government of p unjab - punjab roads & …prbdb.gov.in/files/tnm/mpr sep 2016.pdf ·...
TRANSCRIPT
Rep
eport pr
WORL
Punj
OutpuImprove
T
repared
MON
GD BANK
jab Ro
ut and ement, Re
Sang
NM
d by TNM
MonitoCon
S
NTHLY
GOVEK FUND
oads
Perforehabilita
grur‐M
TECHNOMANAG
M – ICR
oring Connstruction
D.A.Sangrur,
Y PROGSepte
RNMED PUN
& Bri
rmancation, Res
ansa‐B
OLOGY AGEMENT
RA Mana
nsultant - Division.C Block Punjab -
GRESSember
ENT NJAB ST
dges
ce Basesurfacing
Bathin
ANDLTD.
agement
Project O, PWD B&– 2 148001
S REPOr 2016
OF PTATE RO
Deve
ed Roag and Ro
da Roa
t Consul
Office &R
ORT N6
UNJAOAD SEC
lopme
ad Contutine Ma
ad Net
33
lting Se
o. 24
AB CTOR P
ent B
tract (aintenan
twork
33333333
ervices L
ROJECT
oard
OPRC)ce works
3
Ltd
T
) s
TNM
OPRC WorlMonthly Pro
ABREV
AASHTOAADT AC ASTM BANK Base YeBC BDS BM BoQ CBR CoI CQAMPDBM DCP DgMark
DRB EHS EIA EMP EIRR ESA ESMF FIDIC
FWD FWP GC or GGDP GOI GOP IBRD ICB IDA INR IRC IRI IRR ITB JV JVA km LOS MC
M TECHNOMANAG
ld Bank Project fogress Report No 24
VIATION
O AmeAnnuAsphAmeWor
ear Last BitumBid DBitumBill oCalifCorr
P ContDensDyna
ket IntergoveDispEnviEnviEnviEconEquiEnviFedeConsFallinForw
GCC GeneGrosGoveGoveInterInterInterIndiaIndiaInterInterInstrJointJointKilomLeveMon
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
S
erican Assocual Averagehalt Concreterican Socierld Bank Completedminous ConData Sheet minous Maof Quantitiefornia Beariidor of Imptract Qualitse Bituminoamic Cone Prnational poernments anute Reviewronment Heronmental ronmental nomic Internvalent Stanronmental eration Intesulting Enging Weight Dward Work Peral Conditiss Domesticernment of ernment of rnational Barnational Cornational Dean Rupees an Roads Cornational Rornal Rate ofructions to Bt Venture t Venture Ametre el of Servicenitoring Con
a Bathinda Netwo
ciation of Ste Daily Traffte ty for Testin
d Financial Yncrete
cadam es ng Ratio act y Assuranceous MacadaPenetrometortal for tennd interna
w Board ealth and SaImpact AssManagemenal Rate of ndard AxelSocial Manarnational Dneers DeflectomeProgrammeions of Contc ProductIndia Punjabank for Rehompetitive evelopment
ongressoughness Inf ReturnBidders
Agreement
e nsultant
ork in Punjab (Ind
tate Highwafic
ng and Mat
Year at the t
e Managemamter nders and ptional orga
afetysessment ent PlanReturn
agement FrDes Ingénieu
ter etract
abilitation aBiddingt Associatio
ndex
dia)
ay and Tran
terials
time of rece
ment Plan
rocuremennisations (w
ramework urs‐Conseils
and Develo
on
sportation
eipt of the B
t opportunwww.dgmar
s ‐ Internatio
pment
Officials
Bids
ities from rket.com)
onal Federa
2
ation of
TNM
OPRC WorlMonthly Pro
MBCB MDR MEC MOEF MORT&MPa MPD MPM MSA NH NHAI NPV ODR OPRC PAP PC PCU PIRR PSPCB PWD PRBDB PSRSP QA QC RAP RDPM ROMDAROW RPM RUS&CPSDBC SH SIA TMP TOR UNDB
WB
M TECHNOMANAG
ld Bank Project fogress Report No 24
MetaMajoMonMini
&H MiniMegMeaManMilliNatioNatioNet OtheOutpProjePartPassProjePunjPubl
PunjPunjQuaQuaReseRoad
AS RoadRighRaise
PM RoadSemStateSociaTraffTermUnitonlinWor
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
al Beam Craor District Rnitoring Conistry of Enviistry of RoagaPascal. Unan Profile Denagement Pon (Equivalonal Highwonal HighwPresent Valer District Rput and Perect Affectedicular Condenger Car Uect Internalab State Poic Works Deab Roads aab State Rolity Assuranlity Control ettlement Ad Durabilityd Measuremt of Way ed Pavemend User Servi Dense Bitue Highway al Impact Afic Managemms of Refereed Nations ne rld Bank
a Bathinda Netwo
ash BarrierRoad nsultant, Emironment and Transportnit of Measuepth erformanceent) Standaay ays Authorilue Road rformance Bd Person itions of CoUnit l Rate of Reollution Conepartmentnd Bridges oad Sector Pnce
Action Plany Performanment Data A
nt Markerice and Comuminous Co
ssessmentment Planence Developme
ork in Punjab (Ind
mployer, Connd Forestst and Highwurement
e Measuresard Axels
ity of India
Based Road
ontract
turn (PIRR)ntrol Board
DevelopmeProject
nce MeasureAcquisition
mfort Perforoncrete
ent Busines
dia)
ntractor
ways
Contract
ent Board
e System
rmance Me
s online (ww
easure
ww.devbus
iness.com)
3
TNM
OPRC WorlMonthly Pro
TABLE
1 PRO
1.1
1.2
1.3
1.4
2 PRO
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7
3 WO
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.2
3.2
3.2
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 24
EOFCON
OJECT HIGHL
Significant
Physical Pr
Crash Reco
Snapshots
OJECT OVER
Backgroun
Agencies I
Contract A
Organisati
Responsib
Project Or
Basic Cont
.1 Proje
ORK PROGRE
Improvem
.1 Work
.2 Work
.3 Work
.4 Work
.5 Work
.6 Chang
Road Dura
.1 Roug
.2 Struct
Network P
.1 Pavem
.2 Unsea
.3 Drain
.4 Routi
.5 Obstr
.6 Incide
.7 Veget
.8 Road
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
NTENTS
LIGHTS FOR
t Events .......
rogress ........
ord Update .
s – Pictorial O
RVIEW .........
nd ................
nvolved in th
Administratio
on & Respon
ilities of the
ganization ..
tract Feature
ct Brief .......
ESS ‐ SUMMA
ment, Rehabil
ks Done ‐ Firs
ks Done ‐ Sec
k Done ‐ Thir
ks Under ‐ Fo
k Progress ‐ F
ge in Propos
ability’s Over
hness ..........
tural Capacit
Performance
ment Mainte
aled Shoulde
nage Mainten
ne Maintena
ruction on th
ent Response
tation Contr
Signs Maint
a Bathinda Netwo
THE MONTH
....................
....................
....................
Overview ......
...................
....................
he OPRC Pro
on Chart .......
nsibilities – M
Monitoring
....................
es .................
....................
ARY AND CO
itation and R
st Year .........
cond Year .....
d Year ..........
ourth Year Pr
Fourth Year P
sal: ...............
rview ............
....................
ty Data (Pave
Works’ Ove
enance (RUS&
er Maintenan
nance (RUS&
ance of Bridg
he Pavement
e and Emerg
ol (RUS&CPM
enance (RUS
ork in Punjab (Ind
H OF SEPTEM
....................
....................
....................
....................
...................
....................
oject .............
....................
Monitoring C
Consultant .
....................
....................
....................
OMMENTS ..
Resurfacing W
....................
....................
....................
rogramme ...
Programme .
....................
....................
....................
ement Defle
rview ..........
&CPM‐1) ....
nce (RUS&CP
&CPM‐3) ......
ges and Othe
t Surface and
gency Works
M‐7) ............
S&CPM‐8) ...
dia)
MBER 2016 ..
....................
....................
....................
....................
...................
....................
....................
....................
Consultant ....
....................
....................
....................
....................
...................
Works ..........
....................
....................
....................
....................
....................
....................
....................
....................
ctions) .........
....................
....................
PM‐2) ..........
....................
er Structures
d Shoulders (
Response (R
....................
....................
...................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
s (RUS&CPM
(RUS&CPM‐5
RUS&CPM‐6)
....................
....................
...................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
– 4) ............
5) .................
) ...................
....................
....................
4
........... 9
............ 9
............ 9
............ 9
.......... 11
.......... 13
.......... 13
.......... 14
.......... 15
.......... 15
.......... 15
.......... 16
.......... 16
.......... 17
.......... 19
.......... 19
.......... 20
.......... 21
.......... 21
.......... 21
.......... 22
.......... 22
.......... 23
.......... 23
.......... 24
.......... 26
.......... 27
.......... 27
.......... 28
.......... 29
.......... 29
.......... 29
.......... 29
.......... 30
TNM
OPRC WorlMonthly Pro
3.3
3.3
3.3
3.3
3.3
3.3
3.4
3.5
3.6
3.6
3.7
3.7
3.7
3.7
3.7
3.8
3.9
4 ENV
4.1
4.2
4.3
4.4
4.5
4.6
5 RO
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
6 CO
M TECHNOMANAG
ld Bank Project fogress Report No 24
.9 Raise
.10 Pavem
.11 Traffi
.12 Crash
.13 Sight
.14 Mark
Other Obs
Recomme
Consolidat
6.1 Contr
Summary &
.1 Analy
.2 Mana
.3 Road
.4 Road
Verificatio
Audit Insp
VIRONMENT
Environme
Complianc
Status of G
Status of P
Status of S
Future key
AD SAFETY A
Introductio
Crash Reco
Crash Ana
Trend in C
Road Safet
Road Safet
Road Safet
Way Forw
Distributio
NTRACTOR’S
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
d Reflective
ment Markin
c Island and
h Barrier Mai
Rail, Hand R
er Post Main
servations on
ndation for N
ted Audit Re
ractor's Audi
& Compariso
ysis and Com
agement Per
Durability P
User Service
on of Contrac
ection Photo
TAL & SOCIA
ental Manag
ce as per Env
General facili
Physical Envi
Statuary Clea
y issues as re
AND TRAFFIC
on ...............
ords .............
lysis ............
rashes .........
ty Audit .......
ty Audit Find
ty Strategies
ard ..............
on of fatal cra
S STAFF AND
a Bathinda Netwo
Pavement M
ng (RUS&CPM
Roundabou
intenance (R
Rail and Pede
ntenance (RU
n Audit Sectio
Network Per
port .............
it Report on
on of Contra
mments of the
rformance M
erformance
e and Comfo
ctor’s Audit R
ographic Rec
AL MANAGEM
ement .........
vironmental
ities at Contr
ronmental A
arances Appl
eviewed from
C MANAGEM
....................
....................
....................
....................
....................
dings ............
s ...................
....................
ashes in the
D CONSTRUC
ork in Punjab (Ind
Markers (RUS
M‐10) ..........
t Maintenan
RUS&CPM‐12
estrian Barrie
US&CPM‐14)
ons ..............
rformance W
....................
September2
ctor’s Audit
e Performan
Measures (MP
Measures (R
ort Performa
Report .........
cord of Non‐C
MENT .........
....................
Performance
ractor Camp
Aspects on Si
icable for pr
m the works
MENT ..........
....................
....................
....................
....................
....................
....................
....................
....................
OPRC netwo
CTION EQUIP
dia)
S&CPM 9) ....
....................
nce (RUS&CP
2) ..................
er Maintenan
) ...................
....................
Works ............
....................
2016 .............
vs. Monitori
nce Audit Ins
PM’s) ...........
RDPM’S) .......
nce Measure
....................
Conformanc
...................
....................
e Indicators
Site .............
te ................
roject and Ca
programme
...................
....................
....................
....................
....................
....................
....................
....................
....................
ork ...............
PMENTS .....
....................
....................
PM‐11) .........
....................
nce (RUS&CP
....................
....................
....................
....................
....................
ing Consulta
pection .......
....................
....................
es ‐ RUS&CP
....................
es ................
...................
....................
as per World
....................
....................
amp site ......
and work m
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
PM‐13) ........
....................
....................
....................
....................
....................
nt’s Audit ....
....................
....................
....................
M ................
....................
....................
...................
....................
d Bank guide
....................
....................
....................
ethod ..........
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
5
.......... 32
.......... 33
.......... 35
.......... 35
.......... 35
.......... 35
.......... 36
.......... 44
.......... 46
.......... 46
.......... 49
.......... 49
.......... 49
.......... 50
.......... 52
.......... 54
.......... 70
.......... 82
.......... 82
elines . 82
.......... 84
.......... 84
.......... 86
.......... 89
.......... 90
.......... 90
.......... 90
.......... 92
.......... 95
.......... 97
.......... 97
.......... 98
.......... 98
.......... 99
........ 105
TNM
OPRC WorlMonthly Pro
6.1
6.1
6.1
6.2
6.3
6.4
7 PAY
7.1
7.2
7.3
8 CLA
8.1
8.2
8.3
8.4
9 ME
10 CO
10.1
10.2
M TECHNOMANAG
ld Bank Project fogress Report No 24
Contract’s
.1 Key S
.2 Key S
Contractor
Contractor
Review of
YMENTS .....
Network P
Financial P
Man hours
AIMS AND D
Dispute Re
Arbitration
Minutes o
Minutes o
EETINGS/INS
RRESPONDE
Correspon
Correspon
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Staff as per
taff of Lead
taff Present
r’s Construct
r’s Staff Pres
Contractor’s
..................
Performance
Progress of O
s of Monitor
ISPUTES .....
eview Board
n Tribunal ...
f Arbitral Tri
f Dispute Re
SPECTIONS H
ENCE DONE B
ndence Sent .
ndence Recei
a Bathinda Netwo
Contract Ag
Contractor P
at Site in Se
tion Equipme
sent – Septem
s Staff ..........
...................
for the mon
OPRC Till Dat
ring Consulta
...................
(DRB) ..........
....................
bunal Meeti
view Board M
HELD DURING
BY THE OFFI
....................
ived .............
ork in Punjab (Ind
greement .....
Present at Sit
ptember 201
ent’s Septem
mber 2016 ..
....................
...................
nth of Septem
e .................
ant Staff .......
...................
....................
....................
ng ...............
Meeting ......
G THE MONT
CE OF MONI
....................
....................
dia)
....................
te in the mo
16 ................
mber 2016 ....
....................
....................
...................
mber 2016 ...
....................
....................
...................
....................
....................
....................
....................
TH ..............
ITORING CO
....................
....................
....................
nth of Septe
....................
....................
....................
....................
...................
....................
....................
....................
...................
....................
....................
....................
....................
...................
NSULTANT ..
....................
....................
....................
ember2016 ...
....................
....................
....................
....................
...................
....................
....................
....................
...................
....................
....................
....................
....................
...................
...................
....................
....................
6
........ 105
........ 105
........ 105
........ 106
........ 107
........ 107
........ 108
........ 108
........ 108
........ 109
........ 110
........ 110
........ 110
........ 110
........ 110
........ 111
........ 112
........ 112
........ 114
TNM
OPRC WorlMonthly Pro
LISTO
Figure 2Figure 2Figure 2Figure 2Figure 2Figure 3Figure 3Figure 3Figure 3Figure 3Figure 3Figure 3Figure 3Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5Figure 5
M TECHNOMANAG
ld Bank Project fogress Report No 24
OFFIGUR
2‐1 : OPRC Or2‐2 : Contract2‐3 : Organiza2‐4 : Major c2‐5 : OPRC N3‐1 : Overall 3‐2 : 4th Yea3‐3 : Rutting 3‐4 : Low sho3‐5 : Vegetat3‐6 : Substan3‐7 : Poor Ma3‐8: The defic5‐1: OPRC Ne5‐2: OPRC Ne5‐3: OPRC Ne5‐4: OPRC Ne5‐5: OPRC Ne5‐6 : Fatal Cra5‐7 : Fatal Cra5‐8 : Fatal Cra5‐9 : Fatal Cra5‐10 : Fatal C5‐11 : Fatal C
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
RES
rganization Ct Administraation Chart ocomponents Network MapWork Progr
ar Works (Phand Shovingoulder and reion on shoudard Roadsiaintenance ociency recoretwork – Secetwork – Secetwork – Speetwork – Fatetwork – Craash Locationash Locationash Locationash Locationrash Locatiorash Locatio
a Bathinda Netwo
Chart ...........ation Chart ..of Monitorinof Civil Worp ..................ress (Physicahysical Progreg at Pavemeneverse slopelders at S5 Ride Signs ......of RPMs. ......ded against ction Length ction Length eeding & Aligality Trend ..ash Trend .....ns at Sectionns at Sectionns at Sectionns at Sectionons at Sectioons at Sectio
ork in Punjab (Ind
....................
....................ng Consultanrks under OP....................al Progress) .ess) .............nt observed e on S5 RoadRoad Section........................................Pavement Mv Number ov Number ognment as F........................................ S1 .............. S2 .............. S3 .............. S4 ..............n S5 ............n B8 ............
dia)
....................
....................nt .................PRC project .............................................................on S2 Road Section ......n ...........................................................Marking .......of Fatalities&of Crashes& Cactors in Cra................................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................Section ..........................................................................................................& Fatality RaCrash Rates ashes ...........................................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................tes .......................................................................................................................................................................................................................
7
.......... 13
.......... 15
.......... 16
.......... 17
.......... 18
.......... 20
.......... 20
.......... 27
.......... 28
.......... 30
.......... 32
.......... 33
.......... 34
.......... 93
.......... 94
.......... 95
.......... 96
.......... 96
.......... 99
........ 100
........ 101
........ 102
........ 103
........ 104
TNM
OPRC WorlMonthly Pro
LISTO
Table 2‐Table 2‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 3‐Table 4‐Table 4‐Table 4‐Table 4‐Table 5‐Table 5‐Table 5‐Table 6‐Table 6‐Table 6‐Table 6‐Table 7‐Table 7‐Table 10Table 10
M TECHNOMANAG
ld Bank Project fogress Report No 24
OFTABLE
‐1 : Agencies‐2 : Network‐1 : Work Pro‐2 : Structura‐3 : Audit Sec‐4 : Accumul‐5 : Summary‐6: Managem‐7: Road Dur‐8 : Road Use‐9 : Summary‐10 : Manage‐11 : Road Du‐12 : Summa‐13 : Verifica‐14 : Verifica‐15 : Verifica‐16 : Verifica‐17 : Verifica‐18 : Verifica‐19 : Verifica‐20: Verificat‐21: Verificat‐22 : Verifica‐23 : Verifica‐24 : Verifica‐25 : Verifica‐26 : Verifica‐27 : Verifica‐28 : Verifica‐1: Complian‐2 : Status of‐3 : Status of‐4 : Status of‐1 : OPRC Ne‐2 : OPRC Ne‐3 : OPRC Ne‐1: Contracto‐2: Key Staff ‐3: Construct‐4 : Contact N‐1 : Man Hou‐2 : Man Hou0‐1 : Corresp0‐2 : Corresp
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
ES
s and Key Pek Road Sectioogram Approal Capacity Dctions for thated Scores y of Networment Performrability Perfoer Service any Non‐Confoement Perfourability Perary of Non–Cation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audition of Audittion of Auditation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audince as per Enf General facf Physical Enf Statuary Cleetwork Crashetwork Fataletwork – Sumor’s Key Stafof Professiotion EquipmNo. of Contrurs (for the murs (for the mpondence Sepondence Re
a Bathinda Netwo
rsons involvons under OPoved vs. AchData (Paveme Month of Submitted bk Performanmance Measormance Mend Comfort Pormances .....ormance Mearformance MConformanceit – Section Sit – Section Sit –Section Sit – Section Sit – Section Sit – Section Sit – Section St – Section St – Section Sit – Section Sit – Section Sit – Section Sit – Section Sit – Section Bit – Section Bit – Section Bnvironmentacilities at Convironmentaearances Aph Details (Upities Details mmary of Craff as per Cononal Engineeent as per Cractor’s Staffmonth of Sepmonth of Sepnt ................eceived ........
ork in Punjab (Ind
ved in the PrPRC projecthieved Progrment DeflectiSeptember 2by Contractonce submittesures (MPM`easures (RDPPerformance....................asures (MPM
Measures (RDes of RUS&CS1 – Km 5.00S2 – Km 2.24S2 – Km 15.0S2 – Km 45.0S2 – Km 60.0S2 – Km 65.0S2 – Km 70.0S2 – Km 75.0S4 – Km 0.00S4 – Km 5.00S4 – Km 15.0S5 – Km 5.00S5 – Km 15.0B8 – Km 15.0B8 – Km 20.0B8 – Km 25.0al Performanntractor Caml Aspects onpplicable for p to Septemb(Up to Septeash Statistictract Agreem
ering Consultontract Agref Present at Sptember 201ptember 201........................................
dia)
oject ...............................ress ..............ons) ............2016 ............or for Non‐Coed by Contra`S) SubmittePM`S) – Subme Measures –....................M’s) ..............DPM’s) .........PM Measure0 to Km 11.34 to Km 10.00 to Km 20.000 to Km 50.00 to Km 65.00 to Km 70.00 to Km 75.0 to Km 80.0 to Km 5.00 .0 to Km 10.000 to Km 20.0 to Km 10.000 to Km 20.00 to Km 20.00 to Km 25.00 to Km 30.nce Indicatormp Site .........n Site ............project andber 2016) .....ember 2016s ..................ment and Prtant (PEC) ....eement/ PreSite ..............16) – Key Exp16) – Non Ke........................................
....................
....................
....................
....................
....................onformanceactor ............ed by Contramitted by Co– Submitted............................................................es ................300 ...............000 ...............00 ................00 ...............00 ...............00 ...............00 ...............00 ....................................00 .................00 ...............
00 .................000 ..............00 ................000 ..............000 .............rs as per .............................................. Camp site ......................) ......................................esent at Site....................esent at Site ....................perts ...........ey Experts ...........................................
....................
....................
....................
....................
....................es ......................................ctor .............ontractor ......d by Contract............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................e ...............................................................................................................................................................
8
.......... 14
.......... 17
.......... 19
.......... 25
.......... 26
.......... 46
.......... 47
.......... 47
.......... 47 tor ..... 48 .......... 49 .......... 50 .......... 50 .......... 53 .......... 54 .......... 55 .......... 56 .......... 57 .......... 58 .......... 59 .......... 60 .......... 61 .......... 62 .......... 63 .......... 64 .......... 65 .......... 66 .......... 67 .......... 68 .......... 69 .......... 82 .......... 84 .......... 84 .......... 86 .......... 91 .......... 91 .......... 97 ........ 105 ........ 105 ........ 106 ........ 107 ........ 109 ........ 109 ........ 112 ........ 114
TNM
OPRC WorlMonthly Pro
1 PR
1.1
1.2
1.3
Progress
M TECHNOMANAG
ld Bank Project fogress Report No 24
ROJECTH
Significan
Monitoring
Leader, Yo
Septembe
Team and
The Monit
submitted
the Contra
The Monit
of August 2
PhysicalP
During th(LHS), kmkm 100.4
CrashRec
Total 8 crash
The total nusame time p
There were
Whereas S2 crashes and measures, e
While the tofatalities on
52.42
Improv
Progress
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
HIGHLIGH
ntEvents
g Consultant
ogendra Bhat
r 2016. Findi
Project Man
oring Consu
the non‐con
act Agreeme
oring Consu
2016 on 21 S
Progress
he month ofm 97.700 to k430 (RHS), km
cordUpdat
hes were rep
mber of crasprevious year
no fatal cras
Section con83.3% of all
especially in t
otal number OPRC Netwo
33.06
vement
a Bathinda Netwo
HTSFOR
t team, consi
tnagar, inspe
ings of their
nager on 16th
ltant conduc
nformance re
nt.
ltant submit
September 2
f Septemberkm 100.430 (m 101.050 to
e
ported on the
shes this year (87).
shes reported
stitutes 52.1 fatalities in the wake of
of crashes hork has risen
3.6
Rehab
4th Yea
ork in Punjab (Ind
THEMON
isting of Env
ected the OP
inspection wh September
cted the mon
eport on 10 S
ted Monthly
2016, in acco
r 2016, S2 ro(LHS), km 10o km 107.370
e network fo
ar (78) is dow
d in the mon
1% of OPRC Nthe 4th Year,ensuing wint
as come down sharply.
3.41
bilitation
ar Physical P
dia)
NTHOFS
ironmental E
PRC network
were discusse
2016.
nthly audit o
September 2
y Progress Re
ordance with
oad sections01.050 to km0 were impro
or reporting
wn by 9, com
nth of Septem
Network, it a, requiring soter/fog seaso
wn from prev
0
Res
Progress
SEPTEMB
Expert, Asha
and M/s PIP
ed with M/s
f the OPRC n
2016 to fulfil
eport (MPR)
the Contrac
s from km 9m 104.850 anoved.
month of Se
mpared to the
mber 2016.
accounted foome urgent ron.
vious year, t
0
urfacing
BER2016
Sharma and
PL’s camp site
PIPL Environ
network and
the require
no 23 for th
ct Agreemen
97.480 to kmd from km 9
ptember 201
e number of
or 80.8% of aroad safety
he number o
Targe
Achie
9
6
d Team
e on 15
nmental
ment of
e month
t.
m 97.570 96.700 to
16.
crashes
ll
of
et
eved
TNM
OPRC WorlMonthly Pro
Sr. No.
1
2
3
4
5
6
To
Crashes
Fatalitie
M TECHNOMANAG
ld Bank Project fogress Report No 24
There has beof fatalities last year (8)
65% of crashvehicle – lea
Road Name
M
S1
S2
S3
S4
S5
B8
otal
Dec Ja
s 5 6
s 0 0
135
1
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
een fatal crain the 4th Ye.
hes were attaving the car
OPRC N
Mar. 2013 toNov. 2013
5
59
3
2
6
6
81
Cra
n Feb M
6 12 9
0 10 1
23
39
11
23
2 3
Total C
a Bathinda Netwo
sh on OPRC ear stands at
ributed to spriageway.
Network Cra
o Dec. 201Nov.20
0
78
3
3
1
1
86
ashes 4th Yea
ar Apr M
9 8
1 2
5059
3240
4 5
Crashes
Third
ork in Punjab (Ind
network for t 18, which a
peeding and
ash Details (U
13 to 014
Dec.No
ar (Dec. 2015
May June
9 7
3 0
6368
4956
6 7
s This Ye
d Year
dia)
the last twore up by 10 c
overtaking.
Up to Septem
. 2014 to ov. 2015
7
71
9
4
1
6
98
5 to Nov. 20
July Aug
8 6
2 0
7481
6470
8 9
ear v Las
Fourth Year
o months; hocompared to
35% of crash
mber 2016)
Dec. 2015 toNov. 2016
7
63
2
1
3
2
78
016)
Sep O
8
0
8793
78
10 11
st Year
owever, totalo number of
hes were sin
o Total C
1
2
1
1
1
1
3
Oct Nov
98
12
10
l number deaths
gle
Crashes
19
71
17
10
11
15
43
Total
78
18
TNM
OPRC WorlMonthly Pro
1.4
M TECHNOMANAG
ld Bank Project fogress Report No 24
Snapshot
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
s–Pictoria
Environ
MC a
a Bathinda Netwo
alOverview
mental Inspe
and M/s PIPL
ork in Punjab (Ind
w
ection Team
L Joint Inspec
dia)
m of MC and M
ction of Cam
M/s PIPL
p Site
11
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Minor Junc
Minor Junc
Minor Junc
a Bathinda Netwo
ction Improv
ction Improv
ction Improv
ork in Punjab (Ind
vement work
vement work
vement work
dia)
ks under pro
ks under pro
ks under pro
gress (S2)
gress (S2)
gress (S2)
12
TNM
OPRC WorlMonthly Pro
2 PR
2.1
M TECHNOMANAG
ld Bank Project fogress Report No 24
ROJECTO
Backgrou
The Goverhas allottePatel InfraRajkot, foBathinda cdate on co
This contManagemMaintenanContractorroutine mpavement emergency
TechnologConsultingof the MoBoard, a sBoard ActConsultanc
The OrganFigure 2‐1
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
OVERVIEW
und
rnment of Pued the worksastructure Por 203.68 kmcontract areaompletion is 4
ract is an ent Contrance works or is responsiaintenance rehabilitatioy works.
gy and Mang Services Ltonitoring Constatutory bot, 1998 (Pucy services w
isation Chart.
