 

 

nce

TNM 

 

OPRC WorlMonthly Pro

Ta

Sr.

1 Tota

2 Tota

3 Tota

Month:Se

Month : Septem

MPM

MPM 1

MPM 2

MPM 3

MPM 4

MPM 5

MPM 6

Repeat MPM N

SL. 

No.Con

re

Total Road D

Month : Sep

M TECHNOMANAG

ld Bank Project fogress Report No 24

Table 

Table  3‐6: M

able  3‐7: Roa

alManagementP

alRoadDurabilit

alRoadUserSafe

eptember2016

mber 2016

Item Descript

Quality Assurance Sy

Contractor`s Program

Contractor`s Reports

Traffic Management

Inventory Database Management

Detailed Design & CoMethodology

Non-Conformance from PMonth

Non‐

nformance 

elating to

Sectio

Durability Non‐Con

ptember 2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

3‐5 : Summ

Management

ad Durability

PerformanceNo

tyNon‐Conform

ety&ComfortN

tionPerforma

MeasuComplia

ystem

ms

onstrcution

Previous

on Code

Number 

Conform

Reco

Contr

A

0

nformance Score

a Bathinda Netwo

ary of Netw

t Performan

y Performan

ItemDescript

on‐Conformance

manceScore(RD

Non‐Conformanc

Summaryof

ance ure ance

NumberNon-Conform

Acontrac

0

r of Non‐ 

mances 

rded

ractor

A

Non

Conform

Weigh

B

0 5

ork in Punjab (Ind

ork Perform

 

nce Measure

 

ce Measures

     

tion

eScore(MPM'S)

DPM'S)

ceScore(RUS&

fNetworkPerfo

TotalSc

r ofmances

ctor

Non-Conforman

WeightinB

2

1

2

4

2

4

4

Total Ma

n‐ 

mance 

hting

Sub‐We

Months/W

Recorde

Confor

C

0

dia) 

mance submit

s (MPM`S) S

s (RDPM`S) –

)

&CPM'S)

ormanceSystem

coreofNon‐Con

nce ng

Sub-WDays/Week

Recorded No

Each Week of De

Each day of Delay

Each day of non r

Each day of non r

Each Week of De

Each Week of De

Number of Monthsconfoermance firs

anagement Performanc

eighting 

Weeks of 

ed Non 

rmance

C

Total

Confor

Sco

Ax

Cont

0 0

0

tted by Cont

Submitted by

– Submitted

Co

m

nformance

Weighting ks/Months of

on Conformance

N° X

elay

y

reciept after deadline

reciept after deadline

elay

elay

s since non-st identified.

ce Non-Conformance S

l Non‐ 

rmance 

ore

BxC

ractor

0

0

   

tractor 

y Contractor

d by Contract

Scoresontractor

0

0

88

88

Non-Con Weigh x SubW

C

Total NonConformanScore AxBx

Contracto

0

0

0

0

0

0

0

0Score

Comments

   

47 

tor 

Remarks

n-nce xCor

CommentsRef

Phot

Referenc

Photo ference No.

ce No.

TNM 

 

OPRC WorlMonthly Pro

Table

M TECHNOMANAG

ld Bank Project fogress Report No 24

e  3‐8 : Road 

S111

S112

S211

S212

S213

S214

S215

S216

S217

S218

S219

S220

S221

S222

S223

S224

S225

S226

S227

S228

S229

S230

S311

S411

S412

S413

S414

S415

S511

S512

S513

S514

S515

B811

B812

B813

B814

B815

Total Leng

Total

Total Leng

Name of Ro

Total Leng

Name of Ro

Name of Ro

Name of Ro

Total Leng

Name of Ro

Total Lengt

Name of Ro

Total Length

Section

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

User Service

F

0

5

2

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

10

18

0

5

10

15

20

0

5

10

15

20

9

15

20

25

30

gth of B8 Road

kms

l Contract Roa

gth of S4 Road

kms

ad :‐ Dhanula

gth of S5 Road

kms

ad :‐ Bathind

ad :‐ Mansa‐T

ad :‐ Sangrur‐

gth of S1 Road

kms

ad :‐  Bhawan

th of S2 Road

kms

ad :‐ Barnala‐

h of S3 Road:

a Bathinda Netwo

e and Comfo

From

0.000

5.000

2.240

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

0.000

5.000

00.000

82.640

0.000

5.000

0.000

5.000

0.000

0.000

5.000

0.000

5.000

0.000

9.200

5.000

0.000

5.000

0.000

d: 28.650 

ad Length: 20

CONFORMA

d: 24.970 

a‐Bhikhi (S5)

d: 25.340 

a‐Kotshamir‐

Talwandi Sab

Chaina

‐Sunam (S1)

d: 11.300 

nigarh‐Sunam

d: 106.130 

‐Mansa (Man

 7.290 kms

ork in Punjab (Ind

ort Performa 

To

5.000

11.300

10.000

15.000

20.000

25.000

30.000

35.000

40.000

45.000

50.000

55.000

60.000

65.000

70.000

75.000

80.000

85.000

90.000

95.000

100.000

108.770

189.930

5.000

10.000

15.000

20.000

24.970

5.000

10.000

15.000

20.000

25.340

15.000

20.000

25.000

30.000

37.850

Total Non‐C

03.680 kms ‐ 

ANCES

Total Non‐

Total Non‐

‐Talwandi Sab

bo upto Ramti

age

Total Non‐

m‐Bhikhi‐Kots

Total Non‐

nsa Kainchian

Total Non‐

dia) 

ance Measur

5.0

6.3

7.7

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

8.7

7.2

5.0

5.0

5.0

5.0

4.9

5.0

5.0

5.0

5.0

5.3

5.8

5.0

5.0

5.0

7.8

Conformance

TOTAL NON‐

Conformance

Conformance

bo upto Ramt

irath Jaga (S4

Conformance

shamir (S2)

Conformance

n to Ram Ditte

Conformance

Audit L

in (K

es – Submitt

00

00

60

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

70

90

00

00

00

00

70

00

00

00

00

40

00

00

00

00

50

es B8

es S4

es S5

tirath Jaga (B

4)

es S1

es S2

e Wala Chowk

es S3

Length 

Kms)

Aud

Sep

Ass

   

ted by Contr

0

14

14

14

0

2

0

0

0

0

0

0

0

0

6

3

0

4

0

0

0

0

0

29

0

0

0

0

0

4

0

4

0

4

0

7

0

11

0

26

0

4

0

30

88

8)

k) (S3)

dit Score of 

ptember ‐16 

sesment‐1

   

48 

ractor 

TNM 

 

OPRC WorlMonthly Pro

3.7

3.7.1

Table  3‐contractadjusted

3.7.2

Sr.

1 TotalMa

2 TotalRo

3 TotalRo

Month:Septem

M TECHNOMANAG

ld Bank Project fogress Report No 24

Summary

1 Analys

Thissubm(MC

Netwa) b) c)

AccMoRM0

‐9  gives  the t and compad by the MC 

2 Manag

Acc(MPoutEmp

TheimpDurdatesubthe reco

anagementPerform

adDurabilityNon‐

adUserSafety&C

mber2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

y&Compar

sisandCom

s  section  prmitted by  thC) after inspe

work PerformManagemenRoad DurabRoad User S

ording  to nitoring Con03.  

  summary  oarison of thefor the mont

Ta

gementPer

ording  to  thPM‘s)  reflectputs,  includiployer. 

e  crack  inveproved  in  thering the 17th e of investigsequently exreport  by 

orded under

ItemDe

manceNon‐Confor

‐ConformanceSco

ComfortNon‐Confo

a Bathinda Netwo

risonofCon

mmentsofth

rovides  a  dehe Contractoecting the au

mance Inspent Performanility PerformService and C

the  Contracnsultant (MC

of  the  audit e NON‐CONFth of Septem

able  3‐9 : Sum

rformanceM

he  Contract t  the  ability ing  the qual

stigation  ane 1st  year wWorld Bank ation reportxtended. In s30th  Septem MPM3 as p

escription

rmanceScore(MPM

ore(RDPM'S)

ormanceScore(RU

SummaryofN

Tot

ork in Punjab (Ind

ntractor’sA

hePerform

escription  aor and  reviewdit sections.

ection includence Measuremance MeasuComfort Perf

ct  Specifica) has perfor

for  each  typFORMANCES mber 2016.

mmary Non‐ 

Measures(M

Agreementof  the  Contity and effic

nd  remedial ork programmission, Cot from 30th Juspite of the ember  2016.resented in T

M'S)

US&CPM'S)

etworkPerforman

alScoreofNon‐Co

dia) 

Auditvs.Mo

manceAudit

and  analysis wed/adjuste   

es  each onees (MPM’s) ures (RDPM’sormance Me

tions  (Appemed the Aud

pe  of  Perforsubmitted b

‐Conformanc

MPM’s)

t,  the  Manatractor  to  suciency of his 

measures mme would bntractor requne 2016 to extension, th  For  the  saTable 3.10.

SCon

nceSystem

onformance

onitoringCo

tInspection

of  the  moed by  the M

e of the below

s). easures (RUS

endix  8),  tdit Inspectio

rmance Meaby the Contr

ces 

gement  Peruccessfully mreporting o

report  for  tbe  submitteuested to ex30th Septem

he Contactorame  the  no

Scoresntractor

Sc

0

0

88

88

   

onsultant’s

n

onthly  auditonitoring Co

w items: 

S&CPM’s) 

the  Contracons as per th

asures  set  ouractor with t

rformance  Mmanage  the of  informatio

the  S2  roadd by  the Coxtend the sumber 2016 wr had failed ton‐conforma

coresMC

Re

20

0

124

144

   

49 

sAudit

t  reports onsultant 

ctor  and e format 

ut  in  the the score 

Measures contract 

on  to  the 

d  section ntractor.  bmission 

which was o submit nce  was 

emarks

TNM 

 

OPRC WorlMonthly Pro

Month : September 2016

MPM Item

MPM 1 Quality Assu

MPM 2 Contractor`s

MPM 3 Contractor`s

MPM 4 Traffic Mana

MPM 5Inventory DaManagemen

MPM 6Detailed DeMethodology

Repeat MPM Non-ConformanMonth

 

3.7.3

SL. 

No.

No

Confor

relat

Total Road Dur

Month : Septe

M TECHNOMANAG

ld Bank Project fogress Report No 24

DescriptionPerform

Co

urance System

s Programs

s ReportsCracks Inv

agement

atabase nt

sign & Constrcution y

nce from Previous

3 RoadD

As pthe futuCon

RDPEmpNonreco

Nowroug

Thenetwcuts 

on‐

rmance 

ting to

Section Cod

rability Non‐Conforman

mber 2016

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

mance Measure ompliance

NumNon-Con

cont

vestigation Report

Table  3‐10 :

DurabilityP

per the ContContractor’

ure  generatintract. 

PM’s  are  theployer’s assen‐conformanorded until a

w  the  Contrghness (IRI) 

e  rain cuts anwork. Contras.  

Table  3‐1

e

Number of Non‐ 

Conformances 

Recorded

Contractor

A

N

0

nce Score

a Bathinda Netwo

mber ofnformances

Atractor

Number oNon-Conforma

AMC

0 1

: Manageme

Performanc

tract Agreems ability to sions  and  pr

e  contractuaessment. Failnce  for  thata program of

ractor  has  odata. The IR

nd erosion oactor  tried  t

11 : Road Du

Number of Non‐ 

Conformances 

Recorded

MC

A

Conf

We

0

ork in Punjab (Ind

ofances

Non-Conformance

WeightingB

R

2 Eac

1 Eac

2 Eac

4 Eac

2 Eac

4 Eac

4Numcon

Total Managemen

ent Performa

ceMeasure

ment these asuccessful prrotect  it  fro

al  requiremelure to delivet  measure.  Tf rectification

owned  his  owI data presen

of embankmto  improve  t

urability Perf 

Non‐ 

formance 

eighting

B

Sub‐We

Months/W

Record

Confor

C

5 0

dia) 

Sub-Weighting Days/Weeks/Months of

Recorded Non Conformance

ch Week of Delay

ch day of Delay

ch day of non reciept after deadl

ch day of non reciept after deadl

ch Week of Delay

ch Week of Delay

mber of Months since non-nfoermance first identified.

nt Performance Non-Conform

ance Measu

es(RDPM’S)

are a set of rotect the pom  consump

ents, which mer the specifThis  non‐con work has b

wn  Profilomnted in Chap

ment were obthe embankm

formance Me

eighting 

Weeks of 

ed Non 

rmance

C

Total No

Conforma

Score

AxBxC

Contract

0 0

0

N° Non-Con X Weigh x

SubWC

Total NonConformanScore AxB

Contracto

0

0

ine 10 0

ine 0

0

0

0

0mance Score

res (MPM’s)

)

performanceavement anption  over  t

must  be meied RDPM crnformance een agreed w

meter  and  stpter 3. 

bserved at  fement  slopes

easures (RD

on‐ 

ance 

C

tor

Total Non‐ 

Conformance 

Score

AxBxC

MC

0

0

   

n-nce

BxCor

Total Non-Conformance Score AxBxC

MC

0

0

20With re

Meetin30t

0

0

0

0

20

e criteria thad surfacing the  duration

et  at  the  timriteria will rewill  continuwith the Em

tarted  to  co

ew locationss and  rectify 

PM’s) 

Comment

   

50 

Comments Photo

eference to World Bank ng, The deadline was h September 2016

at reflect asset  for n  of  the 

me  of  the sults in a ue  to  be ployer. 

ollect  the 

s of  road the  rain 

ts Photo N

o No.

 

No.

TNM 

 

OPRC WorlMonthly Pro

3.7.

3.7.

3.7.

3.7.

M TECHNOMANAG

ld Bank Project fogress Report No 24

.3.1 Minim

As  eContyear

TherAsse

The Nove

The and 

.3.2 Pavem

The provPartsurvmenmuseverthe 8.2.2carry

In  acontcrite

As  pClauInterprecCont

Nowof  thanal

The 

.3.3 Pavem

Pave

Cont

Sub‐sect

.3.4 Roadw Any 

Emb

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

mumAnnua

explained  intractor's  wors and is bind

refore  so  faet Preservatio

4th year worember 2015

4th  year wo3.6 kms for 

mentRough

roughness  ivisions of Se 2A of the cey  and meantioned in tht measure thry  six  (06) mIRI  (Internat2.2. Also it  isy out roughn

accordance  wtractor  shall eria througho

per  the  conse  2.6.2.4, rnational  Rocision  Profiletractor shall 

w the Contrache  network ysed as per c

IRI data colle

mentDeflec

ement Deflectract Works, 

‐section3.2.2ions was rec wayCutand

non‐conformbankment Slo

a Bathinda Netwo

alAssetPre

  Sub‐chapteork  annual  pding on the C

r  there  are on Quantitie

rk program (. 

ork  programmrehabilitatio

hness(RDP

is  a measurection VI – Spcontract specasure  the  roe Chapter 8,he roughnesmonths  theretional  Roughs very imporness measure

with  the  Clensure  that

out the durat

ntract  agreethe  Rough

oughness  Inde  according own and ma

ctor has ownroads.  The clause 8.2.2.

ected by the

ction(RDPM

ction shall b Chapters 8 a

2  of  this  recorded and fo

dEmbankm

mance undeope.  

ork in Punjab (Ind

eservationQ

er  3.1,  this program  thatContractor. 

no  NON‐COes. 

