government of andhra pradesh a.p. revised standard data · pdf filegovernment of andhra...

392
Government of Andhra Pradesh A.P. Revised Standard Data (With Schedule of Rates 2014-15) (Effective from 01-06-2014) BOARD OF CHIEF ENGINEERS Part – 1 For IRRIGATION & CAD WORKS and LEADS & LIFTS (Common to all Departments)

Upload: vuxuyen

Post on 06-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Government of Andhra Pradesh

A.P. Revised Standard Data (With Schedule of Rates 2014-15)

(Effective from 01-06-2014)

BOARD OF CHIEF ENGINEERS

Part – 1

For IRRIGATION & CAD WORKS

and

LEADS & LIFTS (Common to all Departments)

Office of the Engineer-in-Chief(I.W) I&cad Dept., Errummanzil,Hyderabad

Procs.No.ENC/IW/P&M/EE.3/DEE-10/AE/13305/Vol.37 dt:30.05.2014

Sub: A.P.Revised Standard Data for I&CAD works(Part-I) for the year 2014-15 –approved-

Printing & communication of Standard Data –Reg., Ref: 1)G.O.Ms.No.49,I&CAD (PW:Reforms)Dept., dt:2.3.2009

2)Minutes of BOCEs meeting for Schedule of Rates held on 24.05.2014. 3) SoR Procs.No.ENC/IW/P&M/EE.3/DEE-10/AE/13305/Vol.37 dt:30.05.2014

***** The Board of Chief Engineers meeting for finalization of Schedule of Rates (SoR) for

I&CAD(Part-I),Road & Bridges(Part-II) and Public Health Items(Part-IV) was held on 24.05.2014 @

3.30 PM and approved the SoR. Based on the approval of BoCEs, the SoR for I&CAD Dept(basic input

required for arriving unit item rate as per A.P. Revised Standard data) ,R&B and Public Health

Department items were communicated vide this office proceedings 3rd cited.

During the BoCE meeting held on 24-05-2014, it is observed that in some

of the estimates, Lead Charges are being added directly to the material basic rates for arriving the finished item rate. In view of that, the BoCE has instructed to see that while arriving the finished item rate, the lead charges are to be added to the material basic rates only after deducting the provision of "Contractor's Profit and Overhead charges"

By incorporating the items, the A.P. Revised Standard Data (unit rate for work items) for the

year 2014-15 is finalized. Any additions, modifications or deletions in the existing data must be

approved by BoCEs. One soft copy is herewith enclosed.

Encl: Soft copy of A.P. Revised Standard Data for I&CAD Department for the year 2014-15

Sd/- L.Narayan Reddy, Dt. 30.05.2014 Engineer-in-Chief(I.W.)

Chairman, BOCE(S.R)

I) Copy communicated to the Principal Secretary to Govt.,I&CAD Dept.,J-Block, A.P.Secretariat

Buildings,Hyderabad.

II) Copy Communicated to the following Heads of Departments along with Enclosures for information.

1) Engineer-in-Chief (Admn & NH)., Roads & Buildings Department.

2) Engineer-in-Chief (P.H.), Public Health Department.

3) Engineer-in-Chief (P.R.), Panchayath Raj Department.

4) Engineer-in-Chief (RWS) R W S, Department.

5) Chief Engineer (Buildings), R&B Department.

6) Copy of C.D containing Schedule of Rates 2014-15 & Standard data, part-1 (Irrigation & CAD

works) to all Engineers-in-Chief, Chief Engineers of Irrigation & CAD Department for favour of

information.

III) Copy to the Superintending Engineer, Irrigation Circle, Irrigation & CAD Department, Red Hill,

Hyderabad for necessary action.

Sd/- L.Narayan Reddy, Dt. 30.05.2014 Engineer-in-Chief(I.W.)

Chairman, BOCE(S.R)

Item Code Item of the work Page No.

i-xiii

PART-1 IRRIGATION

Abstract of Items - Irrigation 1-45Abstract of Leads and Lifts 46-47

IRR-DAW Dam And Allied Works (48-104)

IRR-DAW-1 EXCAVATION & FOUNDATION TREATMENT WORKS: 48-59IRR-DAW-2 REINFORCEMENT & CEMENT CONCRETE WORKS : 59-78IRR-DAW-3 MASONRY & GUNITING WORKS : 78-84IRR-DAW-4 CONTRACTION JOINT WORKS: 84-87IRR-DAW-5 EARTH / ROCKFILL EMBANKMENT WORKS : 87-95IRR-DAW-6 FILTER & PITCHING WORKS : 96-104

IRR-TAW Tunnel & Allied Works (105-130)IRR-TAW-1 EXCAVATION : 105-113IRR-TAW-2 DEWATERING & GUNITING WORKS : 113-116IRR-TAW-3 TEMPORARY & PERMANENT SUPPORTS : 116-122IRR-TAW-4 MASONRY WORKS : 122-123IRR-TAW-5 REINFORCEMENT & CONCRETE WORKS : 123-128IRR-TAW-6 DRILLING & GROUTING WORKS : 128-130

IRR-CAW Canal And Allied Works (131-230)IRR-CAW-1 EXCAVATION WORKS : 131-145IRR-CAW-2 EMBANKMENT WORKS USING BORROW AREA SOIL : 145-152IRR-CAW-3 EMBANKMENT WORKS USING DUMP AREA SOIL : 152-157IRR-CAW-4 EMBANKMENT WORKS USING EXCAVATED SOIL : 157-162IRR-CAW-5 FOUNDATION FILLING WORKS : 162-170IRR-CAW-6 ROCK FILL WORKS : 170-172IRR-CAW-7 CANAL LINING WORKS : 172-216IRR-CAW-8 ROCK PITCHING: 216-228

IRR-CCDW Canal & Cross Drainage Works (229-284)IRR-CCDW-1 EXCAVATION & FOUNDATION TREATMENT WORKS : 230-236IRR-CCDW-2 STEEL AND CEMENT CONCRETE WORKS : 236-262IRR-CCDW-3 FOUNDATION WELL SINKING WORKS : 262-264IRR-CCDW-4 MASONRY WORKS : 264-271IRR-CCDW-5 COPING & RAILING WORKS : 271-275IRR-CCDW-6 HUME PIPE LAYING & JOINTING WORKS : 275-281IRR-CCDW-7 BACK FILLING & OTHER WORKS : 281-284

IRR_GAW Gates/Hoists And Allied Works (285-317)NOTES ON GATES/HOISTS AND ALLIED WORKS 285

IRR_GAW-1 RADIAL GATES 285-291IRR_GAW-2 VERTICAL LIFT GATES 291-310IRR_GAW-3 SAND BLASTING AND PAINTING: 310-315IRR_GAW-4 PAINTING WITHOUT SAND BLASTING: 315-317

IRR-PMW Preliminary And Maintenance Works (318-354)IRR-PMW-1 JUNGLE CLEARANCE : 318-328IRR-PMW-2 PRELIMINARY WORKS : 328-338IRR-PMW-3 MAINTENANCE WORKS : 338-354

code and index for work items of standard data

PREAMBLE & GUIDELINES

Proceedings for the Standard DataCopy of the G.O.Ms.No.49, I & CAD (PW: Reforms) Dept., dt:.2-3-2009.

Item Code Item of the work Page No.

COM-MWRK A. Manual Works 355-355COM-LDLFT B. Lead/Lift/Loading & Unloading Charges 356-356

(to follow MORTH standardsfor the items not covered ,as applicable to roads and bridge works)

COM-LDLFT Notes on Lead and Lift 356-356COM-LDLFT-1 (Lead) Conveyance Charges for materials by head load 356-356

COM-LDLFT-2

( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks, excluding loading, unloading and hire charges of machinery.

356-356

COM-LDLFT-3LOADING AND UNLOADING CHARGES BY MANUAL MEANS (Idle hire charges of trucks are not added) 356-357

COM-LDLFT-4LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks ) 357-357

COM-LDLFT-5

LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks )

357-357COM-LDLFT-6 LIFT CHARGES FOR MATERIALS BY HEAD LOAD 357-357COM-DTL-LDLFT-1 (Lead) Conveyance Charges for materials by head load 358-359

COM-DTL-LDLFT-2

( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks, excluding loading, unloading and hire charges of machinery.

359-365

COM-DTL-LDLFT-3LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added) 365-366

COM-DTL-LDLFT-4LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks ) 366-367

COM-DTL-LDLFT-5

LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks )

367-368COM-DTL-LDLFT-6 LIFT CHARGES FOR MATERIALS BY HEAD LOAD 368-369

Hire Charges 370-371

COMMON ITEMS TO ALL DEPARTMENTS (unless specified)

i

A.P. REVISED STANDARD DATA PREAMBLE

The AP Revised Standard data for various construction items has come into

existence as per the Government orders G.O.Ms.No.49, I & CAD (PW:

Reforms) Dept., dt:.2-3-2009.

The background for adoption of A.P. Revised Standard Data is:

1. Government, in GO 7326 (GAD-GPM& AR), Dated 26-10-2005, has observed

that the age old “Standard data” requires revision and updation with

reference to the latest machinery and contemporary practices and has

constituted a High Level Committee to advise on updating and revision of

standard data and schedule of rates. The work has been taken up by CGG

and SPIU-irrigation. The secretary (Irrigation ) is the member- convener of

the committee

Accordingly the data has been revised adopting the procedures and

guidelines given by CWC, Report on “committee on cost control of river valley

Projects, BIS specifications, NHAI, MORTH, MORD, CPWD and Government of

Karnataka and revised data and formulated schedule of rates for all

infrastructure Departments (I&CAD, R&B, PR and PH). The team of senior

engineers interacted with the S.R Committee of Karnataka on implementation

and improvements needed. For irrigation works, the data pattern as adopted by

Karnataka has been considered and for other Departments, the data adopted by

MORTH,MORD and NHAI etc. is adopted

2. Sequence followed in revision of standard data is,

(a) The first step is the revision and formulation of standard data for each

work component.

ii

(b) The second step is to work out the details of inputs. This enables to

generate the unit work item rates, by incorporating the use rates of

machinery, materials, labour charges and other supplementary parameters.

(c) The third step is to develop software tool to generate unit rate using

the software (completed for irrigation works by the SPI Unit of Irrigation)

3. The Detailed draft data was communicated to all the HOD’s and interacted

through many seminars and discussions and incorporated the relevant

features. The Board of chief engineers in their meetings have recommended

for acceptance to the data formulated and schedule of rates. It was proposed

to examine the recommendations on important parameters, to refer to high

level committee, for their specific recommendations for adoption, as they are

common to all departments.

The committee made in depth study on the methodology and systems

followed by the reputed National organizations and other States and made

detailed deliberations with HOD’s and representatives of Builders

Association of India and made recommendations to the Government, on

adoption of such parameters in A.P.

4. The Chief Secretary held a detailed discussions on 04-07-2007,with the

Secretaries of the Departments and Heads of Departments.

iii

GUIDELINES

1) The Revised Standard Data is formulated under four Parts, which are

applicable to all the Engineering Departments and other Organisations.

PART -1: Irrigation& CAD (Dam and Allied Works, Canals and Allied Works,

Canal C.D. Works, Tunnels and Allied Works, Preliminary and

Maintenance Works, Hydraulic Gates and allied works and Leads and

Lifts applicable to all Departments

PART -2: Roads and Bridges

PART -3: Buildings including Electrical Works

PART -4: Drinking Water Supply and Public Health (ONLY FOR WORKS

DONE BY MANUAL MEANS)

2) Brief description of item of work. :

Brief description of the item of work to cover all important aspects of the

work included in the in the Data . On reading the item description, the user should

be in a position to assess the various cost components involved in the work.

3) Data for assessing quantities:

The data reflects various assessments / assumptions made in arriving at

the quantities of materials, machinery, labour and other in-puts. In case of plants

and equipment the output of main plant is worked out and the requirement of all

other inputs and assessed to match the output of the main plant. Cycle time of

operations is the criteria for assessing the output of equipment. Generally the

equipment manufacturers furnish the output of machinery under ideal conditions of

working. Suitable job and management efficiency factors are considered while

working out the average output of machinery under field conditions. In case of

combination of machinery and manpower, the assessment of manpower shall

match the output of machinery.

Though cycle time of operations is the criteria for hourly / daily out-put of

machinery work-force ,the actual progress of work depends on several other

factors such as power interruptions, minor break-downs, time for meals and other

iv

needs of work-force, stray rains etc. Therefore, it is the general practice to consider

50 minutes as the actual working time per hour for working out the hourly / daily

out-put of machinery / work-force. CWC / BIS guide-lines stipulate the actual

working hours for the purpose of equipment planning and utilisation. The daily out-

put is computed duly considering the actual available working time and feed back

from the field.

For gate and hoist works, it is the general practice to specify the quantity

of work in terms of number of sets of embedded parts / gates. The

requirement of machinery and work-force for cutting, bending,

fabrication, erection, painting etc., is assessed to commensurate with the

task involved.

The data for gates and E.M. Parts is arrived per Ton quantity.

The data for Hoists and Gantry Cranes is worked out on the basis of

capacity in tonnage

4) The lead and lift charges provided in PART-I (B) are generally applicable

and common to all Departments. Any item is not covered in this part, the

rates as provided in the data of the relevant works may be adopted in

preparation of estimates.

5) The basic material inputs needed for all works are listed and incorporated in

the data. The requirements are analyzed and the specifications adopted shall

confirm to Standards published by the BIS.

The labour and material rates will be communicated by the Board of

Chief engineers.

Unless otherwise specified, all material rates shall be inclusive of all

taxes, duties, levies, transportation and handling costs up to project area.

For sand, gravel , murum, stones , course aggregates etc, the rates are

to be fixed for delivery at Quarry, adding loading charges by machinery /

manual means and idle hire charges of machinery (as per table under

chapter “ conveyance or lead and lift charges”), as applicable.

v

For steel, Cement, AC sheets, GI sheets, Hume pipes, wood and stone

slabs, the rates are to be taken prevailing at major commercial centre

near project area. The lead charges, as applicable are to be added in

preparing estimates.

The specifications of the aggregates for sizes and gradation and its

adoption shall be as per IS 383.

6) The labour component in the data is mentioned for unit work.

No allowance towards labour importation and labour amenities added

extra as they are included in the recommended overheads.

On Labour Component: Certain additional allowances are added extra to

the wages of labour (,i.e. only on labour component in the work item) in

the form of percentage, as recommended by the Government/Board of

chief engineers due to statutory and other provisions.

However, If more than one area allowances, such as those for (1)

Municipalities (2) Agency / Tribal areas (3) Industrial areas are applicable

for a particular situation, only the maximum out of the allowable

percentages is to be allowed.

7) HIRE CHARGES OF MACHINERY : The machinery and /or group of machinery

for items of works and their output has been worked based on the

availability of machinery generally in the market and working in the

field successfully, duly considering cycle time, idle time, operator

efficiency, type of work etc.

The hire charge of a machinery / equipment is worked out based on the

guidelines published by CWC and BIS codes.

For the other machinery not covered by the list, the R&B and other users

may adopt hire charges as recommended by the MORTH.

vi

8) Lead Charges

The high level committee has recommended to adopt, for conveyance by

head load, a minimum lead of 50 meters and additional lead up to 150

meters in the intervals of 50 meters. Beyond 150 meters lead ,only

machinery rates are to be adopted.

The basic work item rates provided in the Standard Data & Schedule of

rates include 50 m or 1 km as initial lead and no lead charges shall be

allowed where the source of material is within the initial lead specified in

item rate. Additional lead charges shall be allowed for the lead exceeding

initial lead specified in the item rate. The Guidelines may be followed

regarding adding Lead charges as given against each chapter.

The lead charges per unit quantity for conveyance of the materials are

worked out, and included in the schedule of rates in increment of 50 m

for head load and in increment of 1 km for mechanical mode.

The rates for lead charges by head load up to 150 meters and by

machinery up to 5 km, shall be cumulative and inclusive of lead charges

for preceding lead. For lead beyond 5 km, the lead charges shall be

worked out on per km basis.

9) Loading and Unloading charges for Materials

The following features are considered:

1. Loading and unloading charges are not payable for conveyance by head load.

2. Loading and unloading charges are not payable for conveyance by mechanical

means, for disposal of excavated material unless specified.

3. The rates for unloading of materials except earth, sand, gravel, coarse

aggregate, rubble, size stone and cut stone, are inclusive of stacking wherever

applicable.

vii

10) LIFT CHARGES :

The data includes initial lift charges of 3 meters ,for materials

conveyance by head load, Additional leads in the interval of 1.0 meters

are worked out, as additional labour input and incorporated in the

chapter on” Lead and lifts” .

Where the conveyance / lifting of material is done by mechanical means,

lift charges shall not be considered, as the cycle time of operation of the

machine includes lifts involved.

The data and rates for lift charges is cumulative and are inclusive of rates

for preceding lifts also.

11) Wastage of Materials

I) Cement : No wastage allowance is recommended towards the quantity of

cement used in works, as the wastage is already included in the input

and in major works , bulk quantities are used.

II) steel : The wastage of steel @ 2.5% is allowed for gates and allied

structures. For RCC works the wastage is @2.5% for the

reinforcement rods above 36mm dia. and @ 5% for rods below 36mm

dia. Including overlaps, if they are not welded.

If welding is adopted for the reinforcement rods even for below 36mm

dia, 2.5% of wastage is only recommended.

12) Provision for rate for water:-

The Committee has recommended not to consider the water charges in

the Irrigation Project works. But, it may be considered in specific cases as per

the site conditions.

13) In respect of RCC works the rate for cement concrete for 1 cum is

worked separately for all grades based on Indian Standards. The rate for ton is

viii

calculated separately and to be added separately in the estimates of RCC works

as a separate item.

14) Soil classification: The Committee recommended to allow uniform classification of soils for all Departments and data is worked out accordingly. 1. all soils

2. Marshy soil

3. ordinary rock ( not requiring blasting),

4. hard rock

a. hard rock (requiring blasting)

b. hard rock (controlled blasting)

c. removable by chiseling(blasting prohibited)

15) Use of Super Plasticizers and Admixtures: Concrete admixtures such as Air-Entraining Agent ( AEA ) / Water reducing agent

can be used advantageously for better quality concrete. The high level committee

has recommended to adopt for super plasticizers and admixtures at 0.4% on

cement for concrete work as per MORTH standards for batching plants.

16) Contractors overheads, profit and other provisions : High Level Committee has recommended adding 14% towards contractor

overheads and profit including labour importation and amenities etc., as given

below which includes various items recommended in MORTH.

The provision for VAT at 5% or as fixed by the Government from time to time

should be made separately in Part-B of the estimate. In the agreements it

should be mentioned that it will be reimbursed as per actual. The provisions

allowed in G.O.Ms.No.94, I&CAD, dt:01.07.03, need not be added separately

for the items covered in the contractor overhead charges.

The provision for labour Cess at 1% or as fixed by the Government from time to

time should be made separately in Part-B of the estimate.

ix

The overhead charges include the following elements:

Site accommodation, setting up plant, access road, water supply, electricity and

general site arrangements.

Office furniture, equipment and communications

Expenditure on:

Corporate office of contractor

site supervision

Documentation and “as built” drawings

Mobilisation/ de-mobilisation of resources

Labour camps with minimum amenities and transportation to work sites.

Light vehicles for site supervision including administrative and managerial

requirements.

Laboratory equipment and quality control including field and laboratory testing.

Minor T & P and survey instruments and setting outworks, including verification

of line, dimensions, trial pits and bore holes, where required.

Watch and ward

Traffic management during construction

Expenditure on safeguarding environment

Sundries

Financing Expenditure

Sales/ Turn overtax

Work Insurance/ compensation

17) EXCISE DUTY ON SUPPLIES :

In respect of gates, hoists and allied works, excise duty is applicable on

the value of fabricated components supplied to site. Excise duty is not applicable

on erection charges. Further, the excise duty shall not be considered in the rate

analysis on material component, as basic material rates are inclusive of excise

duty.

x

Therefore, excise duty is considered in the rate analysis only on

machinery and labour components required for fabrication of gates and hoists at

the central fabrication yard. It is difficult to determine the machinery and labour

components separately for fabrication and erection.

For the purpose of computation of excise duty to be included in the rate analysis

the machinery and labour components may apportioned at 75 % for central

fabrication yard and 25 % for field erection and commissioning. Therefore, 75 % of

the machinery and labour components may be considered for assessing the extent

of excise duty to be added in the rate analysis.

18) DEWATERING & DESILTING:

The High level committee considering the local conditions of rainfall / seepage has

recommended towards de-watering and de-silting at 3 percent on the relevant

work component for which dewatering is required.

It is also proposed as per CWC guidelines, to keep a condition in the agreements

shall be incorporated, to fix a ceiling of 5% in extreme cases, with the specific

approval of chief engineer/Government.

19) Computerization Of Data :

A software program is developed by the SPI Unit(Irrigation), which

facilitates automatic changes and generation of unit rates, based on

basic input rates of Labour, materials and capital cost of machinery.

A soft ware tool is also developed for auto preparation of estimates

based on in put quantities.

Other Departments are also advised to develop such program.

20) For each chapter separate additional details are incorporated for clarity.

xi

USER GUIDELINES OF REVISED STANDARD DATA

1. Please select the item of work, as given in Index Code, and view

the relevant data.

2. The common data items like, lead, lift, conveyance and manual

excavation (without involving contracting agencies) is applicable

to all Departments (volume-1).

3. The departments have to adopt the relevant data from other

Departments, if such works are executed by them.

4. The unit rate /hire charges, of machinery not covered in the

Irrigation data, the MORTH data may be taken with the approval

of Board of Chief Engineers.

5. For “Drinking water Supply works”(PART-IV), the data

incorporated is generally applicable only for manual means of

execution. The rates deploying machinery have to be worked out

by the Board of Chief engineers and approved for adoption.

xii

ROLE OF CENTRAL COMPETENT AGENCY FOR SCHEDULE OF RATES

( BOARD OF CHIEF ENGINEERS)

a) The Board Of Chief Engineers under the chairman ship of Engineer-in-

chief,(administration) I&CAD Department is the competent authority to

finalise and recommend the Schedule of Rates applicable for all engineering

Departments. The board has to assess and incorporate only the three basic

inputs required to generate unit work item rates as below.

Basic rates of labour:

Wages of labour commonly required in execution of works has to be

arrived and incorporated in the schedule of rates ( Basic Input Of Labour

Wages), without adding extra towards area allowances ( like municipality

allowance, tribal area and ghat road allowances etc, which shall be added to

the rates where applicable in the form of separate percentage as explained

in the preceding paras. The rates shall be the prevailing daily rates in the

State and shall not be less than the minimum wages fixed by the

Government from time to time.

Materials rates:

The basic input material rates common to all departmental works are

listed out and incorporated (in the chapter “Basic inputs”) The material

specifications adopted shall confirm to Standards published by the BIS.

The Prevailing market rates for all basic input materials shall be

obtained from the major commercial centers near the project areas. Average

of the rates, ignoring freak rates, shall be reckoned as the prevailing market

rate.

Unless otherwise specified, all material rates shall be inclusive of all

taxes, duties, levies, royalty, transportation and handling costs up to

project area.

xiii

For sand, gravel , murrum, stones , aggregates etc, the rates are

for delivery at Quarry including loading charges and idle hire charges. For

steel, Cement, AC sheets, GI sheets, Hume pipes, wood and stone slabs,

the rates prevailing at major commercial centre near project area has to be

adopted.

Use rate of machinery:

The third parameter for incorporation in the Basic Inputs, is the use rate

of machinery. To arrive at the use rate of machinery, the inputs to be

incorporated are

The list and capital cost of machinery required to be used in the

construction activity, The rate has to be obtained from major

manufacturers and outlet sources and the rate shall be the current

market price inclusive of all taxes, duties and freight charges.

The prevailing fuel charges of petrol and diesel are ascertained and

average rate adopted

Borrow rate of interest as fixed by the Government/competent authority

be indicated.

For the other machinery not covered by the list, the R&B and other

users may adopt hire charges as recommended by the MORTH

b) The Chairman, Board of Chief Engineers or competent authority appointed

by the Government, based on the approved basic inputs, load the above three

basic parameters in the software program. The unit rate of all works including

hire charges of all machinery will be generated automatically for adoption.

He shall communicate the uniform Schedule of rates arrived from

Standard Data, to all users for uniform and direct adoption in all

infrastructure Departments, as applicable

Abstract of work items_UNit Rates for the year 2014-15

1

WORK ITEM RATES FOR THE YEAR - 2014-15

* Add Leads and Lifts, Area Allowance and VAT as applicable in the estimate** Area Allowance includes profit component also*** Unit Rates arrived without Seigniorage Charges

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Chapter IIRR-DAW DAM AND ALLIED WORKS

IRR-DAW-1 EXCAVATION & FOUNDATION TREATMENT WORKS:

IRR-DAW-1-1 1

Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

cum 120.70

Labour Component (including contractor's profit and Overheads) cum 22.50

IRR-DAW-1-2 2

Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

cum 159.90

Labour Component (including contractor's profit and Overheads) cum 29.20

IRR-DAW-1-3 3

Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

cum 240.50

Labour Component (including contractor's profit and Overheads) cum 52.00

IRR-DAW-1-3-ANew Item 2014-

15-14

Excavation for foundation in hard rock (including F&F rock) including boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads

cum 360.50

Labour Component (including contractor's profit and Overheads) 61.20cum

IRR-DAW-1-4(a) 5

Excavation for foundation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts.

cum 428.50

Labour Component (including contractor's profit and Overheads) cum 100.40

IRR-DAW-1-5(b) 6

Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by controlled blasting method and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto upto 1 km and all lifts.

cum 662.70

Labour Component (including contractor's profit and Overheads) cum 110.20

IRR-DAW-1-6(c) 7

Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by line drilling and smooth blasting and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including dressing sides and bed to required level / profile, placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i ) For the purpose of payment 1 m width of excavation along boundary of excavation shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate includes controlling fly-rock wherever required.iii ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval.iv ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided for excavation by normal blasting or controlled blasting as the case may be.

cum 909.60

Labour Component (including contractor's profit and Overheads) cum 290.20

Abstract of work items_UNit Rates for the year 2014-15

2

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-1-7 8

Preparing foundation bed for masonry or concrete by benching, stepping, removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet etc.,complete with initial lead upto 50 m and all lifts.

sqm 33.90

Labour Component (including contractor's profit and Overheads) sqm 26.60

IRR-DAW-1-8 9Preparing foundation bed for cut-off trench filling in rock portion by removing all loose materials by wedging / chiselling and disposing off the same as directed etc., complete with initial lead upto 50 m and all lifts.

sqm 22.50

Labour Component (including contractor's profit and Overheads) sqm 22.50

IRR-DAW-1-9 10

Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete for drilling upto 6 m depth from surface.

The item rate for drilling through rock / masonry / concrete includes redrilling through partially set grout, if any, in the portion of the hole drilled and grouted.

Rm 199.80

. Beyond 6 m upto 12 m from surface : Rm 219.80Beyond 12 m upto 18 m from surface : Rm 241.80Beyond 18 m upto 24 m from surface Rm 266.00Beyond 24 m upto 30 m from surface Rm 292.60Beyond 30 m upto 36 m from surface Rm 321.90Beyond 36 m upto 42 m from surface Rm 354.10Beyond 42 m upto 48 m from surface Rm 389.50Labour Component (including contractor's profit and Overheads) Rm 43.80

IRR-DAW-1-10 11Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes including water intake observations after flushing, cost of all materials, machinery, labour etc., complete.

Rm 50.90

Labour Component (including contractor's profit and Overheads) Rm 17.20

IRR-DAW-1-11(a)

12

Consolidation grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc.,complete with initial lead upto 1 km and all lifts.

tonne 8413.30

Labour Component (including contractor's profit and Overheads) tonne 2775.80

IRR-DAW-1-12(b)

13

Curtain grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc., complete with initial lead upto 1 km and all lifts.

tonne 9365.40

Labour Component (including contractor's profit and Overheads) tonne 3573.80

IRR-DAW-1-13 14

Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.

Each 1016.30

Labour Component (including contractor's profit and Overheads) Each 102.30

IRR-DAW-1-14 15

Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts.

Each 933.30

Labour Component (including contractor's profit and Overheads) Each 115.60

IRR-DAW-2 REINFORCEMENT & CEMENT CONCRETE WORKS :

IRR-DAW-2-1A 16Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods overlaps and wastages wherever required, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts. tonne

59857.87

Labour Component (including contractor's profit and Overheads) tonne 3326.30

Abstract of work items_UNit Rates for the year 2014-15

3

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-2-1B 17Providing, fabricating and placing in position reinforcement steel for RCC above 36 dia with welding and wastage at 2.5%, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts. tonne

61009.05

Labour Component (including contractor's profit and Overheads) tonne 4423.50

IRR-DAW-2-2 18

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.98 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum ))

cum 3454.20

Labour Component (including contractor's profit and Overheads) cum 160.90

IRR-DAW-2-2A (new Item1 2010-

11)19

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.90 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.4 cum ))

cum 3665.50

Labour Component (including contractor's profit and Overheads) cum 160.90

IRR-DAW-2-3 20

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220 kg /cum with use of super plasticiser, CA: 0.98 cum, Blending Ratio of CA --40:30:20:10, FA: 0.37 cum )

cum. 3300.90

Labour Component (including contractor's profit and Overheads) cum. 160.90

IRR-DAW-2-4 21

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super plasticiser, CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

cum. 4640.50

Labour Component (including contractor's profit and Overheads) cum. 318.60

IRR-DAW-2-4A (new Item2 2010-

11)22

Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

cum. 4916.40

Labour Component (including contractor's profit and Overheads) cum. 318.60

IRR-DAW-2-4B (new Item3 2010-

11)23

Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum)

cum. 5006.80

Labour Component (including contractor's profit and Overheads) cum. 318.60

Abstract of work items_UNit Rates for the year 2014-15

4

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-2-5 24

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum)

cum. 4242.70

Labour Component (including contractor's profit and Overheads) cum. 1141.30

IRR-DAW-2-6 25

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of concrete with use of plums and super plasticiser,, CA : 0.77 cum, Blending Ratio of CA : 50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum)

cum. 4108.80

Labour Component (including contractor's profit and Overheads) cum. 1113.60

IRR-DAW-2-7 26

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content 220 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA : 50:30:20, FA : 0.40 cum )

cum. 3921.10

Labour Component (including contractor's profit and Overheads) cum. 1033.20

IRR-DAW-2-8 27

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280 kg /cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum)

cum. 4128.10

Labour Component (including contractor's profit and Overheads) cum. 1058.00

IRR-DAW-2-9 28

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of spillway bridge, blockouts and such other similar structures with conjested reinforcement with initial lead upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum).

cum. 5869.00

Labour Component (including contractor's profit and Overheads) cum. 1499.60

IRR-DAW-2-10 29

Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23 cm diameter central hole using cement and 20 mm down approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all materials, machinery, labour, formwork, curing etc., complete with initial lead upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending Ratio of CA -- 65:35)

Rm 2191.20

Labour Component (including contractor's profit and Overheads) Rm 515.30

Abstract of work items_UNit Rates for the year 2014-15

5

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-2-11(a)

30

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5 cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm coping for pillars with top edges of kerb and coping chamferred / rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Rm 2221.70

Labour Component (including contractor's profit and Overheads) Rm 639.00

IRR-DAW-2-12(b)

31

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Rm 2290.90

Labour Component (including contractor's profit and Overheads) Rm 678.20

IRR-DAW-2-13 32

Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4725.50

Labour Component (including contractor's profit and Overheads) cum 1282.80

IRR-DAW-2-14 33

Pre-cooling to control placement temperature of cement concrete in the range of 18 to 21 C at the concrete placement point by inundation of coarse aggregates and adding flaked ice as part of mixing water including cost of all materials, machinery, labour etc., complete with all leads and lifts.

cum 81.20

Labour Component (including contractor's profit and Overheads) cum 12.30

IRR-DAW-2-15 34

Conveying and fixing elastomeric bearing for spillway bridge including cleaning and preparing surface, mixing and applying adhesive, fixing bearing in correct position etc., including cost of all materials except bearings, machinery, labour etc., complete with all leads and lifts.

Each 321.30

Labour Component (including contractor's profit and Overheads) Each 266.00

IRR-DAW-2-16 35

Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.

Rm 435.70

Labour Component (including contractor's profit and Overheads) Rm 60.80

IRR-DAW-2-17 36

Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 25 cm long 12 mm dia. anchors fixed to both flanges at 15 cm c /c and 140 x 6 mm plate welded on top of one of the angle including cost of all materials, machinery, labour, providing and fixing 38 mm thick joint filler board matching the thickness of wearing coat, painting etc., complete with lead upto 1 km and all lifts.

Rm 1909.40

Labour Component (including contractor's profit and Overheads) Rm 277.80

IRR_DAW-3 MASONRY & GUNITING WORKS :

Abstract of work items_UNit Rates for the year 2014-15

6

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR_DAW-3-1 37

Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 190 kg/cum of masonry, rubble stones : 0.85 cum,stone chips : 0.15 cum/cum, FA : 0.4 cum)

cum 2584.70

Labour Component (including contractor's profit and Overheads) cum 972.50

IRR_DAW-3-2 38

Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum, stone chips : 0.15 cum/cum, FA : 0.4 cum) cum

2364.60

Labour Component (including contractor's profit and Overheads) cum 972.50

IRR_DAW-3-3 39

Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts.( Thickness of the CR face assumed: 0.75 m, Cement content : 178 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

cum 2750.10

Labour Component (including contractor's profit and Overheads) cum 1082.70

IRR_DAW-3-4 40

Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts. ( Cement content : 134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

cum 2543.90

Labour Component (including contractor's profit and Overheads) cum 1082.70

IRR_DAW-3-5 41

Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

cum 2935.40

Labour Component (including contractor's profit and Overheads) cum 1328.40

IRR-DAW-3-6 42

Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

cum 2738.60

Labour Component (including contractor's profit and Overheads) cum 1328.40

IRR-DAW-3-7 43

Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 2 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

sqm 104.20

Labour Component (including contractor's profit and Overheads) sqm 77.50

IRR-DAW-3-8 44

Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 3 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

sqm 97.90

Labour Component (including contractor's profit and Overheads) sqm 77.50

IRR_DAW-4 CONTRACTION JOINT WORKS:

IRR-DAW-4-1 45

Providing 25 mm thick guniting to rock or masonry surface in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, raking-out and cleaning joints, scaffolding wherever required and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

sqm 457.10

Abstract of work items_UNit Rates for the year 2014-15

7

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) sqm 153.40

IRR-DAW-4-2 46

Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in two lines with 8 mm dia steel dowel rods on either side at one metre interval, forming 125 x 125 mm size groove in between copper strips for filling asphalt including fixing 15 mm dia two legged G.I pipe with U - bend at bottom for circulation of steam at intervals and forming 150 mm dia formed drain behind water seals including cost of all materials, machinery, labour, filling asphalt, circulation of steam through pipes etc., complete with all leads and lifts.

Rm 15626.50

Labour Component (including contractor's profit and Overheads) Rm 161.80

IRR-DAW-4-3 47

Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete with all leads and lifts.

Rm 2480.90

Labour Component (including contractor's profit and Overheads) Rm 106.90

IRR-DAW-4-4 48

Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in single line with 8 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour etc., complete with all leads and lifts.

Rm 7277.70

Labour Component (including contractor's profit and Overheads) Rm 124.50

IRR-DAW-4-5 49

Providing and constructing contraction joints by fixing 23 cm wide central bulb type PVC water stop in single line supported by 10 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, valcunising joints etc., complete with all leads and lifts.

Rm 220.30

Labour Component (including contractor's profit and Overheads) Rm 99.30

IRR-DAW-5 EARTH / ROCKFILL EMBANKMENT WORKS :

IRR-DAW-5-1 50

Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 139.20

Labour Component (including contractor's profit and Overheads) cum 19.00

IRR-DAW-5-2 51

Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

cum 149.40

Labour Component (including contractor's profit and Overheads) cum 20.70

IRR-DAW-5-3 52

Providing casing embankment using semi-pervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading soil in layers of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

cum 149.90

Labour Component (including contractor's profit and Overheads) cum 20.60

IRR-DAW-5-4 53

Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

cum 126.00

Labour Component (including contractor's profit and Overheads) cum 17.60

Abstract of work items_UNit Rates for the year 2014-15

8

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-5-4-A (New Item1 -

2011-12)54

Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2Tonne Roller as stipulated etc., complete with initial lead upto 1 km and all lifts. (For Maintenance Works)

cum 86.00

Labour Component (including contractor's profit and Overheads) cum 17.60

IRR-DAW-5-5 55

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 141.50

Labour Component (including contractor's profit and Overheads) cum 19.40

IRR-DAW-5-6 56

Providing embankment adjacent to masonry / concrete structures and filling trial pits using impervious soil from approved borrow areas in layers of 10 to 15 cm and compacting each layer to density control of not less than 95 percent using pneumatic tampers or by vibratory earth rammers including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto 1 km and all lifts.

cum 258.60

Labour Component (including contractor's profit and Overheads) cum 105.90

IRR-DAW-5-7 57

Providing and constructing rockfill embankment with 300 mm down graded stones and quarry spalls from approved source including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes etc., complete with initial lead upto 1 km and all lifts.

cum 434.80

Labour Component (including contractor's profit and Overheads) cum 96.40

IRR-DAW-5-8 58

Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts.

cum 493.20

Labour Component (including contractor's profit and Overheads) cum 181.50

IRR-DAW-5-9 59

Providing and constructing dry rubble rock-toe with rubble and stone chips from dump yard including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts.

Note: Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /stone chips. Sorting out and breaking charges included in rate analysis.

cum 444.90

Labour Component (including contractor's profit and Overheads) cum 125.40

IRR-DAW-5-9-A (New Item4-2012-

13)60

Providing and constructing Dry rock Pitching for Groynes using Un-Coursed rubble stone of size 300 mm thick and Un-Coursed rubble stone chips from Quarry to site of work including cost of all materials, Machinery, Labour charge hand packing Un-Course rubble stone &chips to the designed profile with all leads and lifts etc

cum 658.90

Labour Component (including contractor's profit and Overheads) cum 125.40

IRR-DAW-5-10 61Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe for drainage including cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.

Rm 769.00

Labour Component (including contractor's profit and Overheads) Rm 28.00

IRR-DAW-6 FILTER & PITCHING WORKS :

Abstract of work items_UNit Rates for the year 2014-15

9

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-6-1 62

Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with 60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hard coarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cm thick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways for bed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover, excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery, labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts.( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,FA : 0.44 cum, superplasticizer (0.4% by wt. of cement)

Each 44110.40

Labour Component (including contractor's profit and Overheads) Each 9462.90

IRR-DAW-6-2 63

Providing and constructing longitudinal and cross graded filter drains using sand and 80-20 mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc. complete with initial lead upto 50 m and all lifts.

cum 956.60

Labour Component (including contractor's profit and Overheads) cum 132.00

IRR-DAW-6-3 64

Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of 20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick 80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 1038.80

Labour Component (including contractor's profit and Overheads) cum 132.00

IRR-DAW-6-4 65

Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 988.40

Labour Component (including contractor's profit and Overheads) cum 118.60

IRR-DAW-6-4-A (New Item2 2011-

12)66

Providing and constructing graded filter media below and behind rock-toe consisting of 30 cm thick, 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 1134.70

Labour Component (including contractor's profit and Overheads) cum 44.60

IRR-DAW-6-5 67

Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-woven filter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclined and horizontal filter blanket for embankment including cost of all materials, machinery, labour etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

sqm 951.10

Labour Component (including contractor's profit and Overheads) sqm 51.30

IRR-DAW-6-6 68Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying filter creteria including cost of all materials, machinery, labour, compacting etc., complete with initial lead upto 50 m and all lifts.

cum 658.10

Labour Component (including contractor's profit and Overheads) cum 105.10

IRR-DAW-6-7 69

Providing and constructing 90 cm thick transition cum filter media behind rockfill using approved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteria in layers of 30 cm thickness each as per specifications including cost of all materials, machinery, labour, laying each layer to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 1020.20

Labour Component (including contractor's profit and Overheads) cum 138.70

IRR-DAW-6-8 70

Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

sqm 860.70

Labour Component (including contractor's profit and Overheads) sqm 154.60

Abstract of work items_UNit Rates for the year 2014-15

10

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-DAW-6-9 71

Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

sqm 1025.20

Labour Component (including contractor's profit and Overheads) sqm 174.80

IRR-DAW-6-10 72

Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts.

sqm 803.40

Labour Component (including contractor's profit and Overheads) sqm 118.10

IRR-DAW-6-11 73

Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 m and all lifts.

sqm 876.10

Labour Component (including contractor's profit and Overheads) sqm 128.70

IRR-DAW-6-12 74

Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts.

sqm 961.50

Labour Component (including contractor's profit and Overheads) sqm 150.00

IRR-DAW-6-13 75

Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery, labour including preparing surface, spreading sand, watering for 15 days etc., complete with initial lead upto 1 km and all lifts.

sqm 99.80

Labour Component (including contractor's profit and Overheads) sqm 59.50

Chapter IIIRR-TAW TUNNEL AND ALLIED WORKS

IRR-TAW-1 EXCAVATION :

IRR-TAW-1-1 76

Excavation for adit by tunnelling methods in all types of rock including cost of all materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside adit upto specified dump area and all other ancillary operations etc., complete with initial lead upto 50 m and all lifts.

cum 1713.00

Labour Component (including contractor's profit and Overheads) cum 551.50

IRR-TAW-1-2 77

Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of all materials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting, drainage, removing and hauling excavated muck outside shaft upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

cum 2237.90

Labour Component (including contractor's profit and Overheads) cum 1104.70

IRR-TAW-1-3 78

Excavation for tunnel by tunnelling methods in rock not requiring supports including cost of all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

cum 1751.70

Labour Component (including contractor's profit and Overheads) cum 543.80

IRR-TAW-1-4 79

Excavation for tunnel by tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

cum 1803.30

Abstract of work items_UNit Rates for the year 2014-15

11

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) cum 561.30

IRR-TAW-1-5 80

Excavation for tunnel by heading and benching tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) for roof before benching including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

NOTE: Where mucking is to be carried out through shaft using winch and mucking tub system increase the basic rates for items 3, 4 & 5 by 8 percent.

cum 1848.30

Labour Component (including contractor's profit and Overheads) cum 603.10

IRR-TAW-1-6 81

Removing and hauling muck overfallen due to natural causes such as geological faults etc., out of tunnel including breaking large fragments by blasting if necessary and disposing off the same in specified dump area or as directed including cost of all materials, machinery, labour, ventilation, drainage, lighting and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

cum 362.60

Labour Component (including contractor's profit and Overheads) cum 84.10

IRR-TAW-2 DEWATERING & GUNITING WORKS :

IRR-TAW-2-1 82

Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting, ventilation and all other ancillary operations etc., complete.

Kwhr 23.40

Labour Component (including contractor's profit and Overheads) Kwhr 7.90

IRR-TAW-2-2 83

Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.

sqm 567.40

Labour Component (including contractor's profit and Overheads) sqm 174.00

IRR-TAW-2-3 (new Item4 2010-

11)84

Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh 100 x 100x5 mm in between the two layers including cost and conveyance of all materials, labour charges, all heads, lifts, centering, scaffolding, machine mixing, laying concrete with shortcrete machine etc. complete as per specification and as directed by Engineer-in-Charge

sqm 1344.10

Labour Component (including contractor's profit and Overheads) sqm 174.00

IRR-TAW-3 TEMPORARY & PERMANENT SUPPORTS :

IRR-TAW-3-1 85

Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge type anchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel tapered wedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.

Rm 1116.60

Labour Component (including contractor's profit and Overheads) Rm 294.50

IRR-TAW-3-2 86

Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsule anchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mm thick plate washers and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts.

Rm 1069.00

Labour Component (including contractor's profit and Overheads) Rm 271.30

IRR-TAW-3-3 87

Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

tonne 95183.90

Labour Component (including contractor's profit and Overheads) tonne 15917.60

IRR-TAW-3-4 88

Providing, fabricating and fixing in position temperary structural steel supports as per details and dismantling the same before concreting including cost of all materials, machinery, labour, cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillary operations etc.,complete with initial lead upto 1 km and all lifts.

tonne 22295.80

Labour Component (including contractor's profit and Overheads) tonne 7944.70

Abstract of work items_UNit Rates for the year 2014-15

12

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-TAW-3-5 89

Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnel wherever required including cost of all materials, machinery, labour, fixing in position, lighting, ventilation, drainage etc complete with all leads and lifts.

cum 32859.50

Labour Component (including contractor's profit and Overheads) cum 1412.00

IRR-TAW-4 MASONRY WORKS :

IRR-TAW-4-1 90

Providing and constructing un-coursed rubble stone masonry with approved stones from tunnel excavated muck in cement mortar 1 : 6 proportion for backfilling over cuts / slips on tunnel sides due to geological faults etc., including cost of all materials, machinery, labour, cleaning,scaffolding, packing mortar, wedging stone chips, curing, ventilation, lighting, drainage complete with lead upto 1 km and all lifts.(cement content : 95 kg/cum of masonry, Rubble stones : 0.83 cum, Stone chips : 0.13 cum,FA : 0.40 cum)

cum 2064.80

Labour Component (including contractor's profit and Overheads) cum 740.30

IRR-TAW-5 REINFORCEMENT & CONCRETE WORKS :

IRR-TAW-5-1 91

Providing, fabricating and placing in position reinforcement steel for tunnel RCC works including cleaning, straightening, cutting, bending, hooking, lapping / welding joints wherever required, tying with 1.25 mm dia.soft annealed steel wire, including cost of all materials, labour, machinery, ventilation, lighting, drainage etc.,complete with initial lead upto 1 km and all lifts.

tonne 73182.60

Labour Component (including contractor's profit and Overheads) tonne 9661.50

IRR-TAW-5-2 92

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates crushed from tunnel excavated muck for filling and levelling over-cuts in bed due to geological faults etc., including cost of all materials, machinery, labour, cleaning bed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting, ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum, Superplasticizer 0.4% by wt. of cement)

cum 5064.10

Labour Component (including contractor's profit and Overheads) cum 738.30

IRR-TAW-5-3 93

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for kerb and bed lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 6099.40

Labour Component (including contractor's profit and Overheads) cum 920.00

IRR-TAW-5-4 94

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for sides and arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum #REF!

Labour Component (including contractor's profit and Overheads) cum #REF!

IRR-TAW-6 DRILLING & GROUTING WORKS :

IRR-TAW-6-1 95

Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete.

Rm 389.00

Labour Component (including contractor's profit and Overheads) Rm 141.60

Abstract of work items_UNit Rates for the year 2014-15

13

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-TAW-6-2 96

Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, redrilling wherever necessary, ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts.

tonne 9052.90

Labour Component (including contractor's profit and Overheads) tonne 2173.80

IRR-TAW-6-3 97

Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel by percussion drilling using waggon drill or other suitable drilling equipment including cost of all materials, machinery, labour, ventilation, lighting, drainage etc., complete.

Rm 360.70

Labour Component (including contractor's profit and Overheads) Rm 58.50

Chapter IIIIRR-CAW CANAL AND ALLIED WORKS

IRR-CAW-1 EXCAVATION WORKS :

IRR-CAW-1-1 98

Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts.

cum 94.00

Labour Component (including contractor's profit and Overheads) cum 22.50

IRR-CAW-1-2 99

Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.

(Machinery excavation and manual conveyance)

cum 49.60

Labour Component (including contractor's profit and Overheads) cum 18.10

IRR-CAW-1-3 100

Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts.

cum 127.30

Labour Component (including contractor's profit and Overheads) cum 33.30

IRR-CAW-1-4 101

Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m.

(Machinery excavation and manual conveyance)

cum 82.10

Labour Component (including contractor's profit and Overheads) cum 30.00

IRR-CAW-1-5 102

Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts.

cum 194.80

Labour Component (including contractor's profit and Overheads) cum 60.40

IRR-CAW-1-6 (a) 103

Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m.ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever required.

cum 484.80

Labour Component (including contractor's profit and Overheads) cum 129.70

Abstract of work items_UNit Rates for the year 2014-15

14

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-1-7 (b) 104

Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water drains etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m.ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required.

cum 604.20

Labour Component (including contractor's profit and Overheads) cum 128.10

IRR-CAW-1-8( c) 105

Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.i) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of

cum 1060.90

Labour Component (including contractor's profit and Overheads) cum 341.90

IRR-CAW-1-9(a) 106

Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating embankment etc., including levelling bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.ii ) The rate includes levelling canal bed by hammering /chiselling all rock projections wherever required.

cum 298.50

Labour Component (including contractor's profit and Overheads) cum 40.80

IRR-CAW-1-10(b)

107

Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, cost of all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required.

cum 451.50

Labour Component (including contractor's profit and Overheads) cum 46.70

Abstract of work items_UNit Rates for the year 2014-15

15

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-1-11(c)

108

Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.i ) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent

cum 753.80

Labour Component (including contractor's profit and Overheads) cum 105.30

IRR-CAW-2 EMBANKMENT WORKS USING BORROW AREA SOIL :

IRR-CAW-2-1 109

Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 198.00

Labour Component (including contractor's profit and Overheads) cum 30.70

IRR-CAW-2-2 110

Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 191.20

Labour Component (including contractor's profit and Overheads) cum 30.10

IRR-CAW-2-3 111

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 197.60

Labour Component (including contractor's profit and Overheads) cum 30.70

IRR-CAW-2-4 112

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 193.20

Labour Component (including contractor's profit and Overheads) cum 32.30

IRR-CAW-2-5 113

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 180.00

Labour Component (including contractor's profit and Overheads) cum 27.90

Abstract of work items_UNit Rates for the year 2014-15

16

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-2-6 114

Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 171.10

Labour Component (including contractor's profit and Overheads) cum 25.30

IRR-CAW-2-7 115

Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 165.10

Labour Component (including contractor's profit and Overheads) cum 24.90

IRR-CAW-2-8 116

Providing casing embankment using homogeneous soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 155.00

Labour Component (including contractor's profit and Overheads) cum 22.80

IRR-CAW-3 EMBANKMENT WORKS USING DUMP AREA SOIL :

IRR-CAW-3-1 117

Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.

cum 150.10

Labour Component (including contractor's profit and Overheads) cum 23.50

IRR-CAW-3-2 118

Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.

cum 144.80

Labour Component (including contractor's profit and Overheads) cum 23.10

IRR-CAW-3-3 119

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 145.80

Labour Component (including contractor's profit and Overheads) cum 22.80

IRR-CAW-3-4 120

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 140.40

Labour Component (including contractor's profit and Overheads) cum 22.30

Abstract of work items_UNit Rates for the year 2014-15

17

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-3-5 121

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

cum 131.50

Labour Component (including contractor's profit and Overheads) cum 20.50

IRR-CAW-4 EMBANKMENT WORKS USING EXCAVATED SOIL :

IRR-CAW-4-1 122

Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

cum 67.30

Labour Component (including contractor's profit and Overheads) cum 9.50

IRR-CAW-4-2 123

Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

cum 61.90

Labour Component (including contractor's profit and Overheads) cum 9.70

IRR-CAW-4-3 124

Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

cum 67.30

Labour Component (including contractor's profit and Overheads) cum 9.50

IRR-CAW-4-4 125

Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

cum 61.90

Labour Component (including contractor's profit and Overheads) cum 9.70

IRR-CAW-4-5 126

Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning and compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete.

cum 51.60

Labour Component (including contractor's profit and Overheads) cum 7.00

IRR-CAW-4-6 127

Providing compacted embankment for field irrigation channels with gravely soil from approved borrow area including sorting out, spreading in layers of 15 cm thickness, breaking clods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto 50 m and all lifts.

( manual work with water pump)

cum 266.80

Labour Component (including contractor's profit and Overheads) cum 262.40

IRR-CAW-5 FOUNDATION FILLING WORKS :

IRR-CAW-5-1 128Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

cum 653.00

Abstract of work items_UNit Rates for the year 2014-15

18

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) cum 134.50

IRR-CAW-5-2 129Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

cum 545.80

Labour Component (including contractor's profit and Overheads) cum 134.50

IRR-CAW-5-3 130Providing and laying 25 cm thick sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts.

sqm 114.30

Labour Component (including contractor's profit and Overheads) sqm 16.90

IRR-CAW-5-3-A (New Item 3 -

2011-12)131

Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts.

cum 457.10

Labour Component (including contractor's profit and Overheads) cum 67.30

IRR-CAW-5-4 132

Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 50 m and all lifts.

cum 517.20

Labour Component (including contractor's profit and Overheads) cum 95.60

IRR-CAW-5-5 133

Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 827.60

Labour Component (including contractor's profit and Overheads) cum 125.30

IRR-CAW-5-6 134Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including excavation of drains and Cost of procuring of all materials

Rm 407.60

133 Rm 23.80

IRR-CAW-5-7 135

Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including excavation of drains and Cost of procuring of all materials

one plug 336.00

Labour Component (including contractor's profit and Overheads) one plug 100.90

IRR-CAW-5-8 136

Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of 15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 954.90

Labour Component (including contractor's profit and Overheads) cum 125.30

IRR-CAW-5-9 137

Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter creiteria below rock-toe as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

cum 1159.30

Labour Component (including contractor's profit and Overheads) cum 117.10

IRR-CAW-5-10(a)

138

Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

Using 200 gsm filter fabric.

sqm 600.60

Labour Component (including contractor's profit and Overheads) sqm 27.80

IRR-CAW-5-11(b)

139

Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

Using 250 gsm filter fabric.

sqm 653.20

Abstract of work items_UNit Rates for the year 2014-15

19

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) sqm 27.80

IRR-CAW-6 ROCK FILL WORKS :

IRR-CAW-6-1 140

Providing and constructing rockfill casing to canal embankment with graded stones and spalls from approved quarry including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts.

cum 471.20

Labour Component (including contractor's profit and Overheads) cum 50.50

IRR-CAW-6-2 141

Providing and constructing rockfill casing to canal embankment with graded stones and spalls available in dump yard including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts.

Stones and spalls available in dump yard will be issued at specified issue rate.

cum 271.70

Labour Component (including contractor's profit and Overheads) cum 65.10

IRR-CAW-7 CANAL LINING WORKS :

IRR-CAW-7-1 142

Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

cum 211.90

Labour Component (including contractor's profit and Overheads) cum 60.60

IRR-CAW-7-2 143

Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

cum 206.90

Labour Component (including contractor's profit and Overheads) cum 59.90

IRR-CAW-7-3 144

Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heaps along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from canal excavation in CNS soil reach including spreading in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and all lifts.

cum 105.00

Labour Component (including contractor's profit and Overheads) cum 45.90

IRR-CAW-7-4 145Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed level stones including cost of all materials, labour, excavation, fixing in position to correct level etc., complete with lead upto 50 m and all lifts.