F
a Bathinda Netwo
W
unjab (GOP)s for ImprovPvt. Ltd Patcms of its sta. The contr4th Decembe
Output anact) for Imf roads andble for the owork, desigon and impr
nagement Litd, India, wansultant (MCody establishnjab Act N
will be for a p
t of Output a
Figure 2‐1 : O
ork in Punjab (Ind
through Punvement, Rehacon House, tate road nact has starter 2022.
nd Performaprovement, allotted unoverall manan and constrovement wo
imited, Israes selected aC) on behalfhed under thNo. 22 of 1period of five
and Perform
OPRC Organ
dia)
njab Public Wabilitation a2nd Floor, K
network comted on 5th De
ance basedRehabilitat
nder Contracagement of ttruction of torks and the
el, in assocs the preferf of Punjab Rhe Punjab R1998). The e (5) years.
ance based
ization Char
Works Depand Routine MKotecha Chomprising ofecember 20
d Road Contion, Resurfct no. PSRSPthe networkthe requirede manageme
ciation with red bidder tRoads and BRoads and Binitial term
Road Contra
rt
artment, PWMaintenanceowk, Kalawathe Sangrur12 and the e
ntract (OPRfacing and P/WB/OPRC/k, including ad surfacing ent of any n
ICRA Manao undertakeBridges DeveBridges Deve
of the Mo
act is given in
13
WD (B&R) e to M/s ad Road, r‐Mansa‐expected
RC)(Asset Routine
/ICB. The all of the renewal, necessary
agement e the role elopment elopment onitoring
n
TNM
OPRC WorlMonthly Pro
2.2
M TECHNOMANAG
ld Bank Project fogress Report No 24
Agencies
Agencies a
T
EMPLOYER
CLIENT
EMPLOYERREPRESENT
FUNDING A
MONITORICONSULTA
CONTRACT
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Involvedin
nd key perso
Table 2‐1 : A
AGE
R
R’S TATIVE
AGENCY
ING ANT
TOR
a Bathinda Netwo
ntheOPRC
ons involved
Agencies and
ENCIES &KEY
PUNJABPROJEC
PUNJABDEVELO
CONSTR(B&R) ‐
INTERNDEVELO
TECHNOMANAGMANAGSERVICE
DATE M
DURATI
PATELINLTD
DURATI
START D
DATE O
END DA
VALUE O
ork in Punjab (Ind
Project
in OPRC pro
d Key Person
Y PERSONS IN
B STATE ROACT (PSRSP)
B ROADS ANDOPMENT BOA
RUCTION DIV‐ SANGRUR
ATIONAL BAOPMENT (IBR
OLOGYAND GEMENT LIMGEMENT CONES LIMITED
MOBILIZED O
ION OF CONT
NFRAESTRUC
ION
DATE
F SIGNING O
ATE
OF CONTRAC
dia)
oject are pre
ns involved i
NVOLVED IN
AD SECTOR
D BRIDGES ARD (PRBDB)
VISION PWD
ANK FOR RECRD)
MITED ‐ ICRA NSULTING
N
TRACT
CTURE PVT.
OF CONTRAC
CT SIGNED
sented in Ta
n the Projec
N THE PROJEC
Mr. YogChief En
)
Mr. YogProject Mr. AniDeputy
Mr. GurExecutivMr. PawSub Div
CONSTRUCTIO
Mr. HaiPresidenMr. YogTeam LeManage
Octobe
5 years
Mr. ArvManagiMr. MuRoad M
10 Year
Decemb
T Decemb
Decemb
INR 596
able 2‐1.
ct
CT
gesh Gupta ngineer‐ PSRS
gesh Gupta Director l Kumar ShaProject Dire
rmukh Singhve Engineer wan Kumar Gvisional Engin
ON AND
m Bonjack nt gendra Bhatneader/Projecer
r 7, 2014
vind Bhai V. Ping Director kesh Kumar
Manager
rs
ber 5, 2012
ber 10, 2012
ber 4, 2022
6.36 Crores
14
SP
rma ctor
Garg neer
nagar ct
Patel
2
TNM
OPRC WorlMonthly Pro
2.3
2.4
2.5
M TECHNOMANAG
ld Bank Project fogress Report No 24
ContractA
Contract ad
Organisat
The appoRepresentOPRC proje
The ConsuConditionsof the Conpotential runder the
As a repreadministraperformedassessmen
Responsib
The Monito
Monitoring
Overall moachieving a
Evaluationconstructe
EvaluationThe Emplo
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Administra
dministratio
tion&Resp
ointed Monative in impect.
ultant will rs of an Outpnsultant’s rorisk to the Emworks contr
sentative of ation of thed by the Contnt of the CE´s
bilitiesofth
oring Consul
g the perform
onitoring of tand maintain
n of the qualied and maint
n and recommoyer.
a Bathinda Netwo
ationChart
n chart is giv
Figure 2‐2
ponsibilitie
itoring Conlementing a
represent thut and Perfole is to provmployer by vact within th
the Employe Contract atracting Entits technical pe
heMonitor
ltant is respo
mance of the
the road conning the requ
ty and residutained by the
mendation o
ork in Punjab (Ind
ven in Figure
: Contract A
es–Monitor
nsultant isnd maintain
he Client asormance basvide timely averifying the he stipulated
er, the Monand for thety for the Civerformance.
ringConsul
onsible for:
e Contractor
nstruction beuired and de
ual life of roae Contractor
of designs pro
dia)
e 2‐2
Administratio
ringConsul
responsible ing an appro
s the Projeced Road Conand orderly achievemen
d time and bu
itoring Conse verificationvil Works. Th
tant
r, based on th
eing done by esigned level
ad pavemenr.
oposed by th
on Chart
ltant
for assistiopriate regim
ct Manager ntract. Accorrequired advnt of all contrudget.
ultant will bn of works he above inc
he approved
the Contracs of service.
t, presented
he Contracto
ing the Emme for mana
under the rdingly, the ovice to minimractual requ
e responsibland serviceludes the co
d Work Progr
ctor, based o
d, designed,
or for accepta
15
mployer’s aging the
General objective mize any irements
e for the es to be ntinuous
ram.
n
ance to
TNM
OPRC WorlMonthly Pro
2.6
2.7
M TECHNOMANAG
ld Bank Project fogress Report No 24
Evaluationand Resett
Managing control of
Monitoringupdating s
The reviewapprovals
Review anusing tech
ProjectOr
Figure 2‐3Consultant
BasicCon
The OPRC The Contra
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
n and monitotlement & Re
the Quality Athe Contract
g, overall supsubmitted by
w of all technof the mont
d monitor thnology accep
rganization
3 shows the t and the rel
Figure 2‐3
ntractFeatu
methodologactor is paid
a Bathinda Netwo
oring of the pehabilitation
Assurance oftor.
pervision andy the Contrac
nical documehly billing pr
he process leptable to the
n
internal distationship wi
: Organizati
ures
gy optimisesd for output
ork in Punjab (Ind
performancen Plan by the
f the roads a
d recommenctor.
entation requesented by t
eading to thee Client.
tribution of th the Client
on Chart of
use of resouts, the main
dia)
e of EnvironmContractor.
and bridges a
ndation for a
uired for paythe Contract
e creation an
all membert and Contra
Monitoring
urces to provntenance ser
mental Impac
and monitori
cceptance o
yment and retor.
d updating o
rs of the stactor.
Consultant
vide maximarvice of ens
ct Managem
ing the quali
of data for inv
ecommendat
of the asset d
ff of the Mo
al “value for uring certain
16
ent Plan
ty
ventory
tions for
database
onitoring
money”. n quality
TNM
OPRC WorlMonthly Pro
2.7.1
RoaCod
S1
S2
S3
S4
S5
B8
Tota
M TECHNOMANAG
ld Bank Project fogress Report No 24
levels on managemehanding ov
1 Projec
AccoWor
Figu
The inte
ad de
N
1 Sangru
2 BhawanSH13 In(SH12A
3 Barnala
4 Mansa interse
5 Dhanau
8 BathindSabo (u(SH17)
l Length of c
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
the roads (ent of the faver the road
ctBrief
ording to thrk Contract a
ure 2‐4 : Ma
roads undrvention are
Table 2‐2
ame of Road
r ‐ Sunam (M
nigarh ‐ Sunantersection ‐A)
a ‐ Mansa: (S
–Talwandi Sction with B8
ula ‐ Bhikhi: (
da ‐ Kotshamup to interse
contract area
a Bathinda Netwo
(level of sercility and asin a certain
he Contractoare illustrate
ajor compon
der the OPe given in Tab
: Network R
d Section
MDR 21)
am ‐ Bhikhi ‐‐ Kotshamir:
SH13)
Sabo (up to 8): (ODR9)
(MDR 14)
mir–Talwandiction with S4
a (kms)
ork in Punjab (Ind
rvice) underssociated righquality to th
or’s Bidding d in Figure 2
nents of Civil
RC Contractble 2‐2 and i
Road Section
Classific
MD
‐ SH
SH
OD
MD
i 4):
SH
dia)
r contract aht of way due Client at th
Document,2‐4.
l Works unde
t and theirllustrated in
ns under OPR
cation Len(k
DR 1
H 10
H 7
DR 24
DR 25
H 28
203
and specific uring the conhe end of the
the major
er OPRC pro
r main featFigure 2‐5.
RC project
ngth km)
Ty
1.3 RehaResu
6.13 Impr(widResu
.29 RehaResu
4.97 Impr(widResu
5.34 RehaResu
8.65 RehaResu
3.68
improvementract periode contract pe
component
oject
tures and t
ype of interv
abilitation anurfacing
rovement Wening) and urfacing
abilitation anurfacing
rovement Wening) and urfacing
abilitation anurfacing
abilitation anurfacing
17
ents, the d and for eriod.
ts of the
types of
vention
nd
Works
nd
Works
nd
nd
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figu
ure 2‐5 : OPRC N
18
Network Map
8
TNM
OPRC WorlMonthly Pro
3 W
3.1
YEAR AC
1 (2013)
2 (2014)
3 (2015)
4 (2016) (Balance of 3
rd
year)
5 (2017)
6 (2018)
7 (2019)
8 (2020)
9 (2021)
10 (2022)
Contract Total (km)
1
*Exclper C
M TECHNOMANAG
ld Bank Project fogress Report No 24
ORKPRO
Improvem
The detailsas per the the achievshown.
The achievthe table.
It should bPIPL) from2014.
The progrework progeffect on tthe contra
As per ontract
As ApprWo
Progra
27.20 27.20
47.60 24.9735.84
54.10 40.87
0.00 52
0.00
0.00
0.00
0.00
0.00
0.00
128.90
uding the ROontract Agree
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
OGRESS‐
ment,Rehab
s of the appcontract for
ved targets a
ved progress
be noted that December 2
ess of works gramme) wathe efficiencyct.
Table 3‐1 :
IMPROVEMENT
per roved ork amme
0 (S2)
(S4) & (S2)
7 (S2) 21.100
.42
2.52
105
B length. As pement the RO
a Bathinda Netwo
SUMMAR
bilitationa
roved work r the remainat the end o
s during the
t the summa2012, prior t
in the seconas appreciaby and effect
Work Progra
Achieved (kms)
25.91(S2)
24.44 (S4)
(S2) & 0.530 (S4
6.00 (S2) 7.85 (S2) 5.900 (S2) 13.31 (S2) 2 (S2) RHS only
.04 (improved length)
per site the RB length is 40
ork in Punjab (Ind
RYANDC
andResurfa
programs foning time (6of the first ye
fourth year
ary includes to the mobil
nd year as wbly behind sciveness of ro
am Approve
As per Contract
0.00
7.29
) 0.00
25.34
5.05
2.20
34.90
0.00
0.00
0.00
74.78
OB deck slab 00m.
dia)
COMMEN
acingWork
or the first foyears) are sear, second
r (balance w
the works caization of M
ell as in the tchedule. Thoad network
ed vs. Achiev
REHABILITAT
As per ApproveWork Programm
25.34 (S5)
11.30 (S1)
7.29 (S3) & 2.20
3.6
49.73
length is 590
NTS
ks
our years anummarised year and th
work of 3rd ye
arried out byMonitoring Co
third year (ehis delay mak operations
ved Progress
ION
ed me
Achieve
25.34 (S5
0.00
(S2) 11.125 (S
3.41*
39.875
0m which is no
nd the work in Table 3‐1e third year
ear) is also s
y the contraconsultant in
extension of ay have detover the du
d As per Contract
5) 34.20
0.00
1) 0.00
11.30
23.60
10.20
0.00
56.00
68.30
0.00
203.60
ot rehabilitate
19
program . Further are also
shown in
ctor (M/s October,
2nd year trimental ration of
RESURFACING
As per Approved Work
Programme
0.00
0.00
28.65
28.65
ed. But as
Achieved
0.00
28.65 (B8)
0.00
28.65
TNM
OPRC WorlMonthly Pro
*ROBAgree
3.1.1
M TECHNOMANAG
ld Bank Project fogress Report No 24
B length excluement.
1 Works
In tapp(i) Fi.e. imp
WitConBhi
0
Progress
52.42
Impro
Progress
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Figure 3‐
uded actually
Figure
sDone‐Fir
the first yeaproved workFrom km 2.2in village G
provement w
th regard tontractor fulfkhi (S5) (leng
128.9105.
Improvemen
Ov
2
33.06
ovement
a Bathinda Netwo
1 : Overall W
y as per site
e 3‐2 : 4th Y
stYear
ar of contrack program. It40 to km 18harachon (iiworks in the f
o the rehabifilled the regth of 25.34
.04
nt R
verall Work
3.6
Reha
4th Ye
ork in Punjab (Ind
Work Progre
is 590m agai
Year Works (
ct, the Contt complied w.150 (except) from km 6first year.
litation worehabilitation 0 km).
74.78
39.87
Rehabilitation
Progress (P
6 3.41*
abilitation
ear Physical P
dia)
ess (Physical
inst the less
Physical Pro
ractor fulfillwith the imprt the road se7.840 to km
rks as per thpertaining
20
n R
Physical Prog
0
Re
Progress
Progress)
ROB length 4
ogress)
ed the requrovement of ction from k
m 79.000. For
he approvedto the road
03.6
28.65
Resurfacing
gress)
0
surfacing
400m as per
uirements asf road sectiokm 8.400 to kr a total of 2
d work progd section Dh
Tar
Ach
Targ
Ach
20
r Contract
s per the ns S2 i.e. km 9.400 26.07 km
ram, the hanaula–
rget
hieved
get
ieved
TNM
OPRC WorlMonthly Pro
3.1.2
3.1.3
3.1.4
M TECHNOMANAG
ld Bank Project fogress Report No 24
2 Works
Imp201thethekmclea
Reh2ndythicDis
ReskmwoconAftreh
Duesec
3 WorkD
Duesec(PSsubbalCon0.0Jun
TheyeaS1)
Thepav67.
4 Works
TheexeThewoEmare
As the
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
sDone‐Sec
provement w14 as per the road lengthe work on the 79.000 andarance of for
habilitation wyear (2014),ckness of thpute Review
surfacing wo37.850). Howrks executensidered as rer the 15thhabilitation o
e to the abovctions (S1 and
Done‐Thir
e to the dection, the 2nd
RSP) approbmitted the ance works ntractor was0 to km 11.3ne, 2015 resp
e balance woar. The Empl and up to05
e works forvement of S840 were co
sUnder‐Fo
e Contractoecuted in these works arrk programmployer for ae to be impro
per the appe 4th year of t
a Bathinda Netwo
condYear
works of 47he approvedh of 24.44 kme other roadd km 108.77rest land.
work for the however thhe pavemenw Board (DRB
ork in the 2wever, the Cd from km rehabilitationh DRB meeof B8 road, th
ve reasons, td S2) in the s
rdYear
esign disputedyear work pved it as revised worfor accepta
s started the300) on 29thpectively.
orks of S1 anloyer was gr5th Dec, 2015
r 3rd year S2 road fromompleted. Th
ourthYear
r had subme 4th year ore to be execme has beenpproval. Undoved and 3.6
proved work the contract
ork in Punjab (Ind
7.60 km werwork progr
m correspondd sections i.e70 (total 29.7
road length he work did nt overlay. TB).
2ndyear wasContractor h9.200 to kn or resurfacting the dehe resurfacin
the Contractsecond year.
e of S1 roaprogramme extension ork programmance of the e rehabilitatih May, 2015
nd S2, schedranted the t5 (for S2) res
(2nd year bm km 45.200he completio
Programm
mitted the rof the contrcuted in the n accepted byder the 4th y km road len
programme
dia)
re planned tramme. Howding to Sectioe. S2 betwee77 km on ro
of 11.3 km fnot commeThe Contrac
completed had raised thm 15.000 scing. The casecision was ng would be
tor did not fu.
d and non‐was shiftedof 2nd year me in June, Monitoringon and imprand S2 (from
uled in the 2ime extensiopectively.
balance wor0 to km 54.0on of minor w
e
revised 3rd ract)for the 4th year of ty the Projecyear work prongths are to b
e the followi
to be compwever, the Con S4 and wen km 32.000oad section
for S1 sectionce due to tctor forward
in the Seche dispute reection, whese has been conveyed tconsidered.
ulfil the work
clearance o to 3rd yearwork prog
2015 to comg Consultantrovement wm km 45.20 t
2nd year, weon up to 15
rks), the im000 and froworks is still i
year work acceptancethe contractt Manager aogramme 52be rehabilita
ing works ar
leted by NoContractor im
was unable to0 and km 67S2) due to t
n was plannthe dispute ded the case
tion B8 (kmegarding theether this shreferred to that the ins
k programme
f forest on r and Chief gramme. Complete the 2t and the Eorks on S1 (to km 67.84)
ere shifted inth August, 2
mprovement m km 55.70in progress.
programmeof Project M. The revisedand forwarde2.42 km roadated.
re to be exe
21
ovember, mproved o execute .840 and the non‐
ed in the over the e to the
m9.200 –e type of hould be the DRB. stead of
e of road
S2 road Engineer ontractor 2nd year mployer. from km ) 0n 03rd
n the 3rd 2015 (for
of road 00 to km
e (to be Manager. d 3rd year ed to the d lengths
ecuted in
TNM
OPRC WorlMonthly Pro
3.1.5
3.1.6
M TECHNOMANAG
ld Bank Project fogress Report No 24
Improv
Km 8.40
Km 18.
Km 28.5
Km 40.7
Km 79.
Total Le
Rehabi
Km 24.6
Km 26.4
Km 27.6
Total Le
5 WorkP
Durto k
Dursec
Durfro
Durkm
Durkm
Dur95.97.
Dur97.km
6 Change
Undhad Brid
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
vement of Bh
00 to km 9.4
150 to km 24
500 to km 39
700 to km 45
150 to km 10
ength (kms)
litation of Su
6 to km 26.4
400 to km 27
600 to km 28
ength (kms)
Progress‐F
ring the monkm 24.400 w
ring the moction from km
ring the monm km 79.000
ring the mon 34.500.
ring the mon 89.500 to km
ring the mo300 (RHS), 700(LHS) we
ring the mo570 (LHS), k 96.700 to km
einPropos
der Section Vapproved th
dge Widening
a Bathinda Netwo
hawanigarh‐
4000
4.5,00
9.300
5.200
08.770
unam portio
400 (less ROB
7.60 (initially
8.600
FourthYea
nth of Marchwas complete
onth of Aprim 24.400 to k
nth of May 0 to km 83.5
nth of June 2
nth of July 20m 95.010 (LH
onth of Augufrom km 9
ere improved
onth of Septm 97.700 tom 100.430 (R
sal:
VII – General he variations
g:
ork in Punjab (Ind
‐Sunam‐Bhik
on S2 road
B 400m)
y included as
rProgramm
h 2016, the ed.
l, 2016, bitukm 28.600 (l
2016, the bi70 and from
2016, 5.9 km
016, 5.510 kmHS) was com
ust 2016, S295.010 to kd.
tember 2016o km 100.430RHS), km 101
Conditions, s for:
dia)
khi‐Kotsham
s improveme
me
bituminous w
uminous woess the ROB
ituminous wm km 86.200 t
of S2 road w
m (LHS) bitumpleted.
2 road sectikm 95.280
6, S2 road s0 (LHS), km 11.050 to km
Clause 63, C
mir Road (S2)
1
6
1
4
2
5
1
ent work) 1
1
3
work of S2 r
ork for rehab) was compl
work for imprto km 89.500
was improve
minous work
ons i.e. from(LHS) and f
sections from101.050 to k107.370 wer
Change in Pro
1.0 km
6.35 km
10.8 km
4.5 km
29.77km
52.42
1.4 km
1.2 km
1.0km
3.6
road from km
bilitation of eted.
rovement of0 was compl
ed from km 2
k of S2 road
m km 89.50from 96.700
m km 97.48km 104.850 are improved
oposal, Empl
22
m 18.400
S2 road
f S2 road eted.
28.600 to
between
00 to km 0 to km
80 to km and from .
oyer
TNM
OPRC WorlMonthly Pro
3.2 Ro
3.2.1
M TECHNOMANAG
ld Bank Project fogress Report No 24
1.
2.
3.
4.
5.
6.
7.
4‐La
1.
2.
3.
4.
oadDurabi
1 Rough
Concolle
In ththe
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Widening of
Drain crossin
Widening o
Branch Cana
road (S2).
Widening of
Drain crossin
Widening o
Branch Can
73+450 (ske
Widening/re
14.50m each
Widening of
Bhawanigar
Widening of
Canal Bhaw
20°) in Distr
anning of Ro
For 4‐lannin
Town from C
For 4‐lannin
Town from C
For 4‐lannin
from Ch 84+
For 4‐laning
ility’sOverv
hness
tractor has pect the rough
he month of following ro
a Bathinda Netwo
f existing bri
ng Bhawanig
f existing br
al at RD 54+0
f existing bri
ng Bathinda‐
f existing br
al crossing
ew in 250)
eplacement
h & 1 Span 1
f Existing Br
h –Sunam‐B
f Existing Br
anigarh – Su
ict Mansa.
ad sections:
ng road of Bh
Ch 54+030 to
ng of Bhaw
Ch 39+300 to
ng of Bhawan
+030 to Ch 86
of Barnala –
view
procured thehness (IRI) d
June and Juad sections:
ork in Punjab (Ind
dge at Ch. 1
garh‐Sunam‐
ridge 2 span
040 (Skew in
dge at RD 20
‐Kotshamir‐T
ridge 3 span
Bhawanigar
of Existing B
13m) on Sang
idge 5 Span
hikhi‐Kotsha
ridge 3 Span
unam‐ Bhikh
hawanigarh‐S
o Ch 55+700
anigarh‐Sun
o Ch 40+700
nigarh‐Sunam
6+060.
– Mansa Roa
e Profilometata of the OP
uly 2016, Con
dia)
00+700 (5x9
‐Bhikhi‐Kotsh
n 3.50m clea
n 250) Bhawa
0+600 (6 spa
Talwandi Sab
n 3.00m clea
rh‐Sunam‐Bh
Bridge 5 spa
grur‐Sunam
6.10m c/c o
amir roat (S2
n 3.00m clea
i‐Kotshamir
Sunam‐Bhikh
0.
am‐Bhikhi‐K
0.
m‐Bhikhi‐Kot
d (S3) from
ter in the moPRC network
ntractor has
9.5m each cl
hamir road (S
ar & 3.60m
anigarh‐Suna
an 8.70 m ea
bo road (B8)
ar & 3.60m
hikhi‐Kotsham
an (2 Span 1
Road (S1) at
over Bhadah
) at RD 53+4
ar & 3.60m e
roat (S2) at
hi‐Kotshamir
otshamir Ro
tshamir Roa
Km 182+640
onth of Junek roads.
collected th
ear span) ov
S2).
each c/c ov
am‐Bhikhi‐Ko
ach clear) ov
each c/c ov
mir road (S2
13.50m each
RD 10+200.
hur Singh Wa
400 in Distric
each c/c ove
RD 69+800
r Road (S2) i
oad (S2) in
d (S2) in Ma
0 to 189+970
2016 and st
e roughness
23
ver Lisara
ver Kotla
otshamir
ver Lisara
ver Kotla
2) at RD
h, 2 Span
ala Drain
t Mansa.
er Bhaini
(shew in
n Bhikihi
Cheema
aur Town
0
tarted to
s data for
TNM
OPRC WorlMonthly Pro
RoadSectioNo.
S2
S1
S2
S4
S5
B8
3.2.2
M TECHNOMANAG
ld Bank Project fogress Report No 24
d on
Road S
BhawaBhikhi
Sangru
BhawaBhikhi
Mansa
Dhana
Bathin
ConprocConfromat threqufulfi
Durithis this
2 Structu
The of Mi.e. IRC
The (fromto 7(frombeca
The com95thcurv
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Section Nam
anigarh‐Suna‐Kotshamir
ur Sunam
anigarh‐Suna‐Kotshamir
a Talwandi Sa
aulaBhikhi
nda Talwandi
tractor has cess the colsultant (MC)m M/s PIPL tohe OPRC siteuired softwall the contra
ing the 17th issue to suprequiremen
uralCapaci
pavement dMonitoring Co(S1&S2 for 1115: 2014 al
pavement dm km 0.000 79.000) for im km 0.000ause this is a
pavement mplying with h percentilevature confir
a Bathinda Netwo
e
am‐
am‐
abo
iSabo
procured thlected roug) has alreadyo arrange the but till datare, the IRI dctual require
World Bankpply the softt.
ityData(Pa
deflections wonsultant wi100 MSA, S4ong the inne
deflection dato km 25.34inner and o0 to km 25.3an intermedi
deflections the requirem
e value of rmed as show
ork in Punjab (Ind
Ro
From (km)
24.400
27.200
79.000
86.200
0.000
2.240
18.400
45.200
55.700
68.000
0.000
0.000
9.200
e profilomethness data y conveyed the software ute Contractodata cannot ements.
k Implementtware at site
avementDe
were recordeith FWD for t4 & S5 for 50er (LHS & RH
ata was colle40), S2 (fromuter wheel 340); the daate lane road
data for tments of Clapavement cwn in the Tab
dia)
oad Section
To
26
28
83
89
11.300 (eCh 2+9403+085)
18
24
54
67
79
24
24.800 (eportion f24.800 to25.340)
37
ter at OPRC has not beeto the Contrused to procr fails to do be verified b
ation Missioe but till date
eflections)
ed by Contacthe improve0 MSA) for eHS) and the o
cted for S1 ( km 2.240 topaths (left ata was colled.
the above ause 8.2.3 ofcharacteristible 3‐2.
o (km)
6.400
8.530
3.560
9.500
except from 0 to Ch
8.150
4.400
4.000
7.800
9.000
4.970
except city from km o km
7.850
project site en arrangedactor/emploess the collethe same. Inby the Moni
on, Monitorie the Contra
ctor (PIPL) ud and rehabeach traffic louter (LHS &
from km 0.0o km 18.150 and right sidected for ou
mentioned f the contracc deflection
Rema
Data collJune 2016
Data collJuly 2016
Data collJuly 2016
Data collJuly 2016
Data collJuly 2016
Data collJuly 2016
but the sofd at site. Mooyer the requected roughnn the absencitoring Cons
ng Consultaactor has not
nder the supilitated roadloading grouRHS) wheel
000 to km 11and from kmde lanes) anuter wheel p
roads sectct agreemenn and chara
24
arks
ected in 6 end
ected in
ected in end
ected in end
ected in end
ected in end.
ftware to onitoring uirement ness data ce of the ultant to
nt raised t fulfilled
pervision sections up as per paths.
1.300), S4 m 68.000 nd for S5 path only
ions are nt i.e. the acteristic
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
The km MonAgrechar
Pavement lo
Group 2 (S4,S5,B8)
Group 3 RoaS2, S3)
The colle
DuriS2 r
Durithe to k
S
S
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
FWD data o54+000 andnitoring Coeement. Theracteristic cu
Table 3‐2 : S
oading categ
Roads 50
ads 100 msa
FWD data ected during
ing the monoad from km
ing the monroad sectionm 89.500. Th
From
1 78+9
2 79+0
3 80+0
4 81+0
5 82+0
6 83+0
From
1 78+9
2 79+0
3 80+0
4 81+0
5 82+0
6 83+0
l No.
l No.
a Bathinda Netwo
on the newly from km 55nsultant ane 95th percurvature conf
Structural Ca
ory MaxiCent
msa < 0.8
a (S1, < 0.8
for road seg the month o
th of June 2m 18.400 to k
nth of June 2ns of S2 roadhe results fo
m To
900 79+000
020 80+000
020 81+000
020 82+000
020 83+000
020 83+560
m To
900 79+000
020 80+000
020 81+000
020 82+000
020 83+000
020 83+560
Chainage
Chainage
ork in Punjab (Ind
constructed5+700 to kmnd analysedentile valuefirmed as me
apacity Data
imum Cral Deflectio
80
80
ection of S2of May 2016
2016, the FWkm 24.400.