(i.e. revised 3

me has  beenn. 

PM‐2)

e  of  comfortpecificationscifications. Tughness  and Clause 8.2.2ss within the eafter.  The  vhness  Index)rtant to undements any t

ause  8.2.2 t  the  roughtion of the c

ment  Sectiohness  shall dex  (IRI).  Thto  the  specaintain the R

ned his ownIRI  will  be  c 

e Contractor 

M‐3)

e measuredand 16 of Pa

port,  the  pound within 

mentSlopes

er  the RDPM

dia) 

Quantities

measure  pet  was  appro

ONFORMANC

3rd year) was

n  approved 

t  of  road  uss and ContraThe contractod  analyse  th2 of Contractfirst six (06)values  corre  shall meet erstand thattime during 

of  the  specness  of  the ontract. 

on  III  Evaluabe  measu

he  equipmecifications  aoughness Pr

 Profilometecalculated  fo

is presented

 according tart 2A of the 

pavement  dethe permiss

s(RDPM‐4)

M‐4 was not 

–WorkPro

ertains  to  thoved  by  the 

CES  regardin

s submitted 

for  52.42  km

sers  and  in  aact Works, Cor has to cohe  data  as  pt Agreement) months on sponding  tothe  requiret the Employthe entire co

cifications  opaved  surfa

ation  and  Qred  by  usient  requiredas  defined  brofilometer a

er and starteor  the  entir

d the Chapter

o Section VIContract Ag

eflection  onible limits as

)

recorded  fo

   

ogram

he  fulfilmenemployer  f

ng  Minimum

by the Cont

ms  for  impro

accordance hapters 8 anduct the roer  the  specit. The emplonew pavem parameter ments  of  thyer’s has theontract. 

of  the  contrace  conform

Qualification ng  the  me  must  be  aby  ASTM  E‐9at all times. 

ed to collect e  road  netw

r 3, Para 3.2

 – Specificatreement. 

n  the  differes per Clause 8

or Roadway C

   

51 

nt  in  the for  three 

m  Annual 

tractor in 

ovement 

with  the nd 16 of oughness ifications yer, who ents and which  is e  Clause e right to 

ract,  the ms  to  the 

Criteria, ethod  of a  Class  1 950.  The 

the data work  and 

2.1. 

tions and 

ent  road 8.2.3. 

Cuts  and 

TNM 

 

OPRC WorlMonthly Pro

3.7.4

M TECHNOMANAG

ld Bank Project fogress Report No 24

4 RoadU

• AccoPerfday com

• The ServexpeCon

• Anycorr

• Theincluadjusubm

• The audMea                                  

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

UserServic

ording  to  tformance Mto  day  serv

mply with theobjectives 

vice  is  mainectations  actractor’s perway  the  firesponds to trefore,  the udes  the  Nusted by  themitted by thcomparisonit  scores  byasures ‐ RUS&

a Bathinda Netwo

eandComf

the  Contraceasures  (RUviceability  oe Contract Stof  the  Contntained,  whicross  the  rarformance.nal  score  othat of the Mfinal  mont

NON‐CONFORe Monitoringhe Contracton of the audity  MC  regard&CPM, is sho

ork in Punjab (Ind

fortPerform

ct  AgreemeUS&CPM)  refof  the  roadsandards spetract  Standaich  reflects nge  of  Cont

of  the  NONMonitoring Cthly  audit  sRMANCES  rg Consultantor.  t scores submding  to  Roaown in the T

dia) 

manceMea

nt,  the  Roflect  the  roas  under  the cified for eacards  are  to the  road  utract  assets,

N‐CONFORMonsultant's Ascores  for  trelating  to t are 144 ag

mitted by thad  User  SerTable 3.12. 

asures‐RUS

ad  User  Sead  user‘s  exContract.  Tch RUS&CPMensure  thatuser‘s  day  t  and  to  per

MANCES  incAudit Inspecthe  month RUS&CPM, gainst  the m

e Contractorrvice  and  Co

   

S&CPM

ervice  and xpectation  abThe  ContractM. t  a  defined to  day  servrmit  auditin

luded  in  thtion. of  SeptembMPM  &  R

monthly scor

r versus the omfort  Perf

   

52 

Comfort bout  the tor  must 

Level  of iceability g  of  the 

his  MPR 

ber  2016 RDPM  as res 88 as 

adjusted formance 

TNM 

 

OPRC WorlMonthly Pro

Month : Se

Referen

 Bidd

Docum

Sectio

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&C

RUS&CP

RUS&CP

RUS&CP

RUS&CP

RUS&CP

Any RUS

Any RUS

Any Road

 Haza

M TECHNOMANAG

ld Bank Project fogress Report No 24

T

eptember 2016

nce to

ding 

ment 

on VI

CPM1 Paveme

CPM2 Unseal

CPM3 Drainag

CPM4Routine

Structu

CPM5Obstru

Should

CPM6 Inciden

CPM7 Vegeta

CPM8 Roadsid

CPM9 Raised 

PM10 Paveme

PM11 Traffic 

PM12 Crash B

PM13Sight R

Mainte

PM14Marker

Culvert

S&CPMRepeat

Month

S&CPMAny un

by the 

d Safety

ards

Any Im

Instruc

OLOGY AND GEMENT LTD.

or Sangrur Mansa4 (September 2016) 

Table  3‐12 : 

Item Des

ent Maintenance

ed Shoulder Mai

ge Maintenance

e Maintenance o

ures

ctions on the Pav

ers

nt and Emergency

tion Control

de Signs Mainten

Reflective Pavem

ent Markings ‐ (L

Island and Roun

Barrier Maintena

ails, Hand Rail an

enance 

r Posts (Guard Sto

t, Distance Marke

ted Non‐Conform

s

‐reported Non‐C

Monitoring Cons

mediate Safety H

ted for Repair

To

R

a Bathinda Netwo

Summary of

scription

e

intenence

of Bridge and oth

vement Surface a

y Works Respons

nance 

ment Markers

Lines, Text, Symb

dabout Mainten

nce 

nd Pedestrian Ba

ones, Boundry, E

ers, Hazard)

mance in Consecu

Conformance ide

sultant

Hazard to Road U

otal  Score

RUS FIELD

ork in Punjab (Ind

f Non–Confo

Minim

for E

Non

5km (1

5km (1

her 5km (1

and 

se 

ols etc)

ance

arrier 

Edge, 

utive 

ntified 

Users 

dia) 

ormances of 

mum Audit Length

Each Recorded

 ‐ Conformance

1km for cracking)

1km for cracking)

1km

1km for cracking)

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

RUS&CPM M

h

Total Non

Conformanc

Score 

AxBxC

Contracto

) 2

) 1

2

) 0

0

0

0

0

10

42

1

0

0

0

58

30

0

0

88

   

Measures 

ce 

r

Total Non

Conforman

Score 

AxBxC

MC

2

1

0

0

0

0

2

2

10

46

1

0

0

0

64

30

30

0

124

   

53 

n‐

nce 

Commentss

 

OM

Month : Se

Non‐Confo

R

R

R

R

R

R

R

R

R

R

R

R

R

R

An

An

Any

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

eptember 2016 Date of Au

ormance Relating To

RUS&CPM1 Pavement 

RUS&CPM2 Unsealed S

RUS&CPM3 Drainage M

RUS&CPM4 Routine M

RUS&CPM5 Obstructio

RUS&CPM6 Incident an

RUS&CPM7 Vegetation

RUS&CPM8 Roadside S

RUS&CPM9 Raised Ref

US&CPM10 Pavement 

US&CPM11 Traffic Islan

US&CPM12 Crash Barr

US&CPM13 Sight Rails,

US&CPM14Marker Po

Markers, H

ny RUS&CPM Repeated N

ny RUS&CPMAny un‐rep

Consultant

y Road Safety

 HazardsAny Immed

3.8 Verific

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

udit: 06.10.2016

Item Description

Maintenance

Shoulder Maintenence

Maintenance

aintenance of Bridge and other S

ons on the Pavement Surface and

nd Emergency Works Response 

n Control

Signs Maintenance 

flective Pavement Markers

Markings ‐ (Lines, Text, Symbols

nd and Roundabout Maintenanc

ier Maintenance 

, Hand Rail and Pedestrian Barrie

sts (Guard Stones, Boundry, Edg

Hazard)

Non‐Conformance in Consecutive

ported Non‐Conformance identifi

t

diate Safety Hazard to Road Use

cationofContra

Bathinda Network in P

Road Se

Minim

for 

Non

5km (1

crackin

5km 

Structures

d Shoulders

 etc)

e

er Maintenance 

e, Culvert, Distance 

e Months

ied by the Monitoring 

rs Instructed for Repair

Total 

actor’sAuditR

Table 

Punjab (India) 

ection : S1;  Length of Audit Sect

mum Audit Length

Each Recorded

n ‐ Conformance

Number 

Conform

Recor

Minimum

Lengt

Contra

km for ravelling or 

ng or edgebreake)0

(1km for Shape) 0

1km 0

5km 0

1km 0

N/A 0

5km  0

5km 0

5km/1km 1

5km/1km 0

5km 0

5km 0

5km 0

5km 0

1

0

0

 Score

Report

3‐13 : Verificatio

 

tion = 6.3 km; Location from  km

of Non‐

mances 

rded

m Audit 

th A

actor

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

MC

0

0

0

0

0

0

0

0

1

0

0

0

0

0

1

0

0

on of Audit – Sec

  54

m 5.00 to km 11.30

Non‐

Conformances 

Weighting 

B

Sub‐W

N

 Con

Week

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

ction S1 – Km 5.0

Weighting 

No of

nsecutive 

s/Months 

C

Total Non‐

Conformance 

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

1 0

2 12

1 0

0 0

14

00 to Km 11.300

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

2 RRP

0

0

0

0

0

12RUS&CP

0

0

14

Comments

PM missing between km 9 to km 

PM ‐ 9 (2 months From Augsut 2

September 2016)

   

Photo No.

10 1,2 & 3

016 to 

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenenc

Drainage Maintenance

Routine Maintenance of Bridge

Obstructions on the Pavement 

Incident and Emergency Works

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Te

Traffic Island and Roundabout 

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pede

Marker Posts (Guard Stones, Bo

Markers, Hazard,Road Delineat

Repeated Non‐Conformance in

Any un‐reported Non‐Conform

Consultant

Any Immediate Safety Hazard t

Bathinda Network in P

Table 

Description

ce

e and other Structures

Surface and Shoulders

s Response 

arkers

ext, Symbols etc)

Maintenance

strian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

tors)

 Consecutive Months

ance identified by the Monitorin

to Road Users Instructed for Rep

Punjab (India) 

3‐14 : Verificatio

7.76 km Audit Length Start

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

ng 

pair

Total  Score

 

on of Audit – Sec 

t Location       S2        km  2.240   

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Num

Co

Min

0

0

0

0

0

0

0

0

1

6

0

0

0

0

0

0

0

  55

ction S2 – Km 2.2

to   km 10

mber of Non‐

onformances 

Recorded

nimum Audit 

Length A

MC

Non‐

Conformanc

Weighting

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

1 2

6 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

24 to Km 10.000

ces 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

T

Co

C

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

1

0

Total Non‐

onformance 

Score 

A*B*C

Contractor

Total Non‐

Conformance

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 2

12 12

0 0

0 0

0 0

0 0

0 0

0 0

0 0

14 14

Comment

RRPM missing between

Pavement marking missi

2.240 to km

   

ts Photo N

n km 2 to km 3 4,5 & 

ing between km 

m 87,8,9 & 10,

 

No.

6

11,12

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016 Da

Non‐Conformance Relating To

RUS&CPM1 Pa

RUS&CPM2 Un

RUS&CPM3 Dr

RUS&CPM4 Ro

RUS&CPM5 Ob

RUS&CPM6 In

RUS&CPM7 Ve

RUS&CPM8 Ro

RUS&CPM9 Ra

RUS&CPM10 Pa

RUS&CPM11 Tr

RUS&CPM12 Cr

RUS&CPM13 Sig

RUS&CPM14M

M

Any RUS&CPM Re

Any RUS&CPMAn

Co

Any Road Safety

 HazardsAn

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

ate of Audit: 05.10.2016

Item Descri

avement Maintenance

nsealed Shoulder Maintenence

rainage Maintenance

outine Maintenance of Bridge and o

bstructions on the Pavement Surfa

cident and Emergency Works Resp

egetation Control

oadside Signs Maintenance 

aised Reflective Pavement Markers

avement Markings ‐ (Lines, Text, Sy

raffic Island and Roundabout Maint

rash Barrier Maintenance 

ght Rails, Hand Rail and Pedestrian

arker Posts (Guard Stones, Boundr

arkers, Hazard)

epeated Non‐Conformance in Cons

ny un‐reported Non‐Conformance i

onsultant

ny Immediate Safety Hazard to Roa

Bathinda Network in P

Table 

5 km

ption

M

5km

cra

5

other Structures

ce and Shoulders

ponse 

s

ymbols etc)

tenance

n Barrier Maintenance 

ry, Edge, Culvert, Distance 

ecutive Months

identified by the Monitoring 

ad Users Instructed for Repair

To

Punjab (India) 

3‐15 : Verificatio

m Audit Length Start Location       S

Minimum Audit Length

 for Each Recorded

Non ‐ Conformance

Numbe

Confo

Rec

Minim

Len

Cont

m (1km for ravelling or 

acking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

otal  Score

 

on of Audit –Sect 

S2        km 15   to   km 20

er of Non‐

rmances 

corded

um Audit 

ngth A

tractor

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

1 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  56

tion S2 – Km 15.

Non‐

Conformances 

Weighting 

B

Sub‐Weig

No o

 Consec

Weeks/M

C

2 1

1 1

2 1

2 1

1 1

2 1

1 1

2 1

2 1

2 1

1 1

1 1

1 1

2 1

6 0

6 1

6 0

00 to Km 20.00

ghting 

of

cutive 

Months 

Total Non‐

Conformance 

Score 

A*B*C

Contractor

C

0

0

0

0

0

0

0

0

2

0

0

0

0

0

0

0

0

2

Total Non‐

onformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

2 RRP

0

0

0

0

0

0

0

0

2

Comments

PM missing between km 17 to km 

   

Photo No.

18 13,14 & 15

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016 D

Non‐Conformance Relating To

RUS&CPM1 P

RUS&CPM2 U

RUS&CPM3 D

RUS&CPM4 R

RUS&CPM5 O

RUS&CPM6 I

RUS&CPM7 V

RUS&CPM8 R

RUS&CPM9 R

RUS&CPM10 P

RUS&CPM11 T

RUS&CPM12 C

RUS&CPM13 S

RUS&CPM14M

M

Any RUS&CPM R

Any RUS&CPMA

C

Any Road Safety

 HazardsA

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item Des

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge an

Obstructions on the Pavement Su

ncident and Emergency Works Re

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Marke

Pavement Markings ‐ (Lines, Text,

Traffic Island and Roundabout Ma

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedestr

Marker Posts (Guard Stones, Boun

Markers, Hazard)

Repeated Non‐Conformance in Co

Any un‐reported Non‐Conformanc

Consultant

Any Immediate Safety Hazard to R

Bathinda Network in P

Table 

cription

nd other Structures

rface and Shoulders

esponse 

ers

, Symbols etc)

aintenance

ian Barrier Maintenance 

ndry, Edge, Culvert, Distance 

onsecutive Months

ce identified by the Monitoring 

Road Users Instructed for Repair

Punjab (India) 

3‐16 : Verificatio

5 km Audit Length Start Location

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

N

C

M

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

n       S2        km 45 to km 50

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number of

Conforma

Record

Minimum 

Length

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  57

ction S2 – Km 45.

f Non‐

ances 

ded

Audit 

h A

Non‐

Conformances 

Weighting 

B

S

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 50.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total Non‐

Conformanc

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

0

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Comments

   

Photo No.