Each 87.90

Labour Component (including contractor's profit and Overheads) Each 61.70

IRR-CAW-7-5 146

Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.(1.05 tonne/tonne of steel)

kg 63.50

Labour Component (including contractor's profit and Overheads) kg 6.70

IRR-CAW-7-6 147

Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 22.5 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,)

sqm 390.40

Labour Component (including contractor's profit and Overheads) sqm 27.70

Abstract of work items_UNit Rates for the year 2014-15

20

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-7-7 148

Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 24 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:84.48 cum including the extra quantity of concrete for curvatures and bends etc.,)

sqm 406.30

Labour Component (including contractor's profit and Overheads) sqm 27.70

IRR-CAW-7-8 149

Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts. ( 43 Gr Cement content: (300kg /cum) 30 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:88 cum including the extra quantity of concrete for curvatures and bends etc.,)

sqm 491.10

Labour Component (including contractor's profit and Overheads) sqm 32.00

IRR-CAW-7-9 150

Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all accessories across canal CD work or other locations wherever shifting and re-erecting is necessary including aligning paver correctly for continuing canal lining work, cost of all materials, machinery, labour etc., complete with all leads and lifts.

Note: Local shifting and re-erection of paver for LH and RH side lining included in concrete lining rates under items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed.

shifting 8490.30

Labour Component (including contractor's profit and Overheads) shifting 6039.30

IRR-CAW-7-10 151

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

(Only forManually operated)

cum 4110.40

Labour Component (including contractor's profit and Overheads) cum 1071.10

IRR-CAW-7-11 152

Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than 10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 4253.20

Labour Component (including contractor's profit and Overheads) cum 1103.00

IRR-CAW-7-12 153

Providing and laying 100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than 10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

sqm 474.20

Labour Component (including contractor's profit and Overheads) sqm 32.00

Abstract of work items_UNit Rates for the year 2014-15

21

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-7-13 154

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4154.90

Labour Component (including contractor's profit and Overheads) cum 1103.00

IRR-CAW-7-14 155

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining(150 mm thick) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 4441.60

Labour Component (including contractor's profit and Overheads) cum 1167.00

IRR-CAW-7-15 156

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 100 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4570.00

Labour Component (including contractor's profit and Overheads) cum 1232.50

IRR-CAW-7-16 157

Providing and laying 150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than 15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

(Paver)

sqm 647.00

Labour Component (including contractor's profit and Overheads) sqm 32.00

IRR-CAW-7-17 158

Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 grade concrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel moulded as per specifications and drawing in CM 1:4 proportion including cost of all materials, machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying, conveying and fixing in position including necessary excavation for seating, finishing joints in CM 1:4, curing etc., complete with initial lead upto 1 km and all lifts.

Rm 1000.70

Labour Component (including contractor's profit and Overheads) Rm 242.60

IRR-CAW-7-18 159

Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Each 136.60

Labour Component (including contractor's profit and Overheads) Each 42.00

IRR-CAW-7-19 160

Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Each 194.10

Labour Component (including contractor's profit and Overheads) Each 42.00

Abstract of work items_UNit Rates for the year 2014-15

22

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-7-20 161

Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Each 230.80

Labour Component (including contractor's profit and Overheads) Each 42.00

IRR-CAW-7-21 162

Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Each 299.50

Labour Component (including contractor's profit and Overheads) Each 42.00

IRR-CAW-7-22 163

Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Each 432.30

Labour Component (including contractor's profit and Overheads) Each 42.00

IRR-CAW-7-23 164Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts.

Each 220.40

Labour Component (including contractor's profit and Overheads) Each 21.00

IRR-CAW-7-24 165Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining of canal laid on rock including cost of all materials, machinery, labour etc., complete with all leads and lifts.

Each 267.10

Labour Component (including contractor's profit and Overheads) Each 85.70

IRR-CAW-7-25 166

Providing and forming 35 x 35 x 40 cm deep filter drain consisting of 75 mm thick 10 mm down coarse aggregate around pressure relief pipe and 75 mm thick sand around coarse aggregate filter including cost of all materials, labour, excavation of pit etc., complete with lead upto 50 m and all lifts.

Each 40.70

Labour Component (including contractor's profit and Overheads) Each 7.30

IRR-CAW-7-26 167

Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabs with pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel lining including cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc., complete with lead upto 50 m and all lifts.

sqm 351.40

Labour Component (including contractor's profit and Overheads) sqm 63.30

IRR-CAW-7-27 168

Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canal including preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 75.30

Labour Component (including contractor's profit and Overheads) sqm 58.70

IRR-CAW-7-28 169

Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab lining including necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

Rm 43.90

Labour Component (including contractor's profit and Overheads) Rm 39.30

IRR-CAW-7-29 170Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc., complete with all leads and lifts.

Each 164.50

Labour Component (including contractor's profit and Overheads) Each 164.50

IRR-CAW-7-30 171

Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 500 micron thick LDPE sheet.

sqm 128.00

Labour Component (including contractor's profit and Overheads) sqm 11.90If the surface on which the LDPE sheet is to be laid is too rough and undulating provide 75 mm thick sand backing to LDPE sheet. For providing 75 mm thick Sand for backing add

sqm 37.30

Labour Component (including contractor's profit and Overheads) sqm 8.10

IRR-CAW-7-31 172Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 750 micron thick LDPE sheet.

sqm 180.00

Labour Component (including contractor's profit and Overheads) sqm 16.20

Abstract of work items_UNit Rates for the year 2014-15

23

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-7-32 173Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 1000 micron thick LDPE sheet.

sqm 248.40

Labour Component (including contractor's profit and Overheads) sqm 21.90

IRR-CAW-7-33 174Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for stone masonry lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

Rm 192.80

Labour Component (including contractor's profit and Overheads) Rm 7.30

IRR-CAW-7-34 175Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

Rm 79.10

Labour Component (including contractor's profit and Overheads) Rm 7.30

IRR-CAW-7-35 176Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

Rm 117.20

Labour Component (including contractor's profit and Overheads) Rm 7.30

IRR-CAW-7-36 177Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.

Rm 22.80

Labour Component (including contractor's profit and Overheads) Rm 5.40

IRR-CAW-7-37 178

Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum)

Each 88.20

Labour Component (including contractor's profit and Overheads) Each 23.00

IRR-CAW-7-38 179

Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum)

Each 62.00

Labour Component (including contractor's profit and Overheads) Each 23.00

IRR-CAW-7-39 180

Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

Each 31.50

Labour Component (including contractor's profit and Overheads) Each 14.80

IRR-CAW-7-40 181

Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),CA : 0.68 cum, FA : 0.43cum)

Each 24.00

Labour Component (including contractor's profit and Overheads) Each 14.80

IRR-CAW-7-41 182

Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube compressive strength not less than 15 N/Sqmm) cement concrete using 20 mm down grades coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35)

Each 72.90

Labour Component (including contractor's profit and Overheads) Each 14.70

Abstract of work items_UNit Rates for the year 2014-15

24

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-7-42 183

Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm )cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

Each 33.40

Labour Component (including contractor's profit and Overheads) Each 14.80

IRR-CAW-7-43 184

Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

Each 23.40

Labour Component (including contractor's profit and Overheads) Each 14.80

IRR-CAW-7-44 185

Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum,Through Stones 20 x 20 x 30cm : 1/sqm)

cum 1901.80

Labour Component (including contractor's profit and Overheads) cum 566.50

IRR-CAW-7-45 186

Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)(Thickness of the Masonry assumed:0.3 m, rubble stones : 1.1 cum)

cum 3009.10

Labour Component (including contractor's profit and Overheads) cum 1870.60

IRR-CAW-7-46 187

Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified interval, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)

cum 1764.50

Labour Component (including contractor's profit and Overheads) cum 639.40

IRR-CAW-7-47 188

Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum)

cum 2805.10

Labour Component (including contractor's profit and Overheads) cum 1870.60

IRR-CAW-8 ROCK PITCHING

IRR-CAW-8-1 189

Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)

sqm 194.40

Labour Component (including contractor's profit and Overheads) sqm 44.10If 15 cm thick murum bed is to be provided below pitching add sqm 35.40Labour Component (including contractor's profit and Overheads) sqm 13.50

IRR-CAW-8-1-A (New Item4 -

2011-12)190

Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.207 cum/sqm, Stone Chips : 0.3375cum/sqm, Pin Headers 30cm : 2/sqm) (For Maintenance Works)

sqm 184.60

Labour Component (including contractor's profit and Overheads) sqm 44.10

IRR-CAW-8-2 191

Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm)

sqm 204.60

Labour Component (including contractor's profit and Overheads) sqm 104.90

Abstract of work items_UNit Rates for the year 2014-15

25

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CAW-8-2 - A (New Item5 -

2011-12)192

Providing and constructing 225 mmm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)

sqm 148.20

Labour Component (including contractor's profit and Overheads) sqm 94.40

IRR-CAW-8-3 193

Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

sqm 213.60

Labour Component (including contractor's profit and Overheads) sqm 44.10

IRR-CAW-8-4 194

Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm)

sqm 245.50

Labour Component (including contractor's profit and Overheads) sqm 125.90

IRR-CAW-8-5 195

Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

sqm 322.10

Labour Component (including contractor's profit and Overheads) sqm 62.00

IRR-CAW-8-6 196

Providing and constructing 45 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.495 cum/sqm)

sqm 368.20

Labour Component (including contractor's profit and Overheads) sqm 188.80

IRR-CAW-8-7 197

Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with pin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

sqm 456.50

Labour Component (including contractor's profit and Overheads) sqm 75.50

IRR-CAW-8-8 198Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete( rubble stones : 0.33 cum/sqm )

sqm 361.30

Labour Component (including contractor's profit and Overheads) sqm 16.80

IRR-CAW-8-9 199

Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

sqm 291.80

Labour Component (including contractor's profit and Overheads) sqm 44.10

IRR-CAW-8-10 200

Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

sqm 310.30

Labour Component (including contractor's profit and Overheads) sqm 62.00

IRR-CAW-8-11 201

Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc.complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

sqm 521.10

Labour Component (including contractor's profit and Overheads) sqm 72.00

IRR-CAW-8-12 202

Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

sqm 632.90

Abstract of work items_UNit Rates for the year 2014-15

26

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) sqm 99.00

IRR-CAW-8-13 203Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.(FA : 2 cum/sqm)

sqm 96.20

Labour Component (including contractor's profit and Overheads) sqm 56.50

IRR-CAW-8-14 204

Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.

with no sand

sqm 64.50

Labour Component (including contractor's profit and Overheads) sqm 32.60

Chapter IVIRR-CCDW CANAL CROSS DRAINAGE WORKS

IRR-CCDW-1 EXCAVATION & FOUNDATION TREATMENT WORKS :

IRR-CCDW-1-1 205

(manual means of excavation and conveyance)

Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 212.30

Labour Component (including contractor's profit and Overheads) cum 212.40

IRR-CCDW-1-2 206

Excavation for Structures- Mechanical Means ( Data adopted fromMORTH)

Earth work in excavation in all kinds of soils of foundation of structures asper drawing and technical specification, including setting out, construction ofshoring and bracing, removal of stumps and other deleterious matter, dressingof sides and bottom and backfilling with approved material. ( depth upto 3meters)

cum 93.00

Labour Component (including contractor's profit and Overheads) cum 17.60

IRR-CCDW-1-3 207

(manual means of excavation and conveyance)

Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 310.70

Labour Component (including contractor's profit and Overheads) cum 310.70

IRR-CCDW-1-4 208

( Data adopted from MORTH) (manual means of excavation and conveyance)

Excavation in ordnary rock (including HDR) without blasting for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 120.00

Labour Component (including contractor's profit and Overheads) cum 19.50

IRR-CCDW-1-5 209

(manual means of excavation after blasting and conveyance)

Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 325.20

Labour Component (including contractor's profit and Overheads) cum 241.30

IRR-CCDW-1-6 210

(manual means of excavation after blasting and conveyance)

Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in specified dump area or stack yard as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 512.30

Labour Component (including contractor's profit and Overheads) cum 300.40

Abstract of work items_UNit Rates for the year 2014-15

27

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-1-7 211

(manual means of excavation after controlled blasting and conveyance)Hard Rock ( blasting prohibited ) ( Data adopted from MORTH)

Excavation in hard rock with blasting ( blasting prohibited )prohibited for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and initial lift upto 3 m.

cum 991.10

Labour Component (including contractor's profit and Overheads) cum 301.20

IRR-CCDW-1-8 212

Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts.

Each 913.30

Labour Component (including contractor's profit and Overheads) Each 185.70

IRR-CCDW-2 STEEL AND CEMENT CONCRETE WORKS :

IRR-CCDW-2-1 213

Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.

kg 63.60

Labour Component (including contractor's profit and Overheads) kg 7.20

IRR-CCDW-2-2 214

Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x 100 x 10 mm angle and 250 x 12 mm plate for sinking 4.50 m outer diameter foundation wells foundation wells including cost of all materials, machinery, labour, bending, welding, providing anchors etc., complete with initial lead upto 50 m and all lifts.

kg 76.70

Labour Component (including contractor's profit and Overheads) kg 8.70

IRR-CCDW-2-3 215

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 4219.80

Labour Component (including contractor's profit and Overheads) cum 1110.60

IRR-CCDW-2-4 216

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

cum 4196.90

Labour Component (including contractor's profit and Overheads) cum 1156.90

IRR-CCDW-2-5 217

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 3964.00

Labour Component (including contractor's profit and Overheads) cum 1061.30

IRR-CCDW-2-6 218

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

cum 4039.00

Abstract of work items_UNit Rates for the year 2014-15

28

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6Labour Component (including contractor's profit and Overheads) cum 1149.30

IRR-CCDW-2-7 219

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 4536.30

Labour Component (including contractor's profit and Overheads) cum 1167.60

IRR-CCDW-2-8 220

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

cum 4971.30

Labour Component (including contractor's profit and Overheads) cum 1163.10

IRR-CCDW-2-9 221

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4968.80

Labour Component (including contractor's profit and Overheads) cum 1235.80

IRR-CCDW-2-10 222

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4725.30

Labour Component (including contractor's profit and Overheads) cum 1237.90

IRR-CCDW-2-11 223

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4322.70

Labour Component (including contractor's profit and Overheads) cum 1150.50

IRR-CCDW-2-12 224

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 6245.20

Labour Component (including contractor's profit and Overheads) cum 1493.90

Abstract of work items_UNit Rates for the year 2014-15

29

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-2-13 225

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well steining including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 5634.20

Labour Component (including contractor's profit and Overheads) cum 1365.20

IRR-CCDW-2-14 226

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well bottom plug by tremie or skip box method including cost of all materials, complete with initial lead upto 50 m and all lifts.(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 4172.40

Labour Component (including contractor's profit and Overheads) cum 1074.60

IRR-CCDW-2-15 227

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well top plug including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltrs / cum

cum 3895.80

Labour Component (including contractor's profit and Overheads) cum 1055.90

IRR-CCDW-2-16 228

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well cap including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4337.00

Labour Component (including contractor's profit and Overheads) cum 1074.60

IRR-CCDW-2-17 229

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 5157.30

Labour Component (including contractor's profit and Overheads) cum 1427.30

IRR-CCDW-2-18 230

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4999.40

Labour Component (including contractor's profit and Overheads) cum 1419.20

Abstract of work items_UNit Rates for the year 2014-15

30

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-2-19 231

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4912.60

Labour Component (including contractor's profit and Overheads) cum 1312.80

IRR-CCDW-2-20 232

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for cantiliver / counterfort retaining walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 5539.60

Labour Component (including contractor's profit and Overheads) cum 1359.10

IRR-CCDW-2-21 233

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type retaining walls / piers / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum, plums of size 150 to 80 mm : 0.25cum )

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4905.90

Labour Component (including contractor's profit and Overheads) cum 1272.70

IRR-CCDW-2-22 234

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded aggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4633.50

Labour Component (including contractor's profit and Overheads) cum 1202.20

IRR-CCDW-2-23 235

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4604.50

Labour Component (including contractor's profit and Overheads) cum 1247.70

Abstract of work items_UNit Rates for the year 2014-15

31

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-2-24 236

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 7742.30

Labour Component (including contractor's profit and Overheads) cum 1789.00

IRR-CCDW-2-25 237

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for columns and beams including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 6708.70

Labour Component (including contractor's profit and Overheads) cum 1632.50

IRR-CCDW-2-26 238

Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 4238.60

Labour Component (including contractor's profit and Overheads) cum 1102.20

IRR-CCDW-2-27 239

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for troughs including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

cum 6066.20

Labour Component (including contractor's profit and Overheads) cum 1514.30

IRR-CCDW-3 FOUNDATION WELL SINKING WORKS :

IRR-CCDW-3-1 240

Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil, sand and soft rock by approved well sinking method including cost of all materials, machinery, labour, kent - ledge arrangements, disposal of excavated material as disposal of excavated material as directed etc., complete with lead upto 50 m for disposal of excavated material.(diameter of well 6.00m) (Data adopted from MORTH)

*Rm 3654.20

Labour Component (including contractor's profit and Overheads) *Rm 1507.80for 3 to 10 meters for each running meter *Rm 5191.60Labour Component (including contractor's profit and Overheads) *Rm 1972.00

IRR-CCDW-3-2 241Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with initial lead upto 50 m and all lifts.

cum 506.10

Labour Component (including contractor's profit and Overheads) cum 96.70

IRR-CCDW-4 MASONRY WORKS :

Abstract of work items_UNit Rates for the year 2014-15

32

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-4-1 242

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

cum 2074.90

Labour Component (including contractor's profit and Overheads) cum 692.10

IRR-CCDW-4-2 243

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for super-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

cum 2124.50

Labour Component (including contractor's profit and Overheads) cum 709.40

IRR-CCDW-4-3 244

Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

cum 2590.20

Labour Component (including contractor's profit and Overheads) cum 795.80

IRR-CCDW-4-4 245

Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

cum 2711.10

Labour Component (including contractor's profit and Overheads) cum 916.80

IRR-CCDW-4-5 246

Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 108.40

246 sqm 81.70

IRR-CCDW-4-6 247

Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 102.10

Labour Component (including contractor's profit and Overheads) sqm 81.70

IRR-CCDW-4-7 248Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 154.10

Labour Component (including contractor's profit and Overheads) sqm 115.40

IRR-CCDW-4-8 249Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 146.80

Labour Component (including contractor's profit and Overheads) sqm 115.40

IRR-CCDW-4-9 250Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 218.80

Labour Component (including contractor's profit and Overheads) sqm 154.10

IRR-CCDW-4-10 251Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

sqm 206.50

Labour Component (including contractor's profit and Overheads) sqm 154.10

Abstract of work items_UNit Rates for the year 2014-15

33

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6IRR-CCDW-5 COPING & RAILING WORKS :

IRR-CCDW-5-1 252

Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

sqm 581.00

Labour Component (including contractor's profit and Overheads) sqm 167.00

IRR-CCDW-5-2 253

Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

sqm 717.30

Labour Component (including contractor's profit and Overheads) sqm 303.20

IRR-CCDW-5-3 254

Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

sqm 892.80

Labour Component (including contractor's profit and Overheads) sqm 478.80

IRR-CCDW-5-4 255

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete using 20 mm down size approved clean, hard, graded aggregates for coping slab including cost of all materials, machinery, labour, formwork, cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

cum 5853.00

Labour Component (including contractor's profit and Overheads) cum 1436.30

IRR-CCDW-5-5 256

Providing and constructing protective railing consisting of in-situ railing posts of size 15 x 15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos. of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork, finishing, curing etc., complete with lead upto 50 m and all lifts.

Rm 1362.80

Labour Component (including contractor's profit and Overheads) Rm 158.50

IRR-CCDW-6 HUME PIPE LAYING & JOINTING WORKS :

IRR-CCDW-6-1 257

Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)

Joint 281.30

Labour Component (including contractor's profit and Overheads) Joint 221.70

IRR-CCDW-6-2 258

Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)

Joint 326.70

Labour Component (including contractor's profit and Overheads) Joint 221.70

IRR-CCDW-6-3 259

Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)

Joint 423.40

Labour Component (including contractor's profit and Overheads) Joint 275.10

Abstract of work items_UNit Rates for the year 2014-15

34

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-6-4 260

Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)

Joint 463.30

Labour Component (including contractor's profit and Overheads) Joint 275.10

IRR-CCDW-6-5 261

Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)

Joint 561.30

Labour Component (including contractor's profit and Overheads) Joint 328.30

IRR-CCDW-6-6 262

Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)

Joint 590.70

Labour Component (including contractor's profit and Overheads) Joint 328.30

IRR-CCDW-6-7 263

Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)

Joint 653.20

Labour Component (including contractor's profit and Overheads) Joint 362.00

IRR-CCDW-6-8 264

Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)

Joint 695.50

Labour Component (including contractor's profit and Overheads) Joint 362.00

IRR-CCDW-6-9 265

Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)

Joint 824.40

Labour Component (including contractor's profit and Overheads) Joint 434.90

IRR-CCDW-7 BACK FILLING & OTHER WORKS :

IRR-CCDW-7-1 266Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.

cum 713.40

Labour Component (including contractor's profit and Overheads) cum 194.90

IRR-CCDW-7-2 267

Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts.

cum 391.80

Labour Component (including contractor's profit and Overheads) cum 245.40

IRR-CCDW-7-3 268

Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 percent etc., complete with lead upto 50 m and all lifts.

cum 262.70

Labour Component (including contractor's profit and Overheads) cum 97.60

Abstract of work items_UNit Rates for the year 2014-15

35

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-CCDW-7-4 269

Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

Each 1323.70

Labour Component (including contractor's profit and Overheads) Each 413.30

IRR-CCDW-7-5 270

Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

Each 945.50

Labour Component (including contractor's profit and Overheads) Each 350.60

Chapter VIRR-GAW GATES / HOISTS AND ALLIED WORKS

IRR-GAW-1-1 271

SPILLWAY RADIAL GATESE.M Parts and anchorages fabrication, supply, erection, testing and commissioning of embedded parts for radial gate consists of sill beam, wall plates, anchor girders , yoke girders, tie flats, trunnion supports etc., including cost of all materials, machinery, labour, welding, finishing, with leads and lifts &all accessories (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

tonne 149350.80

Labour Component (including contractor's profit and Overheads) tonne 40637.80

IRR-GAW-1-2 272

RADIAL GATES fabrication, supply, erection, testing and commissioning of radial gate consisting of skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulley supports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

tonne 134658.00

Labour Component (including contractor's profit and Overheads) tonne 30982.70

IRR-GAW-1-3 273

RADIAL GATES-ROPE DRUM HOISTS WITH HOIST BRIDGES fabrication, supply, erection, testing and commissioning of electrically operated rope drum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gear system, brake system, electric motor, wire ropes, gate position indicator, manual operation arrangement etc., with all accessories for spillway radial gate including cost of all materials, machinery, labour,, greasing, providing hand railing and approach staircase with gate to hoist platform, , complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

tonne capacity

42629.40

Labour Component (including contractor's profit and Overheads)tonne capacity

2471.30

IRR-GAW-1-4 274

RADIAL GATES Walk way(cat walk) Design, fabrication, supply, erection and commissioning of 1 metre wide walkway connecting spillway piers / abutments at trunnion platform level including cost of all materials, machinery, labour, cutting, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

Rm 101753.40

Labour Component (including contractor's profit and Overheads) Rm 29505.30

Abstract of work items_UNit Rates for the year 2014-15

36

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-GAW-2-1 275

VERTICAL LIFT GATES-EM PARTSDesign, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials, machinery, labour, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne 164527.20

Labour Component (including contractor's profit and Overheads) tonne 48353.90

IRR-GAW-2-2 276

vertical lift gates and stop log gate elements ( SLIDING GATES)

Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and stoplog gate elements, consisting of skin plate, horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes, rubber seals, clamps etc., with all accessories including cost of all materials, machinery, labour, seal fixing etc.,complete as per specifications and approved drawings

(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)2

tonne 137213.20

Labour Component (including contractor's profit and Overheads) tonne 35746.40

IRR-GAW-2-3 277

STOP LOGS-automatic lifting beam fabrication, supply, erection, testing and commissioning of automatic lifting beam with all accessories for handling, lowering and lifting of spillway stop log gate elements including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, etc., complete as per specifications and drawings with all leads and lifts.(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne 120072.60

Labour Component (including contractor's profit and Overheads) tonne 17970.00

IRR-GAW-2-4 278

MOVING GANTRY CRANE-CLASS II fabrication, supply, erection, testing and commissioning of adequate capacity Class- II type moving gantry crane consisting of rail mounted gantry frame, top platform with hand railing, long / cross travel arrangements, rope drums, gear systems, electric motors, electro-magnetic brake system, cabin, control panel, wire rope, ladder, motorised cable reeling drum etc., with all accessories for operating spillway stop log gate elements and river sluice / canal sluice emergency gates including cost of all materials, machinery, labour, etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

237820.70

Labour Component (including contractor's profit and Overheads)tonne

capacity18145.40

IRR-GAW-2-5 279

RAIL TRACK FOR GANTRY CRANEDesign, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard rails on spillway bridge for movement of gantry crane for handling and operating spillway stoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials, machinery, labour, complete as per specifications(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

Rm 7320.50

Labour Component (including contractor's profit and Overheads) Rm 444.70

IRR-GAW-2-6 280

VERTICAL LIFT GATES/STOP LOGS - ROLLER MOUNTEDDesign, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for river sluice / canal sluice vent including cost of all materials, machinery, labour,welding ,aligning finishing seal fixing etc.with all leads and lifts, complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne 135722.10

Labour Component (including contractor's profit and Overheads) tonne 33808.20

Abstract of work items_UNit Rates for the year 2014-15

37

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-GAW-2-7 281

VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATEDDesign, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc., with all accessories for operating river sluice / canal sluice service gate including cost of all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

71620.70

Labour Component (including contractor's profit and Overheads) tonne

capacity2354.80

IRR-GAW-2-8 282

HOIST BRIDGE/ WITH TRESSELSDesign, fabrication, supply, erection and commissioning of structural steel hoist bridge consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, ladder etc., with all accessories for supporting rope drum hoist for operating barrage gates including cost of all materials, machinery, labour, welding, finishing, etc., complete complete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne 115727.40

Labour Component (including contractor's profit and Overheads) tonne 30570.70

IRR-GAW-2-9 283

ROPE DRUM HOIST WITHOUT HOIST BRIDGE FOR BARRAGE GATESDesign, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of rope drum, pulleys, gear system, electric motor, electro-magnetic brake system, manual operation assembly, position indicator, control panel, wire rope etc., with all accessories for operating vertical lift roller gates for barrage including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

35397.90

Labour Component (including contractor's profit and Overheads)tonne

capacity997.80

IRR-GAW-2-10 284

SCREW GEAR HOISTS INCLUDING PLATFORM ( UPTO 10 TON CAP)Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw gear type hoist consisting of supporting structure, platform, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc.,complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

33455.00

Labour Component (including contractor's profit and Overheads)tonne

capacity4508.50

IRR-GAW-2-11 285

MANUAL OPERATED ROPE DRUM HOISTSDesign, fabrication, supply, erection, testing and commissioning of adequate capacity manually operated rope drum hoist consisting of hoist platform, rope drum, gear system, brake system, wire rope, ladder etc., with all accessories for operating canal regulator radial gate including cost of all materials, machinery, labour, welding, finishing, cleaning, ., complete with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

76007.60

Labour Component (including contractor's profit and Overheads)tonne

capacity6040.10

Abstract of work items_UNit Rates for the year 2014-15

38

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-GAW-2-12New Item 2014-

15-2286

OT SLUICE SHUTTERS Screw Gear Hoist Including Platform for below 5 Tons Capacity (Small Gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta System Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete as per Specification and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

Tonne 124326.20

Labour Component (including contractor's profit and Overheads) Tonne 22515.50

IRR-GAW-2-13New Item 2014-

15-3287

OT SLUICE SHUTTERS EM parts for Below 5 Tons capacity (small gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta System Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings. (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

Tonne 83401.00

Labour Component (including contractor's profit and Overheads) Tonne 18842.40

IRR-GAW-2-14New Item 2014-

15-4288

OT SLUICE SHUTTERS for Below 5 Tons capacity (small gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta System Fabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

Tonne 198547.40

Labour Component (including contractor's profit and Overheads) Tonne 9581.20

IRR-GAW-3 SAND BLASTING AND PAINTING

IRR-GAW-3-1 289Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.

sqm 431.70

Labour Component (including contractor's profit and Overheads) sqm 84.40

IRR-GAW-3-2 290

painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

(Upstream surface of gates portion may be painted with solventless coaltar epoxy brown paint instead of solventless coaltar black. The rate for coaltar epoxy brown shall be adopted in data for Upstream side painting)

sqm 499.40

Labour Component (including contractor's profit and Overheads) sqm 180.00

IRR-GAW-3-3 291

painting of Lifting beams,cat walks and other similar structures-painting hoist machinery, on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and twocoats of alkyd based micaccous iron oxide paint , 65 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

sqm 350.60

Labour Component (including contractor's profit and Overheads) sqm 138.20

IRR-GAW-3-4 292

HOISTS:STRUCTURAL COMPONENTS--painting structurals on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and one coat 65+/-5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

sqm 432.10

Labour Component (including contractor's profit and Overheads) sqm 180.00

Abstract of work items_UNit Rates for the year 2014-15

39

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-GAW-3-5 293

HOISTS:machineryCOMPONENTS--painting hoist machinery, on sand blasted surfaces with one coats of zinc phosphate primer (airless spray preferred) 50microns/coat and three coats of aluminium paint or synthetic enamel , 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

sqm 383.00

Labour Component (including contractor's profit and Overheads) sqm 180.00

IRR-GAW-4 PAINTING WITHOUT SAND BLASTING

IRR-GAW-4-1 294

E.M Parts OF ALL TYPES OF GATES Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns ,followed by finishing coats 2 coats with coal tar epoxy each coat with a DFT of 150+5 microns and total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts

(in respect of Heavily rusted (30 to 40% rusted) surfaces)

sqm 568.60

Labour Component (including contractor's profit and Overheads) sqm 180.00

IRR-GAW-4-2 Deleted from the year 2014-15 onwards

IRR-GAW-4-3 295

HOIST BRIDGES ,HOISTING EQUIPMENT AND CRANES,Etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer , followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.

sqm 401.70

Labour Component (including contractor's profit and Overheads) sqm 180.00

IRR-GAW-4-4 296

WALK WAYS( CAT WALKS), LIFTING BEAMS,etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 2 coats with coal tar epoxy with material, labour, and all accessories with all leads and lifts

sqm 477.80

Labour Component (including contractor's profit and Overheads) sqm 121.40

Chapter VIIRR-PMW PRELIMINARY AND MAINTENANCE WORKS

IRR-PMW-1 JUNGLE CLEARANCE :

IRR-PMW-1-1 297Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.

sqm 1.20

Labour Component (including contractor's profit and Overheads) sqm 1.30

IRR-PMW-1-2 298Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.

sqm 1.90

Labour Component (including contractor's profit and Overheads) sqm 1.90

IRR-PMW-1-3 299Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth including excavation, stacking the materials neatly and levelling the surface etc., complete with initial lead upto 50 m and all lifts.

Each 43.20

Labour Component (including contractor's profit and Overheads) Each 43.20

IRR-PMW-1-4 300Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts.

Each 97.30

Labour Component (including contractor's profit and Overheads) Each 97.30

Abstract of work items_UNit Rates for the year 2014-15

40

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-PMW-1-5 301Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts.

Each 311.20

Labour Component (including contractor's profit and Overheads) Each 311.20

IRR-PMW-1-6 302Additional rate for every 0.5 m increase in girth of tree stump/stumps of bamboo cluster beyond 5 m Each 55.30

Labour Component (including contractor's profit and Overheads) Each 55.30

IRR-PMW-1-7 303Cutting and stacking bamboos excluding removing stumps and roots etc., complete with initial lead upto 50 m and all lifts.

Each 12.60

Labour Component (including contractor's profit and Overheads) Each 12.60

IRR-PMW-1-8 304Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts.

Each 12.20

Labour Component (including contractor's profit and Overheads) Each 12.20

IRR-PMW-1-9 305Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts.

Each 24.40

Labour Component (including contractor's profit and Overheads) Each 24.40

IRR-PMW-1-10 306Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

Each 82.70

Labour Component (including contractor's profit and Overheads) Each 79.60

IRR-PMW-1-11 307Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

Each 289.30

Labour Component (including contractor's profit and Overheads) Each 278.60

IRR-PMW-1-12 308Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

Each 578.60

Labour Component (including contractor's profit and Overheads) Each 557.20

IRR-PMW-1-13 309Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

Each 1157.10

Labour Component (including contractor's profit and Overheads) Each 1114.40

IRR-PMW-1-14 310Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

Each 1872.50

Labour Component (including contractor's profit and Overheads) Each 1787.00

IRR-PMW-1-15 311

For every 0.5 m increase in girth of tree beyond 3 m add

Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m.

Each 656.40

Labour Component (including contractor's profit and Overheads) Each 630.80

IRR-PMW-1-16 312Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with initial lead upto 50 m and all lifts. sqm 4.50

Labour Component (including contractor's profit and Overheads) sqm 4.40

IRR-PMW-2 PRELIMINARY WORKS :

IRR-PMW-2-1 313Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds of soil including boulders upto 30 cm dia and disposing off excavated soil as directed with lead upto 10 m and lift upto 3 m.

cum 222.90

Labour Component (including contractor's profit and Overheads) cum 222.90

IRR-PMW-2-2 314Earthwork excavation for trial pits / borrow pits and other investigation works in soft rock including disposing off the excavated rock as directed with lead upto 10 m and lift upto 3 m.

cum 312.60

Labour Component (including contractor's profit and Overheads) cum 312.70

Abstract of work items_UNit Rates for the year 2014-15

41

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-PMW-2-3 315

Conducting geophysical investigation studies by electrical resistivity method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete excluding cost of transportation arrangements.

stage 283.90

Labour Component (including contractor's profit and Overheads) stage 218.10

IRR-PMW-2-4 316

Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, water charges, reaming, collection of wash samples at suitable intervals, logging and lebelling, supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc., complete for depth upto 30 m from surface.

1. For driiling through over-burden beyond 30 m from surface increase the rate per Rm by 10 percent.2. For providing HDPE or light black MS casing pipe add the cost of pipe per Rm.

Rm 1162.20

Labour Component (including contractor's profit and Overheads) Rm 390.30

IRR-PMW-2-5 317

Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, collection of core samples, logging and lebelling, supplying honne wood core box and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For driiling in hard rock beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.

Rm 5942.70

Labour Component (including contractor's profit and Overheads) Rm 1553.00

IRR-PMW-2-5-A(New Item 2014-

15)-5318

Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface for Primary and Secondary Holes

1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.

Rm 3809.60

Labour Component (including contractor's profit and Overheads) Rm 926.60

IRR-PMW-2-5-B(New Item 2014-

15)-6319

Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, collection of core samples, logging and lebelling, supplying honne wood core box and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface for Test Holes

1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.

Rm 4599.60

Labour Component (including contractor's profit and Overheads) Rm 927.20

Abstract of work items_UNit Rates for the year 2014-15

42

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-PMW-2-6 320

Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges,collection of core samples,logging, lebelling, supplying honne wood core box and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.

Rm 5781.60

Labour Component (including contractor's profit and Overheads) Rm 1553.00

IRR-PMW-2-6-A(New Item 2014-

15)-7321

Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard Rock) including Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m

1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 60 m upto 90 m from surface increase the rate per Rm by 40 percent.

Rm 3580.90

Labour Component (including contractor's profit and Overheads) Rm 926.60

IRR-PMW-2-7 322

Providing and fixing 20 x 20 x 75 cm size roughly dressed boundary / demarcation / chainage / arrow stones including cost of all materials, labour, engraving marks, fixing in position, murum filling etc., complete with lead upto 50 m and all lifts.

Each 136.90

Labour Component (including contractor's profit and Overheads) Each 103.90

IRR-PMW-2-8 323

Providing and fixing 20 x 20 x 75 cm size temporary bench mark stone in CC 1 : 4 : 8 using 40 mm down size graded coarse aggregate including cost of all materials, labour, dressing top surface, engraving BM data etc.,complete with lead upto 50 m and all lifts.

Each 452.60

Labour Component (including contractor's profit and Overheads) Each 308.40NOTE: For providing 30 cm thick compacted murum bed in B.C soil area including additional

excavation for thickness of murum bedding add per Each 4.00

IRR-PMW-2-9 324

Providing and fixing 20 x 20 x 75 cm size permanent bench mark stone in CC 1 :3 : 6 block of size 90 x 90 x 120 cm using 40 mm down size graded coarse aggregate and providing 35 cm thick 30 cm high UCR masonry in CM 1 : 5 proportion protective wall alround the BM stone, including cost of all materials, labour, dressing top surface of stone, engraving BM data

Each 5625.10

Labour Component (including contractor's profit and Overheads) Each 2716.10

IRR-PMW-3 MAINTENANCE WORKS :

IRR-PMW-3-1 325Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment including stacking all materials separately as directed with initial lead upto 50 m and all lifts.

cum 180.20

Labour Component (including contractor's profit and Overheads) cum 180.20

IRR-PMW-3-2 326

Re-constructing 60 cm thick hand packed rough stone revetment with through stones at 1.5 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from revetment removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

sqm 215.40

Labour Component (including contractor's profit and Overheads) sqm 134.90

IRR-PMW-3-3 327

Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from rock-toe removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

cum 244.80

Labour Component (including contractor's profit and Overheads) cum 193.20

Abstract of work items_UNit Rates for the year 2014-15

43

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-PMW-3-4 328Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with lead upto 50 m and all lifts.

sqm 52.50

Labour Component (including contractor's profit and Overheads) sqm 46.50

IRR-PMW-3-5 329Removing and resetting disturbed dry rubble / khandki stone pitching 25 to 45 cm thick including packing, wedging, finishing etc., complete with all leads and lifts.

sqm 48.00

Labour Component (including contractor's profit and Overheads) sqm 48.00

IRR-PMW-3-6 330Removing and refixing disturbed chainage / demarcation / hectometre / guard stones including excavation, back filling etc., complete with all leads and lifts.

Each 60.80

Labour Component (including contractor's profit and Overheads) Each 60.80

IRR-PMW-3-7 331

Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., including excavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x 7.5 cm including watering, ramming etc complete with all leads and lifts.

Each 136.80

Labour Component (including contractor's profit and Overheads) Each 136.80

IRR-PMW-3-8 332

Providing impervious hearting for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

cum 185.60

Labour Component (including contractor's profit and Overheads) cum 27.80

IRR-PMW-3-9 333

Providing pervious/semi-pervious casing for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

cum 212.30

Labour Component (including contractor's profit and Overheads) cum 33.20

IRR-PMW-3-10 334

Providing impervious hearting for breached / damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil,sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

cum 168.60

Labour Component (including contractor's profit and Overheads) cum 26.60

IRR-PMW-3-11 335

Providing pervious /semi-pervious casing for breached /damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

cum 192.10

Labour Component (including contractor's profit and Overheads) cum 31.40

IRR-PMW-3-12 336Repairing rain cuts / resectioning canal slopes to required lines and grades as directed using available soil including dressing, clod breaking, packing, tamping etc., complete with all leads and lifts.

sqm 3.10

Labour Component (including contractor's profit and Overheads) sqm 3.10

IRR-PMW-3-13 337

Cleaning drainage gallery, adits, instrumentation galleries etc., by scrubbing / brushing including chiselling and removing leached lime deposit and disposing off all the waste material out side adits in specified location etc., complete with all leads and lifts.

Rm 36.40

Labour Component (including contractor's profit and Overheads) Rm 28.00

IRR-PMW-3-14 338Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing / brushing and washing to remove all surface coatings etc., complete .

Rm 32.90

Labour Component (including contractor's profit and Overheads) Rm 20.20

Abstract of work items_UNit Rates for the year 2014-15

44

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6

IRR-PMW-3-15 Deleted from the year 2014-15 onwards

IRR-PMW-3-16 Deleted from the year 2014-15 onwards

IRR-PMW-3-17 Deleted from the year 2014-15 onwards

IRR-PMW-3-18 Deleted from the year 2014-15 onwards

IRR-PMW-3-19 Deleted from the year 2014-15 onwards

IRR-PMW-3-20 339

Excavation and removal of silt and silt mixed with sand from canal bed in dry condition including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts.

cum 134.50

Labour Component (including contractor's profit and Overheads) cum 134.50

IRR-PMW-3-21 340

Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts.

cum 168.20

Labour Component (including contractor's profit and Overheads) cum 168.20

IRR-PMW-3-22 (new Item5 2010-

11) (for Minor Works)

341

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.

cum 95.50

Labour Component (including contractor's profit and Overheads) cum 13.10

IRR-PMW-3-23 (new Item6 2010-11) (for Minor

Works)

342

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as watering, compactingto density control of not less than 95 percent or as stipulated using 8T roller etc., complete with initial lead upto 1 km and all lifts.

cum 46.10

Labour Component (including contractor's profit and Overheads) 6.40

IRR-PMW-3-24 (new Item7 2010-

11)343

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compactingto density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.

cum 6.10

Labour Component (including contractor's profit and Overheads) cum 1.10

(New Item 2012-13-3)

Weed Removal by Manual Means

IRR-PMW-3-25(a)

344Removal of Water Hyacinth up to 30 cm thick

Sqm 5.40

IRR-PMW-3-25(b)

345Removal of Water Hyacinth beyond 30 cm thick

Sqm 7.40

IRR-PMW-3-25( c)

346Clearing Alchi Tilla

Sqm 5.00

IRR-PMW-3-25(d)

347Removal of Jammu

Sqm 4.20

IRR-PMW-3-25(e)

348Removal of Imponea, Cornea

Sqm 5.00

IRR-PMW-3-25(f)

(new Item 2012-13-6)

349

Removal of Natchu, goobi, thooti, etc.

Sqm 1.60

IRR-PMW-3-26New Item 2014-

15-8350

PAINTING OF SLUICES FOR MAINTENANCE WORKSSurface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with Coal tar epoxy with material, labour, and all accessories with all leads and lifts.

Sqm 397.20

Labour Component (including contractor's profit and Overheads) Sqm 145.92

COM-MWRK New extra items-- common item for all earth works using only manual labour for all other works

Abstract of work items_UNit Rates for the year 2014-15

45

Chapterwise item No.

S.NO Item description Unit RateItemwise unit rate

for Labour Component

1 2 3 4 5 6without involving contractors

COM-MWRK-1 351

(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 3 Cum per day output

cum 98.30

COM-MWRK-2 352

(Manual)Excavation in all kinds of soil/HDR including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 2.5 Cum per day output

cum 118

COM-MWRK-3 353

(Manual)Excavation in soft rock (including F&F rock) without blasting, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Soft rock 1.33 Cum/Day

cum 221.80

COM-MWRK-4 354

(Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Hard rock 0.67Cum/ day

cum 440.30

Abstract of leads and lifts - for the year 2014-15

46

COM-LDLFT LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS

FOR THE YEAR: 2014-15

COM-LDLFT 1 For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be adopted irrespective of mode of conveyance.

2 For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of mode of conveyance.

3 The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.

4 Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume and not for compacted or in-situ volume.

5 The rates for lift charges,lead charges hire cahrges are cumulative are cumulative and inclusive of rates for preceding lift,load and hire charges

6 Lift charges are not payable where conveyance of materials is by mechanical means to final placing point.7 Loading and unloading charges are not payable for conveyance by head load.8 Loading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond

initial lead of 50 m wherever specified.9 Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated

materials beyond initial lead of 1 km wherever specified.10 The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut stone

are inclusive of stacking.11 Hire charges are per 1KM for tippers and trucks for tranport of materials from work site

to dump yard and other places are cumulative& includes previous km upto 5 kms12 The lead & lift charges are inclusive of contractor's profit and overhead charges of 14%13 During the BoCE meeting held on 24-05-2014, it is observed that in some of the estimates, Lead

Charges are being added directly to the material basic rates for arriving the finished item rate. In view of that, the BoCE has instructed to see that while arriving the finished item rate, the lead charges are to be added to the material basic rates only after deducting the provision of "Contractor's Profit and Overhead charges"

COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head load FOR THE YEAR: 2014-15

1 2 3 4 5

1Total lead upto 50 m

(covered by item rate) initial lead initial lead initial lead2 Total lead upto 100 m 48.00 28.00 61.103 Total lead upto 150 m 96.10 56.10 122.30

Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges by mechanical means only shallbe adopted irrespective of mode of conveyance.

COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials

( No loading and unloading charges allowed for machinery loading and unloading )

Sl No. Distance

(Lead) charges for trucks and

tippers for Earth / Sand /Gravel / Murrum/ Lime/

Surki/ per cu.meter

(Lead) charges for trucks and

tippers for Rubble/Size stones/ Cut

Stones/ Coarse aggregate per

cu.meter

(Lead) charges for trucks and tippers for Cement/

Steel/ RCC poles/ AC & GI sheets/

Packed materials/tonn

e

(Lead) charges for trucks and

tippers per cu.meter for PCC slabs/ Shahabad

slabs/ CC & Laterite blocks/

Wood/ cum

(Lead) charges for trucks and

tippers per cu.meter for water/ 1000

litres

(Lead) charge

s for trucks

per 1000

Nos. of Bricks

1 2 3 4 5 6 7 8

Abstract

PCC slab/ Shahbad slab

/ CC block/ BS slab/ Late-

rite / Wood Rs / cum

Sl No.Total distance

( Total lead includes initial lead )

Earth / Sand /Gravel /

Murrum/ Lime/ Surki/ Size stone / Cut

stone Rubble / Coarse

Cement / Reinforce-ment steel Str steel

Rs / tonne

3.The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

by tippers and trucks excluding loading, unloading and idle hire charges of machinery

Abstract of leads and lifts - for the year 2014-15

47

1 Lead upto 1 km 31.50 30.40 19.00 44.70 18.80 50.702 Lead upto 2 km 44.10 42.60 26.60 62.60 26.30 71.003 Lead upto 3 km 58.90 58.90 36.80 86.60 35.00 94.604 Lead upto 4 km 71.50 71.50 44.70 105.10 42.50 114.905 Lead upto 5 km 84.10 84.10 52.60 123.70 50.00 135.20

6 for Every km beyond

5 km upto 30 km 12.60 12.60 7.90 18.50 7.50 20.30

7for Every km beyond

30 km 10.50 10.50 6.60 15.50 6.30 16.90

COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)

Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime

in Rs/cum

cement in Rs/tonne

steel in Rs./tonne

brick work Rs/1000 No

1 2 3 4 5 6 71 Loading 16.00 32.00 52.80 63.30 44.002 Unloading 8.00 16.00 52.80 63.30 44.00

COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime

in Rs/cum

cement in Rs/tonne

steel in Rs./tonne

brick work Rs/1000 No

1 2 3 4 5 6 71 Loading 108.20 124.20 154.20 164.70 211.302 Unloading 38.60 62.10 154.20 164.70 211.30

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Note:The Loading & Unloading Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Abstract of leads and lifts - for the year 2014-15

48

COM-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime

in Rs/cum

1 2 3 41 Loading 52.50 105.002 Unloading 15.90 15.90

COM-LDLFT-6 F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

Sl No.Total lift

( Total lift includes initial lift )

Earth / Sand /Gravel

Murrum/ Lime/ Surki/

Size stone / Cut stone

Rubble / CoarseaggregateRs / cum

Cement /Reinforce-ment steelStr steel

Rs / tonne

PCC slab/Shahbadslab / CCblock/ BS

slab / Laterite/ Wood

Rs / cum

1 2 3 4 5

1Total lift upto 3 m

(covered by item rate) Initial lift Initial lift Initial lift

2

For Every 1.00 Lift beyond initial lift of 3

meters 5.60 4.10 7.50

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Note:The Loading & Unloading Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Dam and Allied Works - Item Unit Rates 2014-15

48

Chapter - I

DAM AND ALLIED WORKS - Standard Data

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

FOR THE YEAR :2014-15Index- codeIRR-DAW DAM AND ALLIED WORKS - DATA RATES

Directions to add Seigniorage Charges and Additional Lead ChargesSeigniorage Charges:1. The unit rate for work item in the Standard Data is exclusive of Seigniorage Charges wherever applicable.2. The appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item while preparing the estimate. (i.e., to the data itself)3. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges while adding Seigniorage Charges to the data in the estimate

Additional Lead and Lift Charges:1. Unless otherwise specified the basic rates are inclusive of all lifts.2. For concrete, masonry and reinforcement items wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Cement, Steel, sand, coarse aggregate, stones and stone chips shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.In case of Cement and Steel, Loading and unloading charges are already added in the work item while arriving the unit rate and hence should not be added againExample:

Total lead for sand from approved sand quarry : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

3. The Leads for Steel and Cement shall be from the nearest market place to the Project area

4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)Example:

Total lead for earth from approved borrow area : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges

DAW - Work Items

IRR-DAW-1 EXCAVATION & FOUNDATION TREATMENT WORKS:

IRR-DAW-1-1 Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 kmand all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT880 cum

Sl No Unit Quantity Rate Amount in Rs. in Rs

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

2 Dumpers 5 cum capacity 6 Nos Hour 48.00 580.70 27873.60

Particulars

Dam and Allied Works - Item Unit Rates 2014-15

49

Fuel / Energy charges Hour 48.00 429.70 20625.603 Tipper 5 cum capacity 1 No Hour 8.00 446.70 3573.60

Fuel / Energy charges Hour 8.00 322.20 2577.60Total hire charges of Machinery Rs: 75805.60

C. LABOUR:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dumper Hour 48.00 195.90 9403.203 Crew for Tipper Hour 8.00 153.10 1224.804 work inspector Day 1.00 370.00 370.005 mazdoor Day 16.00 295.00 4720.00

Total cost of Labour Rs: 17350.80labour component/unit qty 19.70Add contractor's profit and overhead charges 14% 2.80labour component/unit qty (including contractor's profit) 22.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 75805.60C. Cost of Labour Rs: 17350.80

Total Rs: 93156.4014% Rs. 13041.9

880.00 cum Rs: 106198.30cum (A+B+C+D)/880 Rs: 120.70

IRR-DAW-1-2 Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT :520 cum

Sl No Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

2 Dumpers 5 cum capacity( 4 Nos) Hour 32.00 580.70 18582.40Fuel / Energy charges Hour 32.00 429.70 13750.40

3 Tipper 5 cum capacity( 1 No) Hour 8.00 446.70 3573.60Fuel / Energy charges Hour 8.00 322.20 2577.60

Total hire charges of Machinery Rs: 59639.20

C. LABOUR:

Sl No Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dumper Hour 32.00 195.90 6268.803 Crew for Tipper Hour 8.00 153.10 1224.804 work inspector Day 1.00 370.00 370.005 Crowbarman Day 2.50 345.00 862.506 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs. 13308.90labour component/unit qty 25.60Add contractor's profit and overhead charges 14% 3.60labour component/unit qty (including contractor's profit) 29.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 59639.20C. Cost of Labour Rs: 13308.90

Total Rs: 72948.1014% Rs. 10212.73

520.00 cum Rs: 83160.83cum (A+B+C+D)/520 Rs: 159.90

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Particulars

Description

Dam and Allied Works - Item Unit Rates 2014-15

50

IRR-DAW-1-3 Excavation for foundation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISA. MATERIALS: UNIT :

520.00 cum.Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of 1.5 m drill rod Rm 216.00 20.14 4350.24

Reconditioning charges @ 10% 435.022 Use rate of air hose 4 Nos. Hour 26.00 10.94 284.383 Explosive small dia kg 104.00 70.00 7280.004 Electric detonators Nos 154.00 13.00 2002.005 Fuse coil Rm 320.00 11.00 3520.006 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs. 18076.64

B. MACHINERY:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

2 Dumpers 5 cum capacity 4 Nos. Hour 32.00 580.70 18582.40Fuel / Energy charges Hour 32.00 429.70 13750.40

3 Tipper 5 cum capacity 1 No Hour 8.00 446.70 3573.60Fuel / Energy charges Hour 8.00 322.20 2577.60

4 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 13.00 170.80 2220.40Fuel / Energy charges Hour 13.00 428.00 5564.00

5 Jack hammers 4 Nos. Hour 26.00 19.80 514.80Fuel / Energy charges Hour 26.00 0.00 0.00

Total hire charges of Machinery Rs: 67938.40

C. LABOUR:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dumper Hour 32.00 195.90 6268.803 Crew for Tipper Hour 8.00 153.10 1224.804 Crew for Air compressor Hour 13.00 142.40 1851.205 Crew for Jack hammer Hour 26.00 284.70 7402.206 work inspector Day 1.00 370.00 370.007 Blaster Day 1.00 440.00 440.008 Helper blaster Day 1.00 345.00 345.009 Crowbarman Day 2.50 345.00 862.50

10 Stone breaker Day 1.00 345.00 345.0011 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs. 23692.30labour component/unit qty 45.60Add contractor's profit and overhead charges 14% 6.40labour component/unit qty (including contractor's profit) 52.00

ABSTRACT:A. Cost of Materials Rs: 18076.64B. Hire charges of Machinery Rs: 67938.40C. Cost of Labour Rs: 23692.30

Total Rs: 109707.3414% Rs. 15359.03

520.00 cum. Rs: 125066.37 cum. (A+B+C+D)/520 Rs: 240.50

IRR-DAW-1-3ANew Item 2014-15-1 Excavation for foundation in hard rock (including F&F rock) including

boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads

DATA: RATE ANALYSISA. MATERIALS: UNIT :

520.00 cum.Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of 1.5 m drill rod Rm 216.00 20.14 4350.24

Reconditioning charges @ 10% 435.02

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

51

2 Use rate of air hose 4 Nos. Hour 26.00 10.94 284.383 Use rate of chain link wire mesh Sq m 500.00 64.93 32462.504 Use rate of Sand Bags Nos. 190.00 74.45 14145.503 Explosive small dia kg 104.00 70.00 7280.004 Electric delay detonators Nos 154.00 23.00 3542.005 Fuse coil Rm 320.00 11.00 3520.006 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs. 66224.64

B. MACHINERY:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

2 Angle dozer 90 hp Hour 1.00 1715.50 1715.50Fuel / Energy charges Hour 1.00 656.00 656.00

3 Dumpers 5 cum capacity 4 Nos. Hour 32.00 580.70 18582.40Fuel / Energy charges Hour 32.00 429.70 13750.40

4 Tipper 5 cum capacity 1 No Hour 8.00 446.70 3573.60Fuel / Energy charges Hour 8.00 322.20 2577.60

5 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 13.00 170.80 2220.40Fuel / Energy charges Hour 13.00 428.00 5564.00

6 Jack hammers 4 Nos. Hour 26.00 19.80 514.80Fuel / Energy charges Hour 26.00 0.00 0.00

Total hire charges of Machinery Rs: 70309.90

C. LABOUR:

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Angle dozer Hour 1.00 204.10 204.103 Crew for Dumper Hour 32.00 195.90 6268.804 Crew for Tipper Hour 8.00 153.10 1224.805 Crew for Air compressor Hour 13.00 142.40 1851.206 Crew for Jack hammer Hour 26.00 284.70 7402.207 work inspector Day 3.00 370.00 1110.008 Blaster Day 1.50 440.00 660.009 Helper blaster Day 2.00 345.00 690.00

10 Crowbarman Day 2.50 345.00 862.5011 Stone breaker Day 2.00 345.00 690.0012 mazdoor Day 18.00 295.00 5310.00

Total cost of Labour Rs. 27906.40labour component/unit qty 53.70Add contractor's profit and overhead charges 14% 7.50labour component/unit qty (including contractor's profit) 61.20

ABSTRACT:A. Cost of Materials Rs: 66224.64B. Hire charges of Machinery Rs: 70309.90C. Cost of Labour Rs: 27906.40

Total Rs: 164440.9414% Rs. 23021.73

520.00 cum. Rs: 187462.67 cum. (A+B+C+D)/520 Rs: 360.50

IRR-DAW-1-4 Excavation for foundation in hard rock of all toughness by blasting (a) including boulders above 1.2 m dia. for dam, spillway, intake structure and

other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS

UNITA. MATERIALS: 320.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill rod 1.5 m long Rm 310.00 26.85 8324.53

Reconditioning charges @ 10% 832.452 Use rate of air hose 4 Nos. Hour 48.00 10.94 525.003 Explosive small dia kg 95.00 70.00 6650.004 Ordinary detonators Nos 10.00 9.00 90.005 Electric detonators Nos 333.00 13.00 4329.006 Fuse coil Rm 450.00 11.00 4950.007 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs: 25905.98

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

52

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.402 Dumpers 5 cum capacity 3 Nos. Hour 24.00 580.70 13936.80

Fuel / Energy charges Hour 24.00 429.70 10312.803 Tipper 5 cum capacity 1 No Hour 4.00 446.70 1786.80

Fuel / Energy charges Hour 4.00 322.20 1288.804 Angle dozer 90 hp Hour 1.00 1715.50 1715.50

Fuel / Energy charges Hour 1.00 656.00 656.005 Air compressor 8.5 cmm (ele) 2 Nos. Hour 24.00 170.80 4099.20

Fuel / Energy charges Hour 24.00 428.00 10272.006 Jack hammers 4 Nos. Hour 48.00 19.80 950.40

Fuel / Energy charges Hour 48.00 0.00 0.00Total hire charges of Machinery Rs. 66173.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dumper Hour 24.00 195.90 4701.603 Crew for Tipper Hour 4.00 153.10 612.404 Crew for Dozer Hour 1.00 204.10 204.105 Crew for Air compressor Hour 24.00 142.40 3417.606 Crew for Jack hammer Hour 48.00 284.70 13665.607 work inspector Day 1.00 370.00 370.008 Blaster Day 1.00 440.00 440.009 Helper blaster Day 1.00 345.00 345.00

10 Crowbarman Day 1.00 345.00 345.0011 Stone breaker Day 2.00 345.00 690.0012 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs. 28194.10labour component/unit qty 88.10Add contractor's profit and overhead charges 14% 12.30labour component/unit qty (including contractor's profit) 100.40

ABSTRACT:A. Cost of Materials Rs: 25905.98B. Hire charges of Machinery Rs: 66173.50C. Cost of Labour Rs: 28194.10

Total Rs: 120273.5814% Rs. 16838.3

320.00 cum Rs: 137111.88 cum (A+B+C+D)/320 Rs: 428.50

IRR-DAW-1-5 Excavation for foundation in hard rock of all toughness including boulders(b) above 1.2 m dia. by controlled blasting method and controlling fly-rock

by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete withlead upto upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 480.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill rod 1.5 m length Rm 464.00 26.85 12459.95

Reconditioning charges @ 10% 1246.002 Use rate of 50 m air hose 4 Nos. Hour 70.00 10.94 765.633 Use rate of chain link wire mesh sqm 715.00 64.93 46421.384 Use rate of sand bag Nos 580.00 74.45 43181.005 Explosive small dia. kg 149.00 70.00 10430.006 Ordinary detonators Nos 23.00 9.00 207.007 Electric delay detonators Nos 500.00 23.00 11500.008 Fuse coil Rm 700.00 11.00 7700.009 Sundries LS 10.00 41.00 410.00

Total cost of Materials Rs: 134320.96

B. MACHINERY:Sl No Unit Quantity Rate Amount

in Rs. in Rs1 Shovel 0.85 cum capacity Hour 12.00 1706.60 20479.20

Fuel / Energy charges Hour 12.00 937.80 11253.602 Angle dozer 90 hp Hour 2.00 1715.50 3431.00

Fuel / Energy charges Hour 2.00 656.00 1312.003 Dumpers 5 cum capacity 3 Nos. Hour 36.00 580.70 20905.20

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Particulars

Dam and Allied Works - Item Unit Rates 2014-15

53

Fuel / Energy charges Hour 36.00 429.70 15469.204 Tipper 5 cum capacity 1 No Hour 4.00 446.70 1786.80

Fuel / Energy charges Hour 4.00 322.20 1288.805 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 35.00 170.80 5978.00

Fuel / Energy charges Hour 35.00 428.00 14980.006 Jack hammers 4 Nos. Hour 70.00 19.80 1386.00

Fuel / Energy charges Hour 70.00 0.00 0.00Total hire charges of Machinery Rs: 98269.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Shovel Hour 12.00 204.10 2449.202 Crew for Angle dozer Hour 2.00 204.10 408.203 Crew for Dumper Hour 36.00 195.90 7052.404 Crew for Tipper Hour 4.00 153.10 612.405 Crew for Air compressor Hour 35.00 142.40 4984.006 Crew for Jack hammer Hour 70.00 284.70 19929.007 work inspector Day 4.50 370.00 1665.008 Blaster Day 1.50 440.00 660.009 Helper blaster Day 3.00 345.00 1035.00

10 Crowbarman Day 2.50 345.00 862.5011 Stone breaker Day 2.50 345.00 862.5013 mazdoor Day 20.00 295.00 5900.00

Total cost of Labour Rs. 46420.20labour component/unit qty 96.70Add contractor's profit and overhead charges 14% 13.50labour component/unit qty (including contractor's profit) 110.20

ABSTRACT:A. Cost of Materials Rs: 134320.96B. Hire charges of Machinery Rs: 98269.80C. Cost of Labour Rs: 46420.20

Total Rs: 279010.9614% Rs. 39061.53

480.00 cum Rs: 318072.49cum (A+B+C+D)/480 Rs: 662.70

IRR-DAW-1-6 Excavation for foundation in hard rock of all toughness including boulders( c) above 1.2 m dia. by line drilling and smooth blasting and controlling

fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including dressing sides and bed to required level / profile, placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

Note : i ) 1 m width of excavation along the face to be dressed shall be treated as excavation by line drilling and smooth blasting.ii) The rate includes controlling fly-rock wherever required.iii ) The rate under this item shall be paid only on ascertaining that the surface requiring dressing has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval.iv ) In case, where the above criteria is not fulfilled payment shall be restricted to the rate provided for excavation by normal or controlled blasting as the case may be..