2016, the FWd i.e. from kr the above
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
Oute
Side
Inne
9
Perc
Value
Side 9
Perc
Value
dia)
d road sectiom 67+850 wd as per t of pavemeentioned in t
a (Pavement
Characteristicon D0 (mm)
2 road from6.
WD data was
WD data waskm 78.500 tomentioned s
0.66 0
0.65 0
0.61 0
0.65 0
0.62 0
0.54 0
0.63 0
0.69 0
0.65 0
0.6 0
0.6 0
0.53 0
er Wheel Path
Ave
Defle
(m
er Wheel Path
5th
centile
e (mm)
5th
centile
e (mm)
Ave
Defle
(m
ns of S2 roadwas collectethe requireent charactethe Table 3‐2
Deflections)
c MinimumCurvatur
< 0.1
<0.1
km 18.400
analysed fo
s also collecto km 83.560 sections are
.08 LHS
.07 LHS
.07 LHS
.07 LHS
.08 LHS
.07 LHS
.08 LHS
.06 LHS
.07 LHS
.07 LHS
.07 LHS
.07 LHS
erage
ection
mm)
Side
Sideerage
ection
mm)
d from km 4d in the preements of ristic deflec2.
)
m Charae D0‐D200 (m
0 to km 24.
r the road se
ted and anaand from kmsummarized
0.54
0.65
0.59
0.65
0.6
0.62
0.44
0.65
0.64
0.69
0.63
0.61
95th
Percentile
Value (mm)
95th
Percentile
Value (mm)
25
5+200 to esence of Contract tion and
acteristic mm)
400 was
ection of
lysed for m 86.200 d below:
0.08
0.07
0.07
0.07
0.07
0.07
0.07
0.08
0.07
0.06
0.07
0.08
Average
Deflection
(mm)
Average
Deflection
(mm)
TNM
OPRC WorlMonthly Pro
3.3
Sl. No.
1 S
2 B(S
3 MR
4 D
5 BIn
M TECHNOMANAG
ld Bank Project fogress Report No 24
No mor
NetworkP
To fulfil thfor the mo
The audit Consultantsections.
angrur ‐ Sun
BhawanigarhS2)
Mansa‐TalwaRamtirathjaga
Dhanaula‐Bhi
Bathinda‐Kotntersection w
1
2
3
4
1
2
3
4
Sl No
Sl No
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
re FWD data
Performan
e requirementh Septemb
details ant against eac
Table 3‐3 : A
Name of
nam Road (S1
‐Sunam‐Bhik
andi Saboa (S4)
ikhi Road (S5
shamir‐Talwwith S4
From
86+200
87+020
88+020
89+020
From
86+200
87+020
88+020
89+020
o. Cha
o. Cha
a Bathinda Netwo
a has been co
nceWorks’O
ent of the Cober, 2016 ar
nd summarych RUS&CPM
Audit Section
f Road
1)
khi‐Kotsham
o Road
5)
wandi Sabo
Total Audit
To
87+000
88+000
89+000
89+500
To
87+000
88+000
89+000
89+500
inage
inage
ork in Punjab (Ind
ollected duri
Overview
ontract Agree summarise
y of non‐coM, MPM and
ns for the M
ir Road
Up to
Road upto
t Length (km
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
Oute
Side 9
Per
Valu
Inne
Side 9
Per
Valu
dia)
ng the mont
eement, the ed below in T
onformancesd RDPM are
onth of Sept
Section Code
S112
S211
S213
S219
S222
S223
S224
S225
S411
S412
S414
S512
S514
B812
B813
B814
ms)
0.51 0
0.60 0
0.62 0
0.52 0
0.51 0
0.59 0
0.56 0
0.6 0
er Wheel Path
95th
rcentile
ue (mm)
Ave
Defl
(m
er Wheel Path
95th
rcentile
ue (mm)
Ave
Defl
(m
th of Septem
randomly seTable 3‐3:
s adjusted explained i
tember 2016
Cha(from km
5.000 t
2.240 t
15.000 t
45.000 t
60.000 t
65.000 t
70.000 t
75.000 t
0.000 t
5.000 t
15.000
5.000 t
15.000 t
15.000 t
20.000 t
25.000
0.07 LHS
0.07 LHS
0.07 LHS
0.07 LHS
0.07 LHS
0.06 LHS
0.07 LHS
0.06 LHS
h
erage
ection
mm)
Sid
erage
ection
mm)
Sid
mber 2016.
elected audit
by the Mon the follow
6
inage m ‐ to km)
o 11.300
to 10.000
to 20.000
to 50.000
to 65.000
to 70.000
to 75.000
to 80.000
to 5.000
to 10.000
to 20.000
o 10.000
to 20.000
to 20.000
to 25.000
to 30.000
S 0.63
S 0.61
S 0.57
S 0.58
S 0.56
S 0.59
S 0.57
S 0.56
e 95th
Percent
Value (m
e 95th
Percent
Value (m
26
t lengths
onitoring wing sub‐
Length (kms)
6.300
7.760
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
84.06
3 0.07
1 0.07
7 0.07
8 0.07
6 0.07
9 0.06
7 0.06
6 0.06
h
tile
mm)
Averag
Deflecti
(mm)
h
tile
mm)
Averag
Deflecti
(mm)
ge
on
)
ge
on
)
TNM
OPRC WorlMonthly Pro
3.3.1
3.3.2
M TECHNOMANAG
ld Bank Project fogress Report No 24
1 Pavem
During were mfew loca
On
obs
The
Figure 3
2 Unseal
Thesho
ThefromobsConexpreq
On was
As shoEmpconthe
Conmatshosholocaloosinco
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
mentMainte
the audit inmaintained asations in som
S2 road, berved.
e deficiencies
S2: (km 75 to
3‐3 : Rutting
ledShoulde
e improvemeulders on all
e extra soil atm the edges erved at sontractor has edite the wuired ratio a
S5 road, bets observed.
intimated bpkeepers anployers interducted withdrainage sys
ntactor also terial in 80/2ulders. Monuld be mixeation insteadse milled monvenience t
a Bathinda Netwo
enance(RU
nspection fos per the reme of the aud
between km
s recorded u
o km 80)
and Shoving
erMainten
ent was obl road section
t the edge oto facilitateme of the astarted to rork and finiss per the cro
tween km 15It is very mu
by the Contnd the villarvention is r the villagersstem of the r
maintaining20 ratio. Thisnitoring Coned with soil d of directly material obto the road u
ork in Punjab (Ind
US&CPM‐1)
or the monthquired leveldit section as
78.000 to
nder RUS&C
g at Paveme
ance(RUS&
served to mns.
of the shoulde the drainagaudit sectionremove the sh the slopeoss‐sections.
5.000 to km ch required
tractor in hagers were equired. Thrs and ‘Gram road section
the unseales shows the gsultant adviin the propmixing at siserved on users.
dia)
h of Septem of service. s summarise
km 79.000
CPM‐1 are pr
ent observed
&CPM‐2)
maintain the
ders was obsge. The erosns but rectifexcess soil fes of the sho
20.000, theto maintain
his own audopposed torough LRC, tPanchayat’ss.
ed shouldergood results ce the Contposed rationite. At site itthe carriag
mber 2016, aThe deficien
ed below:
0, the ruttin
resented in F
S2: (km 7
d on S2 Road
e service lev
served whichion of shoulfied by the from the shoulders and
e low shouldthe shoulde
dit that at o maintain the consultats’ to find out
s by mixing for the maintractor that n at the camt cannot be geway whic
all the audit ncy was obs
ng and shov
Figure 3.3
75 to km 80)
d Section
vel of the u
h should be ders due to Contractor oulders but embankmen
er and reverrs on regular
some locatthe shouldtion may net the way to
the soil witntenance of uthe milling
mp site or amixed propch may cre
27
sections served at
ving was
unsealed
removed rain was on time. need to nt in the
rse slope r basis.
ions the ers. The eed to be maintain
th milled unsealed material ny other erly. The eate the
TNM
OPRC WorlMonthly Pro
3.3.3
M TECHNOMANAG
ld Bank Project fogress Report No 24
Thenorlocastarsign
The
S5: (km
Fi
3 Draina
Mosfromfewthe maithe
At sCongun
On the
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
e road sectiomal such as ations the shrted to mainn of mainten
e deficiencies
m 15 to km
gure 3‐4 : Lo
ageMainten
st of the culm debris. New locations th
parapets wintain/restorquality of Ha
some culvertntractor has nny bags. Thi
S5 road, betwaterway w
a Bathinda Netwo
ns where ththe locationhoulders be ntain the aboance which n
s recorded u
20)
S5: (
ow shoulder
nance(RUS
lvert drains ed to maintahe hazard mwas missingre the reflecazard marke
t locations tstarted to s exercise sh
tween km 0.0was not clear
ork in Punjab (Ind
he wear and ns near dhamaintained
ove mentionneeds to con
nder RUS&C
(km 15 to km
and reverse
S&CPM‐3)
under this main the emba
marker wereg/damaged. ting tapes, ders.
he erosion arectify the ehould be con
000 to km 5..
dia)
tear of the bas, schools on regular ned locationsntinue.
CPM 2 are pr
S5
m 20)
e slope on S5
month audit ankment adjfound damaThe imme
delineators o
adjacent to teroded locaducted on re
.000, some o
unsealed sho and petrol basis. Nows on regular
resented in F
: (km 15 to
5 Road Sectio
sections wejacent to theaged and thediate attenton the parap
the parapetstions by puegular basis.
of the culver
oulders is mpumps etc.
w the Contrabasis. This i
Figure 3.4
km 20)
on
ere cleaned e culvert parae reflective ttion is reqpets and to
s was also otting the sa
rts were choc
28
ore than at these
actor has s a good
and free apets. At tapes on uired to maintain
observed. and filled
cked and
TNM
OPRC WorlMonthly Pro
3.3.4
3.3.5
3.3.6
3.3.7
M TECHNOMANAG
ld Bank Project fogress Report No 24
Conand
In bthe villa
In Bactithe maicooadjawith
Thebe ssolurecoConland
4 Routin
Theand
All locaobs
No
Themonto m
5 Obstru
The of tposs
At sand to st
No
6 Incide
Conememajo
7 Vegeta
On veg
Conmai
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
ntractor has d the work is
built up areahigher leve
agers oppose
Built‐up areavities, the CRoW corri
intenance wperatively wacent landowhin Built‐up z
e impact of isevere and tutions for adognizes the ntractor anddowner issue
neMaintena
e bridges andd free from d
the bridgesations whererved.
damage of t
e median manthly audit imaintain.
uctiononth
unauthorizethe road secsible.
some locatioin RoW by ttop this type
obstruction
ntRespons
tractor has ergency toll for incident w
ationContr
S5 road sectetation was
ntractor haintain/contro
a Bathinda Netwo
started to jogoing on in f
a, the water l of surrouned the activit
s where othContractor shdor and wi
work that exwith the Emwners to seezones.
nadequate dthe Contractddressing thdifficulties
d the Empes that may b
anceofBrid
d the other sebris.
s and otherre the una
he structure
rkers were it was observ
hePavemen
ed stockpilingctions. Whe
ons the wastthe local pube of activities
was found o
seandEme
deputed thfree contractwas recorded
ol(RUS&CP
tion, betweeobserved on
s arrangedol the vegeta
ork in Punjab (Ind
oin the catcfull swing.
stagnation ding groundties to maint
hers may be hall be respoill inform thxtends beyomployer, otheek the best
drainage on tor is requirehese deficieinvolved inloyer shall be an imped
dgesandO
structures in
r structures uthorised a
s was observ
installed on ved some of
ntSurfacea
g of materiaere possible
te constructblic who needs.
on the pavem
rgencyWor
he highway t numbers od during the
PM‐7)
n km 0 to kmn the shoulde
d the manation on the
dia)
hpits to all t
was observed. Contractortain the drain
responsible onsible for ahe Project ond the correr communsolutions fo
the pavemeed to give pncies as a pn implemenwork coopiment to ach
therStruct
n this month
were cleanadvertisemen
ved and reco
the footpathf the marker
andShould
ls along therequest the
ion materiad to monitor
ment surface
rksRespon
patrolling n each netwmonth.
m 5, km 15 toer having he
nual and shoulders.
the culverts
ed along ther has alreadnage.
for some drall drainage Manager ofridor. The City organisator addressing
ent within tharticular attpriority. Hownting these peratively thieving these
tures(RUS&
h audit sectio
n and clear nts and wr
orded during
hs of the Mars were miss
ers(RUS&C
shoulders we owner to
l was dumpr on regular
during audit
nse(RUS&C
vehicles anwork road at s
o km 16 andight more th
mechanical
where it is
e carriageway intimated
rainage mainmaintenancf the need Contractor wtions (e.g. Lg drainage p
he Built‐up zoention to idwever the Eimproveme
to resolve e improveme
&CPM–4)
ons were ma
except froritten mate
g the monthly
ansa ROB. Dusing which m
CPM‐5)
was observedremove as
ed on the sbasis and fo
t visit.
CPM‐6)
d also dispsuitable inte
km 16 to kmhan 100mm.
grass cut
29
required
y due to that the
ntenance ce within for any
will work LRC) and problems
ones can entifying Employer nts. The adjacent ents.
aintained
m some rial was
y audit.
uring the may need
d in some soon as
houlders rce them
plays the rvals. No
m 17, the
tters to
TNM
OPRC WorlMonthly Pro
3.3.8
M TECHNOMANAG
ld Bank Project fogress Report No 24
At sposregu
Thevegconwithloca
Thecut zon
Conbranfrom
The
S5: (k
S5: (k
8 RoadS
Thesect
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
some locatiots etc. wereular basis an
e Contractor etation thattrol or simihin the subation, area/n
e road‐side tthe vegetate” as per the
ntractor mennches of them the forest
e deficiencies
km 5 to km 1
m 15 to km 2
Figure 3‐5
SignsMaint
e `deficiency tions. On S4
a Bathinda Netwo
ons the km e not visible d make the s
shall also idet have beenlar purposebsequent mnumber and c
rees obstruction and cleae contract ag
ntioned that e trees. Interdepartment
s recorded u
10)
20)
5 : Vegetatio
tenance(RU
to maintain road the sig
ork in Punjab (Ind
stones, hecdue the grasite hazard f
entify any arn planted fos within theonthly repocause of the
ct the visibilar up to 6m greement.
the forest drvention of Et.
nder RUS&C
on on should
US&CPM‐8)
the sign boan boards we
dia)
ctometre stoass. The vegfree.
rea of dead aor amenity, e RoW and ort. This infvegetation d
ity of the sigvertically fr
epartment wEmployer is
CPM 7 are pre
S5
S5
ers at S5 Ro
)
ards and posere not as pe
ones, culvergetation shou
and dying trelandscapingreport to tformation cdying.
gn boards, gom ground
was not allowrequired to
esented in F
5: (km 15 to k
5: (km 15 to k
ad Section
t was observr IRC standa
rt parapets uld be contr
ees, shrubs og, screening,he Project learly ident
gantries etc. the “vegeta
wing them toseek the pe
igure 3.5.
km 20)
km 20)
ved on differrd.
30
and sign rolled on
or similar , erosion Manager ifies the
Need to tion free
o cut the ermission
rent road
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
Momucthe the loca
Thecorr93–
Theroad
Theconholl
Somstan
At fsho
The
S4: (
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
ost of the roach required visibility. Ascushion at
ations.
e Contractoresponding t–1985 and IR
e steel sectiods should be
e traffic signsfirming to ISow section c
me of the signdards. Thes
few locationuld be replac
e deficiencies
km 0 to km 5
a Bathinda Netwo
o At km IRC: 67
o At km sides.
o Schoolo At km
ad side gantto paste the per the instthe gantry
r should mto location dC 67–2012.
on used for se compatible
s should be mS: 1239, rectconfirming to
gn boards anse sign board
ns the speedced with the
s recorded u
5)
ork in Punjab (Ind
0.100, RHS, 7‐2012. 1.600, the sp
sign was no2.010, speed
tries existede reflective ttruction of Wposts. The
maintain thedetails of eac
sign posts ine to IRC: 67‐2
mounted onangular holloo IS: 3589.
nd sign postsds and posts
d signs are ne suitable spe
nder RUS&C
dia)
the Major R
peed breake
ot as per IRC:d breaker sig
in the audit tape on the
World Bank tecushion sh
e sign detch sign in ac
stalled on th2012 and MO
the supportow sections
s are substanshould be re
not as per theed signs.
CPM 8 are pre
S
Road Ahead S
er sign was n
67‐2012. gn was not sa
sections wepost of the eam during thould be pro
ails along cordance wi
he new imprORT&H speci
t posts whicconfirming t
ndard and neplaced at th
he State Gov
esented in F
S4: (km 0 to k
Sign not as p
not the same
ame on both
ere painted. gantries to their visits toovided at a
with the dith the stand
roved / rehafications.
h may be of to IS: 4923 o
ot compatibhe earliest.
vt. Guideline
igure 3.6.
km 5)
31
er
e on both
sides.
It is very improve
o provide ll gantry
drawings dards IRC
abilitated
f GI pipes or square
ble to IRC
es. These
TNM
OPRC WorlMonthly Pro
3.3.9
M TECHNOMANAG
ld Bank Project fogress Report No 24
S4: (
9 Raised
As pshoIRC:
On dysf
On mis
On and
On or m
The
S1: (km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
km 0 to km 5
Fig
dReflective
per the Conuld be provi: 79.
S1 road, befunctional.
S2 road, betsing and dys
S5 road betwd missing. Acc
B8 road, betmissing at km
e non‐confor
m 5 to km 11
a Bathinda Netwo
5)
gure 3‐6 : Su
ePavement
tract agreemded on all h
etween km
tween km 2.sfunction.
ween km 19cordingly the
tween km 15m 12.000 to k
mance recor
1.3)
ork in Punjab (Ind
ubstandard R
tMarkers(R
ment delineaorizontal cu
9.000 to km
000 to km3.
9.000 to km e non‐confor
5.000 to km km 14.000.
rded against
dia)
S
Roadside Sig
RUS&CPM9
ators, bollarrves on eith
m 10.000, th
000, km 17.0
20.000, the rmance was
16.000, the
the RPMs is
S2:
S4: (km 0 to k
gns
9)
rds and the er side of th
he RPMs we
000 to km 18
RPMs were recorded fo
RPMs were
presented i
(km 2.24 to
km 5)
other safetye carriagewa
ere found m
8.000the RP
found dysfur the same.
found dysfu
n the Fig. 3‐7
km 10)
32
y devises ay as per
issing or
Ms were
unctional
unctional
7.
TNM
OPRC WorlMonthly Pro
3.3.1
M TECHNOMANAG
ld Bank Project fogress Report No 24
S2: (km
10 Pavem
During pavemeAt somemaintai10 is sum
On
On
On
On
As cen
AlsoCon
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
m 15 to km 2
Fig
mentMarkin
this month ent marking we locations ned as per tmmarized be
S2 road sect
S4 road, the
S5 road, the
B8 road, the
per the Clautreline and e
o as per thntractor mus
a Bathinda Netwo
20)
gure 3‐7 : Po
ng(RUS&CP
audit inspewas observeit was obsehe specificatelow:
tion, the pave
o Betweo Betweeo Betweeo Betwee
not mao Betwee
pavement mo Betweeo Betwee
pavement mo Betweeo Betweeo Betwee
e pavement mo Betweeo Betweeo Betwee
use 15.13 oedge lines on
he Clause 1st ensure tha
ork in Punjab (Ind
oor Mainten
PM‐10)
ction the deed. The paverved that thtions. The no
ement mark
een km 2.240en km 61 to en km 66 to en km 73 toaintained. en km 75 to
marking was en km 6 to ken km 15 to
marking was en km 6 to ken km 9 to ken km 16 to
marking was en km 15.20en km 18 to en km 26 to
f the Contran all state hig
15.3 (last pat the centre
dia)
B8
nance of RPM
eficiency to ment markinhe width of on‐conforma
ing was miss
0 to km 8.00062 and km 667
o km 74, the
km 76
faded/missikm 7 km 16 and k
faded/missikm 7 km 10 km 17
faded/missi00 to km 17.0km 19 km 28.
act Agreemeghways and m
paragraph)of e line and ed
8: (km 15 to k
Ms.
maintainingng was eithethe pavemeance recorde
sing and dam
0, 63 to km 65,
width of pa
ng
km 19 to km
ng
ing 000
ent Contractmajor distric
the Contradge lines me
km 20)
g the serviceer faded or dent marking ed against RU
maged.
avement ma
20
tor has to mct roads.
act Agreemeet the speci
33
e level of damaged. was not US&CPM
king was
mark the
ent, the ifications
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
to othe
Themoris veThepart
Durpres
S2–(K
S2–(K
B8–(K
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
offer an accetime for con
e roads may rnings, in wiery much reqerefore, the ticularly at th
ring this mosented below
m 2.24 to km
Km 70 to km
Km 15 to km
Figure 3‐8
a Bathinda Netwo
eptable levelnstruction to
be hazardounter seasonquired to maContractor he missing a
onth audit,w in Figure3.
m 10)
75)
m 20)
8: The defici
ork in Punjab (Ind
l of safety foo commence
us for the rowhen fog exaintain the sneeds to end faded sec
the record.8.
ency recorde
dia)
or the road uor if it is und
oad‐users duxists and duervice level ensure the ctions as IRC
ed deficien
ed against P
users at all tderway’.
e to low visiring the monof pavementnew set of‐35.
cies in pav
S2–(Km 60 t
S2–(Km 75 t
B8–(Km 25 t
Pavement Ma
times ‘irresp
ibility in nighnsoon seasot marking atf pavement
vement mar
to km 65)
to km 80)
to km 30)
arking
34
ective of
hts, early n also. It all time. marking
king are
TNM
OPRC WorlMonthly Pro
3.3.1
3.3.1
3.3.1
3.3.1
M TECHNOMANAG
ld Bank Project fogress Report No 24
11 Traffic
The imdeficien
On
mai
Thespe
12 Crash
TheSP:
On accispemak
As instenh
13 SightR
Thebotacco
Theincrto t
14 Marke
Thepillaobs
Stillmai
TheNow
Theof dandof vthesmaione
It isCondeta
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
cIslandand
mprovement ncies were re
S2 road, at kintained as p
e roundaboucifications. T
BarrierMa
e ends of th: 73.
S1 road, betident. It is ined traffic. It ke it safe for
per Contractalled on thehancement w
Rail,HandR
e sight rails, h drivers anordance with
e Contractor rease the safhe Project M
erPostMain
e deficiency ars, edge maerved along
the boundaintain the se
e delineatorsw the curves
e concrete pdifferent road on the otheview. Now thse pipe bollintain and pes.
s very mucntractor shouail design for
a Bathinda Netwo
dRoundabo
in the maiecorded as th
km 67.840, thper IRC: 35.
ts in all the The road safe
aintenance
e MBCB sho
tween km 9nstalled alonis very muc traffic.
ct Agreemee both sides will be achiev
RailandPe
hand rails and pedestriah IRC specific
shall identifety to pedesManager alon
ntenance(R
to maintainarkers, culvethe differen
ary pillars arvice level of
s are installe appear very
pipe bollardsad sections oer locations ohe new delinlards. On thpaint. The da
h required uld need to ir improveme
ork in Punjab (Ind
outMainten
ntenance ohe non‐confo
he road mar
network seety on the ro
(RUS&CPM
ould be flaye
.000 to km ng the sharpch required t
nt the Metof the curv
ved with thei
destrianBa
and pedestrians. The pecations.
fy the locatstrians and ong with an es
RUS&CPM‐1
n the kilomert markers,t road sectio
re not mainf the bounda
ed on both sy nice and sa
s (roadway inof network.of road sectioneators are ihe other senamaged pipe
to enhanceidentify the sent.
dia)
nance(RUS
f roundabouormance sum
king at traffi
ections shououndabouts n
M‐12)
er and cover
10.000, the p curve whicto increase t
tal Beam Crves and any ir installation
arrierMain
ian barriers destrian ba
tions where other vulnerstimate for in
14)
etre stones distance mons of the ne
ntained alonary pillars als
ides of the cfety also enh
ndicators) arThese wereons which arnstalled at tnsitive locate bollards sh
e the safetysensitive loc
S&CPM‐11)
uts was obsmmarized be
c Island and
ld be maintaneeds to imp
red with the
MBCB was ch is not nethe safety ba
rash Barrierother locatin.
ntenance(R
provide guirriers should
the installatable road usnstallation.
, hectometrmarkers and etwork.
g the netwoso.
curves as pehanced.
re existed ale installed atre sensitive fthe curves soions, the pihould be rep
y on the encations at its
served but elow:
roundabout
ained as perprove.
e Fishtails as
damaged duegotiable to arrier at the
(MBCB) shon where th
RUS&CPM‐1
dance to rod be constr
tion of barrsers and repo
re stones, bhazard mar
ork. It is req
er IRC: 79 gu
ong the carrt the curve lfrom the safeo there is nope bollards placed with
ntire road own and su
35
still few
t was not
r the IRC
per IRC:
ue to the the high curve to
hould be he safety
13)
oad users ructed in
iers may ort these
boundary kers was
quired to
uidelines.
riageway locations ety point o need of need to the new
network. ubmit the
TNM
OPRC WorlMonthly Pro
3.4
M TECHNOMANAG
ld Bank Project fogress Report No 24
OtherObs
The obsattentioconform 1. S1 R
km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
servations
ervations whon are summmance in the
Road:
m 5 – km 11.3
On LHS,Need to
On LHS,should b
On LHS,the safestones,
At km properlyrequired
At km 7post mu
Some ofnot vert
At culveclear un
The culvto maint
The misimmedia
The “Pla16.06).
At curvmaintain
At few required
Bounda
Excavate
Paining
At km Immedia
Settlem
At somenight upuniform
Gantry wtrim therequired
Delineat
The signreplaced
a Bathinda Netwo
onAuditSe
hich were nomarized belownext month’
30
, the reflecto restore.
the electricbe maintaine
Vegetation ety parapetshectometre
6.590, LHS, y. The heighd.
.800, RHS, thust be vertica
f the pipe botical. These s
ert 8/5 and 1sealed shou
vert parapettain the sam
ssing medianately.
ace Identific
ves, some Rn on regular
culvert locatd.
ry pillars nee
ed earth at t
of retaining
9.800, RHS,ate action re
ent on pavem
e locations tp to 160m. A. Need to re
was not visibe tree brand.
tion at Island
n boards andd immediate
ork in Punjab (Ind
ections
ot the part ow. These obs’s audits.
tive tape on
c poles are ced on the po
on the emb. The vegetastones, sign
the curve ht was also
he place idenal and mainta
ollards were hould be pa
10/1, the parlder was not
s height shome throughou
n makers fro
cation Signs”
RPMs were basis. The sp
tions the ca
ed to mainta
the minor jun
walls along t
, the retainequired.
ment was ob
the pavemeAt few locatistore immed
ble due to thnches, co‐or
d was very po
d sign post wely.
dia)
of the non‐coservations m
n the safety
lose to the cles on regula
ankments anation shouldposts and cu
sign post wmore than
ntification sigained as per
still not maiinted in blac
rapets were t available.
ould be unifout the netwo
om the retai
” should be
missing andpacing of RP
tch pits are
in along the
nction should
the road sec
ning wall st
bserved betw
ent marking ions the widdiately.
he obstructiordinate with
oor. Need to
which are no
onformance may become
y parapets m
carriageway,ar basis.
nd shouldersd be removeulvert parape
was damagethe required
gn post was MORT&H sp
ntained. Fewck & white.
close to the
orm on bothork.
ining walls s
as per IRC:
d dysfunctioMs should b
not installe
road section
d be remove
tion should b
ructurally fa
ween km 11.
was blackisdth of edge l
on by the treh the conce
o improve.
ot as per IRC
but need imthe part of
missing or d
, the reflecti
s (after 1m),ed and makeets visible.
ed and not d. Immediat
not vertical.pecifications
w were dama
carriageway
sides and a
should be re
67: 2012, (r
onal which be as per IRC.
d. Immediat
n.
ed immediate
be done on p
ailed and d
200 to km 1
h and not vine marking
ee branches.erned autho
standards s
36
mmediate the non‐
damaged.
ive tapes
covered e the km
painted te action
The sign .
aged and
y and 1m
also need
einstalled
refer Fig.
need to .
te action
ely.
priority.
damaged.