 

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenenc

Drainage Maintenance

Routine Maintenance of Bridge 

Obstructions on the Pavement S

Incident and Emergency Works 

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Tex

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedes

Marker Posts (Guard Stones, Bo

Markers, Hazard)

Repeated Non‐Conformance in 

Any un‐reported Non‐Conforma

Consultant

Any Immediate Safety Hazard to

Bathinda Network in P

Table 

Description

e

and other Structures

Surface and Shoulders

Response 

arkers

xt, Symbols etc)

Maintenance

strian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

Consecutive Months

ance identified by the Monitoring

o Road Users Instructed for Repa

Punjab (India) 

3‐17 : Verificatio

5 km Audit Length Start Loc

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

air

Total  Score

 

on of Audit – Sec 

ation       S2        km 60   to  km 6

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Numbe

Confo

Rec

Minim

Len

0

0

0

0

0

0

0

0

0

3

0

0

0

0

0

0

0

  58

ction S2 – Km 60.

65

er of Non‐

ormances 

corded

um Audit 

ngth A

MC

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

3 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

.00 to Km 65.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total N

Conform

Sco

A*B

Contra

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 6

1 0

1 0

1 0

1 0

0 0

1 0

0 0

6

Non‐

mance 

re 

*C

actor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

6Pav

0

0

0

0

0

0

0

6

Comments

ement marking faded between k

km 63 to km 65

   

Photo No.

km 61 to 62 & 16,17,18 & 19

9,20

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenenc

Drainage Maintenance

Routine Maintenance of Bridge

Obstructions on the Pavement 

Incident and Emergency Works

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Te

Traffic Island and Roundabout 

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pede

Marker Posts (Guard Stones, Bo

Markers, Hazard,Road Delineat

Repeated Non‐Conformance in

Any un‐reported Non‐Conform

Consultant

Any Immediate Safety Hazard t

Bathinda Network in P

Table 

Description

ce

e and other Structures

Surface and Shoulders

s Response 

arkers

ext, Symbols etc)

Maintenance

estrian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

tors)

 Consecutive Months

ance identified by the Monitorin

to Road Users Instructed for Rep

Punjab (India) 

3‐18 : Verificatio

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

ng 

pair

Total  Score

Road Section: S2; Length o

 

on of Audit – Sec 

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Num

Co

Min

0

0

0

0

0

0

0

0

0

1

1

0

0

0

0

0

0

of Audit Section: 5 km; Location 

  59

ction S2 – Km 65.

mber of Non‐

onformances 

Recorded

nimum Audit 

Length A

MC

Non‐

Conformanc

Weighting

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

1 2

1 1

0 1

0 1

0 2

0 6

0 6

0 6

from km 65 to km 70

.00 to Km 70.00

ces 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

T

Co

C

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

1

0

Total Non‐

onformance 

Score 

A*B*C

Contractor

Total Non‐

Conformance

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 2

1 1

0 0

0 0

0 0

0 0

0 0

0 0

3 3

Comments

Pavement marking faded b

km 67

Road marking at Traffi

Roundabout at km 67+840

as per IRC: 3

   

s Photo No

etween km 66 to 21,22 & 2

ic island and 

0 not maintained 

35 

 

o.

23

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016 D

Non‐Conformance Relating To

RUS&CPM1 P

RUS&CPM2 U

RUS&CPM3 D

RUS&CPM4 R

RUS&CPM5 O

RUS&CPM6 I

RUS&CPM7 V

RUS&CPM8 R

RUS&CPM9 R

RUS&CPM10 P

RUS&CPM11 T

RUS&CPM12 C

RUS&CPM13 S

RUS&CPM14M

M

Any RUS&CPM R

Any RUS&CPMA

C

Any Road Safety

 HazardsA

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item Des

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge a

Obstructions on the Pavement Su

Incident and Emergency Works R

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mark

Pavement Markings ‐ (Lines, Text

Traffic Island and Roundabout Ma

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedestr

Marker Posts (Guard Stones, Bou

Markers, Hazard,Road Delineator

Repeated Non‐Conformance in Co

Any un‐reported Non‐Conforman

Consultant

Any Immediate Safety Hazard to 

Bathinda Network in P

Table 

scription

nd other Structures

urface and Shoulders

esponse 

kers

t, Symbols etc)

aintenance

rian Barrier Maintenance 

undry, Edge, Culvert, Distance 

rs)

onsecutive Months

nce identified by the Monitoring 

Road Users Instructed for Repair

Punjab (India) 

3‐19 : Verificatio

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

Road Section S2; Length of Aud

 

on of Audit – Sec 

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number 

Conform

Recor

Minimum

Lengt

M

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 0

0 1

0 0

dit Section: 5 km; Location from 

  60

ction S2 – Km 70.

of Non‐

mances 

rded

m Audit 

th A

C

Non‐

Conformances 

Weighting 

B

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

km 70 to km 75

.00 to Km 75.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total No

Conforma

Score

A*B*C

Contract

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

0

on‐

ance 

C

tor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

2Poo

73 to

0

0

0

0

0

6

0

8

Comments

or maintenance of pavement ma

o km 74, width not maintained a

RUS&CPM ‐ 10

   

Photo N

rking between km 

s per specifications 24,25 & 

 

No.

26

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 05.10.2016

Item De

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge 

Obstructions on the Pavement S

Incident and Emergency Works 

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mar

Pavement Markings ‐ (Lines, Tex

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedes

Marker Posts (Guard Stones, Bo

Markers, Hazard)

Repeated Non‐Conformance in C

Any un‐reported Non‐Conforma

Consultant

Any Immediate Safety Hazard to

Bathinda Network in P

Table 

escription

e

and other Structures

Surface and Shoulders

Response 

rkers

xt, Symbols etc)

Maintenance

strian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

Consecutive Months

nce identified by the Monitoring

o Road Users Instructed for Repa

Punjab (India) 

3‐20: Verificatio

5 km Audit Length Start Loca

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

air

Total  Score

 

on of Audit – Sect 

ation       S2        km 75   to   km 8

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Numbe

Confor

Reco

Minimu

Leng

M

1

0

0

0

0

0

0

0

0

1

0

0

0

0

0

0

0

  61

tion S2 – Km 75.

80

er of Non‐

rmances 

orded

um Audit 

gth A

MC

Non‐

Conformances 

Weighting 

B

1 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

1 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

00 to Km 80.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total N

Conform

Sco

A*B

Contra

1 2

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 0

1 0

1 0

1 0

0 0

1 0

0 0

4

Non‐

mance 

re 

*C

actor

Total Non‐

Conformance 

Score 

A*B*C

MC

2Ru

0

0

0

0

0

0

0

0

2 Pa

0

0

0

0

0

0

0

4

Comments

utting/Flow of pavement observe

78+300 to km 78+750 

vement marking faded between 

   

Photo No

ed between km 

RHS27,28 & 2

km 75 to km 76 30,31 & 3

 

o.

29

32

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 04.10.2016

Item De

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge a

Obstructions on the Pavement S

Incident and Emergency Works R

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mar

Pavement Markings ‐ (Lines, Tex

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedest

Marker Posts (Guard Stones, Bou

Markers, Hazard)

Repeated Non‐Conformance in C

Any un‐reported Non‐Conforman

Consultant

Any Immediate Safety Hazard to

Bathinda Network in P

Table

escription

e

and other Structures

urface and Shoulders

Response 

rkers

t, Symbols etc)

Maintenance

trian Barrier Maintenance 

undry, Edge, Culvert, Distance 

Consecutive Months

nce identified by the Monitoring 

o Road Users Instructed for Repai

Punjab (India) 

e  3‐21: Verificati

5 km Audit Length Start Locat

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

r

Total  Score

 

ion of Audit – Se 

tion      S4      km 0   to   km 5

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number of

Conforma

Record

Minimum 

Length

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

  62

ction S4 – Km 0.

f Non‐

ances 

ed

Audit 

h A

Non‐

Conformances 

Weighting 

BW

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

00 to Km 5.00 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total Non‐

Conformanc

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

0

ce 

r

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

2

1. Major

IRC: 67 ‐

2. At km

LHS & RH

3. Schoo

4. At km

LHS & RH

0

0

0

0

0

0

0

6

0

8

Comments

r road ahead sign at km 0+100 RH

‐2012, Fig. 15.19

 1+600 speed breaker signs were

HS and also not as per   IRC: 67 ‐2

ol signs are not as per IRC: 67 ‐20

 2+010  speed breaker signs wer

HS and also not as per   IRC: 67 ‐2

RUS&CPM ‐ 8 

   

Photo No

HS not as per 

e different on 

2012, Fig. 15.49

12, Fig. 15.34 

re different on 

2012, Fig. 15.49

33,34,35 & 36,

 

o.

,37,38

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 04.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenenc

Drainage Maintenance

Routine Maintenance of Bridge

Obstructions on the Pavement 

Incident and Emergency Works

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Te

Traffic Island and Roundabout 

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pede

Marker Posts (Guard Stones, Bo

Markers, Hazard,Road Delineat

Repeated Non‐Conformance in

Any un‐reported Non‐Conform

Consultant

Any Immediate Safety Hazard t

Bathinda Network in P

Table 

Description

ce

e and other Structures

Surface and Shoulders

s Response 

arkers

ext, Symbols etc)

Maintenance

estrian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

tors)

n Consecutive Months

ance identified by the Monitorin

to Road Users Instructed for Rep

Punjab (India) 

3‐22 : Verificatio

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

ng 

pair

Total  Score

Road Section: S4; Length o

 

on of Audit – Sec 

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Nu

Co

Mi

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

of Audit Section: 5 km; Location

  63

ction S4 – Km 5.0

mber of Non‐

onformances 

Recorded

nimum Audit 

Length A

MC

Non‐

Conforman

Weightin

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

1 2

0 1

0 1

0 1

0 2

0 6

1 6

0 6

 from km 5 to km 10

00 to Km 10.00

ces 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Co

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

1

0

Total Non‐

onformance 

Score 

A*B*C

Contractor

Total Non‐

Conformance

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 2

0 0

0 0

0 0

0 0

0 0

0 6

0 0

0 8

Commen

Pavement marking faded/

km 6 to km

RUS&CPM ‐

   

ts Photo N

/missing between 

m 739 & 4

‐ 10

 

No.

40

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016 D

Non‐Conformance Relating To

RUS&CPM1 P

RUS&CPM2 U

RUS&CPM3 D

RUS&CPM4 R

RUS&CPM5 O

RUS&CPM6 I

RUS&CPM7 V

RUS&CPM8 R

RUS&CPM9 R

RUS&CPM10 P

RUS&CPM11 T

RUS&CPM12 C

RUS&CPM13 S

RUS&CPM14M

M

Any RUS&CPM R

Any RUS&CPMA

C

Any Road Safety

 HazardsA

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 04.10.2016

Item Des

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge an

Obstructions on the Pavement Sur

ncident and Emergency Works Re

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Marke

Pavement Markings ‐ (Lines, Text,

Traffic Island and Roundabout Ma

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedestri

Marker Posts (Guard Stones, Boun

Markers, Hazard,Road Delineators

Repeated Non‐Conformance in Co

Any un‐reported Non‐Conformanc

Consultant

Any Immediate Safety Hazard to R

Bathinda Network in P

Table 

cription

nd other Structures

rface and Shoulders

esponse 

ers

 Symbols etc)

aintenance

ian Barrier Maintenance 

ndry, Edge, Culvert, Distance 

s)

onsecutive Months

ce identified by the Monitoring 

Road Users Instructed for Repair

Punjab (India) 

3‐23 : Verificatio

5 km Audit Length Start Location

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

N

C

M

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

Total  Score

 

on of Audit – Sec 

n      S4      km 15   to   km 20

umber of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number of

Conforma

Recorde

Minimum 

Length 

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 2

0 0

0 0

0 0

0 0

0 0

0 0

0 0

  64

ction S4 – Km 15.

f Non‐

ances 

ed

Audit 

A

Non‐

Conformances 

Weighting 

B

S

W

2

1

2

2

1

2

1

2

2

2

1

1

1

2

6

6

6

.00 to Km 20.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total Non‐

Conformanc

Score 

A*B*C

Contractor

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 4

1 0

1 0

1 0

1 0

0 0

1 0

0 0

4

ce 

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

4Pavem

0

0

0

0

0

0

0

4

Comments

ment marking faded between km 1

19 to km 20

   

Photo No

15 to km 16 & km 41 & 42

 

o.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016 D

Non‐Conformance Relating To

RUS&CPM1 P

RUS&CPM2 U

RUS&CPM3 D

RUS&CPM4 R

RUS&CPM5 O

RUS&CPM6 I

RUS&CPM7 V

RUS&CPM8 R

RUS&CPM9 R

RUS&CPM10 P

RUS&CPM11 T

RUS&CPM12 C

RUS&CPM13 S

RUS&CPM14M

M

Any RUS&CPM R

Any RUS&CPMA

C

Any Road Safety

 HazardsA

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 04.10.2016

Item Des

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge a

Obstructions on the Pavement Su

Incident and Emergency Works R

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mark

Pavement Markings ‐ (Lines, Text

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedest

Marker Posts (Guard Stones, Bou

Markers, Hazard,Road Delineator

Repeated Non‐Conformance in Co

Any un‐reported Non‐Conforman

Consultant

Any Immediate Safety Hazard to 

Bathinda Network in P

Table 

scription

nd other Structures

urface and Shoulders

Response 

kers

t, Symbols etc)

aintenance

rian Barrier Maintenance 

undry, Edge, Culvert, Distance 

rs)

onsecutive Months

nce identified by the Monitoring 

Road Users Instructed for Repair

Punjab (India) 

3‐24 : Verificatio

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

r

Total  Score

Road Section: S5; Length of Au

 

on of Audit – Sec 

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number 

Conform

Reco

Minimum

Leng

M

0 0

0 0

0 0

0 0

0 0

0 0

0 1

0 0

0 0

2 2

0 0

0 0

0 0

0 0

0 0

0 1

0 0

dit Section: 5 km; Location from

  65

ction S5 – Km 5.0

of Non‐

mances 

rded

m Audit 

th A

C

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

1 1

0 2

0 2

2 2

0 1

0 1

0 1

0 2

0 6

1 6

0 6

m km 5 to km 10

00 to Km 10.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total No

Conforma

Score

A*B*C

Contrac

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 4

1 0

1 0

1 0

1 0

0 0

1 0

0 0

4

on‐

ance 

C

ctor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

1Veg

0

0

4Pav

0

0

0

0

0

6

0

11

Comments

etation on shoulder more than 10

0 to km 5

vement marking faded between k

9 to km 10

RUS&CPM ‐  7

   

Photo No

0mm between km 43 & 44

m 6 to km 7 & km 45 & 46

 

o.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 04.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge 

Obstructions on the Pavement S

Incident and Emergency Works 

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Tex

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedes

Marker Posts (Guard Stones, Bo

Markers, Hazard,Road Delineat

Repeated Non‐Conformance in 

Any un‐reported Non‐Conforma

Consultant

Any Immediate Safety Hazard to

Bathinda Network in P

Table  3

escription

e

and other Structures

Surface and Shoulders

Response 

rkers

xt, Symbols etc)

Maintenance

strian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

ors)

Consecutive Months

ance identified by the Monitoring

o Road Users Instructed for Repa

Punjab (India) 

3‐25 : Verificatio

5 km Audit Length Start Loca

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

air

Total  Score

 

n of Audit – Sect 

ation      S5      km 15   to   km 20

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Num

Con

R

Mini

L

0

1

1

0

0

0

0

0

1

1

0

0

0

0

0

0

0

  66

tion S5 – Km 15.0

0

ber of Non‐

formances 

ecorded

mum Audit 

Length A

MC

Non‐

Conformance

Weighting 

B

0 2

1 1

0 2

0 2

0 1

0 2

1 1

0 2

1 2

1 2

0 1

0 1

0 1

0 2

0 6

1 6

0 6

00 to Km 20.000

es 

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

To

Con

A

Co

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

1

0

 

otal Non‐

formance 

Score 

A*B*C

ontractor

Total Non‐

Conformance 

Score 

A*B*C

MC

0 0

1 1

2 0

0 0

0 0

0 0

0 1

0 0

2 2

2 2

0 0

0 0

0 0

0 0

0 0

0 6

0 0

7 12

Comments

Low shoulder and reverse slo

km 15 to km 2

At km 15+630 parapet paintin

Audit

Vegetation on the shoulders m

high between km 15 to km 16

RPMs missing/dysfunctional b

km 20 

Pavement marking faded betw

17

RUS&CPM ‐ 

   

Photo No

pe found between 

2047,48 & 49

ng done during MC 51

more than 100mm 

6 & km 16 to km 1752,53 & 54

between km 19 to 56,57,58  &

ween km 16 to km 

 

o.