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 40.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill rod 1.5 m length Rm 138.00 26.85 3705.76

Reconditioning charges @ 10% 370.582 Use rate of 50 m air hose 4 Nos. Hour 22.00 10.94 240.633 Explosive small dia. kg 10.50 70.00 735.004 Ordinary detonators Nos 2.00 9.00 18.005 Electric delay detonators Nos 76.00 23.00 1748.006 Fuse coil Rm 140.00 11.00 1540.007 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs. 8439.97

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Shovel 0.85 cum capacity Hour 1.00 1706.60 1706.60

Fuel / Energy charges Hour 1.00 937.80 937.802 Angle dozer 90 hp Hour 0.25 1715.50 428.88

Fuel / Energy charges Hour 0.25 656.00 164.003 Dumpers 5 cum capacity 3 Nos. Hour 3.00 580.70 1742.10

Fuel / Energy charges Hour 3.00 429.70 1289.104 Air compressor 8.5 cmm ( ele ) 2 Nos Hour 11.00 170.80 1878.80

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

54

Fuel / Energy charges Hour 11.00 428.00 4708.005 Jack hammers 4 Nos. Hour 22.00 19.80 435.60

Fuel / Energy charges Hour 22.00 0.00 0.00Total hire charges of Machinery Rs: 13290.88

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Shovel Hour 1.00 204.10 204.102 Crew for Angle dozer Hour 0.25 204.10 51.033 Crew for Dumper Hour 3.00 195.90 587.704 Crew for Air compressor Hour 11.00 142.40 1566.405 Crew for Jack hammer Hour 22.00 284.70 6263.406 work inspector Day 0.50 370.00 185.007 Blaster Day 0.50 440.00 220.008 Helper blaster Day 0.50 345.00 172.509 Crowbarman Day 0.50 345.00 172.50

10 Stone breaker Day 0.50 345.00 172.5011 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs. 10185.13labour component/unit qty 254.60Add contractor's profit and overhead charges 14% 35.60labour component/unit qty (including contractor's profit) 290.20

ABSTRACT:A. Cost of Materials Rs: 8439.97B. Hire charges of Machinery Rs: 13290.88C. Cost of Labour Rs: 10185.13

Total Rs: 31915.9814% Rs. 4468.24

40.00 cum Rs: 36384.22cum (A+B+C+D)/40 Rs: 909.60

IRR-DAW-1-7 Preparing foundation bed for masonry or concrete by benching, stepping, removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet etc.,complete with initial lead upto 50 m and all lifts.

DATA RATE ANALYSISUNIT:

A. MATERIALS: 100.00 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs. 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5 cmm ( ele ) Hour 1.00 170.80 170.80

Fuel / Energy charges Hour 1.00 428.00 428.002 Pump 5 hp ( ele ) Hour 1.00 3.00 3.00

Fuel / Energy charges Hour 1.00 38.00 38.00Total hire charges of Machinery Rs. 639.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Air compressor Hour 1.00 142.40 142.402 Crew for Pump Hour 1.00 72.10 72.103 Stone breaker Day 2.00 345.00 690.004 mazdoor Day 2.50 295.00 737.505 Crowbar man Day 2.00 345.00 690.00

Total cost of Labour Rs: 2332.00labour component/unit qty 23.30Add contractor's profit and overhead charges 14% 3.30labour component/unit qty (including contractor's profit) 26.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 639.80C. Cost of Labour Rs: 2332.00

Total Rs: 2971.8014% Rs. 416.05

100.00 sqm Rs: 3387.85sqm (A+B+C+D)/100 Rs: 33.90

IRR-DAW-1-8 Preparing foundation bed for cut-off trench filling in rock portion by

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

55

removing all loose materials by wedging / chiselling and disposing off the same as directed etc., complete with initial lead upto 50 m and all lifts.

DATA RATE ANALYSISUNIT:

A. MATERIALS: 100.00 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs. 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Machinery Rs. 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crowbar man Day 2.00 345.00 690.002 Stone breaker Day 2.00 345.00 690.003 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1970.00labour component/unit qty 19.70Add contractor's profit and overhead charges 14% 2.80labour component/unit qty (including contractor's profit) 22.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1970.00

Total Rs: 1970.0014% Rs. 275.8

100.00 sqm Rs: 2245.80sqm (A+B+C+D)/100 Rs: 22.50

IRR-DAW-1-9 Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry/ concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete.for drilling upto 6 m depth from surface.

NOTE: The item rate for drilling through rock / masonry / concrete includes redrilling through partially set grout, if any, in the portion of hole already grouted.

Data RATE ANALYSISUNIT:

A. MATERIALS: 96.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of cross bit 50 mm dia Rm 96.00 62.50 6000.002 Use rate of 50 mm dia air hose 50 m Hour 8.00 18.63 149.003 Use rate of extension rod 4.5 m Rm 96.00 6.36 610.56

Total cost of Materials Rs. 6759.56

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Waggon drill Hour 8.00 188.50 1508.00

Fuel / Energy charges Hour 8.00 0.00 0.002 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.003 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 6380.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Waggon drill Hour 8.00 244.90 1959.202 Crew for Air compressor Hour 8.00 142.40 1139.203 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 3688.40labour component/unit qty 38.40Add contractor's profit and overhead charges 14% 5.40labour component/unit qty (including contractor's profit) 43.80

ABSTRACT:

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

56

A. Cost of Materials Rs: 6759.56B. Hire charges of Machinery Rs: 6380.40C. Cost of Labour Rs: 3688.40

Total Rs: 16828.3614% Rs. 2355.97

96.00 Rm Rs: 19184.33Rm (A+B+C+D)/96 Rs: 199.80

Upto 6 m from surface 199.80Beyond 6 m upto 12 m from surface :Upto 6 m from surface Rate per Rm Rs: 199.80Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 19.98Beyond 6 m upto 12 m from surface Rate / Rm Rs: 219.80Beyond 12 m upto 18 m from surface :For 6 m to 12 m from surface Rate per Rm Rs: 219.80Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 21.98Beyond 12 m upto 18 m from surface Rate / Rm Rs: 241.80Beyond 18 m upto 24 m from surface :For 12 m to 18 m from surface Rate per Rm Rs: 241.80Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 24.18Beyond 18 m upto 24 m from surface Rate / Rm Rs: 266.00Beyond 24 m upto 30 m from surface :For 18 m to 24 m from surface Rate per Rm Rs: 266.00Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ : 10% Rs 26.60Beyond 24 m upto 30 m from surface Rate / Rm Rs: 292.60Beyond 30 m upto 36 m from surface :For 24 m to 30 m from surface Rate per Rm Rs: 292.60Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 29.26Beyond 30 m upto 36 m from surface Rate / Rm Rs: 321.90Beyond 36 m upto 42 m from surface :For 30 m to 36 m from surface Rate per Rm Rs: 321.90Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 32.19Beyond 36 m upto 42 m from surface Rate / Rm Rs: 354.10Beyond 42 m upto 48 m from surface For 36 m to 42 m from surface Rate per Rm Rs: 354.10Add for redrilling through partially set grout / additionalextension rods / reduction in rate of drilling etc @ 10% Rs: 35.41Beyond 42 m upto 48 m from surface Rate / Rm Rs: 389.50

IRR-DAW-1-10 Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes including water intake observations after flushing, cost of all materials, machinery, labour etc., complete.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 192.00 Rm.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of air hose 2 Nos x 8 hrs Hour 16.00 10.94 175.042 Use rate of water hose 2 Nos x 8 hrs Hour 16.00 13.69 219.043 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 476.08

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.002 Pump 5 hp ( ele ) Hour 8.00 3.00 24.00

Fuel / Energy charges Hour 8.00 38.00 304.003 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 5200.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Air compressor Hour 8.00 142.40 1139.202 Crew for Pump Hour 8.00 72.10 576.803 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 2896.00labour component/unit qty 15.10Add contractor's profit and overhead charges 14% 2.10labour component/unit qty (including contractor's profit) 17.20

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

57

ABSTRACT:A. Cost of Materials Rs: 476.08B. Hire charges of Machinery Rs: 5200.40C. Cost of Labour Rs: 2896.00

Total Rs: 8572.4814% Rs. 1200.15

192.00 Rm. Rs: 9772.63Rm. (A+B+C+D)/192 Rs: 50.90

IRR-DAW-1-11 Consolidation grouting with neat cement grout mix of suitable (a) consistency under specified pressure as directed in drilled holes by stage

grouting method including cost of all materials, machinery, labour, redrilling if necessary etc.,complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 1.05 tonneSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement tonne 1.05 4000.00 4200.002 Use rate of 50 m pressure hose Hour 8.00 10.94 87.523 Sundries ( packer assembly etc ) LS 3.00 41.00 123.00

Total cost of Materials Rs: 4410.52

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Grouting equipment Hour 8.00 24.90 199.20

Fuel / Energy charges Hour 8.00 38.00 304.002 Pump 5 hp ( ele ) Hour 2.00 3.00 6.00

Fuel / Energy charges Hour 2.00 38.00 76.003 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 667.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Grout pump Hour 8.00 227.80 1822.402 Crew for Pump Hour 2.00 72.10 144.203 mazdoor ( cement handling) Day 2.00 295.00 590.00

Total cost of Labour Rs: 2556.60labour component/unit qty 2434.90Add contractor's profit and overhead charges 14% 340.90labour component/unit qty (including contractor's profit) 2775.80

ABSTRACT:A. Cost of Materials Rs: 4410.52B. Hire charges of Machinery Rs: 667.20C. Cost of Labour Rs: 2556.60

Total Rs: 7634.3214% Rs. 1068.8

124.60 Rs/Tonne 130.831.05 tonne Rs: 8833.95

tonne (A+B+C+D)/1.05 Rs: 8413.30

IRR-DAW-1-12 Curtain grouting with neat cement grout mix of suitable consistency (b) under specified pressure as directed in drilled holes by stage grouting

method including cost of all materials, machinery, labour, redrilling if necessary etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 1.05 tonneSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement tonne 1.05 4000.00 4200.002 Use rate of 100 m pressure hose Hour 8.00 21.88 175.043 Use rate of 400 m GI pipe Hour 8.00 6.8 54.404 Sundries ( packer assembly etc ) LS 3.00 41.00 123.00

Total cost of Materials Rs: 4552.44

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Grouting equipment Hour 8.00 24.90 199.20

Fuel / Energy charges Hour 8.00 38.00 304.002 Pump 5 hp ( ele ) Hour 2.00 3.00 6.00

Fuel / Energy charges Hour 2.00 38.00 76.00

Lead Charges for 1Km for Cement 1.05 Tonne @ (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

58

3 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 667.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Grout pump Hour 8.00 227.80 1822.402 Crew for Pump Hour 2.00 72.10 144.203 Pipe fitter Day 1.00 440.00 440.004 mazdoor ( cement handling ) Day 3.00 295.00 885.00

Total cost of Labour Rs: 3291.60labour component/unit qty 3134.90Add contractor's profit and overhead charges 14% 438.90labour component/unit qty (including contractor's profit) 3573.80

ABSTRACT:A. Cost of Materials Rs: 4552.44B. Hire charges of Machinery Rs: 667.20C. Cost of Labour Rs: 3291.60

Total Rs: 8511.2414% Rs. 1191.57

124.60 Rs/Tonne 130.831.05 tonne Rs: 9833.64

tonne (A+B+C+D)/1.05 Rs: 9365.40

IRR-DAW-1-13 Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.Consider 25 anchor rods for analysis.

DATA: RATE ANALYSISUNIT:

25 Nos.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill bit 50 mm dia Rm 37.50 62.50 2343.752 Use rate of air hose 50 m Hour 4.00 18.63 74.523 Anchor rod 25 mm dia kg 303.22 46.50 14099.734 Cement kg 75.00 4.00 300.005 Sand ( screened ) cum 0.05 606.00 30.30

Total cost of Materials Rs: 16848.30B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5 cmm ( ele ) Hour 4.00 170.80 683.20

Fuel / Energy charges Hour 4.00 428.00 1712.002 Waggon drill Hour 4.00 188.50 754.00

Fuel / Energy charges Hour 4.00 0.00 0.00Total hire charges of Machinery Rs: 3149.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Air compressor Hour 4.00 142.40 569.602 Crew for Waggon drill Hour 4.00 244.90 979.603 Bar bender Day 0.50 450.00 225.004 Mason Cl- II Day 0.50 345.00 172.505 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 2241.70labour component/unit qty 89.70Add contractor's profit and overhead charges 14% 12.60labour component/unit qty (including contractor's profit) 102.30

ABSTRACT:A. Cost of Materials Rs: 16848.30B. Hire charges of Machinery Rs: 3149.20C. Cost of Labour Rs: 2241.70

Total Rs: 22239.2014% Rs. 3113.49

Lead Charges for 1 Km for FA 0.05 cum @ 31.5 Rs./Cum 1.575

0.08 tonne @ 124.6 Rs./Tonne 9.345

0.30 tonne @ 145.6 Rs./Tonne 44.14883225.00 Nos. Rs: 25407.76

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

A. MATERIALS

Lead Charges for 1Km for Cement 1.05 Tonne @ (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

59

Each (A+B+C+D)/25 Rs: 1016.30

IRR-DAW-1-14 Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts.Consider 25 anchor rods for analysis.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 Nos.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of 50 mm dia drill bit Rm 31.25 62.50 1953.132 Use rate of air hose 50 m 1 Nos. Hour 3.00 18.63 55.893 Anchor rod 25 mm dia kg 277.92 46.50 12923.284 Cement kg 62.50 4.00 250.005 Gas for splitting anchor rods LS 5.00 37.20 186.006 Steel wedges LS 10.00 16.00 160.00

Total cost of Materials Rs: 15528.30B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5 cmm ( ele ) Hour 3.00 170.80 512.40

Fuel / Energy charges Hour 3.00 428.00 1284.002 Waggon drill Hour 3.00 188.50 565.50

Fuel / Energy charges Hour 3.00 0.00 0.00Total hire charges of Machinery Rs: 2361.90

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Air compressor Hour 3.00 142.40 427.202 Crew for Waggon drill Hour 3.00 244.90 734.703 Bar bender Day 0.50 450.00 225.004 Mason Cl- II Day 0.50 345.00 172.505 Gas cutter Day 1.00 385.00 385.006 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 2534.40labour component/unit qty 101.40Add contractor's profit and overhead charges 14% 14.20labour component/unit qty (including contractor's profit) 115.60

ABSTRACT:A. Cost of Materials Rs: 15528.30B. Hire charges of Machinery Rs: 2361.90C. Cost of Labour Rs: 2534.40

Total Rs: 20424.6014% Rs. 2859.44

0.06 tonne @ 124.6 Rs./Tonne 7.7875

0.28 tonne @ 145.6 Rs./Tonne 40.46515225.00 Nos. Rs: 23332.29

Each (A+B+C+D)/25 Rs: 933.30

IRR-DAW-2 REINFORCEMENT & CEMENT CONCRETE WORKS :

IRR-DAW-2-1A Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods overlaps and wastages wherever required, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.overlaps and wastage as per NHAI-dataLap jointing considered for bars upto 36 mm diameter.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 1.00 tonneSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Rein.Steel with 5 % wastage tonne 1.05 46500.00 48825.002 Binding wire 1.25 mm dia kg 9.00 70.00 630.00

Total cost of Materials Rs: 49455.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

60

in Rs. in RsTotal hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Bar bender Day 2.00 450.00 900.002 mazdoor Day 6.84 295.00 2017.80

Total cost of Labour 2917.80labour component/unit qty 2917.80Add contractor's profit and overhead charges 14% 408.50labour component/unit qty (including contractor's profit) 3326.30

A.MATERIAL 49455.00B.MACHINERY 0.00C. LABOUR 2917.80Total 52372.80D.Add for contractor's profit and overheads on A+B+C 14% 7332.19

145.60 Rs/Tonne 152.881.00 tonne 59857.87

Rate per/ TON.=(A+B+C+D) / I 59857.87

IRR-DAW-2-1B Providing, fabricating and placing in position reinforcement steel for RCC above 36 dia with welding and wastage at 2.5%, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.overlaps and wastage as per NHAI-datawelding joints considered for bars above 36 mm diameter.

DATA: RATE ANALYSIS UNIT :A. MATERIALS: 1.00 tonneSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Rein.Steel with 2.5 % wastage tonne 1.025 46500.00 47662.503 Welding electrodes 5 per joint and 14 joints pe One 70.00 11.00 770.00

Total cost of Materials Rs: 48432.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 welding machine hour 10.00 16.00 160.00

fuel charges hour 10.00 91.30 913.00Total hire charges of Machinery Rs: 1073.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 welder day 2.50 385.00 962.502 Bar bender Day 2.00 450.00 900.003 mazdoor Day 6.84 295.00 2017.80

Total cost of Labour 3880.30labour component/unit qty 3880.30Add contractor's profit and overhead charges 14% 543.20labour component/unit qty (including contractor's profit) 4423.50

ABSTRACT:A. Cost of Materials 48432.50B. Hire charges of Machinery 1073.00C. Cost of Labour 3880.30Total 53385.80D.Add for contractor's profit and overheads on A+B+C 14% 7474.01

145.60 Rs/Tonne 149.241.00 tonne 61009.05

61009.05

IRR-DAW-2-2 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250 kg /cum with use of super plasticiser equal to 0.4% of cement content , CA : 0.98 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum )

DATA: RATE ANALYSISUNIT:

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Total cost for

Total cost forRate per/ TON.=(A+B+C+D) / I

Dam and Allied Works - Item Unit Rates 2014-15

61

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 60000.00 4.00 240000.00

Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.002 Coarse aggregate 80-40 mm cum 94.08 635.00 59740.80

Coarse aggregate 40-20 mm cum 70.56 1145.00 80791.20Coarse aggregate 20-10 mm cum 47.04 1210.00 56918.40Coarse aggregate 10 mm below cum 23.52 875.00 20580.00

3 Fine aggregate (Un-screened ) cum 84.00 462.00 38808.004 Super Plasticizer or AEA kg 240.00 80.00 19200.005 Use rate of shuttering sqm 120.00 353.76 42451.20

Total cost of Materials Rs: 561369.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 120.00 112.95 13554.00Total cost of Labour Rs: 33868.00

labour component/unit qty 141.10Add contractor's profit and overhead charges 14% 19.80labour component/unit qty (including contractor's profit) 160.90

ABSTRACT:A. Cost of Materials Rs: 561369.60B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 33868.00

Total Rs: 650210.00Add for conveyor system @ 3.00% 19506.30Add for electric sub-station/ Demand charges @ 2.5% 16255.25Add for trestle bridge for tower crane track @ 4.0% 26008.40

Total Rs: 711979.9514% Rs. 99677.19

Lead Charges for 1 Km for FA 84.00 cum @ 31.5 Rs./Cum 2646Lead Charges for 1 Km for CA 235.20 cum @ 30.4 Rs./Cum 7150.08

60.72 tonne @ 124.6 Rs./Tonne 7565.712240.00 cum Rs: 829018.93

cum (A+B+C+D)/240 Rs: 3454.20

IRR-DAW-2-2A Providing and laying insitu vibrated M-20 ( 28 days cube compressive New Item1-2010-11 strength not less than 20 N / sq mm ) grade cement concrete using 80 mm

down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300 kg /cum with use of

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

62

0.4% of cement content super plasticiser , CA : 0.90 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.40 cum )

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 72000.00 4.00 288000.00

Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.002 Coarse aggregate 80-40 mm cum 86.40 635.00 54864.00

Coarse aggregate 40-20 mm cum 64.80 1145.00 74196.00Coarse aggregate 20-10 mm cum 43.20 1210.00 52272.00Coarse aggregate 10 mm below cum 21.60 875.00 18900.00

3 Fine aggregate (Un-Screened ) cum 96.00 462.00 44352.004 Super Plasticizer or AEA kg 288.00 80.00 23040.005 Use rate of shuttering sqm 120.00 353.76 42451.20

Total cost of Materials Rs: 600955.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 120.00 112.95 13554.00Total cost of Labour Rs: 33868.00

labour component/unit qty 141.10Add contractor's profit and overhead charges 14% 19.80labour component/unit qty (including contractor's profit) 160.90

ABSTRACT:A. Cost of Materials Rs: 600955.20B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 33868.00

Total Rs: 689795.60Add for conveyor system @ 3.00% 20693.87Add for electric sub-station/ Demand charges @ 2.5% 17244.89Add for trestle bridge for tower crane track @ 4.0% 27591.82

Total Rs: 755326.1814% Rs. 105745.67

Lead Charges for 1 Km for FA 96.00 cum @ 31.5 Rs./Cum 3024Lead Charges for 1 Km for CA 216.00 cum @ 30.4 Rs./Cum 6566.40

72.72 tonne @ 124.6 Rs./Tonne 9060.912240.00 cum Rs: 879723.16

cum (A+B+C+D)/240 Rs: 3665.50

IRR-DAW-2-3 Providing and laying insitu vibrated M-10 ( 28 days cube compressive

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

63

strength not less than10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220 kg /cum with use of super plasticiser,CA: 0.98 cum, Blending Ratio of CA --40:30:20:10, FA: 0.37 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 52800 4.00 211200.00

Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.002 Coarse aggregate 80-40 mm cum 94.08 635.00 59740.80

Coarse aggregate 40-20 mm cum 70.56 1145.00 80791.20Coarse aggregate 20-10 mm cum 47.04 1210.00 56918.40Coarse aggregate 10 mm below cum 23.52 875.00 20580.00

3 Fine aggregate (Un-Screened ) cum 88.8 462.00 41025.604 Super Plasticizer or AEA kg 211.20 80.00 16896.005 Use rate of shuttering sqm 120.00 353.76 42451.20

Total cost of Materials Rs: 532483.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant 2 x 1.5 cum Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 120.00 112.95 13554.00Total cost of Labour Rs: 33868.00

labour component/unit qty 141.10Add contractor's profit and overhead charges 14% 19.80labour component/unit qty (including contractor's profit) 160.90

ABSTRACT:A. Cost of Materials Rs: 532483.20B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 33868.00

Total Rs: 621323.60Add for conveyor system @ 3.00% 18639.71Add for electric sub-station/ Demand charges @ 2.5% 15533.09Add for trestle bridge for tower crane track @ 4.0% 24852.94

Total Rs: 680349.3414% Rs. 95248.91

Lead Charges for 1 Km for FA 88.80 cum @ 31.5 Rs./Cum 2797.2Lead Charges for 1 Km for CA 235.20 cum @ 30.4 Rs./Cum 7150.08

D.Add for contractor's profit and overheads on (A+B+C+other

Dam and Allied Works - Item Unit Rates 2014-15

64

53.52 tonne @ 124.6 Rs./Tonne 6668.592240.00 cum Rs: 792214.12

cum (A+B+C+D)/240 Rs: 3300.90

IRR-DAW-2-4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 74400 4.00 297600.002 Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.00

Coarse aggregate 40-20 mm cum 108 1145.00 123660.00Coarse aggregate 20-10 mm cum 64.8 1210.00 78408.00Coarse aggregate 10 mm below cum 43.2 875.00 37800.00

3 Fine aggregate (Un-Screened ) cum 96 462.00 44352.004 Super Plasticizer or AEA kg 297.60 80.00 23808.005 Use rate of shuttering sqm 360.00 353.76 127353.606 Scaffolding of shuttering @ 15% 19103.04

Total cost of Materials Rs: 754964.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant 2 x 1.5 cum Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor 0.00

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 360.00 112.95 40662.0011 Labour cost for scaffolding @ 15% 6099.30

Total cost of Labour Rs: 67075.30labour component/unit qty 279.50Add contractor's profit and overhead charges 14% 39.10labour component/unit qty (including contractor's profit) 318.60

ABSTRACT:A. Cost of Materials Rs: 754964.64B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 67075.30

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

65

Total Rs: 877012.34Add for aggregate conveyor system @ 3.0% 26310.37Add for electric sub-station / Demand charges @ 2.50% 21925.31Add for trestle bridge for tower crane track @ 4.0% 35080.49

Total Rs: 960328.5114% Rs. 134445.99

Lead Charges for 1 Km for FA 96.00 cum @ 31.5 Rs./Cum 3024Lead Charges for 1 Km for CA 216.00 cum @ 30.4 Rs./Cum 6566.40

75.12 tonne @ 124.6 Rs./Tonne 9359.952240.00 cum Rs: 1113724.85

cum (A+B+C+D)/240 Rs: 4640.50

IRR-DAW-2-4A Providing and laying insitu vibrated M-25 ( 28 days cube compressive new Item2-2010-11 strength not less than 25 N / sq mm ) grade cement concrete using 40 mm

down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 86400 4.00 345600.002 Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.00

Coarse aggregate 40-20 mm cum 108 1145.00 123660.00Coarse aggregate 20-10 mm cum 64.8 1210.00 78408.00Coarse aggregate 10 mm below cum 43.2 875.00 37800.00

3 Fine aggregate (Un-Screened ) cum 96 462.00 44352.004 Super Plasticizer or AEA kg 345.60 80.00 27648.005 Use rate of shuttering sqm 360.00 353.76 127353.606 Scaffolding of shuttering @ 15% 19103.04

Total cost of Materials Rs: 806804.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant 2 x 1.5 cum Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor 0.00

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 360.00 112.95 40662.0011 Labour cost for scaffolding @ 15% 6099.30

Total cost of Labour Rs: 67075.30labour component/unit qty 279.50

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

66

Add contractor's profit and overhead charges 14% 39.10labour component/unit qty (including contractor's profit) 318.60

ABSTRACT:A. Cost of Materials Rs: 806804.64B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 67075.30

Total Rs: 928852.34Add for aggregate conveyor system @ 3.0% 27865.57Add for electric sub-station / Demand charges @ 2.50% 23221.31Add for trestle bridge for tower crane track @ 4.0% 37154.09

Total Rs: 1017093.3114% Rs. 142393.06

Lead Charges for 1 Km for FA 96.00 cum @ 31.5 Rs./Cum 3024Lead Charges for 1 Km for CA 216.00 cum @ 30.4 Rs./Cum 6566.40

87.12 tonne @ 124.6 Rs./Tonne 10855.152240.00 cum Rs: 1179931.92

cum (A+B+C+D)/240 Rs: 4916.40

IRR-DAW-2-4B Providing and laying insitu vibrated M-25 ( 28 days cube compressive new Item3-2010-11 strength not less than 25 N / sq mm ) grade cement concrete using 20 mm

down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 240.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 91200 4.00 364800.002 Cement for incidentals @ 3 kg / cum kg 720.00 4.00 2880.00

Coarse aggregate 20-10 mm cum 140.4 1210.00 169884.00Coarse aggregate 10 mm below cum 75.6 875.00 66150.00

3 Fine aggregate (Un-Screened ) cum 96 462.00 44352.004 Super Plasticizer or AEA kg 364.80 80.00 29184.005 Use rate of shuttering sqm 360.00 353.76 127353.606 Scaffolding of shuttering @ 15% 19103.04

Total cost of Materials Rs: 823706.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Batching plant 2 x 1.5 cum Hour 8.00 518.10 4144.80

Fuel / Energy charges Hour 8.00 418.50 3348.002 Air compressor 7 cmm ( ele ) Hour 8.00 131.90 1055.20

Fuel / Energy charges Hour 8.00 342.40 2739.203 Tipper Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Tower crane 5 t Hour 16.00 867.10 13873.60

Fuel / Energy charges Hour 16.00 197.80 3164.805 Concrete bucket Hour 40.00 15.80 632.00

Fuel / Energy charges Hour 40.00 0.00 0.006 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.807 Needle vibrator 60 mm dia ( ele ) Hour 16.00 9.70 155.20

Fuel / Energy charges Hour 16.00 11.40 182.408 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 54972.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for Tipper ( 4 ) Hour 32.00 153.10 4899.204 Crew for Tower crane ( 2 ) Hour 16.00 163.30 2612.805 Crew for Pump Hour 8.00 72.10 576.806 Crew for Needle vibrator ( 2 ) Hour 16.00 136.60 2185.607 Mason Class-I Day 4.00 385.00 1540.008 Foreman Day 2.00 440.00 880.009 mazdoor 0.00

for silo ( cement handling ) Day 2.00 295.00 590.00for batching plant Day 2.00 295.00 590.00for conveyor system Day 2.00 295.00 590.00

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

67

for laying & vibrating Day 6.00 295.00 1770.00for cleaning / washing / curing Day 2.00 295.00 590.00

10 Labour cost for shuttering sqm 360.00 112.95 40662.0011 Labour cost for scaffolding @ 15% 6099.30

Total cost of Labour Rs: 67075.30labour component/unit qty 279.50Add contractor's profit and overhead charges 14% 39.10labour component/unit qty (including contractor's profit) 318.60

ABSTRACT:A. Cost of Materials Rs: 823706.64B. Hire charges of Machinery Rs: 54972.40C. Cost of Labour Rs: 67075.30

Total Rs: 945754.34Add for aggregate conveyor system @ 3.0% 28372.63Add for electric sub-station / Demand charges @ 2.50% 23643.86Add for trestle bridge for tower crane track @ 4.0% 37830.17

Total Rs: 1035601.0014% Rs. 144984.14

Lead Charges for 1 Km for FA 96.00 cum @ 31.5 Rs./Cum 3024Lead Charges for 1 Km for CA 216.00 cum @ 30.4 Rs./Cum 6566.40

91.92 tonne @ 124.6 Rs./Tonne 11453.232240.00 cum Rs: 1201628.77

cum (A+B+C+D)/240 Rs: 5006.80

IRR-DAW-2-5 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 14.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 3640.00 4.00 14560.00

Cement for incidentals @ 3 kg kg 42.00 4.00 168.002 Coarse aggregate 40-20 mm cum 6.3 1145.00 7213.50

Coarse aggregate 20-10 mm cum 3.78 1210.00 4573.80Coarse aggregate 10 mm below cum 2.52 875.00 2205.00

3 Fine aggregate (Un-Screened ) cum 5.6 462.00 2587.204 Super plasticizer kg 14.56 80.00 1164.805 Use rate of shuttering sqm 14.00 235.84 3301.766 Use rate of scaffolding @ 15% 495.26

Total cost of Materials Rs: 36269.32

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.0 51.70 413.60

Fuel / Energy charges Hour 8.0 38.00 304.002 10 hp pump ( ele ) Hour 1.0 6.70 6.70

Fuel / Energy charges Hour 1.0 76.10 76.103 Needle vibrator 40 mm dia ( ele ) Hour 8.0 8.00 64.00

Fuel / Energy charges Hour 8.0 7.60 60.80Total hire charges of Machinery Rs: 925.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.00 295.00 4130.00for cleaning / washing / curing Day 1.00 295.00 295.00

6 Labour cost of shuttering sqm 14.00 75.30 1054.207 Labour cost of scaffolding @ 15% 158.13

Total cost of Labour Rs: 14015.63labour component/unit qty 1001.10Add contractor's profit and overhead charges 14% 140.20

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

68

labour component/unit qty (including contractor's profit) 1141.30

ABSTRACT:A. Cost of Materials Rs: 36269.32B. Hire charges of Machinery Rs: 925.20C. Cost of Labour Rs: 14015.63

Total Rs: 51210.1514% Rs. 7169.42

Lead Charges for 1 Km for FA 5.60 cum @ 31.5 Rs./Cum 176.4Lead Charges for 1 Km for CA 12.60 cum @ 30.4 Rs./Cum 383.04

3.68 tonne @ 124.6 Rs./Tonne 458.777214.00 cum Rs: 59397.79

cum (A+B+C+D)/14 Rs: 4242.70

IRR-DAW-2-6 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of concrete with use of plums and super plasticiser of 0.4% of cement quantity, CA : 0.77 cum, Blending Ratio of CA : 50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum)

DATA: RATE ANALYSISA. MATERIALS: UNIT: 16.45 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 4277 4.00 17108.00

Cement for incidentals @ 3 kg / cum kg 49.35 4.00 197.402 Coarse aggregate 40-20 mm cum 6.33 1145.00 7247.85

Coarse aggregate 20-10 mm cum 3.8 1210.00 4598.00Coarse aggregate 10 mm below cum 2.53 875.00 2213.75

3 Plums of size 150 to 80 mm cum 4.11 340.00 1398.254 Fine aggregate (Un-Screened ) cum 5.59 462.00 2583.975 Super Plasticizer kg 17.11 80.00 1368.646 Use rate of shuttering for 40 uses sqm 16.45 235.84 3879.577 Scaffolding of shuttering @ 15% 581.94

Total cost of Materials Rs: 41177.37

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.103 Needle vibrator 60 mm dia ( ele ) Hour 8.00 9.70 77.60

Fuel / Energy charges Hour 8.00 11.40 91.20Total hire charges of Machinery Rs: 969.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for loading plums Day 1.00 295.00 295.00for laying concrete and plums Day 4.00 295.00 1180.00for conveying concrete Day 13.99 295.00 4125.87for conveying plums Day 3.00 295.00 885.00for cleaning / washing / curing Day 1.00 295.00 295.00

7 Labour for shuttering sqm 16.45 75.30 1238.698 Labour for scaffolding @ 15% 185.80

Total cost of Labour Rs: 16068.66labour component/unit qty 976.80Add contractor's profit and overhead charges 14% 136.80labour component/unit qty (including contractor's profit) 1113.60

ABSTRACT:

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Dam and Allied Works - Item Unit Rates 2014-15

69

A. Cost of Materials Rs: 41177.37B. Hire charges of Machinery Rs: 969.20C. Cost of Labour Rs: 16068.66

Total Rs: 58215.2314% Rs. 8150.13

Lead Charges for 1 Km for FA 5.59 cum @ 31.5 Rs./Cum 176.1795Lead Charges for 1 Km for CA and Plums 16.77 cum @ 30.4 Rs./Cum 509.88

4.33 tonne @ 124.6 Rs./Tonne 539.0632116.45 cum Rs: 67590.49

cum (A+B+C+D)/16.45 Rs: 4108.80

IRR-DAW-2-7 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content 220 kg / cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA : 50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 16.53 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 3636.60 4.00 14546.40

Cement for incidentals @ 3 kg/ cum kg 49.59 4.00 198.362 Coarse aggregate 40-20 mm cum 7.44 1145.00 8517.08

Coarse aggregate 20-10 mm cum 4.46 1210.00 5400.35Coarse aggregate 10 mm below cum 2.98 875.00 2603.48

3 Fine aggregate (Un-Screened ) cum 6.61 462.00 3054.744 Super plasticizer kg 14.55 80.00 1163.715 Use rate of shuttering sqm 16.53 235.84 3898.446 Use rate of scaffolding @ 15% 584.77

Total cost of Materials Rs: 39967.33

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.103 Needle vibrator 40 mm dia ( ele ) Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.80Total hire charges of Machinery Rs: 925.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 16.53 295.00 4876.35for cleaning / washing / curing Day 1.00 295.00 295.00

6 Labour cost of shuttering sqm 16.53 75.30 1244.717 Labour cost of scaffolding @ 15% 186.71

Total cost of Labour Rs: 14981.07labour component/unit qty 906.30Add contractor's profit and overhead charges 14% 126.90labour component/unit qty (including contractor's profit) 1033.20

ABSTRACT:A. Cost of Materials Rs: 39967.33B. Hire charges of Machinery Rs: 925.20C. Cost of Labour Rs: 14981.07

Total Rs: 55873.6014% Rs. 7822.3

Lead Charges for 1 Km for FA 6.61 cum @ 31.5 Rs./Cum 208.278Lead Charges for 1 Km for CA 14.88 cum @ 30.4 Rs./Cum 452.26

3.69 tonne @ 124.6 Rs./Tonne 459.29927

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

70

16.53 cum Rs: 64815.74cum (A+B+C+D)/16.53 Rs: 3921.10

IRR-DAW-2-8 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280 kg / cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 15.87 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 4443.6 4.00 17774.40

Cement for incidentals @ 3 kg/ cum kg 47.61 4.00 190.442 Coarse aggregate 20-10 mm cum 8.25 1210.00 9985.40

Coarse aggregate 10 mm below cum 4.44 875.00 3888.153 Fine aggregate (Un-Screened ) cum 6.98 462.00 3226.054 Super plasticiser kg 17.77 80.00 1421.955 Use rate of shuttering sqm 15.87 235.84 3742.786 Use rate of scaffolding @ 15% 561.42

Total cost of Materials Rs: 40790.59

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.103 Needle vibrator 40 mm dia ( ele ) Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.80Total hire charges of Machinery Rs: 925.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.87 295.00 4681.65for cleaning / washing / curing Day 1.00 295.00 295.00

6 Labour cost of shuttering sqm 15.87 75.30 1195.017 Labour cost of scaffolding @ 15% 179.25

Total cost of Labour Rs: 14729.21labour component/unit qty 928.10Add contractor's profit and overhead charges 14% 129.90labour component/unit qty (including contractor's profit) 1058.00

ABSTRACT:A. Cost of Materials Rs: 40790.59B. Hire charges of Machinery Rs: 925.20C. Cost of Labour Rs: 14729.21

Total Rs: 56445.0014% Rs. 7902.3

Lead Charges for 1 Km for FA 6.98 cum @ 31.5 Rs./Cum 219.9582Lead Charges for 1 Km for CA 12.70 cum @ 30.4 Rs./Cum 385.96

4.49 tonne @ 124.6 Rs./Tonne 559.6047715.87 cum Rs: 65512.82

cum (A+B+C+D)/15.87 Rs: 4128.10

IRR-DAW-2-9 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of spillway bridge, blockouts and such other similar structures with conjested reinforcement with initial lead

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Rate per

Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

71

upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 13.47 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 4445.1 4.00 17780.40

Cement for incidentals @ 3 kg/ cum kg 40.41 4.00 161.642 Coarse aggregate 20-10 mm cum 7.00 1210.00 8475.32

Coarse aggregate 10 mm below cum 3.77 875.00 3300.153 Fine aggregate (Un-Screened ) cum 5.93 462.00 2738.184 Super plasticiser ltr 17.78 80.00 1422.435 Use rate of shuttering sqm 33.68 235.84 7941.916 Scaffolding of shuttering @ 100% 7941.91

Total cost of Materials Rs: 49761.94

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.103 Needle vibrator 40 mm dia ( ele ) Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.80Total hire charges of Machinery Rs: 925.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 mazdoor 0.00

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 13.47 295.00 3973.65for cleaning/ washing/ curing Day 1.00 295.00 295.00

6 Labour cost of shuttering sqm 33.68 75.30 2535.737 Labour cost of scaffolding @ 100% 2535.73

Total cost of Labour Rs: 17718.41labour component/unit qty 1315.40Add contractor's profit and overhead charges 14% 184.20labour component/unit qty (including contractor's profit) 1499.60

ABSTRACT:A. Cost of Materials Rs: 49761.94B. Hire charges of Machinery Rs: 925.20C. Cost of Labour Rs: 17718.41

Total Rs: 68405.5514% Rs. 9576.78

Lead Charges for 1 Km for FA 5.93 cum @ 31.5 Rs./Cum 186.6942Lead Charges for 1 Km for CA 10.78 cum @ 30.4 Rs./Cum 327.59

4.49 tonne @ 124.6 Rs./Tonne 558.8945513.47 cum Rs: 79055.51

cum (A+B+C+D)/13.47 Rs: 5869.00

IRR-DAW-2-10 Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23 cm diameter central hole using cement and 20 mm down approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all materials, machinery, labour, formwork, curing etc., complete with initial lead upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending Ratio of CA -- 65:35)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 20.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement kg 3424 4.00 13696.002 Coarse aggregate 20-10 mm cum 5.56 1210.00 6732.443 Coarse aggregate 10-4.75 mm cum 3.00 875.00 2621.50

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Rate per Total cost for

D.Add for contractor's profit and overheads on (A+B+C)

Dam and Allied Works - Item Unit Rates 2014-15

72

4 Use rate of shuttering sqm 76.00 65.68 4991.76Total cost of Materials Rs: 28041.70

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 0.50 6.70 3.35

Fuel / Energy charges Hour 0.50 76.10 38.05Total hire charges of Machinery Rs: 759.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 72.10 36.053 Mason Class-I Day 1.00 385.00 385.004 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching other materials Day 6.00 295.00 1770.00for loading mortar pans Day 2.00 295.00 590.00for laying & packing concrete Day 2.00 295.00 590.00for conveying concrete Day 8.56 295.00 2525.20

5 Fitter shuttering Day 3.00 345.00 1035.00Total cost of Labour Rs: 9039.65

labour component/unit qty 452.00Add contractor's profit and overhead charges 14% 63.30labour component/unit qty (including contractor's profit) 515.30

ABSTRACT:A. Cost of Materials Rs: 28041.70B. Hire charges of Machinery Rs: 759.00C. Cost of Labour Rs: 9039.65

Total Rs: 37840.3514% Rs. 5297.65

Lead Charges for 1 Km for CA 8.56 cum @ 30.4 Rs./Cum 260.22

3.42 tonne @ 124.6 Rs./Tonne 426.630420.00 Rm Rs: 43824.85

Rm (A+B+C+D)/20 Rs: 2191.20

IRR-DAW-2-11 Providing and laying insitu vibrated M-20 ( 28 days cube compressive (a) strength not less than 20 N / sq mm ) grade cement concrete using 20 mm

down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5 cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm coping for pillars with top edges of kerb and coping chamferred / rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

73

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 36.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement mix kg 3034.5 4.00 12138.00

Cement for incidentals @ 5 kg / cum kg 43.35 4.00 173.402 Coarse aggregate 20-10 mm cum 4.51 1210.00 5457.10

Coarse aggregate 10-4.75 mm cum 2.43 875.00 2126.253 Fine aggregate (Un-Screened ) cum 3.81 462.00 1760.224 Super plasticiser kg 12.14 80.00 971.045 Use rate of shuttering sqm 95.00 235.84 22404.806 Scaffolding of shuttering @ 15% 3360.727 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 48473.53

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 Needle vibrator 40 mm ( ele ) Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.803 10 hp pump ( ele ) Hour 0.50 6.70 3.35

Fuel / Energy charges Hour 0.50 76.10 38.05Total hire charges of Machinery Rs: 883.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 72.10 36.053 Crew for Vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing concrete Day 2.00 295.00 590.00for conveying concrete Day 8.67 295.00 2557.65for curing & miscellaneous Day 2.00 295.00 590.00

7 Labour for shuttering sqm 95.00 75.30 7153.508 Labour for scaffolding @ 15% 1073.03

Total cost of Labour Rs: 20176.43labour component/unit qty 560.50Add contractor's profit and overhead charges 0.14 78.50labour component/unit qty (including contractor's profit) 639.00

ABSTRACT:A. Cost of Materials Rs: 48473.53B. Hire charges of Machinery Rs: 883.80C. Cost of Labour Rs: 20176.43

Total Rs: 69533.7614% Rs. 9734.73

Lead Charges for 1 Km for FA 3.81 cum @ 31.5 Rs./Cum 120.015Lead Charges for 1 Km for CA 6.94 cum @ 30.4 Rs./Cum 210.98

3.08 tonne @ 124.6 Rs./Tonne 383.5001136.00 Rm Rs: 79982.98

Rm (A+B+C+D)/36 Rs: 2221.70

IRR-DAW-2-12 Providing and laying insitu vibrated M-20 ( 28 days cube compressive (b) strength not less than 20 N / sq mm ) grade cement concrete using 20 mm

down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350 kg / cum with use of super plasticiser(0.4% by wt.of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

74

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 36.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement mix kg 2450 4.00 9800.00

Cenent for incidentals @ 5 kg / cum kg 35.00 4.00 140.002 Coarse aggregate 20-10 mm cum 3.64 1210.00 4404.40

Coarse aggregate 10-4.75 mm cum 1.96 875.00 1715.003 Fine aggregate (Un-Screened ) cum 3.08 462.00 1422.964 Super plasticiser kg 9.80 80.00 784.005 Use rate of shuttering sqm 115.00 235.84 27121.606 Scaffolding of shuttering @ 15% 4068.247 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 49538.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 Needle vibrator 40 mm ( ele ) Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.803 10 hp pump ( ele ) Hour 0.50 6.70 3.35

Fuel / Energy charges Hour 0.50 76.10 38.05Total hire charges of Machinery Rs: 883.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 72.10 36.053 Crew for Vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching other materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing concrete Day 2.00 295.00 590.00for conveying concrete Day 7.00 295.00 2065.00for curing & miscellaneous Day 2.00 295.00 590.00

7 Labour for shuttering sqm 115.00 75.30 8659.508 Labour for scaffolding @ 15% 1298.93

Total cost of Labour Rs: 21415.68labour component/unit qty 594.90Add contractor's profit and overhead charges 0.14 83.30labour component/unit qty (including contractor's profit) 678.20

ABSTRACT:A. Cost of Materials Rs: 49538.20B. Hire charges of Machinery Rs: 883.80C. Cost of Labour Rs: 21415.68

Total Rs: 71837.6814% Rs. 10057.27

Lead Charges for 1 Km for FA 3.08 cum @ 31.5 Rs./Cum 97.02Lead Charges for 1 Km for CA 5.60 cum @ 30.4 Rs./Cum 170.24

2.49 tonne @ 124.6 Rs./Tonne 309.63136.00 Rm Rs: 82471.84

Rm (A+B+C+D)/36 Rs: 2290.90

IRR-DAW-2-13 Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing,

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

75

curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser(0.4% bywt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 11.70 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mix kg 4446 4.00 17784.00

Cement for incidentals @ 5 kg / cum kg 58.50 4.00 234.002 Coarse aggregate 20-10 mm cum 6.084 1210.00 7361.64

Coarse aggregate 10 mm below cum 3.276 875.00 2866.503 Fine aggregate (Un-Screened ) cum 5.265 462.00 2432.434 Super Plasticizer kg 17.78 80.00 1422.725 Use rate of shuttering sqm 5.85 235.84 1379.666 Sundries ( asphalt mortar etc ) LS 5.00 41.00 205.00

Total cost of Materials Rs: 33685.95

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300/200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 0.50 6.70 3.35

Fuel / Energy charges Hour 0.50 76.10 38.05Total hire charges of Machinery Rs: 759.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 72.10 36.053 Mason Class-I Day 3.00 385.00 1155.004 work inspector Day 1.00 370.00 370.005 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching materials Day 9.00 295.00 2655.00for loading mortar pans Day 4.00 295.00 1180.00for laying & compacting Day 5.00 295.00 1475.00for conveying concrete Day 11.70 295.00 3451.50for cleaning/ washing/ curing Day 1.00 295.00 295.00

6 Labour cost for shuttering sqm 5.85 75.30 440.51Total cost of Labour Rs: 13166.46

labour component/unit qty 1125.30Add contractor's profit and overhead charges 0.14 157.50labour component/unit qty (including contractor's profit) 1282.80

ABSTRACT:A. Cost of Materials Rs: 33685.95B. Hire charges of Machinery Rs: 759.00C. Cost of Labour Rs: 13166.46

Total Rs: 47611.4114% Rs. 6665.6

Lead Charges for 1 Km for FA 5.27 cum @ 31.5 Rs./Cum 165.8475Lead Charges for 1 Km for CA 9.36 cum @ 30.4 Rs./Cum 284.54

4.50 tonne @ 124.6 Rs./Tonne 561.260711.70 cum Rs: 55288.66

cum (A+B+C+D)/11.70 Rs: 4725.50

IRR-DAW-2-14 Pre-cooling to control placement temperature of cement concrete in the range of 18 to 21 C at the concrete placement point by inundation of coarse aggregates and adding flaked ice as part of mixing water including cost of all materials, machinery, labour etc., complete with all leads and lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 500 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sundries ( amonia gas etc) LS 3.00 41.00 123.00

0.00 0.00 0.00Total cost of Materials Rs: 123.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Ice maker unit consisting of: Hour 24.00 170.20 4084.80

Rate per Total cost for

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Dam and Allied Works - Item Unit Rates 2014-15

76

Compressor 125 hp - 1 NoCondenser with 30 hp motor - 1 No.Ice makers 10 t / day each - 3 Nos.Pump 2 hp for ice cutting - 3 Nos.Pump 2 hp for pumping water-3 Nos.Screw conveyor with 15 hp motor -1Ice elevator with 5 hp motor - 1 No.Fuel / Energy charges for system Hour 24.00 1084.30 26023.20

Total hire charges of Machinery Rs: 30108.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Ice maker unit Hour 24.00 113.90 2733.602 mazdoor

for Ice chamber ( 2 x 3 ) Day 6.00 295.00 1770.00for miscellaneous works ( 1 x 3 ) Day 3.00 295.00 885.00

Total cost of Labour Rs: 5388.60labour component/unit qty 10.80Add contractor's profit and overhead charges 0.14 1.50labour component/unit qty (including contractor's profit) 12.30

ABSTRACT:A. Cost of Materials Rs: 123.00B. Hire charges of Machinery Rs: 30108.00C. Cost of Labour Rs: 5388.60

Total Rs: 35619.6014% Rs. 4986.74

500.00 cum Rs: 40606.34cum (A+B+C+D)/500 Rs: 81.20

IRR-DAW-2-15 Conveying and fixing elastomeric bearing for spillway bridge including cleaning and preparing surface, mixing and applying adhesive, fixing bearing in correct position etc., including cost of all materials except bearings, machinery, labour etc., complete with all leads and lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 6.00 Nos.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Synthetic adhesive ( Resin + Hardener) kg 0.60 348.00 208.802 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 290.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Marker / Erector Day 1.00 440.00 440.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1400.00labour component/unit qty 233.30Add contractor's profit and overhead charges 0.14 32.70labour component/unit qty (including contractor's profit) 266.00

ABSTRACT:A. Cost of Materials Rs: 290.80B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1400.00

Total Rs: 1690.8014% Rs. 236.71

6.00 Nos. Rs: 1927.51Each (A+B+C+D)/6 Rs: 321.30

IRR-DAW-2-16 Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.