1.300.
visible at was not
Need to orities, if
hould be
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
2. S2 RKm
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Road: 2.240 – km 1
The delwas mis
The cush
The RPM
3/1, ero
The placMORT&
The pavcracked
The soilwas notwas obs
The lettnumber
The dammaintain
3/1, 4/1
The signcrossing
The “Pla16.06).
The vegwhich wdrainage
The sectThese sh
Culvert Need to
The min
At someNeed to
At km 9
At km 9plate wa
The RPM
Vegetatvisibilityvisible. immedia
At the imwith theshould b
Bounda
15 – km 20
The mis
The signcrossing
Between
a Bathinda Netwo
10
ineators at tssing and the
hion (with w
M at the edge
osion adjacen
ce identificat&H specificati
vement marlocations.
and milled as per the sserved at site
tering at curing was don
maged hazaned.
1, 5/2, 7/2 cu
n board of pg location as
ace Identific
etation trimwill create te of water fr
tions used fohould be rep
no. 6/1, pao maintain.
nor junctions
e locations tho maintain th
.570, RHS, th
9.620, RHS, as missing.
Ms at the ped
ion on the ey of km stonThe road
ately.
mproved roae Thermoplabe scarified p
ry pillars nee
sing and dys
n board of pg location as
n km 17.500
ork in Punjab (Ind
the Island we Jumbo bolla
waste tyres) a
e line near is
nt the culvert
tion boards ions.
rking was a
material msubmitted me which shou
ulverts shoue poorly.
rd boards a
ulverts have n
pedestrian crper IRC: 67‐2
cation Signs”
med from thhe inconvenom shoulder
or sign posts placed at the
rapet heigh
were not im
he pavementhese immedia
he curve sign
the speed s
destrian cros
embankmentnes, hectomefurniture
ad sections tastic materiaproperly befo
ed to mainta
sfunctional R
pedestrian crper IRC: 67‐2
to km 17.60
dia)
were poorly ard was also
at the Island
sland were m
t parapets w
were old an
also not res
ix used to methodology. uld be remov
uld be as p
at the culve
no catch pit.
rossing shou2012, Fig 15.
” should be
he shouldersnience to thrs.
were not as earliest.
t was less a
mproved/ ma
t marking anately.
n board was
sign post wa
ssing were m
ts and shouetre stones, should be
he pavemenal. The old aore remarkin
in.
PMs need to
rossing shou2012, Fig: 15
00, the chevr
maintained. damaged.
need to rest
missing.
was observed
d the posts
tored after
maintain theExcess and
ved from site
per IRC. At
ert locations
ld be install.33.
as per IRC:
s was not rehe traffic an
s per the MO
and not uni
aintained yet
nd pedestrian
damaged. N
as damaged
missing and d
lders (after sign posts avisible. Tr
nt marking mand damagedng.
o maintain at
ld be install5.33.
rons should b
. The reflect
tore at both
d.
were also no
the rectific
e unsealed sloose milled e at the earlie
some culv
should nee
ed at the pe
67: 2012, (r
moved fromnd also obst
ORT&H specif
form on bo
t.
n crossing wa
eed to maint
and supple
dysfunctiona
1m), obstrucand culvert rim the ve
may need to d pavement
t the earliest
ed at the pe
be installed.
37
tive tape
ends.
ot as per
cation of
houlders material est.
verts the
ed to be
edestrian
refer Fig.
m the site truct the
fications.
th sides.
as faded.
tain.
ementary
l.
cting the parapets egetation
maintain marking
t.
edestrian
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
Km
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
The fadlocation
The imp
The sectThese sh
The “Pl16.06).
Bounda
45‐km 50
46/1, LHwas obs
Reflectirestore
The para
The imp
At Ch 46be impdelineat
Deficienshould b
Bounda
60 – km 65
The pain
The parrestricte
At few lbe main
The slop
The eroshould bbe done
The heigFRL. Theon both
Culvert Immedia
Culvert width sh
At km 64road. Th
The pipeprovide
Erosion basis anthrough
Few sigspecificaand noimmedia
a Bathinda Netwo
ded pavemens should be
provement of
tions used fohould be rep
ace Identific
ry pillars nee
HS, the catchserved.
ive tape froimmediately
apets should
provement of
6.620, RHS, proved, incrtors.
ncy in Paintinbe rectifying
ry pillars nee
nting of Km s
king of trucked.
locations thentained at all
pes should be
sion of embbe maintainee properly wi
ght of culvee height of p sides as wel
No. 65/1, thate action re
no. 65/3, thhould be 12m
4.800, RHS, the permanen
e and slab cuthe wing wa
of embankmnd maintains vegetation
gn boards ations. The sot comply ately as per t
ork in Punjab (Ind
ent markingmaintained
f minor junct
or sign posts placed at the
cation Signs”
ed to mainta
h pit was dam
om delineatoy.
d be plastere
f minor junct
the existing rease the h
ng of parapeat the earlie
ed to mainta
stones shoul
ks on both s
e pavement time.
e maintained
bankment aded at the earith the suitab
rt parapets parapets sholl throughou
he pipe was pequired.
he parapets m and 1m cle
the village pnt solution ne
ulverts, wheralls as per IRC
ment slopes s these reguand other su
and sign psign boards with the sthe specifica
dia)
g particularat the earlie
tions was sti
were not as earliest.
” should be
in.
maged and e
ors at the p
ed from the b
tions was sti
retaining wheight of r
et was also oest.
in.
d be restore
sides of the
marking wa
d as per the
djacent to thrliest. The bable material.
was very lesuld be as pet the networ
partially cho
are close toear unsealed
ond is full ofeed to propo
re it is not feC: SP: 13‐200
due to rain sularly. The suitable meth
posts are nof junction specificationations.
rly at the st.
ill pending.
s per the MO
as per IRC:
erosion adja
parapets wa
back also.
ill pending.
wall along theretaining w
observed at
ed.
road at HM
as disturbed
specified cro
he parapets ackfilling of t.
ss some havr specificatiork.
oked and cat
o the carriagd shoulder on
f waste wateose and impl
easible to con04.
should be relope protectods.
not as per and Place Ids. These s
pedestrian
ORT&H specif
67: 2012, (r
cent to the
as missing.
e water bodwell and ins
few locatio
P location sh
and faded
oss‐sections.
was observethe catch pit
ve only 360mons and also
ch pit was d
geway. The n both sides.
er and may tlement.
nstruct the c
ectifies on thtion should
IRC and Mdentificationsshould be
38
crossing
fications.
refer Fig.
parapets
Need to
dy should stall the
ns which
hould be
it should
ed which ts should
mm from o uniform
damaged.
roadway
ouch the
catch pits
he urgent be done
MORT&H s are old replaced
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
The shonetwork
Bounda
65 – km 70
The signThese sh
At few lrestored
The km route m
Betweenaction re
At km 62012; Fi
At km 67
The cusposts an
The pav
Betweenembank
The mis
The heigfrom FRuniform
At culveunseale
The pipeprovide
Bounda
Km 70 – km
71/1, cato mainadjacent
The extremoved
71/2, caThe pipe
73/1, 73pit insta2004. EImmedia
At few maintain
74/1, 75side alsoImmedia1m clea
It was oAt some
a Bathinda Netwo
oulders shok.
ary pillars ne
n post are oldhould be rep
ocations thed immediate
stones shouarker should
n km 66‐67,equired.
67.300, LHS, g 15.15.
7.400, LHS, t
shion (with wnd follow the
ement mark
n km 67.900kment slope
sing RPMs sh
ght of culveRL. The heigh on both sid
ert locationd shoulder o
e and slab cuthe wing wa
ry pillars nee
75 atch pit requntain the ut to the para
tra soil (leftd immediate
atch pit is nes chocked w
3/2, catch piallation will nErosion of eate rectificat
locations tn.
5/2, slab, cato. Erosion oate rectificatr unsealed s
observed thae locations t
ork in Punjab (Ind
uld be mai
ed to mainta
d and not coplaced immed
e pavement mly.
uld be painted be marked
, the shovin
the roundab
the speed sig
waste tyres)e same throu
king at round
0 to km 68.00and shoulde
hould be rein
ert parapets ht of parapees as well th
s the roadwon both sides
ulverts, wheralls as per IRC
ed to mainta
ired. LHS paniformity inapets was ob
after constely.
ot attached with silt.
its required.not be possibembankmenttion required
he Culvert
tch pit requiof embankmetion requiredhoulder is no
at the pavemthe width w
dia)
intained on
ain.
ompatible to diately.
marking was
ed and markon each km
g was obser
bout sign sh
gn board was
) should be ughout the n
dabout shoul
00, LHs, the wers need to m
nstalled.
was very leets should broughout th
way width s. At few loca
re it is not feC: SP: 13‐200
in.
rapet heightn parapet hbserved. Imm
truction) at
to the culv
The pipe anble provide tt adjacent td.
parapet pa
red. Parapetent adjacentd. Parapets aot available.
ment markingwas more tha
regular ba
IRC and MO
s faded and b
ked as per IRstone.
rved upto 2
ould be rep
s damaged.
provided inetwork at ot
d be mainta
water stagnamaintain.
ess some habe as per spe network.
should be ations it was
easible to con04.
t is less as coeight. Erosi
mediate recti
the should
vert. Immedi
nd slab culvethe wing wato the para
inting was
ts should be t to the parare close to
g was not man the requi
asis through
ORT&H specif
blackish. It s
RC specificati
0‐25mm, im
laced as per
n from of thther gantries
ined as per I
ated in the R
ave only 300ecifications
12m and 1 less than re
nstruct the c
ompare to RHon of embfication requ
er edges sh
iate action r
erts where talls as per IRCpets was o
faded and
plastered frapets was othe carriage
maintained unired. The p
39
hout the
fications.
hould be
ions. The
mmediate
r IRC: 67‐
he gantry s.
RC: 35.
RoW. The
0‐330mm and also
1m clear quired.
catch pits
HS. Need ankment uired.
hould be
required.
the catch C: SP‐13‐observed.
need to
rom back observed. eway and
niformly. avement
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
3. S4 RKm
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
markingthe exist
Few sigshould b
At km 7were adysfunctold and
At few maintain
The roukm ston
At km 7Identific
The culvmaintain
Betweenobserve
Bounda
Km 75 – km
At vertic
Culvert parapet also.
Culvert clear un
At few improvecatch pit
The rutshould b
Bounda Road 0 – km 5
Poor imjunctionper IRC:
Culvert immedia
Pavemepaint.
The paraat the ea
Km stonclearly v
At the cshould b
At curve
a Bathinda Netwo
g should be rting old and
n boards wbe replaced i
4.000, the dlso not instional RPMs damaged RP
locations, itned. The pai
te number se, the state
72.200, therecation sign” w
vert parapetn uniform he
n km 73.90ed. Rectificat
ry pillars nee
80
cal curves th
no. 77/1, th height shou
no. 77/2, 77sealed shou
culvert loced yet. Thest walls shoul
ting and shbe done at th
ry pillars nee
mplementation with S3 (i.e 35.
No. 1/1, ately.
ent marking
apet paintinarliest.
nes and hevisible.
culvert parabe improved
es the old de
ork in Punjab (Ind
restored witdamaged pa
ere observeimmediately
elineators wstalled. Immshould be m
PMs from sit
t was obsernting should
should be mehighway rou
e was a speewas there. Im
t height shoeight in the e
00 to km 7ion required
ed to mainta
e road safety
he parapet huld be uniform
7/3, the paralder was not
cations the se should beld be above t
hoving was he earliest.
ed to mainta
on of pavem. NH). The ju
the waterw
should be m
g of few culv
ctometre st
apets the da at the earlie
lineators sho
dia)
h the thermavement ma
ed patched ay.
were not maimediate actimaintained ime.
ved that thd be done at
entioned onute number w
ed limit signmmediate ac
ould be unifoentire netwo
74.000, settd.
in.
y should be e
height was m on both si
apets were ct available. Im
old catch e maintainedthe adjacent
observed be
in.
ment markiunction pave
way was ch
maintained/r
verts was fa
tones should
amaged refleest.
ould be repla
moplastic matrking proper
and not app
ntained andon requiredmmediately
e painting othe earliest.
each km stowas not men
n 30, but no ction require
orm on bothork.
tlement at
enhanced.
not uniformides and thro
close to the mmediate ac
pits were nd immediatet earth level.
etween km
ng was obsment markin
hocked. It
restored wit
ded which s
d be free fr
ective tape
aced immed
terial after srly.
pearing goo
the new ded. The missand also rem
of parapets
one as per IRntioned.
built‐up ared.
h sides and
the pavem
m on both sioughout the
carriagewayction require
not maintainely. The leve
78‐79. Rect
served at kng should be
should be
th the Therm
hould be ma
rom vegetat
and hazard
iately.
40
scarifying
d. These
lineators sing and move the
was not
RC: 8. 5th
ea “Place
need to
ent was
des. The network
y and 1m ed.
ned and el of the
tification
m 0.000 e done as
cleared
moplastic
aintained
tion and
markers
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
Km
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
At few lthe IRC MORT&
The heigthe culvheight s
At horizper IRC:
At few lo
The bou
5 – km 10
Culvert as per IR
The baccompac
The “Pla
At few tape at t
6/5, the
At curvstandard
The painobservedamagestones s
The “FlaIRC: 67‐
All the s
Bounda
15 – km 20
The painobservedamagestones s
Culvert 20/1 anobserve
The baccompac
The “Pla
At few tape at t
6/5, the
At curvstandard
The “FlaIRC: 67‐
a Bathinda Netwo
locations, thand MORT&
&H specificati
ght of culververt parapethould be ma
zontal curves 79.
ocations the
undary pillars
no. 6/1, theRC guidelines
ckfilling of thted properly
ace Identifica
culvert locatthe parapet
catch pit wa
es, the heigd height sho
ntings of Kmed on theed and painshould be as
ag Type Dire2012 (refer F
signs should
ry pillars nee
ntings of Kmed on the ed and painshould be as
No. 17/1, 18nd 20/4, the ed at few loca
ckfilling of thted properly
ace Identifica
culvert locatthe parapet
catch pit wa
es, the heigd height sho
ag Type Dire2012 (refer F
ork in Punjab (Ind
he section us&H specificaions Clause 8
rt parapets wts had less aintained un
s the distan
e pavement m
s should be m
parapet pais.
he catch pits y.
ation Sign” s
tions the padelineators s
as not attach
ght of the uld be maint
m stones neekm stones.ting was faper IRC.
ection Signs”Fig. 16.04).
be as per IRC
ed to mainta
m stones neekm stones.ting was faper IRC.
8/1, 18/3, 18catch pits aations. Imme
he catch pits y.
ation Sign” s
tions the padelineators s
as not attach
ght of the uld be maint
ection Signs”Fig. 16.04).
dia)
sed in the siations. These801.4.
was not unifparapet heigiformly throu
ce between
marking was
maintained a
inting requir
should be d
hould be as
arapet paintshould be m
hed. Immedia
chevrons wtained at the
ed to mainta Few hectoded. The le
” should be
C: 67‐2012.
in.
ed to mainta Few hectoded. The le
8/4, 18/5, 18are not attacediate action
should be d
should be as
arapet paintshould be m
hed. Immedia
chevrons wtained at all
” should be
ign posts wae should be
form on botght than spughout the n
RPMs shou
faded and a
at the earlies
red and lette
done with th
per IRC:67:2
ing was reqaintained at
ate action re
as less thane earliest.
in. The patcometre stoettering of k
installed at
in. The patcometre stoettering of k
8/6, 19/1, 19ched. The wn required.
done with th
per IRC: 67:
ing was reqaintained at
ate action re
as less thancurves.
installed at
as not compreplaced as
th sides and ecified. The network.
uld be maint
appeared bla
st.
ering should
he suitable e
012 (Fig. 16.
uired. The rt the earliest
equired.
n the requi
hes of paintnes were okm and hec
the Junction
hes of paintnes were okm and hec
9/2, 19/3, 19water stagna
he suitable e
2012 (Fig. 1
uired. The rt the earliest
equired.
n the requi
the Junction
41
patible to s per the
some of parapet
tained as
ckish.
be done
earth and
.06).
reflective .
red. The
ing were observed ctometre
ns as per
ing were observed ctometre
/4, 19/5, tion was
earth and
16.06).
reflective .
red. The
ns as per
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
4. S5 RKm
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
All the s
Bounda
Road: 5 – km 10
At km 6need to the crac
At km 6trim the
Culvert surroun
At km 6
At km 6erosion.
Need toIRC: 79.
Some osigns.
At few maintainshoulde
It was othe villaactivitie
8/2, catc
The heigthrough
The hazmust be
The pain
At km 9trim the
10/2, ne
Betweencarriage
At somvegetatihectome
Some siReplace
The baccompac
Improve
Km 10; r
The bouguidelin
15 – km 20
Km ston
a Bathinda Netwo
signs should
ry pillars nee
6.050, old slaplaster, pain
cks develope
6.300, the vee tree branch
no. 7/1, 8/ding earth le
.410, the con
.450, the 7/2.
o maintain th
f the speed
locations ned upto 1mrs.
observed thagers. Need ts in future.
ch pit requir
ght of the cuout the netw
zard markerse replaced im
nting of km a
9.560, the vee tree branch
eed to clear t
n km 9.900eway on regu
e locations ion. Need etre stones a
ign posts we these with s
ck filling of tt it to achiev
ement of min
repair and pa
undary pillares.
ne 15, paintin
ork in Punjab (Ind
be as per IRC
ed to mainta
ab culvert, nnt and the nud on paveme
egetation obhes.
1 needs to evel and mai
ndition of cu
2, protect th
he RPMs at c
signs are ir
it was obsm. Vegetation
at the waste to remove an
ed.
ulvert parapework.
s should be mmediately.
and hectome
egetation obhes.
the water wa
0 to km 10ular basis or e
the parapeto cut the vand parapets
ere old and suitable supp
he catch pitsve the requir
nor junctions
ainting of km
rs need to m
ng required.
dia)
C: 67‐2012.
in.
need to cleaumbering alsent. Immedi
bstructs the
raise the wntain it.
urve sign was
he parapet si
curves. The s
rrelevant an
served that n and loose c
material dund also consu
ets should be
maintained.
etre stones r
bstructs the
ay.
.000, need execute ano
et of the cuvegetation is should be v
not compatport posts as
s should be dred level of c
s was not do
m stone requ
maintain and
an and maintso to be donate attention
visibility of
walls of the
s poor. Repla
ides, to cont
spacing of RP
d need to r
the shouldcompaction
umped on thult with them
e uniform on
. The old an
equired.
visibility of
to remove ther alternat
ulverts was in such a mvisible at leas
tible to MOTs per MORT&
done with thompaction.
one. Immedia
uired.
d should be
tain it. The ne. At the culn required.
the Gentry.
catch pit ab
acement req
trol the emb
PMs should b
replace with
der width wwas observe
he shoulder em to stop thi
n both sides
nd damaged
the Gentry;
the dust ftive.
not visiblemanner that st from 100m
TH&H specif&H Clause 80
he suitable e
ate action re
installed as
42
parapets lvert slab
Need to
bove the
uired.
ankment
be as per
suitable
was not ed on the
edges by is type of
and also
markers
need to
from the
e due to the km,
m.
fications. 01.4.
earth and
quired.
s per IRC
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
5. B8 RKm
Km
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
At few maintainshoulde
16/3, Rcarriage
16/4, pa
At km 16
At km 1action re
17/1, neand mai
Some osigns.
The min
Some sspecificaClause 8
At km 1install as
Bounda
Road 15 – km 20 –
The km the earl
Some sspecificaClause 8
At few lthat thewhich ca
At someat the ea
At few maintain
The dam
The “Plajunction
At few cImmedia
Culvert installed
The spe
Bounda
25 – km 30
The km the earl
Some sspecificaClause 8
a Bathinda Netwo
locations ned upto 1mrs.
RHS parapeteway clearan
arapets need
6.250, RHS, r
6.800, the dequired.
eeds to raiseintain it.
f the speed
nor junctions
sign supportations. Repla801.4.
18.580, MBCs per IRC: SP
ry pillars nee
– km 25
and 5th km siest. The lett
sign supportations. Repla801.4.
ocations it we required. Nan be mainta
e curve locatarliest. The s
locations tn the service
maged hazard
ace Identificns as per IRC:
curve locatioate action re
no. 17/1, thd. Need to pl
ed limit sign
ry pillars nee
and 5th km siest. The lett
sign supportations. Repla801.4.
ork in Punjab (Ind
it was obsm. Vegetation
t needs to ce.
ds to shift to
roads crossin
elineators w
e the walls of
signs are ir
were not im
t posts weace these w
CB was not P: 73 guidelin
ed to mainta
stone were ntering should
t posts weace these w
was observedNeed to mainained.
tions the fewspacing of RP
he pavemee level of the
d markers sh
cation Signs”:67:2012.
ons the chevequired.
he water walaster the ba
s should be a
ed to mainta
stone were ntering should
t posts weace these w
dia)
served that n and loose c
shift on c
clear the roa
ng sign board
were not visib
f the catch p
rrelevant an
mproved.
re old andwith suitable
rectified. Nnes.
in.
not as per thed be done as
re old andwith suitable
d that the unntain the uns
w RPMs werePMs should b
nt marking e pavement m
hould be rep
” should be
vrons and cr
y was not cck side of th
as per State
in.
not as per thed be done as
re old andwith suitable
the shouldcompaction
catch pit w
adway width
d was in poo
ble due to ve
pit above the
d need to r
not compsupport po
Need to incr
e IRC standa per IRC stan
not compsupport po
nsealed shousealed shoul
e missing whbe as per IRC
was faded marking.
laced at the
placed at a
rash barriers
clear and thee parapet al
Govt. Guide
e IRC standa per IRC stan
not compsupport po
der width wwas observe
wall to incre
h.
or condition.
egetation. Im
e adjacent ea
replace with
patible to Mosts as per M
ease the he
rds. Replacendards.
patible to Mosts as per M
ulder drop wders upto th
hich need to C.
/blackish.
earliest.
all minor an
s were not i
e catch was so.
lines.
rds. Replacendards.
patible to Mosts as per M
43
was not ed on the
ease the
mmediate
arth level
suitable
MOTH&H MORT&H
eight and
e these at
MOTH&H MORT&H
was more he extent
maintain
Need to
nd major
installed.
not also
e these at
MOTH&H MORT&H
TNM
OPRC WorlMonthly Pro
3.5
M TECHNOMANAG
ld Bank Project fogress Report No 24
Recomme
Momaipainnee
Moeffeirre
Mopavan a
ThesectTheIdenIden
At reqheigIRC
TheentinewThebe p
Theavaeros
In teffefromsho
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
At few lthat thewhich ca
At someat the ea
At few maintain
The dam
The “Plajunction
At few cImmedia
Some orequired
Some of
Bounda
endationfo
nitoring Conintain the pnting and cueds to mainta
nitoring Conectively and spective of t
nitoring Conement markacceptable le
e deficiency ttions used foe old and ntification Sntification Si
some of theuired or lesght of the sig: 67 guidelin
e catchpits sire road netw catch pits e slab and thpossible prov
e embankmeilable with Psion cuts.
the view of ectively and m safety poiuld be maint
a Bathinda Netwo
ocations it we required. Nan be mainta
e curve locatarliest. The s
locations tn the service
maged hazard
ace Identificns as per IRC:
curve locatioate action re
of the culvd.
f the culverts
ry pillars nee
orNetwork
nsultant haspavement mulvert parapeain.
nsultant recmaintain t
the monthly
nsultant alsokings meet tevel of safety
to maintain tor sign suppoout dated Signs were gns should b
e road sectios than thatgn posts as pnes.
should be ptwork. Contrbut at the se pipe (morevide the wing
ent slopes shPWD. Need
the upcomiput close wnt of view. Ttained at all
ork in Punjab (Ind
was observedNeed to mainained.
tions the fewspacing of RP
the pavemee level of the
d markers sh
cation Signs”:67:2012.
ons the chevequired.
vert parapet
s had no catc
ed to mainta
Performan
s observed tmarking, roaets painting
commends tthe service audit section
recommendhe IRC speciy and service
the sing boaort post wersign supponot as per
be installed.
ons either th. Contractorper IRC guide
rovided at eractor has stame time nee than 2 nosg wall as per
hould be mato ensure t
ng winter sewatch on theThe pavemetime to incre
dia)
d that the unntain the uns
w RPMs werePMs should b
ent markinge pavement m
hould be rep
” should be
vrons and cr
ts had fade
ch pit. Attach
in.
nceWorks
that there iad signs, ais required.
that the CMlevel of thens.
ds that the Cifications ane for the road
rds and signre not compaort posts shr IRC. At e
he height of r needs to celines and al
each culverttated to exeeeds to imps.), where ther IRC:SP:13‐2
aintained in that the emb
eason; the Ce sensitive lont marking, ease the nigh
nsealed shousealed shoul
e missing whbe as per IRC
g was fadedmarking.
laced at the
placed at a
rash barriers
ed painting
h the catch p
is a scope fnd bridge m. This is a co
MU team nee entire net
Contractor md contractuad users at all
support posatible to MOhould be reach minor
the sign pocheck and mso maintain
t location onecute the wrove the exie installation2014.
a good manbankments s
CMU team nocations whidelineators,ht visibility.
ulder drop wders upto th
hich need to C.
d/blackish.
earliest.
all minor an
s were not i
. Immediate
pit to all the
for improvemaintenanceontinue pro
eeds to wotwork at ea
must ensure al obligationl times.
st was obserORT&H specifreplaced. Thjunction th
sts is more maintain thethe sign pos
n both sidesork to conststing catch pn of catch pit
nner within should be fr
needs to woich may be chevrons a
44
was more he extent
maintain
Need to
nd major
installed.
e action
culverts.
ement to e, island cess and
ork more ach time
that the n to offer
rved. The fications. he Place he Place
than the e desired sts as per
s on the truct the pits also. t will not
the land ree from
ork more sensitive nd RPMs
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 24
Thnot sho
Spemaispesafe
Convegthe
Thepho
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
e water bodoverflow anuld be remo
ed zoning ointain the roed limit signety measures
ntractor has etation on scontinuity.
e detailed aotographs is p
a Bathinda Netwo
dies exist alond enters on ved to facilit
of the entirad signs acc boards. In ts and prepar
arranged thhoulders. Th
audit reporpresented in
ork in Punjab (Ind
ong the netwthe networktate the drai
re road netordingly. Cohe built‐up are the propo
he manual ahis is a good
rt with scon Para 3.6.
dia)
work need tok roads. Thenage.
work is verntractor hasareas it is versal according
and mechansign of impr
ores, un‐rep
o protect so extra soil on
ry much req started the ry much reqgly.
ical grass curovement an
ported non‐
o that the wan the should
quired and activity to inuired to enh
utters to connd needs to
‐conformanc
45
ater may der edges
need to nstall the ance the
ntrol the maintain
ces with
TNM
OPRC WorlMonthly Pro
3.6
3.6.1
T
T
T
A
Acc
M TECHNOMANAG
ld Bank Project fogress Report No 24
Consolida
1 Contra
Table 3‐4 :
Month
Mar‐13
Jul‐13
Aug‐13
Sep‐13
Oct‐13
Nov‐13
Dec‐13
Total – 2013
Jan‐14
Feb‐14
Mar‐14
Apr‐14
May‐14
Jun‐14
Jul‐14
Aug‐14
Sep‐14
Oct‐14
Nov‐14
Dec‐14
Total – 2014
Jan‐15
Feb‐15
Mar‐15
Apr‐15
May‐15
Jun‐15
Jul‐15
Aug‐15
Sep‐15
Oct‐15
Nov‐15
Dec‐15
Total – 2015
Jan – 2016
Feb – 2016
Mar – 2016
April – 2016
May – 2016
Jun‐16
Jul‐16
Aug‐16
Sep‐16
umulated Total
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
atedAuditR
actor'sAud
: Accumulate
S1 S2
2 12
2 12
2 11
1 14
2 16
1 12
2 13
12 90
0 9
1 9
1 17
1 11
1 10
1 7
0 5
0 3
1 9
1 13
7 20
14 42
28 155
2 13
2 7
40 31
4 44
24 16
0 36
0 35
0 131
2 87
2 65
0 32
0 26
76 523
0 8
2 43
2 2
0 43
1 16
14 29
4 43
8 24
14 29
161 100
a Bathinda Netwo
Report
itReporto
ed Scores Su
2 S3
2 0
2 0
1 1
4 0
6 0
2 0
3 0
0 1
3
0
7 0
1 0
0 0
0
0
0
0
3 1
0 0
2 3
5 7
3 1
1
1 0
4 0
6 53
6 0
5 55
1 0
7 0
5 11
2 0
6 4
3 125
0
3 39
0
3 0
6 0
9 8
3 0
4 2
9 0
05 182
ork in Punjab (Ind
nSeptembe
ubmitted by
S4 S5
10 6
6 1
2 3
10 2
4 0
5 1
4 2
41 15
3 3
2 2
2 2
1 3
3 2
0 0
0 0
0 0
6 4
1 3
13 1
11 24
42 44
0 3
4 4
20 40
22 20
11 10
2 28
3 0
6 0
6 18
15 2
23 4
2 8
114 137
8 0
2 10
53 0
0 20
0 46
19 0
4 4
22 12
4 11
309 299
dia)
er2016
Contractor f
5 B8
4
4
5
6
5
5
5
5 34
6
6
4
4
5
1
0
3
3
2
17
4 35
4 86
4
4
0 39
0 69
0 31
8 44
17
0
8 21
19
5
5
7 258
26
0 20
44
0 14
6 2
36
10
2 14
1 30
9 574
for Non‐Con
MPM RDP
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
16 0
16 0
24 0
0 0
0 0
6 0
22 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
52 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
68 0
nformances
PMNon –
Conforma
34
25
24
33
27
24
26
193
24
20
26
20
21
9
5
6
23
21
58
145
378
47
22
170
165
167
110
110
137
134
114
64
45
1285
42
116
101
77
65
106
65
82
88
2598
46
nce
TNM
OPRC WorlMonthly Pro
Ta
Sr.