9,50

4,55

& 59

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 06.10.2016

Item De

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge a

Obstructions on the Pavement S

Incident and Emergency Works R

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mar

Pavement Markings ‐ (Lines, Tex

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedest

Marker Posts (Guard Stones, Bo

Markers, Hazard)

Repeated Non‐Conformance in C

Any un‐reported Non‐Conforma

Consultant

Any Immediate Safety Hazard to

Bathinda Network in P

Table  3

escription

e

and other Structures

Surface and Shoulders

Response 

rkers

xt, Symbols etc)

Maintenance

trian Barrier Maintenance 

undry, Edge, Culvert, Distance 

Consecutive Months

nce identified by the Monitoring 

o Road Users Instructed for Repa

Punjab (India) 

3‐26 : Verificatio

5 km Audit Length Start Locat

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

ir

Total  Score

 

on of Audit – Sec 

tion           B8        Km 15    to    Km

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Numbe

Confor

Rec

Minimu

Len

M

0

0

0

0

0

0

0

0

1

3

0

0

0

0

1

0

0

  67

tion B8 – Km 15.

m 20

er of Non‐

rmances 

orded

um Audit 

gth A

MC

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

1 2

3 2

0 1

0 1

0 1

0 2

1 6

0 6

0 6

.00 to Km 20.00

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total 

Confor

Sco

A*B

Contr

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 2

1 6

1 0

1 0

1 0

1 0

3 1

1 0

0 0

2

Non‐

mance 

ore 

B*C

ractor

Total Non‐

Conformance 

Score 

A*B*C

MC

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 2

6 6Pa

0 0

0 0

0 0

0 0

8 18

0 0

0 0

6 26

Comments

RRPM missing between km 

vement marking faded between 

km 18 to km 19

RUS&CPM ‐ 10 (3 months from

September 2016

   

Photo N

15 to km 16 60,61 & 

km 15 to km 17 & 63,64,65 & 

m July 2016 to 

)

 

No.

62

66,67

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5

RUS&CPM6

RUS&CPM7

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11

RUS&CPM12

RUS&CPM13

RUS&CPM14

Any RUS&CPM

Any RUS&CPM

Any Road Safety

 Hazards

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 06.10.2016

Item D

Pavement Maintenance

Unsealed Shoulder Maintenenc

Drainage Maintenance

Routine Maintenance of Bridge 

Obstructions on the Pavement 

Incident and Emergency Works 

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Ma

Pavement Markings ‐ (Lines, Te

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedes

Marker Posts (Guard Stones, Bo

Markers, Hazard)

Repeated Non‐Conformance in 

Any un‐reported Non‐Conforma

Consultant

Any Immediate Safety Hazard t

Bathinda Network in P

Table  3

Description

e

and other Structures

Surface and Shoulders

Response 

arkers

xt, Symbols etc)

Maintenance

strian Barrier Maintenance 

oundry, Edge, Culvert, Distance 

Consecutive Months

ance identified by the Monitoring

o Road Users Instructed for Rep

Punjab (India) 

3‐27 : Verification

5 km Audit Length Start Loc

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

air

Total  Score

 

n of Audit – Sect 

cation           B8        Km 20   to   k

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Numbe

Confor

Reco

Minimu

Leng

M

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

  68

tion B8 – Km 20.0

km 25

r of Non‐

rmances 

orded

um Audit 

gth A

MC

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

0 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

00 to Km 25.000

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total N

Conform

Scor

A*B

Contra

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

0 0

1 0

0 0

0

Non‐

mance 

re 

*C

actor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Comments

   

Photo No.

 

OM

TNM TECMAN

OPRC World Bank ProjMonthly Progress Report N

Month : September 2016

Non‐Conformance Relating To

RUS&CPM1

RUS&CPM2

RUS&CPM3

RUS&CPM4

RUS&CPM5 O

RUS&CPM6

RUS&CPM7 V

RUS&CPM8

RUS&CPM9

RUS&CPM10

RUS&CPM11 T

RUS&CPM12 C

RUS&CPM13 S

RUS&CPM14

Any RUS&CPM

Any RUS&CPMA

C

Any Road Safety

 HazardsA

HNOLOGY AND NAGEMENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Date of Audit: 06.10.2016

Item Des

Pavement Maintenance

Unsealed Shoulder Maintenence

Drainage Maintenance

Routine Maintenance of Bridge a

Obstructions on the Pavement Su

Incident and Emergency Works R

Vegetation Control

Roadside Signs Maintenance 

Raised Reflective Pavement Mark

Pavement Markings ‐ (Lines, Text

Traffic Island and Roundabout M

Crash Barrier Maintenance 

Sight Rails, Hand Rail and Pedest

Marker Posts (Guard Stones, Bou

Markers, Hazard,Road Delineator

Repeated Non‐Conformance in Co

Any un‐reported Non‐Conforman

Consultant

Any Immediate Safety Hazard to 

Bathinda Network in P

Table  3

scription

nd other Structures

urface and Shoulders

Response 

kers

t, Symbols etc)

aintenance

rian Barrier Maintenance 

undry, Edge, Culvert, Distance 

rs)

onsecutive Months

nce identified by the Monitoring 

Road Users Instructed for Repair

Punjab (India) 

3‐28 : Verification

Minimum Audit Length

 for Each Recorded

 Non ‐ Conformance

5km (1km for ravelling or 

cracking or edgebreake)

5km (1km for Shape)

1km

5km

1km

N/A

5km 

5km

5km/1km

5km/1km

5km

5km

5km

5km

r

Total  Score

Road Section: B8; Length of Au

 

n of Audit – Sect

Number of Non‐

Conformances 

Recorded

Minimum Audit 

Length A

Contractor

Number 

Conform

Recor

Minimum

Lengt

M

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

2 2

0 0

0 0

0 0

0 0

0 0

0 0

0 0

udit Section: 5 km; Location from

  69

tion B8 – Km 25.0

of Non‐

mances 

rded

m Audit 

th A

C

Non‐

Conformances 

Weighting 

B

0 2

0 1

0 2

0 2

0 1

0 2

0 1

0 2

0 2

2 2

0 1

0 1

0 1

0 2

0 6

0 6

0 6

m km 25 to km 30

00 to Km 30.000

Sub‐Weighting 

No of

 Consecutive 

Weeks/Months 

C

Total No

Conforma

Score

A*B*C

Contract

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 0

1 4

1 0

1 0

1 0

1 0

0 0

1 0

0 0

4

on‐

ance 

C

tor

Total Non‐

Conformance 

Score 

A*B*C

MC

0

0

0

0

0

0

0

0

0

4 Pav

0

0

0

0

0

0

0

4

Comments

vement marking faded between k

   

Photo No.

km 26 to km 28 68,69 & 70

0

TNM 

OPRC World Monthly Progre

3.9

 

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Audit Inspect

[Photograph N

Ph

Ph

Ph

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

tion Photogra

Numbers As R

 oto No. 1 

 

oto No. 3  

 oto No. 5 

thinda Network in 

aphic Record

Referred in Ab

Punjab (India)

d of Non‐Conf

bove Tables (

 

  

 

 

formances

(From Table 3

P

P

P

 

3.13 To Table 

 Photo No. 2 

Photo No. 4 

 Photo No. 6 

  70

3.28)] 

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Ph

Ph

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 

 oto No. 7 

 

 oto No. 9 

 

 oto No. 11 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 8 

 Photo No. 10 

 Photo No.  12 

  71

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 13 

 

 oto No. 15 

 

 oto No. 17 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 14 

 Photo No. 16 

 Photo No. 18 

  72

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

  

oto No. 19  

 oto No. 21 

  

 oto No. 23 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

  

Photo No. 20 

 Photo No. 22 

  

 Photo No. 24 

 

  73

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 25 

 

 oto No. 27 

 

 oto No. 29 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 26 

 

 Photo No. 28 

 

 Photo No. 30 

 

  74

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 31 

 

 oto No. 33 

 

 oto No. 35 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 32 

 

 Photo No. 34 

 

 Photo No.  36 

 

  75

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 37 

 

 oto No. 39 

 

 oto No. 41 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 38 

 

 Photo No. 40 

  

 Photo No. 42 

 

  76

 

 

 

 

TNM 

OPRC World Monthly Progre

 

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 43 

 

 oto No. 45 

 oto No. 47 

  

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 44 

 

 Photo No. 46 

   

 Photo No. 48 

  

  77

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 49 

 

 oto No. 51 

 

 oto No. 53 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 50 

 

 Photo No. 52 

 

 Photo No. 54 

 

  78

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 55 

 

 oto No.  57 

 

 oto No. 59 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 56 

 

 Photo No. 58 

 

 Photo No. 60 

 

  79

 

 

 

 

TNM 

OPRC World Monthly Progre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 61 

 

 oto No. 63 

 

 oto No. 65 

 

thinda Network in Punjab (India)

 

 

 

 

P

P

P

 

 Photo No. 62 

 

 Photo No. 64 

 

 Photo No. 66 

 

  80

 

 

 

 

TNM 

OPRC World Monthly Progre

  

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

Pho

Pho

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 oto No. 67 

 

 oto No. 69 

 

thinda Network in Punjab (India)

 

 

           

 

P

P

 

 Photo No. 68 

 

 Photo No. 70 

 

  81

 

 

 

TNM 

OPRC World Monthly Progre

4 ENV

4.1

4.2

SI. 

No. 

De

1  RO

wit

day

any

of 

2  Bo

Ma

3  Co

and

fac

ma

4  Co(bonowama

5  Am

(AA

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

VIRONME

Environmen

This  part  ofmanagementIssues relatedstaff  at  site, management

Complianceguidelines

Table  4‐

escription Act

OW Encroachm

thin five work

ys of observin

y encroachme

ROW. 

rrow Area 

anagement 

nstruction pla

d Contractor‘

cilities 

anagement 

nstruction waoth hazardoun‐hazardous aste) anagement. 

mbient Air Qu

AQ) in 

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

ENTAL&S

ntalManage

f  the  report t conducted dd to functionaair  pollution

t were discus

e as per En

‐1: Complianc

tivity  St

Con

ment 

king 

ng 

ent 

No

ants 

‘s 

All recompobtaadeqimplesite s

aste s and 

Storerecycregu   

ality  Mitigmeas

thinda Network in 

SOCIALM

ement

highlights  tduring the moality of equipn  control  actsed. Observa

nvironment

ce as per Env World 

tatus as Per 

tractor’s MP

Nil 

ot applicable.

egulatory pliance ined and quate ementation ospecific EMP.

ed, reused, cled & sold larly. 

gation sures taken fo

Punjab (India)

ANAGEM

the  activitiesonth of Septement’s, healttivities,  dust tions and key

tal Perform

ironmental PBank guideli

Action R

Regular 

required

Records 

shall be 

of 

Facilitiessite  shoaccordanobservat

Solid  a

Material

done  as

Act. 

Spillage 

hazard 

controlle

contami

waste  sh

hazardo

 

or Dust sup

Plantatio

 

ENT

s  related  to ember 2016. th and safetyemission  coy issues have 

mance Indic

Performancenes 

Required / M

be taken 

observa

d. 

of  borrow  a

maintained a

s  for  labor ould  be  maince  wittions raised b

nd  Hazardo

l  Manageme

s  per  Provisio

of  bitumen 

material  s

ed  and

nated  sand 

hould  be  sto

us waste faci

ppression / b

ons  in  both 

 

  the  Environ

y of labour anontrol,  water been explain

cators as p

Indicators as

Measures to 

 

tion  is 

area  closed 

at site.  

and  plant ntained  in h  the by the MC. 

ous  Waste 

ent  to  be 

ons  of  the 

and  other 

should  be 

d  oil 

and  other 

ored  under 

lity. 

arriers and 

the  camp 

  82

nment  and 

d other contrand  waste  w

ned in the rep

per World

s per 

Remar

 

 

Insufficient circulation exhausts were  obselabor  camneed  imattention.  

Improvemenrequired  foperation maintenanceWaste ManaSites.  

Dust  barrieinstalled  bu

 

social 

ractor water port. 

Bank

rks  

Air and 

facilities rved  in ps  and 

mmediate 

nt  is for  the 

and e  of agement 

rs  were ut  more 

TNM 

OPRC World Monthly Progre

con

str

6  AmLevconstr

7  Reg

com

8  EnvMaPro

9  OpMaProlabduma

10  Machaarcremexccon

11  Precomdisto inccom

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

nstruction 

etches. 

mbient Noise vels (ANL) in nstruction etches. 

gulatory 

mpliance. 

vironmental anagement ocess. 

perational anagement ocesses includbour deploymring routine aaintenance w

anagement ofance discoverchaeological mains at any scavated undentract. 

evention of mmunicable seases spreadnew areas ducreased mmunication

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

enhaby resprinfor dsupp 

Mitigmeasredulevel has bper msched

Docuand rof licperm& renupda

EnvirScreeEnvirImpa& Enmanaof linroadsubmappr

ding ment and ork. 

As peroutimain

f any ry of 

site er the 

Not f

ding ue to 

s. 

HIV‐Aawarcondothetakenbase

thinda Network in 

ancing the AAegular nkling of wateust 

pression. 

gation sures taken focing the noise& monitoring

been carried amonitoring dule. 

umentation record keepinenses/ 

mits/ consentsnewed/ ated regularly

ronmental ening, ronmental act Assessmenvironmental agement Plannk specific s has been mitted and oved by clien

er schedule one and ntenance wor

found. 

AIDS reness camp iducted and r measures n on regular s. 

Punjab (India)

AQ 

er 

sites to b

basis.  

or e g as 

Improve

to  att

pollution

ng 

y. 

To be co

nt 

nt. 