Total cost for

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Rate per

Dam and Allied Works - Item Unit Rates 2014-15

77

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 3.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 150 mm dia hume pipe Rm 2.90 330.00 957.002 Cement kg 3.00 4.00 12.003 20 - 10 mm coarse aggregate cum 0.01 1210.00 9.684 Sand for filling cum 0.02 342.00 6.84

Total cost of Materials Rs: 985.52

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Mason Class-II Day 0.25 345.00 86.252 mazdoor Day 0.25 295.00 73.75

Total cost of Labour Rs: 160.00labour component/unit qty 53.30Add contractor's profit and overhead charges 0.14 7.50labour component/unit qty (including contractor's profit) 60.80

ABSTRACT:A. Cost of Materials Rs: 985.52B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 160.00

Total Rs: 1145.5214% Rs. 160.37

Lead Charges for 1 Km for FA 0.02 cum @ 31.5 Rs./Cum 0.63Lead Charges for 1 Km for CA 0.01 cum @ 30.4 Rs./Cum 0.24

0.00 tonne @ 124.6 Rs./Tonne 0.37383.00 Rm Rs: 1307.14

Rm (A+B+C+D)/3 Rs: 435.70

IRR-DAW-2-17 Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 25 cm long 12 mm dia. anchors fixed to both flanges at 15 cm c /c and 140 x 6 mm plate welded on top of one of the angle including cost of all materials, machinery, labour, providing and fixing 38 mm thick joint filler board matching the thickness of wearing coat, painting etc., complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 7.50 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Structural steel plate kg 50.70 46.00 2332.202 Structural steel angle kg 104.50 45.00 4702.503 12 dia steel anchors kg 27.40 46.50 1274.104 Welding electrodes Nos 70.00 11.00 770.005 Joint filler board 19 mm thick sqm 1.00 630.00 630.006 Sundries ( cutting gas / paint etc ) LS 1.50 41.00 61.50

Total cost of Materials Rs: 9770.30

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Welding set Hour 8.00 16.00 128.00

Fuel / Energy charges Hour 8.00 91.30 730.402 Sundries (cutting torch/ welding guns etc) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 940.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Marker / Fabricator / Erector Day 1.50 440.00 660.002 Gas cutter / Welder Day 1.50 385.00 577.503 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1827.50labour component/unit qty 243.70Add contractor's profit and overhead charges 0.14 34.10labour component/unit qty (including contractor's profit) 277.80

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

78

ABSTRACT:A. Cost of Materials Rs: 9770.30B. Hire charges of Machinery Rs: 940.40C. Cost of Labour Rs: 1827.50

Total Rs: 12538.2014% Rs. 1755.35

0.18 tonne @ 145.6 Rs./Tonne 26.586567.50 Rm Rs: 14320.14

Rm (A+B+C+D)/7.50 Rs: 1909.40

IRR_DAW-3 MASONRY & GUNITING WORKS :

IRR-DAW-3-1 Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 190 kg/cum of masonry, rubble stones : 0.85 cum, stone chips : 0.15 cum/cum, FA : 0.4 cum)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 4750 4.00 19000.002 Rubble stones cum 21.25 318.00 6757.503 Stone chips cum 3.75 340.00 1275.004 Sand (Screened ) cum 10 606.00 6060.00

Total cost of Materials Rs: 33092.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Mason Class-I Day 2.50 385.00 962.505 Mason Class-II Day 4.00 345.00 1380.006 Chavali Day 16.00 345.00 5520.007 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 21328.00labour component/unit qty 853.10Add contractor's profit and overhead charges 0.14 119.40labour component/unit qty (including contractor's profit) 972.50

ABSTRACT:A. Cost of Materials Rs: 33092.50B. Hire charges of Machinery Rs: 800.40C. Cost of Labour Rs: 21328.00

Total Rs: 55220.9014% Rs. 7730.93

Lead Charges for 1 Km for FA 10.00 cum @ 31.5 Rs./Cum 315Lead Charges for 1 Km for Stones/Stone Chips 25.00 cum @ 30.4 Rs./Cum 760.00

4.75 tonne @ 124.6 Rs./Tonne 591.8525.00 cum Rs: 64618.68

cum (A+B+C+D)/25 Rs: 2584.70

IRR-DAW-3-2 Providing and constructing un-coursed rubble stone masonry using approved stones incement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto1 km and all lifts.

Total cost forRate per

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

79

( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum, stone chips : 0.15 cum/cum, FA : 0.4 cum)For 1 cum masonry :-

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 3575 4.00 14300.002 Rubble stones cum 21.25 318.00 6757.503 Stone chips cum 3.75 340.00 1275.004 Sand (Screened ) cum 10 606.00 6060.00

Total cost of Materials Rs: 28392.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr(ele) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Mason Class-I Day 2.50 385.00 962.505 Mason Class-II Day 4.00 345.00 1380.006 Chavali Day 16.00 345.00 5520.007 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 21328.00labour component/unit qty 853.10Add contractor's profit and overhead charges 0.14 119.40labour component/unit qty (including contractor's profit) 972.50

ABSTRACT:A. Cost of Materials Rs: 28392.50B. Hire charges of Machinery Rs: 800.40C. Cost of Labour Rs: 21328.00

Total Rs: 50520.9014% Rs. 7072.93

Lead Charges for 1 Km for FA 10.00 cum @ 31.5 Rs./Cum 315Lead Charges for 1 Km for Stones/Stone Chips 25.00 cum @ 30.4 Rs./Cum 760.00

3.58 tonne @ 124.6 Rs./Tonne 445.44525.00 cum Rs: 59114.28

cum (A+B+C+D)/25 Rs: 2364.60

IRR-DAW-3-3 Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts.( Thickness of the CR face assumed: 0.75 m,Cement content : 178 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 4450 4.00 17800.002 Coursed rubble stone 30 x 30 x 45 cm Nos 244 20.00 4880.003 Coursed rubble stone 30 x 30 x 60 cm Nos 82 23.00 1886.004 Rubble stones cum 8.75 318.00 2782.505 Stone chips cum 3.75 340.00 1275.006 Sand (Screened ) cum 9.375 606.00 5681.25

Rs: 34304.75

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Total cost of Materials

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Dam and Allied Works - Item Unit Rates 2014-15

80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -II Day 7.00 345.00 2415.005 Mason Class-I Day 2.50 385.00 962.506 Mason Class-II Day 4.00 345.00 1380.007 Chavali Day 16.00 345.00 5520.008 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 23743.00labour component/unit qty 949.70Add contractor's profit and overhead charges 0.14 133.00labour component/unit qty (including contractor's profit) 1082.70

ABSTRACT:A. Cost of Materials Rs: 34304.75B. Hire charges of Machinery Rs: 800.40C. Cost of Labour Rs: 23743.00

Total Rs: 58848.1514% Rs. 8238.74

Lead Charges for 1 Km for FA 9.38 cum @ 31.5 Rs./Cum 295.3125Lead Charges for 1 Km for Stones/Stone Chips 26.81 cum @ 30.4 Rs./Cum 815.02

4.45 tonne @ 124.6 Rs./Tonne 554.4725.00 cum Rs: 68751.70

cum (A+B+C+D)/25 Rs: 2750.10

IRR-DAW-3-4 Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts.( Cement content : 134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 3350 4.00 13400.002 Coursed rubble stone 30 x 30 x 45 cm Nos 244 20.00 4880.003 Coursed rubble stone 30 x 30 x 60 cm Nos 82 23.00 1886.004 Rubble stones cum 8.75 318.00 2782.505 Stone chips cum 3.75 340.00 1275.006 Sand (Screened ) cum 9.375 606.00 5681.25

Total cost of Materials Rs: 29904.75

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Dam and Allied Works - Item Unit Rates 2014-15

81

1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -II Day 7.00 345.00 2415.005 Mason Class-I Day 2.50 385.00 962.506 Mason Class-II Day 4.00 345.00 1380.007 Chavali Day 16.00 345.00 5520.008 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 23743.00labour component/unit qty 949.70Add contractor's profit and overhead charges 14% 133.00labour component/unit qty (including contractor's profit) 1082.70

ABSTRACT:A. Cost of Materials Rs: 29904.75B. Hire charges of Machinery Rs: 800.40C. Cost of Labour Rs: 23743.00

Total Rs: 54448.1514% Rs. 7622.74

Lead Charges for 1 Km for FA 9.38 cum @ 31.5 Rs./Cum 295.3125Lead Charges for 1 Km for Stones/Stone Chips 26.81 cum @ 30.4 Rs./Cum 815.02

3.35 tonne @ 124.6 Rs./Tonne 417.4125.00 cum Rs: 63598.64

cum (A+B+C+D)/25 Rs: 2543.90

IRR-DAW-3-5 Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 4175 4.00 16700.002 Coursed rubble stone 30 x 30 x 45 cm Nos 250 20.00 5000.003 Coursed rubble stone 30 x 30 x 60 cm Nos 85 23.00 1955.004 Rubble stones cum 8.75 318.00 2782.505 Stone chips cum 3.75 340.00 1275.006 Sand (Screened ) cum 8.75 606.00 5302.50

Total cost of Materials Rs: 33015.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -I Day 14.00 385.00 5390.005 Stone chiseller Cl -II Day 7.00 345.00 2415.006 Mason Class-I Day 2.50 385.00 962.507 Mason Class-II Day 4.00 345.00 1380.008 Chavali Day 16.00 345.00 5520.009 mazdoor

for batching cement ( cement handling ) Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Dam and Allied Works - Item Unit Rates 2014-15

82

for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 29133.00labour component/unit qty 1165.30Add contractor's profit and overhead charges 14% 163.10labour component/unit qty (including contractor's profit) 1328.40

ABSTRACT:A. Cost of Materials Rs: 33015.00B. Hire charges of Machinery Rs: 800.40C. Cost of Labour Rs: 29133.00

Total Rs: 62948.4014% Rs. 8812.78

Lead Charges for 1 Km for FA 8.75 cum @ 31.5 Rs./Cum 275.625Lead Charges for 1 Km for Stones/Stone Chips 27.22 cum @ 30.4 Rs./Cum 827.34

4.18 tonne @ 124.6 Rs./Tonne 520.20525.00 cum Rs: 73384.35

cum (A+B+C+D)/25 Rs: 2935.40

IRR-DAW-3-6 Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 25.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement for mortar kg 3125 4.00 12500.002 Coursed rubble stone 30 x 30 x 45 cm Nos 250 20.00 5000.003 Coursed rubble stone 30 x 30 x 60 cm Nos 85 23.00 1955.004 Rubble stones cum 8.75 318.00 2782.505 Stone chips cum 3.75 340.00 1275.006 Sand (Screened ) cum 8.75 606.00 5302.50

Total cost of Materials Rs: 28815.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ltr ( ele ) Hour 8.00 51.70 413.60

Fuel / Energy charges Hour 8.00 38.00 304.002 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 800.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 1.00 72.10 72.103 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -I Day 14.00 385.00 5390.005 Stone chiseller Cl -II Day 7.00 345.00 2415.006 Mason Class-I Day 2.50 385.00 962.507 Mason Class-II Day 4.00 345.00 1380.008 Chavali Day 16.00 345.00 5520.009 mazdoor

for batching cement ( cement handling Day 2.00 295.00 590.00for batching sand Day 6.00 295.00 1770.00for loading mortar pans Day 4.00 295.00 1180.00for laying & packing mortar Day 10.00 295.00 2950.00for loading chips Day 1.00 295.00 295.00for washing rubble / finishing / curing Day 4.00 295.00 1180.00for conveying mortar / chips Day 12.00 295.00 3540.00

Total cost of Labour Rs: 29133.00labour component/unit qty 1165.30Add contractor's profit and overhead charges 14% 163.10labour component/unit qty (including contractor's profit) 1328.40

ABSTRACT:A. Cost of Materials Rs: 28815.00B. Hire charges of Machinery Rs: 800.40

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

83

C. Cost of Labour Rs: 29133.00Total Rs: 58748.40

14% Rs. 8224.78Lead Charges for 1 Km for FA 8.75 cum @ 31.5 Rs./Cum 275.625Lead Charges for 1 Km for Stones/Stone Chips 27.22 cum @ 30.4 Rs./Cum 827.34

3.13 tonne @ 124.6 Rs./Tonne 389.37525.00 cum Rs: 68465.52

cum (A+B+C+D)/25 Rs: 2738.60

IRR-DAW-3-7 Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 2 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 100.00 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement kg 455.446 4.00 1821.782 Sand (Screened ) cum 0.735 606.00 445.41

Total cost of Materials Rs: 2267.19

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

(Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Mason Class-I Day 10.00 385.00 3850.002 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs: 6800.00labour component/unit qty 68.00Add contractor's profit and overhead charges 14% 9.50labour component/unit qty (including contractor's profit) 77.50

ABSTRACT:A. Cost of Materials Rs: 2267.19B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 6800.00

Total Rs: 9067.1914% Rs. 1269.41

Lead Charges for 1 Km for FA 0.74 cum @ 31.5 Rs./Cum 23.1525

0.46 tonne @ 124.6 Rs./Tonne 56.748572100.00 sqm Rs: 10416.51

sqm (A+B+C+D)/100 Rs: 104.20

IRR-DAW-3-8 Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 3 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 100.00 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement kg 321.80 4.00 1287.202 Sand (Screened ) cum 0.74 606.00 445.41

Total cost of Materials Rs: 1732.61

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Mason Class-I Day 10.00 385.00 3850.00

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C)

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Dam and Allied Works - Item Unit Rates 2014-15

84

2 mazdoor Day 10.00 295.00 2950.00Total cost of Labour Rs: 6800.00

labour component/unit qty 68.00Add contractor's profit and overhead charges 14% 9.50labour component/unit qty (including contractor's profit) 77.50

ABSTRACT:A. Cost of Materials Rs: 1732.61B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 6800.00

Total Rs: 8532.6114% Rs. 1194.57

Lead Charges for 1 Km for FA 0.74 cum @ 31.5 Rs./Cum 23.1525

0.32 tonne @ 124.6 Rs./Tonne 40.09628100.00 sqm Rs: 9790.43

sqm (A+B+C+D)/100 Rs: 97.90

IRR_DAW-4 CONTRACTION JOINT WORKS:

IRR-DAW-4-1 Providing 25 mm thick guniting to rock or masonry surface in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, raking-out and cleaning joints, scaffolding wherever required and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 36.00 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement kg 609.90 4.00 2439.602 Sand (Screened ) cum 1.09 606.00 660.543 Use rate of grout hose 25 m Hour 8.00 5.47 43.754 Use rate of water hose 25 m Hour 8.00 6.84 54.755 Use rate of guniting nozzle Hour 8.00 3.50 28.006 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 3308.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Guniting equipment Hour 8.00 110.10 880.80

Fuel / Energy charges Hour 8.00 0.00 0.002 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.003 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.104 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 5836.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Guniting equipment Hour 8.00 189.80 1518.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for pump Hour 1.00 72.10 72.104 Mason Cl II Day 1.00 345.00 345.005 mazdoor

for cement handling Day 2.00 295.00 590.00for sand Day 2.00 295.00 590.00mazdoor for other works Day 2.00 295.00 590.00

Total cost of Labour Rs: 4844.70labour component/unit qty 134.60Add contractor's profit and overhead charges 14% 18.80labour component/unit qty (including contractor's profit) 153.40

ABSTRACT:A. Cost of Materials Rs: 3308.64B. Hire charges of Machinery Rs: 5836.00C. Cost of Labour Rs: 4844.70

Total Rs: 13989.34Add for scaffolding 3% 349.73

Total Rs: 14339.0714% Rs. 2007.47

Lead Charges for 1 Km for FA 1.09 cum @ 31.5 Rs./Cum 34.335

0.61 tonne @ 124.6 Rs./Tonne 75.9935436.00 sqm Rs: 16456.87

sqm (A+B+C+D)/36 Rs: 457.10

D.Add for contractor's profit and overheads on (A+B+C)

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other

Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Dam and Allied Works - Item Unit Rates 2014-15

85

IRR-DAW-4-2 Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in two lines with 8 mm dia steel dowel rods on either side at one metre interval, forming 125 x 125 mm size groove in between copper strips for filling asphalt including fixing 15 mm dia two legged G.I pipe with U - bend at bottom for circulation of steam at intervals and forming 150 mm dia formed drain behind water seals including cost of all materials, machinery, labour, filling asphalt, circulation of steam through pipes etc., complete with all leads and lifts. consider 12 m height of contraction joint for analysis.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 12.00 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Copper sheet 16 SWG kg 215.00 695.00 149425.002 Reinforcement steel 8 mm dia kg 30.00 46.50 1395.003 GI pipe 15 mm dia Rm 24.00 110.00 2640.004 Asphalt kg 192.00 43.00 8256.005 Elbows / Nipple / Plugs etc., LS 5.00 17.00 85.006 Soldering materials LS 40.00 17.00 680.00

Total cost of Materials Rs: 162481.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Steam circulation arrangement LS 8.00 17.00 136.00

Fuel charges ( gas for heating ) LS 10.00 17.00 170.00Total hire charges of Machinery Rs: 306.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Welder Day 1.00 385.00 385.002 Tinsmith Day 1.00 385.00 385.003 Bar bender Day 0.50 450.00 225.004 Pipe fitter Day 0.50 440.00 220.005 Mason Class-I Day 0.50 385.00 192.506 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 1702.50labour component/unit qty 141.90Add contractor's profit and overhead charges 14% 19.90labour component/unit qty (including contractor's profit) 161.80

ABSTRACT:A. Cost of Materials Rs: 162481.00B. Hire charges of Machinery Rs: 306.00C. Cost of Labour Rs: 1702.50

Total Rs: 164489.5014% Rs. 23028.53

12.00 Rm Rs: 187518.03Rm (A+B+C+D)/12 Rs: 15626.50

IRR-DAW-4-3 Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete with all leads and lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 12.00 Rm.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 PVC water stops 310 mm wide Rm 24.50 485.00 11882.502 Reinforcement steel 8 mm dia kg 30.00 46.50 1395.003 GI pipe 15 mm dia Rm 24.00 110.00 2640.004 Asphalt kg 192.00 43.00 8256.005 Elbows / Nipple / Plugs etc., LS 5.00 17.00 85.006 Vulcanizing materials LS 25.00 17.00 425.00

Total cost of Materials Rs: 24683.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

86

1 Steam circulation arrangement LS 8.00 17.00 136.00Fuel charges ( gas for heating ) LS 10.00 17.00 170.00

Total hire charges of Machinery Rs: 306.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Welder Day 0.50 385.00 192.502 Bar bender Day 0.50 450.00 225.003 Pipe fitter Day 0.50 440.00 220.004 Mason Class-I Day 0.50 385.00 192.505 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 1125.00labour component/unit qty 93.80Add contractor's profit and overhead charges 14% 13.10labour component/unit qty (including contractor's profit) 106.90

ABSTRACT:A. Cost of Materials Rs: 24683.50B. Hire charges of Machinery Rs: 306.00C. Cost of Labour Rs: 1125.00

Total Rs: 26114.5014% Rs. 3656.03

12.00 Rm. Rs: 29770.53Rm. (A+B+C+D)/12 Rs: 2480.90

IRR-DAW-4-4 Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in single line with 8 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour etc., complete with all leads and lifts.

DATA: RATE ANALYSISUNIT:

A. MATERIALS: 8.7 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Copper sheet 16 SWG kg 77.00 695.00 53515.002 Reinforcement steel 8 mm dia kg 15.00 46.50 697.503 Soldering materials LS 10.00 17.00 170.00

Total cost of Materials Rs: 54382.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Sundries such as soldering gun etc., LS 3.00 41.00 123.00

Fuel charges ( gas ) LS 5.00 17.00 85.00Total hire charges of Machinery Rs: 208.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Welder Day 0.5 385.00 192.502 Tinsmith Day 0.5 385.00 192.503 Bar bender Day 0.5 450.00 225.004 Mason Class-I Day 0.5 385.00 192.505 mazdoor Day 0.5 295.00 147.50

Total cost of Labour Rs: 950.00labour component/unit qty 109.20Add contractor's profit and overhead charges 14% 15.30labour component/unit qty (including contractor's profit) 124.50

ABSTRACT:A. Cost of Materials Rs: 54382.50B. Hire charges of Machinery Rs: 208.00C. Cost of Labour Rs: 950.00

Total Rs: 55540.5014% Rs. 7775.67

8.70 Rm Rs: 63316.17Rm (A+B+C+D)/8.70 Rs: 7277.70

IRR-DAW-4-5 Providing and constructing contraction joints by fixing 23 cm wide central bulb type PVC water stop in single line supported by 10 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, valcunising joints etc., complete with all leads and lifts.

DATA: RATE ANALYSISUNIT:

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

87

A. MATERIALS: 8.70 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 PVC water seal 23 cm wide Rm 9.00 44.00 396.002 Reinforcement steel 10 mm dia kg 10.00 46.50 465.003 Vulcanising materials LS 2.00 17.00 34.00

Total cost of Materials Rs: 895.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Sundries such as heater etc., LS 0.50 41.00 20.50

Fuel charges for heating LS 0.50 17.00 8.50Total hire charges of Machinery 29.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Welder Day 0.50 385.00 192.502 Bar bender Day 0.50 450.00 225.003 Mason Class-I Day 0.50 385.00 192.504 mazdoor Day 0.50 295.00 147.50

Total cost of Labour Rs: 757.50labour component/unit qty 87.10Add contractor's profit and overhead charges 14% 12.20labour component/unit qty (including contractor's profit) 99.30

ABSTRACT:A. Cost of Materials Rs: 895.00B. Hire charges of Machinery Rs: 29.00C. Cost of Labour Rs: 757.50

Total Rs: 1681.5014% Rs. 235.41

8.70 Rm Rs: 1916.91Rm (A+B+C+D)/8.70 Rs: 220.30

IRR_DAW-5 EARTH / ROCKFILL EMBANKMENT WORKS :

IRR-DAW-5-1 Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT

A. MATERIALS: 825.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 5.50 1715.50 9435.25

Fuel / Energy charges Hour 5.50 656.00 3608.002 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.403 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 446.70 17868.00

Fuel / Energy charges Hour 40.00 322.20 12888.004 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00

Fuel / Energy charges Hour 4.00 38.00 152.005 Water tanker 8000 ltr Hour 8.00 402.50 3220.00

Fuel / Energy charges Hour 8.00 322.20 2577.606 Vibratory Roller 8 tonne Hour 6.50 1342.20 8724.30

Fuel / Energy charges Hour 6.50 1108.30 7203.957 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 86926.30

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 5.50 204.10 1122.552 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 40.00 153.10 6124.004 Crew for Pump Hour 4.00 72.10 288.405 Crew for Water tanker Hour 8.00 153.10 1224.80

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

88

6 Crew for Roller Hour 6.50 227.80 1480.707 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 13793.25labour component/unit qty 16.70Add contractor's profit and overhead charges 14% 2.30labour component/unit qty (including contractor's profit) 19.00

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 86926.30C. Cost of Labour Rs: 13793.25

Total Rs: 100719.5514% Rs. 14100.74

825.00 cum Rs: 114820.29cum (A+B+C+D)/825 Rs: 139.20

IRR-DAW-5-2 Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness,breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 825.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 5.50 1715.50 9435.25

Fuel / Energy charges Hour 5.50 656.00 3608.002 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.403 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00

Fuel / Energy charges Hour 4.00 38.00 152.005 Water tanker 8000 ltr Hour 8.00 402.50 3220.00

Fuel / Energy charges Hour 8.00 322.20 2577.606 Vibratory Roller 8 tonne Hour 6.50 1342.20 8724.30

Fuel / Energy charges Hour 6.50 1108.30 7203.957 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 93077.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 5.50 204.10 1122.552 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 4.00 72.10 288.405 Crew for Water tanker Hour 8.00 153.10 1224.806 Crew for Roller Hour 6.50 227.80 1480.707 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 15018.05labour component/unit qty 18.20Add contractor's profit and overhead charges 14% 2.50labour component/unit qty (including contractor's profit) 20.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 93077.50C. Cost of Labour Rs: 15018.05

Total Rs: 108095.5514% Rs. 15133.38

825.00 cum Rs: 123228.93cum (A+B+C+D)/825 Rs: 149.40

IRR-DAW-5-3 Providing casing embankment using semi-pervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

89

all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading soil in layers of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 630 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 4.00 1715.50 6862.00

Fuel / Energy charges Hour 4.00 656.00 2624.002 Shovel 0.85 cum Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.403 Tipper 5 cum Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Pump 5 hp ( ele ) Hour 3.00 3.00 9.00

Fuel / Energy charges Hour 3.00 38.00 114.005 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.006 Vibratory Roller 8 tonne Hour 5.00 1342.20 6711.00

Fuel / Energy charges Hour 5.00 1108.30 5541.507 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 71450.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 4.00 204.10 816.402 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 3.00 72.10 216.305 Crew for Water tanker Hour 5.00 153.10 765.506 Crew for Roller Hour 5.00 227.80 1139.007 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 11389.20labour component/unit qty 18.10Add contractor's profit and overhead charges 14% 2.50labour component/unit qty (including contractor's profit) 20.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 71450.00C. Cost of Labour Rs: 11389.20

Total Rs: 82839.2014% Rs. 11597.49

630.00 cum Rs: 94436.69cum (A+B+C+D)/630 Rs: 149.90

IRR-DAW-5-4 Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation,sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 95 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc.,complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 970.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 4.60 1715.50 7891.30

Fuel / Energy charges Hour 4.60 656.00 3017.60

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

90

2 Shovel 0.85 cum Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

3 Tipper 5 cum Hour 48.00 446.70 21441.60Fuel / Energy charges Hour 48.00 322.20 15465.60

4 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00Fuel / Energy charges Hour 4.00 38.00 152.00

5 Water tanker 8000 ltr Hour 8.00 402.50 3220.00Fuel / Energy charges Hour 8.00 322.20 2577.60

6 Vibratory Roller 8 tonne Hour 7.00 1342.20 9395.40Fuel / Energy charges Hour 7.00 1108.30 7758.10

7 Sundries LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 92291.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 4.60 204.10 938.862 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 4.00 72.10 288.405 Crew for Water tanker Hour 8.00 153.10 1224.806 Crew for Roller Hour 7.00 227.80 1594.607 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 14948.26labour component/unit qty 15.40Add contractor's profit and overhead charges 14% 2.20labour component/unit qty (including contractor's profit) 17.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 92291.40C. Cost of Labour Rs: 14948.26

Total Rs: 107239.6614% Rs. 15013.55

970.00 cum Rs: 122253.21cum (A+B+C+D)/970 Rs: 126.00

IRR-DAW-5-4-A Providing casing embankment using semi-pervious soil available (New Item1 - 2011-12) from excavation in layers of 25 to 30 cm before compaction including cost

of all materials, machinery, labour, all other operations such as re-excavation,sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2 Tonne Roller as stipulated etc.,complete with initial lead upto 1 km and all lifts. (For Maintenance Works)

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 970.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 4.60 1715.50 7891.30

Fuel / Energy charges Hour 4.60 656.00 3017.602 Shovel 0.85 cum Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.403 Tipper 5 cum Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00

Fuel / Energy charges Hour 4.00 38.00 152.005 Water tanker 8000 ltr Hour 8.00 402.50 3220.00

Fuel / Energy charges Hour 8.00 322.20 2577.606 Vibratory Roller 8 tonne Hour 7.00 1342.20 9395.40

Fuel / Energy charges Hour 7.00 1108.30 7758.107 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 92291.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 4.60 204.10 938.862 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 4.00 72.10 288.40

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

91

5 Crew for Water tanker Hour 8.00 153.10 1224.806 Crew for Roller Hour 7.00 227.80 1594.607 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 14948.26labour component/unit qty 15.40Add contractor's profit and overhead charges 14% 2.20labour component/unit qty (including contractor's profit) 17.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 92291.40C. Cost of Labour Rs: 14948.26

Total Rs: 107239.6614% Rs. 15013.55

970.00 cum Rs: 122253.21cum (A+B+C+D)/970 Rs: 126.00

46.106.10

Rate per cum Rs. 86.00

IRR-DAW-5-5 Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSISUNIT :

A. MATERIALS: 807.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 5.40 1715.50 9263.70

Fuel / Energy charges Hour 5.40 656.00 3542.402 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.403 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 446.70 17868.00

Fuel / Energy charges Hour 40.00 322.20 12888.004 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00

Fuel / Energy charges Hour 4.00 38.00 152.005 Water tanker 8000 ltr Hour 8.00 402.50 3220.00

Fuel / Energy charges Hour 8.00 322.20 2577.606 Vibratory Roller 8 tonne Hour 6.40 1342.20 8590.08

Fuel / Energy charges Hour 6.40 1108.30 7093.127 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 86444.10

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 5.40 204.10 1102.142 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 40.00 153.10 6124.004 Crew for Pump Hour 4.00 72.10 288.405 Crew for Water tanker Hour 8.00 153.10 1224.806 Crew for Roller Hour 6.40 227.80 1457.927 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 13750.06labour component/unit qty 17.00Add contractor's profit and overhead charges 14% 2.40labour component/unit qty (including contractor's profit) 19.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 86444.10C. Cost of Labour Rs: 13750.06

Total Rs: 100194.1614% Rs. 14027.18

807.00 cum Rs: 114221.34cum (A+B+C+D)/807 Rs: 141.50

D.Add for contractor's profit and overheads on (A+B+C)

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per Deduct Rate for Proctar's density Control of 95% using 8T roller as per IRR-PMW-3-23Add Rate for Proctor's Density control of 90% using 2T Roller as per IRR-PMW-3-24

Rate per Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

92

IRR-DAW-5-6 Providing embankment adjacent to masonry / concrete structures and filling trial pitsusing impervious soil from approved borrow areas in layers of 10 to 15 cm and compactingeach layer to density control of not less than 95 percent using pneumatic tampers or byvibratory earth rammers including cost of all materials, machinery, labour, picking previouslayer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto1 km and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 80 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of air hose Hour 16.00 10.94 175.00

0.00 0.00 0.00Total cost of Materials Rs: 175.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Angle dozer 90 hp Hour 0.15 1715.50 257.33

Fuel / Energy charges Hour 0.15 656.00 98.402 Shovel 0.85 cum Hour 0.80 1706.60 1365.28

Fuel / Energy charges Hour 0.80 937.80 750.243 Tipper 5 cum Hour 3.00 446.70 1340.10

Fuel / Energy charges Hour 3.00 322.20 966.604 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.005 Pump 5 hp ( ele ) Hour 0.40 3.00 1.20

Fuel / Energy charges Hour 0.40 38.00 15.206 Water tanker 8000 ltr Hour 0.80 402.50 322.00

Fuel / Energy charges Hour 0.80 322.20 257.767 Pneumatic tampers 2 Nos. Hour 16.00 20.70 331.20

Fuel / Energy charges Hour 16.00 0.00 0.008 Sundries LS 1.00 41.00 41.00

Total hire charges of Machinery Rs: 10536.71

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Dozer Hour 0.15 204.10 30.622 Crew for Shovel Hour 0.80 204.10 163.283 Crew for Tipper Hour 3.00 153.10 459.304 Crew for Air compressor Hour 8.00 142.40 1139.205 Crew for Pump Hour 0.40 72.10 28.846 Crew for Water tanker Hour 0.80 153.10 122.487 Crew for Pneumatic tamper Hour 16.00 227.80 3644.808 work inspector Day 1.00 370.00 370.009 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 7433.52labour component/unit qty 92.90Add contractor's profit and overhead charges 14% 13.00labour component/unit qty (including contractor's profit) 105.90

ABSTRACT:A. Cost of Materials Rs: 175.00B. Hire charges of Machinery Rs: 10536.71C. Cost of Labour Rs: 7433.52

Total Rs: 18145.2214% Rs. 2540.33

80.00 cum Rs: 20685.55cum (A+B+C+D)/80 Rs: 258.60

IRR-DAW-5-7 Providing and constructing rockfill embankment with 300 mm down graded stones andquarry spalls from approved source including cost of all materials, machinery, labour, spreadingstones and spalls in layers, hand packing, wedging, finishing the surface to required slopesetc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 400 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill rod 2.5 m long Rm 387.00 41.69 16135.32

Reconditioning charges @ 10% 1613.532 Use rate of air hose 6 Nos. Hour 60.00 10.94 656.253 Explosive small dia kg 118.00 70.00 8260.004 Electric detonators Nos 159.00 13.00 2067.005 Detonator ordinary Nos 8.00 9.00 72.006 Fuse coil Rm 200.00 11.00 2200.00

Rate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

93

7 Sundries ( waste tyres etc ) LS 10.00 41.00 410.00Total cost of Materials Rs: 31414.10

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5cmm( diesel )3 Nos Hour 30.00 275.60 8268.00

Fuel / Energy charges Hour 30.00 959.10 28773.002 Jack hammer 6 Nos Hour 60.00 19.80 1188.00

Fuel / Energy charges Hour 60.00 0.00 0.003 Angle dozer 90 hp Hour 4.00 1715.50 6862.00

Fuel / Energy charges Hour 4.00 656.00 2624.004 Shovel 0.85 cum Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.405 Tipper 5 cum Hour 24.00 446.70 10720.80

Fuel / Energy charges Hour 24.00 322.20 7732.80Total hire charges of Machinery Rs: 87323.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Air compressor Hour 30.00 182.20 5466.002 Crew for Jack hammer Hour 60.00 284.70 17082.003 Crew for Shovel Hour 8.00 204.10 1632.804 Crew for Tipper Hour 24.00 153.10 3674.405 Crew for Dozer Hour 4.00 204.10 816.406 Blaster Day 1.00 440.00 440.007 Helper blaster Day 1.00 345.00 345.008 work inspector Day 2.00 370.00 740.009 Mason Class-II Day 2.00 345.00 690.00

10 mazdoor Day 10.00 295.00 2950.00Total cost of Labour Rs: 33836.60

labour component/unit qty 84.60Add contractor's profit and overhead charges 14% 11.80labour component/unit qty (including contractor's profit) 96.40

ABSTRACT:A. Cost of Materials Rs: 31414.10B. Hire charges of Machinery Rs: 87323.80C. Cost of Labour Rs: 33836.60

Total Rs: 152574.5014% Rs. 21360.43

400.00 cum Rs: 173934.93cum (A+B+C+D)/400 Rs: 434.80

IRR-DAW-5-8 Providing and constructing dry rubble rock-toe using rubble and stone chips fromapproved source including cost of all materials, machinery, labour, hand packing rubbleand stone chips, finishing top and sides to required slopes etc., complete with initial lead upto1 km and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Use rate of drill rod 1.5 m long Rm 97.00 41.69 4044.25

Reconditionong charges @ 10% 404.432 Use rate of air hose Hour 15.00 10.94 164.063 Explosive small dia kg 30.00 70.00 2100.004 Electric detonator Nos 40.00 13.00 520.005 Detonator ordinary Nos 2.00 9.00 18.006 Fuse coil Rm 50.00 11.00 550.007 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 7882.74

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Air compressor 8.5 cmm ( diesel ) Hour 7.50 275.60 2067.00

Fuel / Energy charges Hour 7.50 959.10 7193.252 Jack hammer Hour 15.00 19.80 297.00

Fuel / Energy charges Hour 15.00 0.00 0.003 Shovel 0.85 cum Hour 2.00 1706.60 3413.20

Fuel / Energy charges Hour 2.00 937.80 1875.604 Tipper 5 cum Hour 6.00 446.70 2680.20

Fuel / Energy charges Hour 6.00 322.20 1933.20Total hire charges of Machinery Rs: 19459.45

C. LABOUR:

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

94

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Air compressor Hour 7.50 182.20 1366.502 Crew for Jack hammer Hour 15.00 284.70 4270.503 Crew for Shovel Hour 2.00 204.10 408.204 Crew for Tipper Hour 6.00 153.10 918.605 Blaster Day 0.50 440.00 220.006 Helper blaster Day 1.00 345.00 345.007 work inspector Day 1.00 370.00 370.008 Mason Class-II Day 7.00 345.00 2415.009 mazdoor Day 19.00 295.00 5605.00

Total cost of Labour Rs: 15918.80labour component/unit qty 159.20Add contractor's profit and overhead charges 14.00% 22.30labour component/unit qty (including contractor's profit) 181.50

ABSTRACT:A. Cost of Materials Rs: 7882.74B. Hire charges of Machinery Rs: 19459.45C. Cost of Labour Rs: 15918.80

Total Rs: 43260.9914.00% Rs. 6056.54

100.00 cum Rs: 49317.53cum (A+B+C+D)/100 Rs: 493.20

IRR-DAW-5-9 Providing and constructing dry rubble rock-toe with rubble and stone chips from dumpyard (Spoil Bank) including cost of all materials, machinery, labour, hand packing rubble and stone chips,finishing top and sides to required slopes etc., complete with initial lead upto 1 km and alllifts.

Note: Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /stone chips. Sorting out and breaking charges included in rate analysis.

DATA: RATE ANALYSISUNIT : 100 cum

A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Useful rubble ( at dump yard ) cum 100.00 155.00 15500.002 Useful stone chips ( at dump yard ) cum 15.00 175.00 2625.00

Total cost of Materials Rs: 18125.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Shovel 0.85 cum Hour 2.00 1706.60 3413.20

Fuel / Energy charges Hour 2.00 937.80 1875.602 Tipper 5 cum Hour 6.00 446.70 2680.20

Fuel / Energy charges Hour 6.00 322.20 1933.20Total hire charges of Machinery Rs: 9902.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Shovel Hour 2.00 204.10 408.202 Crew for Tipper Hour 6.00 153.10 918.603 Mason Class-II Day 7.00 345.00 2415.004 work inspector Day 1.00 370.00 370.006 Stone breaker Day 2.00 345.00 690.007 mazdoor Day 21.00 295.00 6195.00

Total cost of Labour Rs: 10996.80labour component/unit qty 110.00Add contractor's profit and overhead charges 14% 15.40labour component/unit qty (including contractor's profit) 125.40

ABSTRACT:A. Cost of Materials Rs: 18125.00B. Hire charges of Machinery Rs: 9902.20C. Cost of Labour Rs: 10996.80

Total Rs: 39024.0014% Rs. 5463.36

100.00 cum Rs: 44487.36cum (A+B+C+D)/100 Rs: 444.90

IRR-DAW-5-9-A Providing and constructing Dry rock Pitching for Groynes using Un-Coursed rubble stone of size 300 mm thick

(New Item 4 -2012-13) and Un-Coursed rubble stone chips from Quarry to site of work including cost of all materials, Machinery, Labour charge hand packing Un-Course rubble stone &chips to the designed profile with all leads and lifts etc

Total cost for

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Rate per

Dam and Allied Works - Item Unit Rates 2014-15

95

DATA: RATE ANALYSISUNIT : 100 cum

A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Un Coursed Rubble Stones at quarry cum 100.00 318.00 31800.002 Stone Chips at Quarry cum 15.00 340.00 5100.00

Total cost of Materials Rs: 36900.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs

1 Hour 2.00 1706.60 3413.20Fuel / Energy charges Hour 2.00 937.80 1875.60

2 Tipper 5 cum Hour 6.00 446.70 2680.20Fuel / Energy charges Hour 6.00 322.20 1933.20

Total hire charges of Machinery Rs: 9902.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Crew for Shovel Hour 2.00 204.10 408.202 Crew for Tipper Hour 6.00 153.10 918.603 Mason Class-II Day 7.00 345.00 2415.004 work inspector Day 1.00 370.00 370.006 Stone breaker Day 2.00 345.00 690.007 mazdoor Day 21.00 295.00 6195.00

Total cost of Labour Rs: 10996.80labour component/unit qty 110.00Add contractor's profit and overhead charges 14% 15.40labour component/unit qty (including contractor's profit) 125.40

ABSTRACT:A. Cost of Materials Rs: 36900.00B. Hire charges of Machinery Rs: 9902.20C. Cost of Labour Rs: 10996.80

Total Rs: 57799.0014% Rs. 8091.86

100.00 cum Rs: 65890.86cum (A+B+C+D)/100 Rs: 658.90

IRR-DAW-5-10 Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe fordrainage including cost of all materials, machinery, labour etc., complete with lead upto 1 kmand all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 RmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Hume pipe 300 mm dia.with collar Rm 100.00 650.00 65000.00

0.00 0.00Total cost of Materials Rs: 65000.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Mason Cl- II Day 2 345.00 690.002 mazdoor Day 6 295.00 1770.00

Total cost of Labour Rs: 2460.00labour component/unit qty 24.60Add contractor's profit and overhead charges 14% 3.40labour component/unit qty (including contractor's profit) 28.00

ABSTRACT:A. Cost of Materials Rs: 65000.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2460.00

Total Rs: 67460.0014% Rs. 9444.4

100.00 Rm Rs: 76904.40Rm (A+B+C+D)/100 Rs: 769.00

Rate per

Shovel 0.85 cum for loading tipper at the worksite

D.Add for contractor's profit and overheads on (A+B+C)Total cost for

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

96

IRR_DAW-6 FILTER & PITCHING WORKS :

IRR-DAW-6-1 Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hardcoarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cmthick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways forbed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover,excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery,labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., completewith lead upto 1 km and all lifts.( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,FA : 0.44 cum, superplasticizer (0.4% by wt. of cement)

DATA: RATE ANALYSIS

A. MATERIALS: UNIT 1 EachSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Cement kg 1331.70 4.00 5326.80

Cement for incidentals @ 3 kg / cum kg 13.32 4.00 53.272 Coarse aggregate 20 to 10 mm cum 2.31 1210.00 2793.02

Coarse aggregate 10 to 4.75 mm cum 1.24 875.00 1087.563 Fine aggregate (Un-Screened ) cum 1.95 462.00 902.364 Super plasticiser kg 23.65 80.00 1891.655 Reinforcement steel with 5 % wastage kg 163.70 46.50 7611.826 Binding wire kg 4.00 70.00 280.007 Hume pipe 300 mm dia Rm 1.00 650.00 650.008 Use rate of shuttering sqm 36.00 235.84 8490.249 Scaffolding of shuttering @ 5% 424.51

10 Sundries LS 2.00 41.00 82.00Total cost of Materials Rs: 29593.22

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Concrete mixer 300 / 200 ( ele ) Hour 4.00 51.70 206.80

Fuel / Energy charges Hour 4.00 38.00 152.002 Needle vibrator 40 mm dia ( ele ) Hour 4.00 8.00 32.00

Fuel / Energy charges Hour 4.00 7.60 30.403 Pump 5 hp ( ele ) Hour 0.50 3.00 1.50

Fuel / Energy charges Hour 0.50 38.00 19.004 Sundries LS 1.00 41.00 41.00

Total hire charges of Machinery Rs: 482.70

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Mason Cl- II Day 1.00 345.00 345.002 Bar bender Day 1.00 450.00 450.003 work inspector Day 1.00 370.00 370.004 mazdoor

for excavation for foundation Day 2.00 295.00 590.00for bar bending Day 1.00 295.00 295.00for concreting Day 5.00 295.00 1475.00for excavation for foundation Day 2.00 295.00 590.00for concreting Day 4.00 295.00 1180.00for curing Day 1.00 295.00 295.00

5 Labour for shuttering sqm 36.00 75.30 2710.80Total cost of Labour Rs: 8300.80

labour component/unit qty 8300.80Add contractor's profit and overhead charges 0.14 1162.10labour component/unit qty (including contractor's profit) 9462.90

ABSTRACT:A. Cost of Materials Rs: 29593.22B. Hire charges of Machinery Rs: 482.70C. Cost of Labour Rs: 8300.80

Dam and Allied Works - Item Unit Rates 2014-15

97

Total Rs: 38376.7214% Rs. 5372.74

Lead Charges for 1 Km for FA 1.95 cum @ 31.5 Rs./Cum 61.52454Lead Charges for 1 Km for CA 3.55 cum @ 30.4 Rs./Cum 107.96

1.35 tonne @ 124.6 Rs./Tonne 167.58912

0.16 tonne @ 145.6 Rs./Tonne 23.8339921.00 Each Rs: 44110.37

Each (A+B+C+D)/1.0 Rs: 44110.40

IRR-DAW-6-2 Providing and constructing longitudinal and cross graded filter drains using sand and 80-20mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as perspecifications including cost of all materials, machinery, labour, laying to required slopes,compaction etc. complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Fine aggregate (Un-Screened ) cum 47.50 462.00 21945.002 Coarse aggregate 80-40 mm cum 17.865 635.00 11344.283 Coarse aggregate 40-20 mm cum 1.99 1145.00 2272.834 Coarse aggregate 20-10 mm cum 24.49 1210.00 29629.885 Coarse aggregate 10 mm down cum 8.16 875.00 7142.19

Total cost of Materials Rs: 72334.16

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 38.00 295.00 11210.00

Total cost of Labour Rs: 11580.00labour component/unit qty 115.80Add contractor's profit and overhead charges 0.14 16.20labour component/unit qty (including contractor's profit) 132.00

ABSTRACT:A. Cost of Materials Rs: 72334.16B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 11580.00

Total Rs: 83914.1614% Rs. 11747.98

100.00 cum Rs: 95662.14cum (A+B+C+D)/100 Rs: 956.60

IRR-DAW-6-3 Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria asper specifications including cost of all materials, machinery, labour, laying to required slope,compaction etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Fine aggregate (Un-Screened ) cum 28.60 462.00 13213.202 Coarse aggregate 80-40 mm cum 32.13 635.00 20402.553 Coarse aggregate 40-20 mm cum 3.57 1145.00 4087.654 Coarse aggregate 20-10 mm cum 28.13 1210.00 34031.255 Coarse aggregate 10 mm down cum 8.93 875.00 7809.38

Total cost of Materials Rs: 79544.03

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

D.Add for contractor's profit and overheads on (A+B+C)

Rate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

98

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 38.00 295.00 11210.00

Total cost of Labour Rs: 11580.00labour component/unit qty 115.80Add contractor's profit and overhead charges 0.14 16.20labour component/unit qty (including contractor's profit) 132.00

ABSTRACT:A. Cost of Materials Rs: 79544.03B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 11580.00

Total Rs: 91124.0314% Rs. 12757.36

100.00 cum Rs: 103881.39cum (A+B+C+D)/100 Rs: 1038.80

IRR-DAW-6-4 Providing and constructing graded filter media below and behind rock-toe consisting of20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarseaggregates satisfying filter creteria as per specifications including cost of all materials, labour,machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m andall lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Fine aggregate (Un-Screened ) cum 23.55 462.00 10880.102 Coarse aggregate 80-40 mm cum 42.39 635.00 26917.653 Coarse aggregate 40-20 mm cum 4.71 1145.00 5392.954 Coarse aggregate 20-10 mm cum 22.05 1210.00 26680.505 Coarse aggregate 10 mm down cum 7.35 875.00 6431.25

Total cost of Materials Rs: 76302.45

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 34.00 295.00 10030.00

Total cost of Labour Rs: 10400.00labour component/unit qty 104.00Add contractor's profit and overhead charges 0.14 14.60labour component/unit qty (including contractor's profit) 118.60

ABSTRACT:A. Cost of Materials Rs: 76302.45B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10400.00

Total Rs: 86702.4514% Rs. 12138.34

100.00 cum Rs: 98840.79cum (A+B+C+D)/100 Rs: 988.40

IRR-DAW-6-4-A Providing and constructing graded filter media below and behind rock-toe consisting of(New Item2- 2011-12) 30 cm thick 80 - 20 mm size graded coarse

aggregates satisfying filter creteria as per specifications including cost of all materials, labour,machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m andall lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Coarse aggregate 80-40 mm cum 35.00 635.00 22225.002 Coarse aggregate 40-20 mm cum 55.00 1145.00 62975.003 Coarse aggregate 20-10 mm cum 5.00 1210.00 6050.004 Coarse aggregate 10 mm down cum 5.00 875.00 4375.00

Total cost forRate per

Total cost forRate per

Description

D.Add for contractor's profit and overheads on (A+B+C)

D.Add for contractor's profit and overheads on (A+B+C)

Dam and Allied Works - Item Unit Rates 2014-15

99

Total cost of Materials Rs: 95625.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 12.00 295.00 3540.00

Total cost of Labour Rs: 3910.00labour component/unit qty 39.10Add contractor's profit and overhead charges 0.14 5.50labour component/unit qty (including contractor's profit) 44.60

ABSTRACT:A. Cost of Materials Rs: 95625.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3910.00

Total Rs: 99535.0014% Rs. 13934.9

100.00 cum Rs: 113469.90cum (A+B+C+D)/100 Rs: 1134.70

IRR-DAW-6-5 Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-wovenfilter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclinedand horizontal filter blanket for embankment including cost of all materials, machinery, labouretc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 PP filter fabric 250 gsm sqm 220.00 154.00 33880.002 20 - 10 mm CA @ 75 % cum 30.00 1210.00 36300.00

10 mm down CA @ 25 % cum 10.00 875.00 8750.00Total cost of Materials Rs: 78930.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 14.00 295.00 4130.00

Total cost of Labour Rs: 4500.00labour component/unit qty 45.00Add contractor's profit and overhead charges 0.14 6.30labour component/unit qty (including contractor's profit) 51.30

ABSTRACT:A. Cost of Materials Rs: 78930.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4500.00

Total Rs: 83430.0014% Rs. 11680.2

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

D.Add for contractor's profit and overheads on (A+B+C)Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

100

100.00 sqm Rs: 95110.20sqm (A+B+C+D)/100 Rs: 951.10

IRR-DAW-6-6 Providing and constructing 45 cm thick chimney filter using clean approved sand satisfyingfilter creteria including cost of all materials, machinery, labour, compacting etc., complete withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened) cum 105.00 462.00 48510.00

0.00 0.00Total cost of Materials Rs: 48510.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 30.00 295.00 8850.00

Total cost of Labour Rs: 9220.00labour component/unit qty 92.20Add contractor's profit and overhead charges 0.14 12.90labour component/unit qty (including contractor's profit) 105.10

ABSTRACT:A. Cost of Materials Rs: 48510.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 9220.00

Total Rs: 57730.0014% Rs. 8082.2

100.00 cum Rs: 65812.20cum (A+B+C+D)/100 Rs: 658.10

IRR-DAW-6-7 Providing and constructing 90 cm thick transition cum filter media behind rockfill usingapproved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteriain layers of 30 cm thickness each as per specifications including cost of all materials,machinery, labour, laying each layer to required slope, compaction etc., complete with initiallead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 cum.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened ) cum 34.00 462.00 15708.002 Coarse aggregate 80-40 mm cum 30.60 635.00 19431.003 Coarse aggregate 40-20 mm cum 3.40 1145.00 3893.004 Coarse aggregate 20-10 mm cum 25.50 1210.00 30855.005 Coarse aggregate 10 mm down cum 8.50 875.00 7437.50

Total cost of Materials Rs: 77324.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 mazdoor Day 40.00 295.00 11800.00

Total cost of Labour Rs: 12170.00labour component/unit qty 121.70Add contractor's profit and overhead charges 0.14 17.00labour component/unit qty (including contractor's profit) 138.70

ABSTRACT:

Total cost forRate per

Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)

Dam and Allied Works - Item Unit Rates 2014-15

101

A. Cost of Materials Rs: 77324.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 12170.00

Total Rs: 89494.5014% Rs. 12529.23

100.00 cum. Rs: 102023.73cum. (A+B+C+D)/100 Rs: 1020.20

IRR-DAW-6-8 Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter mediaconsisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cmthick each including cost of all materials, machinery, labour, laying to required slopes, wedgingwith chips, finishing etc. complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened ) cum 15.30 462.00 7068.602 Coarse aggregate 10 mm down cum 15.30 875.00 13387.503 Coarse aggregate 40-20 mm cum 15.30 1145.00 17518.504 Stone chips cum 9.00 340.00 3060.005 cum 57.60 318.00 18316.806 Nos 44.00 59.00 2596.00

Total cost of Materials Rs: 61947.40

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 10.00 345.00 3450.003 mazdoor Day 33.00 295.00 9735.00

Total cost of Labour Rs: 13555.00labour component/unit qty 135.60Add contractor's profit and overhead charges 0.14 19.00labour component/unit qty (including contractor's profit) 154.60

ABSTRACT:A. Cost of Materials Rs: 61947.40B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 13555.00

Total Rs: 75502.4014% Rs. 10570.34

100.00 sqm Rs: 86072.74sqm (A+B+C+D)/100 Rs: 860.70

IRR-DAW-6-9 Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter mediaconsisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cmthick each including cost of all materials, machinery, labour, laying to required slopes, wedgingwith chips, finishing etc. complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened ) cum 20.40 462.00 9424.802 Coarse aggregate 10 mm down cum 20.40 875.00 17850.003 Coarse aggregate 40-20 mm cum 20.40 1145.00 23358.004 Stone chips cum 9.00 340.00 3060.005 Rough stones ( rubble ) 30 to 45 cm long cum 57.60 318.00 18316.806 Through stones 65 to 75 cm long Nos 44.00 59.00 2596.00

Total cost of Materials Rs: 74605.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Rate per

Rough stones ( rubble ) 30 to 45 cm longThrough stones 65 to 75 cm long

D.Add for contractor's profit and overheads on (A+B+C)Total cost for

Dam and Allied Works - Item Unit Rates 2014-15

102

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 10.00 345.00 3450.003 mazdoor Day 39.00 295.00 11505.00

Total cost of Labour Rs: 15325.00labour component/unit qty 153.30Add contractor's profit and overhead charges 0.14 21.50labour component/unit qty (including contractor's profit) 174.80

ABSTRACT:A. Cost of Materials Rs: 74605.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 15325.00

Total Rs: 89930.6014% Rs. 12590.28

100.00 sqm Rs: 102520.88sqm (A+B+C+D)/100 Rs: 1025.20

IRR-DAW-6-10 Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approvedaggregates laid in layers of 15 cm thick each including cost of all materials, machinery,labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqm.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened ) cum 15.30 462.00 7068.602 Coarse aggregate 10 mm down cum 15.30 875.00 13387.503 Coarse aggregate 40-20 mm cum 15.30 1145.00 17518.504 Stone chips cum 9.00 340.00 3060.005 Rough stones ( rubble ) cum 60.00 318.00 19080.00

Total cost of Materials Rs: 60114.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 5.00 345.00 1725.003 mazdoor Day 28.00 295.00 8260.00

Total cost of Labour Rs: 10355.00labour component/unit qty 103.60Add contractor's profit and overhead charges 0.14 14.50labour component/unit qty (including contractor's profit) 118.10

ABSTRACT:A. Cost of Materials Rs: 60114.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10355.00

Total Rs: 70469.6014% Rs. 9865.74

100.00 sqm. Rs: 80335.34sqm. (A+B+C+D)/100 Rs: 803.40

IRR-DAW-6-11 Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approvedaggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour,laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 mand all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqmSl No Particulars Unit Quantity Rate Amount

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

103

in Rs. in Rs1 Sand (Un-Screened ) cum 15.30 462.00 7068.602 Coarse aggregate 10 mm down cum 15.30 875.00 13387.503 Coarse aggregate 40-20 mm cum 15.30 1145.00 17518.504 Stone chips cum 11.00 340.00 3740.005 Rough stones ( rubble ) cum 75.00 318.00 23850.00

Total cost of Materials Rs: 65564.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 6.00 345.00 2070.003 mazdoor Day 30.00 295.00 8850.00

Total cost of Labour Rs: 11290.00labour component/unit qty 112.90Add contractor's profit and overhead charges 0.14 15.80labour component/unit qty (including contractor's profit) 128.70

ABSTRACT:A. Cost of Materials Rs: 65564.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 11290.00

Total Rs: 76854.6014% Rs. 10759.64

100.00 sqm Rs: 87614.24sqm (A+B+C+D)/100 Rs: 876.10

IRR-DAW-6-12 Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approvedaggregates laid in layers of 15 cm thick each including cost of all materials, machinery,labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto50 m and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqmSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand (Un-Screened ) cum 15.30 462.00 7068.602 Coarse aggregate 10 mm down cum 15.30 875.00 13387.503 Coarse aggregate 40-20 mm cum 15.30 1145.00 17518.504 Stone chips cum 13.50 340.00 4590.005 Rough stones ( rubble ) cum 90.00 318.00 28620.00

Rs: 71184.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 8.00 345.00 2760.003 mazdoor Day 34.00 295.00 10030.00

Total cost of Labour Rs: 13160.00labour component/unit qty 131.60Add contractor's profit and overhead charges 0.14 18.40labour component/unit qty (including contractor's profit) 150.00

ABSTRACT:A. Cost of Materials Rs: 71184.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 13160.00

Total Rs: 84344.6014% Rs. 11808.24

100.00 sqm Rs: 96152.84sqm (A+B+C+D)/100 Rs: 961.50

Total cost of Materials

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

D.Add for contractor's profit and overheads on (A+B+C)Total cost forRate per

Dam and Allied Works - Item Unit Rates 2014-15

104

IRR-DAW-6-13 Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthenembankments over 20 mm thick sand backing including cost of all materials, machinery,labour including preparing surface, spreading sand, watering for 15 days etc., complete withinitial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS

A. MATERIALS: UNIT : 100 sqm.Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 Sand for filling cum 2.00 342.00 684.002 Hariyala turfing sods sqm 100.00 28.00 2800.00

Total cost of Materials Rs: 3484.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs1 Day 2.00 395.00 790.002 mazdoor Day 15.00 295.00 4425.00

Total cost of Labour Rs: 5215.00labour component/unit qty 52.20Add contractor's profit and overhead charges 0.14 7.30labour component/unit qty (including contractor's profit) 59.50

ABSTRACT:A. Cost of Materials Rs: 3484.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5215.00

Total Rs: 8699.0014% Rs. 1217.86

Lead Charges for 1 Km for FA 2.00 cum @ 31.5 Rs./Cum 63100.00 sqm. Rs: 9979.86

sqm. (A+B+C+D)/100 Rs: 99.80Total cost for

Cartman with double bullock cart

Rate per

D.Add for contractor's profit and overheads on (A+B+C)

Tunnel and Allied Works - Item Unit Rates 2014-15

105

Chapter - II

TUNNEL AND ALLIED WORKS - Standard Data

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)FOR THE YEAR :2014-15

Index- code

IRR-TAW

Directions to add Seigniorage Charges and Additional Lead ChargesSeigniorage Charges:1. The unit rate for work item in the Standard Data is exclusive of Seigniorage Charges wherever applicable.2. The appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item while preparing the estimate. (i.e., to the data itself)3. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges while adding Seigniorage Charges to the data in the estimateAdditional Lead and Lift Charges:1. Unless otherwise specified the basic rates are inclusive of all lifts.2. For concrete, masonry and reinforcement items wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Cement, Steel, sand, coarse aggregate, stones and stone chips shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.In case of Cement and Steel, Loading and unloading charges are already added in the work item while arriving the unit rate and hence should not be added againExample:Total lead for sand from approved sand quarry : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

3. The Leads for Steel and Cement shall be from the nearest market place to the Project area

4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)Example:Total lead for earth from approved borrow area : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges

TAW -Work Items

IRR-TAW-1 EXCAVATION :

IRR-TAW-1-1 Excavation for adit by tunnelling methods in all types of rock including cost of all materials,machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing andhauling the excavated muck outside adit upto specified dump area and all other ancillaryoperations etc., complete with initial lead upto 1km and all lifts.