1 Tota
2 Tota
3 Tota
Month:Se
Month : Septem
MPM
MPM 1
MPM 2
MPM 3
MPM 4
MPM 5
MPM 6
Repeat MPM N
SL.
No.Con
re
Total Road D
Month : Sep
M TECHNOMANAG
ld Bank Project fogress Report No 24
Table
Table 3‐6: M
able 3‐7: Roa
alManagementP
alRoadDurabilit
alRoadUserSafe
eptember2016
mber 2016
Item Descript
Quality Assurance Sy
Contractor`s Program
Contractor`s Reports
Traffic Management
Inventory Database Management
Detailed Design & CoMethodology
Non-Conformance from PMonth
Non‐
nformance
elating to
Sectio
Durability Non‐Con
ptember 2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
3‐5 : Summ
Management
ad Durability
PerformanceNo
tyNon‐Conform
ety&ComfortN
tionPerforma
MeasuComplia
ystem
ms
onstrcution
Previous
on Code
Number
Conform
Reco
Contr
A
0
nformance Score
a Bathinda Netwo
ary of Netw
t Performan
y Performan
ItemDescript
on‐Conformance
manceScore(RD
Non‐Conformanc
Summaryof
ance ure ance
NumberNon-Conform
Acontrac
0
r of Non‐
mances
rded
ractor
A
Non
Conform
Weigh
B
0 5
ork in Punjab (Ind
ork Perform
nce Measure
ce Measures
tion
eScore(MPM'S)
DPM'S)
ceScore(RUS&
fNetworkPerfo
TotalSc
r ofmances
ctor
Non-Conforman
WeightinB
2
1
2
4
2
4
4
Total Ma
n‐
mance
hting
Sub‐We
Months/W
Recorde
Confor
C
0
dia)
mance submit
s (MPM`S) S
s (RDPM`S) –
)
&CPM'S)
ormanceSystem
coreofNon‐Con
nce ng
Sub-WDays/Week
Recorded No
Each Week of De
Each day of Delay
Each day of non r
Each day of non r
Each Week of De
Each Week of De
Number of Monthsconfoermance firs
anagement Performanc
eighting
Weeks of
ed Non
rmance
C
Total
Confor
Sco
Ax
Cont
0 0
0
tted by Cont
Submitted by
– Submitted
Co
m
nformance
Weighting ks/Months of
on Conformance
N° X
elay
y
reciept after deadline
reciept after deadline
elay
elay
s since non-st identified.
ce Non-Conformance S
l Non‐
rmance
ore
BxC
ractor
0
0
tractor
y Contractor
d by Contract
Scoresontractor
0
0
88
88
Non-Con Weigh x SubW
C
Total NonConformanScore AxBx
Contracto
0
0
0
0
0
0
0
0Score
Comments
47
r
tor
Remarks
n-nce xCor
CommentsRef
Phot
Referenc
Photo ference No.
o
ce No.
TNM
OPRC WorlMonthly Pro
Table
M TECHNOMANAG
ld Bank Project fogress Report No 24
e 3‐8 : Road
S111
S112
S211
S212
S213
S214
S215
S216
S217
S218
S219
S220
S221
S222
S223
S224
S225
S226
S227
S228
S229
S230
S311
S411
S412
S413
S414
S415
S511
S512
S513
S514
S515
B811
B812
B813
B814
B815
Total Leng
Total
Total Leng
Name of Ro
Total Leng
Name of Ro
Name of Ro
Name of Ro
Total Leng
Name of Ro
Total Lengt
Name of Ro
Total Length
Section
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
User Service
F
0
5
2
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
10
18
0
5
10
15
20
0
5
10
15
20
9
15
20
25
30
gth of B8 Road
kms
l Contract Roa
gth of S4 Road
kms
ad :‐ Dhanula
gth of S5 Road
kms
ad :‐ Bathind
ad :‐ Mansa‐T
ad :‐ Sangrur‐
gth of S1 Road
kms
ad :‐ Bhawan
th of S2 Road
kms
ad :‐ Barnala‐
h of S3 Road:
a Bathinda Netwo
e and Comfo
From
0.000
5.000
2.240
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
00.000
82.640
0.000
5.000
0.000
5.000
0.000
0.000
5.000
0.000
5.000
0.000
9.200
5.000
0.000
5.000
0.000
d: 28.650
ad Length: 20
CONFORMA
d: 24.970
a‐Bhikhi (S5)
d: 25.340
a‐Kotshamir‐
Talwandi Sab
Chaina
‐Sunam (S1)
d: 11.300
nigarh‐Sunam
d: 106.130
‐Mansa (Man
7.290 kms
ork in Punjab (Ind
ort Performa
To
5.000
11.300
10.000
15.000
20.000
25.000
30.000
35.000
40.000
45.000
50.000
55.000
60.000
65.000
70.000
75.000
80.000
85.000
90.000
95.000
100.000
108.770
189.930
5.000
10.000
15.000
20.000
24.970
5.000
10.000
15.000
20.000
25.340
15.000
20.000
25.000
30.000
37.850
Total Non‐C
03.680 kms ‐
ANCES
Total Non‐
Total Non‐
‐Talwandi Sab
bo upto Ramti
age
Total Non‐
m‐Bhikhi‐Kots
Total Non‐
nsa Kainchian
Total Non‐
dia)
ance Measur
5.0
6.3
7.7
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
8.7
7.2
5.0
5.0
5.0
5.0
4.9
5.0
5.0
5.0
5.0
5.3
5.8
5.0
5.0
5.0
7.8
Conformance
TOTAL NON‐
Conformance
Conformance
bo upto Ramt
irath Jaga (S4
Conformance
shamir (S2)
Conformance
n to Ram Ditte
Conformance
Audit L
in (K
es – Submitt
00
00
60
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
70
90
00
00
00
00
70
00
00
00
00
40
00
00
00
00
50
es B8
es S4
es S5
tirath Jaga (B
4)
es S1
es S2
e Wala Chowk
es S3
Length
Kms)
Aud
Sep
Ass
ted by Contr
0
14
14
14
0
2
0
0
0
0
0
0
0
0
6
3
0
4
0
0
0
0
0
29
0
0
0
0
0
4
0
4
0
4
0
7
0
11
0
26
0
4
0
30
88
8)
k) (S3)
dit Score of
ptember ‐16
sesment‐1
48
ractor
TNM
OPRC WorlMonthly Pro
3.7
3.7.1
Table 3‐contractadjusted
3.7.2
Sr.
1 TotalMa
2 TotalRo
3 TotalRo
Month:Septem
M TECHNOMANAG
ld Bank Project fogress Report No 24
Summary
1 Analys
Thissubm(MC
Netwa) b) c)
AccMoRM0
‐9 gives the t and compad by the MC
2 Manag
Acc(MPoutEmp
TheimpDurdatesubthe reco
anagementPerform
adDurabilityNon‐
adUserSafety&C
mber2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
y&Compar
sisandCom
s section prmitted by thC) after inspe
work PerformManagemenRoad DurabRoad User S
ording to nitoring Con03.
summary oarison of thefor the mont
Ta
gementPer
ording to thPM‘s) reflectputs, includiployer.
e crack inveproved in thering the 17th e of investigsequently exreport by
orded under
ItemDe
manceNon‐Confor
‐ConformanceSco
ComfortNon‐Confo
a Bathinda Netwo
risonofCon
mmentsofth
rovides a dehe Contractoecting the au
mance Inspent Performanility PerformService and C
the Contracnsultant (MC
of the audit e NON‐CONFth of Septem
able 3‐9 : Sum
rformanceM
he Contract t the ability ing the qual
stigation ane 1st year wWorld Bank ation reportxtended. In s30th Septem MPM3 as p
escription
rmanceScore(MPM
ore(RDPM'S)
ormanceScore(RU
SummaryofN
Tot
ork in Punjab (Ind
ntractor’sA
hePerform
escription aor and reviewdit sections.
ection includence Measuremance MeasuComfort Perf
ct Specifica) has perfor
for each typFORMANCES mber 2016.
mmary Non‐
Measures(M
Agreementof the Contity and effic
nd remedial ork programmission, Cot from 30th Juspite of the ember 2016.resented in T
M'S)
US&CPM'S)
etworkPerforman
alScoreofNon‐Co
dia)
Auditvs.Mo
manceAudit
and analysis wed/adjuste
es each onees (MPM’s) ures (RDPM’sormance Me
tions (Appemed the Aud
pe of Perforsubmitted b
‐Conformanc
MPM’s)
t, the Manatractor to suciency of his
measures mme would bntractor requne 2016 to extension, th For the saTable 3.10.
SCon
nceSystem
onformance
onitoringCo
tInspection
of the moed by the M
e of the below
s). easures (RUS
endix 8), tdit Inspectio
rmance Meaby the Contr
ces
gement Peruccessfully mreporting o
report for tbe submitteuested to ex30th Septem
he Contactorame the no
Scoresntractor
Sc
0
0
88
88
onsultant’s
n
onthly auditonitoring Co
w items:
S&CPM’s)
the Contracons as per th
asures set ouractor with t
rformance Mmanage the of informatio
the S2 roadd by the Coxtend the sumber 2016 wr had failed ton‐conforma
coresMC
Re
20
0
124
144
49
sAudit
t reports onsultant
ctor and e format
ut in the the score
Measures contract
on to the
d section ntractor. bmission
which was o submit nce was
emarks
TNM
OPRC WorlMonthly Pro
Month : September 2016
MPM Item
MPM 1 Quality Assu
MPM 2 Contractor`s
MPM 3 Contractor`s
MPM 4 Traffic Mana
MPM 5Inventory DaManagemen
MPM 6Detailed DeMethodology
Repeat MPM Non-ConformanMonth
3.7.3
SL.
No.
No
Confor
relat
Total Road Dur
Month : Septe
M TECHNOMANAG
ld Bank Project fogress Report No 24
DescriptionPerform
Co
urance System
s Programs
s ReportsCracks Inv
agement
atabase nt
sign & Constrcution y
nce from Previous
3 RoadD
As pthe futuCon
RDPEmpNonreco
Nowroug
Thenetwcuts
on‐
rmance
ting to
Section Cod
rability Non‐Conforman
mber 2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
mance Measure ompliance
NumNon-Con
cont
vestigation Report
Table 3‐10 :
DurabilityP
per the ContContractor’
ure generatintract.
PM’s are theployer’s assen‐conformanorded until a
w the Contrghness (IRI)
e rain cuts anwork. Contras.
Table 3‐1
e
Number of Non‐
Conformances
Recorded
Contractor
A
N
0
nce Score
a Bathinda Netwo
mber ofnformances
Atractor
Number oNon-Conforma
AMC
0 1
: Manageme
Performanc
tract Agreems ability to sions and pr
e contractuaessment. Failnce for thata program of
ractor has odata. The IR
nd erosion oactor tried t
11 : Road Du
Number of Non‐
Conformances
Recorded
MC
A
Conf
We
0
ork in Punjab (Ind
ofances
Non-Conformance
WeightingB
R
2 Eac
1 Eac
2 Eac
4 Eac
2 Eac
4 Eac
4Numcon
Total Managemen
ent Performa
ceMeasure
ment these asuccessful prrotect it fro
al requiremelure to delivet measure. Tf rectification
owned his owI data presen
of embankmto improve t
urability Perf
Non‐
formance
eighting
B
Sub‐We
Months/W
Record
Confor
C
5 0
dia)
Sub-Weighting Days/Weeks/Months of
Recorded Non Conformance
ch Week of Delay
ch day of Delay
ch day of non reciept after deadl
ch day of non reciept after deadl
ch Week of Delay
ch Week of Delay
mber of Months since non-nfoermance first identified.
nt Performance Non-Conform
ance Measu
es(RDPM’S)
are a set of rotect the pom consump
ents, which mer the specifThis non‐con work has b
wn Profilomnted in Chap
ment were obthe embankm
formance Me
eighting
Weeks of
ed Non
rmance
C
Total No
Conforma
Score
AxBxC
Contract
0 0
0
N° Non-Con X Weigh x
SubWC
Total NonConformanScore AxB
Contracto
0
0
ine 10 0
ine 0
0
0
0
0mance Score
res (MPM’s)
)
performanceavement anption over t
must be meied RDPM crnformance een agreed w
meter and stpter 3.
bserved at fement slopes
easures (RD
on‐
ance
C
tor
Total Non‐
Conformance
Score
AxBxC
MC
0
0
n-nce
BxCor
Total Non-Conformance Score AxBxC
MC
0
0
20With re
Meetin30t
0
0
0
0
20
)
e criteria thad surfacing the duration
et at the timriteria will rewill continuwith the Em
tarted to co
ew locationss and rectify
PM’s)
Comment
50
Comments Photo
eference to World Bank ng, The deadline was h September 2016
at reflect asset for n of the
me of the sults in a ue to be ployer.
ollect the
s of road the rain
ts Photo N
o No.
No.
TNM
OPRC WorlMonthly Pro
3.7.
3.7.
3.7.
3.7.
M TECHNOMANAG
ld Bank Project fogress Report No 24
.3.1 Minim
As eContyear
TherAsse
The Nove
The and
.3.2 Pavem
The provPartsurvmenmuseverthe 8.2.2carry
In acontcrite
As pClauInterprecCont
Nowof thanal
The
.3.3 Pavem
Pave
Cont
Sub‐sect
.3.4 Roadw Any
Emb
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
mumAnnua
explained intractor's wors and is bind
refore so faet Preservatio
4th year worember 2015
4th year wo3.6 kms for
mentRough
roughness ivisions of Se 2A of the cey and meantioned in tht measure thry six (06) mIRI (Internat2.2. Also it isy out roughn
accordance wtractor shall eria througho
per the conse 2.6.2.4, rnational Rocision Profiletractor shall
w the Contrache network ysed as per c
IRI data colle
mentDeflec
ement Deflectract Works,
‐section3.2.2ions was rec wayCutand
non‐conformbankment Slo
a Bathinda Netwo
alAssetPre
Sub‐chapteork annual pding on the C
r there are on Quantitie
rk program (.
ork programmrehabilitatio
hness(RDP
is a measurection VI – Spcontract specasure the roe Chapter 8,he roughnesmonths theretional Roughs very imporness measure
with the Clensure that
out the durat
ntract agreethe Rough
oughness Inde according own and ma
ctor has ownroads. The clause 8.2.2.
ected by the
ction(RDPM
ction shall b Chapters 8 a
2 of this recorded and fo
dEmbankm
mance undeope.
ork in Punjab (Ind
eservationQ
er 3.1, this program thatContractor.
no NON‐COes.
(i.e. revised 3
me has beenn.
PM‐2)
e of comfortpecificationscifications. Tughness and Clause 8.2.2ss within the eafter. The vhness Index)rtant to undements any t
ause 8.2.2 t the roughtion of the c
ment Sectiohness shall dex (IRI). Thto the specaintain the R
ned his ownIRI will be c
e Contractor
M‐3)
e measuredand 16 of Pa
port, the pound within
mentSlopes
er the RDPM
dia)
Quantities
measure pet was appro
ONFORMANC
3rd year) was
n approved
t of road uss and ContraThe contractod analyse th2 of Contractfirst six (06)values corre shall meet erstand thattime during
of the specness of the ontract.
on III Evaluabe measu
he equipmecifications aoughness Pr
Profilometecalculated fo
is presented
according tart 2A of the
pavement dethe permiss
s(RDPM‐4)
M‐4 was not
–WorkPro
ertains to thoved by the
CES regardin
s submitted
for 52.42 km
sers and in aact Works, Cor has to cohe data as pt Agreement) months on sponding tothe requiret the Employthe entire co
cifications opaved surfa
ation and Qred by usient requiredas defined brofilometer a
er and starteor the entir
d the Chapter
o Section VIContract Ag
eflection onible limits as
)
recorded fo
ogram
he fulfilmenemployer f
ng Minimum
by the Cont
ms for impro
accordance hapters 8 anduct the roer the specit. The emplonew pavem parameter ments of thyer’s has theontract.
of the contrace conform
Qualification ng the me must be aby ASTM E‐9at all times.
ed to collect e road netw
r 3, Para 3.2
– Specificatreement.
n the differes per Clause 8
or Roadway C
51
nt in the for three
m Annual
tractor in
ovement
with the nd 16 of oughness ifications yer, who ents and which is e Clause e right to
ract, the ms to the
Criteria, ethod of a Class 1 950. The
the data work and
2.1.
tions and
ent road 8.2.3.
Cuts and
TNM
OPRC WorlMonthly Pro
3.7.4
M TECHNOMANAG
ld Bank Project fogress Report No 24
4 RoadU
• AccoPerfday com
• The ServexpeCon
• Anycorr
• Theincluadjusubm
• The audMea
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
UserServic
ording to tformance Mto day serv
mply with theobjectives
vice is mainectations actractor’s perway the firesponds to trefore, the udes the Nusted by themitted by thcomparisonit scores byasures ‐ RUS&
a Bathinda Netwo
eandComf
the Contraceasures (RUviceability oe Contract Stof the Contntained, whicross the rarformance.nal score othat of the Mfinal mont
NON‐CONFORe Monitoringhe Contracton of the audity MC regard&CPM, is sho
ork in Punjab (Ind
fortPerform
ct AgreemeUS&CPM) refof the roadsandards spetract Standaich reflects nge of Cont
of the NONMonitoring Cthly audit sRMANCES rg Consultantor. t scores submding to Roaown in the T
dia)
manceMea
nt, the Roflect the roas under the cified for eacards are to the road utract assets,
N‐CONFORMonsultant's Ascores for trelating to t are 144 ag
mitted by thad User SerTable 3.12.
asures‐RUS
ad User Sead user‘s exContract. Tch RUS&CPMensure thatuser‘s day t and to per
MANCES incAudit Inspecthe month RUS&CPM, gainst the m
e Contractorrvice and Co
S&CPM
ervice and xpectation abThe ContractM. t a defined to day servrmit auditin
luded in thtion. of SeptembMPM & R
monthly scor
r versus the omfort Perf
52
Comfort bout the tor must
Level of iceability g of the
his MPR
ber 2016 RDPM as res 88 as
adjusted formance
TNM
OPRC WorlMonthly Pro
Month : Se
Referen
Bidd
Docum
Sectio
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&CP
RUS&CP
RUS&CP
RUS&CP
RUS&CP
Any RUS
Any RUS
Any Road
Haza
M TECHNOMANAG
ld Bank Project fogress Report No 24
T
eptember 2016
nce to
ding
ment
on VI
CPM1 Paveme
CPM2 Unseal
CPM3 Drainag
CPM4Routine
Structu
CPM5Obstru
Should
CPM6 Inciden
CPM7 Vegeta
CPM8 Roadsid
CPM9 Raised
PM10 Paveme
PM11 Traffic
PM12 Crash B
PM13Sight R
Mainte
PM14Marker
Culvert
S&CPMRepeat
Month
S&CPMAny un
by the
d Safety
ards
Any Im
Instruc
OLOGY AND GEMENT LTD.
or Sangrur Mansa4 (September 2016)
Table 3‐12 :
Item Des
ent Maintenance
ed Shoulder Mai
ge Maintenance
e Maintenance o
ures
ctions on the Pav
ers
nt and Emergency
tion Control
de Signs Mainten
Reflective Pavem
ent Markings ‐ (L
Island and Roun
Barrier Maintena
ails, Hand Rail an
enance
r Posts (Guard Sto
t, Distance Marke
ted Non‐Conform
s
‐reported Non‐C
Monitoring Cons
mediate Safety H
ted for Repair
To
R
a Bathinda Netwo
Summary of
scription
e
intenence
of Bridge and oth
vement Surface a
y Works Respons
nance
ment Markers
Lines, Text, Symb
dabout Mainten
nce
nd Pedestrian Ba
ones, Boundry, E
ers, Hazard)
mance in Consecu
Conformance ide
sultant
Hazard to Road U
otal Score
RUS FIELD
ork in Punjab (Ind
f Non–Confo
Minim
for E
Non
5km (1
5km (1
her 5km (1
and
se
ols etc)
ance
arrier
Edge,
utive
ntified
Users
dia)
ormances of
mum Audit Length
Each Recorded
‐ Conformance
1km for cracking)
1km for cracking)
1km
1km for cracking)
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
RUS&CPM M
h
Total Non
Conformanc
Score
AxBxC
Contracto
) 2
) 1
2
) 0
0
0
0
0
10
42
1
0
0
0
58
30
0
0
88
Measures
‐
ce
r
Total Non
Conforman
Score
AxBxC
MC
2
1
0
0
0
0
2
2
10
46
1
0
0
0
64
30
30
0
124
53
n‐
nce
Commentss
OM
Month : Se
Non‐Confo
R
R
R
R
R
R
R
R
R
R
R
R
R
R
An
An
Any
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
eptember 2016 Date of Au
ormance Relating To
RUS&CPM1 Pavement
RUS&CPM2 Unsealed S
RUS&CPM3 Drainage M
RUS&CPM4 Routine M
RUS&CPM5 Obstructio
RUS&CPM6 Incident an
RUS&CPM7 Vegetation
RUS&CPM8 Roadside S
RUS&CPM9 Raised Ref
US&CPM10 Pavement
US&CPM11 Traffic Islan
US&CPM12 Crash Barr
US&CPM13 Sight Rails,
US&CPM14Marker Po
Markers, H
ny RUS&CPM Repeated N
ny RUS&CPMAny un‐rep
Consultant
y Road Safety
HazardsAny Immed
3.8 Verific
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
udit: 06.10.2016
Item Description
Maintenance
Shoulder Maintenence
Maintenance
aintenance of Bridge and other S
ons on the Pavement Surface and
nd Emergency Works Response
n Control
Signs Maintenance
flective Pavement Markers
Markings ‐ (Lines, Text, Symbols
nd and Roundabout Maintenanc
ier Maintenance
, Hand Rail and Pedestrian Barrie
sts (Guard Stones, Boundry, Edg
Hazard)
Non‐Conformance in Consecutive
ported Non‐Conformance identifi
t
diate Safety Hazard to Road Use
cationofContra
Bathinda Network in P
Road Se
Minim
for
Non
5km (1
crackin
5km
Structures
d Shoulders
etc)
e
er Maintenance
e, Culvert, Distance
e Months
ied by the Monitoring
rs Instructed for Repair
Total
actor’sAuditR
Table
Punjab (India)
ection : S1; Length of Audit Sect
mum Audit Length
Each Recorded
n ‐ Conformance
Number
Conform
Recor
Minimum
Lengt
Contra
km for ravelling or
ng or edgebreake)0
(1km for Shape) 0
1km 0
5km 0
1km 0
N/A 0
5km 0
5km 0
5km/1km 1
5km/1km 0
5km 0
5km 0
5km 0
5km 0
1
0
0
Score
Report
3‐13 : Verificatio
tion = 6.3 km; Location from km
of Non‐
mances
rded
m Audit
th A
actor
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
MC
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
on of Audit – Sec
54
m 5.00 to km 11.30
Non‐
Conformances
Weighting
B
Sub‐W
N
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
ction S1 – Km 5.0
4
Weighting
No of
nsecutive
s/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 0
2 12
1 0
0 0
14
00 to Km 11.300
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
2 RRP
0
0
0
0
0
12RUS&CP
0
0
14
Comments
PM missing between km 9 to km
PM ‐ 9 (2 months From Augsut 2
September 2016)
Photo No.
10 1,2 & 3
016 to
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenenc
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Te
Traffic Island and Roundabout
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pede
Marker Posts (Guard Stones, Bo
Markers, Hazard,Road Delineat
Repeated Non‐Conformance in
Any un‐reported Non‐Conform
Consultant
Any Immediate Safety Hazard t
Bathinda Network in P
Table
Description
ce
e and other Structures
Surface and Shoulders
s Response
arkers
ext, Symbols etc)
Maintenance
strian Barrier Maintenance
oundry, Edge, Culvert, Distance
tors)
Consecutive Months
ance identified by the Monitorin
to Road Users Instructed for Rep
Punjab (India)
3‐14 : Verificatio
7.76 km Audit Length Start
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
ng
pair
Total Score
on of Audit – Sec
t Location S2 km 2.240
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Num
Co
Min
0
0
0
0
0
0
0
0
1
6
0
0
0
0
0
0
0
55
ction S2 – Km 2.2
to km 10
mber of Non‐
onformances
Recorded
nimum Audit
Length A
MC
Non‐
Conformanc
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
1 2
6 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
5
24 to Km 10.000
ces
g
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
T
Co
C
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0
Total Non‐
onformance
Score
A*B*C
Contractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 2
12 12
0 0
0 0
0 0
0 0
0 0
0 0
0 0
14 14
e
Comment
RRPM missing between
Pavement marking missi
2.240 to km
ts Photo N
n km 2 to km 3 4,5 &
ing between km
m 87,8,9 & 10,
No.
6
11,12
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016 Da
Non‐Conformance Relating To
RUS&CPM1 Pa
RUS&CPM2 Un
RUS&CPM3 Dr
RUS&CPM4 Ro
RUS&CPM5 Ob
RUS&CPM6 In
RUS&CPM7 Ve
RUS&CPM8 Ro
RUS&CPM9 Ra
RUS&CPM10 Pa
RUS&CPM11 Tr
RUS&CPM12 Cr
RUS&CPM13 Sig
RUS&CPM14M
M
Any RUS&CPM Re
Any RUS&CPMAn
Co
Any Road Safety
HazardsAn
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
ate of Audit: 05.10.2016
Item Descri
avement Maintenance
nsealed Shoulder Maintenence
rainage Maintenance
outine Maintenance of Bridge and o
bstructions on the Pavement Surfa
cident and Emergency Works Resp
egetation Control
oadside Signs Maintenance
aised Reflective Pavement Markers
avement Markings ‐ (Lines, Text, Sy
raffic Island and Roundabout Maint
rash Barrier Maintenance
ght Rails, Hand Rail and Pedestrian
arker Posts (Guard Stones, Boundr
arkers, Hazard)
epeated Non‐Conformance in Cons
ny un‐reported Non‐Conformance i
onsultant
ny Immediate Safety Hazard to Roa
Bathinda Network in P
Table
5 km
ption
M
5km
cra
5
other Structures
ce and Shoulders
ponse
s
ymbols etc)
tenance
n Barrier Maintenance
ry, Edge, Culvert, Distance
ecutive Months
identified by the Monitoring
ad Users Instructed for Repair
To
Punjab (India)
3‐15 : Verificatio
m Audit Length Start Location S
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
Numbe
Confo
Rec
Minim
Len
Cont
m (1km for ravelling or
acking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
otal Score
on of Audit –Sect
S2 km 15 to km 20
er of Non‐
rmances
corded
um Audit
ngth A
tractor
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
56
tion S2 – Km 15.