To  be  m

clauses 

agreeme

MoEF 20

amendm

rk. 

Improve

provision

Protectiv

labour 

mainten

bank no

If  fou

archaeo

project 

docume

is Awarene

organize

agreeme

Condom

as soon 

 

be improved 

ed  plantation

tenuate  th

n generation.

omplied regul

maintained  a

setup  in 

ent & EIA not

006 and  its  s

ments.  

ement  requ

n  of  PPEs 

ve  Equipmen

for  rout

nance work as

rms.  

nd,  any 

logical  rema

site  s

nted.  

ess  camps 

ed  as  per 

ent.  At  c

m Boxes  shou

as they are e

 

on priority 

n  will  help 

he  Noise 

.  

larly. 

as  per  the 

contract 

tification of 

subsequent 

uired  for 

(Personal 

nt)  to  the 

tine  and 

s per world 

such  an 

ains  in  the 

shall  be 

should  be 

contract 

amp  site 

ld be  filled 

mpty. 

  83

are  still  rSurvival  oplants under  greeneeds  toensured.  

 

 

Sewage  trplant  shouoperated  rand inspections done.   

 

 

 

 

required. of  the planted 

en  belt o  be 

reatment uld  be regularly regular shall  be 

TNM 

OPRC World Monthly Progre

4.3

SI. No. 

1  Sw

2  S

3  C

4  ADH

5  CC

6  Ap

7  F

4.4

SI. No. 

1  Soma

2  Sane

3  Wtre

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

StatusofGe

Ta

Facilities

Separate  Driwater facility 

Security 

Creche Facilit

Availability Doctor  /  MeHelp 

Cooking  faciCanteen 

Awareness posters 

First Aid Facil

StatusofPh

T

Indicators 

olid waste anagement  

nitation etwork 

aste water eatment facil

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

eneralfacilit

able  4‐2 : Sta

nking  Providrinkby co

Provicamp

ty   Not R

of edical 

Detafacilitavaila

lities/  Proviin  Caother

Awarrelatecampposte

ity   First both first store

hysicalEnvir

Table  4‐3 : St

Not Ma

Provide

ity Providefunctio

thinda Network in 

tiesatContr

atus of Gener

Stat

ided.  Treatmking water  haontractor at p

ided.  Gated p sites is prov

Required.  

ils  of  nties/  local able.  

ided. Meal  faamp  site  for r camp reside

reness  posteed  to  occupp  site.  Road  sers need to be

Aid  boxes camp  sites. aid  room  wae room.  

ronmentalA

tatus of Physi

Status 

aintained 

ed 

ed but not onal.  

Punjab (India)

ractorCamp

al facilities at

tus 

ment  facility as  been  provproject site.  

entry  for vided.  

earby  Meddoctors 

acility  is provproject  staff ents.  

ers  are  instapation  safetysafety  awaree provided. 

are  providedAt old  campas  being  use

AspectsonS

ical Environm

Responsi

Contracto

Contracto

Contracto

 

pSite

t Contractor 

for vided 

Regulasystem

both  SecuriCamp 

The operafacility

dical are 

Agreehospitof  thmedic

vided and 

‐  

alled y  at eness 

More installof the

d  at p  site ed  as 

First  APlacembox mshall used f

Site

mental Aspect

ibility 

or  SegremaincompdumpUrge

or  ‐ 

or  To befunct

 

Camp Site 

Action

ar  Maintenam to be done

ity Guard  at  should be m

camp  site tors  and  drivy is not requi

ement may betal or medicae  Emergenccal requireme

number of aled and on  see project road

Aid  box  to ment  and  acmay  be  improbe  maintainefor any other 

ts on Site 

Action requ

egation  yardntained. posting  pit wp area.  nt attention 

e made opertional. 

  84

n / Remarks 

nce  of  filter.  

the  entry  poaintained. 

has  the  favers  only,  thred.  

e done with tal authority focy  services  aents.  

wareness poselected  junctd.  

be  managedccessibility  ooved.  Dispened  and  shoupurposes. 

uired 

d  was  not Organic 

was  used  as 

is required. 

ational and Proper 

 

rs  and  RO 

oint  of  the 

acility  for hus  Creche 

he nearest or facilities and  other 

sters to be tion points 

d  properly. f  First  aid sary  room uld  not  be 

Remarks 

‐ 

‐ 

‐ 

TNM 

OPRC World Monthly Progre

4  StoPla

1.

2.

3.

4.

5.

5  Du1. 2. 3.

6  Sa

7  Oi

8  PPLa

9  DGSta

10  Plaanca

M TECHNOLOMANAGEM

 

Bank Project for Sess Report No 24 (Se

ockyard anning 

Solid Platfor

Segregation Materials  

Layout of Ya

Ground Levelling  

Covering vehicles fine  parttransportati

ust SuppressioHaul Road  Stock Yard  Open Area Camp Site  

fety Equipme

l & Grease Tr

PEs provided tbour 

G sets adequaack  

antation insidnd around themp site  

OGY AND MENT LTD.

angrur Mansa Bateptember 2016) 

 

rms   Provideand installacamp s

of  ‐  

ard  Approvplan is client.  

Mainta

of for 

ticle on   

‐ 

on 

in 

Not ma

ent   Partiall

rap   Provide

to  Partiall

ate  Provide

de e 

Not pro

thinda Network in 

ed for DG setothe

ations  in  botsites. 

ved  layouawaited from

ained 

aintained 

ly maintained

ed.  

ly maintained

ed  

ovided.  

Punjab (India)

 

ts er h 

Contracto

Contracto

ut m 

Contracto

Contracto

Contracto

Contracto

d.  Contracto

Contracto

d.  Contracto

Contracto

Contracto

 

treatbe  dtestinplacerequ

 

or  Garlawas sand wthe cplatfo

or   

or  ‐ 

or  Shouregul

or  ‐ 

or  Dust insta

or  Geneneed

or  To main

or  ImprRequAwarof  Pprovi

or  ‐ 

or  New and matunearbplantpossimeas

 

tment of wasone  and  primng  facility ed  onsite  asirements.  

anding of the suggested to was implemecontractor fororms 

uld be maintalarly. 

barriers shallled on priori

eral safety meds to be impro

be  cleanntained regula

ovement require  Trainreness  prograPPE  which ided to labou

Saplings  to healthy  / 

ure  trees  avaby  areas  mted  in new caible,  as sure.  

  85

te water to mary water should  be   per  PPCB 

Platforms contractor nted by r DG sets 

ined 

l be ty.  

easures oved. 

ned  and arly.  

uired.  ning  & am  for  use has  been 

urs.  

be  planted growing  / 

ailable  from may  be  re‐amp site,  if immediate 

 

 

 

 

 

 

 

 

 

 

 

 

 

TN 

OM

4

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

4.5 Status

Activities 

Camp Layout Plan 

Consent to Establishment (CTE) for Hot Mix Plant (Apollo) 

Consent to Operation (CTO)

for Hot Mix Plant (Apollo) 

NOC for change of Land Use 

Permission for Withdrawal of Ground Water for Construction

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

ofStatuaryCle

StatutoryAuthority

PWD, Sang

Punjab StaPollution Con

Board 

) Punjab StaPollution

Control Boa 

District TowPlanner, Bath

 

Central GroWater Boa

 

Bathinda Network in P

earancesApplic

Table  4‐4

y y 

WheRequi

rur Befo

Constru

ate ntrol 

BefoConstru

ate n ard 

BefoConstru

wn hinda 

BefoConstru

und ard 

BefoExtrac

Punjab (India) 

cableforproje

4 : Status of Statu

en ired 

Camp‐1: Khia

ore uction 

Appliedcamp seweraletter PIPL/OPdated 3

ore uction 

AppliedPIPL/OP14/010 09.2013

ore uction 

AppliedPIPL/OP14/ 24.10.2 

ore uction 

Applied16.04.2

ore ction 

AppliedOPRC/P14/007 No.908Mansa.

 

ctandCampsi

uary Clearances A

Applied 

ala Khurd Camp a

d  with  reviselayout  plan  witge  system  vid

nPRC/186/  20131.07.2013 

d  vide  letter  nPRC/PWD/  201

dated  23 

d  vide  letter  nPRC/  PWD  /201

027  date2013 

d dated 2013 

d  vide  PIPPWD/201/2013‐

Receivin3  at  DC  offic 

  86

te

Applicable for pr

Status 

Obtain

at Km. 64+050; 3

ed th de o. 13 

‐ 

o. 3‐23. 

Obtained ZO/BTI/201304.10.2013 

o. 3‐ed 

Obtained ZO/BTI/WPCdated  19.1/APC/2013/19.12.2013 

Obtained 997DTP(B)/517.04.2013 

L/ 

ng ce 

In  process (letter  no2015)  has office  Man16341) date

roject and Camp

ed / Approved 

3KM LHS 

vide  NOC 3/  NOC  ‐110  da

vide  NOC C/  2013  /F‐112.2013  &  ZO//  F‐  148  da

vide  letter 55  da

Gentle  remin.  PIPL/OPRC/6been  given  to nsa  (receiving ed on 30.07.2015

p site 

Expiry Da

NA 

No. ted 

03.10.20 

No. 164 /BTI ted 

30.06.20 

no. ted  NA 

der 18/ DC no. 

NA  

ate  Rem

14  Renewrequired abeen es

16  Not in udemo

Extractiofrom localbore wellpaymen

   

marks 

 

wal is not as plant has tablished 

use; to be obilized 

 

n of water lly available l owner on nt mode. 

TN 

OM

C

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Installation of Generators 

Explosive License for 

Storing Fuel Oil, Lubricants, 

Diesel, etc. at Construction 

Camp 

Camp‐2: Khiala K

Camp Layout Plan 

Consent to Establishment 

(CTE) for Hot Mix 

Plant (Linhoff) 

Consent to Operation (CTO)

for Hot Mix Plant (Linhoff) 

Storage Handling and Transport of Hazardous Materials 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Punjab ElectricityBoard 

Chief Cont.Explosive

Kalan Camp at K

PWD, Sang

Punjab StaPollution Con

Board 

) Punjab Sta

Pollution ConBoard 

Punjab StaPollution Con

Board 

Bathinda Network in P

y Befo

Installa

. of es 

BefoInstalla

M. 61+600; 0.3K

rur Befo

Constru

ate ntrol 

BefoConstru

ate ntrol 

BefoConstru

ate ntrol 

BefoConstru

Punjab (India) 

ore ation 

Applied2014 ‐ 123.04.2 

ore ation 

Applied2014‐ 122.04.2

KM RHS 

ore uction 

Appliedlayout seweraletter n/2014 d

ore uction 

Applied10830929.03.1

ore uction 

Applied130825dated 1

ore uction 

AppliedID no. 111.06.2

 

d  PIPL/ADMIN15/078 dated 2015 

d  PIPL/ADMIN15/018 dated 2015 

d  revised  camplan  wit

ge  system  vidno. PIPL/OPRC/40dated 09.09.2014

d ID Nos. 96 dated 1014 

d ID Nos. 53 and 130818816.05.1014 

d application 1421038 dated 2014 

  87

N/ Obtained  vdated 27.04

N/  Obtained P/NC/PB/14dated 22.04

mp th de 08 4 

‐ 

Obtained vidZO/BTI/2014dated 17.04

Obtained vidZO/BTI/WPCZO/BTI/APC21.05.2014 

Obtained HWM/MMSdated 28.08

ide  memo  00074.2015 

vide 4/4153  (P31704.2015 

de NOC No. 4/ NOC ‐123 4.2014 

de NOC No. C/  2014/F‐180 /2014 /F‐163 da

vide  letter S‐2014/16826448.2014 

760 10.04.20

no. 010)  31.12.20

NA 

16.04.20

& ted 

30.06.20

no. 27.08.20

17 

17 

15 Renew

required abeen es

19 Indus

R14MNS

15 Applied fo

(Applic3467

   

 

 

 

wal is not as plant has tablished 

stry ID S1083075 

or renewal cation ID 7370) 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Installation of Generators 

 

Permission for Withdrawal of Ground Water for Construction

 

Registration of Vehicles & RoadEquipments 

PUC of all Vehicles/ Machinery 

Labour license 

Labour License 

Sand Mining 

Quarry for Aggregates 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Punjab ElectricityBoard 

 

Central GroWater Boa

 Motor VehiDepartme

Motor VehiDepartme

Labour Commission

Sangrur 

Labour Commission

Bathinda

Dept of Geo.Mining 

Dept of Geo.Mining 

Bathinda Network in P

y Befo

installa

und ard 

BefoExtrac

icle nt 

Befoconstru

icle nt 

Befooperat

ner  ‐

ner, a 

 And  Befooperat

 And  Befooperat

Punjab (India) 

ore ation 

Applied2014‐1523.04.2

ore ction 

AppliedOPRC/P14/007 No.908Mansa.

ore uction 

Applied

ore ional 

Applied

Appliedletter PIPL/AD15/39 d

Appliedvide PIPL/AD15/40 d

ore ional 

‐ 

ore ional 

‐ 

 

d  PIPL/ADMIN5/078  date2015 

d  vide  PIPPWD/201/2013‐

Receivin4  at  DC  offic 

Other Clear

d various date 

d various date 

d  for  renewal  vidn

DMIN/2014‐ dated 15.12.2014

d for renewedletter  n

DMIN/2014‐ dated 15.12. 201

  88

N/ ed 

Obtained vid000761 date

L/ 

ng ce 

In  process (letter  no2015)  has office  Man16341) date  

rances 

Obtained 

Various date

de o. 

Obtained  v563  dated labours 

o. 

Obtained  vi20/2013  da50 labours 

‐ 

‐ 

de memo ed 27.04.2015 

Gentle  remin.  PIPL/OPRC/6been  given  to nsa  (receiving ed on 30.07.2015

es 

ide  License  no.‐19.02.2013  for  1

ide  License  no.  ‐ted  06.05.2013 

10.04.20

der 18/ DC no. 

NA  

Various da

Various da

‐  L‐100  31.12.20

‐  L‐for   

NA 

NA 

17 

Extractiofrom localbore wellpaymen

ates Engaged

pro

ates Engaged

pro

16  Applied fo

Not Appprocur

existing sa

Not Appprocur

existing sa

   

 

n of water lly available l owner on nt mode. 

d for OPRC oject 

d for OPRC oject 

or renewal. 

‐ 

plicable as red from and quarry 

plicable as red from and quarry 

TN 

OM

4

T

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Debris Disposal Sites 

Canal Water Permission 

Forest Clearance

.

4.6 Future

Following key iss

1. Air pollu

2. Air pollu

3. Waste ha

4. Safety pr

These are the ke

issues may be re

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Gram Panch

IrrigationDepartme

e Forest 

Departme

ekeyissuesas

sues may arise du

tion from Hot M

tion from road c

andling and man

ractices during ro

ey potential issue

solved and mana

Bathinda Network in P

ayat Befo

Operat

n nt 

nt Befo

Operat

reviewedfrom

uring future cons

ix Plant operatio

onstruction work

nagement during 

oad construction

es that may arise 

aged if good envi

Punjab (India) 

ore tional 

AppliedPIPL/OPdated 0

Applieddated 0

ore tional 

Various

mtheworkspro

struction work as

on. 

k. 

road constructio

n.  

during further r

ironmental pract

 

d  vide  letter  nPRC/  101/20102.05.2015 

d for renewal 06.10.2015 

s dates for differe

ogrammeandw

s there may be ch

on.  

oad construction

tices and environ

  89

o. 13   

Renewed  vreceipt  no01.10.2015 

ent Sections 

workmethod

hange in scenario

n work and chang

nmental managem

vide  serial  no. o.  110485  da

o in the working 

ge in working me

ment plan to be 

NA 

Z, ted  31.03.20

NA 

method and wor

ethod and workin

implemented. 