TUNNEL AND ALLIED WORKS - DATA RATES

Tunnel and Allied Works - Item Unit Rates 2014-15

106

DATA: RATE ANALYSIS UNIT : 38.50 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Small dia explosive kg 40.00 70.00 2800.002 Delay detonators Nos 54.00 23.00 1242.003 Electric detonators Nos 5.00 13.00 65.004 Detonating fuse coil Rm 50.00 11.00 550.005 Use rate of drill rod 2.5 m long Rm 119.00 41.69 4961.51

Reconditioning charges @ 10% 496.156 Use rate of air hose Hour 20.00 5.47 109.387 Use rate of water hose Hour 20.00 6.84 136.888 Sundries( paint / template etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 10442.91

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling jumbo Hour 8.00 368.40 2947.20

Fuel / Energy charges Hour 8.00 46.00 368.002 Air compressor 15 cmm ( ele ) Hour 5.00 138.80 694.00

Fuel / Energy charges Hour 5.00 951.20 4756.003 Jack hammer ( 4 x 5 hrs ) Hour 20.00 19.80 396.00

Fuel / Energy charges Hour 20.00 0.00 0.004 Pusher leg Hour 20.00 12.70 254.00

Fuel / Energy charges Hour 20.00 0.00 0.005 Convey mucker Hour 6.50 822.80 5348.20

Fuel / Energy charges Hour 6.50 264.80 1721.206 Dumper ( 1 x 6.5 hrs ) Hour 6.50 580.70 3774.55

Fuel / Energy charges Hour 6.50 429.70 2793.057 Pump 10 hp ( ele ) Hour 5.00 6.70 33.50

Fuel / Energy charges Hour 5.00 76.10 380.508 Ventilation fans 20 hp Hour 1.00 11.50 11.50

Fuel / Energy charges Hour 1.00 152.20 152.209 Sundries(explosive van / magazine ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 23711.90

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 8.00 151.80 1214.402 Crew for Air compressor Hour 5.00 151.80 759.003 Crew for Jack hammer Hour 20.00 284.70 5694.004 Crew for Convey mucker Hour 6.50 151.80 986.705 Crew for Dumper Hour 6.50 195.90 1273.356 Crew for Pump Hour 5.00 72.10 360.507 Crew for ventilation fans Hour 1.00 24.90 24.908 Surveyor Day 0.50 550.00 275.009 Foreman Day 1.00 440.00 440.00

10 Fitter / Mechanic Day 2.00 385.00 770.0011 Blaster ( Licensed ) Day 1.00 440.00 440.00

Tunnel and Allied Works - Item Unit Rates 2014-15

107

12 Helper blasting Day 2.00 345.00 690.0013 Hammerman Day 2.00 345.00 690.0014 work inspector 1 in each shift Day 3.00 370.00 1110.0015 Khalasi for mucking shift 4 Nos Day 4.00 385.00 1540.0016 mazdoor

for mucking shift 4 Nos Day 4.00 295.00 1180.00for other 2 shifts 1 No each shift Day 2.00 295.00 590.00for cleaning & miscellaneous Day 2.00 295.00 590.00

Total cost of Labour Rs: 18627.85labour component/unit qty 483.80Add contractor's profit and overhead charges 0.14 67.70labour component/unit qty (including contractor's profit) 551.50

ABSTRACT:A. Cost of Materials Rs: 10442.91B. Hire charges of Machinery Rs: 23711.90C. Cost of Labour Rs: 18627.85

Total Rs: 52782.66Add for Air and Water line @ 1.00% Rs: 527.83Add for Ventilation @ 4.50% Rs: 2375.22Add for Lighting @ 1.60% Rs: 844.52Add for Ele sub-station / Demand charges @ 2.50% Rs: 1319.57

Total Rs: 57849.79

14% Rs: 8098.97Total cost for 38.50 cum Rs: 65948.76Rate per cum (A+B+C+D)/38.50 Rs: 1713.00

IRR-TAW-1-2 Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of allmaterials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting,drainage, removing and hauling excavated muck outside shaft upto specified dump area andall other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

DATA RATE ANALYSIS UNIT : 30.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Small dia explosive kg 32.00 70.00 2240.002 Electric detonator Nos 65.00 13.00 845.003 Detonating fuse coil Rm 50.00 11.00 550.004 Use rate of drill rod 1.6 m long Rm 95.00 26.85 2551.075 Reconditioning charges @ 10% 255.116 Use rate of air hose Hour 18.00 21.88 393.757 Use rate of water hose Hour 16.00 27.38 438.008 Use rate of rail track Shift 3.00 127.46 382.399 Use rate of mucking bucket Hour 24.00 24.19 580.54

10 Sundries( paint / template etc ) LS 2.00 41.00 82.00Total cost of Materials Rs: 8317.85

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 15 cmm ( ele ) Hour 4.50 138.80 624.60

Fuel / Energy charges Hour 4.50 951.20 4280.402 Jack hammer ( 4 x 4 hrs ) Hour 16.00 19.80 316.80

Fuel / Energy charges Hour 16.00 0.00 0.003 Pump 10 hp ( ele ) Hour 4.00 6.70 26.80

Fuel / Energy charges Hour 4.00 76.10 304.404 Pump 20 hp electric Hour 2.00 12.30 24.60

Fuel / Energy charges Hour 2.00 152.20 304.405 Winch 35 hp electric Hour 28.00 129.40 3623.20

Fuel / Energy charges Hour 28.00 186.40 5219.206 Tipping tub 1.5 cum Hour 24.00 64.20 1540.80

Fuel / Energy charges Hour 24.00 0.00 0.007 Sundries(explosive van / magazine ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 16347.20

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

108

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 4.50 151.80 683.102 Crew for Jack hammer Hour 16.00 284.70 4555.203 Crew for Pump 10 hp Hour 4.00 72.10 288.404 Crew for Pump 20 hp Hour 2.00 72.10 144.205 Crew for Winch Hour 28.00 227.80 6378.406 Surveyor Day 0.50 550.00 275.007 Foreman Day 4.00 440.00 1760.008 Fitter / Mechanic Day 2.00 385.00 770.009 Blaster ( Licensed ) Day 1.00 440.00 440.00

10 Helper blasting Day 2.00 345.00 690.0011 Hammerman 1 No. in each shift Day 3.00 345.00 1035.0012 work inspector 1 in each shift Day 4.00 370.00 1480.0013 Khalasi for mucking 2 Nos in each shift Day 6.00 385.00 2310.0014 mazdoor

for mucking 8 Nos in each shift Day 24.00 295.00 7080.00for other 2 shifts 1 No / shift Day 2.00 295.00 590.00for cleaning & miscellaneous Day 2.00 295.00 590.00

Total cost of Labour Rs: 29069.30labour component/unit qty 969.00Add contractor's profit and overhead charges 0.14 135.70labour component/unit qty (including contractor's profit) 1104.70

ABSTRACT:A. Cost of Materials Rs: 8317.85B. Hire charges of Machinery Rs: 16347.20C. Cost of Labour Rs: 29069.30

Total Rs: 53734.35Add for Air and Water line @ 1.00% Rs: 537.34Add for Ventilation @ 4.50% Rs: 2418.05Add for Lighting @ 1.60% Rs: 859.75Add for Ele sub-station / Demand charges @ 2.50% Rs: 1343.36

Total Rs: 58892.85

14% Rs: 8245.00Total cost for 30.00 cum Rs: 67137.85Rate per cum (A+B+C+D)/30.0 Rs: 2237.90

IRR-TAW-1-3 Excavation for tunnel by tunnelling methods in rock not requiring supports including costof all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation,lighting, drainage, removing and hauling the excavated muck outside tunnel upto specifieddump area and all other ancillary operations etc., complete with initial lead upto 1 km andall lifts.

DATA: Size of tunnel assumed ( finished section ) : 4.50 m diaShape of tunnel assumed for excavation : D - shapeHeight of tunnel assumed ( finished section ) : 4.50 mLength of tunnel assumed : 1000 mThickness of CC lining : 0.30 mPay-line margin assumed : 0.20 mDiameter of tunnel upto pay line for excavation : 5.50 mDistance of dump yard from face :within 500 mHaulage of excavated muck : By dumpers

DATA: RATE ANALYSIS UNIT : 48.60 cum

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

109

A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Small dia explosive kg 54.00 70.00 3780.002 Delay detonators Nos 68.00 23.00 1564.003 Electric detonators Nos 10.00 13.00 130.004 Detonating fuse coil Rm 50.00 11.00 550.005 Use rate of drill rod 2.5 m long Rm 150.00 41.69 6254.00

Reconditioning charges @ 10% 625.406 Use rate of air hose Hour 24.00 5.47 131.257 Use rate of water hose Hour 24.00 6.84 164.258 Sundries( paint / template etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 13280.90

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling jumbo Hour 10.00 368.40 3684.00

Fuel / Energy charges Hour 10.00 46.00 460.002 Air compressor 15 cmm ( ele ) Hour 6.50 138.80 902.20

Fuel / Energy charges Hour 6.50 951.20 6182.803 Jack hammer ( 4 x 6.5 hrs ) Hour 26.00 19.80 514.80

Fuel / Energy charges Hour 26.00 0.00 0.004 Pusher leg Hour 26.00 12.70 330.20

Fuel / Energy charges Hour 26.00 0.00 0.005 Convey mucker Hour 6.00 822.80 4936.80

Fuel / Energy charges Hour 6.00 264.80 1588.806 Dumper ( 2 x 6 hrs ) Hour 12.00 580.70 6968.40

Fuel / Energy charges Hour 12.00 429.70 5156.407 Pump 10 hp ( ele ) Hour 6.50 6.70 43.55

Fuel / Energy charges Hour 6.50 76.10 494.658 Ventilation fans 20 hp Hour 2.00 11.50 23.00

Fuel / Energy charges Hour 2.00 152.20 304.409 Sundries(explosive van / magazine ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 31672.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 10.00 151.80 1518.002 Crew for Air compressor Hour 6.50 151.80 986.703 Crew for Jack hammer Hour 26.00 284.70 7402.204 Crew for Convey mucker Hour 6.00 151.80 910.805 Crew for Dumper Hour 12.00 195.90 2350.806 Crew for Pump Hour 6.50 72.10 468.657 Crew for ventilation fans Hour 2.00 24.90 49.808 Surveyor Day 0.50 550.00 275.009 Foreman Day 1.00 440.00 440.00

10 Fitter / Mechanic Day 2.00 385.00 770.0011 Blaster ( Licensed ) Day 1.00 440.00 440.0012 Helper blasting Day 2.00 345.00 690.0013 Hammerman Day 2.00 345.00 690.0014 work inspector 1 in each shift Day 3.00 370.00 1110.0015 Khalasi for mucking shift 4 Nos Day 4.00 385.00 1540.0016 mazdoor

for mucking shift 8 Nos Day 8.00 295.00 2360.00for other 2 shifts 1 No each shift Day 2.00 295.00 590.00for cleaning & miscellaneous Day 2.00 295.00 590.00

Total cost of Labour Rs: 23181.95labour component/unit qty 477.00Add contractor's profit and overhead charges 0.14 66.80labour component/unit qty (including contractor's profit) 543.80

ABSTRACT:A. Cost of Materials Rs: 13280.90B. Hire charges of Machinery Rs: 31672.00C. Cost of Labour Rs: 23181.95

Total Rs: 68134.85Add for Air and Water line @ 1.00% Rs: 681.35

Tunnel and Allied Works - Item Unit Rates 2014-15

110

Add for Ventilation @ 4.50% Rs: 3066.07Add for Lighting @ 1.60% Rs: 1090.16Add for Ele sub-station / Demand charges @ 2.50% Rs: 1703.37

Total Rs: 74675.80

14% Rs: 10454.61Total cost for 48.60 cum Rs: 85130.41Rate per cum (A+B+C+D)/48.60 Rs: 1751.70

IRR-TAW-1-4 Excavation for tunnel by tunnelling methods including excavation for supports in all types ofsoil / rock strata requiring supports ( excluding cost of providing supports ) including cost ofall other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage,removing and hauling the excavated muck outside tunnel upto specified dump area and allother ancillary operations etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 46.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Small dia explosive kg 41.00 70.00 2870.002 Delay detonators Nos 77.00 23.00 1771.003 Electric detonators Nos 10.00 13.00 130.004 Detonating fuse coil Rm 50.00 11.00 550.005 Use rate of drill rod 2.5 m long Rm 144.00 41.69 6003.84

Reconditioning charges @ 10% 600.386 Use rate of air hose Hour 24.00 5.47 131.257 Use rate of water hose Hour 24.00 6.84 164.258 Sundries( paint / template etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 12302.72

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling jumbo Hour 11.00 368.40 4052.40

Fuel / Energy charges Hour 11.00 46.00 506.002 Air compressor 15 cmm ( ele ) Hour 6.00 138.80 832.80

Fuel / Energy charges Hour 6.00 951.20 5707.203 Jack hammer ( 4 x 6 hrs ) Hour 24.00 19.80 475.20

Fuel / Energy charges Hour 24.00 0.00 0.004 Pusher leg Hour 24.00 12.70 304.80

Fuel / Energy charges Hour 24.00 0.00 0.005 Convey mucker Hour 6.00 822.80 4936.80

Fuel / Energy charges Hour 6.00 264.80 1588.806 Dumper ( 2 x 6 hrs ) Hour 12.00 580.70 6968.40

Fuel / Energy charges Hour 12.00 429.70 5156.407 Pump 10 hp ( ele ) Hour 6.00 6.70 40.20

Fuel / Energy charges Hour 6.00 76.10 456.608 Ventilation fans 20 hp Hour 2.00 11.50 23.00

Fuel / Energy charges Hour 2.00 152.20 304.409 Sundries(explosive van / magazine ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 31435.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 11.00 151.80 1669.802 Crew for Air compressor Hour 6.00 151.80 910.803 Crew for Jack hammer Hour 24.00 284.70 6832.804 Crew for Convey mucker Hour 6.00 151.80 910.805 Crew for Dumper Hour 12.00 195.90 2350.806 Crew for Pump Hour 6.00 72.10 432.607 Crew for ventilation fans Hour 2.00 24.90 49.808 Surveyor Day 0.50 550.00 275.009 Foreman Day 1.00 440.00 440.00

10 Fitter / Mechanic Day 2.00 385.00 770.0011 Blaster ( Licensed ) Day 1.00 440.00 440.0012 Helper blasting Day 2.00 345.00 690.00

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

111

13 Hammerman 2 Nos Day 2.00 345.00 690.0014 work inspector 1 in each shift Day 3.00 370.00 1110.0015 Khalasi for mucking shift 4 Nos Day 4.00 385.00 1540.0016 mazdoor

for mucking shift 8 Nos Day 8.00 295.00 2360.00for other 2 shifts 1 No each shift Day 2.00 295.00 590.00for cleaning & miscellaneous Day 2.00 295.00 590.00

Total cost of Labour Rs: 22652.40labour component/unit qty 492.40Add contractor's profit and overhead charges 0.14 68.90labour component/unit qty (including contractor's profit) 561.30

ABSTRACT:A. Cost of Materials Rs: 12302.72B. Hire charges of Machinery Rs: 31435.00C. Cost of Labour Rs: 22652.40

Total Rs: 66390.12Add for Air and Water line @ 1.00% Rs: 663.90Add for Ventilation @ 4.50% Rs: 2987.56Add for Lighting @ 1.60% Rs: 1062.24Add for Ele sub-station / Demand charges @ 2.50% Rs: 1659.75

Total Rs: 72763.58

14% Rs: 10186.90Total cost for 46.00 cum Rs: 82950.48Rate per cum (A+B+C+D)/46.0 Rs: 1803.30

IRR-TAW-1-5 Excavation for tunnel by heading and benching tunnelling methods including excavationfor supports in all types of soil / rock strata requiring supports ( excluding cost of providingsupports ) for roof before benching including cost of all other materials, machinery, labour,scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muckoutside tunnel upto specified dump area and all other ancillary operations etc., complete withinitial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 50.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Small dia explosive kg 44.00 70.00 3080.002 Delay detonators Nos 84.00 23.00 1932.003 Electric detonator Nos 10.00 13.00 130.004 Detonating fuse coil Rm 50.00 11.00 550.005 Use rate of drill rod 2.5 m long Rm 157.00 41.69 6545.85

Reconditioning charges @ 10% 654.596 Use rate of air hose Hour 26.00 5.47 142.197 Use rate of water hose Hour 26.00 6.84 177.948 Sundries( paint / template etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 13294.56

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling jumbo Hour 12.00 368.40 4420.80

Fuel / Energy charges Hour 12.00 46.00 552.002 Air compressor 15 cmm ( ele ) Hour 6.50 138.80 902.20

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

112

Fuel / Energy charges Hour 6.50 951.20 6182.803 Jack hammer ( 4 x 6.5 hrs ) Hour 26.00 19.80 514.80

Fuel / Energy charges Hour 26.00 0.00 0.004 Pusher leg Hour 26.00 12.70 330.20

Fuel / Energy charges Hour 26.00 0.00 0.005 Convey mucker Hour 6.50 822.80 5348.20

Fuel / Energy charges Hour 6.50 264.80 1721.206 Dumper ( 2 x 6.5 hrs ) Hour 13.00 580.70 7549.10

Fuel / Energy charges Hour 13.00 429.70 5586.107 Pump 10 hp ( ele ) Hour 6.50 6.70 43.55

Fuel / Energy charges Hour 6.50 76.10 494.658 Ventilation fans 20 hp Hour 3.00 11.50 34.50

Fuel / Energy charges Hour 3.00 152.20 456.609 Sundries(explosive van / magazine ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 34218.70

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 12.00 151.80 1821.602 Crew for Air compressor Hour 6.50 151.80 986.703 Crew for Jack hammer Hour 26.00 284.70 7402.204 Crew for Convey mucker Hour 6.50 151.80 986.705 Crew for Dumper Hour 13.00 195.90 2546.706 Crew for Pump Hour 6.50 72.10 468.657 Crew for Ventilation fan Hour 3.00 24.90 74.708 Surveyor Day 0.50 550.00 275.009 Foreman Day 1.00 440.00 440.00

10 Fitter / Mechanic Day 2.00 385.00 770.0011 Blaster ( Licensed ) Day 2.00 440.00 880.0012 Helper blasting Day 4.00 345.00 1380.0013 Hammerman 2 Nos Day 2.00 345.00 690.0014 work inspector 1 in each shift Day 3.00 370.00 1110.0015 Khalasi

for pushing muck in heading portion Day 4.00 385.00 1540.00for mucking shift 4 Nos Day 4.00 385.00 1540.00

16 mazdoorfor mucking shift 8 Nos Day 8.00 295.00 2360.00for other 2 shifts 1 No each shift Day 2.00 295.00 590.00for cleaning &miscellaneous Day 2.00 295.00 590.00

Total cost of Labour Rs: 26452.25labour component/unit qty 529.00Add contractor's profit and overhead charges 0.14 74.10labour component/unit qty (including contractor's profit) 603.10

ABSTRACT:A. Cost of Materials Rs: 13294.56B. Hire charges of Machinery Rs: 34218.70C. Cost of Labour Rs: 26452.25

Total Rs: 73965.51Add for Air and Water line @ 1.00% Rs: 739.66Add for Ventilation @ 4.50% Rs: 3328.45Add for Lighting @ 1.60% Rs: 1183.45Add for Ele sub-station / Demand charges @ 2.50% Rs: 1849.14

Total Rs: 81066.20

14% Rs: 11349.27Total cost for 50.00 cum Rs: 92415.47Rate per cum (A+B+C+D)/50.0 Rs: 1848.30

NOTE: Where mucking is to be carried out through shaft using winch and mucking tub systemincrease the basic rates for items IRR-TAW-1-3, IRR-TAW-1-4 & IRR-TAW-1-5 by 8 percent.

IRR-TAW-1-6 Removing and hauling muck overfallen due to natural causes such as geological faultsetc., out of tunnel including breaking large fragments by blasting if necessary and disposing offthe same in specified dump area or as directed including cost of all materials, machinery,labour, ventilation, drainage, lighting and all other ancillary operations etc., complete withinitial lead upto 1 km and all lifts.

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

113

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod Rm 15.00 26.85 402.80Reconditioning charges @ 10% 40.28

2 Explosive small dia. kg 8.00 70.00 560.003 Detonator ( ele ) Nos. 30.00 13.00 390.004 Detonating fuse coil Rm 20.00 11.00 220.005 Use rate of air hose Hour 4.00 5.47 21.886 Use rate of water hose Hour 4.00 6.84 27.387 Sundries LS 1.00 41.00 41.00

Total cost of Materials Rs: 1703.33

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 15 cmm ( ele ) Hour 1.00 138.80 138.80

Fuel / Energy charges Hour 1.00 951.20 951.202 Jack hammer Hour 4.00 19.80 79.20

Fuel / Energy charges Hour 4.00 0.00 0.003 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.104 Convey mucker Hour 6.00 822.80 4936.80

Fuel / Energy charges Hour 6.00 264.80 1588.805 Dumper 4.5 cum Hour 12.00 580.70 6968.40

Fuel / Energy charges Hour 12.00 429.70 5156.406 Sundries LS 1.00 41.00 41.00

Total hire charges of Machinery Rs: 19943.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 1.00 151.80 151.802 Crew for Jack hammer Hour 4.00 284.70 1138.803 Crew for Pump Hour 1.00 72.10 72.104 Crew for Convey mucker Hour 6.00 151.80 910.805 Crew for Dumper Hour 12.00 195.90 2350.806 Blaster ( Licensed ) Day 0.50 440.00 220.007 Helper blasting Day 0.50 345.00 172.508 mazdoor Day 8.00 295.00 2360.00

Total cost of Labour Rs: 7376.80labour component/unit qty 73.80Add contractor's profit and overhead charges 0.14 10.30labour component/unit qty (including contractor's profit) 84.10

ABSTRACT:A. Cost of Materials Rs: 1703.33B. Hire charges of Machinery Rs: 19943.40C. Cost of Labour Rs: 7376.80

Total Rs: 29023.53Add for Air and Water line @ 1.00% Rs: 290.24Add for Ventilation @ 4.50% Rs: 1306.06Add for Lighting @ 1.60% Rs: 464.38Add for Ele sub-station / Demand charges @ 2.50% Rs: 725.59

Total Rs: 31809.79

14% Rs: 4453.37Total cost for 100.00 cum Rs: 36263.16Rate per cum (A+B+C+D)/100.0 Rs: 362.60

IRR_TAW-2 DEWATERING & GUNITING WORKS :

IRR-TAW-2-1 Dewatering tunnel by pumping out water collected by natural drainage inside tunnel includingproviding sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting,ventilation and all other ancillary operations etc., complete.

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

114

DATA RATE ANALYSIS UNIT : 15.00 KwhrA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of G.I.pipe 100 mm dia Hour 1.00 4.67 4.672 Sundries LS 0.10 41.00 4.10

Total cost of Materials Rs: 8.77

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Electric pump 20 hp Hour 1.00 12.30 12.302 Fuel / Energy charges Hour 1.00 152.20 152.203 Sundries(Starter/Switches ete) LS 0.10 41.00 4.10

Total hire charges of Machinery Rs: 168.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew charges for Pump Hour 1.00 72.10 72.102 Laying & dismantling pipe LS 0.05 41.00 2.053 mazdoor Day 0.10 295.00 29.50

Total cost of Labour Rs: 103.65labour component/unit qty 6.90Add contractor's profit and overhead charges 0.14 1.00labour component/unit qty (including contractor's profit) 7.90

ABSTRACT:A. Cost of Materials Rs: 8.77B. Hire charges of Machinery Rs: 168.60C. Cost of Labour Rs: 103.65

Total Rs: 281.02Add for Air and Water line @ 1.00% Rs: 2.81Add for Ventilation @ 4.50% Rs: 12.65Add for Lighting @ 1.60% Rs: 4.50Add for Ele sub-station / Demand charges @ 2.50% Rs: 7.03

Total Rs: 307.99

14% Rs: 43.12Total cost for 15.00 Kwhr Rs: 351.11Rate per Kwhr (A+B+C+D)/15.0 Rs: 23.40

IRR-TAW-2-2 Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportionby weight including cost of all materials, machinery, labour, ventilation, lighting, drainageand all other ancillary operations etc., complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 36.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 600.00 4.00 2400.002 Sand (Screened) cum 1.10 606.00 666.603 Use rate of grout hose 20 m Hour 8.00 5.47 43.754 Use rate of water hose 20 m Hour 8.00 6.84 54.755 Use rate of guniting nozzle Hour 8.00 3.50 28.006 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 3275.10

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Guniting equipment Hour 8.00 110.10 880.80

Fuel / Energy charges Hour 8.00 0.00 0.002 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.003 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

115

Fuel / Energy charges Hour 1.00 76.10 76.104 Drilling jumbo Hour 4.00 368.40 1473.60

Fuel / Energy charges Hour 4.00 46.00 184.005 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 7493.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Guniting equipment Hour 8.00 189.80 1518.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for pump Hour 1.00 72.10 72.104 Crew for Drilling jumbo Hour 4.00 151.80 607.205 Mason Cl I Day 1.00 385.00 385.006 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 5491.90labour component/unit qty 152.60Add contractor's profit and overhead charges 0.14 21.40labour component/unit qty (including contractor's profit) 174.00

ABSTRACT:A. Cost of Materials Rs: 3275.10B. Hire charges of Machinery Rs: 7493.60C. Cost of Labour Rs: 5491.90

Total Rs: 16260.60Add for Air and Water line @ 1.00% Rs: 162.61Add for Ventilation @ 4.50% Rs: 731.73Add for Lighting @ 1.60% Rs: 260.17Add for Ele sub-station / Demand charges @ 2.50% Rs: 406.52

Total Rs: 17821.62

14% Rs: 2495.03Lead Charges for 1 Km for FA 1.10 cum @ 31.5 Rs./Cum 34.65

0.60 tonne @ 124.6 Rs./Tonne 74.76Total cost for 36.00 sqm Rs: 20426.05Rate per sqm (A+B+C+D)/36.0 Rs: 567.40

IRR-TAW-2-3 Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh (new4 - 2011-12) 100 x 100x5 mm in between the two layers including cost and conveyance of all materials,

labour charges, all heads, lifts, centering, scaffolding, machine mixing, laying concrete with shortcrete machine etc. complete as per specification and as directed by Engineer-in-Charge

Data RATE ANALYSIS UNIT : 36.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1548.00 4.00 6192.002 Sand (Screened) cum 2.41 606.00 1460.463 Coarse aggregate 10-4.75 mm size cum 1.03 875.00 901.254 Use rate of grout hose 20 m Hour 8.00 5.47 43.755 Use rate of water hose 20 m Hour 8.00 6.84 54.756 Use rate of guniting nozzle Hour 8.00 3.50 28.007 Welded steel wire fabric 100 x 100 x 5 mm kg 108.00 155.00 16740.008 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 25502.21

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Guniting equipment Hour 8.00 110.10 880.80

Fuel / Energy charges Hour 8.00 0.00 0.002 Air compressor 8.5 cmm ( ele ) Hour 8.00 170.80 1366.40

Fuel / Energy charges Hour 8.00 428.00 3424.003 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.10

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Tunnel and Allied Works - Item Unit Rates 2014-15

116

4 Drilling jumbo Hour 4.00 368.40 1473.60Fuel / Energy charges Hour 4.00 46.00 184.00

5 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 7493.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Guniting equipment Hour 8.00 189.80 1518.402 Crew for Air compressor Hour 8.00 142.40 1139.203 Crew for pump Hour 1.00 72.10 72.104 Crew for Drilling jumbo Hour 4.00 151.80 607.205 Mason Cl I Day 1.00 385.00 385.006 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 5491.90labour component/unit qty 152.60Add contractor's profit and overhead charges 0.14 21.40labour component/unit qty (including contractor's profit) 174.00

ABSTRACT:A. Cost of Materials Rs: 25502.21B. Hire charges of Machinery Rs: 7493.60C. Cost of Labour Rs: 5491.90

Total Rs: 38487.71Add for Air and Water line @ 1.00% Rs: 384.88Add for Ventilation @ 4.50% Rs: 1731.95Add for Lighting @ 1.60% Rs: 615.80Add for Ele sub-station / Demand charges @ 2.50% Rs: 962.19

Total Rs: 42182.53

14% Rs: 5905.55Lead Charges for 1 Km for FA 2.41 cum @ 31.5 Rs./Cum 75.915Lead Charges for 1 Km for CA 1.03 cum @ 30.4 Rs./Cum 31.312

1.55 tonne @ 124.6 Rs./Tonne 192.8808Total cost for 36.00 sqm Rs: 48388.19Rate per sqm (A+B+C+D)/36.0 Rs: 1344.10

IRR_TAW-3 TEMPORARY & PERMANENT SUPPORTS :

IRR-TAW-3-1 Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge typeanchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel taperedwedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of allmaterials, machinery, labour, ventilation, lighting, drainage and all other ancillary operationsetc., complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 20.00 RmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rein.Steel with 5 % wastage kg 86.91 46.50 4041.492 Steel plate for washers kg 65.94 46.00 3033.24

Steel plate for wedges kg 6.18 46.00 284.373 M S Nuts for bolts kg 4.00 90.00 360.004 Use rate of drill rod Rm 20.00 41.69 833.87

Reconditioning charges @ 10% 83.395 Use rate of air hose 4 Nos Hour 6.00 5.47 32.816 Use rate of water hose 4 Nos Hour 6.00 6.84 41.067 Sundries ( gas for cutting / heating etc ) LS 5.00 41.00 205.00

Total cost of Materials Rs: 8915.22

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 15 cmm ( ele ) Hour 1.50 138.80 208.20

Fuel / Energy charges Hour 1.50 951.20 1426.802 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Tunnel and Allied Works - Item Unit Rates 2014-15

117

Fuel / Energy charges Hour 1.00 76.10 76.103 Jack hammer Hour 6.00 19.80 118.80

Fuel / Energy charges Hour 6.00 0.00 0.004 Pusher leg Hour 6.00 12.70 76.20

Fuel / Energy charges Hour 6.00 0.00 0.005 Drilling jumbo Hour 4.00 368.40 1473.60

Fuel / Energy charges Hour 4.00 46.00 184.006 Sundries ( lathe, blower etc ) LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 3775.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 1.50 151.80 227.702 Crew for pump Hour 1.00 72.10 72.103 Crew for Jack hammer Hour 6.00 284.70 1708.204 Crew for Drilling jumbo Hour 4.00 151.80 607.205 Fitter Day 0.50 385.00 192.506 Gas cutter Day 1.00 385.00 385.007 Turner Day 1.00 440.00 440.008 Blacksmith Day 1.00 385.00 385.009 Khalasi ( 2 x 0.5 ) Day 1.00 385.00 385.00

10 Hammerman Day 0.50 345.00 172.5011 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 5165.20labour component/unit qty 258.30Add contractor's profit and overhead charges 0.14 36.20labour component/unit qty (including contractor's profit) 294.50

ABSTRACT:A. Cost of Materials Rs: 8915.22B. Hire charges of Machinery Rs: 3775.40C. Cost of Labour Rs: 5165.20

Total Rs: 17855.82Add for Air and Water line @ 1.00% Rs: 178.56Add for Ventilation @ 4.50% Rs: 803.51Add for Lighting @ 1.60% Rs: 285.69Add for Ele sub-station / Demand charges @ 2.50% Rs: 446.40

Total Rs: 19569.98

14% Rs: 2739.80

0.16 tonne @ 145.6 Rs./Tonne 23.155587Total cost for 20.00 Rm Rs: 22332.94Rate per Rm (A+B+C+D)/20.0 Rs: 1116.60

IRR-TAW-3-2 Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsuleanchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mmthick plate washers and nuts and tightening the same by torque wrench after hardening ofcement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and otherancillary operations etc., complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 20.00 RmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rein.Steel with 5 % wastage kg 86.91 46.50 4041.492 Steel plate for washers kg 65.94 46.00 3033.243 Resin bond cement grout capsule Nos. 2.00 46.00 92.004 M S Nuts for bolts kg 4.00 90.00 360.005 Use rate of drill rod Rm 20.00 41.69 833.87

Reconditioning charges @ 10% 83.396 Use rate of air hose 4 Nos Hour 6.00 5.47 32.817 Use rate of water hose 4 Nos Hour 6.00 6.84 41.068 Sundries(gas for cutting etc) LS 3.00 41.00 123.00

Total cost of Materials Rs: 8640.86

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

118

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 15 cmm ( ele ) Hour 1.50 138.80 208.20

Fuel / Energy charges Hour 1.50 951.20 1426.802 Pump 10 hp ( ele ) Hour 1.00 6.70 6.70

Fuel / Energy charges Hour 1.00 76.10 76.103 Jack hammer Hour 6.00 19.80 118.80

Fuel / Energy charges Hour 6.00 0.00 0.004 Pusher leg Hour 6.00 12.70 76.20

Fuel / Energy charges Hour 6.00 0.00 0.005 Drilling jumbo Hour 4.00 368.40 1473.60

Fuel / Energy charges Hour 4.00 46.00 184.006 Sundries ( lathe, etc ) LS 3.00 41.00 123.00

Total hire charges of Machinery Rs: 3693.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 1.50 151.80 227.702 Crew for pump Hour 1.00 72.10 72.103 Crew for Jack hammer Hour 6.00 284.70 1708.204 Crew for Drilling jumbo Hour 4.00 151.80 607.205 Fitter Day 0.50 345.00 172.506 Gas cutter Day 1.00 385.00 385.007 Turner Day 1.00 440.00 440.008 Khalasi ( 2 x 0.5 ) Day 1.00 385.00 385.009 Hammerman Day 0.50 345.00 172.5010 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 4760.20labour component/unit qty 238.00Add contractor's profit and overhead charges 0.14 33.30labour component/unit qty (including contractor's profit) 271.30

ABSTRACT:A. Cost of Materials Rs: 8640.86B. Hire charges of Machinery Rs: 3693.40C. Cost of Labour Rs: 4760.20

Total Rs: 17094.46Add for Air and Water line @ 1.00% Rs: 170.94Add for Ventilation @ 4.50% Rs: 769.25Add for Lighting @ 1.60% Rs: 273.51Add for Ele sub-station / Demand charges @ 2.50% Rs: 427.36

Total Rs: 18735.53

14% Rs: 2622.97

0.15 tonne @ 145.6 Rs./Tonne 22.255506Total cost for 20.00 Rm Rs: 21380.75Rate per Rm (A+B+C+D)/20.0 Rs: 1069.00

IRR-TAW-3-3 Providing, fabricating and fixing in position permanent structural steel supports as per detailsincluding cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting,ventilation, drainage and all other ancillary operations etc., complete with initial lead upto1 km and all lifts.

Data RATE ANALYSIS UNIT : 1.00 tonneA. MATERIALS:

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

119

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel beams kg 760.00 45.00 34200.002 Structural steel plates kg 115.00 46.00 5290.003 Steel bars for tie rods & anchors kg 150.00 46.50 6975.004 For cutting sections:

Oxygen gas @ 2.4 cum / t cum 2.40 52.00 124.80Acetylene gas @ 0.8 cum / t cum 0.80 320.00 256.00

5 For welding sections:Electrodes 4 x 300 mm @ 125 Nos / t Nos. 125.00 11.00 1375.00

6 For field connections:M.S.Bolts / Nuts & Washers kg 50.00 90.00 4500.00

7 Sundries LS 5.00 41.00 205.00Total cost of Materials Rs: 52925.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Bending machine Hour 8.00 42.60 340.80

Fuel / Energy charges Hour 8.00 114.10 912.802 Welding set Hour 16.00 16.00 256.00

Fuel / Energy charges Hour 16.00 91.30 1460.803 Drilling Jumbo Hour 12.00 368.40 4420.80

Fuel / Energy charges Hour 12.00 46.00 552.004 Sundries ( lathe / drilling / grinder ) LS 30.00 41.00 1230.00

Total hire charges of Machinery Rs: 9173.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling Jumbo Hour 12.00 151.80 1821.602 Crew fir Bending machine Hour 8.00 113.90 911.203 For cutting & preparing sections:

Structural steel Marker Day 1.00 440.00 440.00Gas cutter Day 2.00 385.00 770.00Fitter Day 2.00 385.00 770.00Turner / Driller Day 3.00 440.00 1320.00Khalasi Day 2.00 385.00 770.00Helper fabrication Day 4.00 345.00 1380.00

4 For welding sections:Welder Day 2.00 385.00 770.00Helper fabrication Day 2.00 345.00 690.00Khalasi Day 2.00 385.00 770.00

5 For erection of supports:Foreman Day 1.00 440.00 440.00Structural steel Erector Day 2.00 440.00 880.00Helper erector Day 2.00 345.00 690.00Khalasi Day 4.00 385.00 1540.00

Total cost of Labour Rs: 13962.80labour component/unit qty 13962.80Add contractor's profit and overhead charges 0.14 1954.80labour component/unit qty (including contractor's profit) 15917.60

ABSTRACT:A. Cost of Materials Rs: 52925.80B. Hire charges of Machinery Rs: 9173.20C. Cost of Labour Rs: 13962.80

Total Rs: 76061.80Add for Air and Water line @ 1.00% Rs: 760.62Add for Ventilation @ 4.50% Rs: 3422.78Add for Lighting @ 1.60% Rs: 1216.99Add for Ele sub-station / Demand charges @ 2.50% Rs: 1901.55

Total Rs: 83363.73

14% Rs: 11670.92

1.03 tonne @ 145.6 Rs./Tonne 149.24

Total cost for 1.00 tonne Rs: 95183.90

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

120

Rate per tonne (A+B+C+D)/1.0 Rs: 95183.90

IRR-TAW-3-4 Providing, fabricating and fixing in position temperary structural steel supports as per detailsand dismantling the same before concreting including cost of all materials, machinery, labour,cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillaryoperations etc.,complete with initial lead upto 1 km and all lifts.

DATA RATE ANALYSIS UNIT : 1.00 tonneA. MATERIALS (for 20 uses):

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel beams kg 760.00 45.00 34200.002 Structural steel plates kg 115.00 46.00 5290.003 Tie rods & anchors kg 150.00 46.50 6975.004 For cutting sections:

Oxygen gas @ 2.40 cum / t cum 2.40 52.00 124.80Acetylene @ 0.8 cum / t cum 0.80 320.00 256.00

5 For welding sections:Electrodes @ 125 Nos / t Nos. 125.00 11.00 1375.00

6 For field connections:M.S.Bolts / Nuts / Washers kg 50.00 90.00 4500.00

7 Sundries LS 20.00 41.00 820.00Total cost of Materials for 20 uses of supports Rs: 53540.80

Cost per use considering 20 uses Rs: 2677.04

B. MACHINERY (for fabrication):Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Bending machine Hour 8.00 42.60 340.80

Fuel / Energy charges Hour 8.00 114.10 912.802 Welding set Hour 16.00 16.00 256.00

Fuel / Energy charges Hour 16.00 91.30 1460.803 Sundries LS 30.00 41.00 1230.00

Total hire charges of Machinery Rs: 4200.40Cost per use considering 20 uses Rs: 210.02

B. MACHINERY (for erection and dismantling):Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling Jumbo Hour 18.00 368.40 6631.20

Fuel / Energy charges Hour 18.00 46.00 828.002 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 7869.20

C. LABOUR ( for fabrication ):Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Bending machine Hour 8.00 113.90 911.202 For cutting & preparing sections:

Structural steel Marker Day 1.00 440.00 440.00Gas cutter Day 2.00 385.00 770.00Fitter Day 2.00 385.00 770.00Turner / Driller Day 3.00 440.00 1320.00Khalasi Day 2.00 385.00 770.00Helper fabrication Day 4.00 345.00 1380.00

3 For welding sections:Welder Day 2.00 385.00 770.00Helper fabrication Day 2.00 345.00 690.00Khalasi Day 2.00 385.00 770.00

Total cost of Labour Rs: 8591.20Cost per use considering 20 uses Rs: 429.56

C. LABOUR ( for erection ):Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 8.00 151.80 1214.402 For erection of supports:

Tunnel and Allied Works - Item Unit Rates 2014-15

121

Foreman Day 1.00 440.00 440.00Structural steel Erector Day 2.00 440.00 880.00Helper erector Day 2.00 345.00 690.00Khalasi Day 4.00 385.00 1540.00

3 For dismantling of supports:Foreman Day 0.50 440.00 220.00Structural steel Erector Day 1.00 440.00 440.00Helper erector Day 1.00 345.00 345.00Khalasi Day 2.00 385.00 770.00

Total cost of Labour Rs: 6539.40labour component/unit qty 6969.00Add contractor's profit and overhead charges 0.14 975.70labour component/unit qty (including contractor's profit) 7944.70

ABSTRACT:A. Cost of Materials Rs: 2677.04B. Hire charges of Machinery for fabrication Rs: 210.02C. Hire charges of Machinery for erection and dismantling Rs: 7869.20D. Cost of Labour for fabrication Rs: 429.56E. Cost of Labour for erection and dismantling Rs: 6539.40

Total Rs: 17725.22Add for Air and Water line @ 1.00% Rs: 177.25Add for Ventilation @ 4.50% Rs: 797.63Add for Lighting @ 1.60% Rs: 283.60Add for Ele sub-station / Demand charges @ 2.50% Rs: 443.13

Total Rs: 19426.84

14% Rs: 2719.76

1.03 tonne @ 145.6 Rs./Tonne 149.24Total cost for 1.00 tonne Rs: 22295.84Rate per tonne (A+B+C+D)/1.0 Rs: 22295.80

IRR-TAW-3-5 Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnelwherever required including cost of all materials, machinery, labour, fixing in position, lighting,ventilation, drainage etc complete with all leads and lifts.

DATA: RATE ANALYSIS UNIT : 1.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cut jungle wood cum 1.05 23000.00 24150.002 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 24232.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling jumbo Hour 2.00 368.40 736.80

Fuel / Energy charges Hour 2.00 46.00 92.00Total hire charges of Machinery Rs: 828.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling jumbo Hour 2.00 151.80 303.602 Carpenter Cl II Day 1.00 345.00 345.003 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1238.60labour component/unit qty 1238.60Add contractor's profit and overhead charges 0.14 173.40labour component/unit qty (including contractor's profit) 1412.00

ABSTRACT:A. Cost of Materials Rs: 24232.00B. Hire charges of Machinery Rs: 828.80

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

122

C. Cost of Labour Rs: 1238.60Total Rs: 26299.40

Add for Air and Water line @ 1.00% Rs: 262.99Add for Ventilation @ 4.50% Rs: 1183.47Add for Lighting @ 1.60% Rs: 420.79Add for Ele sub-station / Demand charges @ 2.50% Rs: 657.49

Total Rs: 28824.14

14% Rs: 4035.38Total cost for 1.00 cum Rs: 32859.52Rate per cum (A+B+C+D)/1.0 Rs: 32859.50

IRR_TAW-4 MASONRY WORKS :

IRR-TAW-4-1 Providing and constructing un-coursed rubble stone masonry with approved stones fromtunnel excavated muck in cement mortar 1 : 6 proportion for backfilling over cuts / slips ontunnel sides due to geological faults etc., including cost of all materials, machinery, labour,cleaning,scaffolding, packing mortar, wedging stone chips, curing, ventilation, lighting, drainagecomplete with lead upto 1 km and all lifts.(cement content : 95 kg/cum of masonry, Rubble stones : 0.83 cum, Stone chips : 0.13 cum, FA : 0.40 cum)

DATA RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 950.00 4.00 3800.002 Rubble stones cum 8.30 318.00 2639.403 Stone chips cum 1.25 340.00 425.004 Sand (Screened) cum 4.00 606.00 2424.00

TOTAL Rs: 9288.40Add for scaffolding @ 2.5% Rs: 232.21

Total cost of Materials Rs: 9520.61

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 10 hp pump ( ele ) Hour 1.00 6.70 6.70

Fuel / energy charges Hour 1.00 76.10 76.10Total hire charges of Machinery Rs: 82.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 1.00 72.10 72.102 work inspector Day 1.00 370.00 370.003 Mason Class-I Day 1.00 385.00 385.004 Mason Class-II Day 2.00 345.00 690.005 mazdoor

for sorting out rubble in dump yard Day 1.00 295.00 295.00for conveying rubble Day 2.00 295.00 590.00for preparing mortar Day 2.00 295.00 590.00for loading mortar pans Day 1.00 295.00 295.00for laying & packing mortar Day 4.00 295.00 1180.00for washing rubble / finishing / curing Day 1.00 295.00 295.00for conveying mortar / chips Day 3.00 295.00 885.00

TOTAL Rs: 5647.10Add for labour for scaffolding @ 15.0% Rs: 847.07

Total cost of Labour Rs: 6494.17labour component/unit qty 649.42Add contractor's profit and overhead charges 0.14 90.90labour component/unit qty (including contractor's profit) 740.30

ABSTRACT:A. Cost of Materials Rs: 9520.61B. Hire charges of Machinery Rs: 82.80C. Cost of Labour Rs: 6494.17

Total Rs: 16097.58

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

123

Add for Air and Water line @ 1.00% Rs: 160.98Add for Ventilation @ 4.50% Rs: 724.39Add for Lighting @ 1.60% Rs: 257.56Add for Ele sub-station / Demand charges @ 2.50% Rs: 402.44

Total Rs: 17642.94

14% Rs: 2470.01Lead Charges for 1 Km for FA 4.00 cum @ 31.5 Rs./Cum 126Lead Charges for 1 Km for Stones and Stone Chips 9.55 cum @ 30.4 Rs./Cum 290.32

0.95 tonne @ 124.6 Rs./Tonne 118.37Total cost for 10.00 cum Rs: 20647.64Rate per cum (A+B+C+D)/10.0 Rs: 2064.80

IRR_TAW-5 REINFORCEMENT & CONCRETE WORKS :

IRR-TAW-5-1 Providing, fabricating and placing in position reinforcement steel for tunnel RCC worksincluding cleaning, straightening, cutting, bending, hooking, lapping / welding joints whereverrequired, tying with 1.25 mm dia.soft annealed steel wire, including cost of all materials, labour,machinery, ventilation, lighting, drainage etc.,complete with initial lead upto 1 km and all lifts.