Non‐
Conformances
Weighting
B
Sub‐Weig
No o
Consec
Weeks/M
C
2 1
1 1
2 1
2 1
1 1
2 1
1 1
2 1
2 1
2 1
1 1
1 1
1 1
2 1
6 0
6 1
6 0
6
00 to Km 20.00
ghting
of
cutive
Months
Total Non‐
Conformance
Score
A*B*C
Contractor
C
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
2
Total Non‐
onformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
2 RRP
0
0
0
0
0
0
0
0
2
Comments
PM missing between km 17 to km
Photo No.
18 13,14 & 15
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016 D
Non‐Conformance Relating To
RUS&CPM1 P
RUS&CPM2 U
RUS&CPM3 D
RUS&CPM4 R
RUS&CPM5 O
RUS&CPM6 I
RUS&CPM7 V
RUS&CPM8 R
RUS&CPM9 R
RUS&CPM10 P
RUS&CPM11 T
RUS&CPM12 C
RUS&CPM13 S
RUS&CPM14M
M
Any RUS&CPM R
Any RUS&CPMA
C
Any Road Safety
HazardsA
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item Des
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge an
Obstructions on the Pavement Su
ncident and Emergency Works Re
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Marke
Pavement Markings ‐ (Lines, Text,
Traffic Island and Roundabout Ma
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedestr
Marker Posts (Guard Stones, Boun
Markers, Hazard)
Repeated Non‐Conformance in Co
Any un‐reported Non‐Conformanc
Consultant
Any Immediate Safety Hazard to R
Bathinda Network in P
Table
cription
nd other Structures
rface and Shoulders
esponse
ers
, Symbols etc)
aintenance
ian Barrier Maintenance
ndry, Edge, Culvert, Distance
onsecutive Months
ce identified by the Monitoring
Road Users Instructed for Repair
Punjab (India)
3‐16 : Verificatio
5 km Audit Length Start Location
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
N
C
M
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
n S2 km 45 to km 50
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number of
Conforma
Record
Minimum
Length
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
57
ction S2 – Km 45.
f Non‐
ances
ded
Audit
h A
Non‐
Conformances
Weighting
B
S
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
7
.00 to Km 50.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non‐
Conformanc
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
0
e
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Comments
Photo No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenenc
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement S
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Tex
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedes
Marker Posts (Guard Stones, Bo
Markers, Hazard)
Repeated Non‐Conformance in
Any un‐reported Non‐Conforma
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table
Description
e
and other Structures
Surface and Shoulders
Response
arkers
xt, Symbols etc)
Maintenance
strian Barrier Maintenance
oundry, Edge, Culvert, Distance
Consecutive Months
ance identified by the Monitoring
o Road Users Instructed for Repa
Punjab (India)
3‐17 : Verificatio
5 km Audit Length Start Loc
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
g
air
Total Score
on of Audit – Sec
ation S2 km 60 to km 6
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Numbe
Confo
Rec
Minim
Len
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
58
ction S2 – Km 60.
65
er of Non‐
ormances
corded
um Audit
ngth A
MC
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
3 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
8
.00 to Km 65.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total N
Conform
Sco
A*B
Contra
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 6
1 0
1 0
1 0
1 0
0 0
1 0
0 0
6
Non‐
mance
re
*C
actor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
6Pav
0
0
0
0
0
0
0
6
Comments
ement marking faded between k
km 63 to km 65
Photo No.
km 61 to 62 & 16,17,18 & 19
9,20
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenenc
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Te
Traffic Island and Roundabout
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pede
Marker Posts (Guard Stones, Bo
Markers, Hazard,Road Delineat
Repeated Non‐Conformance in
Any un‐reported Non‐Conform
Consultant
Any Immediate Safety Hazard t
Bathinda Network in P
Table
Description
ce
e and other Structures
Surface and Shoulders
s Response
arkers
ext, Symbols etc)
Maintenance
estrian Barrier Maintenance
oundry, Edge, Culvert, Distance
tors)
Consecutive Months
ance identified by the Monitorin
to Road Users Instructed for Rep
Punjab (India)
3‐18 : Verificatio
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
ng
pair
Total Score
Road Section: S2; Length o
on of Audit – Sec
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Num
Co
Min
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
of Audit Section: 5 km; Location
59
ction S2 – Km 65.
mber of Non‐
onformances
Recorded
nimum Audit
Length A
MC
Non‐
Conformanc
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
1 2
1 1
0 1
0 1
0 2
0 6
0 6
0 6
from km 65 to km 70
9
.00 to Km 70.00
ces
g
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
T
Co
C
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0
Total Non‐
onformance
Score
A*B*C
Contractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 2
1 1
0 0
0 0
0 0
0 0
0 0
0 0
3 3
e
Comments
Pavement marking faded b
km 67
Road marking at Traffi
Roundabout at km 67+840
as per IRC: 3
s Photo No
etween km 66 to 21,22 & 2
ic island and
0 not maintained
35
o.
23
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016 D
Non‐Conformance Relating To
RUS&CPM1 P
RUS&CPM2 U
RUS&CPM3 D
RUS&CPM4 R
RUS&CPM5 O
RUS&CPM6 I
RUS&CPM7 V
RUS&CPM8 R
RUS&CPM9 R
RUS&CPM10 P
RUS&CPM11 T
RUS&CPM12 C
RUS&CPM13 S
RUS&CPM14M
M
Any RUS&CPM R
Any RUS&CPMA
C
Any Road Safety
HazardsA
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item Des
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge a
Obstructions on the Pavement Su
Incident and Emergency Works R
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mark
Pavement Markings ‐ (Lines, Text
Traffic Island and Roundabout Ma
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedestr
Marker Posts (Guard Stones, Bou
Markers, Hazard,Road Delineator
Repeated Non‐Conformance in Co
Any un‐reported Non‐Conforman
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table
scription
nd other Structures
urface and Shoulders
esponse
kers
t, Symbols etc)
aintenance
rian Barrier Maintenance
undry, Edge, Culvert, Distance
rs)
onsecutive Months
nce identified by the Monitoring
Road Users Instructed for Repair
Punjab (India)
3‐19 : Verificatio
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
Road Section S2; Length of Aud
on of Audit – Sec
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number
Conform
Recor
Minimum
Lengt
M
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 1
0 0
dit Section: 5 km; Location from
60
ction S2 – Km 70.
of Non‐
mances
rded
m Audit
th A
C
Non‐
Conformances
Weighting
B
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
km 70 to km 75
0
.00 to Km 75.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total No
Conforma
Score
A*B*C
Contract
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
0
on‐
ance
e
C
tor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
2Poo
73 to
0
0
0
0
0
6
0
8
Comments
or maintenance of pavement ma
o km 74, width not maintained a
RUS&CPM ‐ 10
Photo N
rking between km
s per specifications 24,25 &
No.
26
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 05.10.2016
Item De
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement S
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mar
Pavement Markings ‐ (Lines, Tex
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedes
Marker Posts (Guard Stones, Bo
Markers, Hazard)
Repeated Non‐Conformance in C
Any un‐reported Non‐Conforma
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table
escription
e
and other Structures
Surface and Shoulders
Response
rkers
xt, Symbols etc)
Maintenance
strian Barrier Maintenance
oundry, Edge, Culvert, Distance
Consecutive Months
nce identified by the Monitoring
o Road Users Instructed for Repa
Punjab (India)
3‐20: Verificatio
5 km Audit Length Start Loca
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
g
air
Total Score
on of Audit – Sect
ation S2 km 75 to km 8
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Numbe
Confor
Reco
Minimu
Leng
M
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
61
tion S2 – Km 75.
80
er of Non‐
rmances
orded
um Audit
gth A
MC
Non‐
Conformances
Weighting
B
1 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
1 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
1
00 to Km 80.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total N
Conform
Sco
A*B
Contra
1 2
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
0 0
1 0
0 0
4
Non‐
mance
re
*C
actor
Total Non‐
Conformance
Score
A*B*C
MC
2Ru
0
0
0
0
0
0
0
0
2 Pa
0
0
0
0
0
0
0
4
Comments
utting/Flow of pavement observe
78+300 to km 78+750
vement marking faded between
Photo No
ed between km
RHS27,28 & 2
km 75 to km 76 30,31 & 3
o.
29
32
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 04.10.2016
Item De
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge a
Obstructions on the Pavement S
Incident and Emergency Works R
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mar
Pavement Markings ‐ (Lines, Tex
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedest
Marker Posts (Guard Stones, Bou
Markers, Hazard)
Repeated Non‐Conformance in C
Any un‐reported Non‐Conforman
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table
escription
e
and other Structures
urface and Shoulders
Response
rkers
t, Symbols etc)
Maintenance
trian Barrier Maintenance
undry, Edge, Culvert, Distance
Consecutive Months
nce identified by the Monitoring
o Road Users Instructed for Repai
Punjab (India)
e 3‐21: Verificati
5 km Audit Length Start Locat
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
r
Total Score
ion of Audit – Se
tion S4 km 0 to km 5
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number of
Conforma
Record
Minimum
Length
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
62
ction S4 – Km 0.
f Non‐
ances
ed
Audit
h A
Non‐
Conformances
Weighting
BW
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
2
00 to Km 5.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non‐
Conformanc
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
0
‐
ce
r
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
2
1. Major
IRC: 67 ‐
2. At km
LHS & RH
3. Schoo
4. At km
LHS & RH
0
0
0
0
0
0
0
6
0
8
Comments
r road ahead sign at km 0+100 RH
‐2012, Fig. 15.19
1+600 speed breaker signs were
HS and also not as per IRC: 67 ‐2
ol signs are not as per IRC: 67 ‐20
2+010 speed breaker signs wer
HS and also not as per IRC: 67 ‐2
RUS&CPM ‐ 8
Photo No
HS not as per
e different on
2012, Fig. 15.49
12, Fig. 15.34
re different on
2012, Fig. 15.49
33,34,35 & 36,
o.
,37,38
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 04.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenenc
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Te
Traffic Island and Roundabout
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pede
Marker Posts (Guard Stones, Bo
Markers, Hazard,Road Delineat
Repeated Non‐Conformance in
Any un‐reported Non‐Conform
Consultant
Any Immediate Safety Hazard t
Bathinda Network in P
Table
Description
ce
e and other Structures
Surface and Shoulders
s Response
arkers
ext, Symbols etc)
Maintenance
estrian Barrier Maintenance
oundry, Edge, Culvert, Distance
tors)
n Consecutive Months
ance identified by the Monitorin
to Road Users Instructed for Rep
Punjab (India)
3‐22 : Verificatio
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
ng
pair
Total Score
Road Section: S4; Length o
on of Audit – Sec
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Nu
Co
Mi
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
of Audit Section: 5 km; Location
63
ction S4 – Km 5.0
mber of Non‐
onformances
Recorded
nimum Audit
Length A
MC
Non‐
Conforman
Weightin
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
1 2
0 1
0 1
0 1
0 2
0 6
1 6
0 6
from km 5 to km 10
3
00 to Km 10.00
ces
g
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Co
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0
Total Non‐
onformance
Score
A*B*C
Contractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 2
0 0
0 0
0 0
0 0
0 0
0 6
0 0
0 8
e
Commen
Pavement marking faded/
km 6 to km
RUS&CPM ‐
ts Photo N
/missing between
m 739 & 4
‐ 10
No.
40
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016 D
Non‐Conformance Relating To
RUS&CPM1 P
RUS&CPM2 U
RUS&CPM3 D
RUS&CPM4 R
RUS&CPM5 O
RUS&CPM6 I
RUS&CPM7 V
RUS&CPM8 R
RUS&CPM9 R
RUS&CPM10 P
RUS&CPM11 T
RUS&CPM12 C
RUS&CPM13 S
RUS&CPM14M
M
Any RUS&CPM R
Any RUS&CPMA
C
Any Road Safety
HazardsA
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 04.10.2016
Item Des
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge an
Obstructions on the Pavement Sur
ncident and Emergency Works Re
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Marke
Pavement Markings ‐ (Lines, Text,
Traffic Island and Roundabout Ma
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedestri
Marker Posts (Guard Stones, Boun
Markers, Hazard,Road Delineators
Repeated Non‐Conformance in Co
Any un‐reported Non‐Conformanc
Consultant
Any Immediate Safety Hazard to R
Bathinda Network in P
Table
cription
nd other Structures
rface and Shoulders
esponse
ers
Symbols etc)
aintenance
ian Barrier Maintenance
ndry, Edge, Culvert, Distance
s)
onsecutive Months
ce identified by the Monitoring
Road Users Instructed for Repair
Punjab (India)
3‐23 : Verificatio
5 km Audit Length Start Location
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
N
C
M
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
n S4 km 15 to km 20
umber of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number of
Conforma
Recorde
Minimum
Length
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 2
0 0
0 0
0 0
0 0
0 0
0 0
0 0
64
ction S4 – Km 15.
f Non‐
ances
ed
Audit
A
Non‐
Conformances
Weighting
B
S
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
4
.00 to Km 20.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non‐
Conformanc
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 4
1 0
1 0
1 0
1 0
0 0
1 0
0 0
4
ce
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
4Pavem
0
0
0
0
0
0
0
4
Comments
ment marking faded between km 1
19 to km 20
Photo No
15 to km 16 & km 41 & 42
o.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016 D
Non‐Conformance Relating To
RUS&CPM1 P
RUS&CPM2 U
RUS&CPM3 D
RUS&CPM4 R
RUS&CPM5 O
RUS&CPM6 I
RUS&CPM7 V
RUS&CPM8 R
RUS&CPM9 R
RUS&CPM10 P
RUS&CPM11 T
RUS&CPM12 C
RUS&CPM13 S
RUS&CPM14M
M
Any RUS&CPM R
Any RUS&CPMA
C
Any Road Safety
HazardsA
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 04.10.2016
Item Des
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge a
Obstructions on the Pavement Su
Incident and Emergency Works R
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mark
Pavement Markings ‐ (Lines, Text
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedest
Marker Posts (Guard Stones, Bou
Markers, Hazard,Road Delineator
Repeated Non‐Conformance in Co
Any un‐reported Non‐Conforman
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table
scription
nd other Structures
urface and Shoulders
Response
kers
t, Symbols etc)
aintenance
rian Barrier Maintenance
undry, Edge, Culvert, Distance
rs)
onsecutive Months
nce identified by the Monitoring
Road Users Instructed for Repair
Punjab (India)
3‐24 : Verificatio
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
r
Total Score
Road Section: S5; Length of Au
on of Audit – Sec
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number
Conform
Reco
Minimum
Leng
M
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
2 2
0 0
0 0
0 0
0 0
0 0
0 1
0 0
dit Section: 5 km; Location from
65
ction S5 – Km 5.0
of Non‐
mances
rded
m Audit
th A
C
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
1 1
0 2
0 2
2 2
0 1
0 1
0 1
0 2
0 6
1 6
0 6
m km 5 to km 10
5
00 to Km 10.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total No
Conforma
Score
A*B*C
Contrac
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 4
1 0
1 0
1 0
1 0
0 0
1 0
0 0
4
on‐
ance
e
C
ctor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
1Veg
0
0
4Pav
0
0
0
0
0
6
0
11
Comments
etation on shoulder more than 10
0 to km 5
vement marking faded between k
9 to km 10
RUS&CPM ‐ 7
Photo No
0mm between km 43 & 44
m 6 to km 7 & km 45 & 46
o.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 04.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement S
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Tex
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedes
Marker Posts (Guard Stones, Bo
Markers, Hazard,Road Delineat
Repeated Non‐Conformance in
Any un‐reported Non‐Conforma
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table 3
escription
e
and other Structures
Surface and Shoulders
Response
rkers
xt, Symbols etc)
Maintenance
strian Barrier Maintenance
oundry, Edge, Culvert, Distance
ors)
Consecutive Months
ance identified by the Monitoring
o Road Users Instructed for Repa
Punjab (India)
3‐25 : Verificatio
5 km Audit Length Start Loca
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
g
air
Total Score
n of Audit – Sect
ation S5 km 15 to km 20
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Num
Con
R
Mini
L
0
1
1
0
0
0
0
0
1
1
0
0
0
0
0
0
0
66
tion S5 – Km 15.0
0
ber of Non‐
formances
ecorded
mum Audit
Length A
MC
Non‐
Conformance
Weighting
B
0 2
1 1
0 2
0 2
0 1
0 2
1 1
0 2
1 2
1 2
0 1
0 1
0 1
0 2
0 6
1 6
0 6
6
00 to Km 20.000
es
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
To
Con
A
Co
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0
otal Non‐
formance
Score
A*B*C
ontractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
1 1
2 0
0 0
0 0
0 0
0 1
0 0
2 2
2 2
0 0
0 0
0 0
0 0
0 0
0 6
0 0
7 12
Comments
Low shoulder and reverse slo
km 15 to km 2
At km 15+630 parapet paintin
Audit
Vegetation on the shoulders m
high between km 15 to km 16
RPMs missing/dysfunctional b
km 20
Pavement marking faded betw
17
RUS&CPM ‐
Photo No
pe found between
2047,48 & 49
ng done during MC 51
more than 100mm
6 & km 16 to km 1752,53 & 54
between km 19 to 56,57,58 &
ween km 16 to km
7
o.
9,50
4,55
& 59
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 06.10.2016
Item De
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge a
Obstructions on the Pavement S
Incident and Emergency Works R
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mar
Pavement Markings ‐ (Lines, Tex
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedest
Marker Posts (Guard Stones, Bo
Markers, Hazard)
Repeated Non‐Conformance in C
Any un‐reported Non‐Conforma
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table 3
escription
e
and other Structures
Surface and Shoulders
Response
rkers
xt, Symbols etc)
Maintenance
trian Barrier Maintenance
undry, Edge, Culvert, Distance
Consecutive Months
nce identified by the Monitoring
o Road Users Instructed for Repa
Punjab (India)
3‐26 : Verificatio
5 km Audit Length Start Locat
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
ir
Total Score
on of Audit – Sec
tion B8 Km 15 to Km
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Numbe
Confor
Rec
Minimu
Len
M
0
0
0
0
0
0
0
0
1
3
0
0
0
0
1
0
0
67
tion B8 – Km 15.
m 20
er of Non‐
rmances
orded
um Audit
gth A
MC
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
1 2
3 2
0 1
0 1
0 1
0 2
1 6
0 6
0 6
7
.00 to Km 20.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total
Confor
Sco
A*B
Contr
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 6
1 0
1 0
1 0
1 0
3 1
1 0
0 0
2
Non‐
mance
ore
B*C
ractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 2
6 6Pa
0 0
0 0
0 0
0 0
8 18
0 0
0 0
6 26
Comments
RRPM missing between km
vement marking faded between
km 18 to km 19
RUS&CPM ‐ 10 (3 months from
September 2016
Photo N
15 to km 16 60,61 &
km 15 to km 17 & 63,64,65 &
m July 2016 to
)
No.
62
66,67
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5
RUS&CPM6
RUS&CPM7
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11
RUS&CPM12
RUS&CPM13
RUS&CPM14
Any RUS&CPM
Any RUS&CPM
Any Road Safety
Hazards
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 06.10.2016
Item D
Pavement Maintenance
Unsealed Shoulder Maintenenc
Drainage Maintenance
Routine Maintenance of Bridge
Obstructions on the Pavement
Incident and Emergency Works
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Ma
Pavement Markings ‐ (Lines, Te
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedes
Marker Posts (Guard Stones, Bo
Markers, Hazard)
Repeated Non‐Conformance in
Any un‐reported Non‐Conforma
Consultant
Any Immediate Safety Hazard t
Bathinda Network in P
Table 3
Description
e
and other Structures
Surface and Shoulders
Response
arkers
xt, Symbols etc)
Maintenance
strian Barrier Maintenance
oundry, Edge, Culvert, Distance
Consecutive Months
ance identified by the Monitoring
o Road Users Instructed for Rep
Punjab (India)
3‐27 : Verification
5 km Audit Length Start Loc
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
g
air
Total Score
n of Audit – Sect
cation B8 Km 20 to k
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Numbe
Confor
Reco
Minimu
Leng
M
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
68
tion B8 – Km 20.0
km 25
r of Non‐
rmances
orded
um Audit
gth A
MC
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
0 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
8
00 to Km 25.000
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total N
Conform
Scor
A*B
Contra
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
0
0
Non‐
mance
re
*C
actor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Comments
Photo No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : September 2016
Non‐Conformance Relating To
RUS&CPM1
RUS&CPM2
RUS&CPM3
RUS&CPM4
RUS&CPM5 O
RUS&CPM6
RUS&CPM7 V
RUS&CPM8
RUS&CPM9
RUS&CPM10
RUS&CPM11 T
RUS&CPM12 C
RUS&CPM13 S
RUS&CPM14
Any RUS&CPM
Any RUS&CPMA
C
Any Road Safety
HazardsA
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Date of Audit: 06.10.2016
Item Des
Pavement Maintenance
Unsealed Shoulder Maintenence
Drainage Maintenance
Routine Maintenance of Bridge a
Obstructions on the Pavement Su
Incident and Emergency Works R
Vegetation Control
Roadside Signs Maintenance
Raised Reflective Pavement Mark
Pavement Markings ‐ (Lines, Text
Traffic Island and Roundabout M
Crash Barrier Maintenance
Sight Rails, Hand Rail and Pedest
Marker Posts (Guard Stones, Bou
Markers, Hazard,Road Delineator
Repeated Non‐Conformance in Co
Any un‐reported Non‐Conforman
Consultant
Any Immediate Safety Hazard to
Bathinda Network in P
Table 3
scription
nd other Structures
urface and Shoulders
Response
kers
t, Symbols etc)
aintenance
rian Barrier Maintenance
undry, Edge, Culvert, Distance
rs)
onsecutive Months
nce identified by the Monitoring
Road Users Instructed for Repair
Punjab (India)
3‐28 : Verification
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling or
cracking or edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
r
Total Score
Road Section: B8; Length of Au
n of Audit – Sect
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Number
Conform
Recor
Minimum
Lengt
M
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 2
0 0
0 0
0 0
0 0
0 0
0 0
0 0
udit Section: 5 km; Location from
69
tion B8 – Km 25.0
of Non‐
mances
rded
m Audit
th A
C
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
2 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
m km 25 to km 30
9
00 to Km 30.000
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total No
Conforma
Score
A*B*C
Contract
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 4
1 0
1 0
1 0
1 0
0 0
1 0
0 0
4
0
on‐
ance
e
C
tor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
4 Pav
0
0
0
0
0
0
0
4
Comments
vement marking faded between k
Photo No.
km 26 to km 28 68,69 & 70
0
TNM
OPRC World Monthly Progre
3.9
[
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Audit Inspect
[Photograph N
Ph
Ph
Ph
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
tion Photogra
Numbers As R
oto No. 1
oto No. 3
oto No. 5
thinda Network in
aphic Record
Referred in Ab
Punjab (India)
d of Non‐Conf
bove Tables (
formances
(From Table 3
P
P
P
3.13 To Table
Photo No. 2
Photo No. 4
Photo No. 6
70
3.28)]
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Ph
Ph
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 7
oto No. 9
oto No. 11
thinda Network in Punjab (India)
P
P
P
Photo No. 8
Photo No. 10
Photo No. 12
71
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 13
oto No. 15
oto No. 17
thinda Network in Punjab (India)
P
P
P
Photo No. 14
Photo No. 16
Photo No. 18
72
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 19
oto No. 21
oto No. 23
thinda Network in Punjab (India)
P
P
P
Photo No. 20
Photo No. 22
Photo No. 24
73
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 25
oto No. 27
oto No. 29
thinda Network in Punjab (India)
P
P
P
Photo No. 26
Photo No. 28
Photo No. 30
74
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 31
oto No. 33
oto No. 35
thinda Network in Punjab (India)
P
P
P
Photo No. 32
Photo No. 34
Photo No. 36
75
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 37
oto No. 39
oto No. 41
thinda Network in Punjab (India)
P
P
P
Photo No. 38
Photo No. 40
Photo No. 42
76
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 43
oto No. 45
oto No. 47
thinda Network in Punjab (India)
P
P
P
Photo No. 44
Photo No. 46
Photo No. 48
77
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 49
oto No. 51
oto No. 53
thinda Network in Punjab (India)
P
P
P
Photo No. 50
Photo No. 52
Photo No. 54
78
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 55
oto No. 57
oto No. 59
thinda Network in Punjab (India)
P
P
P
Photo No. 56
Photo No. 58
Photo No. 60
79
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 61
oto No. 63
oto No. 65
thinda Network in Punjab (India)
P
P
P
Photo No. 62
Photo No. 64
Photo No. 66
80
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
Pho
Pho
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
oto No. 67
oto No. 69
thinda Network in Punjab (India)
P
P
Photo No. 68
Photo No. 70
81
TNM
OPRC World Monthly Progre
4 ENV
4.1
4.2
SI.
No.
De
1 RO
wit
day
any
of
2 Bo
Ma
3 Co
and
fac
ma
4 Co(bonowama
5 Am
(AA
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
VIRONME
Environmen
This part ofmanagementIssues relatedstaff at site, management
Complianceguidelines
Table 4‐
escription Act
OW Encroachm
thin five work
ys of observin
y encroachme
ROW.
rrow Area
anagement
nstruction pla
d Contractor‘
cilities
anagement
nstruction waoth hazardoun‐hazardous aste) anagement.
mbient Air Qu
AQ) in
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
ENTAL&S
ntalManage
f the report t conducted dd to functionaair pollution
t were discus
e as per En
‐1: Complianc
tivity St
Con
ment
king
ng
ent
No
ants
‘s
All recompobtaadeqimplesite s
aste s and
Storerecycregu
ality Mitigmeas
thinda Network in
SOCIALM
ement
highlights tduring the moality of equipn control actsed. Observa
nvironment
ce as per Env World
tatus as Per
tractor’s MP
Nil
ot applicable.
egulatory pliance ined and quate ementation ospecific EMP.
ed, reused, cled & sold larly.
gation sures taken fo
Punjab (India)
ANAGEM
the activitiesonth of Septement’s, healttivities, dust tions and key
tal Perform
ironmental PBank guideli
R
Action R
Regular
required
Records
shall be
of
Facilitiessite shoaccordanobservat
Solid a
Material
done as
Act.
Spillage
hazard
controlle
contami
waste sh
hazardo
or Dust sup
Plantatio
ENT
s related to ember 2016. th and safetyemission coy issues have
mance Indic
Performancenes
Required / M
be taken
observa
d.
of borrow a
maintained a
s for labor ould be maince wittions raised b
nd Hazardo
l Manageme
s per Provisio
of bitumen
material s
ed and
nated sand
hould be sto
us waste faci
ppression / b
ons in both
the Environ
y of labour anontrol, water been explain
cators as p
Indicators as
Measures to
tion is
area closed
at site.
and plant ntained in h the by the MC.
ous Waste
ent to be
ons of the
and other
should be
d oil
and other
ored under
lity.
arriers and
the camp
82
nment and
d other contrand waste w
ned in the rep
per World
s per
Remar
Insufficient circulation exhausts were obselabor camneed imattention.
Improvemenrequired foperation maintenanceWaste ManaSites.
Dust barrieinstalled bu
social
ractor water port.
Bank
rks
Air and
facilities rved in ps and
mmediate
nt is for the
and e of agement
rs were ut more
TNM
OPRC World Monthly Progre
con
str
6 AmLevconstr
7 Reg
com
8 EnvMaPro
9 OpMaProlabduma
10 Machaarcremexccon
11 Precomdisto inccom
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
nstruction
etches.
mbient Noise vels (ANL) in nstruction etches.
gulatory
mpliance.
vironmental anagement ocess.
perational anagement ocesses includbour deploymring routine aaintenance w
anagement ofance discoverchaeological mains at any scavated undentract.
evention of mmunicable seases spreadnew areas ducreased mmunication
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
enhaby resprinfor dsupp
Mitigmeasredulevel has bper msched
Docuand rof licperm& renupda
EnvirScreeEnvirImpa& Enmanaof linroadsubmappr
ding ment and ork.
As peroutimain
f any ry of
site er the
Not f
ding ue to
s.
HIV‐Aawarcondothetakenbase
thinda Network in
ancing the AAegular nkling of wateust
pression.
gation sures taken focing the noise& monitoring
been carried amonitoring dule.
umentation record keepinenses/
mits/ consentsnewed/ ated regularly
ronmental ening, ronmental act Assessmenvironmental agement Plannk specific s has been mitted and oved by clien
er schedule one and ntenance wor
found.