Ch. 6+300road. Not debris be

16  Applied fo

Applicatioclearances

by PSan

rking program. 

ng program. How

   

0 R/S on S‐2 required as ing reused. 

or renewal 

on for forest s submitted PWD, ngrur 

wever these 

TN 

OM

5

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5 ROAD SA

5.1 Introdu

This  se

finding

Safe an

practic

The Se

by the 

5.2 Crash R

Crash a

Contra

The pr

Month

Table 5

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

AFETY AND TR

uction 

ection  presents  t

gs performance a

nd efficient netw

es in accordance

ction also contai

World Bank Miss

Records 

analysis is presen

ctor. The fatal cr

incipal data sour

ly Progress Repo

5‐1 gives the sna

Bathinda Network in P

RAFFIC MANA

the  road  safety p

udit conducted m

work are the prim

e with the provisi

ns recommenda

sion.   

nted by using cra

rashes are verifie

rce  for this  repo

orts (MPRs). The d

pshot of total cra

Punjab (India) 

AGEMENT 

performance of 

monthly by Mon

me aims of the O

ions of the contra

tions based on c

ash records from

ed with the police

ort was the Road

data format is pr

ashes on the OPR

 

the OPRC netwo

itoring Consultan

OPRC project. MC

act ‐ to ensure th

continuous road s

m the March 2013

e records for auth

d Crash database

rogressively bein

RC network year 

  90

ork  in  terms of 

nt.  

C is making all ef

hat the Contracto

safety assessmen

3 up to Septemb

henticity. 

e maintained by 

g improved to pr

wise. 

crash  statistics  b

fforts with the he

or builds and ope

nt being carried o

er 2016. The info

M/s PIPL and su

rovide meaningfu

based on  the  an

elp standards, sp

erates safer road

out regularly by 

ormation is extra

ubmitted to Mon

ul details. 

nalysis  of  crash  r

pecifications, gui

s. 

the Team Leade

acted from the M

nitoring Consulta

   

records  and 

delines and 

r as desired 

MPRs of the 

ant  through 

TN 

OM

 

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

Table 5

 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Sr. No.  Road

Total 

5‐2 gives the sna

Sr. No.  Road

Total 

Bathinda Network in P

d Name MaN

S1 

S2 

S3 

S4 

S5 

B8 

pshot of total fat

Ta

d Name MaN

S1 

S2 

S3 

S4 

S5 

B8 

Punjab (India) 

Table  5‐1 : OPRC

ar. 2013 to Nov. 2013 

59 

81

talities on the OP

able  5‐2 : OPRC N

Tota

ar. 2013 to ov. 2013 

13 

23 

 

C Network Crash

Dec. 2013 to Nov.2014 

78 

86

 

PRC network yea

Network Fataliti

al Fatalities 

Dec. 2013 to Nov.2014 

15 

  91

h Details (Up to S

Dec. 2014 toNov. 2015 

71 

98 

r wise. 

es Details (Up to

on Network

Dec. 2014 toNov. 2015 

September 2016)

o  Dec. 201Nov. 20

63

78

o September 201

o  Dec. 201Nov. 20

15

18

15 to 016 

Total 

2

3

16) 

15 to 016 

To

4

Crashes 

19 

271 

17 

10 

11 

15 

343

otal 

44 

10 

64 

   

TN 

OM

      

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.3 Crash A

The aim of

were first r

crash histo

 

Total 8

The tot

There w

Where

some u

While t

There h

10 com

65% of

Figure       

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Analysis 

f this crash analy

reported by the 

ry, the identifica

8 crashes were re

tal number of cra

were no fatal cra

as S2 Section co

urgent road safet

the total number

has been fatal cr

mpared to numbe

f crashes were at

5‐1 to Figure 5‐5

Bathinda Network in P

ysis is to examine

contractor.  The

tion of any trend

eported on the ne

ashes this year (7

ashes reported in

onstitutes 52.1% 

ty measures, esp

r of crashes has c

ash on OPRC net

er of deaths last y

tributed to spee

5 depicts various 

Punjab (India) 

e the crash histo

re are many fact

d will assist in dev

etwork for report

78) is down by 9, 

n the month of Se

of OPRC Netwo

ecially in the wak

come down from

twork for the last

year (8). 

ding and overtak

attributes of cra

 

ory and trends in

tors which contri

veloping strategi

ting month of Se

compared to the

eptember 2016.

rk,  it accounted 

ke of ensuing win

m previous year, t

t two months, ho

king. 35% of cras

sh statistics. 

  92

 the occurrence 

ibute to the occu

ies to decrease th

eptember 2016.  

e number of cras

for 80.8% of all 

nter/fog season. 

he number of fat

owever, total num

hes were single v

of these crashes

urrence of road c

he number of roa

shes same time p

crashes and 83.

talities on OPRC 

mber of fatalities

vehicle – leaving 

s since March 20

crashes. Althoug

ad crashes.  

previous year (87

3% of all fatalitie

Network has rise

s in the 4th Year 

the carriageway

013 when the cra

gh it’s a very sho

7).  

es  in the 4th Yea

en sharply. 

stands at 18, wh

y. 

   

ash records 

rt period of 

r, requiring 

hich is up by 

TN 

OM

       

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

1

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

1.3

106.13

3

44

S1 S2

Lengt

Section 

Bathinda Network in P

Figure 5‐1: O

7.29 24.971

S3 S

th v Fatalit

Length (L) Fatal

Punjab (India) 

OPRC Network –

7 25.341 5

S4 S5

ties

ities (F)

 

 

– Section Length 

          

28.65 10

B8

  93

v Number of Fat

0.

S

talities& Fatality

07

0.12

0

S1 S2

Fata

Fat

y Rates 

0.040.01

S3 S4

ality Rates

tality Rate/Year (F)

0.06

0.10

S5 B8 A

s

   

0.09

AVERAGE

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

19

271

11.3

10

S1 S2

Len

Total Cra

Bathinda Network in P

Figure 5‐2

17 10

06.13

7.29

2 S3

ngth v Cras

ashes (C) Sectio

Punjab (India) 

2: OPRC Network

0 1124.97 25.34

S4 S5

shes

on Length (L)

 

      

k – Section Lengt

        

1528.65

B8

  94

th v Number of C

0.47

S1

Crashes& Crash R

0.710.65

S2 S3

Crash

Crash

Rates 

0.11 0.12

S4 S5

h Rates

 Rate/year(R)

0.15

0.47

B8 AVERAG

   

GE

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.4 Trend i

Total 8

There w

Althoug

twice c

The tot

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

in Crashes 

8 crashes were re

were no fatal cra

gh there were no

compared to tota

tal number of cra

Bathinda Network in P

Figure 

eported on the ne

ashes reported in

o deaths on OPRC

al fatalities last ye

ashes this year (7

34

TOT

Punjab (India) 

5‐3: OPRC Netw

etwork for report

n September 201

C network for th

ear (8).  

78) is down by 9, 

43

22

TAL SPEED

Speed

 

work – Speeding &

ting month of Se

16. 

e last two month

compared to the

 

27

66

DING PERC

ing & Align

  95

& Alignment as F

eptember 2016 (A

hs, total number 

e number of cras

6

11

CENT  RUN‐

nment as 

Factors in Crashe

All on S2 Road) 

of fatalities in th

shes same time p

18

34

‐OFF PERC

Factor

es 

he 4th Year stands

previous year (87

4

CENT

s at 18 which are

7). 

   

e more than 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

23

1ST YEAR

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

15

2ND YEA

Toatl Fata

Bathinda Network in P

8

AR 3RD Y

alities ‐ Yea

135

1

Punjab (India) 

Figure 5

Figure 

1

EAR 4TH

ar Wise

23

3950

1123

32

2 3 4

Total Cra

 

    

5‐4: OPRC Netwo

5‐5: OPRC Netw

18

 YEAR

59 63 6

4049

5

5 6

shes This Y

Third Year

  96

ork – Fatality Tre

work – Crash Tren

13

1

S2 S

6874

81

5664

70

7 8 9

Year v Last

Fourth Year

end 

nd 

9

2

Section Fat

8793 98

78

10 11 12

t Year

7

3

talities ‐ Ye

8

2

15

4

ear Wise

   

 

5

TN 

OM

 

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.5 Road S

Road s

treatm

work‐s

Part 6: 

5.6 Road S

Head o

establis

The ma

(mobile

The mo

and un

the inte

The gre

While t

road sa

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Cras

Fata

afety Audit 

afety audit is a p

ent approaches 

ites, is carried o

Road Safety Aud

afety Audit Find

on crashes, crash

sh possible trend

ain behavioural 

e phone use whil

ost significant ris

nsafe (helmet) dr

ersections, inade

eatest risks are fo

the total number

afety measures. 

Bathinda Network in P

  Dec Jan

shes  5  6

lities  0  0

powerful tool for

such as black sp

ut by the Team 

dits, IRC Codes an

ings 

hing  into slow m

ds in road user be

factor  continues

le driving), drivin

sks relate to unsa

rivers/passengers

equate clear zone

or pedestrians, tw

r of crashes has c

Punjab (India) 

Table  5‐3 : O

Crashes

n Feb Mar

12  9 

10  1 

r improving the s

pot treatments w

Leader along wit

nd in accordance

moving vehicle an

ehaviours and de

s  to be excessive

ng while intoxicat

afe overtaking m

s, stray animals, 

es, hazards in cle

wo‐wheelers and

come down, the 

 

PRC Network – S

s 4th Year (Dec. 2

Apr May Jun

8  9  7

2  3  0

safety of the roa

which is also part

th monthly netw

e with the princip

nd vehicle  leavin

eficiencies in road

e  speed with  tot

ted. 

manoeuvres, illeg

poor road work

ear zones, inadeq

d overloaded veh

number of fatalit

  97

Summary of Cras

2015 to Nov. 201

ne July Aug 

8  6 

2  0 

ad network in a p

 of this contract

work performanc

ples of ‘Safe Syste

ng the carriagew

d safety.  

tal  disrespect  to

al parking, un‐ro

k practices, poor 

quate delineation

hicles (with passe

ties on OPRC Net

sh Statistics 

16) 

Sep Oct

8   

0   

proactive manne

. Road Safety Au

e audit in accord

em Approach’. 

ay are predomin

o prevailing  cond

oadworthy and o

facilities for vuln

n and signposting

engers and goods

twork has risen s

Nov

  78 

  18 

er. It complemen

udit which also in

dance with Austr

nantly  reflected 

ditions,  urge  to o

overloaded vehic

nerable road use

g.  

s) involved in ove

sharply from 8 to

ts more tradition

ncludes road safe

ralia’s Guide to R

in crashes. MC h

overtake, driver 

les, unrestrained

ers, lack of traffic

ertaking manoeu

o 18, calling for so

   

nal reactive 

ety audit of 

Road Safety 

has tried  to 

inattention 

d (seat belt) 

c control at 

uvres 

ome urgent 

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.7 Road S

The mo

measu

Police t

Preven

Speed 

Improv

Improv

To sup

Contra

their ro

Employ

Institut

Safety 

5.8 Way Fo

Till now

Delinea

MC int

season

MC has

Keepin

 

 

 

 

 

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

afety Strategies 

ost  important  st

res. Without this

to help educate d

nt driving under t

Zoning and Traff

vement of junctio

vement of curve 

port the safe roa

ctors to ensure 

oad safety engine

y VMS and Flashi

tional arrangeme

Engineers. 

orward 

w MC has alread

ation’. 

ends to hold wo

s introduced stric

g in view the fac

Bathinda Network in P

trategy  to  reduc

s it will be difficu

drivers to comply

he influence of a

fic Calming Meas

ons and intersect

delineation with 

ad system concep

compliance to IR

eers to continuou

ing Lights around

ents for technica

y conducted tra

orkshop to enhan

ct compliance of 

tors and issues id

Punjab (India) 

e  crashes  on OP

lt to lower crash 

y with the rules, 

alcohol and enfor

ures on roads pa

tion delineation a

enhanced signag

pt, a strategic app

RC SP ‐55 throug

usly improve imp

d C/D and bridge 

l skills developm

ining sessions fo

nce night time de

traffic control an

dentified in Secti

 

PRC  network  is  t

rates as the maj

as well as enforc

rcement of seatb

assing through to

and signposting.

ge and crash bar

proach is needed

gh deploying app

plementation.  

works.  

ment by holding w

or the contractor 

elineation based 

nd TMP at work s

ion 6.7, MC will a

  98

towards  curbing 

ority of the crash

cement. 

belt and helmet u

owns and villages

riers at all risky l

d to make roadsid

proved channeliz

workshops, traini

on ‘Safe System

on findings of N

sites and use of p

assist the client in

excessive  speed

hes are due to ex

use. 

s. 

ocations identifie

de environment 

ation devices in 

ing courses for st

m Approach’, ‘Spe

Night Time Inspec

personal protect

n developing the

d  through  enforc

xcessive speed. 

ed by MC. 

more forgiving.  

and around roa

takeholders ‐ Co

eed Zoning Guide

ction and in view

ion equipment (P

eir road safety str

cement  and/or  e

 

d worksites and 

ntractor, Counci

elines ‘and ‘Enha

w of forthcoming

PPE) for workers

rategies in Punjab

   

engineering 

by training 

ls and Road 

anced Curve 

g winter/fog 

b. 

TN 

OM

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

5.9 Distribu

Distribu

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

ution of fatal cra

ution of Fatal cra

Bathinda Network in P

ashes in the OPR

ashes on OPRC N

Punjab (India) 

RC network 

etwork is illustra

Figure 5‐6

 

ated in Figure 5‐6

6 : Fatal Crash Lo   

  99

6 to Figure 5‐11. 

cations at Sectio

on S1 

   

TN 

OM

 

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figure 5‐7

 

7 : Fatal Crash Lo

  10

cations at Sectio

00 

on S2 

   

 

TN 

OM

 

 

 

  

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figure 5‐8

 

 

 8 : Fatal Crash Lo

   

  10

cations at Sectio

01 

on S3 

 

   

TN 

OM

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figure 5‐9

 

 

     

9 : Fatal Crash Lo     

  10

cations at Sectio

02 

on S4 

   

TN 

OM

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figure 5‐10

 

 

  

0 : Fatal Crash Lo       

  10

ocations at Sectio

03 

on S5 

   

TN 

OM

 

NM TECHNOLMANAGEM

OPRC World Bank ProjMonthly Progress Report N

LOGY AND MENT LTD.

ect for Sangrur Mansa No 24 (September 2016) 

Bathinda Network in PPunjab (India) 

Figure 5‐11

 

 

   

1 : Fatal Crash Lo

  10

ocations at Sectio

04 

on B8 

   

TNM TM 

OPRC WorlMonthly Pro

6 CO

6.1

6.1.1

SI. No. 

1. 

2. 

3. 

4. 

5. 

6. 

7. 

8. 

9.  6.1.2

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

ONTRACT

Contract’s

1 KeySta

Table  6

Road Mana

Road AssetManager 

Senior Site 

Site Engine

Site Engine

ConformanUnit 

Material En

Contract Fi

Plant & Equ

2 KeySta

SI. No. 