DATA RATE ANALYSIS UNIT : 1.00 tonneA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rein.Steel with 5 % wastage tonne 1.05 46500.00 48825.002 Binding wire 1.25 mm dia kg 13.50 70.00 945.003 Sundries ( chairs / spacers etc ) LS 5.00 41.00 205.00

Total cost of Materials Rs: 49975.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Bar bender Day 9.00 450.00 4050.002 mazdoor Day 15.00 295.00 4425.00

Total cost of Labour Rs: 8475.00labour component/unit qty 8475.00Add contractor's profit and overhead charges 0.14 1186.50labour component/unit qty (including contractor's profit) 9661.50

ABSTRACT:A. Cost of Materials Rs: 49975.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 8475.00

Total Rs: 58450.00Add for Air and Water line @ 1.00% Rs: 584.50Add for Ventilation @ 4.50% Rs: 2630.25Add for Lighting @ 1.60% Rs: 935.20Add for Ele sub-station / Demand charges @ 2.50% Rs: 1461.25

Total Rs: 64061.20

14% Rs: 8968.57

1.05 tonne @ 145.6 Rs./Tonne 152.88Total cost for 1.00 tonne Rs: 73182.65Rate per tonne (A+B+C+D)/1.0 Rs: 73182.60

IRR-TAW-5-2 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

124

10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded aggregates crushed from tunnel excavated muck for filling and levelling over-cutsin bed due to geological faults etc., including cost of all materials, machinery, labour, cleaningbed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting,ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cementcontent : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum, Superplasticizer 0.4% by wt. of cement)

DATA RATE ANALYSIS UNIT : 28.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 6160.00 4.00 24640.002 Coarse aggregate 40-20 mm cum 12.60 1145.00 14427.00

Coarse aggregate 20-10 mm cum 7.56 1210.00 9147.60Coarse aggregate 10 mm below cum 5.04 875.00 4410.00

3 Fine aggregate (Un-Screened ) cum 11.20 462.00 5174.404 Super Plasticizer kg 24.64 80.00 1971.205 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 59852.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Batching plant 2 x 1 cum Hour 8.00 405.40 3243.20

Fuel / Energy charges Hour 8.00 342.40 2739.202 Agitator car 2 cum Hour 16.00 758.40 12134.40

Fuel / Energy charges Hour 16.00 937.80 15004.803 10 hp pump ( ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.804 Needle vibrator 40 mm dia Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.805 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 33990.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Agitator car Hour 16.00 244.90 3918.403 Crew for Pump Hour 8.00 72.10 576.804 Crew for Needle vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for cleaning bed Day 2.00 295.00 590.00for loading material bin ( Cement ) Day 3.00 295.00 885.00for miscellaneous works at BP Day 2.00 295.00 590.00for laying concrete Day 7.00 295.00 2065.00for conveying laying concrete Day 14.00 295.00 4130.00for cleaning bed Day 2.00 295.00 590.00for washing CA / curing Day 2.00 295.00 590.00

Total cost of Labour Rs: 18133.40labour component/unit qty 647.60Add contractor's profit and overhead charges 0.14 90.70labour component/unit qty (including contractor's profit) 738.30

ABSTRACT:A. Cost of Materials Rs: 59852.20B. Hire charges of Machinery Rs: 33990.80C. Cost of Labour Rs: 18133.40

Total Rs: 111976.40Add for Air and Water line @ 1.00% Rs: 1119.76Add for Ventilation @ 4.50% Rs: 5038.94Add for Lighting @ 1.60% Rs: 1791.62Add for Ele sub-station / Demand charges @ 2.50% Rs: 2799.41

Total Rs: 122726.13

14% Rs: 17181.66D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

125

Lead Charges for 1 Km for FA 11.20 cum @ 31.5 Rs./Cum 352.8Lead Charges for 1 Km for CA 25.20 cum @ 30.4 Rs./Cum 766.08

6.16 tonne @ 124.6 Rs./Tonne 767.536Total cost for 28.00 cum Rs: 141794.21Rate per cum (A+B+C+D)/28.0 Rs: 5064.10

IRR-TAW-5-3 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,graded aggregates crushed from tunnel muck for kerb and bed lining including cost of allmaterials, machinery, labour, formwork, batching, mixing, conveying upto placing point inagitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA RATE ANALYSIS UNIT : 28.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 9240.00 4.00 36960.00Cement for incidentals @ 1 kg / cum kg 28.00 4.00 112.00

2 Fine aggregate (Un-Screened ) cum 11.20 462.00 5174.403 Coarse aggregate 40-20 mm cum 12.60 1145.00 14427.00

Coarse aggregate 20-10 mm cum 7.56 1210.00 9147.60Coarse aggregate 10-4.75 mm cum 5.04 875.00 4410.00

4 Super plasticiser kg 36.96 80.00 2956.805 Use rate of shuttering for kerb / bed sqm 28.00 174.56 4887.796 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 78157.59

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Batching plant 2 x 1.00 cum Hour 8.00 405.40 3243.20

Fuel / Energy charges Hour 8.00 342.40 2739.202 Agitator car 2 cum ( 2 Nos ) Hour 16.00 758.40 12134.40

Fuel / Energy charges Hour 16.00 937.80 15004.803 Needle Vibrator Hour 8.00 8.00 64.00

Fuel / Energy charges Hour 8.00 7.60 60.804 Pump 10 hp ( Ele ) Hour 8.00 6.70 53.60

Fuel / Energy charges Hour 8.00 76.10 608.805 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 34113.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Agitator car Hour 16.00 244.90 3918.403 Crew for vibrator Hour 8.00 136.60 1092.804 Crew for pump Hour 8.00 72.10 576.805 For scaling & cleaning bed

Hammerman Day 2.00 345.00 690.00mazdoor Day 6.00 295.00 1770.00

6 For loading cement to BP binmazdoor Day 3.00 295.00 885.00

7 For miscellaneous work at BPmazdoor Day 2.00 295.00 590.00

8 For wetting C.A & curing mazdoor Day 2.00 295.00 590.00

9 Laying concrete for kerb/ invertMason Cl I Day 2.00 385.00 770.00Mason Cl II Day 2.00 345.00 690.00mazdoor Day 21.00 295.00 6195.00work inspector Day 1.00 370.00 370.00

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Tunnel and Allied Works - Item Unit Rates 2014-15

126

10 Labour charges for shuttering sqm 28.00 75.30 2108.40Total cost of Labour Rs: 22596.80

labour component/unit qty 807.00Add contractor's profit and overhead charges 0.14 113.00labour component/unit qty (including contractor's profit) 920.00

ABSTRACT:A. Cost of Materials Rs: 78157.59B. Hire charges of Machinery Rs: 34113.80C. Cost of Labour Rs: 22596.80

Total Rs: 134868.19Add for Air and Water line @ 1.00% Rs: 1348.68Add for Ventilation @ 4.50% Rs: 6069.07Add for Lighting @ 1.60% Rs: 2157.89Add for Ele sub-station / Demand charges @ 2.50% Rs: 3371.70

Total Rs: 147815.54

14% Rs: 20694.18Lead Charges for 1 Km for FA 11.20 cum @ 31.5 Rs./Cum 352.8Lead Charges for 1 Km for CA 25.20 cum @ 30.4 Rs./Cum 766.08

9.27 tonne @ 124.6 Rs./Tonne 1154.7928Total cost for 28.00 cum Rs: 170783.38Rate per cum (A+B+C+D)/28.0 Rs: 6099.40

IRR-TAW-5-4 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard,graded aggregates crushed from tunnel muck for sides and arch lining including cost of allmaterials, machinery, labour, formwork, batching, mixing, conveying upto placing point inagitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting,drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 48.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 15840.00 4.00 63360.00Cement for incidentals @ 1 kg / cum kg 48.00 4.00 192.00

2 Fine aggregate (Un-Screened ) cum 19.20 462.00 8870.403 Coarse aggregate 40-20 mm cum 21.60 1145.00 24732.00

Coarse aggregate 20-10 mm cum 12.96 1210.00 15681.60Coarse aggregate 10-4.75 mm cum 8.64 875.00 7560.00

4 Super plasticiser kg 63.36 80.00 5068.805 Use rate of end shuttering sqm 6.00 174.56 1047.386 Use rate of steel gantry sqm 100.00 75.30 7530.007 Sundries ( placer pipe etc ) LS 5.00 41.00 205.00

Total cost of Materials Rs: 134247.18

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor ( Ele ) 8.5 cmm Hour 16.00 170.80 2732.80

Fuel / Energy charges @ 75 % load Hour 12.00 428.00 5136.00

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

127

2 Batching plant 2 x 1.00 cum Hour 12.00 405.40 4864.80Fuel / Energy charges Hour 12.00 342.40 4108.80

3 Agitator car 2 cum ( 2 Nos ) Hour 32.00 758.40 24268.80Fuel / Energy charges Hour 32.00 937.80 30009.60

4 Concrete placer pump Hour 16.00 #REF! #REF!Fuel / Energy charges Hour 16.00 #REF! #REF!

5 Needle Vibrator / Shutter vibrator Hour 8.00 8.00 64.00Fuel / Energy charges Hour 8.00 7.60 60.80

6 Pump 10 hp ( Ele ) Hour 8.00 6.70 53.60Fuel / Energy charges Hour 8.00 76.10 608.80

7 Sundries LS 5.00 41.00 205.00Total hire charges of Machinery Rs: #REF!

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew charges for Air compressor Hour 16.00 142.40 2278.402 Crew charges for Batching plant Hour 16.00 293.80 4700.803 Crew charges for Agitator car Hour 32.00 244.90 7836.804 Crew charges for placer pump Hour 16.00 #REF! #REF!5 Crew charges for vibrator Hour 8.00 136.60 1092.806 Crew charges for Pump Hour 8.00 72.10 576.807 For scaling & cleaning

Stone chiseller Cl II Day 0.50 345.00 172.50mazdoor Day 1.00 295.00 295.00

8 For dismantling / Laying trackSurveyer Day 0.50 550.00 275.00Fitter shuttering Day 0.50 345.00 172.50Helper shuttering 2 x 0.5 Day 1.00 345.00 345.00Khalasi 6 x 0.5 Day 3.00 385.00 1155.00mazdoor 2 x 0.5 Day 1.00 295.00 295.00

9 For Moving / Positioning gantrySurveyer Day 0.50 550.00 275.00Foreman Day 0.50 440.00 220.00Fitter shuttering Day 0.50 345.00 172.50Helper shuttering 2 x 0.5 Day 1.00 345.00 345.00Khalasi 6 x 0.5 Day 3.00 385.00 1155.00mazdoor 2 x 0.5 Day 1.00 295.00 295.00

10 For loading cement to BP binmazdoor Day 5.00 295.00 1475.00

11 For miscellaneous works of BPmazdoor Day 2.00 295.00 590.00

12 For Erection/Dismantling bulk head sqm 6.00 75.30 451.8013 For Laying concrete by placer

Masom Cl I Day 3.00 385.00 1155.00mazdoor Day 9.00 295.00 2655.00work inspector Day 3.00 370.00 1110.00

14 For wetting C.A / Curing etc mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: #REF!labour component/unit qty #REF!Add contractor's profit and overhead charges 0.14 #REF!labour component/unit qty (including contractor's profit) #REF!

ABSTRACT:A. Cost of Materials Rs: 134247.18B. Hire charges of Machinery Rs: #REF!C. Cost of Labour Rs: #REF!

Total Rs: #REF!Add for Air and Water line @ 1.00% Rs: #REF!Add for Ventilation @ 4.50% Rs: #REF!Add for Lighting @ 1.60% Rs: #REF!Add for Ele sub-station / Demand charges @ 2.50% Rs: #REF!

Total Rs: #REF!

14% Rs: #REF!Lead Charges for 1 Km for FA 19.20 cum @ 31.5 Rs./Cum 604.8Lead Charges for 1 Km for CA 43.20 cum @ 30.4 Rs./Cum 1313.28

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

128

15.89 tonne @ 124.6 Rs./Tonne 1979.6448Total cost for 48.00 cum Rs: #REF!Rate per cum (A+B+C+D)/48.0 Rs: #REF!

IRR-TAW-6 DRILLING & GROUTING WORKS :

IRR-TAW-6-1 Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jackhammer or stooper drills as directed to specified depth for consolidation / contact groutingincluding cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainageand all other ancillary operations etc., complete.

DATA: RATE ANALYSIS UNIT : 100.00 RmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod Rm 100.00 41.69 4169.33Reconditioning charges @ 10% 416.93

2 Use rate of air hose 4 Nos Hour 32.00 5.47 175.003 Use rate of water hose 4 Nos Hour 32.00 6.84 219.004 Sundries LS 3.00 41.00 123.00

Total cost of Materials Rs: 5103.27

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 15 cmm ( ele ) Hour 8.00 138.80 1110.40

Fuel / Energy charges Hour 8.00 951.20 7609.602 Pump 10 hp ( ele ) Hour 4.00 6.70 26.80

Fuel / Energy charges Hour 4.00 76.10 304.403 Jack hammer Hour 32.00 19.80 633.60

Fuel / Energy charges Hour 32.00 0.00 0.004 Pusher leg Hour 32.00 12.70 406.40

Fuel / Energy charges Hour 32.00 0.00 0.005 Drilling jumbo Hour 8.00 368.40 2947.20

Fuel / Energy charges Hour 8.00 46.00 368.006 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 13611.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew charges for Air compressor Hour 8.00 151.80 1214.402 Crew charges for Pump Hour 4.00 72.10 288.403 Crew charges for Jack Hammer Hour 32.00 284.70 9110.404 Crew charges for Drilling Jumbo Hour 8.00 151.80 1214.405 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 12417.60labour component/unit qty 124.20Add contractor's profit and overhead charges 0.14 17.40labour component/unit qty (including contractor's profit) 141.60

ABSTRACT:A. Cost of Materials Rs: 5103.27B. Hire charges of Machinery Rs: 13611.40C. Cost of Labour Rs: 12417.60

Total Rs: 31132.27Add for Air and Water line @ 1.00% Rs: 311.32Add for Ventilation @ 4.50% Rs: 1400.95Add for Lighting @ 1.60% Rs: 498.12Add for Ele sub-station / Demand charges @ 2.50% Rs: 778.31

Total Rs: 34120.96

14% Rs: 4776.93Total cost for 100.00 Rm Rs: 38897.90Rate per Rm (A+B+C+D)/100.0 Rs: 389.00

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

129

IRR-TAW-6-2 Grouting cement slurry in grout holes under specified pressure for consolidation / contactgrouting including cost of all materials, machinery, labour, redrilling wherever necessary,ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 kmand all lifts.

DATA:RATE ANALYSIS UNIT : 1.50 tonne

A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement tonne 1.50 4000.00 6000.002 Use rate of grouting hose 50 m Hour 8.00 10.94 87.503 Use rate of water hose 50 m Hour 8.00 13.69 109.504 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 6279.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Grouting machine Hour 8.00 24.90 199.20

Fuel / Energy charges Hour 8.00 38.00 304.002 Pump 10 hp ( ele ) Hour 2.00 6.70 13.40

Fuel / Energy charges Hour 2.00 76.10 152.203 Drilling jumbo Hour 2.00 368.40 736.80

Fuel / Energy charges Hour 2.00 46.00 92.004 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 1579.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Grout pump Hour 8.00 227.80 1822.402 Crew for pump Hour 2.00 72.10 144.203 Crew for Drilling jumbo Hour 2.00 151.80 303.604 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 2860.20labour component/unit qty 1906.80Add contractor's profit and overhead charges 0.14 267.00labour component/unit qty (including contractor's profit) 2173.80

ABSTRACT:A. Cost of Materials Rs: 6279.00B. Hire charges of Machinery Rs: 1579.60C. Cost of Labour Rs: 2860.20

Total Rs: 10718.80Add for Air and Water line @ 1.00% Rs: 107.19Add for Ventilation @ 4.50% Rs: 482.35Add for Lighting @ 1.60% Rs: 171.50Add for Ele sub-station / Demand charges @ 2.50% Rs: 267.97

Total Rs: 11747.80

14% Rs: 1644.69

1.50 tonne @ 124.6 Rs./Tonne 186.9Total cost for 1.50 tonne Rs: 13579.40Rate per tonne (A+B+C+D)/1.50 Rs: 9052.90

IRR-TAW-6-3 Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel bypercussion drilling using waggon drill or other suitable drilling equipment including cost of allmaterials, machinery, labour, ventilation, lighting, drainage etc., complete.

DATA RATE ANALYSIS UNIT : 120.00 RmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of cross bit 75 mm dia Rm 120.00 125.00 15000.00

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Tunnel and Allied Works - Item Unit Rates 2014-15

130

2 Use rate of air hose 20 m Hour 16.00 4.38 70.003 Use rate of water hose 20 m Hour 16.00 5.48 87.604 Use rate of extension rods Rm 120.00 8.48 1017.60

Total cost of Materials Rs: 16175.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Waggon drill Hour 16.00 188.50 3016.00

Fuel / Energy charges Hour 16.00 0.00 0.002 Air compressor 15 cmm ( ele ) Hour 8.00 138.80 1110.40

Fuel / Energy charges Hour 8.00 951.20 7609.603 Pump 10 hp ( ele ) Hour 6.00 6.70 40.20

Fuel / Energy charges Hour 6.00 76.10 456.604 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 12314.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Waggon drill Hour 16.00 244.90 3918.402 Crew for Air compressor Hour 8.00 151.80 1214.403 Crew for Pump Hour 6.00 72.10 432.604 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 6155.40labour component/unit qty 51.30Add contractor's profit and overhead charges 0.14 7.20labour component/unit qty (including contractor's profit) 58.50

ABSTRACT:A. Cost of Materials Rs: 16175.20B. Hire charges of Machinery Rs: 12314.80C. Cost of Labour Rs: 6155.40

Total Rs: 34645.40Add for Air and Water line @ 1.00% Rs: 346.45Add for Ventilation @ 4.50% Rs: 1559.04Add for Lighting @ 1.60% Rs: 554.33Add for Ele sub-station / Demand charges @ 2.50% Rs: 866.14

Total Rs: 37971.36

14% Rs: 5315.99Total cost for 120.00 Rm Rs: 43287.35Rate per Rm (A+B+C+D)/120.0 Rs: 360.70

D.Add for contractor's profit and overheads on (A+B+C+other percentages)

Canal and Allied Works - Item Unit Rates 2014-15

131

Chapter III

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

Index- codeIRR-CAW

Directions to add Seigniorage Charges and Additional Lead ChargesSeigniorage Charges:1. The unit rate for work item in the Standard Data is exclusive of Seigniorage Charges wherever applicable.2. The appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item while preparing the estimate. (i.e., to the data itself)3. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges while adding Seigniorage Charges to the data in the estimateAdditional Lead and Lift Charges:1. Unless otherwise specified the basic rates are inclusive of all lifts.2. For concrete, masonry and reinforcement items wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Cement, Steel, sand, coarse aggregate, stones and stone chips shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.In case of Cement and Steel, Loading and unloading charges are already added in the work item while arriving the unit rate and hence should not be added againExample:Total lead for sand from approved sand quarry : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

3. The Leads for Steel and Cement shall be from the nearest market place to the Project area

4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)Example:Total lead for earth from approved borrow area : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges for 5 km Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km /cum Rs. 210.10Less 1 km initial lead charges /cum Rs. 31.50 (-)Net additional lead charges / cum Rs. 178.60

5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges

CAW-Work Items

IRR-CAW-1 EXCAVATION WORKS :

IRR-CAW-1-1 Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating ofembankment, filter drains / catch water drains etc., including dressing bed and sides torequired level and profile, cost of all materials, machinery, labour, placing the excavated soilneatly in dump area or for the formation of service road / embankment as directed etc.,complete with initial lead upto 1 km and all lifts.

CANAL AND ALLIED WORKS - Standard Data

FOR THE YEAR : 2014-15

CANAL AND ALLIED WORKS - DATA RATES

Canal and Allied Works - Item Unit Rates 2014-15

132

DATA: RATE ANALYSIS UNIT : 925.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.402 Tippers 5 cum capacity 6 Nos Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.60Total hire charges of Machinery Rs: 58062.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Tipper Hour 48.00 153.10 7348.803 work inspector Day 1.00 370.00 370.004 mazdoor Day 30.00 295.00 8850.00

Total cost of Labour Rs: 18201.60labour component/unit qty 19.70Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 22.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 58062.40C. Cost of Labour Rs: 18201.60Total Rs: 76264.00

14% Rs: 10676.96Total cost for 925.00 cum Rs: 86940.96Rate per cum (A+B+C+D)/925 Rs. 94.00

IRR-CAW-1-2 Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seatingof embankment for field channels etc., including dressing of bed and sides to required profile,cost of all materials, machinery, labour, placing the excavated stuff for formation of serviceroad / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 440.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.00Total hire charges of Machinery Rs: 12116.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

133

1 Crew for Shovel Hour 8.00 204.10 1632.802 work inspector Day 1.00 370.00 370.003 mazdoor Day 17.00 295.00 5015.00

Total cost of Labour Rs: 7017.80labour component/unit qty 15.90Add contractor's profit and overhead charges 0.14 2.20labour component/unit qty (including contractor's profit) 18.10

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 12116.80C. Cost of Labour Rs: 7017.80

Total Rs: 19134.60

14% Rs: 2678.84Total cost for 440.00 cum Rs: 21813.44Rate per cum (A+B+C+D)/440 Rs. 49.60

IRR-CAW-1-3 Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. forcanals, seating of embankment, filter drain / catch water drains etc., including dressing ofbed and sides to required level and profile, cost of all materials, machinery, labour, placing theexcavated soft rock neatly in dump area or for formation of service road as directed etc.,complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 630.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.402 Tippers 5 cum capacity 5 Nos Hour 40.00 446.70 17868.00

Fuel / Energy charges Hour 40.00 322.20 12888.00Total hire charges of Machinery Rs: 51911.20

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Tipper Hour 40.00 153.10 6124.003 work inspector Day 1.00 370.00 370.004 Crowbarman Day 11.00 345.00 3795.005 mazdoor Day 22.00 295.00 6490.00

Total cost of Labour Rs: 18411.80labour component/unit qty 29.20Add contractor's profit and overhead charges 0.14 4.10labour component/unit qty (including contractor's profit) 33.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 51911.20C. Cost of Labour Rs: 18411.80

Total Rs: 70323.00

14% Rs: 9845.22Total cost for 630.00 cum Rs: 80168.22Rate per cum (A+B+C+D)/630 Rs. 127.30

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

134

IRR-CAW-1-4 Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. forfield channels, seating of embankment for field channels etc., including dressing of bed andsides to required profile, cost of all materials, machinery, labour, placing the excavated stufffor formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 265.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.00Total hire charges of Machinery Rs: 12116.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 work inspector Day 1.00 370.00 370.003 Crowbarman Day 5.00 345.00 1725.004 mazdoor Day 11.00 295.00 3245.00

Total cost of Labour Rs: 6972.80labour component/unit qty 26.30Add contractor's profit and overhead charges 0.14 3.70labour component/unit qty (including contractor's profit) 30.00

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 12116.80C. Cost of Labour Rs: 6972.80

Total Rs: 19089.60

14% Rs: 2672.54Total cost for 265.00 cum Rs: 21762.14Rate per cum (A+B+C+D)/265 Rs. 82.10

IRR-CAW-1-5 Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 805.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod 1.5 m length Rm 316.00 20.14 6364.24Reconditioning charges @ 10% 636.42

2 Use rate of 50 m air hose 2 Nos Hour 24.00 10.94 262.50

3 Explosive small dia ( Kelvex-220 ) kg 161.00 70.00 11270.004 Ordinary detonators Nos 12.00 9.00 108.005 Electric detonators Nos 215.00 13.00 2795.006 Fuse coil Rm 520.00 11.00 5720.007 Sundries LS 5.00 41.00 205.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

135

Total cost of Materials Rs: 27361.16

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80

Fuel / Energy charges Hour 8.00 937.80 7502.402 Tippers 5 cum capacity 5 Nos. Hour 40.00 446.70 17868.00

Fuel / Energy charges Hour 40.00 322.20 12888.00

3 Air compressor 8.5 cmm ( diesel ) Hour 12.00 275.60 3307.20Fuel / Energy charges Hour 12.00 959.10 11509.20

4 Jack hammers 3 Nos. Hour 39.00 19.80 772.20Fuel / Energy charges Hour 39.00 0.00 0.00

Total hire charges of Machinery Rs: 67499.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Tipper Hour 40.00 153.10 6124.003 Crew for Air compressor Hour 12.00 182.20 2186.404 Crew for Jack hammer Hour 39.00 284.70 11103.305 work inspector Day 1.00 370.00 370.006 Blaster Day 1.00 440.00 440.007 Helper blaster Day 1.00 345.00 345.008 Crowbarman Day 16.00 345.00 5520.009 Stone breaker Day 16.00 345.00 5520.00

10 mazdoor Day 32.00 295.00 9440.00Total cost of Labour Rs: 42681.50

labour component/unit qty 53.00Add contractor's profit and overhead charges 0.14 7.40labour component/unit qty (including contractor's profit) 60.40

ABSTRACT:A. Cost of Materials Rs: 27361.16B. Hire charges of Machinery Rs: 67499.80C. Cost of Labour Rs: 42681.50

Total Rs: 137542.46

14% Rs: 19255.94Total cost for 805.00 cum Rs: 156798.40Rate per cum (A+B+C+D)/805 Rs. 194.80

IRR-CAW-1-6 Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for(a) canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed

by removing all projections by hammering / chiselling, cost of all materials, machinery, labour,placing the excavated rock neatly in approved dump area and levelling the same as directedetc., complete with initial lead upto 1 km and all lifts.

Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of lessthan 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections whereverrequired.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

136

DATA: RATE ANALYSIS UNIT : 68.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod 1.5 m length Rm 85.00 26.85 2282.53Reconditioning charges @ 10% 228.25

2 Use rate of 50 m air hose 2 Nos. Hour 13.00 10.94 142.19

3 Explosive small dia. (Kelvex-220 ) kg 21.20 70.00 1484.004 Ordinary detonators Nos 4.00 9.00 36.005 Electric detonators Nos 59.00 13.00 767.006 Fuse coil Rm 90.00 11.00 990.007 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 6011.97

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 1.10 1706.60 1877.26

Fuel / energy charges Hour 1.10 937.80 1031.582 Angle dozer 90 hp Hour 0.25 1715.50 428.88

Fuel / Energy charges Hour 0.25 656.00 164.003 Tippers 5 cum capacity 4 Nos. Hour 4.40 446.70 1965.48

Fuel / Energy charges Hour 4.40 322.20 1417.68

4Air compressor 8.5 cmm ( diesel ) 1 Nos Hour 6.50 275.60 1791.40Fuel / Energy charges Hour 6.50 959.10 6234.15

5 Jack hammers 2 Nos. Hour 13.00 19.80 257.40Fuel / Energy charges Hour 13.00 0.00 0.00

Total hire charges of Machinery Rs: 15167.83

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 1.10 204.10 224.512 Crew for Dozer Hour 0.25 204.10 51.033 Crew for Tipper Hour 4.40 153.10 673.644 Crew for Air compressor Hour 6.50 182.20 1184.305 Crew for Jack hammer Hour 13.00 284.70 3701.106 work inspector Day 0.50 370.00 185.007 Blaster Day 1.00 440.00 440.008 Helper blaster Day 1.00 345.00 345.009 Crowbarman Day 0.50 345.00 172.50

10 Stone breaker Day 0.50 345.00 172.5011 mazdoor Day 2.00 295.00 590.00

Canal and Allied Works - Item Unit Rates 2014-15

137

Total cost of Labour Rs: 7739.58labour component/unit qty 113.80Add contractor's profit and overhead charges 0.14 15.90labour component/unit qty (including contractor's profit) 129.70

ABSTRACT:A. Cost of Materials Rs: 6011.97B. Hire charges of Machinery Rs: 15167.83C. Cost of Labour Rs: 7739.58

Total Rs: 28919.37

14% Rs: 4048.71Total cost for 68.00 cum Rs: 32968.08Rate per cum (A+B+C+D)/68 Rs. 484.80

IRR-CAW-1-7 Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved(b) controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water

drains etc., including controlling fly-rock by muffling arrangements such as placing50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring groundvibrations at specified locations, costof all materials, machinery, labour, placing excavated rockneatly in approved dump area or other place as directed etc., complete with lead upto 1 kmand all lifts.

Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of lessthan 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrationsis required.

DATA RATE ANALYSIS UNIT : 68.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

138

1 Use rate of drill rod 1.5 m length Rm 85.00 26.85 2282.53Reconditioning charges @ 10% 228.25

2 Use rate of 50 m air hose 2 Nos. Hour 13.00 10.94 142.193 Use rate of wire mesh sqm 94.00 53.33 5013.024 Use rate of sand bag Nos 98.00 14.67 1437.66

5 Explosive small dia. (Kelvex-220 ) kg 21.20 70.00 1484.006 Ordinary detonators Nos 4.00 9.00 36.007 Electric delay detonators Nos 59.00 23.00 1357.008 Fuse coil Rm 90.00 11.00 990.009 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 13052.65

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 1.10 1706.60 1877.26

Fuel / Energy charges Hour 1.10 937.80 1031.582 Angle dozer 90 hp Hour 0.25 1715.50 428.88

Fuel / Energy charges Hour 0.25 656.00 164.003 Tippers 5 cum capacity 3 Nos. Hour 4.40 446.70 1965.48

Fuel / Energy charges Hour 4.40 322.20 1417.68

4Air compressor 8.5 cmm ( diesel ) 1 No Hour 6.50 275.60 1791.40Fuel / Energy charges Hour 6.50 959.10 6234.15

5 Jack hammers 2 Nos. Hour 13.00 19.80 257.40Fuel / Energy charges Hour 13.00 0.00 0.00

Total hire charges of Machinery Rs: 15167.83

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 1.10 204.10 224.512 Crew for Angle dozer Hour 0.25 204.10 51.033 Crew for Tipper Hour 4.40 153.10 673.644 Crew for Air compressor Hour 6.50 182.20 1184.305 Crew for Jack hammer Hour 13.00 284.70 3701.106 work inspector Day 0.50 370.00 185.007 Blaster Day 0.50 440.00 220.008 Helper blaster Day 0.50 345.00 172.509 Stone chiseller Cl - II Day 0.50 345.00 172.50

10 Stone breaker Day 0.50 345.00 172.5011 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 7642.08labour component/unit qty 112.40Add contractor's profit and overhead charges 0.14 15.70labour component/unit qty (including contractor's profit) 128.10

ABSTRACT:A. Cost of Materials Rs: 13052.65B. Hire charges of Machinery Rs: 15167.83C. Cost of Labour Rs: 7642.08

Total Rs: 35862.55Add for blasting studies & monitoring vibrations etc 0.50% Rs: 179.31

Total Rs: 36041.8714% Rs: 5045.86

Total cost for 68.00 cum Rs: 41087.73Rate per cum (A+B+C+D)/68 Rs. 604.20

IRR-CAW-1-8 Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing( c) canal sides neatly on either side to required profile by line drilling and smooth blasting

including removing under-cuts by chiselling / hammering, placing the excavated rock neatly indump area or other place as directed, cost of all materials, machinery, labour etc., completewith lead upto 1 km and all lifts.

D. Add for contractor's profit and overheads on

Canal and Allied Works - Item Unit Rates 2014-15

139

Note: i) For excavation of canal below free board level combination of normal / controlled blasting andline drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purposeof payment 1 m width of excavation on either side shall be treated as excavation by line drillingand smooth blasting and remaining portion shall be treated as excavation by normal / controlledblasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of lessthan 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face hascome off neatly as per specifications or atleast 50 percent of smooth blast holes are visible forinspection and are spaced at specified interval.v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate providedfor excavation by normal blasting or controlled blasting as the case may be.

DATA RATE ANALYSISA. MATERIALS: UNIT : 17.50 cum

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod 1.5 m length Rm 63.00 26.85 1691.76Reconditioning charges @ 10% 169.18

2 Use rate of 50 m air hose 2 Nos. Hour 10.00 10.94 109.38

3 Explosive small dia. (Kelvex-220 ) kg 3.50 70.00 245.004 Electric delay detonators Nos 22.00 23.00 506.005 Fuse coil Rm 20.00 11.00 220.006 Sundries LS 1.00 41.00 41.00

Total cost of Materials Rs: 2982.31

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.85 cum capacity Hour 0.28 1706.60 477.85

Fuel / Energy charges Hour 0.28 937.80 262.582 Tippers 5 cum capacity 4 Nos. Hour 1.12 446.70 500.30

Fuel / Energy charges Hour 1.12 322.20 360.86

3Air compressor 8.5 cmm ( diesel ) 1 Nos Hour 5.00 275.60 1378.00Fuel / Energy charges Hour 5.00 959.10 4795.50

4 Jack hammers 2 Nos. Hour 10.00 19.80 198.00Fuel / Energy charges Hour 10.00 0.00 0.00

Total hire charges of Machinery Rs: 7973.10

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 0.50 204.10 102.052 Crew for Tipper Hour 1.12 153.10 171.473 Crew for Air compressor Hour 5.00 182.20 911.004 Crew for Jack hammer Hour 10.00 284.70 2847.005 work inspector Day 0.50 370.00 185.006 Blaster Day 0.50 440.00 220.00

Canal and Allied Works - Item Unit Rates 2014-15

140

7 Helper blaster Day 0.50 345.00 172.508 Stone breaker Day 0.50 345.00 172.509 Stone chiseller Cl - II Day 0.50 345.00 172.50

10 mazdoor Day 1.00 295.00 295.00Total cost of Labour Rs: 5249.02

labour component/unit qty 299.90Add contractor's profit and overhead charges 0.14 42.00labour component/unit qty (including contractor's profit) 341.90

ABSTRACT:A. Cost of Materials Rs: 2982.31B. Hire charges of Machinery Rs: 7973.10C. Cost of Labour Rs: 5249.02

Total Rs: 16204.43Add for blasting studies & monitoring vibrations etc 0.50% Rs: 81.02

Total Rs: 16285.4614% Rs: 2279.96

Total cost for 17.50 cum Rs: 18565.42Rate per cum (A+B+C+D)/17.50 Rs. 1060.90

IRR-CAW-1-9 Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating(a) embankment etc., including levelling bed by removing all projections by hammering / chiselling,

cost of all materials, machinery, labour, placing the excavated rock neatly in approved dumparea and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts.

Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of morethan 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections whereverrequired.

DATA: RATE ANALYSIS Unit: 386.00 CumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on

Canal and Allied Works - Item Unit Rates 2014-15

141

in Rs. in Rs.1 Use rate of T.C bit 100 mm dia Rm 104.00 150.00 15600.00

2Use rate of Extension rod with coupling sleeve Rm 104.00 6.36 661.44

3Use rate of Jack hammer drill rod 1.5 m Rm 12.00 26.85 322.24reconditioning charges @ 10% 32.22

4Use rate of 50 m air hose for waggon drill Hour 10.50 18.63 195.56Use rate of 25 m air hose for JH 2 Nos Hour 1.00 10.94 10.94

5 High strength ANFO booster kg 38.00 73.00 2774.006 ANFO kg 155.00 43.00 6665.007 Diesel oil ltr 35.00 62.00 2170.00

8 Explosive small dia ( Kelvex-220 ) kg 4.00 70.00 280.009 Ordinary detonators Nos 20.00 9.00 180.00

10 D-cord Rm 145.00 10.00 1450.0011 Detonating fuse coil Rm 20.00 11.00 220.0012 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs: 30766.40

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Tippers 5 cum capacity Hour 24.84 446.70 11096.03

Fuel / Energy charges Hour 24.84 322.20 8003.452 Shovel 0.85 cum capacity Hour 6.21 1706.60 10597.99

Fuel / Energy charges Hour 6.21 937.80 5823.743 Angle dozer Hour 2.00 1715.50 3431.00

Fuel / Energy charges Hour 2.00 656.00 1312.00

4 Air compressor 8.5 cmm ( diesel ) Hour 11.50 275.60 3169.40Fuel / Energy charges Hour 11.50 959.10 11029.65

5 Waggon drill Hour 10.50 188.50 1979.25Fuel / Energy charges Hour 10.50 0.00 0.00

6 Jack hammer Hour 2.00 19.80 39.60Fuel / Energy charges Hour 2.00 0.00 0.00

Total hire charges of Machinery Rs: 56482.10

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Tipper Hour 24.84 153.10 3803.002 Crew for Shovel Hour 6.21 204.10 1267.463 Crew for Dozer Hour 2.00 204.10 408.204 Crew for Air compressor Hour 11.50 182.20 2095.305 Crew for Waggon drill Hour 10.50 244.90 2571.456 Crew for Jack hammer Hour 2.00 284.70 569.407 work inspector Day 2.00 370.00 740.008 Blaster Day 1.00 440.00 440.009 Helper blaster Day 1.00 345.00 345.00

10 Stone chiseller Cl - II Day 1.00 345.00 345.0011 Stone breaker Day 1.00 345.00 345.0012 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 13814.82labour component/unit qty 35.80Add contractor's profit and overhead charges 0.14 5.00labour component/unit qty (including contractor's profit) 40.80

ABSTRACT:A. Cost of Materials Rs: 30766.40B. Hire charges of Machinery Rs: 56482.10C. Cost of Labour Rs: 13814.82

Total Rs: 101063.32

Canal and Allied Works - Item Unit Rates 2014-15

142

14% Rs: 14148.86Total cost for 386.00 Cum Rs: 115212.18Rate per Cum (A+B+C+D)/386 Rs. 298.50

IRR-CAW-1-10 Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved(b) controlled blasting methods for canals, cut-off trench of embankment etc., including

controlling fly-rock by muffling arrangements such as placing 50 x 50 mm openingchain link mesh or waste tyres and sand bags, monitoring ground vibrations at specifiedlocations, cost of all materials, machinery, labour, placing excavated rock neatly in approveddump area or other place as directed etc., complete with lead upto 1 km and all lifts.

Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of morethan 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrationsis required.

DATA RATE ANALYSIS UNIT : 386.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of T.C bit 100 mm dia Rm 104.00 150.00 15600.00

2Use rate of Extension rod with coupling sleeve Rm 104.00 6.36 661.44

3Use rate of Jack hammer drill rod 1.6 m Rm 12.00 26.85 322.24reconditioning charges @ 10% 32.22

4Use rate of 50 m air hose 50 mm 1 No. Hour 10.50 18.63 195.56

Use rate of 25 mm air hose 2 Nos Hour 2.00 10.94 21.885 High strength ANFO booster kg 38.00 73.00 2774.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

143

6 ANFO kg 155.00 43.00 6665.007 Diesel oil ltr 35.00 62.00 2170.00

8 Explosive small dia ( Kelvex-220 ) kg 4.00 70.00 280.009 Ordinary detonators Nos 20.00 9.00 180.00

10 Shock tube detonators Rm 120.00 65.00 7800.0011 Noiseless trunk line delays Nos 12.00 21.00 252.0012 Detonating fuse coil Rm 20.00 11.00 220.0013 Use rate of chain link wire mesh sqm 132.00 190.80 25185.6014 Use rate of sand bag Nos 110.00 11.17 1228.7015 Sundries LS 20.00 41.00 820.00

Total cost of Materials Rs: 64408.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Tippers 5 cum capacity Hour 30.00 446.70 13401.00

Fuel / Energy charges Hour 30.00 322.20 9666.002 Shovel 0.85 cum capacity Hour 10.00 1706.60 17066.00

Fuel / Energy charges Hour 10.00 937.80 9378.003 Angle dozer Hour 2.00 1715.50 3431.00

Fuel / Energy charges Hour 2.00 656.00 1312.00

4 Air compressor 8.5 cmm ( diesel ) Hour 12.50 275.60 3445.00Fuel / Energy charges Hour 12.50 959.10 11988.75

5 Waggon drill Hour 11.50 188.50 2167.75Fuel / Energy charges Hour 11.50 0.00 0.00

6 Jack hammer Hour 2.00 19.80 39.60Fuel / Energy charges Hour 2.00 0.00 0.00

Total hire charges of Machinery Rs: 71895.10

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Tipper Hour 30.00 153.10 4593.002 Crew for Shovel Hour 10.00 204.10 2041.003 Crew for Dozer Hour 2.00 204.10 408.204 Crew for Air compressor Hour 12.50 182.20 2277.505 Crew for Waggon drill Hour 11.50 244.90 2816.356 Crew for Jack hammer Hour 2.00 284.70 569.407 work inspector Day 1.50 370.00 555.008 Blaster Day 0.50 440.00 220.009 Helper blaster Day 0.50 345.00 172.50

10 Stone chiseller Cl - II Day 1.00 345.00 345.0011 Stone breaker Day 1.00 345.00 345.0012 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 15817.95labour component/unit qty 41.00Add contractor's profit and overhead charges 0.14 5.70labour component/unit qty (including contractor's profit) 46.70

ABSTRACT:A. Cost of Materials Rs: 64408.64B. Hire charges of Machinery Rs: 71895.10C. Cost of Labour Rs: 15817.95

Total Rs: 152121.69Add for blasting studies & monitoring vibrations etc 0.50% Rs: 760.61

Total Rs: 152882.3014% Rs: 21403.52

Total cost for 386.00 cum Rs: 174285.82Rate per cum (A+B+C+D)/386 Rs. 451.50

IRR-CAW-1-11 Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing( c) canal sides neatly on either side to required profile by line drilling and smooth blasting

D. Add for contractor's profit and overheads on

Canal and Allied Works - Item Unit Rates 2014-15

144

including removing under-cuts by chiselling / hammering, placing the excavated rock neatly indump area or other place as directed, cost of all materials, machinery, labour etc., completewith lead upto 1 km and all lifts.

Note: i ) For excavation of canal below free board level combination of normal / controlled blasting andline drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purposeof payment 1 m width of excavation on either side shall be treated as excavation by line drillingand smooth blasting and remaining portion shall be treated as excavation by normal / controlledblasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of morethan 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face hascome off neatly as per specifications or atleast 50 percent of smooth blast holes are visible forinspection and are spaced at specified interval.v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate providedfor excavation by normal blasting or controlled blasting as the case may be.

DATA RATE ANALYSIS UNIT : 97.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of T.C bit 100 mm dia Rm 121.00 150.00 18150.00

2Use rate of Extension rod with coupling sleeve Rm 121.00 6.36 769.56

3Use rate of Jack hammer drill rod 1.6 m Rm 3.00 26.85 80.56reconditioning charges @ 10% 8.06

4Use rate of 50 m air hose 50 mm 1 No. Hour 12.00 18.63 223.50

Use rate of 25 mm air hose 2 Nos Hour 0.50 10.94 5.475 High strength ANFO booster kg 5.00 73.00 365.006 ANFO kg 19.00 43.00 817.007 Diesel oil ltr 4.50 62.00 279.00

8 Explosive small dia ( Kelvex-220 ) kg 1.00 70.00 70.009 Ordinary detonators Nos 5.00 9.00 45.00

10 Detonating shock tube Rm 70.00 65.00 4550.0011 Noiseless trunk line delays Nos 4.00 21.00 84.0012 Fuse coil Rm 10.00 11.00 110.0013 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 25639.14

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Tippers 5 cum capacity Hour 6.24 446.70 2787.41

Fuel / Energy charges Hour 6.24 322.20 2010.532 Shovel 0.85 cum capacity Hour 1.56 1706.60 2662.30

Canal and Allied Works - Item Unit Rates 2014-15

145

Fuel / Energy charges Hour 1.56 937.80 1462.973 Angle dozer Hour 0.50 1715.50 857.75

Fuel / Energy charges Hour 0.50 656.00 328.00

4 Air compressor 8.5 cmm ( diesel ) Hour 13.45 275.60 3706.82Fuel / Energy charges Hour 13.45 959.10 12899.90

5 Waggon drill Hour 13.20 188.50 2488.20Fuel / Energy charges Hour 13.20 0.00 0.00

6 Jack hammer Hour 0.50 19.80 9.90Fuel / Energy charges Hour 0.50 0.00 0.00

Total hire charges of Machinery Rs: 29213.77

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Tipper Hour 5.24 153.10 802.242 Crew for Shovel Hour 1.56 204.10 318.403 Crew for Dozer Hour 0.50 204.10 102.054 Crew for Air compressor Hour 13.45 182.20 2450.595 Crew for Waggon drill Hour 13.45 244.90 3293.916 Crew for Jack hammer Hour 0.50 284.70 142.357 work inspector Day 0.50 370.00 185.008 Blaster Day 0.50 440.00 220.009 Helper blaster Day 0.50 345.00 172.50

10 Stone breaker Day 1.00 345.00 345.0011 Stone chiseller Cl- II Day 1.00 345.00 345.0012 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 8967.04labour component/unit qty 92.40Add contractor's profit and overhead charges 0.14 12.90labour component/unit qty (including contractor's profit) 105.30

ABSTRACT:A. Cost of Materials Rs: 25639.14B. Hire charges of Machinery Rs: 29213.77C. Cost of Labour Rs: 8967.04

Total Rs: 63819.94Add for blasting studies & monitoring vibrations etc 0.50% Rs: 319.10

Total Rs: 64139.0414% Rs: 8979.47

Total cost for 97.00 cum Rs: 73118.51Rate per cum (A+B+C+D)/97 Rs. 753.80

IRR-CAW-2 EMBANKMENT WORKS USING BORROW AREA SOIL :

IRR-CAW-2-1 Providing impervious hearting embankment with selected soil from approved borrow areas inlayers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to density control ofnot less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 412.80 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer Hour 3.40 1715.50 5832.70

Fuel / Energy charges Hour 3.40 656.00 2230.40

D. Add for contractor's profit and overheads on

Canal and Allied Works - Item Unit Rates 2014-15

146

2 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80Fuel / Energy charges Hour 8.00 511.50 4092.00

3 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 446.70 14294.40Fuel / Energy charges Hour 32.00 322.20 10310.40

4 Pump 5 hp ( diesel ) Hour 2.00 10.20 20.40Fuel / Energy charges Hour 2.00 85.30 170.60

5 Water tanker 8000 ltr Hour 4.00 402.50 1610.00Fuel / Energy charges Hour 4.00 322.20 1288.80

6 Vibratory Roller 8 tonne Hour 5.10 1342.20 6845.22Fuel / Energy charges Hour 5.10 1108.30 5652.33

7 Sundries LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 60577.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.40 204.10 693.942 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 2.00 96.10 192.205 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Roller Hour 5.10 227.80 1161.787 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 11112.32labour component/unit qty 26.90Add contractor's profit and overhead charges 0.14 3.80labour component/unit qty (including contractor's profit) 30.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 60577.05C. Cost of Labour Rs: 11112.32

Total Rs: 71689.37

14% Rs: 10036.51Total cost for 412.80 cum Rs: 81725.88Rate per cum (A+B+C+D)/412.80 Rs. 198.00

IRR-CAW-2-2 Providing impervious hearting embankment with selected soil from approved borrow areas inlayers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to density control ofnot less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 412.80 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.40 1715.50 5832.70

Fuel / Energy charges Hour 3.40 656.00 2230.402 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5 cum Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.40

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

147

4 Pump 5 hp ( diesel ) Hour 2.00 10.20 20.40Fuel / Energy charges Hour 2.00 85.30 170.60

5 Water tanker 8000 ltr Hour 4.00 402.50 1610.00Fuel / Energy charges Hour 4.00 322.20 1288.80

6 Vibratory Roller 8 tonne Hour 4.18 1342.20 5610.40Fuel / Energy charges Hour 4.18 1108.30 4632.69

7 Sundries LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 58322.59

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.40 204.10 693.942 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 2.00 96.10 192.205 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Roller Hour 4.18 227.80 952.207 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 10902.74labour component/unit qty 26.40Add contractor's profit and overhead charges 0.14 3.70labour component/unit qty (including contractor's profit) 30.10

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 58322.59C. Cost of Labour Rs: 10902.74

Total Rs: 69225.33

14% Rs: 9691.55Total cost for 412.80 cum Rs: 78916.88Rate per cum (A+B+C+D)/412.80 Rs. 191.20

IRR-CAW-2-3 Providing semi-pervious / pervious casing embankment using soil from approved borrow areain layers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sortingout, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting to density control of not lessthan 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 412.80 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.40 1715.50 5832.70

Fuel / Energy charges Hour 3.40 656.00 2230.402 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 3 Nos. Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Pump 5 hp ( diesel ) Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.605 Water tanker 8000 ltr Hour 4.00 402.50 1610.00

Fuel / Energy charges Hour 4.00 322.20 1288.806 Vibratory Roller 8 tonne Hour 5.10 1342.20 6845.22

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

148

Fuel / Energy charges Hour 5.10 1108.30 5652.337 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 60454.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.40 204.10 693.942 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 2.00 96.10 192.205 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Roller Hour 5.10 227.80 1161.787 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 11112.32labour component/unit qty 26.90Add contractor's profit and overhead charges 0.14 3.80labour component/unit qty (including contractor's profit) 30.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 60454.05C. Cost of Labour Rs: 11112.32

Total Rs: 71566.37

14% Rs: 10019.29Total cost for 412.80 cum Rs: 81585.66Rate per cum (A+B+C+D)/412.80 Rs. 197.60

IRR-CAW-2-4 Providing semi-pervious / pervious casing embankment using soil from approved borrow areain layers of 25cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sortingout, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting to density control of not lessthan 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 412.80 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.40 1715.50 5832.70

Fuel / Energy charges Hour 3.40 656.00 2230.402 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5 cum Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Pump 5 hp ( diesel ) Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.605 Water tanker 8000 ltr Hour 4.00 402.50 1610.00

Fuel / Energy charges Hour 4.00 322.20 1288.806 Vibratory Roller 8 tonne Hour 4.17 1342.20 5596.97

Fuel / Energy charges Hour 4.17 1108.30 4621.617 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 58298.09

C. LABOUR:

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

149

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Crew for Dozer Hour 3.40 204.10 693.942 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 2.00 96.10 192.205 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Roller Hour 4.00 227.80 911.207 work inspector Day 4.17 370.00 1542.908 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 11664.64labour component/unit qty 28.30Add contractor's profit and overhead charges 0.14 4.00labour component/unit qty (including contractor's profit) 32.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 58298.09C. Cost of Labour Rs: 11664.64

Total Rs: 69962.73

14% Rs: 9794.78Total cost for 412.80 cum Rs: 79757.51Rate per cum (A+B+C+D)/412.80 Rs. 193.20

IRR-CAW-2-5 Providing semi-pervious / pervious casing embankment using soil from approved borrow areain layers of 25cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sortingout, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, compacting each layer without watering to densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 412.80 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.40 1715.50 5832.70

Fuel / Energy charges Hour 3.40 656.00 2230.402 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 3 Nos. Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Vibratory Roller 8 tonne Hour 4.17 1342.20 5596.97

Fuel / Energy charges Hour 4.17 1108.30 4621.615 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 55085.29

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.40 204.10 693.942 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Roller Hour 4.17 227.80 949.935 work inspector Day 2.00 370.00 740.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 10095.87

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

150

labour component/unit qty 24.50Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.90

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 55085.29C. Cost of Labour Rs: 10095.87

Total Rs: 65181.15

14% Rs: 9125.36Total cost for 412.80 cum Rs: 74306.51Rate per cum (A+B+C+D)/412.80 Rs. 180.00

IRR-CAW-2-6 Providing hearting / casing embankment with homogeneous soil from approved borrowareas in layers of 25 cm before compaction including cost of all materials, machinery,labour, all operations such as excavation, sorting out, transporting, spreading in layer ofspecified thickness, breaking clods, sectioning, watering, compacting each layer to densitycontrol of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 677.28 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer Hour 6.06 1715.50 10395.93

Fuel / Energy charges Hour 6.06 656.00 3975.362 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 7.53 1342.20 10106.77

Fuel / Energy charges Hour 7.53 1108.30 8345.507 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 86564.26

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 6.06 204.10 1236.852 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 7.53 227.80 1715.337 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 15060.68labour component/unit qty 22.20Add contractor's profit and overhead charges 0.14 3.10labour component/unit qty (including contractor's profit) 25.30

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

151

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 86564.26C. Cost of Labour Rs: 15060.68

Total Rs: 101624.94

14% Rs: 14227.49Total cost for 677.28 cum Rs: 115852.43Rate per cum (A+B+C+D)/677.28 Rs. 171.10

IRR-CAW-2-7 Providing hearting / casing embankment with homogeneous soil from approved borrowareas in layers of 25 cm before compaction including cost of all materials, machinery,labour, all operations such as excavation, sorting out, transporting, spreading in layer ofspecified thickness, breaking clods, sectioning, watering, compacting each layer to densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 677.28 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 6.06 1715.50 10395.93

Fuel / Energy charges Hour 6.06 656.00 3975.362 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5 cum 3 Nos Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 6.16 1342.20 8267.95

Fuel / Energy charges Hour 6.16 1108.30 6827.137 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 83330.07

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 6.06 204.10 1236.852 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 6.16 227.80 1403.257 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 14748.59labour component/unit qty 21.80Add contractor's profit and overhead charges 0.14 3.10labour component/unit qty (including contractor's profit) 24.90

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 83330.07C. Cost of Labour Rs: 14748.59

Total Rs: 98078.66

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

152

14% Rs: 13731.01Total cost for 677.28 cum Rs: 111809.67Rate per cum (A+B+C+D)/677.28 Rs. 165.10

IRR-CAW-2-8 Providing casing embankment using homogeneous soil from approved borrow areain layers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sortingout, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, compacting each layer without watering to densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 677.28 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 6.06 1715.50 10395.93

Fuel / Energy charges Hour 6.06 656.00 3975.362 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 4 Nos. Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Vibratory Roller 8 tonne Hour 6.16 1342.20 8267.95

Fuel / Energy charges Hour 6.16 1108.30 6827.135 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 78572.37

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 6.06 204.10 1236.852 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Roller Hour 6.16 227.80 1403.255 work inspector Day 2.00 370.00 740.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 13541.69labour component/unit qty 20.00Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 22.80

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 78572.37C. Cost of Labour Rs: 13541.69

Total Rs: 92114.06

14% Rs: 12895.97Total cost for 677.28 cum Rs: 105010.03Rate per cum (A+B+C+D)/677.28 Rs. 155.00

IRR-CAW-3 EMBANKMENT WORKS USING DUMP AREA SOIL :

IRR-CAW-3-1 Providing impervious hearting embankment with soil from approved dump areas in layersof 25 cm before compaction including cost of all materials, machinery, labour, alloperations such as re-excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to achieve density

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

153

control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 735.36 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer Hour 4.04 1715.50 6930.62

Fuel / Energy charges Hour 4.04 656.00 2650.242 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 7.50 1342.20 10066.50

Fuel / Energy charges Hour 7.50 1108.30 8312.257 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 81700.31

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.58 204.10 730.682 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 7.50 227.80 1708.507 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 15137.68labour component/unit qty 20.60Add contractor's profit and overhead charges 0.14 2.90labour component/unit qty (including contractor's profit) 23.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 81700.31C. Cost of Labour Rs: 15137.68

Total Rs: 96837.99

14% Rs: 13557.32Total cost for 735.36 cum Rs: 110395.31Rate per cum (A+B+C+D)/735.36 Rs. 150.10

IRR-CAW-3-2 Providing impervious hearting embankment with soil from approved dump areas in layersof 25 cm before compaction including cost of all materials, machinery, labour, alloperations such as re-excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to achieve densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc.,complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 735.36 cum

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

154

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 4.04 1715.50 6930.62

Fuel / Energy charges Hour 4.04 656.00 2650.242 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5 cum Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 6.13 1342.20 8227.69

Fuel / Energy charges Hour 6.13 1108.30 6793.887 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 78466.13

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.04 204.10 824.562 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 6.13 227.80 1396.417 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 14919.48labour component/unit qty 20.30Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 23.10

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 78466.13C. Cost of Labour Rs: 14919.48

Total Rs: 93385.60

14% Rs: 13073.98Total cost for 735.36 cum Rs: 106459.58Rate per cum (A+B+C+D)/735.36 Rs. 144.80

IRR-CAW-3-3 Providing semi-pervious / pervious casing embankment using soil from approved dump areain layers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as re-excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to density control ofnot less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 768.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

155

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 4.22 1715.50 7239.41

Fuel / Energy charges Hour 4.22 656.00 2768.322 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 6 Nos Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 7.82 1342.20 10496.00

Fuel / Energy charges Hour 7.82 1108.30 8666.917 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 82911.34

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.22 204.10 861.302 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 7.82 227.80 1781.407 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 15341.20labour component/unit qty 20.00Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 22.80

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 82911.34C. Cost of Labour Rs: 15341.20

Total Rs: 98252.54

14% Rs: 13755.36Total cost for 768.00 cum Rs: 112007.90Rate per cum (A+B+C+D)/768 Rs. 145.80

IRR-CAW-3-4 Providing semi-pervious / pervious casing embankment using soil from approved dump areain layers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as re-excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, watering, compacting each layer to density control ofnot less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 768.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

156

in Rs. in Rs.1 Angle dozer 90 hp Hour 4.22 1715.50 7239.41

Fuel / Energy charges Hour 4.22 656.00 2768.322 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5 cum of 6 Nos Hour 48.00 446.70 21441.60

Fuel / Energy charges Hour 48.00 322.20 15465.604 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory Roller 8 tonne Hour 6.40 1342.20 8590.08

Fuel / Energy charges Hour 6.40 1108.30 7093.127 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 79554.63

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.22 204.10 861.302 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 6.40 227.80 1457.927 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 15017.72labour component/unit qty 19.60Add contractor's profit and overhead charges 0.14 2.70labour component/unit qty (including contractor's profit) 22.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 79554.63C. Cost of Labour Rs: 15017.72

Total Rs: 94572.35

14% Rs: 13240.13Total cost for 768.00 cum Rs: 107812.48Rate per cum (A+B+C+D)/768 Rs. 140.40

IRR-CAW-3-5 Providing semi-pervious / pervious casing embankment using soil from approved dump areain layers of 25 cm before compaction including cost of all materials, machinery, labour,all operations such as re-excavation, sorting out, transporting, spreading in layer of specifiedthickness, breaking clods, sectioning, compacting each layer without watering to densitycontrol of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 768.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 4.22 1715.50 7239.41

Fuel / Energy charges Hour 4.22 656.00 2768.322 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

157

3 Tippers 5.00 cum capacity 6 Nos. Hour 48.00 446.70 21441.60Fuel / Energy charges Hour 48.00 322.20 15465.60

4 Vibratory Roller 8 tonne Hour 6.40 1342.20 8590.08Fuel / Energy charges Hour 6.40 1108.30 7093.12

5 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 74796.93

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.22 204.10 861.302 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 48.00 153.10 7348.804 Crew for Roller Hour 6.40 227.80 1457.925 work inspector Day 2.00 370.00 740.006 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 13810.82labour component/unit qty 18.00Add contractor's profit and overhead charges 0.14 2.50labour component/unit qty (including contractor's profit) 20.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 74796.93C. Cost of Labour Rs: 13810.82

Total Rs: 88607.75

14% Rs: 12405.09Total cost for 768.00 cum Rs: 101012.84Rate per cum (A+B+C+D)/768 Rs. 131.50

IRR-CAW-4 EMBANKMENT WORKS USING EXCAVATED SOIL :

IRR-CAW-4-1 Providing impervious hearting embankment with soil collected in embankment area inheaps as part of disposal of excavated soil from canal including cost of all materials,machinery,labour, all operations such as sortingout, spreading in layer of 25 cm before compaction,breaking clods,sectioning, watering and compacting each layer to density control of not lessthan 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

DATA: RATE ANALYSIS UNIT : 600.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.60 1715.50 6175.80

Fuel / Energy charges Hour 3.60 656.00 2361.602 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.903 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.004 Vibratory Roller 8 tonne Hour 7.30 1342.20 9798.06

Fuel / Energy charges Hour 7.30 1108.30 8090.595 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 30418.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.60 204.10 734.76

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

158

2 Crew for Pump Hour 3.00 96.10 288.303 Crew for Water tanker Hour 5.00 153.10 765.504 Crew for Roller Hour 7.30 227.80 1662.945 work inspector Day 1.00 370.00 370.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 5001.50labour component/unit qty 8.30Add contractor's profit and overhead charges 0.14 1.20labour component/unit qty (including contractor's profit) 9.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 30418.05C. Cost of Labour Rs: 5001.50

Total Rs: 35419.55

14% Rs: 4958.74Total cost for 600.00 cum Rs: 40378.29Rate per cum (A+B+C+D)/600 Rs. 67.30

IRR-CAW-4-2 Providing impervious hearting embankment with soil collected in embankment area inheaps as part of disposal of excavated soil from canal including cost of all materials,machinery,labour, all operations such as sortingout, spreading in layer of 25 cm before compaction,breaking clods,sectioning, watering and compacting each layer to density control of not lessthan 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

DATA: RATE ANALYSIS UNIT : 600.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.60 1715.50 6175.80

Fuel / Energy charges Hour 3.60 656.00 2361.602 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.903 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.004 Vibratory Roller 8 tonne Hour 6.06 1342.20 8133.73

Fuel / Energy charges Hour 6.06 1108.30 6716.305 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 27502.43

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.60 204.10 734.762 Crew for Pump Hour 3.00 96.10 288.303 Crew for Water tanker Hour 5.00 153.10 765.504 Crew for Roller Hour 6.06 227.80 1380.475 work inspector Day 2.00 370.00 740.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 5089.03labour component/unit qty 8.50Add contractor's profit and overhead charges 0.14 1.20labour component/unit qty (including contractor's profit) 9.70

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

159

A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 27502.43C. Cost of Labour Rs: 5089.03

Total Rs: 32591.46

14% Rs: 4562.8Total cost for 600.00 cum Rs: 37154.26Rate per cum (A+B+C+D)/600 Rs. 61.90

IRR-CAW-4-3 Providing semi-pervious / pervious casing hearting embankment using soil collected inheaps in embankment area as part of disposal of excavated soil from canal including cost ofall materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layerto density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

DATA: RATE ANALYSIS UNIT : 600.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.60 1715.50 6175.80

Fuel / Energy charges Hour 3.60 656.00 2361.602 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.903 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.004 Vibratory Roller 8 tonne Hour 7.30 1342.20 9798.06

Fuel / Energy charges Hour 7.30 1108.30 8090.595 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 30418.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.60 204.10 734.762 Crew for Pump Hour 3.00 96.10 288.303 Crew for Water tanker Hour 5.00 153.10 765.504 Crew for Roller Hour 7.30 227.80 1662.945 work inspector Day 1.00 370.00 370.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 5001.50labour component/unit qty 8.30Add contractor's profit and overhead charges 0.14 1.20labour component/unit qty (including contractor's profit) 9.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 30418.05C. Cost of Labour Rs: 5001.50

Total Rs: 35419.55

14% Rs: 4958.74Total cost for 600.00 cum Rs: 40378.29Rate per cum (A+B+C+D)/600 Rs. 67.30

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

160

IRR-CAW-4-4 Providing semi-pervious / pervious casing embankment using soil collected in heaps inembankment area as part of disposal of excavated soil from canal including cost of allmaterials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layerto density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with lead upto 1 km for water.