AIDS reness camp iducted and r measures n on regular s.
Punjab (India)
AQ
er
sites to b
basis.
or e g as
Improve
to att
pollution
ng
s
y.
To be co
nt
n
nt.
To be m
clauses
agreeme
MoEF 20
amendm
f
rk.
Improve
provision
Protectiv
labour
mainten
bank no
If fou
archaeo
project
docume
is Awarene
organize
agreeme
Condom
as soon
be improved
ed plantation
tenuate th
n generation.
omplied regul
maintained a
setup in
ent & EIA not
006 and its s
ments.
ement requ
n of PPEs
ve Equipmen
for rout
nance work as
rms.
nd, any
logical rema
site s
nted.
ess camps
ed as per
ent. At c
m Boxes shou
as they are e
on priority
n will help
he Noise
.
larly.
as per the
contract
tification of
subsequent
uired for
(Personal
nt) to the
tine and
s per world
such an
ains in the
shall be
should be
contract
amp site
ld be filled
mpty.
83
are still rSurvival oplants under greeneeds toensured.
Sewage trplant shouoperated rand inspections done.
required. of the planted
en belt o be
reatment uld be regularly regular shall be
TNM
OPRC World Monthly Progre
4.3
SI. No.
1 Sw
2 S
3 C
4 ADH
5 CC
6 Ap
7 F
4.4
SI. No.
1 Soma
2 Sane
3 Wtre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
StatusofGe
Ta
Facilities
Separate Driwater facility
Security
Creche Facilit
Availability Doctor / MeHelp
Cooking faciCanteen
Awareness posters
First Aid Facil
StatusofPh
T
Indicators
olid waste anagement
nitation etwork
aste water eatment facil
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
eneralfacilit
able 4‐2 : Sta
s
nking Providrinkby co
Provicamp
ty Not R
of edical
Detafacilitavaila
lities/ Proviin Caother
Awarrelatecampposte
ity First both first store
hysicalEnvir
Table 4‐3 : St
Not Ma
Provide
ity Providefunctio
thinda Network in
tiesatContr
atus of Gener
Stat
ided. Treatmking water haontractor at p
ided. Gated p sites is prov
Required.
ils of nties/ local able.
ided. Meal faamp site for r camp reside
reness posteed to occupp site. Road sers need to be
Aid boxes camp sites. aid room wae room.
ronmentalA
tatus of Physi
Status
aintained
ed
ed but not onal.
Punjab (India)
ractorCamp
al facilities at
tus
ment facility as been provproject site.
entry for vided.
earby Meddoctors
acility is provproject staff ents.
ers are instapation safetysafety awaree provided.
are providedAt old campas being use
AspectsonS
ical Environm
Responsi
Contracto
Contracto
Contracto
pSite
t Contractor
for vided
Regulasystem
both SecuriCamp
The operafacility
dical are
Agreehospitof thmedic
vided and
‐
alled y at eness
More installof the
d at p site ed as
First APlacembox mshall used f
Site
mental Aspect
ibility
or SegremaincompdumpUrge
or ‐
or To befunct
Camp Site
Action
ar Maintenam to be done
ity Guard at should be m
camp site tors and drivy is not requi
ement may betal or medicae Emergenccal requireme
number of aled and on see project road
Aid box to ment and acmay be improbe maintainefor any other
ts on Site
Action requ
egation yardntained. posting pit wp area. nt attention
e made opertional.
84
n / Remarks
nce of filter.
the entry poaintained.
has the favers only, thred.
e done with tal authority focy services aents.
wareness poselected junctd.
be managedccessibility ooved. Dispened and shoupurposes.
uired
d was not Organic
was used as
is required.
ational and Proper
rs and RO
oint of the
acility for hus Creche
he nearest or facilities and other
sters to be tion points
d properly. f First aid sary room uld not be
Remarks
‐
‐
‐
TNM
OPRC World Monthly Progre
4 StoPla
1.
2.
3.
4.
5.
5 Du1. 2. 3.
6 Sa
7 Oi
8 PPLa
9 DGSta
10 Plaanca
M TECHNOLOMANAGEM
Bank Project for Sess Report No 24 (Se
ockyard anning
Solid Platfor
Segregation Materials
Layout of Ya
Ground Levelling
Covering vehicles fine parttransportati
ust SuppressioHaul Road Stock Yard Open Area Camp Site
fety Equipme
l & Grease Tr
PEs provided tbour
G sets adequaack
antation insidnd around themp site
OGY AND MENT LTD.
angrur Mansa Bateptember 2016)
rms Provideand installacamp s
of ‐
ard Approvplan is client.
Mainta
of for
ticle on
‐
on
in
Not ma
ent Partiall
rap Provide
to Partiall
ate Provide
de e
Not pro
thinda Network in
ed for DG setothe
ations in botsites.
ved layouawaited from
ained
aintained
ly maintained
ed.
ly maintained
ed
ovided.
Punjab (India)
ts er h
Contracto
Contracto
ut m
Contracto
Contracto
Contracto
Contracto
d. Contracto
Contracto
d. Contracto
Contracto
Contracto
treatbe dtestinplacerequ
or Garlawas sand wthe cplatfo
or
or ‐
or Shouregul
or ‐
or Dust insta
or Geneneed
or To main
or ImprRequAwarof Pprovi
or ‐
or New and matunearbplantpossimeas
tment of wasone and primng facility ed onsite asirements.
anding of the suggested to was implemecontractor fororms
uld be maintalarly.
barriers shallled on priori
eral safety meds to be impro
be cleanntained regula
ovement require Trainreness prograPPE which ided to labou
Saplings to healthy /
ure trees avaby areas mted in new caible, as sure.
85
te water to mary water should be per PPCB
Platforms contractor nted by r DG sets
ined
l be ty.
easures oved.
ned and arly.
uired. ning & am for use has been
urs.
be planted growing /
ailable from may be re‐amp site, if immediate
TN
OM
4
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
4.5 Status
Activities
Camp Layout Plan
Consent to Establishment (CTE) for Hot Mix Plant (Apollo)
Consent to Operation (CTO)
for Hot Mix Plant (Apollo)
NOC for change of Land Use
Permission for Withdrawal of Ground Water for Construction
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
ofStatuaryCle
StatutoryAuthority
PWD, Sang
Punjab StaPollution Con
Board
) Punjab StaPollution
Control Boa
District TowPlanner, Bath
Central GroWater Boa
Bathinda Network in P
earancesApplic
Table 4‐4
y y
WheRequi
rur Befo
Constru
ate ntrol
BefoConstru
ate n ard
BefoConstru
wn hinda
BefoConstru
und ard
BefoExtrac
Punjab (India)
cableforproje
4 : Status of Statu
en ired
Camp‐1: Khia
ore uction
Appliedcamp seweraletter PIPL/OPdated 3
ore uction
AppliedPIPL/OP14/010 09.2013
ore uction
AppliedPIPL/OP14/ 24.10.2
ore uction
Applied16.04.2
ore ction
AppliedOPRC/P14/007 No.908Mansa.
ctandCampsi
uary Clearances A
Applied
ala Khurd Camp a
d with reviselayout plan witge system vid
nPRC/186/ 20131.07.2013
d vide letter nPRC/PWD/ 201
dated 23
d vide letter nPRC/ PWD /201
027 date2013
d dated 2013
d vide PIPPWD/201/2013‐
Receivin3 at DC offic
86
te
Applicable for pr
Status
Obtain
at Km. 64+050; 3
ed th de o. 13
‐
o. 3‐23.
Obtained ZO/BTI/201304.10.2013
o. 3‐ed
Obtained ZO/BTI/WPCdated 19.1/APC/2013/19.12.2013
Obtained 997DTP(B)/517.04.2013
L/
ng ce
In process (letter no2015) has office Man16341) date
6
roject and Camp
ed / Approved
3KM LHS
vide NOC 3/ NOC ‐110 da
vide NOC C/ 2013 /F‐112.2013 & ZO// F‐ 148 da
vide letter 55 da
Gentle remin. PIPL/OPRC/6been given to nsa (receiving ed on 30.07.2015
p site
Expiry Da
NA
No. ted
03.10.20
No. 164 /BTI ted
30.06.20
no. ted NA
der 18/ DC no.
5
NA
ate Rem
14 Renewrequired abeen es
16 Not in udemo
Extractiofrom localbore wellpaymen
marks
wal is not as plant has tablished
use; to be obilized
n of water lly available l owner on nt mode.
TN
OM
C
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Installation of Generators
Explosive License for
Storing Fuel Oil, Lubricants,
Diesel, etc. at Construction
Camp
Camp‐2: Khiala K
Camp Layout Plan
Consent to Establishment
(CTE) for Hot Mix
Plant (Linhoff)
Consent to Operation (CTO)
for Hot Mix Plant (Linhoff)
Storage Handling and Transport of Hazardous Materials
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Punjab ElectricityBoard
Chief Cont.Explosive
Kalan Camp at K
PWD, Sang
Punjab StaPollution Con
Board
) Punjab Sta
Pollution ConBoard
Punjab StaPollution Con
Board
Bathinda Network in P
y Befo
Installa
. of es
BefoInstalla
M. 61+600; 0.3K
rur Befo
Constru
ate ntrol
BefoConstru
ate ntrol
BefoConstru
ate ntrol
BefoConstru
Punjab (India)
ore ation
Applied2014 ‐ 123.04.2
ore ation
Applied2014‐ 122.04.2
KM RHS
ore uction
Appliedlayout seweraletter n/2014 d
ore uction
Applied10830929.03.1
ore uction
Applied130825dated 1
ore uction
AppliedID no. 111.06.2
d PIPL/ADMIN15/078 dated 2015
d PIPL/ADMIN15/018 dated 2015
d revised camplan wit
ge system vidno. PIPL/OPRC/40dated 09.09.2014
d ID Nos. 96 dated 1014
d ID Nos. 53 and 130818816.05.1014
d application 1421038 dated 2014
87
N/ Obtained vdated 27.04
N/ Obtained P/NC/PB/14dated 22.04
mp th de 08 4
‐
Obtained vidZO/BTI/2014dated 17.04
Obtained vidZO/BTI/WPCZO/BTI/APC21.05.2014
Obtained HWM/MMSdated 28.08
7
ide memo 00074.2015
vide 4/4153 (P31704.2015
de NOC No. 4/ NOC ‐123 4.2014
de NOC No. C/ 2014/F‐180 /2014 /F‐163 da
vide letter S‐2014/16826448.2014
760 10.04.20
no. 010) 31.12.20
NA
16.04.20
& ted
30.06.20
no. 27.08.20
17
17
15 Renew
required abeen es
19 Indus
R14MNS
15 Applied fo
(Applic3467
wal is not as plant has tablished
stry ID S1083075
or renewal cation ID 7370)
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Installation of Generators
Permission for Withdrawal of Ground Water for Construction
Registration of Vehicles & RoadEquipments
PUC of all Vehicles/ Machinery
Labour license
Labour License
Sand Mining
Quarry for Aggregates
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Punjab ElectricityBoard
Central GroWater Boa
Motor VehiDepartme
Motor VehiDepartme
Labour Commission
Sangrur
Labour Commission
Bathinda
Dept of Geo.Mining
Dept of Geo.Mining
Bathinda Network in P
y Befo
installa
und ard
BefoExtrac
icle nt
Befoconstru
icle nt
Befooperat
ner ‐
ner, a
‐
And Befooperat
And Befooperat
Punjab (India)
ore ation
Applied2014‐1523.04.2
ore ction
AppliedOPRC/P14/007 No.908Mansa.
ore uction
Applied
ore ional
Applied
Appliedletter PIPL/AD15/39 d
Appliedvide PIPL/AD15/40 d
ore ional
‐
ore ional
‐
d PIPL/ADMIN5/078 date2015
d vide PIPPWD/201/2013‐
Receivin4 at DC offic
Other Clear
d various date
d various date
d for renewal vidn
DMIN/2014‐ dated 15.12.2014
d for renewedletter n
DMIN/2014‐ dated 15.12. 201
88
N/ ed
Obtained vid000761 date
L/
ng ce
In process (letter no2015) has office Man16341) date
rances
Obtained
Various date
de o.
4
Obtained v563 dated labours
o.
4
Obtained vi20/2013 da50 labours
‐
‐
8
de memo ed 27.04.2015
Gentle remin. PIPL/OPRC/6been given to nsa (receiving ed on 30.07.2015
es
ide License no.‐19.02.2013 for 1
ide License no. ‐ted 06.05.2013
10.04.20
der 18/ DC no.
5
NA
Various da
Various da
‐ L‐100 31.12.20
‐ L‐for
NA
NA
17
Extractiofrom localbore wellpaymen
ates Engaged
pro
ates Engaged
pro
16 Applied fo
Not Appprocur
existing sa
Not Appprocur
existing sa
n of water lly available l owner on nt mode.
d for OPRC oject
d for OPRC oject
or renewal.
‐
plicable as red from and quarry
plicable as red from and quarry
TN
OM
4
T
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Debris Disposal Sites
Canal Water Permission
Forest Clearance
.
4.6 Future
Following key iss
1. Air pollu
2. Air pollu
3. Waste ha
4. Safety pr
These are the ke
issues may be re
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Gram Panch
IrrigationDepartme
e Forest
Departme
ekeyissuesas
sues may arise du
tion from Hot M
tion from road c
andling and man
ractices during ro
ey potential issue
solved and mana
Bathinda Network in P
ayat Befo
Operat
n nt
‐
nt Befo
Operat
reviewedfrom
uring future cons
ix Plant operatio
onstruction work
nagement during
oad construction
es that may arise
aged if good envi
Punjab (India)
ore tional
AppliedPIPL/OPdated 0
Applieddated 0
ore tional
Various
mtheworkspro
struction work as
on.
k.
road constructio
n.
during further r
ironmental pract
d vide letter nPRC/ 101/20102.05.2015
d for renewal 06.10.2015
s dates for differe
ogrammeandw
s there may be ch
on.
oad construction
tices and environ
89
o. 13
Renewed vreceipt no01.10.2015
ent Sections
workmethod
hange in scenario
n work and chang
nmental managem
9
vide serial no. o. 110485 da
o in the working
ge in working me
ment plan to be
NA
Z, ted 31.03.20
NA
method and wor
ethod and workin
implemented.
Ch. 6+300road. Not debris be
16 Applied fo
Applicatioclearances
by PSan
rking program.
ng program. How
0 R/S on S‐2 required as ing reused.
or renewal
on for forest s submitted PWD, ngrur
wever these
TN
OM
5
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5 ROAD SA
5.1 Introdu
This se
finding
Safe an
practic
The Se
by the
5.2 Crash R
Crash a
Contra
The pr
Month
Table 5
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
AFETY AND TR
uction
ection presents t
gs performance a
nd efficient netw
es in accordance
ction also contai
World Bank Miss
Records
analysis is presen
ctor. The fatal cr
incipal data sour
ly Progress Repo
5‐1 gives the sna
Bathinda Network in P
RAFFIC MANA
the road safety p
udit conducted m
work are the prim
e with the provisi
ns recommenda
sion.
nted by using cra
rashes are verifie
rce for this repo
orts (MPRs). The d
pshot of total cra
Punjab (India)
AGEMENT
performance of
monthly by Mon
me aims of the O
ions of the contra
tions based on c
ash records from
ed with the police
ort was the Road
data format is pr
ashes on the OPR
the OPRC netwo
itoring Consultan
OPRC project. MC
act ‐ to ensure th
continuous road s
m the March 2013
e records for auth
d Crash database
rogressively bein
RC network year
90
ork in terms of
nt.
C is making all ef
hat the Contracto
safety assessmen
3 up to Septemb
henticity.
e maintained by
g improved to pr
wise.
0
crash statistics b
fforts with the he
or builds and ope
nt being carried o
er 2016. The info
M/s PIPL and su
rovide meaningfu
based on the an
elp standards, sp
erates safer road
out regularly by
ormation is extra
ubmitted to Mon
ul details.
nalysis of crash r
pecifications, gui
s.
the Team Leade
acted from the M
nitoring Consulta
records and
delines and
r as desired
MPRs of the
ant through
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Table 5
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Sr. No. Road
1
2
3
4
5
6
Total
5‐2 gives the sna
Sr. No. Road
1
2
3
4
5
6
Total
Bathinda Network in P
d Name MaN
S1
S2
S3
S4
S5
B8
pshot of total fat
Ta
d Name MaN
S1
S2
S3
S4
S5
B8
Punjab (India)
Table 5‐1 : OPRC
ar. 2013 to Nov. 2013
5
59
3
2
6
6
81
talities on the OP
able 5‐2 : OPRC N
Tota
ar. 2013 to ov. 2013
2
13
0
0
3
5
23
C Network Crash
Dec. 2013 to Nov.2014
0
78
3
3
1
1
86
PRC network yea
Network Fataliti
al Fatalities
Dec. 2013 to Nov.2014
0
9
0
1
0
5
15
91
h Details (Up to S
Dec. 2014 toNov. 2015
7
71
9
4
1
6
98
r wise.
es Details (Up to
on Network
Dec. 2014 toNov. 2015
1
7
0
0
0
0
8
1
September 2016)
o Dec. 201Nov. 20
7
63
2
1
3
2
78
o September 201
k
o Dec. 201Nov. 20
0
15
1
0
2
0
18
)
15 to 016
Total
2
3
16)
15 to 016
To
4
Crashes
19
271
17
10
11
15
343
otal
3
44
1
1
5
10
64
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.3 Crash A
The aim of
were first r
crash histo
Total 8
The tot
There w
Where
some u
While t
There h
10 com
65% of
Figure
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Analysis
f this crash analy
reported by the
ry, the identifica
8 crashes were re
tal number of cra
were no fatal cra
as S2 Section co
urgent road safet
the total number
has been fatal cr
mpared to numbe
f crashes were at
5‐1 to Figure 5‐5
Bathinda Network in P
ysis is to examine
contractor. The
tion of any trend
eported on the ne
ashes this year (7
ashes reported in
onstitutes 52.1%
ty measures, esp
r of crashes has c
ash on OPRC net
er of deaths last y
tributed to spee
5 depicts various
Punjab (India)
e the crash histo
re are many fact
d will assist in dev
etwork for report
78) is down by 9,
n the month of Se
of OPRC Netwo
ecially in the wak
come down from
twork for the last
year (8).
ding and overtak
attributes of cra
ory and trends in
tors which contri
veloping strategi
ting month of Se
compared to the
eptember 2016.
rk, it accounted
ke of ensuing win
m previous year, t
t two months, ho
king. 35% of cras
sh statistics.
92
the occurrence
ibute to the occu
ies to decrease th
eptember 2016.
e number of cras
for 80.8% of all
nter/fog season.
he number of fat
owever, total num
hes were single v
2
of these crashes
urrence of road c
he number of roa
shes same time p
crashes and 83.
talities on OPRC
mber of fatalities
vehicle – leaving
s since March 20
crashes. Althoug
ad crashes.
previous year (87
3% of all fatalitie
Network has rise
s in the 4th Year
the carriageway
013 when the cra
gh it’s a very sho
7).
es in the 4th Yea
en sharply.
stands at 18, wh
y.
ash records
rt period of
r, requiring
hich is up by
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
1
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
1.3
106.13
3
44
S1 S2
Lengt
Section
Bathinda Network in P
Figure 5‐1: O
7.29 24.971
S3 S
th v Fatalit
Length (L) Fatal
Punjab (India)
OPRC Network –
7 25.341 5
S4 S5
ties
ities (F)
– Section Length
28.65 10
B8
93
v Number of Fat
0.
S
3
talities& Fatality
07
0.12
0
S1 S2
Fata
Fat
y Rates
0.040.01
S3 S4
ality Rates
tality Rate/Year (F)
0.06
0.10
S5 B8 A
s
0.09
AVERAGE
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
19
271
11.3
10
S1 S2
Len
Total Cra
Bathinda Network in P
Figure 5‐2
17 10
06.13
7.29
2 S3
ngth v Cras
ashes (C) Sectio
Punjab (India)
2: OPRC Network
0 1124.97 25.34
S4 S5
shes
on Length (L)
k – Section Lengt
1528.65
B8
94
th v Number of C
0.47
S1
4
Crashes& Crash R
0.710.65
S2 S3
Crash
Crash
Rates
0.11 0.12
S4 S5
h Rates
Rate/year(R)
0.15
0.47
B8 AVERAG
GE
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.4 Trend i
Total 8
There w
Althoug
twice c
The tot
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
in Crashes
8 crashes were re
were no fatal cra
gh there were no
compared to tota
tal number of cra
Bathinda Network in P
Figure
eported on the ne
ashes reported in
o deaths on OPRC
al fatalities last ye
ashes this year (7
34
TOT
Punjab (India)
5‐3: OPRC Netw
etwork for report
n September 201
C network for th
ear (8).
78) is down by 9,
43
22
TAL SPEED
Speed
work – Speeding &
ting month of Se
16.
e last two month
compared to the
27
66
DING PERC
ing & Align
95
& Alignment as F
eptember 2016 (A
hs, total number
e number of cras
6
11
CENT RUN‐
nment as
5
Factors in Crashe
All on S2 Road)
of fatalities in th
shes same time p
18
34
‐OFF PERC
Factor
es
he 4th Year stands
previous year (87
4
CENT
s at 18 which are
7).
e more than
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
23
1ST YEAR
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
15
2ND YEA
Toatl Fata
Bathinda Network in P
8
AR 3RD Y
alities ‐ Yea
135
1
Punjab (India)
Figure 5
Figure
1
EAR 4TH
ar Wise
23
3950
1123
32
2 3 4
Total Cra
5‐4: OPRC Netwo
5‐5: OPRC Netw
18
YEAR
59 63 6
4049
5
5 6
shes This Y
Third Year
96
ork – Fatality Tre
work – Crash Tren
13
1
S2 S
6874
81
5664
70
7 8 9
Year v Last
Fourth Year
6
end
nd
9
2
Section Fat
8793 98
78
10 11 12
t Year
7
3
talities ‐ Ye
8
2
15
4
ear Wise
5
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.5 Road S
Road s
treatm
work‐s
Part 6:
5.6 Road S
Head o
establis
The ma
(mobile
The mo
and un
the inte
The gre
While t
road sa
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Cras
Fata
afety Audit
afety audit is a p
ent approaches
ites, is carried o
Road Safety Aud
afety Audit Find
on crashes, crash
sh possible trend
ain behavioural
e phone use whil
ost significant ris
nsafe (helmet) dr
ersections, inade
eatest risks are fo
the total number
afety measures.
Bathinda Network in P
Dec Jan
shes 5 6
lities 0 0
powerful tool for
such as black sp
ut by the Team
dits, IRC Codes an
ings
hing into slow m
ds in road user be
factor continues
le driving), drivin
sks relate to unsa
rivers/passengers
equate clear zone
or pedestrians, tw
r of crashes has c
Punjab (India)
Table 5‐3 : O
Crashes
n Feb Mar
12 9
10 1
r improving the s
pot treatments w
Leader along wit
nd in accordance
moving vehicle an
ehaviours and de
s to be excessive
ng while intoxicat
afe overtaking m
s, stray animals,
es, hazards in cle
wo‐wheelers and
come down, the
PRC Network – S
s 4th Year (Dec. 2
Apr May Jun
8 9 7
2 3 0
safety of the roa
which is also part
th monthly netw
e with the princip
nd vehicle leavin
eficiencies in road
e speed with tot
ted.
manoeuvres, illeg
poor road work
ear zones, inadeq
d overloaded veh
number of fatalit
97
Summary of Cras
2015 to Nov. 201
ne July Aug
8 6
2 0
ad network in a p
of this contract
work performanc
ples of ‘Safe Syste
ng the carriagew
d safety.
tal disrespect to
al parking, un‐ro
k practices, poor
quate delineation
hicles (with passe
ties on OPRC Net
7
sh Statistics
16)
Sep Oct
8
0
proactive manne
. Road Safety Au
e audit in accord
em Approach’.
ay are predomin
o prevailing cond
oadworthy and o
facilities for vuln
n and signposting
engers and goods
twork has risen s
Nov
78
18
er. It complemen
udit which also in
dance with Austr
nantly reflected
ditions, urge to o
overloaded vehic
nerable road use
g.
s) involved in ove
sharply from 8 to
ts more tradition
ncludes road safe
ralia’s Guide to R
in crashes. MC h
overtake, driver
les, unrestrained
ers, lack of traffic
ertaking manoeu
o 18, calling for so
nal reactive
ety audit of
Road Safety
has tried to
inattention
d (seat belt)
c control at
uvres
ome urgent
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.7 Road S
The mo
measu
Police t
Preven
Speed
Improv
Improv
To sup
Contra
their ro
Employ
Institut
Safety
5.8 Way Fo
Till now
Delinea
MC int
season
MC has
Keepin
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
afety Strategies
ost important st
res. Without this
to help educate d
nt driving under t
Zoning and Traff
vement of junctio
vement of curve
port the safe roa
ctors to ensure
oad safety engine
y VMS and Flashi
tional arrangeme
Engineers.
orward
w MC has alread
ation’.
ends to hold wo
.
s introduced stric
g in view the fac
Bathinda Network in P
trategy to reduc
s it will be difficu
drivers to comply
he influence of a
fic Calming Meas
ons and intersect
delineation with
ad system concep
compliance to IR
eers to continuou
ing Lights around
ents for technica
y conducted tra
orkshop to enhan
ct compliance of
tors and issues id
Punjab (India)
e crashes on OP
lt to lower crash
y with the rules,
alcohol and enfor
ures on roads pa
tion delineation a
enhanced signag
pt, a strategic app
RC SP ‐55 throug
usly improve imp
d C/D and bridge
l skills developm
ining sessions fo
nce night time de
traffic control an
dentified in Secti
PRC network is t
rates as the maj
as well as enforc
rcement of seatb
assing through to
and signposting.
ge and crash bar
proach is needed
gh deploying app
plementation.
works.
ment by holding w
or the contractor
elineation based
nd TMP at work s
ion 6.7, MC will a
98
towards curbing
ority of the crash
cement.
belt and helmet u
owns and villages
riers at all risky l
d to make roadsid
proved channeliz
workshops, traini
on ‘Safe System
on findings of N
sites and use of p
assist the client in
8
excessive speed
hes are due to ex
use.
s.
ocations identifie
de environment
ation devices in
ing courses for st
m Approach’, ‘Spe
Night Time Inspec
personal protect
n developing the
d through enforc
xcessive speed.
ed by MC.
more forgiving.
and around roa
takeholders ‐ Co
eed Zoning Guide
ction and in view
ion equipment (P
eir road safety str
cement and/or e
d worksites and
ntractor, Counci
elines ‘and ‘Enha
w of forthcoming
PPE) for workers
rategies in Punjab
engineering
by training
ls and Road
anced Curve
g winter/fog
.
b.
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.9 Distribu
Distribu
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
ution of fatal cra
ution of Fatal cra
Bathinda Network in P
ashes in the OPR
ashes on OPRC N
Punjab (India)
RC network
etwork is illustra
Figure 5‐6
ated in Figure 5‐6
6 : Fatal Crash Lo
99
6 to Figure 5‐11.
cations at Sectio
9
on S1
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figure 5‐7
7 : Fatal Crash Lo
10
cations at Sectio
00
on S2
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figure 5‐8
8 : Fatal Crash Lo
10
cations at Sectio
01
on S3
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figure 5‐9
9 : Fatal Crash Lo
10
cations at Sectio
02
on S4
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figure 5‐10
0 : Fatal Crash Lo
10
ocations at Sectio
03
on S5
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 24 (September 2016)
Bathinda Network in PPunjab (India)
Figure 5‐11
1 : Fatal Crash Lo
10
ocations at Sectio
04
on B8
TNM TM
OPRC WorlMonthly Pro
6 CO
6.1
6.1.1
SI. No.
1.
2.
3.
4.
5.
6.
7.
8.
9. 6.1.2
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
ONTRACT
Contract’s
1 KeySta
Table 6
Road Mana
Road AssetManager
Senior Site
Site Engine
Site Engine
ConformanUnit
Material En
Contract Fi
Plant & Equ
2 KeySta
SI. No.