1.  D(H

2.  MSy

3.  BrEn

4.  RoMCo

5.  EnSp

6.  So

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

TOR’SSTA

sStaffaspe

affofLead

‐1: Contract

Position 

ager 

t Manager/R

Engineer 

eer (Construc

eer (Mainten

nce Managem

ngineer 

nancial Man

uipment Eng

affPresent

Table  6‐2: K

Position

esign EngineHighways) 

Management ystem/IT Ma

ridge ngineer/Con

oad Safety Management/onsultant 

nvironment pecialist  

ocial Speciali

a Bathinda Netwo

AFFAND

erContract

Contractor

or’s Key Staf

N

isk 

ction)

ance) 

ment 

nager 

gineer

tatSiteinS

Key Staff of P

n E

eer 

nager 

sultant 

/Design 

ist 

ork in Punjab (Ind

DCONSTR

tAgreemen

rPresentat

ff as per Con

Numbers

1  M

1  Ja

1  Pu

2 YoPa

Ch

2  Pa

Ra

1  Se

1  Sa

1  Pr

1 R 

September2

Professional 

New Profengineering C

Staf

Ziauddin A

Gopal K

Rashid N

Dhanraj N

Manoj K

Minati S

dia) 

RUCTION

nt

tSiteinthe

ntract Agree

Name of Pe

Mukesh Kuma

askarn Singh

ushpraj Singh

ogender Natandey 

hinu Singla

ankaj Kumar

akesh Kumar

ewak Singh S

anjay Pandey

raveen Kaha

K Singh

2016

Engineering

essional Consultant ff 

A Khan 

hatri 

Najfi 

Nagdev 

umar 

Sinha 

EQUIPM

emonthofS

ment and Pr

erson  M

ar 

A

r

Sidhu 

g Consultant 

MonitoriR

Despite cocommitmeprofessionavailable arequired bvisits of nemeetings harranged beven after requests, eroad safetyenvironme

   

MENTS

September2

resent at Site

Monitoring CRema

Full T

Acting as Billials

Full T

Full T

Full T

Full T

Full T

Full T

Full T

Full T

Full T

(PEC) 

ing Consultaemarks 

ntractual ent that the kals would bes and when y the Client, ew PEC staff ahave not beeby ContractoMC’s repeatespecially fory & ental experts

105 

2016

Consultant arks 

Time 

ng Engineer o 

Time 

Time

Time

Time 

Time

Time 

Time 

Time 

Time

ant 

key e 

and en r ted r 

s. 

 

SN

TNM TM 

OPRC WorlMonthly Pro

6.2

Sl. No. 

Eq

1  Hot M

2  WMM

3  Paver with se(Bitum

4  Hydrau

5  Backho

6  Motor

7  Loader

8  Paver for WM

9  Contrarespon

10  ContraInspecand Di

11  Vibrato

12  Pneum

13  Tipper

14  Water

15  Pavem

16  Bitume

17  Power

18  Falling(Pavemtesting

19  CalibraProfilo

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

Contracto

Table  6

quipment TyCharacteris

ix Plant (Bat

 Mixing Plan

Finisher Hydensor controminous Work

ulic Excavato

oes  

r Grader 

r  

Finisher MecMM Work 

actor’s patronse vehicles 

actor’s generction Vehicleisplacement 

ory Rollers  

matic Tyre Ro

r/Trucks  

r Tanker 

ment Marking

en Pressure 

r Broom 

g Weight Defment deflectg) 

ated Roughnometer 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

or’sConstru

6‐3: Construc

ype and stics 

ch type) 

nt 

drostatic ol s)  

ors 

chanical 

l and 

ral s (with GPS meters) 

oller 

g Plant 

Distributor 

flectometer ion 

ness 

a Bathinda Netwo

uctionEqui

ction Equipm

As PeAg

MinimumCapacity

100 TPH

60 TPH

100 TPH

1.0 m³ bucket

0.5 m³ bucket

150 kw

1.0 m³ bucket

100 TPH

 

 

8‐10 T

8‐10 T

5.5 m³

6 m³

 

 

 

 

 

ork in Punjab (Ind

ipment’sSe

ment as per C

er Contract reement 

m y 

MinimNumb

H 1

  1

H 2

2

2

  1

2

H  1

2

3

3

2

15

3

1

1

2

1

1

dia) 

eptember2

Contract Agr

Pr

mum bers 

Capa

128 T& 20TP

250 T

600 T

0.9‐1m

0.5 mbuck

120 m

1.61.7&

m

250T

8‐10

15M

5 14‐24

1200

016

reement/ Pr

resent at Site

city Numb

TPH 00 H 

1 ea

TPH  1 

TPH 2 

1.0 3 

m³ ket 

m3/h  3 

6‐&2.4 3 

TPH  1 

0 T  4 

MT  1 

4 m3 33

00L  4 

   

resent at Site

bers 

ach 

106 

Remarks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TNM TM 

OPRC WorlMonthly Pro

6.3

SI No. 

10 

11 

6.4

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

Contracto

P

Road Mana

CMU, Team

Field Engin

HR& Adm. 

Road Asset

Plant & Eq

Contract Fi

Road Safet

Billing/QS 

Quality Con

Reviewof

 

Monitoring Contract Aghas not chaengineers  frMonitoring found that  twith the critto the Emplquality of do

One  significAsset  ManaManager  ancritical for thqualification   

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

or’sStaffPr

Table  6‐4

Position  

ager 

m Leader 

neer 

t Manager 

uipment Eng

inancial Man

ty officer 

ntrol In‐char

fContracto

Consultant hreement andnged from wrom  the  siteConsultant fthe qualificateria, containoyer and thocuments an

ant  issue whager  in  the nd  Billing  Enhe success ons and exper

a Bathinda Netwo

resent–Sep

4 : Contact N

Muk

S. S.

Pank

Parv

Jask

gineer R. K

nager Parv

Ram

Jask

rge  Sanj

or’sStaff

has undertakd actual preswhat was ree.  The  CVs for review. Mations and exned in the coeir advice  isnd workmans

hich has  beeContractor’

ngineer  whicof this projecience as per 

ork in Punjab (Ind

ptember20

No. of Contra 

Name of Pe

kesh Kumar

 Sidhu 

kaj Kumar

veen Kahar 

karan Singh 

. Singh

veen Kahar

mesh Patil 

karan Singh 

jay Pandey

ken a reviewsent at the siported prevof  the  newMonitoring Cxperience ofontract. Mon still awaitedship. 

en highlightes  Staff.  Oneh  affects  thct that the cothe Contrac

dia) 

016

actor’s Staff 

rson 

w of the Contte in the moious month.

wly  appointeConsultant hf  the replacenitoring Consd. Deploying

ed  repeatede  engineer e  performanontractor apct Agreement

Present at S

Contact 

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

8288032

tractor’s Keyonth of Septe. Contractor ed  engineershad revieweded engineerssultant’s obsg such staff h

dly  is  that  thhas  dual  chnce  of  Assetpoints a full t.  

   

ite 

No. 

760 

757 

763 

780 

796 

782 

780 

778 

796 

753 

y Staff requirember 2016.has replaces  were  submd the credens were not  iervations wehas detrime

he  there  is  nharges  workt Managemetime Asset M

107 

 Remarks 

 

 

 

 

 

 

red as per th The situatioed some of  itmitted  to  thntials and han accordancere submittental effect o

no permanenking  as  Asseent.  It  is  verManager wit

 

he on ts he ad ce ed on 

nt et ry th 

TNM TM 

OPRC WorlMonthly Pro

7 PA

7.1

Thi

the

incl

 

As 

Pav

rec

Con

7.2

Sl. No. 

4   

 7 

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

AYMENTS

NetworkP

s Chapter de

e Contractor'

ludes curren

per  the  Gen

vement Roug

ommends  to

ntractor: 

i.

ii.

Financial

During the m28 is as belo

Value of WImproveme

Value of WRehabilitat

Value of WResurfacing

Value of WEmergency

Value of WNetwork Pe

Value of Wperforman

Value of WVariation 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

S

Performan

escribes the 

's next paym

nt description

neral  Condit

ghness and P

o  the  Emplo

Provisional 

CONFORMA

Contractor h

to process t

the  absence

Monitoring 

requirement

has  failed  t

software  av

withheld. 

Progresso

month of Sepow: 

Descriptio

Work executeent 

Work executetion 

Work executeg 

Work executey 

Work executeerformance 

Work executece achievem

Work execute

Total 

a Bathinda Netwo

nceforthem

recommend

ment corresp

n of the Claim

tions  of  the

Pavement De

oyer  to  con

payment  for

ANCES. 

has procured

he collected

e  of  the  req

Consultant 

ts.  Despite 

o  the  softw

vailable  at  th

ofOPRCTill

ptember 201

on 

d for 

d for 

d for 

d for 

d for Month

d for monthment  

d for Under 

ork in Punjab (Ind

monthofSe

dation of the

ponding to  t

ms submitted

  Contract  A

eflections ha

sider  any  of

r  the month

d the profilo

d roughness d

quired  softw

and  therefo

Monitoring 

ware  availabl

he OPRC  site

lDate

16, the IPC‐28

ValuDone

1, 91

733

96

ly  402

ly  261

3,40

dia) 

eptember2

 Monitoring 

he Month o

d by the Con

Agreement  a

ave yet to be

f  the  follow

 of Septemb

ometer at th

data has not

ware,  the  IR

ore  cannot  b

Consultant

e  at  the  pro

e,  it  is  recom

8 was proces

ue of Work e up to Date

11, 296, 720

3,571,734

6,041,591

2,881,964 

1,532,783 

‐ 

05,324,792 

016

Consultant 

of Septembe

ntractor to th

nd  consider

e collected, t

wing  alternat

ber 2016 cor

e OPRC proj

t been arran

I  data  could

be  accepted

repeated  re

oject  site.  U

mmended  th

ssed. The fin

Value oDone previo

1,861, 0

733,57

96,04

374,03

242,34

3,306,9

   

regarding th

r 2016. This

he Client. 

ring  that  the

he Monitorin

tives  for  pay

rresponding 

ject site but 

ged at the p

d  not  be  ve

d  to  fulfil  th

eminders,  th

Until  the  tim

hat  some am

nancial progr

of Work up to us IPC 

000, 922 

71,734 

1,591 

‐ 

37,804 

43,821 

‐ 

995,872 

108 

he approval o

 Chapter als

e  data  of  th

ng Consultan

yment  to  th

to 144 NON

the softwar

project site. I

erified  by  th

e  contractu

he  Contracto

e, makes  th

mount may b

ress upto IPC

This bill amount (Rs.

50,295,798

28,844,160

19,188,962

‐ 

98,328,920

 

of 

so 

he 

nt 

he 

N‐

re 

In 

he 

al 

or 

he 

be 

C‐

.) 

8

TNM TM 

OPRC WorlMonthly Pro

7.3

Sl.  No. 

Sl. No. 

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

Manhour

The  Summ

during the

Tab

Employee N

Yogendra B

‐ 

Harpreet Si

Dr. Sohan S

Dr. Vinay M

Dr. Asha Sh

Table 

Employee N

Deepak Kum

Varinder Si

Happy Sing

Dr Rajni Sar

Rohit Jinda

Gadi Moshe

Emilia De L

Note: Only 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

rsofMonito

mary  of  the

e Month of S

le  7‐1 : Man

Name 

Bhatnagar 

ngh 

Singh Seehra 

Maitri 

arma 

7‐2 : Man Ho

Name  D

mar  P

ngh CS

gla  AA

rangal  S

l  H

el  S

a Ossa HE

actual work

a Bathinda Netwo

oringConsu

  inputs  of  t

September 2

n Hours (for t

De

Project MTeam Lea

OPRC OpSpecialist

Principal 

PavemenSpecialist

Data Ana

Environm

ours (for the

Designation

Project Engin

CAD Expert/LSurveyor

AM‐Accounts/Ad

Secretary/As

Head Clerk 

Senior Engin

Hydraulic/DrExpert

king days are

ork in Punjab (Ind

ultantStaff

the  Monitor

2016 is given 

the month o

esignation 

Manager cumader

perational t/Asset Man

Auditor

nt Design t

alyst/Statistic

mental Specia

Tota

e month of S

neer

Land 

dministrator

ssistant

eer

rainage 

TOTAL (B

e included in

dia) 

f

ing  Consulta

in Table 7.1 

of Septembe

Man HourHom

m 1

ager

1

cian 

alist

al (A)

September 2

Man HoIn Hom

2

14

16

17

17

B) 6

 man hours,

ant’s  team  i

and 7.2. 

r 2016) – Ke

rs/Days In me Office

128/16 

‐ 

128/16 

‐ 

‐ 

16/2 

272 

2016) – Non 

ours/Days me Office

24/3 

44/18 

68/21 

76/22

76/22 

‐ 

688 

 Holidays ar

   

n  terms  of 

y Experts 

Man Hours/DaysOn Field 

48/6 

‐ 

48/6 

‐ 

‐ 

‐ 

96 

Key Experts 

Man Hours/DaOn Field

168/21 

32/4 

8/1 

‐ 

‐ 

‐ 

‐ 

208 

re not consid

109 

man  –  hou

s  Total MaHours

176 

‐ 

176 

‐ 

‐ 

16 

368 

ys d 

TotalMan Hours

192

176

176

176

176

‐ 

896

dered

 

rs 

an 

s

TNM TM 

OPRC WorlMonthly Pro

8 CL

8.1

8.2

8.3

8.4

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

LAIMSAN

This  secti

connectio

difference

referred  i

matter is 

DisputeR

Dispute R

 

There is n

 

There was

Arbitratio

Arbitratio

Mr MS Gu

 

There  is  a

PIPL), aris

detailed i

hearings s

15 and 16

 

The next h

Minuteso

There was

Minuteso

There was 

 

 

 

 

 

 

 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

NDDISPU

on deals wit

on with or ar

e  by  mutua

in  writing  by

referred to t

ReviewBoa

eview Board

no dispute pe

s no meeting

onTribuna

on Tribunal c

uram.  

an Arbitratio

sing out price

n PCC of the

so far. The A

6 July 2016 a

hearing is sc

ofArbitralT

s no meeting

ofDisputeR

s no meeting

a Bathinda Netwo

UTES

th  the dispu

rising out of

l  consultatio

y  either  par

the Arbitratio

rd(DRB)

d (DRB) comp

ending betwe

g/visit of DRB

al

consists of D

on Case  betw

e adjustmen

e contract. T

Arbitral Tribu

nd there hav

heduled to b

TribunalM

g in the mon

ReviewBoa

g in the mon

ork in Punjab (Ind

te of any ki

f  the Contrac

on,  then  the

rty  to  the  Di

on Tribunal.

prises of Mr 

een the Emp

B in the mon

Dr PC Markan

ween Claima

t formula, co

The case is w

unal had hea

ve been no m

be held in De

eeting

th of Septem

ardMeeting

th of Septem

dia) 

nd between

ct.  If  the pa

e  matter  in 

isputes  Revi

RP Indoria, M

ployer and th

nth of Septem

nda, Mr KB 

ant  (Chief  En

ontained in t

with the Arbi

rd the argum

meetings sinc

ecember 201

mber 2016. 

g

mber 2016. 

  the Employ

rties  fail  to 

dispute  sha

ew  Board  a

Mr HP Jamda

he Contracto

mber 2016.

Lal Singhal  (

ngineer,  PW

the clause 4

itration Tribu

ments of the

ce then.  

16. 