DATA: RATE ANALYSIS UNIT : 600.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.60 1715.50 6175.80

Fuel / Energy charges Hour 3.60 656.00 2361.602 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.903 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.004 Vibratory Roller 8 tonne Hour 6.1 1342.20 8133.73

Fuel / Energy charges Hour 6.1 1108.30 6716.305 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 27502.43

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.60 204.10 734.762 Crew for Pump Hour 3.00 96.10 288.303 Crew for Water tanker Hour 5.00 153.10 765.504 Crew for Roller Hour 6.1 227.80 1380.475 work inspector Day 2.00 370.00 740.006 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 5089.03labour component/unit qty 8.50Add contractor's profit and overhead charges 0.14 1.20labour component/unit qty (including contractor's profit) 9.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 27502.43C. Cost of Labour Rs: 5089.03

Total Rs: 32591.46

14% Rs: 4562.8Total cost for 600.00 cum Rs: 37154.26Rate per cum (A+B+C+D)/600 Rs. 61.90

IRR-CAW-4-5 Providing semi-pervious / pervious casing embankment using soil collected in heaps inembankment area as part of disposal of excavated soil from canal including cost of allmaterials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning and compacting each layer withoutwatering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete.

DATA: RATE ANALYSIS UNIT : 600.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

161

in Rs. in Rs.1 Nill 0.00 0.00

0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.60 1715.50 6175.80

Fuel / Energy charges Hour 3.60 656.00 2361.602 Vibratory Roller 8 tonne Hour 6.06 1342.20 8133.73

Fuel / Energy charges Hour 6.06 1108.30 6716.303 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 23469.43

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.60 204.10 734.762 Crew for Roller Hour 6.06 227.80 1380.473 work inspector Day 1.00 370.00 370.004 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 3665.23labour component/unit qty 6.10Add contractor's profit and overhead charges 0.14 0.90labour component/unit qty (including contractor's profit) 7.00

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 23469.43C. Cost of Labour Rs: 3665.23

Total Rs: 27134.66

14% Rs: 3798.85Total cost for 600.00 cum Rs: 30933.51Rate per cum (A+B+C+D)/600 Rs. 51.60

IRR-CAW-4-6 Providing compacted embankment for field irrigation channels with gravely soil fromapproved borrow area including sorting out, spreading in layers of 15 cm thickness, breakingclods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto50 m and all lifts.

DATA RATE ANALYSIS UNIT : 25.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.000.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 1.00 10.20 10.20

Fuel / Energy charges Hour 1.00 85.30 85.30Total hire charges of Machinery Rs: 95.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for pump Hour 1.00 96.10 96.102 work inspector Day 1.00 370.00 370.003 Crowbarman for loosening soil Day 2.50 345.00 862.504 mazdoor

For excavation at borrow area Day 5.00 295.00 1475.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

162

For spreading / levelling / sectioning Day 2.50 295.00 737.50 for loading soil Day 5.00 295.00 1475.00

5 Cartman with Bullock cart for water Day 1.00 370.00 370.006 Bullock drawn roller for rolling Day 1.00 370.00 370.00

Total cost of Labour Rs: 5756.10labour component/unit qty 230.20Add contractor's profit and overhead charges 0.14 32.20labour component/unit qty (including contractor's profit) 262.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 95.50C. Cost of Labour Rs: 5756.10

Total Rs: 5851.60

14% Rs: 819.22Total cost for 25.00 cum Rs: 6670.82Rate per cum (A+B+C+D)/25 Rs. 266.80

IRR-CAW-5 FOUNDATION FILLING WORKS :

IRR-CAW-5-1 Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials,machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble stones at quarry cum 10.00 318.00 3180.002 Sand for filling cum 4.00 342.00 1368.00

Total cost of Materials Rs: 4548.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1180.00labour component/unit qty 118.00Add contractor's profit and overhead charges 0.14 16.50labour component/unit qty (including contractor's profit) 134.50

ABSTRACT:A. Cost of Materials Rs: 4548.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1180.00

Total Rs: 5728.00

14% Rs: 801.92Total cost for 10.00 cum Rs: 6529.92Rate per cum (A+B+C+D)/10 Rs. 653.00

IRR-CAW-5-2 Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials,machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

163

DATA RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble stones at quarry cum 10.00 318.00 3180.002 Murum cum 4.00 107.00 428.00

Total cost of Materials Rs: 3608.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1180.00labour component/unit qty 118.00Add contractor's profit and overhead charges 0.14 16.50labour component/unit qty (including contractor's profit) 134.50

ABSTRACT:A. Cost of Materials Rs: 3608.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1180.00

Total Rs: 4788.00

14% Rs: 670.32Total cost for 10.00 cum Rs: 5458.32Rate per cum (A+B+C+D)/10 Rs. 545.80

IRR-CAW-5-3 Providing and laying 25 cm thick sand blanket below embankment including cost of allmaterials, machinery, labour, spreading to specified thickness etc., complete with initial leadupto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand for Filling cum 25.00 342.00 8550.000.00 0.00

Total cost of Materials Rs: 8550.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 1475.00labour component/unit qty 14.80Add contractor's profit and overhead charges 0.14 2.10labour component/unit qty (including contractor's profit) 16.90

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

164

A. Cost of Materials Rs: 8550.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1475.00

Total Rs: 10025.00

14% Rs: 1403.5Total cost for 100.00 sqm Rs: 11428.50Rate per sqm (A+B+C+D)/100 Rs. 114.30

IRR-CAW-5-3-A Providing and laying sand blanket below embankment including cost of all(New Item3- 2011--

12) materials, machinery, labour, spreading to specified thickness etc., complete with initial leadupto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand for Filling cum 100.00 342.00 34200.000.00 0.00

Total cost of Materials Rs: 34200.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 20.00 295.00 5900.00

Total cost of Labour Rs: 5900.00labour component/unit qty 59.00Add contractor's profit and overhead charges 0.14 8.30labour component/unit qty (including contractor's profit) 67.30

ABSTRACT:A. Cost of Materials Rs: 34200.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5900.00

Total Rs: 40100.00

14% Rs: 5614Total cost for 100.00 cum Rs: 45714.00Rate per cum (A+B+C+D)/100 Rs. 457.10

IRR-CAW-5-4 Providing and constructing dry rubble rock-toe using rubble and stone chips fromapproved source including cost of all materials, machinery, labour, hand packing rubbleand stone chips, finishing top and sides to required slopes etc., complete with initial lead upto50 m and all lifts.

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble cum 100.00 318.00 31800.002 Stone chips cum 15.00 340.00 5100.003 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 36982.00

B. MACHINERY:

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

165

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Nil 0.00 0.000.00 0.00

Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class-II Day 7.00 345.00 2415.003 mazdoor Day 19.00 295.00 5605.00

Total cost of Labour Rs: 8390.00labour component/unit qty 83.90Add contractor's profit and overhead charges 0.14 11.70labour component/unit qty (including contractor's profit) 95.60

ABSTRACT:A. Cost of Materials Rs: 36982.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 8390.00

Total Rs: 45372.00

14% Rs: 6352.08Total cost for 100.00 cum Rs: 51724.08Rate per cum (A+B+C+D)/100 Rs. 517.20

IRR-CAW-5-5 Providing and constructing longitudinal and cross graded filter drains using sand and20 mm down graded aggregates satisfying specified filter creteria in layers as per specificationsincluding cost of all materials, machinery, labour, laying to required slopes, compaction etc.,complete with initial lead upto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand (Un-Screened ) cum 76.80 462.00 35481.60

2 Coarse aggregate 20-10 mm 75 % cum 17.40 1210.00 21054.00

3 Coarse aggregate 10 mm down 25 % cum 5.80 875.00 5075.00Total cost of Materials Rs: 61610.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 36.00 295.00 10620.00

Total cost of Labour Rs: 10990.00labour component/unit qty 109.90Add contractor's profit and overhead charges 0.14 15.40labour component/unit qty (including contractor's profit) 125.30

ABSTRACT:A. Cost of Materials Rs: 61610.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10990.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

166

Total Rs: 72600.60

14% Rs: 10164.08Total cost for 100.00 cum Rs: 82764.68Rate per cum (A+B+C+D)/100 Rs. 827.60

IRR-CAW-5-6 Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed andfilling with 12 mm to 40 mm HG machine Crushed metal and sand in bed includingExcavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.

DATA: RATE ANALYSISA. MATERIALS: Unit: 100 mtSl.No Particulars Unit Qty Rate in RAmount in Rs.

1 12 mm to 40 mm metal Cum 13.5 1145.00 15457.502 Sand (Un-Screened ) cum 36 462.00 16632.00

Total cost of Materials Rs. 32089.5

B. MACHINERYSl.No Description Unit Quantity Rate in RAmount in Rs.

1 Excavation of drain with Excavator Cum 45 35.00 1575.00Total hire charges of Machinery Total Rs. 1575

C. LABOURSl.No Particulars Unit Qty Rate in RAmount in Rs.

1 Labour for Sand laying Cum 5.14 295.00 1516.302 Labour for Metal laying Cum 1.93 295.00 569.35

Total cost of Labour Rs. 2085.65labour component/unit qty 20.90Add contractor's profit and overhead charges 0.14 2.90labour component/unit qty (including contractor's profit) 23.80

ABSTRACTA. Cost of Materials Rs. 32089.5B. Hire charges of Machinery Rs. 1575C. Cost of Labour Rs. 2085.65

Total Rs: 35750.15

14% Rs: 5005.02Total cost for 100.00 mt Rs: 40755.17Rate per mt (A+B+C+D)/100 Rs. 407.60

IRR-CAW-5-7 Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sidesusing 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including Excavation of drains and Cost of procuring of all materialsincluding 50 m lead and for all lifts.

DATA Rate Analysis Unit 1 Plug

A. MATERIALS:

Sl.No Particulars Unit QtyRate in

RsAmount in

Rs. 1 Coarse aggregate Cum 0.08 1210.00 97.282 Sand (Un-Screened ) cum 0.203 462.00 93.793 Cement Kg 1.181 4.00 4.72

Total cost of Materials Rs. 195.79

B. MACHINERY

Sl.No Description Unit QuantityRate in

Rs.Amount in

Rs.

1 Excavation of drain with Excavator Cum 0.27 35.00 9.452 Machine mixing Charges Cum 0.003 328.60 0.99

Total hire charges of Machinery Total Rs. 10.44

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

167

C. LABOUR

Sl.No Particulars Unit QtyRate in

RsAmount in

Rs. 1 Mazdoor Day 0.30 295.00 88.50

Total cost of Labour Rs. 88.50labour component/unit qty 88.50Add contractor's profit and overhead charges 0.14 12.40labour component/unit qty (including contractor's profit) 100.90

ABSTRACTA. Cost of Materials Rs. 195.79B. Hire charges of Machinery Rs. 10.44C. Cost of Labour Rs. 88.50

Total Rs: 294.73

14% Rs: 41.26Total cost for 1.00 Plug Rs: 335.99Rate per each plug (A+B+C+D)/1.0 Rs. 336.00

IRR-CAW-5-8 Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approvedmaterials satisfying specified filter creteria as per specifications including cost of all materials,machinery, labour, laying to required slope, compaction etc., complete with initial lead upto50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand (Un-Screened ) cum 60.00 462.00 27720.00

2 Coarse aggregate 20-10 mm 75 % cum 30.00 1210.00 36300.00

3 Coarse aggregate 10 mm down 25 % cum 10.00 875.00 8750.00Total cost of Materials Rs: 72770.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 36.00 295.00 10620.00

Total cost of Labour Rs: 10990.00labour component/unit qty 109.90Add contractor's profit and overhead charges 0.14 15.40labour component/unit qty (including contractor's profit) 125.30

ABSTRACT:A. Cost of Materials Rs: 72770.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10990.00

Total Rs: 83760.00

14% Rs: 11726.4Total cost for 100.00 cum Rs: 95486.40Rate per cum (A+B+C+D)/100.0 Rs. 954.90

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

168

IRR-CAW-5-9 Providing and constructing graded filter media below and behind rock-toe consisting of20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarseaggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mmdown coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filtercreiteria below rock-toe as per specifications including cost of all materials, machinery, labour,laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 176.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand (Un-Screened ) cum 58.77 462.00 27151.742 Coarse aggregate 40-20 mm cum 52.70 1145.00 60341.503 Coarse aggregate 20-10 mm cum 50.70 1210.00 61347.004 Coarse aggregate 10 mm down cum 13.80 875.00 12075.00

Total cost of Materials Rs: 160915.24

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoors Day 60.00 295.00 17700.00

Total cost of Labour Rs: 18070.00labour component/unit qty 102.70Add contractor's profit and overhead charges 0.14 14.40labour component/unit qty (including contractor's profit) 117.10

ABSTRACT:A. Cost of Materials Rs: 160915.24B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 18070.00

Total Rs: 178985.24

14% Rs: 25057.93Total cost for 176.00 cum Rs: 204043.17Rate per cum (A+B+C+D)/176.0 Rs. 1159.30

IRR-CAW-5-10 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter(a) fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including

cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 ma. for aggregate and all leads for fabric and all lifts.

Using 200 gsm filter fabric.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

169

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 PP filter fabric 200 gsm sqm 210.00 132.00 27720.002 20 - 10 mm CA @ 75 % cum 15.00 1210.00 18150.00

10 mm down CA @ 25 % cum 5.00 875.00 4375.00Total Cost of materials Rs: 50245.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 7.00 295.00 2065.00

Total cost of Labour Rs: 2435.00labour component/unit qty 24.40Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.80

ABSTRACT:A. Cost of Materials Rs: 50245.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2435.00

Total Rs: 52680.00

14% Rs: 7375.2Total cost for 100.00 sqm Rs: 60055.20Rate per sqm (A+B+C+D)/100.0 Rs. 600.60

IRR-CAW-5-11 Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter(b) fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including

cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 mfor aggregate and all leads for fabric and all lifts.

b. Using 250 gsm filter fabric.

Data RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 PP filter fabric 250 gsm sqm 210.00 154.00 32340.002 20 - 10 mm CA @ 75 % cum 15.00 1210.00 18150.00

10 mm down CA @ 25 % cum 5.00 875.00 4375.00Total cost of Materials Rs: 54865.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

170

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 7.00 295.00 2065.00

Total cost of Labour Rs: 2435.00labour component/unit qty 24.40Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.80

ABSTRACT:A. Cost of Materials Rs: 54865.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2435.00

Total Rs: 57300.00

14% Rs: 8022Total cost for 100.00 sqm Rs: 65322.00Rate per sqm (A+B+C+D)/100.0 Rs. 653.20

IRR-CAW-6 ROCK FILL WORKS :

IRR-CAW-6-1 Providing and constructing rockfill casing to canal embankment with graded stones andspalls from approved quarry including cost of all materials, machinery, labour, spreadingstones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,complete with initial lead upto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble stones ( at quarry ) cum 100.00 318.00 31800.002 Stone chips / spalls ( at quarry ) 15.00 340.00 5100.00

Total cost of Materials Rs: 36900.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 6.00 345.00 2070.002 mazdoor Day 8.00 295.00 2360.00

Total cost of Labour Rs: 4430.00labour component/unit qty 44.30Add contractor's profit and overhead charges 0.14 6.20labour component/unit qty (including contractor's profit) 50.50

ABSTRACT:A. Cost of Materials Rs: 36900.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4430.00

Total Rs: 41330.00

14% Rs: 5786.2Total cost for 100.00 cum Rs: 47116.20Rate per cum (A+B+C+D)/100.0 Rs. 471.20

IRR-CAW-6-2 Providing and constructing rockfill casing to canal embankment with graded stones andspalls available in dump yard (spoil bank) including cost of all materials, machinery, labour, spreadingstones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc.,complete with initial lead upto 50 m and all lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

171

Note: Stones and spalls available in dump yard shall be issued at specified issue rate.

DATA RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble stones at dump yard cum 100.00 155.00 15500.00

2 Stone chips ( spalls ) at dump yard 15.00 175.00 2625.00Total cost of Materials Rs: 18125.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 6.00 345.00 2070.002 Crowbarman Day 2.00 345.00 690.003 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs: 5710.00labour component/unit qty 57.10Add contractor's profit and overhead charges 0.14 8.00labour component/unit qty (including contractor's profit) 65.10

ABSTRACT:A. Cost of Materials Rs: 18125.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5710.00

Total Rs: 23835.00

14% Rs: 3336.9Total cost for 100.00 cum Rs: 27171.90Rate per cum (A+B+C+D)/100.0 Rs. 271.70

IRR-CAW-7 CANAL LINING WORKS :

IRR-CAW-7-1 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrowarea including spreading soil in layers of thickness not more than 15 cm, breaking clods,watering, compacting to density control of not less than 98 percent or as stipulated,dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

DATA: Capacity of shovel bucket : 0.50 cumCapacity of shovel bucket under heaped condition : 0.58 cumCapacity of tipper : 5.00 cumLead for conveyance of soil : 1 kmSpeed for loaded tipper under haul road condition : 20 km / hrSpeed for empty tipper under haul road condition : 25 km / hrTurning and unloading time : 2.00 minShovel digging and loading cycle per bucket : 32 secIn-situ qty / bucket for 15 % bulkage of soil ( 0.58 /1.15 ) : 0.50 cumIn-situ quantity per load for 20 % bulkage of soil ( 5.0 /1.2 ) say : 4.00 cumNumber of buckets per load ( 4.00 / 0.50 ) say : 8 bucketsCycle time for loading 8 buckets ( 8 x 32 / 60 ) say : 4.30 minRound trip cycle time for tipper:Ideal cycle time of shovel for digging & loading : 4.30 minTime for 1km haulage under load ( 60 / 20 ) : 3.00 minTime for turning and un-loading : 2.00 minTime for 1 km return trip ( 60 / 25 ) : 2.40 minTime for turning and spotting : 0.50 min

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

172

Total : 12.20 minNo. of tippers to match corrected cycle time of shovel ( 12.60 / 4.00 ) : 3 NosOutput of tipper / hr with 50 min working / hr ( 50 x 4.00 / 12.20 ) : 16.40 cumOutput for 3 tippers per day ( 3 x 16.40 x 8 ) say : 394 cum

1 Stripping of borrow area :Generally borrow area is stripped once in a week for 6 days requirement of soil.Area to be stripped assuming 2.0 m depth of cut ( 394 x 6 / 2.0 ) : 1182 sqmDepth of stripping : 0.2 mQuantity of stripping considering 5 % extra area ( 1182x1.05x0.20 ) : 248 cumOutput of dozer per hr with 50 min / hr working for stripping : 72 cumTime required for stripping 248 cum : 3.5 hoursConsider 5 hours including time for levelling stripped siol / shifting time.Requirement of dozer for one day work of 394 cum say : 1.00 hours

2 Collection of soil for embankment:Deploy one 0.50 cum capacity shovel for 8 hours for digging and loading soil.Deploy 3 tippers of 5.00 cum capacity for 8 hours to convey soil to embankment area.

3 Spreading soil in 15 cm layer:In view of narrow width spreading soil by dozer is generally not be possible.Soil collected in heaps along the edge of the canal can be pushed down by dozer to the extentrequired and further spreading in layers of specified thickness has to be carried out by manuallabour. Deploy dozer for 2.00 hour for pushing soil.Output of mazdoor for levelling per day : 20 cumConsider 27 mazdoors for levelling 551.6 cum soil including extra soil to be laid for rollermargin.

4 Watering;Generally soil in the borrow area will be in moist condition. In the beginning of the season nowatering may be necessary and in summer months about 8 to 10 percent watering may beneeded to maintain soil moisture within OMC plus or minus 3 percent limit. Assuming seasonalaverage of 5 % watering by weight, the daily requirement of water for 394 cum of embankmentwill be about 4 tanker loads of 8000 ltrs each.Deploy 8000 ltr capacity water tanker for 4 hours daily for watering before rolling.Consider 2 mazdoors for spraying water.

5 Compaction:Since dozer is not considered for spreading soil about 25 percent extra roller passes needed.Generally about 10 to 12 passes of diesel road roller is adequate for achieving 98 percent densitycontrol for 25 cm thick loose layer.Effective length of roller drum : 1.50 mSpeed of roller per hour : 3.00 kmThickness of layer : 0.15 mNumber of roller passes to achieve specified density control : 12 NosOutput of roller / hr with 50 min /hr working and 75 % effenciancy50 / 60 ( 1.5 x 3000 x 0.15 x 0.75 / 12 ) 35.15625 say : 35.15 cum/hourTime for rolling 394 cum spread soil 11.2091 say : 11.5 hoursSorting out/ sectioning etc :Assume 4 mazdoors for sorting out.No extra labour required for sectioning as trimming roller margin forms part of the soil collectionfor bed lining.However 5 mazdoors considered for finishing to required slopes.

DATA: RATE ANALYSIS UNIT : 394.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nil 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.002 Angle dozer 90 hp Hour 3.00 1715.50 5146.50

Fuel / Energy charges Hour 3.00 656.00 1968.003 Tipper 5 cum Hour 24.00 446.70 10720.80

Fuel / Energy charges Hour 24.00 322.20 7732.804 Pump 5 hp ( diesel ) Hour 4.00 10.20 40.80

Canal and Allied Works - Item Unit Rates 2014-15

173

Fuel / Energy charges Hour 4.00 85.30 341.205 Water tanker 8000 ltr Hour 4.00 402.50 1610.00

Fuel / Energy charges Hour 4.00 322.20 1288.806 Diesel road roller 8-10 tonne Hour 11.50 197.20 2267.80

Fuel / Energy charges Hour 11.50 767.30 8823.957 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 52262.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dozer Hour 3.00 204.10 612.303 Crew for Tipper Hour 24.00 153.10 3674.404 Crew for Pump Hour 4.00 96.10 384.405 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Road roller Hour 11.50 182.20 2095.307 work inspector Day 2.00 370.00 740.008 mazdoor Day 38.00 295.00 11210.00

Total cost of Labour Rs: 20961.60labour component/unit qty 53.20Add contractor's profit and overhead charges 0.14 7.40labour component/unit qty (including contractor's profit) 60.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 52262.45C. Cost of Labour Rs: 20961.60

Total Rs: 73224.05

14% Rs: 10251.37Total cost for 394.00 cum Rs: 83475.42Rate per cum (A+B+C+D)/394.0 Rs. 211.90

IRR-CAW-7-2 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrowarea including spreading soil in layers of thickness not more than 15 cm, breaking clods,watering, compacting to density control of not less than 95 percent or as stipulated,dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 394.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nil 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Shovel 0.5 cum Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.002 Angle dozer 90 hp Hour 3.00 1715.50 5146.50

Fuel / Energy charges Hour 3.00 656.00 1968.003 Tippers 5 cum Hour 24.00 446.70 10720.80

Fuel / Energy charges Hour 24.00 322.20 7732.804 Pump 5 hp ( diesel ) Hour 4.00 10.20 40.80

Fuel / Energy charges Hour 4.00 85.30 341.205 Water tanker 8000 ltr Hour 4.00 402.50 1610.00

Fuel / Energy charges Hour 4.00 322.20 1288.806 Diesel road roller 8-10 tonnes Hour 10.00 197.20 1972.00

Fuel / Energy charges Hour 10.00 767.30 7673.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

174

7 Sundries LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 50815.70

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Shovel Hour 8.00 204.10 1632.802 Crew for Dozer Hour 3.00 204.10 612.303 Crew for Tipper Hour 24.00 153.10 3674.404 Crew for Pump Hour 4.00 96.10 384.405 Crew for Water tanker Hour 4.00 153.10 612.406 Crew for Road roller Hour 10.00 182.20 1822.007 work inspector Day 2.00 370.00 740.008 mazdoor Day 38.00 295.00 11210.00

Total cost of Labour Rs: 20688.30labour component/unit qty 52.50Add contractor's profit and overhead charges 0.14 7.40labour component/unit qty (including contractor's profit) 59.90

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 50815.70C. Cost of Labour Rs: 20688.30

Total Rs: 71504.00

14% Rs: 10010.56Total cost for 394.00 cum Rs: 81514.56Rate per cum (A+B+C+D)/394.0 Rs. 206.90

IRR-CAW-7-3 Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heapsalong the edge of canal requiring CNS soil lining as part of the disposal of excavated soil fromcanal excavation in CNS soil reach including spreading in layers of thickness not more than15 cm, breaking clods, watering, compacting to density control of not less than 95 percentor as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and alllifts.

DATA: RATE ANALYSIS UNIT : 394.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nil 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle Dozer 90 hp Hour 1.50 1715.50 2573.25

Fuel / Energy charges Hour 1.50 656.00 984.002 Pump 5 hp ( diesel ) Hour 5.00 10.20 51.00

Fuel / Energy charges Hour 5.00 85.30 426.503 Water tanker 8000 ltr Hour 5.00 402.50 2012.50

Fuel / Energy charges Hour 5.00 322.20 1611.004 Diesel road roller 8-10 tonne Hour 13.00 197.20 2563.60

Fuel / Energy charges Hour 13.00 767.30 9974.905 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 20401.75

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 1.50 204.10 306.152 Crew for Pump Hour 5.00 96.10 480.503 Crew for Water tanker Hour 5.00 153.10 765.50

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

175

4 Crew for Road roller Hour 13.00 182.20 2368.605 work inspector Day 2.00 370.00 740.006 mazdoor Day 38.00 295.00 11210.00

Total cost of Labour Rs: 15870.75labour component/unit qty 40.30Add contractor's profit and overhead charges 0.14 5.60labour component/unit qty (including contractor's profit) 45.90

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 20401.75C. Cost of Labour Rs: 15870.75

Total Rs: 36272.50

14% Rs: 5078.15Total cost for 394.00 cum Rs: 41350.65Rate per cum (A+B+C+D)/394.0 Rs. 105.00

IRR-CAW-7-4 Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed levelstones including cost of all materials, labour, excavation, fixing in position to correct level etc.,complete with lead upto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 32 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rough stone 20x20x75 cm Each 32.00 23.00 736.000.00 0.00 0.00

Total cost of Materials Rs: 736.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Stone chiseller Cl- I Day 2.00 385.00 770.003 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1730.00labour component/unit qty 54.10Add contractor's profit and overhead charges 0.14 7.60labour component/unit qty (including contractor's profit) 61.70

ABSTRACT:A. Cost of Materials Rs: 736.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1730.00

Total Rs: 2466.00

14% Rs: 345.24Total cost for 32.00 Nos. Rs: 2811.24Rate per each (A+B+C+D)/32.0 Rs. 87.90

IRR-CAW-7-5 Providing, fabricating and placing in position reinforcement steel bars for RCC worksincluding cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required including cost of all materials, machinery,labour etc., complete with initial lead upto 50 and all lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

176

DATA RATE ANALYSIS UNIT : 1000.00 kgA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rein.Steel with 5 % wastage kg 1050.00 46.50 48825.002 Binding wire 1.25 mm dia kg 8.00 70.00 560.003 Sundries ( chairs / spacers etc ) LS 10.00 41.00 410.00

Total cost of Materials Rs: 49795.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Bar bender Day 6.00 450.00 2700.002 mazdoor Day 11.00 295.00 3245.00

Total cost of Labour Rs: 5945.00labour component/unit qty 5.90Add contractor's profit and overhead charges 0.14 0.80labour component/unit qty (including contractor's profit) 6.70

ABSTRACT:A. Cost of Materials Rs: 49795.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5945.00

Total Rs: 55740.00

14% Rs: 7803.6Total cost for 1000.00 kg Rs: 63543.60Rate per kg (A+B+C+D)/1000.0 Rs. 63.50

IRR-CAW-7-6 Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not lessthan 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,graded aggregates for canal lining using vibrating cylinder type mechanical paver includingcost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paverfrom one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.(43 Gr Cement content: 300 kg /cum (22.5 kg/ sqm) for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,)

DATA: RATE ANALYSIS UNIT : 960 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 23760.00 4.00 95040.002 Coarse aggregate 20-10 mm cum 41.18 1210.00 49832.64

Coarse aggregate 10-4.75 mm cum 22.18 875.00 19404.003 Fine aggregate (Un-Screened ) cum 35.64 462.00 16465.684 Super plasticiser kg 95.04 80.00 7603.205 PVC sealing strip Rm 640.00 44.00 28160.006 Use rate of paving cylinder sqm 960.00 0.88 842.407 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs: 217552.92

B. MACHINERY:

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

177

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Batching plant Hour 8.00 405.40 3243.20Lubricants etc @ 5 % Hour 8.00 20.27 162.16

2 Transit mixer 3 Nos Hour 24.00 758.40 18201.60Fuel / Energy charges Hour 24.00 937.80 22507.20

3 Mechanical paver Hour 8.00 356.50 2852.00Lubricants etc @ 5 % Hour 8.00 17.83 142.60

4 DG set for batching plant 50 KVA Hour 8.00 85.10 680.80Fuel / Energy charges Hour 8.00 1023.00 8184.00

5 DG set for paver 30 KVA Hour 8.00 65.80 526.40Fuel / Energy charges Hour 8.00 682.00 5456.00

6 Shovel 0.5 cum / Loader Hour 2.00 1003.10 2006.20Fuel / Energy charges Hour 2.00 511.50 1023.00

7 Water tanker Hour 8.00 402.50 3220.00Fuel / Energy charges Hour 8.00 322.20 2577.60

8 Pump 5 hp(diesel) 2 Nos. 4 hrs each Hour 8.00 10.20 81.60Fuel / Energy charges Hour 8.00 85.30 682.40

9 Sundries ( power line etc ) LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 71751.76

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Transit mixer Hour 24.00 244.90 5877.603 Crew for Concrete paver Hour 8.00 364.40 2915.204 Crew for DG set Hour 16.00 113.90 1822.405 Crew for Shovel Hour 2.00 204.10 408.206 Crew for Water tanker Hour 8.00 153.10 1224.807 Crew for Pump Hour 16 96.10 1537.608 Mason Class I Day 2 385.00 770.009 Mechanic Day 1 385.00 385.00

10 Fitter Day 1 385.00 385.0011 Electrician Day 1 440.00 440.0012 work inspector Day 2 370.00 740.0013 mazdoor ( BP site ) Day 5 295.00 1475.0014 mazdoor ( Paver site ) Day 10 295.00 2950.00

Total cost of Labour Rs: 23281.20labour component/unit qty 24.30Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.70

ABSTRACT:A. Cost of Materials Rs: 217552.92B. Hire charges of Machinery Rs: 71751.76C. Cost of Labour Rs: 23281.2

Total 312585.88Add for shifting & re-erection of BP @ 2% Rs: 6251.7176Add for LH / RH shifting & erection of Paver @ 0.5% Rs: 1562.9294Add for ledge cutting / erection of tracks etc @ 1% Rs: 3125.8588

Total Rs: 323526.3914% Rs: 45293.69

Lead Charges for 1 Km for FA 35.64 cum @ 31.5 Rs./ 1122.66Lead Charges for 1 Km for CA 63.36 cum @ 30.4 Rs./ 1926.14

23.76 tonne @ 124.6 Rs 2960.496Total cost for 960.00 sqm Rs: 374829.38Rate per sqm (A+B+C+D)/960.0 Rs. 390.40

IRR-CAW-7-7 Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not lessthan 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,graded aggregates for canal lining using vibrating cylinder type mechanical paver includingcost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,

D. Add for contractor's profit and overheads on (A+B+C+other

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Canal and Allied Works - Item Unit Rates 2014-15

178

finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paverfrom one side to other side of canal etc., complete with initial lead upto 1 km and all lifts.(43 Gr Cement content: 300 kg /cum (24 kg/ sqm) for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum equivalent concrete volume:84.48 cum including the extra quantity of concrete for curvatures and bends etc.,)

DATA: RATE ANALYSIS UNIT : 960 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 25344.00 4.00 101376.002 Coarse aggregate 20-10 mm cum 43.93 1210.00 53154.82

Coarse aggregate 10-4.75 mm cum 23.65 875.00 20697.603 Fine aggregate (Un-Screened ) cum 38.02 462.00 17563.394 Super plasticiser kg 101.38 80.00 8110.085 PVC sealing strip Rm 640.00 44.00 28160.006 Use rate of paving cylinder sqm 960.00 0.88 842.407 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs: 230109.29

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Batching plant Hour 8.00 405.40 3243.20

Lubricants etc @ 5 % Hour 8.00 20.27 162.162 Transit mixer 3 Nos Hour 24.00 758.40 18201.60

Fuel / Energy charges Hour 24.00 937.80 22507.203 Mechanical paver Hour 8.00 356.50 2852.00

Lubricants etc @ 5 % Hour 8.00 17.83 142.604 DG set for batching plant 50 KVA Hour 8.00 85.10 680.80

Fuel / Energy charges Hour 8.00 1023.00 8184.005 DG set for paver 30 KVA Hour 8.00 65.80 526.40

Fuel / Energy charges Hour 8.00 682.00 5456.006 Shovel 0.5 cum / Loader Hour 2.00 1003.10 2006.20

Fuel / Energy charges Hour 2.00 511.50 1023.007 Water tanker Hour 8.00 402.50 3220.00

Fuel / Energy charges Hour 8.00 322.20 2577.60

8 Pump 5 hp(diesel) 2 Nos. 4 hrs each Hour 8.00 10.20 81.60Fuel / Energy charges Hour 8.00 85.30 682.40

9 Sundries ( power line etc ) LS 5.00 41.00 205.00Total hire charges of Machinery Rs: 71751.76

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Transit mixer Hour 24.00 244.90 5877.603 Crew for Concrete paver Hour 8.00 364.40 2915.204 Crew for DG set Hour 16.00 113.90 1822.405 Crew for Shovel Hour 2.00 204.10 408.206 Crew for Water tanker Hour 8.00 153.10 1224.807 Crew for Pump Hour 16 96.10 1537.608 Mason Class I Day 2 385.00 770.009 Mechanic Day 1 385.00 385.00

10 Fitter Day 1 385.00 385.0011 Electrician Day 1 440.00 440.0012 work inspector Day 2 370.00 740.0013 mazdoor ( BP site ) Day 5 295.00 1475.0014 mazdoor ( Paver site ) Day 10 295.00 2950.00

Total cost of Labour Rs: 23281.20labour component/unit qty 24.30Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.70

Canal and Allied Works - Item Unit Rates 2014-15

179

ABSTRACT:A. Cost of Materials Rs: 230109.29B. Hire charges of Machinery Rs: 71751.76C. Cost of Labour Rs: 23281.2

Total 325142.25Add for shifting & re-erection of BP @ 2% Rs: 6502.845Add for LH / RH shifting & erection of Paver @ 0.5% Rs: 1625.7112Add for ledge cutting / erection of tracks etc @ 1% Rs: 3251.4225

Total Rs: 336522.2314% Rs: 47113.11

Lead Charges for 1 Km for FA 38.02 cum @ 31.5 Rs./ 1197.504Lead Charges for 1 Km for CA 67.58 cum @ 30.4 Rs./ 2054.55

25.34 tonne @ 124.6 Rs 3157.8624Total cost for 960.00 sqm Rs: 390045.26Rate per sqm (A+B+C+D)/960.0 Rs. 406.30

IRR-CAW-7-8 Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, gradedaggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othereside of canal etc., complete with initial lead upto 1 Km and all lifts.(43 Gr Cement content: 300 kg /cum (30 kg/ sqm) for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum equivalent concrete volume:88 cum including the extra quantity of concrete for curvatures and bends etc.,)

DATA: RATE ANALYSIS UNIT : 800 Sqm A. MATERIALS:Sl.No Particulars Unit Qty Rate in RAmount

1 Cement 43 Gr Kg 26400 4.00 105600.002 Coarse aggregate 20-10 mm cum 45.76 1210.00 55369.60 Coarse aggregate 10-4.75 mm cum 24.64 875.00 21560.003 Fine aggregate (Un-Screened) cum 39.6 462.00 18295.204 Super plasticiser kg 105.6 80.00 8448.005 PVC sealing strip Rm 533 44.00 23452.006 Use rate of paving cylinder sqm 800 0.8775 702.00

Total cost of Materials Rs. 233426.8

B. MACHINERY: Sl.No Particulars Unit Qty Rate in RAmount

1 Batching plant Hour 8 405.40 3243.202 Transit mixer 3 Nos Hour 24 758.40 18201.60 Fuel / Energy charges Hour 24 937.80 22507.203 Mechanical paver Hour 8 356.50 2852.00 lubricants etc @ 5% Hour 8 17.83 142.604 DG set for batching plant 50 KVA Hour 8 85.10 680.80 Fuel / Energy charges Hour 8 1023.00 8184.005 DG set for paver 30 KVA Hour 8 65.80 526.40

Fuel / Energy charges Hour 8 682.00 5456.006 Shovel 0.5 cum / Loader Hour 2.00 1003.10 2006.20

Fuel / Energy charges Hour 2.00 511.50 1023.007 Water tanker Hour 8 402.50 3220.00

Fuel / Energy charges Hour 8 322.20 2577.60

8 Pump 5 hp (diesel) 2 Nos. 4 hrs each Hour 8 10.20 81.60Fuel / Energy charges 8 85.30 682.40Total hire charges of Machinery Rs. 71384.6

C. LABOUR:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C+other

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Canal and Allied Works - Item Unit Rates 2014-15

180

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Transit mixer Hour 24.00 244.90 5877.603 Crew for Concrete paver Hour 8.00 364.40 2915.204 Crew for DG set Hour 16.00 113.90 1822.405 Crew for Shovel Hour 2.00 204.10 408.206 Crew for Water tanker Hour 8 153.10 1224.807 Crew for Pump Hour 8 96.10 768.808 Mason Class I Day 2 385.00 770.009 Mechanic Day 1 385.00 385.00

10 Fitter Day 1 385.00 385.0011 Electrician Day 1 440.00 440.0012 work inspector Day 2 370.00 740.0013 mazdoor ( BP site ) Day 5 295.00 1475.0014 mazdoor ( Paver site ) Day 10 295.00 2950.00

Total cost of Labour Rs: 22512.40labour component/unit qty 28.10Add contractor's profit and overhead charges 0.14 3.90labour component/unit qty (including contractor's profit) 32.00

ABSTRACTA. Cost of Materials Rs. 233426.8B. Hire charges of Machinery Rs. 71384.6C. Cost of Labour Rs. 22512.40

TOTAL R 327323.8Add for shifting & re-erection of BP @ 2% Rs. 6546.476Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 1636.619Add for ledge cutting / erection of tracks etc @ 1% Rs. 3273.238

Total Rs: 338780.1314% Rs: 47429.22

Lead Charges for 1 Km for FA 39.60 cum @ 31.5 Rs./ 1247.4Lead Charges for 1 Km for CA 70.40 cum @ 30.4 Rs./ 2140.16

26.40 tonne @ 124.6 Rs 3289.44Total cost for 800.00 Sqm Rs: 392886.35Rate per Sqm (A+B+C+D)/800.0 Rs. 491.10

IRR-CAW-7-9 Dismantling, shifting and re-erecting mechanical concrete paver and DG set with allaccessories across canal CD work or other locations wherever shifting and re-erecting isnecessary including aligning paver correctly for continuing canal lining work, cost of allmaterials, machinery, labour etc., complete with all leads and lifts.

Note: Local shifting and re-erection of paver for LH and RH side lining included in concrete lining ratesunder items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed.