1. D(H
2. MSy
3. BrEn
4. RoMCo
5. EnSp
6. So
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
TOR’SSTA
sStaffaspe
affofLead
‐1: Contract
Position
ager
t Manager/R
Engineer
eer (Construc
eer (Mainten
nce Managem
ngineer
nancial Man
uipment Eng
affPresent
Table 6‐2: K
Position
esign EngineHighways)
Management ystem/IT Ma
ridge ngineer/Con
oad Safety Management/onsultant
nvironment pecialist
ocial Speciali
a Bathinda Netwo
AFFAND
erContract
Contractor
or’s Key Staf
N
isk
ction)
ance)
ment
nager
gineer
tatSiteinS
Key Staff of P
n E
eer
nager
sultant
/Design
ist
ork in Punjab (Ind
DCONSTR
tAgreemen
rPresentat
ff as per Con
Numbers
1 M
1 Ja
1 Pu
2 YoPa
Ch
2 Pa
Ra
1 Se
1 Sa
1 Pr
1 R
September2
Professional
New Profengineering C
Staf
Ziauddin A
Gopal K
Rashid N
Dhanraj N
Manoj K
Minati S
dia)
RUCTION
nt
tSiteinthe
ntract Agree
Name of Pe
Mukesh Kuma
askarn Singh
ushpraj Singh
ogender Natandey
hinu Singla
ankaj Kumar
akesh Kumar
ewak Singh S
anjay Pandey
raveen Kaha
K Singh
2016
Engineering
essional Consultant ff
A Khan
hatri
Najfi
Nagdev
umar
Sinha
EQUIPM
emonthofS
ment and Pr
erson M
ar
A
h
h
r
r
Sidhu
y
r
g Consultant
MonitoriR
Despite cocommitmeprofessionavailable arequired bvisits of nemeetings harranged beven after requests, eroad safetyenvironme
MENTS
September2
resent at Site
Monitoring CRema
Full T
Acting as Billials
Full T
Full T
Full T
Full T
Full T
Full T
Full T
Full T
Full T
(PEC)
ing Consultaemarks
ntractual ent that the kals would bes and when y the Client, ew PEC staff ahave not beeby ContractoMC’s repeatespecially fory & ental experts
105
2016
e
Consultant arks
Time
ng Engineer o
Time
Time
Time
Time
Time
Time
Time
Time
Time
ant
key e
and en r ted r
s.
SN
TNM TM
OPRC WorlMonthly Pro
6.2
Sl. No.
Eq
1 Hot M
2 WMM
3 Paver with se(Bitum
4 Hydrau
5 Backho
6 Motor
7 Loader
8 Paver for WM
9 Contrarespon
10 ContraInspecand Di
11 Vibrato
12 Pneum
13 Tipper
14 Water
15 Pavem
16 Bitume
17 Power
18 Falling(Pavemtesting
19 CalibraProfilo
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
Contracto
Table 6
quipment TyCharacteris
ix Plant (Bat
Mixing Plan
Finisher Hydensor controminous Work
ulic Excavato
oes
r Grader
r
Finisher MecMM Work
actor’s patronse vehicles
actor’s generction Vehicleisplacement
ory Rollers
matic Tyre Ro
r/Trucks
r Tanker
ment Marking
en Pressure
r Broom
g Weight Defment deflectg)
ated Roughnometer
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
or’sConstru
6‐3: Construc
ype and stics
ch type)
nt
drostatic ol s)
ors
chanical
l and
ral s (with GPS meters)
oller
g Plant
Distributor
flectometer ion
ness
a Bathinda Netwo
uctionEqui
ction Equipm
As PeAg
MinimumCapacity
100 TPH
60 TPH
100 TPH
1.0 m³ bucket
0.5 m³ bucket
150 kw
1.0 m³ bucket
100 TPH
8‐10 T
8‐10 T
5.5 m³
6 m³
ork in Punjab (Ind
ipment’sSe
ment as per C
er Contract reement
m y
MinimNumb
H 1
1
H 2
2
2
1
2
H 1
2
3
3
2
15
3
1
1
2
1
1
dia)
eptember2
Contract Agr
Pr
mum bers
Capa
128 T& 20TP
250 T
600 T
0.9‐1m
0.5 mbuck
120 m
1.61.7&
m
250T
8‐10
15M
5 14‐24
1200
016
reement/ Pr
resent at Site
city Numb
TPH 00 H
1 ea
TPH 1
TPH 2
1.0 3
3
m³ ket
3
m3/h 3
6‐&2.4 3
5
TPH 1
2
2
0 T 4
MT 1
4 m3 33
00L 4
1
3
2
1
1
resent at Site
e
bers
ach
3
106
e
Remarks
TNM TM
OPRC WorlMonthly Pro
6.3
SI No.
1
2
3
5
6
7
8
9
10
11
6.4
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
Contracto
P
Road Mana
CMU, Team
Field Engin
HR& Adm.
Road Asset
Plant & Eq
Contract Fi
Road Safet
Billing/QS
Quality Con
Reviewof
Monitoring Contract Aghas not chaengineers frMonitoring found that twith the critto the Emplquality of do
One significAsset ManaManager ancritical for thqualification
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
or’sStaffPr
Table 6‐4
Position
ager
m Leader
neer
t Manager
uipment Eng
inancial Man
ty officer
ntrol In‐char
fContracto
Consultant hreement andnged from wrom the siteConsultant fthe qualificateria, containoyer and thocuments an
ant issue whager in the nd Billing Enhe success ons and exper
a Bathinda Netwo
resent–Sep
4 : Contact N
Muk
S. S.
Pank
Parv
Jask
gineer R. K
nager Parv
Ram
Jask
rge Sanj
or’sStaff
has undertakd actual preswhat was ree. The CVs for review. Mations and exned in the coeir advice isnd workmans
hich has beeContractor’
ngineer whicof this projecience as per
ork in Punjab (Ind
ptember20
No. of Contra
Name of Pe
kesh Kumar
Sidhu
kaj Kumar
veen Kahar
karan Singh
. Singh
veen Kahar
mesh Patil
karan Singh
jay Pandey
ken a reviewsent at the siported prevof the newMonitoring Cxperience ofontract. Mon still awaitedship.
en highlightes Staff. Oneh affects thct that the cothe Contrac
dia)
016
actor’s Staff
rson
w of the Contte in the moious month.
wly appointeConsultant hf the replacenitoring Consd. Deploying
ed repeatede engineer e performanontractor apct Agreement
Present at S
Contact
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
tractor’s Keyonth of Septe. Contractor ed engineershad revieweded engineerssultant’s obsg such staff h
dly is that thhas dual chnce of Assetpoints a full t.
ite
No.
760
757
763
780
796
782
780
778
796
753
y Staff requirember 2016.has replaces were submd the credens were not iervations wehas detrime
he there is nharges workt Managemetime Asset M
107
Remarks
red as per th The situatioed some of itmitted to thntials and han accordancere submittental effect o
no permanenking as Asseent. It is verManager wit
he on ts he ad ce ed on
nt et ry th
TNM TM
OPRC WorlMonthly Pro
7 PA
7.1
Thi
the
incl
As
Pav
rec
Con
7.2
Sl. No.
1
2
3
4
5
6
7
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
AYMENTS
NetworkP
s Chapter de
e Contractor'
ludes curren
per the Gen
vement Roug
ommends to
ntractor:
i.
ii.
Financial
During the m28 is as belo
Value of WImproveme
Value of WRehabilitat
Value of WResurfacing
Value of WEmergency
Value of WNetwork Pe
Value of Wperforman
Value of WVariation
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
S
Performan
escribes the
's next paym
nt description
neral Condit
ghness and P
o the Emplo
Provisional
CONFORMA
Contractor h
to process t
the absence
Monitoring
requirement
has failed t
software av
withheld.
Progresso
month of Sepow:
Descriptio
Work executeent
Work executetion
Work executeg
Work executey
Work executeerformance
Work executece achievem
Work execute
Total
a Bathinda Netwo
nceforthem
recommend
ment corresp
n of the Claim
tions of the
Pavement De
oyer to con
payment for
ANCES.
has procured
he collected
e of the req
Consultant
ts. Despite
o the softw
vailable at th
ofOPRCTill
ptember 201
on
d for
d for
d for
d for
d for Month
d for monthment
d for Under
ork in Punjab (Ind
monthofSe
dation of the
ponding to t
ms submitted
Contract A
eflections ha
sider any of
r the month
d the profilo
d roughness d
quired softw
and therefo
Monitoring
ware availabl
he OPRC site
lDate
16, the IPC‐28
ValuDone
1, 91
733
96
ly 402
ly 261
3,40
dia)
eptember2
Monitoring
he Month o
d by the Con
Agreement a
ave yet to be
f the follow
of Septemb
ometer at th
data has not
ware, the IR
ore cannot b
Consultant
e at the pro
e, it is recom
8 was proces
ue of Work e up to Date
11, 296, 720
3,571,734
6,041,591
‐
2,881,964
1,532,783
‐
05,324,792
016
Consultant
of Septembe
ntractor to th
nd consider
e collected, t
wing alternat
ber 2016 cor
e OPRC proj
t been arran
I data could
be accepted
repeated re
oject site. U
mmended th
ssed. The fin
Value oDone previo
1,861, 0
733,57
96,04
‐
374,03
242,34
‐
3,306,9
regarding th
r 2016. This
he Client.
ring that the
he Monitorin
tives for pay
rresponding
ject site but
ged at the p
d not be ve
d to fulfil th
eminders, th
Until the tim
hat some am
nancial progr
of Work up to us IPC
000, 922
71,734
1,591
‐
37,804
43,821
‐
995,872
108
he approval o
Chapter als
e data of th
ng Consultan
yment to th
to 144 NON
the softwar
project site. I
erified by th
e contractu
he Contracto
e, makes th
mount may b
ress upto IPC
This bill amount (Rs.
50,295,798
‐
‐
‐
28,844,160
19,188,962
‐
98,328,920
of
so
he
nt
he
N‐
re
In
he
al
or
he
be
C‐
.)
8
0
2
0
TNM TM
OPRC WorlMonthly Pro
7.3
Sl. No.
1
2
3
4
5
6
Sl. No.
1
2
3
4
5
6
7
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
Manhour
The Summ
during the
Tab
Employee N
Yogendra B
‐
Harpreet Si
Dr. Sohan S
Dr. Vinay M
Dr. Asha Sh
Table
Employee N
Deepak Kum
Varinder Si
Happy Sing
Dr Rajni Sar
Rohit Jinda
Gadi Moshe
Emilia De L
Note: Only
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
rsofMonito
mary of the
e Month of S
le 7‐1 : Man
Name
Bhatnagar
ngh
Singh Seehra
Maitri
arma
7‐2 : Man Ho
Name D
mar P
ngh CS
gla AA
rangal S
l H
el S
a Ossa HE
actual work
a Bathinda Netwo
oringConsu
inputs of t
September 2
n Hours (for t
De
Project MTeam Lea
OPRC OpSpecialist
Principal
PavemenSpecialist
Data Ana
Environm
ours (for the
Designation
Project Engin
CAD Expert/LSurveyor
AM‐Accounts/Ad
Secretary/As
Head Clerk
Senior Engin
Hydraulic/DrExpert
king days are
ork in Punjab (Ind
ultantStaff
the Monitor
2016 is given
the month o
esignation
Manager cumader
perational t/Asset Man
Auditor
nt Design t
alyst/Statistic
mental Specia
Tota
e month of S
neer
Land
dministrator
ssistant
eer
rainage
TOTAL (B
e included in
dia)
f
ing Consulta
in Table 7.1
of Septembe
Man HourHom
m 1
ager
1
cian
alist
al (A)
September 2
Man HoIn Hom
2
14
16
17
17
B) 6
man hours,
ant’s team i
and 7.2.
r 2016) – Ke
rs/Days In me Office
128/16
‐
128/16
‐
‐
16/2
272
2016) – Non
ours/Days me Office
24/3
44/18
68/21
76/22
76/22
‐
‐
688
Holidays ar
n terms of
y Experts
Man Hours/DaysOn Field
48/6
‐
48/6
‐
‐
‐
96
Key Experts
Man Hours/DaOn Field
168/21
32/4
8/1
‐
‐
‐
‐
208
re not consid
109
man – hou
s Total MaHours
176
‐
176
‐
‐
16
368
ys d
TotalMan Hours
192
176
176
176
176
‐
‐
896
dered
rs
an
l
s
TNM TM
OPRC WorlMonthly Pro
8 CL
8.1
8.2
8.3
8.4
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
LAIMSAN
This secti
connectio
difference
referred i
matter is
DisputeR
Dispute R
There is n
There was
Arbitratio
Arbitratio
Mr MS Gu
There is a
PIPL), aris
detailed i
hearings s
15 and 16
The next h
Minuteso
There was
Minuteso
There was
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
NDDISPU
on deals wit
on with or ar
e by mutua
in writing by
referred to t
ReviewBoa
eview Board
no dispute pe
s no meeting
onTribuna
on Tribunal c
uram.
an Arbitratio
sing out price
n PCC of the
so far. The A
6 July 2016 a
hearing is sc
ofArbitralT
s no meeting
ofDisputeR
s no meeting
a Bathinda Netwo
UTES
th the dispu
rising out of
l consultatio
y either par
the Arbitratio
rd(DRB)
d (DRB) comp
ending betwe
g/visit of DRB
al
consists of D
on Case betw
e adjustmen
e contract. T
Arbitral Tribu
nd there hav
heduled to b
TribunalM
g in the mon
ReviewBoa
g in the mon
ork in Punjab (Ind
te of any ki
f the Contrac
on, then the
rty to the Di
on Tribunal.
prises of Mr
een the Emp
B in the mon
Dr PC Markan
ween Claima
t formula, co
The case is w
unal had hea
ve been no m
be held in De
eeting
th of Septem
ardMeeting
th of Septem
dia)
nd between
ct. If the pa
e matter in
isputes Revi
RP Indoria, M
ployer and th
nth of Septem
nda, Mr KB
ant (Chief En
ontained in t
with the Arbi
rd the argum
meetings sinc
ecember 201
mber 2016.
g
mber 2016.
the Employ
rties fail to
dispute sha
ew Board a
Mr HP Jamda
he Contracto
mber 2016.
Lal Singhal (
ngineer, PW
the clause 4
itration Tribu
ments of the
ce then.
16.
yer and the
resolve such
all, in the fi
nd if still un
ar and Mr RP
or.
(Presiding Ar
WD) and Resp
48.1 of GCC a
unal. There
e respondent
110
Contractor i
h a dispute o
irst place, b
nresolved th
P Singh.
rbitrator) an
pondent (M/
and as furthe
have been 1
t’s counsel o
in
or
be
he
nd
/s
er
14
on
TNM TM
OPRC WorlMonthly Pro
9 ME
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
EETINGS
Monitoring
Leader, Yo
Septembe
Team and
The Monit
the non‐co
Agreemen
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
/INSPEC
g Consultant
ogendra Bhat
r 2016. Findi
Project Man
oring Consu
onformance
t.
MC E
a Bathinda Netwo
TIONSHE
t team, consi
tnagar, inspe
ings of their
nager on 16th
ltant conduc
report on 10
Environment
ork in Punjab (Ind
ELDDUR
isting of Env
ected the OP
inspection w
h September
cted the mon
0 September
al Consultan
dia)
RINGTHE
ironmental E
PRC network
were discusse
r 2016.
nthly audit o
r 2016 to fulf
nt inspecting
EMONTH
Expert, Asha
and M/s PIP
ed with M/s
f the OPRC n
fil the require
Camp Site
H
Sharma and
PL’s camp site
PIPL Environ
network and
ement of the
111
d Team
e on 15
nmental
submitted
e Contract
TNM TM
OPRC WorlMonthly Pro
10 COCO
10.1
Sl. No.
DispD
1 1/9
2 1/9
3 1/9
4 1/9
5 3/9
6 5/9
7 5/9
8 6/9
9 7/9
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
ORRESPOONSULTA
Correspon
patched Date
9/2016 T
9/2016 T
9/2016 T
9/2016 T
9/2016 T
9 /2016 T
9/2016 T
9/2016 T
9/2016 T
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
ONDENCEANT
ndenceSen
Letter N
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
a Bathinda Netwo
E DONE
nt
Table 10
No.
538/2016
539/2016
540/2016
537/2016
541/2016
537/2016
542/2016
543/2016
544/2016
ork in Punjab (Ind
E BY T
0‐1 : Corresp
Variation Orlanning roadSunam‐BhikS2) in cheem39+300 to C
Variation Orlanning roadSunam‐Bhikin Bhikhi towto Ch. 55+70
Variation Orlanning roadSunam‐Bhikin Maur towto Ch. 86+06
Exclusion of 86+060 of BBhikhi‐Kotshfrom4th yearprogrammework progra
Interim paym
Exclusion of 86+060 of BBhikhi‐Kotsh4th year wor
Interim Paym
Rate Analysi1.Cheema 2sections of BBhikhi‐kotsh
Rate Analysi1.Cheema 2sections of BBhikhi‐kotsh
dia)
THE OF
ondence Sen
Subject
rder no.6 ford of Bhawanihi‐kotshamirma town fromh. 40+700
rder no.5 ford of Bhawanihi‐kotshamirwn from Ch.00
rder no.7: Fod of Bhawanihi‐kotshamir
wn from Ch. 860
Ch. 84+030 hawanigarh‐hamir (S2) ror work (i.e. 3rd year amme)
ment Certific
Ch 84+030 thawanigarh‐hamir (S2) rok programm
ment Certific
is: For 4 lann.Bhikhi 3.MaBhawanigarhhamir Road(S
is: For 4 lann.Bhikhi 3.MaBhawanigarhhamir Road(S
FFICE O
nt
r 4‐igarh‐r road( m Ch.
T
r 4‐igarh‐r road S2 54+030
T
or 4‐igarh‐r road S2 84+030
T
to Ch. ‐Sunam‐oad
revised
T
cate ‐ 27 T
to Ch.‐Sunam‐oad from e
T
cate ‐ 27 T
ning of aur Road h‐Sunam‐S2)
T
ning of aur Road h‐Sunam‐S2)
T
OF MON
Sent By
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
112
NITORING
Sent T
r ExecutiEngine
r ExecutiEngine
r ExecutiEngine
r ExecutiEngine
r ExecutiEngine
r ChiefEngine
r ExecutiEngine
r ExecutiEngine
r Patel infPvt. Lt
G
To
ive er
ive er
ive er
ive er
ive er
f er
ive er
ive er
fra. td
TNM TM
OPRC WorlMonthly Pro
10 9/9
11 9/9
12 12/
13 14/
14 16/
15 16/
16 16/
17 16/
18 19/
19 16/
20 20/
21 19/
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
9/2016 T
9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
a Bathinda Netwo
545/2016
546/2016
547/2016
548/2016
549/2016
551/2016
552/2016
553/2016
554/2016
550/2016
557/2016
555/2016
ork in Punjab (Ind
Adjusted Mofor the mon
Hindrance dbetween Ch(Gharachon
Releasing ofthe works co2nd and 3rd yprogramme
6thNight InspAugust 2016
Submission for the Mon
Improvemenunder 4th ye– proposal fretaining wa
ConstructionBhawanigarKotshamir Rtown at Ch.
Pending Wo
Regarding thexpenses fooffice boy anoffice Sangrof amount.
Submission camp (13th R
Regarding afor wideningroad Ch. 53+69+800, 73+B8 road cha
Submission reports for Asurface and month of JuAwareness C
dia)
onthly Audit th of August
due to utilitie. 8+400 to 9+area)
f retention Mompleted unear work .
pection Repo6
of MPR of Mth of August
nt Works Exear work progor constructalls n of new culvh – Sunam –Road (S2) in s26+150
orks
he approval r the servicend sweeper ur‐ Reimburs
of HSE AwarRound)
pproved drag of bridges o+400, 54+040+450, 100+70inage 20+60
of MonitorinAAQ, ANL, soground wately 2016. HSECamp report
Results t 2016
T
es +400
T
Money for nder 1st,
T
ort – T
M/s PIPL t 2016
T
ecuted gramme ion of
T
vert on – Bhikhi – sunam
T
T
of es of at TNM sement
T
reness T
wings on S2 0, 00 and 0
T
ng oil er for the E t
T
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
113
r Patel infPvt. Lt
r ExecutiEngine
r ExecutiEngine
r ExecutiEngine
r ExecutiEngine
r Patel infPvt. Lt
r ExecutiEngine
r Patel infPvt. Lt
r Patel infPvt. Lt
r ExecutiEngine
r Patel infPvt. Lt
r Patel infPvt. Lt
fra. td
ive er
ive er
ive er
ive er
fra. td
ive er
fra. td
fra. td
ive er
fra. td
fra. td
TNM TM
OPRC WorlMonthly Pro
22 20/
23 21/
24 21/
25 21/
26 26/
27 20/
28 30/
29 30/
10.2
Sl. No.
1
2
3
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 T
/9/2016 P
/9/2016 P
/9/2016 P
Correspon
Date On Letter
1/9/2016
1/9/2016
1/9/2016
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
TNM/OPRC/5
PIPL/OPRC/5
PIPL/OPRC/5
PIPL/OPRC/5
ndenceRec
Lett
1
PIPL/OPR
PIPL/OPR
a Bathinda Netwo
558/2016
559/2016
560/2016
561/2016
562/2016
556/2016
564/2016
563/2016
ceived
Table 10‐2
ter No.
1737
RC/989/2016
RC/988/2016
ork in Punjab (Ind
Laying of WMroad betweeCh. 105+000observation
Submission Report (MPRmonth of Au
IPC ‐ 28
Reconstruct29/2 on BathSabo (B8) ro
Audit lengthSeptember 2
Invoice No. Tfor the perioto 31st Augus
Submission
Submission of bridge at
: Correspon
Regardinexpensesoffice boTNM M.C
Hindrancbetween( Gharac
ConstrucCh. 26+1
dia)
MM top layeen Ch. 103+90(LHS) – Site s of Monthly PR) no 23 for tugust 2016
ion of Culvehinda to Talwoad
hs for the mo2016
TNM/0045 &od: 1st Augusst 2016
of work prog
of work progCh. 53+400
ndence Rece
Subject
ng the approvs for the servoy and sweepC Office
ce due to utin Ch. 8+400 thon Area)
ction of culve150
er on S2 900 to
T
Progress the
T
T
rt no wandi
T
onth of T
& 0046 st 2016
T
gramme T
gramme T
ived
val of vice of per at
lities to 9+400
ert at
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Team Leade
Received Date
1/9/2016
1/9/2016
1/9/2016
114
r Patel infPvt. Lt
r ExecutiEngine
r Patel infPvt. Lt
r Patel infPvt. Lt
r Patel infPvt. Lt
r ProjecDirecto
r ExecutiEngine
r ExecutiEngine
Remarks
Received
Received
Received
fra. td
ive er
fra. td
fra. td
fra. td
ct or
ive er
ive er
s
d
d
d
TNM TM
OPRC WorlMonthly Pro
4
5
6
7
8
9
10
11
12
13
14
15
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
1/9/2016
1/9/2016
30/8/2016
30/8/2016
8/8/2016
3/9/2016
5/9/2016
5/9/2016
5/9/2016
13/9/2016
13/9/2016
13/9/2016
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
PIPL/OPR
PIPL/OPR
PIPL/OPR
PIPL/OPR
PIPL/OPR
PIPL/OPR
1
1
PIPL/OPRC
PIPL/OPR
PIPL/OPR
PIPL/OPR
a Bathinda Netwo
RC/987/2016
RC/986/2016
RC/985/2016
RC/984/2016
RC/969/2016
RC/992/2016
1766
1788
C/492A/2016
RC/995/2016
RC/996/2016
RC/997/2016
ork in Punjab (Ind
Submissidepth of KotshamSangrur –
Various cissues anMEC mee
NetworkData Ana
OrganizaAwareneNo.14
RegardinStretch.
SubmissiPerformaReport foAugust 2
Release oheld for improvem1st year 2
Variationlanning r– SunamKotshamBhikhi to54+030 torder noof BhawaBhikhi – in Cheem39+300 tOrder noroad of BSunam –Road (S2from Ch.
6 RegardinRetentio
SubmissiBlack Spo
SubmissiMajor ju
Time framdeadlineBank ImpMission
dia)
ion of Mean f Bhawanigarmir S2 road a– Sunam S1
critical pendnd notificatioeting
k Informationalysis ation of HSE/ess Camp Rou
ng Report on
ion of Netwoance Inspector the month2016
of retention rehabilitatioment work f2nd year and 3
n Order no 5 road of Bhaw – Bhikhi –
mir Road (S2) own from Chto 55+700. Vo 6 for 4 laninanigarh – SuKotshamirroma town fromto 40+700. Vo 7 for 4 lannBhawanigarh– Bhikhi – Kot2) in Maur to 84+030 to 8
ng Release ofn Money
ion of Designot Improvem
ion of Designnctions me for meet as per 17th Wplementation
Profile rh to nd road
ing on of
n and
/ AIDS und
BC
ork tion h of
money n and or the 3rd year.
for 4 wanigarh
in . Variation ng road nam – oad (S2) m Ch. Variation ning h – tshamir wn 86+060.
f
n for ment
n for
ting World n
1/9/2016
1/9/2016
1/9/2016
1/9/2016
1/9/2016
05/9/2016
06/9/2016
7/9/2016
9/9/2016
14/9/2016
14/9/2016
14/9/2016
115
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
d
d
d
d
d
d
d
d
d
d
d
d
TNM TM
OPRC WorlMonthly Pro
16
17
18
19
20
21
22
23
24
25
26
27
28
29
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
13/9/2016
13/9/2016
17/9/2016
17/9/2016
19/9/2016
19/9/2016
12/9/2016
19/9/2016
21/9/2016
21/9/2016
24/9/2016
24/9/2016
26/9/2016
26/9/2016
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
PIPL/OPR
PIPL/OPR
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
1
1
PIPL/OPRC
1
1
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
a Bathinda Netwo
RC/999/2016
RC/998/2016
C/1000/2016
C/1001/2016
C/1003/2016
1870
1852
C/1005/2016
1906
1907
C/1007/2016
C/1008/2016
C/1009/2016
C/1010/2016
ork in Punjab (Ind
ObservatEnvironmComplian
SubmissiMonth o
6 SubmissiDevelopm
6 MethodoRutting/Con S4 Ro
6 IPC ‐ 28
Regardindrawingsbridges o53+400, 73+450, road cha
SubmissiProgressno.22 for2016
6
ComplianMonthly no.22 for2016
Regardin
Improveexecutedwork profor constwalls
6 Submissiprogram
6
Laying ofS2 road b103+900Site obse
6 Re‐subm
6 Submissiprogram53+400
dia)
tions of MC’smental Expernce
ion of MPR fof August 201
ion of Greenment Plan
ology for Camber Corroad Km 10 to
ng approved s for wideninon S2 road C54+040, 69+100+700 andinage 20+60
ion of Month Report (MPr the month
nce of MC’s Progress repr the month
ng black Spot
ment works d under 4th Yeogramme – ptruction of re
ion of work me (Bridges
f WMM top between Ch.0 to 105+000ervations
mission of IPC
ion of work me of bridge
s rt for
or the 16
Belt
rection o 12
ng of h. +800, d B8 00
hly R) of July
port of July
ts
ear proposal etaining
)
layer on
0 LHS –
C‐28
e at Ch.
14/9/2016
15/9/2016
19/9/2016
19/9/2016
19/9/2016
20/9/2016
14/9/2016
22/9/2016
23/9/2016
23/9/2016
24/9/2016
24/9/2016
26/9/2016
26/9/2016
116
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
Received
d
d
d
d
d
d
d
d
d
d
d
d
d
d
TNM TM
OPRC WorlMonthly Pro
30
31
32
33
34
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 24
26/9/2016
28/9/2016
30/9/2016
30/9/2016
30/9/2016
Y AND NT LTD.
or Sangrur Mansa4 (September 2016)
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
PIPL/OPRC
a Bathinda Netwo
C/1011/2016
C/1012/2016
C/1013/2016
C/1014/2016
C/1015/2016
ork in Punjab (Ind
6
Re‐ schedIncomple
6
Submissiconstrucon BathinSabo roa
6 Methodorectificat96+700 t
6
Non Shiftbetweento 9+400S2 road
6 Traffic S
dia)
duling of Minete works
ion of estimation of new nda – Talwanad(B8)
ology and uption from Kmto 100+430 S
ting of utilityn Km 40‐45 &0 Ghrachon a
urvey
nor
ate for culvert ndi
pdate of m S2 road
y & 8+400 area on
26/9/2016
29/9/2016
3/10/2016
3/10/2016
3/10/2016
117
Received
Received
Received
Received
Received
d
d
d
d
d