   

yer and  the 

resolve such

all,  in  the  fi

nd  if  still  un

ar and Mr RP

or. 

(Presiding Ar

WD)  and Resp

48.1 of GCC a

unal. There 

e respondent

110 

Contractor  i

h a dispute o

irst  place,  b

nresolved  th

P Singh.  

rbitrator) an

pondent  (M/

and as furthe

have been 1

t’s counsel o

 

in 

or 

be 

he 

nd 

/s 

er 

14 

on 

TNM TM 

OPRC WorlMonthly Pro

9 ME

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

EETINGS

Monitoring

Leader, Yo

Septembe

Team and 

The Monit

the non‐co

Agreemen

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

/INSPEC

g Consultant

ogendra Bhat

r 2016. Findi

Project Man

oring Consu

onformance 

t. 

MC E

a Bathinda Netwo

TIONSHE

t team, consi

tnagar, inspe

ings of their 

nager on 16th

ltant conduc

report on 10

Environment

ork in Punjab (Ind

ELDDUR

isting of Env

ected the OP

inspection w

h September

cted the mon

0 September

al Consultan

dia) 

RINGTHE

ironmental E

PRC network 

were discusse

r 2016. 

nthly audit o

r 2016 to fulf

nt inspecting 

EMONTH

Expert, Asha 

and M/s PIP

ed with M/s 

f the OPRC n

fil the require

Camp Site 

   

H

Sharma and

PL’s camp site

PIPL Environ

network and 

ement of the

111 

d Team 

e on 15 

nmental 

submitted 

e Contract 

 

TNM TM 

OPRC WorlMonthly Pro

10 COCO

10.1

 Sl. No. 

DispD

1  1/9

2  1/9

3  1/9

4  1/9

5  3/9

6  5/9

7  5/9

8  6/9

9  7/9

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

ORRESPOONSULTA

Correspon

 patched Date 

9/2016  T

9/2016  T

9/2016  T

9/2016  T

9/2016  T

9 /2016  T

9/2016  T

9/2016  T

9/2016  T

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

ONDENCEANT

ndenceSen

 Letter N

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

a Bathinda Netwo

E DONE

nt

Table  10

No. 

538/2016

539/2016

540/2016

537/2016

541/2016

537/2016

542/2016

543/2016

544/2016

ork in Punjab (Ind

E BY T

0‐1 : Corresp

Variation Orlanning roadSunam‐BhikS2) in cheem39+300 to C

Variation Orlanning roadSunam‐Bhikin Bhikhi towto Ch. 55+70

Variation Orlanning roadSunam‐Bhikin Maur towto Ch. 86+06

Exclusion of 86+060 of BBhikhi‐Kotshfrom4th yearprogrammework progra

Interim paym

Exclusion of 86+060 of BBhikhi‐Kotsh4th year wor

Interim Paym

Rate Analysi1.Cheema 2sections of BBhikhi‐kotsh

Rate Analysi1.Cheema 2sections of BBhikhi‐kotsh

 

dia) 

THE OF

ondence Sen

 Subject 

rder no.6 ford of Bhawanihi‐kotshamirma town fromh. 40+700

rder no.5 ford of Bhawanihi‐kotshamirwn from Ch.00

rder no.7: Fod of Bhawanihi‐kotshamir

wn from Ch. 860

Ch. 84+030 hawanigarh‐hamir (S2) ror work (i.e. 3rd year amme) 

ment Certific

Ch 84+030 thawanigarh‐hamir (S2) rok programm

ment Certific

is: For 4 lann.Bhikhi  3.MaBhawanigarhhamir Road(S

is: For 4 lann.Bhikhi  3.MaBhawanigarhhamir Road(S

FFICE O

nt 

r 4‐igarh‐r road( m Ch. 

T

r 4‐igarh‐r road S2 54+030 

T

or 4‐igarh‐r road S2 84+030 

T

to Ch. ‐Sunam‐oad 

revised 

T

cate ‐ 27 T

to Ch.‐Sunam‐oad from e

T

cate ‐ 27 T

ning of aur Road  h‐Sunam‐S2) 

T

ning of aur Road  h‐Sunam‐S2) 

T

   

OF MON

 Sent By 

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

112 

NITORING

 Sent T

r  ExecutiEngine

r  ExecutiEngine

r  ExecutiEngine

r  ExecutiEngine

r  ExecutiEngine

r  ChiefEngine

r  ExecutiEngine

r  ExecutiEngine

r  Patel infPvt. Lt

 

G

To 

ive er 

ive er 

ive er 

ive er 

ive er 

f  er 

ive er 

ive er 

fra. td 

TNM TM 

OPRC WorlMonthly Pro

10  9/9

11  9/9

12  12/

13  14/

14  16/

15  16/

16  16/

17  16/

18  19/

19  16/

20  20/

21  19/

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

9/2016  T

9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

a Bathinda Netwo

545/2016

546/2016

547/2016

548/2016

549/2016

551/2016

552/2016

553/2016

554/2016

550/2016

557/2016

555/2016

ork in Punjab (Ind

Adjusted Mofor the mon

Hindrance dbetween Ch(Gharachon 

Releasing ofthe works co2nd and 3rd yprogramme

6thNight InspAugust 2016

Submission for the Mon

Improvemenunder 4th ye– proposal fretaining wa

ConstructionBhawanigarKotshamir Rtown at Ch.

Pending Wo

Regarding thexpenses fooffice boy anoffice Sangrof amount.

Submission camp (13th R

Regarding afor wideningroad Ch. 53+69+800, 73+B8 road cha

Submission reports for Asurface and month of JuAwareness C

dia) 

onthly Audit th of August

due to utilitie. 8+400 to 9+area) 

f retention Mompleted unear work . 

pection Repo6 

of MPR of Mth of August

nt Works Exear work progor constructalls n of new culvh – Sunam –Road (S2) in s26+150 

orks

he approval r the servicend sweeper ur‐ Reimburs

of HSE AwarRound) 

pproved drag of bridges o+400, 54+040+450, 100+70inage 20+60

of MonitorinAAQ, ANL, soground wately 2016. HSECamp report

Results t 2016 

T

es +400 

T

Money for nder 1st, 

T

ort – T

M/s PIPL t 2016 

T

ecuted gramme ion of 

T

vert on – Bhikhi – sunam 

T

T

of es of at TNM sement 

T

reness  T

wings on S2 0, 00 and 0

T

ng oil er for the E t

T

   

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

113 

r  Patel infPvt. Lt

r  ExecutiEngine

r  ExecutiEngine

r  ExecutiEngine

r  ExecutiEngine

r  Patel infPvt. Lt

r  ExecutiEngine

r  Patel infPvt. Lt

r  Patel infPvt. Lt

r  ExecutiEngine

r  Patel infPvt. Lt

r  Patel infPvt. Lt

 

fra. td 

ive er 

ive er 

ive er 

ive er 

fra. td 

ive er 

fra. td 

fra. td 

ive er 

fra. td 

fra. td 

TNM TM 

OPRC WorlMonthly Pro

22  20/

23  21/

24  21/

25  21/

26  26/

27  20/

28  30/

29  30/

10.2

Sl. No. 

1  

2  

3  

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  T

/9/2016  P

/9/2016  P

/9/2016  P

Correspon

Date On  Letter 

1/9/2016 

1/9/2016 

1/9/2016 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

TNM/OPRC/5

PIPL/OPRC/5

PIPL/OPRC/5

PIPL/OPRC/5

ndenceRec

Lett

1

PIPL/OPR

PIPL/OPR

a Bathinda Netwo

558/2016

559/2016

560/2016

561/2016

562/2016

556/2016

564/2016

563/2016

ceived

Table  10‐2

ter No. 

1737 

RC/989/2016

RC/988/2016

ork in Punjab (Ind

Laying of WMroad betweeCh. 105+000observation

Submission Report (MPRmonth of Au

IPC ‐ 28

Reconstruct29/2 on BathSabo (B8) ro

Audit lengthSeptember 2

Invoice No. Tfor the perioto 31st Augus

Submission 

Submission of bridge at 

 : Correspon

Regardinexpensesoffice boTNM M.C

 Hindrancbetween( Gharac

 ConstrucCh. 26+1

dia) 

MM top layeen Ch. 103+90(LHS) – Site s of Monthly PR) no 23 for tugust 2016 

ion of Culvehinda to Talwoad 

hs for the mo2016 

TNM/0045 &od: 1st Augusst 2016 

of work prog

of work progCh. 53+400

ndence Rece

Subject 

ng the approvs for the servoy and sweepC Office

ce due to utin Ch. 8+400 thon Area)

ction of culve150 

er on S2 900 to 

T

Progress the 

T

T

rt no wandi 

T

onth of  T

& 0046 st 2016 

T

gramme T

gramme  T

ived 

val of vice of per at 

lities to 9+400 

ert at 

   

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Team Leade

Received Date 

1/9/2016 

1/9/2016 

1/9/2016 

114 

r  Patel infPvt. Lt

r  ExecutiEngine

r  Patel infPvt. Lt

r  Patel infPvt. Lt

r  Patel infPvt. Lt

r  ProjecDirecto

r  ExecutiEngine

r  ExecutiEngine

Remarks

Received

Received

Received

 

fra. td 

ive er 

fra. td 

fra. td 

fra. td 

ct or 

ive er 

ive er 

TNM TM 

OPRC WorlMonthly Pro

4  

5  

6  

7  

8  

9  

10  

11  

12  

13  

14  

15  

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

1/9/2016 

1/9/2016 

30/8/2016 

30/8/2016 

8/8/2016 

3/9/2016 

5/9/2016 

5/9/2016 

5/9/2016 

13/9/2016 

13/9/2016 

13/9/2016 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

PIPL/OPR

PIPL/OPR

PIPL/OPR

PIPL/OPR

PIPL/OPR

PIPL/OPR

1

1

PIPL/OPRC

PIPL/OPR

PIPL/OPR

PIPL/OPR

a Bathinda Netwo

RC/987/2016

RC/986/2016

RC/985/2016

RC/984/2016

RC/969/2016

 RC/992/2016

1766 

1788 

C/492A/2016

RC/995/2016

RC/996/2016

RC/997/2016

ork in Punjab (Ind

 

Submissidepth of KotshamSangrur –

 

Various cissues anMEC mee

 NetworkData Ana

 OrganizaAwareneNo.14

 RegardinStretch.

 SubmissiPerformaReport foAugust 2

Release oheld for improvem1st year 2

Variationlanning r– SunamKotshamBhikhi to54+030 torder noof BhawaBhikhi – in Cheem39+300 tOrder noroad of BSunam –Road (S2from Ch.

6 RegardinRetentio

 SubmissiBlack Spo

 SubmissiMajor ju

 

Time framdeadlineBank ImpMission

dia) 

ion of Mean f Bhawanigarmir  S2 road a– Sunam S1 

critical pendnd notificatioeting 

k Informationalysis ation of HSE/ess Camp Rou

ng Report on

ion of Netwoance Inspector the month2016

of retention rehabilitatioment work f2nd year and 3

n Order no 5 road of Bhaw – Bhikhi – 

mir Road (S2) own from Chto 55+700. Vo 6 for 4 laninanigarh – SuKotshamirroma town fromto 40+700. Vo 7 for 4 lannBhawanigarh– Bhikhi – Kot2) in Maur to 84+030 to 8

ng Release ofn Money 

ion of Designot Improvem

ion of Designnctions me for meet as per 17th Wplementation

Profile rh to nd road

ing on of 

n and 

/ AIDS und 

 BC 

ork tion h of 

money n and or the 3rd year.

for 4 wanigarh 

in . Variation ng road nam – oad  (S2) m Ch. Variation ning h – tshamir wn 86+060.

n for ment 

n for 

ting World n 

   

1/9/2016 

1/9/2016 

1/9/2016 

1/9/2016 

1/9/2016 

05/9/2016 

06/9/2016 

7/9/2016 

9/9/2016 

14/9/2016 

14/9/2016 

14/9/2016 

115 

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

 

TNM TM 

OPRC WorlMonthly Pro

16  

17  

18  

19  

20  

21  

22  

23  

24  

25  

26  

27  

28  

29  

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

13/9/2016 

13/9/2016 

17/9/2016 

17/9/2016 

19/9/2016 

19/9/2016 

12/9/2016 

19/9/2016 

21/9/2016 

21/9/2016 

24/9/2016 

24/9/2016 

26/9/2016 

26/9/2016 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

PIPL/OPR

PIPL/OPR

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

1

1

PIPL/OPRC

1

1

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

a Bathinda Netwo

RC/999/2016

RC/998/2016

C/1000/2016

C/1001/2016

C/1003/2016

1870 

1852 

C/1005/2016

1906 

1907 

C/1007/2016

C/1008/2016

C/1009/2016

C/1010/2016

ork in Punjab (Ind

 ObservatEnvironmComplian

 SubmissiMonth o

6 SubmissiDevelopm

6 MethodoRutting/Con S4 Ro

6  IPC ‐ 28

Regardindrawingsbridges o53+400, 73+450, road cha

SubmissiProgressno.22 for2016

ComplianMonthly no.22 for2016

Regardin

Improveexecutedwork profor constwalls

6 Submissiprogram

Laying ofS2 road b103+900Site obse

6  Re‐subm

6 Submissiprogram53+400

dia) 

tions of MC’smental Expernce 

ion of MPR fof August 201

ion of Greenment Plan 

ology for Camber Corroad Km 10 to

ng approved s for wideninon S2 road C54+040, 69+100+700 andinage 20+60

ion of Month Report (MPr the month 

nce of MC’s Progress repr the month 

ng black Spot

ment works d under 4th Yeogramme – ptruction of re

ion of work me (Bridges

f WMM top between Ch.0 to 105+000ervations

mission of IPC

ion of work me of bridge

s rt for 

or the 16

 Belt 

rection o 12

ng of h. +800, d B8 00

hly R) of July 

port of July 

ts 

ear proposal etaining 

layer on  

0 LHS – 

C‐28 

e at Ch. 

   

14/9/2016 

15/9/2016 

19/9/2016 

19/9/2016 

19/9/2016 

20/9/2016 

14/9/2016 

22/9/2016 

23/9/2016 

23/9/2016 

24/9/2016 

24/9/2016 

26/9/2016 

26/9/2016 

116 

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

Received

 

TNM TM 

OPRC WorlMonthly Pro

30  

31  

32  

33  

34  

 

TECHNOLOGYMANAGEMEN

 

ld Bank Project fogress Report No 24

26/9/2016 

28/9/2016 

30/9/2016 

30/9/2016 

30/9/2016 

Y AND NT LTD.

or Sangrur Mansa4 (September 2016) 

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

PIPL/OPRC

a Bathinda Netwo

C/1011/2016

C/1012/2016

C/1013/2016

C/1014/2016

C/1015/2016

ork in Punjab (Ind

Re‐ schedIncomple

 

 Submissiconstrucon BathinSabo roa

6 Methodorectificat96+700 t

Non Shiftbetweento 9+400S2 road 

 

6  Traffic  S

dia) 

duling of Minete works 

ion of estimation of new nda – Talwanad(B8)

ology and uption from Kmto 100+430 S

ting of utilityn Km 40‐45 &0 Ghrachon a

urvey

nor 

ate for culvert ndi 

pdate of m S2 road

y & 8+400 area on 

   

26/9/2016 

29/9/2016 

3/10/2016 

3/10/2016 

3/10/2016 

117 

Received

Received

Received

Received

Received