DATA: RATE ANALYSIS UNIT : 1.00 ShiftingA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Tipper Hour 4.00 446.70 1786.8

Fuel / Energy charges Hour 1.00 322.20 322.22 Sundries (ropes / rails etc) LS 1.00 41.00 41

Total hire charges of Machinery Rs: 2150.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C+other

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Canal and Allied Works - Item Unit Rates 2014-15

181

in Rs. in Rs.1 Crew for Tipper Hour 4.00 153.10 612.42 Crew for Paver Hour 8.00 364.40 2915.23 mazdoor Day 6.00 295.00 1770

Total cost of Labour Rs: 5297.60labour component/unit qty 5297.60Add contractor's profit and overhead charges 0.14 741.70labour component/unit qty (including contractor's profit) 6039.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 2150.00C. Cost of Labour Rs: 5297.60

Total Rs: 7447.60

14% Rs: 1042.66Total cost for 1.00 Shifting Rs: 8490.26Rate per Shifting (A+B+C+D)/1.0 Rs. 8490.30

IRR-CAW-7-10 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sidesto required curveture, cost of all materials, machinery, labour, formwork including supports,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA RATE ANALYSIS UNIT : 28.17 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 7042.5 4.00 28170

Cement for incidentals @ 5 kg / cum kg 140.85 4.00 563.42 Coarse aggregate 40-20 mm cum 12.68 1145.00 14514.593

Coarse aggregate 20-10 mm cum 7.61 1210.00 9203.139Coarse aggregate 10 mm below cum 5.07 875.00 4436.775

3 Fine aggregate (Un-Screened) cum 11.27 462.00 5205.8164 Super Plasticizer kg 28.17 80.00 2253.66 Use rate of manual paver sqm 180 29.02 5222.947 Sundries LS 2 41.00 82

Total cost of Materials Rs: 69652.26

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1 Concrete mixer 600/400 ltr ( diesel ) Hour 16.00 92.70 1483.2Fuel / Energy charges Hour 16.00 170.50 2728

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

182

2 5 hp pump ( diesel ) Hour 0.50 10.20 5.1Fuel / Energy charges Hour 0.50 85.30 42.65

3 Water tanker 8000 ltr Hour 1.00 402.50 402.5Fuel / Energy charges Hour 1.00 322.20 322.2

4 Needle vibrator 40 mm dia ( petrol ) Hour 16.00 7.60 121.6Fuel / Energy charges Hour 16.00 21.50 344

Total hire charges of Machinery Rs: 5449.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 16.00 189.80 3036.82 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.14 Crew for Needle vibrator Hour 16.00 136.60 2185.65 work inspector Day 1.00 370.00 3706 Mason Class-I Day 2.00 385.00 7707 Fitter Day 1.00 385.00 3858 mazdoor

for batching materials Day 22.00 295.00 6490for loading mortar pans Day 8.00 295.00 2360for laying and moving paver Day 6.00 295.00 1770for conveying concrete Day 28.17 295.00 8310.15for cleaning/ washing/ curing Day 2.00 295.00 590

Total cost of Labour Rs: 26468.70labour component/unit qty 939.60Add contractor's profit and overhead charges 0.14 131.50labour component/unit qty (including contractor's profit) 1071.10

ABSTRACT:A. Cost of Materials Rs: 69652.26B. Hire charges of Machinery Rs: 5449.25C. Cost of Labour Rs: 26468.70

Total Rs: 101570.21

14% Rs: 14219.83Total cost for 28.17 cum Rs: 115790.04Rate per cum (A+B+C+D)/28.17 Rs. 4110.40

IRR-CAW-7-11 Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sidesto required curvature, cost of all materials, machinery, labour, formwork including supportscleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead up to 50 m and all lifts (Cement content: 250 kg/cum)( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA RATE ANALYSIS UNIT: 27 cum

A. MATERIALS:Sl.No Particulars Unit Qty Rate in Rs Amount

1 Cement for mix kg 6750 4.00 27000.00

Cement for incidentals @ 5 Kg / cum kg 135 4.00 540.002 Coarse aggregate 40mm cum 12.15 1145.00 13911.75

Coarse aggregate 20 mm . cum 7.29 1210.00 8820.90Coarse aggregate 10 mm . cum 4.86 875.00 4252.50

3 Fine aggregate (Un-Screened) cum 10.8 462.00 4989.604 Super Plasticizer kg 27 80.00 2160.005 Use rate of manual paver sqm 270 29.02 7834.41

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

183

Total Rs. 69509.16Total cost of Materials Rs. 69509.16

B. MACHINERY:Sl.No Particulars Unit Qty Rate in Rs Amount

1 Concrete mixer 600/400 ltr (diesel) Hour 16.00 92.70 1483.20Fuel / Energy charges Hour 16.00 170.50 2728.00

2 5 hp pump (diesl) Hour 0.50 10.20 5.10Fuel / Energy charges Hour 0.50 85.30 42.65

3 Water tanker 8000 ltr Hour 1.00 402.50 402.50Fuel / Energy charges Hour 1.00 322.20 322.20

4 Needle vibrator 40 mm die (petrol) Hour 4.00 7.60 30.40Fuel / Energy charges Hour 4.00 21.50 86.00Total hire charges of Machinery Rs. 5100.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 16.00 189.80 3036.82 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.14 Crew for Needle vibrator Hour 16.00 136.60 2185.65 work inspector Day 1.00 370.00 3706 Mason Class-I Day 2.00 385.00 7707 Fitter Day 1.00 385.00 3858 mazdoor

for batching materials Day 22.00 295.00 6490for loading mortar pans Day 8.00 295.00 2360for laying and moving paver Day 6.00 295.00 1770for conveying concrete Day 27.00 295.00 7965for cleaning/ washing/ curing Day 2.00 295.00 590

Total cost of Labour Rs: 26123.55labour component/unit qty 967.50Add contractor's profit and overhead charges 0.14 135.50labour component/unit qty (including contractor's profit) 1103.00

ABSTRACT:A. Cost of Materials including royalty charges Rs. 69509.16B. Hire charges of Machinery Rs. 5100.05C. Cost of Labour Rs. 26123.55

Total Rs. 100732.76

14% Rs: 14102.59Total cost for 27.00 cum Rs: 114835.35Rate per cum (A+B+C+D)/27.0 Rs. 4253.20

IRR-CAW-7-12 Providing and laying100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paverincluding cost of all materials mechinery labour batching mixing placing in position forming contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with 1 km lead & all lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 800 Sqm A. MATERIALS:

Sl.No Particulars Unit Qty Rate in Rs Amount 1 Cement 43 Gr Kg 22000.00 4.00 880002 Coarse aggregate 40 mm cum 39.60 1145.00 45342

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

184

Coarse aggregate 20 mm cum 23.76 1210.00 28749.6 Coarse aggregate 10 mm cum 15.84 875.00 138603 Fine aggregate (Un-Screened) cum 35.20 462.00 16262.44 Super plasticiser kg 88.00 80.00 70405 PVC sealing strip Rm 533.00 44.00 234526 Use rate of paving cylinder sqm 800.00 0.878 702

Total cost of Materials Rs. 223408.00

B. MACHINERY: Sl.No Particulars Unit Qty Rate in Rs Amount

1 Batching plant Hour 8.00 405.40 3243.22 Transit mixer 3 Nos Hour 24.00 758.40 18201.6 Fuel / Energy charges Hour 24.00 937.80 22507.23 Mechanical paver Hour 5.00 356.50 1782.5 lubricants etc @ 5% Hour 5.00 17.83 89.1254 DG set for batching plant 50 KVA Hour 8.00 85.10 680.8 Fuel / Energy charges Hour 8.00 1023.00 81845 DG set for paver 30 KVA Hour 8.00 65.80 526.4

Fuel / Energy charges Hour 8.00 682.00 54566 Shovel 0.5 cum / Loader Hour 2.00 1003.10 2006.20

Fuel / Energy charges Hour 2.00 511.50 1023.007 Water tanker Hour 8.00 402.50 3220

Fuel / Energy charges Hour 8.00 322.20 2577.6

8 Pump 5 hp (diesel) 2 Nos. 4 hrs each Hour 8.00 10.20 81.6Fuel / Energy charges Hour 8.00 85.30 682.4Total hire charges of Machinery Rs. 70261.63

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Transit mixer Hour 24.00 244.90 5877.603 Crew for Concrete paver Hour 8.00 364.40 2915.204 Crew for DG set Hour 16.00 113.90 1822.405 Crew for Shovel Hour 2.00 204.10 408.206 Crew for Water tanker Hour 8 153.10 1224.807 Crew for Pump Hour 8 96.10 768.808 Mason Class I Day 2 385.00 770.009 Mechanic Day 1 385.00 385.00

10 Fitter Day 1 385.00 385.0011 Electrician Day 1 440.00 440.0012 work inspector Day 2 370.00 740.0013 mazdoor ( BP site ) Day 5 295.00 1475.0014 mazdoor ( Paver site ) Day 10 295.00 2950.00

Total cost of Labour Rs: 22512.40labour component/unit qty 28.10Add contractor's profit and overhead charges 0.14 3.90labour component/unit qty (including contractor's profit) 32.00

ABSTRACT:A. Cost of Materials Rs. 223408.00B. Hire charges of Machinery Rs. 70261.63C. Cost of Labour Rs. 22512.40

TOTAL R 316182.03Add for shifting & re-erection of BP @ 2% Rs. 6323.64Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 1580.91Add for ledge cutting / erection of tracks etc @ 1% Rs. 3161.82

Total Rs: 327248.4014% Rs: 45814.78

Lead Charges for 1 Km for FA 35.20 cum @ 31.5 Rs./ 1108.8Lead Charges for 1 Km for CA 79.20 cum @ 30.4 Rs./ 2407.68

22.00 tonne @ 124.6 Rs 2741.2

D. Add for contractor's profit and overheads on (A+B+C+other

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

Canal and Allied Works - Item Unit Rates 2014-15

185

Total cost for 800.00 Sqm Rs: 379320.86Rate per Sqm (A+B+C+D)/800.0 Rs. 474.20

IRR-CAW-7-13 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal including finishing the junction of bed and sidesto required curveture, cost of all materials, machinery, labour, formwork including supports,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 250 kg / cum )(Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA RATE ANALYSIS UNIT : 27.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 6750 4.00 27000

Cement for incidentals @ 5 kg / cum kg 135 4.00 5402 Coarse aggregate 20-10 mm cum 14.04 1210.00 16988.4

Coarse aggregate 10 mm below cum 7.56 875.00 66153 Fine aggregate (Un-Screened) cum 12.15 462.00 5613.34 Super Plasticizer kg 27 80.00 21605 Use rate of manual paver sqm 270 29.02 7834.416 Sundries LS 2 41.00 82

Total cost of Materials Rs: 66833.11

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1 Concrete mixer 600/400 ltr ( diesel ) Hour 16.00 92.70 1483.2Fuel / Energy charges Hour 16.00 170.50 2728

2 5 hp pump ( diesel ) Hour 0.50 10.20 5.1Fuel / Energy charges Hour 0.50 85.30 42.65

3 Water tanker 8000 ltr Hour 1.00 402.50 402.5Fuel / Energy charges Hour 1.00 322.20 322.2

4 Needle vibrator 40 mm dia ( petrol ) Hour 16.00 7.60 121.6Fuel / Energy charges Hour 16.00 21.50 344

Total hire charges of Machinery Rs: 5449.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 16.00 189.80 3036.82 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.14 Crew for Vibrator Hour 16.00 136.60 2185.605 Mason Class-I Day 2.00 385.00 7706 work inspector Day 1.00 370.00 3707 Fitter Day 1.00 385.00 3858 mazdoor

for batching materials Day 22.00 295.00 6490for loading mortar pans Day 8.00 295.00 2360for laying and moving paver Day 6.00 295.00 1770for conveying concrete Day 27.00 295.00 7965for cleaning/ washing/ curing Day 2.00 295.00 590

Total cost of Labour Rs: 26123.55labour component/unit qty 967.50Add contractor's profit and overhead charges 0.14 135.50labour component/unit qty (including contractor's profit) 1103.00

Canal and Allied Works - Item Unit Rates 2014-15

186

ABSTRACT:A. Cost of Materials Rs: 66833.11B. Hire charges of Machinery Rs: 5449.25C. Cost of Labour Rs: 26123.55

Total Rs: 98405.91

14% Rs: 13776.83Total cost for 27.00 cum Rs: 112182.74Rate per cum (A+B+C+D)/27.0 Rs. 4154.90

IRR-CAW-7-14 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal(150 mm thick) including finishing the junction of bed and sidesto required curveture, cost of all materials, machinery, labour, formwork including supports,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA RATE ANALYSIS UNIT : 24.92 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 7226.8 4.00 28907.20

Cement for incidentals @ 5 kg / cum kg 124.6 4.00 498.42 Coarse aggregate 40-20 mm cum 11.21 1145.00 12840.03

Coarse aggregate 20-10 mm cum 6.73 1210.00 8141.364Coarse aggregate 10 mm below cum 4.49 875.00 3924.90

3 Fine aggregate (Un-Screened) cum 9.97 462.00 4605.2164 Super Plasticizer kg 28.91 80.00 2312.585 Use rate of manual paver sqm 166.14 29.02 4820.776 Sundries LS 2 41.00 82.00

Total cost of Materials Rs: 66132.46

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1 Concrete mixer 600/400 ltr ( diesel ) Hour 16.00 92.70 1483.20Fuel / Energy charges Hour 16.00 170.50 2728.00

2 5 hp pump ( diesel ) Hour 0.50 10.20 5.10Fuel / Energy charges Hour 0.50 85.30 42.65

3 Water tanker 8000 ltr Hour 1.00 402.50 402.50Fuel / Energy charges Hour 1.00 322.20 322.20

4 Needle vibrator 40 mm dia ( petrol ) Hour 16.00 7.60 121.60Fuel / Energy charges Hour 16.00 21.50 344.00

Total hire charges of Machinery Rs: 5449.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 16.00 189.80 3036.82 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.14 Crew for Vibrator Hour 16.00 136.60 2185.605 Mason Class-I Day 2.00 385.00 7706 work inspector Day 1.00 370.00 3707 Fitter Day 1.00 385.00 3858 mazdoor

for batching materials Day 22.00 295.00 6490

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

187

for loading mortar pans Day 8.00 295.00 2360for laying Day 6.00 295.00 1770for conveying concrete Day 24.92 295.00 7351.4for cleaning/ washing/ curing Day 2.00 295.00 590

Total cost of Labour Rs: 25509.95labour component/unit qty 1023.70Add contractor's profit and overhead charges 0.14 143.30labour component/unit qty (including contractor's profit) 1167.00

ABSTRACT:A. Cost of Materials Rs: 66132.46B. Hire charges of Machinery Rs: 5449.25C. Cost of Labour Rs: 25509.95

Total Rs: 97091.66

14% Rs: 13592.83Total cost for 24.92 cum Rs: 110684.49Rate per cum (A+B+C+D)/24.92 Rs. 4441.60

IRR-CAW-7-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sidesto required curveture, cost of all materials, machinery, labour, formwork including supports,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA RATE ANALYSIS UNIT : 23.10 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 6930 4.00 27720

Cement for incidentals @ 5 kg / cum kg 115.5 4.00 4622 Coarse aggregate 20-10 mm cum 12.01 1210.00 14534.52

Coarse aggregate 10 mm below cum 6.47 875.00 5659.53 Fine aggregate (Un-Screened) cum 10.40 462.00 4802.494 Super Plasticizer kg 27.72 80.00 2217.606 Use rate of manual paver sqm 231 29.02 6702.777 Sundries LS 2 41.00 82

Total cost of Materials Rs: 62180.88

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1 Concrete mixer 600/400 ltr ( diesel ) Hour 16.00 92.70 1483.2Fuel / Energy charges Hour 16.00 170.50 2728

2 5 hp pump ( diesel ) Hour 0.50 10.20 5.1Fuel / Energy charges Hour 0.50 85.30 42.65

3 Water tanker 8000 ltr Hour 1.00 402.50 402.5Fuel / Energy charges Hour 1.00 322.20 322.2

4 Needle vibrator 40 mm dia ( petrol ) Hour 16.00 7.60 121.6Fuel / Energy charges Hour 16.00 21.50 344

Total hire charges of Machinery Rs: 5449.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 16.00 189.80 3036.82 Crew for Pump Hour 0.50 96.10 48.05

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

188

3 Crew for Water tanker Hour 1.00 153.10 153.14 Crew for Vibrator Hour 16.00 136.60 2185.65 Mason Class-I Day 2.00 385.00 7706 work inspector Day 1.00 370.00 3707 Fitter Day 1.00 385.00 3858 mazdoor

for batching materials Day 22.00 295.00 6490for loading mortar pans Day 8.00 295.00 2360for laying and moving paver Day 6.00 295.00 1770for conveying concrete Day 23.10 295.00 6814.5for cleaning/ washing/ curing Day 2.00 295.00 590

Total cost of Labour Rs: 24973.05labour component/unit qty 1081.10Add contractor's profit and overhead charges 0.14 151.40labour component/unit qty (including contractor's profit) 1232.50

ABSTRACT:A. Cost of Materials Rs: 62180.88B. Hire charges of Machinery Rs: 5449.25C. Cost of Labour Rs: 24973.05

Total Rs: 92603.18

14% Rs: 12964.45Total cost for 23.10 cum Rs: 105567.63Rate per cum (A+B+C+D)/23.10 Rs. 4570.00

IRR-CAW-7-16 Providing and laying150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paverincluding cost of all materials mechinery labour batching mixing placing in position forming contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with 1km lead & all lifts.(43 Gr Cement content: 300 kg /cum (45 kg/ sqm) for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.44 cum equivalent concrete volume:132 cum including the extra quantity of concrete for curvatures and bends etc.,)

DATA: RATE ANALYSIS UNIT : 800 Sqm A. MATERIALS:

Sl.No Particulars Unit Qty Rate in Rs Amount 1 Cement 43 Gr Kg 39600.00 4.00 1584002 Coarse aggregate 20 mm cum 68.64 1210.00 83054.4

Coarse aggregate 10 mm cum 36.96 875.00 323403 Fine aggregate (Un-Screened) cum 58.08 462.00 26832.964 Super plasticiser kg 158.40 80.00 126725 PVC sealing strip Rm 533.00 44.00 234526 Use rate of paving cylinder sqm 800.00 0.878 702

Total cost of Materials Rs. 337453.36

B. MACHINERY: Sl.No Particulars Unit Qty Rate in Rs Amount

1 Batching plant Hour 8.00 405.40 3243.22 Transit mixer 3 Nos Hour 24.00 758.40 18201.6

Fuel / Energy charges Hour 24.00 937.80 22507.23 Mechanical paver Hour 5.00 356.50 1782.5

lubricants etc @ 5% Hour 5.00 17.83 89.1254 DG set for batching plant 50 KVA Hour 8.00 85.10 680.8

Fuel / Energy charges Hour 8.00 1023.00 81845 DG set for paver 30 KVA Hour 8.00 65.80 526.4

Fuel / Energy charges Hour 8.00 682.00 54566 Shovel 0.5 cum / Loader Hour 2.00 1003.10 2006.20

Fuel / Energy charges Hour 2.00 511.50 1023.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

189

7 Water tanker Hour 8.00 402.50 3220Fuel / Energy charges Hour 8.00 322.20 2577.6

8 Pump 5 hp (diesel) 2 Nos. 4 hrs each Hour 8.00 10.20 81.6Fuel / Energy charges Hour 8.00 85.30 682.4Total hire charges of Machinery Rs. 70261.63

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Batching plant Hour 8.00 293.80 2350.402 Crew for Transit mixer Hour 24.00 244.90 5877.603 Crew for Concrete paver Hour 8.00 364.40 2915.204 Crew for DG set Hour 16.00 113.90 1822.405 Crew for Shovel Hour 2.00 204.10 408.206 Crew for Water tanker Hour 8 153.10 1224.807 Crew for Pump Hour 8 96.10 768.808 Mason Class I Day 2 385.00 770.009 Mechanic Day 1 385.00 385.00

10 Fitter Day 1 385.00 385.0011 Electrician Day 1 440.00 440.0012 work inspector Day 2 370.00 740.0013 mazdoor ( BP site ) Day 5 295.00 1475.0014 mazdoor ( Paver site ) Day 10 295.00 2950.00

Total cost of Labour Rs: 22512.40labour component/unit qty 28.10Add contractor's profit and overhead charges 0.14 3.90labour component/unit qty (including contractor's profit) 32.00

ABSTRACTA. Cost of Materials Rs. 337453.36B. Hire charges of Machinery Rs. 70261.63C. Cost of Labour Rs. 22512.40

TOTAL R 430227.39Add for shifting & re-erection of BP @ 2% Rs. 8604.55Add for LH / RH shifting & erection of Paver @ 0.5% Rs. 2151.14Add for ledge cutting / erection of tracks etc @ 1% Rs. 4302.27

Total Rs: 445285.3514% Rs: 62339.95

Lead Charges for 1 Km for FA 58.08 cum @ 31.5 Rs./ 1829.52Lead Charges for 1 Km for CA 105.60 cum @ 30.4 Rs./ 3210.24

39.60 tonne @ 124.6 Rs 4934.16Total cost for 800.00 Sqm Rs: 517599.22Rate per Sqm (A+B+C+D)/800.0 Rs. 647.00

IRR-CAW-7-17 Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 gradeconcrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel mouldedas per specifications and drawing in CM 1:4 proportion including cost of all materials,machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying,conveying and fixing in position including necessary excavation for seating, finishing joints inCM 1:4, curing etc., complete with initial lead upto 1 km and all lifts.

DATA RATE ANALYSIS UNIT : 20.00 templete

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D. Add for contractor's profit and overheads on (A+B+C+other

Canal and Allied Works - Item Unit Rates 2014-15

190

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement 43 Gr kg 310.00 4.00 12402 Sand (Un-Screened ) cum 0.50 462.00 2313 Coarse aggregate 20-10 mm cum 0.50 1210.00 605

Coarse aggregate 10-4.75 mm cum 0.30 875.00 262.54 Reinforcement steel kg 200.00 46.50 93005 Binding wire kg 3.00 70.00 2106 Use rate of mould set 20.00 63.69 1273.79567 Sundries( water charges & misc. ) LS 1.00 41.00 41

Total cost of Materials Rs: 13163.30

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hand mixer Hour 8.00 5.50 44

8.00 0.00 0Total hire charges of Machinery Rs: 44.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 3702 Mason Class I for fixing Day 1.00 385.00 3853 Mason Class II for casting Day 2.00 345.00 6904 Bar bender Day 1.00 450.00 4505 mazdoor ( casting yard ) Day 4.00 295.00 1180

mazdoor ( for fixing ) Day 2.00 295.00 590 mazdoor for conveying Day 2.00 295.00 590

Total cost of Labour Rs: 4255.00labour component/unit qty 212.80Add contractor's profit and overhead charges 0.14 29.80labour component/unit qty (including contractor's profit) 242.60

ABSTRACT:A. Cost of Materials including serignorage charges Rs: 13163.30B. Hire charges of Machinery Rs: 44.00C. Cost of Labour Rs: 4255.00

Total Rs: 17462.3014% Rs: 2444.72

Lead Charges for 1 Km for FA 0.50 cum @ 31.5 Rs./ 15.75Lead Charges for 1 Km for CA 0.80 cum @ 30.4 Rs./ 24.32

0.31 tonne @ 124.6 Rs 38.626

0.20 tonne @ 145.6 Rs 29.12Total cost for 20.00 templete Rs: 20014.83Rate per templete (A+B+C+D)/20.0 Rs. 1000.70

IRR-CAW-7-18 Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long withone end closed with perforated GI plate and other end provided with alluminium lid hingedto pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 GI pipe 50 mm dia 10 Nos Rm 1.25 320.00 400

2 GI plate & Alluminium lid ( hinged ) LS 10.00 41.00 410

Lead Charges for 1Km for Cement (including Loading and Unloading Charges)

D. Add for contractor's profit and overheads on (A+B+C)

Lead Charges for 1Km for Steel (including Loading and Unloading Charges)

Canal and Allied Works - Item Unit Rates 2014-15

191

Total cost of Materials Rs: 810.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling 8 mm dia holes LS 0.50 41.00 20.5

0.00Total hire charges of Machinery Rs: 20.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Pipe fitter Day 0.50 440.00 220

mazdoor Day 0.50 295.00 147.5Total cost of Labour Rs: 367.50

labour component/unit qty 36.80Add contractor's profit and overhead charges 0.14 5.20labour component/unit qty (including contractor's profit) 42.00

ABSTRACT:A. Cost of Materials Rs: 810.00B. Hire charges of Machinery Rs: 20.50C. Cost of Labour Rs: 367.50

Total Rs: 1198.00

14% Rs: 167.72Total cost for 10.00 Nos. Rs: 1365.72Rate per each (A+B+C+D)/10.0 Rs. 136.60

IRR-CAW-7-19 Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long withone end closed with perforated GI plate and other end provided with alluminium lid hingedto pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 GI pipe 50 mm dia 10 Nos Rm 2.25 320.00 720

2 GI plate & Alluminium lid ( hinged ) LS 10.00 41.00 410Total cost of Materials Rs: 1130.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling 8 mm dia holes LS 5.00 41.00 205

0.00Total hire charges of Machinery Rs: 205.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Pipe fitter Day 0.50 440.00 220

mazdoor Day 0.50 295.00 147.5Total cost of Labour Rs: 367.50

labour component/unit qty 36.80Add contractor's profit and overhead charges 0.14 5.20labour component/unit qty (including contractor's profit) 42.00

ABSTRACT:A. Cost of Materials Rs: 1130.00B. Hire charges of Machinery Rs: 205.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

192

C. Cost of Labour Rs: 367.50Total Rs: 1702.50

14% Rs: 238.35Total cost for 10.00 Nos. Rs: 1940.85Rate per No. (A+B+C+D)/10.0 Rs. 194.10

IRR-CAW-7-20 Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long withone end closed with perforated GI plate and other end provided with alluminium lid hingedto pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 GI pipe 50 mm dia 10 Nos Rm 3.00 320.00 960.00

2 GI plate & Alluminium lid ( hinged ) LS 10.00 41.00 410.00Total cost of Materials Rs: 1370.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling 8 mm dia holes LS 7.00 41.00 287.00

0.00Total hire charges of Machinery Rs: 287.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Pipe fitter Day 0.50 440.00 220.00

mazdoor Day 0.50 295.00 147.50Total cost of Labour Rs: 367.50

labour component/unit qty 36.80Add contractor's profit and overhead charges 0.14 5.20labour component/unit qty (including contractor's profit) 42.00

ABSTRACT:A. Cost of Materials Rs: 1370.00B. Hire charges of Machinery Rs: 287.00C. Cost of Labour Rs: 367.50

Total Rs: 2024.50

14% Rs: 283.43Total cost for 10.00 Nos. Rs: 2307.93Rate per No. (A+B+C+D)/10.0 Rs. 230.80

IRR-CAW-7-21 Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long withone end closed with perforated GI plate and other end provided with alluminium lid hingedto pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 GI pipe 50 mm dia 10 Nos Rm 4.50 320.00 1440.00

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

193

2 GI plate & Alluminium lid ( hinged ) LS 10.00 41.00 410.00Total cost of Materials Rs: 1850.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling 8 mm dia holes LS 10.00 41.00 410.00

0.00Total hire charges of Machinery Rs: 410.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Pipe fitter Day 0.50 440.00 220.00

mazdoor Day 0.50 295.00 147.50Total cost of Labour Rs: 367.50

labour component/unit qty 36.80Add contractor's profit and overhead charges 0.14 5.20labour component/unit qty (including contractor's profit) 42.00

ABSTRACT:A. Cost of Materials Rs: 1850.00B. Hire charges of Machinery Rs: 410.00C. Cost of Labour Rs: 367.50

Total Rs: 2627.50

14% Rs: 367.85Total cost for 10.00 Nos. Rs: 2995.35Rate per No. (A+B+C+D)/10.0 Rs. 299.50

IRR-CAW-7-22 Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long withone end closed with perforated GI plate and other end provided with alluminium lid hingedto pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 GI pipe 50 mm dia Rm 7.50 320.00 2400.00

2 GI plate & Alluminium lid ( hinged ) LS 10.00 41.00 410.00Total cost of Materials Rs: 2810.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Drilling 8 mm dia holes LS 15.00 41.00 615.00

0.00Total hire charges of Machinery Rs: 615.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Pipe fitter Day 0.50 440.00 220.002 mazdoor Day 0.50 295.00 147.50

Total cost of Labour Rs: 367.50labour component/unit qty 36.80Add contractor's profit and overhead charges 0.14 5.20labour component/unit qty (including contractor's profit) 42.00

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

194

A. Cost of Materials Rs: 2810.00B. Hire charges of Machinery Rs: 615.00C. Cost of Labour Rs: 367.50

Total Rs: 3792.50

14% Rs: 530.95Total cost for 10.00 Nos. Rs: 4323.45Rate per No. (A+B+C+D)/10.0 Rs. 432.30

IRR-CAW-7-23 Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with allleads and lifts.

DATA RATE ANALYSIS UNIT: 10 Nos.A. MATERIALS:

Sl.No Particulars Unit QtyRate in

RsAmount in

Rs. 1 PVC pipe 100 mm dia 10 Nos Rm 10.00 175.00 1750.00

Total cost of Materials Rs. 1750.00

B. MACHINERY

Sl.No Description Unit QuantityRate in

Rs.Amount in

Rs.1 Nill 0.00 0.00

0.00 0.00Total hire chargs of Machinery Rs. 0.00

C. LABOUR

Sl.No Particulars Unit QtyRate in

RsAmount in

Rs. 1 Pipe fitter Day 0.25 440.00 110.002 Mazdoor Day 0.25 295.00 73.75

Total cost of Labour Rs. 183.75labour component/unit qty 18.40Add contractor's profit and overhead charges 0.14 2.60labour component/unit qty (including contractor's profit) 21.00

ABSTRACTA. Cost of Materials Rs. 1750.00B. Hire charges of Machinery Rs. 0.00C. Cost of Labour Rs. 183.75

Total Rs: 1933.75

14% Rs: 270.73Total cost for 10.00 Nos. Rs: 2204.48Rate per No. (A+B+C+D)/10.0 Rs. 220.40

IRR-CAW-7-24 Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining ofcanal laid on rock including cost of all materials, machinery, labour etc., complete with allleads and lifts.

DATA: RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of drill rod 1.6 m long Rm 10.00 26.85 268.53Reconditioning charges @ 10% 26.85

2 Use rate of air hose 2 Nos. Hour 2.00 10.94 21.88Total cost of Materials Rs: 317.26

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

195

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 8.5 cmm diesel Hour 1.00 275.60 275.60

Fuel / Energy charges Hour 1.00 959.10 959.102 Jack hammer 2 Nos. Hour 2.00 19.80 39.60

Fuel / Energy charges Hour 2.00 0.00 0.00Total hire charges of Machinery Rs: 1274.30

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 1.00 182.20 182.202 Crew for Jack hammer Hour 2.00 284.70 569.40

Total cost of Labour Rs: 751.60labour component/unit qty 75.20Add contractor's profit and overhead charges 0.14 10.50labour component/unit qty (including contractor's profit) 85.70

ABSTRACT:A. Cost of Materials Rs: 317.26B. Hire charges of Machinery Rs: 1274.30C. Cost of Labour Rs: 751.60

Total Rs: 2343.16

14% Rs: 328.04Total cost for 10.00 Nos. Rs: 2671.20Rate per No. (A+B+C+D)/10.0 Rs. 267.10

IRR-CAW-7-25 Providing and forming 35 x 35 x 40 cm deep filter drain consisting of 75 mm thick 10 mmdown coarse aggregate around pressure relief pipe and 75 mm thick sand around coarseaggregate filter including cost of all materials, labour, excavation of pit etc., complete withlead upto 50 m and all lifts.

DATA RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Coarse aggregate 10-4.75 mm cum 0.15 875.00 131.252 Sand (Un-Screened ) cum 0.35 462.00 161.70

Total cost of Materials Rs: 292.95

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00

Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 0.10 345.00 34.502 mazdoor Day 0.10 295.00 29.50

Total cost of Labour Rs: 64.00labour component/unit qty 6.40Add contractor's profit and overhead charges 0.14 0.90labour component/unit qty (including contractor's profit) 7.30

ABSTRACT:A. Cost of Materials Rs: 292.95B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 64.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

196

Total Rs: 356.95

14% Rs: 49.97Total cost for 10.00 Nos. Rs: 406.92Rate per No. (A+B+C+D)/10.0 Rs. 40.70

IRR-CAW-7-26 Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabswith pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel liningincluding cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc.,complete with lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Shahabad Stone slabs sqm 105.00 229.00 24045.002 Cement 43 Gr kg 200.00 4.00 800.003 Sand (Screened ) cum 0.40 606.00 242.40

Total cost of Materials Rs: 25087.40

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.60Total hire charges of Machinery Rs: 191.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Operator pump Hour 2.00 96.10 192.202 work inspector Day 1.00 370.00 370.003 Mason Class I Day 4.00 385.00 1540.004 Mason Class II Day 2.00 345.00 690.005 mazdoor Day 8.00 295.00 2360.00

6Cartman with Double Bullock cart for water Day 1.00 395.00 395.00

Total cost of Labour Rs: 5547.20labour component/unit qty 55.50Add contractor's profit and overhead charges 0.14 7.80labour component/unit qty (including contractor's profit) 63.30

ABSTRACT:A. Cost of Materials Rs: 25087.40B. Hire charges of Machinery Rs: 191.00C. Cost of Labour Rs: 5547.20

Total Rs: 30825.60

14% Rs: 4315.58Total cost for 100.00 sqm Rs: 35141.18Rate per sqm (A+B+C+D)/100.0 Rs. 351.40

IRR-CAW-7-27 Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canalincluding preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excludingPCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

197

in Rs. in Rs.1 Cement 43 Gr kg 240.00 4.00 960.002 Sand (Screened) cum 0.50 606.00 303.00

Total cost of Materials Rs: 1263.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.60Total hire charges of Machinery Rs: 191.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Operator pump Hour 2.00 96.10 192.202 work inspector Day 1.00 370.00 370.003 Mason Class I Day 4.00 385.00 1540.004 mazdoor Day 9.00 295.00 2655.00

5Cartman with Double Bullock cart for water Day 1.00 395.00 395.00

Total cost of Labour Rs: 5152.20labour component/unit qty 51.50Add contractor's profit and overhead charges 0.14 7.20labour component/unit qty (including contractor's profit) 58.70

ABSTRACT:A. Cost of Materials Rs: 1263.00B. Hire charges of Machinery Rs: 191.00C. Cost of Labour Rs: 5152.20

Total Rs: 6606.20

14% Rs: 924.87Total cost for 100.00 sqm Rs: 7531.07Rate per sqm (A+B+C+D)/100.0 Rs. 75.30

IRR-CAW-7-28 Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab liningincluding necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of allmaterials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial leadupto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 58.00 4.00 232.002 Sand ( Screened) cum 0.12 606.00 72.72

Total cost of Materials Rs: 304.72

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 1.00 10.20 10.20

Fuel / Energy charges Hour 1.00 85.30 85.30Total hire charges of Machinery Rs: 95.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Operator pump Hour 1.00 96.10 96.102 work inspector Day 1.00 370.00 370.003 Mason Class I Day 2.00 385.00 770.004 Mason Class II Day 1.00 345.00 345.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

198

5 mazdoor Day 5.00 295.00 1475.00

6Cartman with Double Bullock cart for water Day 1.00 395.00 395.00

Total cost of Labour Rs: 3451.10labour component/unit qty 34.50Add contractor's profit and overhead charges 0.14 4.80labour component/unit qty (including contractor's profit) 39.30

ABSTRACT:A. Cost of Materials Rs: 304.72B. Hire charges of Machinery Rs: 95.50C. Cost of Labour Rs: 3451.10

Total Rs: 3851.32

14% Rs: 539.18Total cost for 100.00 Rm Rs: 4390.50Rate per Rm (A+B+C+D)/100.0 Rs. 43.90

IRR-CAW-7-29 Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc.,complete with all leads and lifts.

DATA: RATE ANALYSIS UNIT : 7 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Nill 0.00 0.000.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Cl- II Day 1.00 345.00 345.003 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 1010.00labour component/unit qty 144.30Add contractor's profit and overhead charges 0.14 20.20labour component/unit qty (including contractor's profit) 164.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1010.00

Total Rs: 1010.00

14% Rs: 141.4Total cost for 7.00 Nos. Rs: 1151.40Rate per No. (A+B+C+D)/7.00 Rs. 164.50

IRR-CAW-7-30 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,labour, laying, joining etc., complete with all leads and lifts.

a. Using 500 micron thick LDPE sheet.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

199

DATA: RATE ANALYSIS UNIT : 250.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 LDPE sheet 500 micron thick sqm 275.00 92.00 25300.002 Bitumen 85 / 25 and 80 / 100 Gr kg 4.00 43.00 172.00

Total cost of Materials Rs: 25472.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1Joining & laying @ 10 % of sheet cost sqm 250.00 9.20 2300.00

2 mazdoor Day 1.00 295.00 295.00Total cost of Labour Rs: 2595.00

labour component/unit qty 10.40Add contractor's profit and overhead charges 0.14 1.50labour component/unit qty (including contractor's profit) 11.90

ABSTRACT:A. Cost of Materials Rs: 25472.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2595.00

Total Rs: 28067.0014% Rs: 3929.38

Total cost for 250.00 sqm Rs: 31996.38Rate per sqm (A+B+C+D)/250.0 Rs. 128.00

Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provideaverage 75 mm thick sand backing to LDPE sheet.

For providing average 75 mm thick sand backing :

DATA: Quantity of sand ( unscreened ) ( 250 x 0.075 ) 18.75 cum2 mazdoors for laying 6 cum per day.

RATE ANALYSIS UNIT : 250.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand for filling cum 18.75 342.00 6412.50

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

200

0.00 0.00Total cost of Materials Rs: 6412.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 1770.00labour component/unit qty 7.10Add contractor's profit and overhead charges 0.14 1.00labour component/unit qty (including contractor's profit) 8.10

ABSTRACT:A. Cost of Materials Rs: 6412.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1770.00

Total Rs: 8182.50

14% Rs: 1145.55Total cost for 250.00 sqm Rs: 9328.05Rate per sqm (A+B+C+D)/250.0 Rs. 37.30

IRR-CAW-7-31 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,labour, laying, joining etc., complete with all leads and lifts.

b. Using 750 micron thick LDPE sheet.

DATA: RATE ANALYSIS UNIT : 250.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 LDPE sheet 750 micron thick 275.00 130.00 35750.002 Bitumen 85 / 25 and 80 / 100 Gr 4.00 43.00 172.00

Total cost of Materials Rs: 35922.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1Joining & laying @ 10 % of sheet cost sqm 250.00 13.00 3250.00

2 mazdoor Day 1.00 295.00 295.00Total cost of Labour Rs: 3545.00

labour component/unit qty 14.20Add contractor's profit and overhead charges 0.14 2.00labour component/unit qty (including contractor's profit) 16.20

ABSTRACT:A. Cost of Materials Rs: 35922.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3545.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

201

Total Rs: 39467.00

14% Rs: 5525.38Total cost for 250.00 sqm Rs: 44992.38Rate per sqm (A+B+C+D)/250.0 Rs. 180.00

Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provideaverage 75 mm thick unscreened sand backing to LDPE sheet.For providing average 75 mm thick sand backing per sqm Rs: 37.30

IRR-CAW-7-32 Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,labour, laying, joining etc., complete with all leads and lifts.

c. Using 1000 micron thick LDPE sheet.

DATA: RATE ANALYSIS UNIT : 250.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 LDPE sheet 1000 micron thick 275.00 180.00 49500.002 Bitumen 85 / 25 and 80 / 100 Gr 4.00 43.00 172.00

Total cost of Materials Rs: 49672.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1Joining & laying @ 10 % of sheet cost sqm 250.00 18.00 4500.00

2 mazdoor Day 1.00 295.00 295.00Total cost of Labour Rs: 4795.00

labour component/unit qty 19.20Add contractor's profit and overhead charges 0.14 2.70labour component/unit qty (including contractor's profit) 21.90

ABSTRACT:A. Cost of Materials Rs: 49672.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4795.00

Total Rs: 54467.00

14% Rs: 7625.38Total cost for 250.00 sqm Rs: 62092.38Rate per sqm (A+B+C+D)/250.0 Rs. 248.40

Note : i ) If the surface on which the LDPE sheet is to be laid is too rough and undulating provideaverage 75 mm thick unscreened sand backing to LDPE sheet.For providing average 75 mm thick sand backing per sqm Rs: 37.30

IRR-CAW-7-33 Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards forstone masonry lining of canal including cost of all materials, labour etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 100.00 Rm

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

202

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.

1 Tarfelt joint filler board 12 mm thick sqm 38.75 420.00 16275.000.00 0.00

Total cost of Materials Rs: 16275.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Carpenter Cl- II Day 1.00 345.00 345.002 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 640.00labour component/unit qty 6.40Add contractor's profit and overhead charges 0.14 0.90labour component/unit qty (including contractor's profit) 7.30

ABSTRACT:A. Cost of Materials Rs: 16275.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 640.00

Total Rs: 16915.00

14% Rs: 2368.1Total cost for 100.00 Rm Rs: 19283.10Rate per Rm (A+B+C+D)/100.00 Rs. 192.80

IRR-CAW-7-34 Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards forcement concrete lining of canal including cost of all materials, labour etc., complete with allleads and lifts.

DATA RATE ANALYSIS UNIT : 100.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Tarfelt joint filler board 20 mm thick sqm 10.00 630.006300.00

0.00 0.00 0.00Total cost of Materials Rs: 6300.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Carpenter Cl- II Day 1.00 345.00 345.002 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 640.00labour component/unit qty 6.40Add contractor's profit and overhead charges 0.14 0.90

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

203

labour component/unit qty (including contractor's profit) 7.30

ABSTRACT:A. Cost of Materials Rs: 6300.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 640.00

Total Rs: 6940.00

14% Rs: 971.6Total cost for 100.00 Rm Rs: 7911.60Rate per Rm (A+B+C+D)/100.00 Rs. 79.10

IRR-CAW-7-35 Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards forcement concrete lining of canal including cost of all materials, labour etc., complete with allleads and lifts.

DATA: RATE ANALYSIS UNIT : 100.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Tarfelt joint filler board 20 mm thick sqm 15.30 630.009639.00

0.00 0.00Total cost of Materials Rs: 9639.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Carpenter Cl- II Day 1.00 345.00 345.002 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 640.00labour component/unit qty 6.40Add contractor's profit and overhead charges 0.14 0.90labour component/unit qty (including contractor's profit) 7.30

ABSTRACT:A. Cost of Materials Rs: 9639.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 640.00

Total Rs: 10279.00

14% Rs: 1439.06Total cost for 100.00 Rm Rs: 11718.06Rate per Rm (A+B+C+D)/100.00 Rs. 117.20

IRR-CAW-7-36 Providing and forming 35 mm wide and 10 mm thick construction / contraction jointsfor concrete lining by mastic filler including cost of all materials, labour etc., complete withall leads and lifts.

DATA: RATE ANALYSIS UNIT : 100.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

204

in Rs. in Rs.1 Asphalt 80/100 Gr kg 35.00 43.00 1505.00

Sand (Screened ) cum 0.04 606.00 24.24Total cost of Materials Rs: 1529.24

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 0.50 345.00 172.502 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 467.50labour component/unit qty 4.70Add contractor's profit and overhead charges 0.14 0.70labour component/unit qty (including contractor's profit) 5.40

ABSTRACT:A. Cost of Materials Rs: 1529.24B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 467.50

Total Rs: 1996.74

14% Rs: 279.54Total cost for 100.00 Rm Rs: 2276.28Rate per Rm (A+B+C+D)/100.00 Rs. 22.80

IRR-CAW-7-37 Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cumequivalent concrete volume: 3.74 cum)

DATA: RATE ANALYSIS UNIT : 225 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 1122.00 4.00 4488.00

Cement for incidentals @ 1 kg / slab kg 225.00 4.00900.00

2 Coarse aggregate 20-10 mm cum 1.94 1210.00 2353.21Coarse aggregate 10 mm below cum 1.05 875.00 916.30

3 Fine aggregate (Un-Screened ) cum 1.68 462.00 777.554 Super Plasticizer kg 4.49 80.00 359.045 Use rate of moulds for 500 uses No. 225.00 8.54 1921.93

Total cost of Materials Rs: 11716.03

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

1 Concrete mixer 300/200 ltr ( diesel) Hour 8.00 53.50428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.53

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

205

3 Water tanker 8000 ltr Hour 0.20 402.50 80.50Fuel / Energy charges Hour 0.20 322.20 64.44

Total hire charges of Machinery Rs: 1264.89Aportioned hire charges of machinery for lining slab 90% Rs: 1138.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.10 96.10 9.613 Crew for Water tanker Hour 0.20 153.10 30.624 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials / laying CC Day 3.00 295.00 885.00for demoulding / oiling / laying Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 5058.63Aportioned cost of labour for lining slabs 90% Rs: 4552.77

labour component/unit qty 20.20Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 23.00

ABSTRACT:A. Cost of Materials Rs: 11716.03B. Hire charges of Machinery Rs: 1138.40C. Cost of Labour Rs: 4552.77

Total Rs: 17407.19

14% Rs: 2437.01Total cost for 225.00 Nos. Rs: 19844.20Rate per each (A+B+C+D)/225.0 Rs. 88.20

IRR-CAW-7-38 Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum, equivalent concrete volume: 0.23 cum)

DATA: RATE ANALYSIS UNIT : 25 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 69.00 4.00 276.00

Cement for incidentals @ 0.5 kg/slab kg 12.50 4.0050.00

2 Coarse aggregate 20-10 mm cum 0.12 1210.00 144.72Coarse aggregate 10 mm below cum 0.06 875.00 56.35

3 Fine aggregate (Un-Screened ) cum 0.10 462.00 47.824 Super Plasticizer kg 0.28 80.00 22.085 Use rate of moulds for 500 uses No. 25.00 5.25 131.33

Total cost of Materials Rs: 728.30

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

206

1 Concrete mixer 300/200 ltr ( diesel) Hour 8.00 53.50428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.533 Water tanker 8000 ltr Hour 0.20 402.50 80.50

Fuel / Energy charges Hour 0.20 322.20 64.44Total hire charges of Machinery Rs: 1264.89

Aportioned hire charges of machinery for lug slabs 10% Rs: 126.49

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.10 96.10 9.613 Crew for Water tanker Hour 0.20 153.10 30.624 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials / laying CC Day 3.00 295.00 885.00for demoulding / oiling / laying Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 5058.63

Aportioned cost of labourfor lug slabs 10% Rs: 505.86labour component/unit qty 20.20Add contractor's profit and overhead charges 0.14 2.80labour component/unit qty (including contractor's profit) 23.00

ABSTRACT:A. Cost of Materials Rs: 728.30B. Hire charges of Machinery Rs: 126.49C. Cost of Labour Rs: 505.86

Total Rs: 1360.65

14% Rs: 190.49Total cost for 25.00 Nos. Rs: 1551.14Rate per each (A+B+C+D)/25.0 Rs. 62.00

IRR-CAW-7-39 Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

DATA: RATE ANALYSIS UNIT : 225 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 270.00 4.00 1080.00

Cement for incidentals @ 0.5 kg/slab kg 112.50 4.00450.00

2 Coarse aggregate 10 mm below cum 0.61 875.00 535.503 Fine aggregate (Un-Screened ) cum 0.39 462.00 178.794 Super Plasticizer kg 1.08 80.00 86.405 Use rate of moulds for 250 uses No. 225.00 3.50 786.98

Total cost of Materials Rs: 3117.68

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

207

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hand mixer 45 / 30 ltr Hour 8.00 5.50 44.00

Fuel / Energy charges Hour 8.00 0.00 0.002 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.533 Water tanker 8000 ltr Hour 0.20 402.50 80.50

Fuel / Energy charges Hour 0.20 322.20 64.44Total hire charges of Machinery Rs: 198.49

Aportioned hire charges of machinery for lining slab 90% Rs: 178.64

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 0.10 96.10 9.612 Crew for Water tanker Hour 0.20 153.10 30.623 Mason Class-I Day 2.00 385.00 770.004 work inspector Day 1.00 370.00 370.005 mazdoor

for batching / mixing / laying Day 2.00 295.00 590.00for demoulding / cleaning / oiling Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 3245.23Aportioned cost of labour for lining slabs 90% Rs: 2920.71

labour component/unit qty 13.00Add contractor's profit and overhead charges 0.14 1.80labour component/unit qty (including contractor's profit) 14.80

ABSTRACT:A. Cost of Materials Rs: 3117.68B. Hire charges of Machinery Rs: 178.64C. Cost of Labour Rs: 2920.71

Total Rs: 6217.03

14% Rs: 870.38Total cost for 225.00 Nos. Rs: 7087.41Rate per each (A+B+C+D)/225.0 Rs. 31.50

IRR-CAW-7-40 Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

DATA: RATE ANALYSIS UNIT : 25 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 15.00 4.00 60.00

Cement for incidentals @ 0.3 kg/slab kg 7.50 4.0030.00

2 Coarse aggregate 10 mm below cum 0.03 875.00 29.753 Fine aggregate (Un-Screened ) cum 0.02 462.00 9.934 Super Plasticizer kg 0.06 80.00 4.805 Use rate of moulds for 250 uses No. 25.00 1.86 46.59

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

208

Total cost of Materials Rs: 181.07

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hand mixer 45 / 30 ltr Hour 8.00 5.50 44.00

Fuel / Energy charges Hour 8.00 0.00 0.002 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.533 Water tanker 8000 ltr Hour 0.20 402.50 80.50

Fuel / Energy charges Hour 0.20 322.20 64.44Total hire charges of Machinery Rs: 198.49

Aportioned hire charges of machinery for lug slabs 10% Rs: 19.85

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 0.10 96.10 9.612 Crew for Water tanker Hour 0.20 153.10 30.623 Mason Class-I Day 2.00 385.00 770.004 work inspector Day 1.00 370.00 370.005 mazdoor

for batching / mixing / laying Day 2.00 295.00 590.00for demoulding / cleaning / oiling Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 3245.23Aportioned cost of labour for lug slabs 10% Rs: 324.52

labour component/unit qty 13.00Add contractor's profit and overhead charges 0.14 1.80labour component/unit qty (including contractor's profit) 14.80

ABSTRACT:A. Cost of Materials Rs: 181.07B. Hire charges of Machinery Rs: 19.85C. Cost of Labour Rs: 324.52

Total Rs: 525.44

14% Rs: 73.56Total cost for 25.00 Nos. Rs: 599.00Rate per each (A+B+C+D)/25.0 Rs. 24.00

IRR-CAW-7-41 Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube compressive strength not less than 15 N/Sqmm) cement concrete using 20mm down grades coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35)

DATA: RATE ANALYSIS UNIT: 225 Nos.

A. MATERIALS :

Ratein Rs.

1 Cement for mix Kg 1215 4.00 4860.002

Cement for incidentals @ 0.5kg/slabKg 112.5

4.00450.00

3 Coarse aggregate 20 mm below Cum 2.11 1210.00 2548.26

Sl. No Particulars Unit Quantity Amount in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

209

4 Coarse aggregate 10 mm below Cum 1.13 875.00 992.255 Fine aggregate (Un-Screened) Cum 1.82 462.00 842.006 Super Plasticizer kg 4.86 80.00 388.807 Use rate of moulds for 250 uses No. 225 1.23 276.75

10358.06

B. MACHINERY :

Ratein Rs.

1 Diesel mixer 300/200 Hour 8 53.50 428.00Fuel/Energy charges Hour 8 85.30 682.40

2 5 hp pump (diesel) Hour 0.1 10.20 1.02Fuel/Energy charges Hour 0.1 85.30 8.53

3 Water tanker 8000 ltr Hour 0.2 402.50 80.50Fuel/Energy charges Hour 0.2 322.20 64.44

1264.89Aportioned hire charges of machinery @ 90% for lining slab Rs.

90% 1138.40

C. LABOUR :Ratein Rs.

1 Crew for Pump Hour 0.1 96.10 9.612 Crew for water tanker Hour 0.2 153.10 30.623 Mason Class-I Day 2 385.00 770.004 Class II Mason Day 1 345.00 345.005 Mazdoor

For batching materials/laying Day 2 295.00 590.00For demoulding/cleaning/oiling 2 295.00 590.00For shifting slabs to curing pond 1 295.00 295.00For stacking after curing 1 295.00 295.00For cleaning & miscellaneous Day 1 295.00 295.00

3220.23Aportioned cost of labour for lining slabs Rs.

90% 2898.21

labour component/unit qty 12.90Add contractor's profit and overhead charges 0.14 1.80labour component/unit qty (including contractor's profit) 14.70

ABSTRACT :A. Cost of Materials Rs. 10358.055

Rs. 1138.40C. Cost of Labour Rs. 2898.21

Total Rs: 14394.66

14% Rs: 2015.25Total cost for 225.00 Nos. Rs: 16409.91Rate per each (A+B+C+D)/225.0 Rs. 72.90

IRR-CAW-7-42 Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N / sqmm )cement concrete using 10 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

DATA: RATE ANALYSIS UNIT : 225 Nos.A. MATERIALS:

Total Cost of Labour Rs.

B. Hire Charges of machinery

D. Add for contractor's profit and overheads on (A+B+C)

Total hire charges of Machinery Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Total Cost of Materials Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Canal and Allied Works - Item Unit Rates 2014-15

210

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 324.00 4.00 1296.00

Cement for incidentals @ 0.5 kg/slab kg 112.50 4.00450.00

2 Coarse aggregate 10 mm below cum 0.73 875.00 642.603 Fine aggregate (Un-Screened ) cum 0.46 462.00 214.554 Super Plasticizer kg 1.30 80.00 103.685 Use rate of moulds for 250 uses No. 225.00 3.52 793.05

Total cost of Materials Rs: 3499.89

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hand mixer 45 / 30 ltr Hour 8.00 5.50 44.00

Fuel / Energy charges Hour 8.00 0.00 0.002 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.533 Water tanker 8000 ltr Hour 0.20 402.50 80.50

Fuel / Energy charges Hour 0.20 322.20 64.44Total hire charges of Machinery Rs: 198.49

Aportioned hire charges of machinery for lining slab 90% Rs: 178.64

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 0.10 96.10 9.612 Crew for Water tanker Hour 0.20 153.10 30.623 Mason Class-I Day 2.00 385.00 770.004 work inspector Day 1.00 370.00 370.005 mazdoor

for batching / mixing / laying Day 2.00 295.00 590.00for demoulding / cleaning / oiling Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 3245.23Aportioned cost of labour for lining slabs 90% Rs: 2920.71

labour component/unit qty 13.00Add contractor's profit and overhead charges 0.14 1.80labour component/unit qty (including contractor's profit) 14.80

ABSTRACT:A. Cost of Materials Rs: 3499.89B. Hire charges of Machinery Rs: 178.64C. Cost of Labour Rs: 2920.71

Total Rs: 6599.23

14% Rs: 923.89Total cost for 225.00 Nos. Rs: 7523.12Rate per each (A+B+C+D)/225.0 Rs. 33.40

IRR-CAW-7-43 Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cubecompressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down gradedcoarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying,compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

DATA: RATE ANALYSIS UNIT : 25 Nos.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

211

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement for mix kg 13.50 4.00 54.00

Cement for incidentals @ 0.3 kg/slab kg 7.50 4.0030.00

2 Coarse aggregate 10 mm below cum 0.03 875.00 26.783 Fine aggregate (Un-Screened ) cum 0.02 462.00 8.944 Super Plasticizer kg 0.05 80.00 4.325 Use rate of moulds for 250 uses No. 25.00 1.83 45.74

Total cost of Materials Rs: 169.78

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hand mixer 45 / 30 ltr Hour 8.00 5.50 44.00

Fuel / Energy charges Hour 8.00 0.00 0.002 5 hp pump ( diesel ) Hour 0.10 10.20 1.02

Fuel / Energy charges Hour 0.10 85.30 8.533 Water tanker 8000 ltr Hour 0.20 402.50 80.50

Fuel / Energy charges Hour 0.20 322.20 64.44Total hire charges of Machinery Rs: 198.49

Aportioned hire charges of machinery for lug slabs 10% Rs: 19.85

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 0.10 96.10 9.612 Crew for Water tanker Hour 0.20 153.10 30.623 Mason Class-I Day 2.00 385.00 770.004 work inspector Day 1.00 370.00 370.005 mazdoor

for batching / mixing / laying Day 2.00 295.00 590.00for demoulding / cleaning / oiling Day 2.00 295.00 590.00for shifting slabs to curing pond Day 1.00 295.00 295.00for stacking after curing Day 1.00 295.00 295.00for cleaning & miscellaneous Day 1.00 295.00 295.00

Total cost of Labour Rs: 3245.23Aportioned cost of labour for lug slabs 10% Rs: 324.52

labour component/unit qty 13.00Add contractor's profit and overhead charges 0.14 1.80labour component/unit qty (including contractor's profit) 14.80

ABSTRACT:A. Cost of Materials Rs: 169.78B. Hire charges of Machinery Rs: 19.85C. Cost of Labour Rs: 324.52

Total Rs: 514.15

14% Rs: 71.98Total cost for 25.00 Nos. Rs: 586.13Rate per each (A+B+C+D)/25.0 Rs. 23.40

IRR-CAW-7-44 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal sidelining using stones and chips from approved quarry including cost of all materials,machinery, labour, forming weep holes at specified intervals, finishing, curing etc., completewith initial lead upto 50 m and all lifts.(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)

DATA: RATE ANALYSIS UNIT : 10.00 cum

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

212

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement 43 Gr kg 1152.00 4.00 4608.002 Sand (Screened ) cum 4.00 606.00 2424.00

3 Uncoursed rubble stones at quarry cum 9.60 318.003052.80

4 Through stones 20x20x30 cm Nos 32.00 23.00 736.005 Stone chips at quarry cum 1.50 340.00 510.00

Total cost of Materials Rs: 11330.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 4.00 10.20 40.80

Fuel / Energy charges Hour 4.00 85.30 341.20Total hire charges of Machinery Rs: 382.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Operator pump Hour 4.00 96.10 384.402 work inspector Day 1.00 370.00 370.003 Mason Class I Day 2.00 385.00 770.004 Mason Class II Day 2.00 345.00 690.005 mazdoor Day 8.00 295.00 2360.00

6Cartman with Double Bullock cart for water Day 1.00 395.00

395.00

Total cost of Labour Rs: 4969.40labour component/unit qty 496.90Add contractor's profit and overhead charges 0.14 69.60labour component/unit qty (including contractor's profit) 566.50

ABSTRACT:A. Cost of Materials Rs: 11330.80B. Hire charges of Machinery Rs: 382.00C. Cost of Labour Rs: 4969.40

Total Rs: 16682.20

14% Rs: 2335.51Total cost for 10.00 cum Rs: 19017.71Rate per cum (A+B+C+D)/10.0 Rs. 1901.80

IRR-CAW-7-45 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal sidelining using stones from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(without pin headers) : 1.1 cum)(Thickness of the Masonry assumed: 0.3 m , rubble stones

DATA: RATE ANALYSIS UNIT: 10 Cum

A. MATERIALS :

Ratein Rs.

1 Cement 43 Gr Kg 979.2 4.00 3916.802 Sand (Screened) Cum 3.4 606.00 2060.403 Uncoursed rubble stones at quarry Cum 11

318.003498.00

9475.2Total Cost of Materials Rs.

Quantity Amount in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Sl. No Particulars Unit

Canal and Allied Works - Item Unit Rates 2014-15

213

B. MACHINERY :

Ratein Rs.

1 Hand Mixing Charges Hour 8 5.50 44.005 hp pump (diesel) Hour 4 10.20 40.80Fuel / Energy charges Hour 5 85.30 426.50

511.30

C. LABOUR :

Ratein Rs.

1 Operator pump Hour 4 96.10 384.402 Mason Class I Day 13 385.00 5005.003 Mason Class II Day 6 345.00 2070.004 Mazdoor Day 29 295.00 8555.005 Cartman with Double Bullock cart for

waterDay 1

395.00395.00

16409.40labour component/unit qty 1640.90Add contractor's profit and overhead charges 0.14 229.70labour component/unit qty (including contractor's profit) 1870.60

ABSTRACT :Rs. 9475.2Rs. 511.3

C. Cost of Labour Rs. 16409.40Total Rs: 26395.90

14% Rs: 3695.43Total cost for 10.00 Cum Rs: 30091.33Rate per Cum (A+B+C+D)/10.0 Rs. 3009.10

IRR-CAW-7-46 Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal sidelining using stones and chips from canal excavation including cost of all materials,machinery, labour, forming weep holes at specified interval, finishing, curing etc., completewith initial lead upto 50 m and all lifts.( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)

Note: Stones and chips will be issued from dump yard at specified issue rate.

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 1144.00 4.00 4576.002 Sand (Screened ) cum 4.00 606.00 2424.003 Uncoursed rubble at dump yard cum 9.60 155.00 1488.004 Through stones 20x20x30 cm Nos 32.00 23.00 736.005 Stone chips at dump yard cum 1.50 175.00 262.50

Total cost of Materials Rs: 9486.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) Hour 4.00 10.20 40.80

Fuel / Energy charges Hour 4.00 85.30 341.20Total hire charges of Machinery Rs: 382.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

Amount in Rs.

Total Cost of Labour Rs.

A. Cost of MaterialsB. Hire Charges of Machinery

D. Add for contractor's profit and overheads on (A+B+C)

2

Total hire charges of Machinery Rs.

Sl. No Particulars Unit Quantity

Sl. No Particulars Unit Quantity Amount in Rs.

Canal and Allied Works - Item Unit Rates 2014-15

214

in Rs. in Rs.1 Operator pump Hour 4.00 96.10 384.402 work inspector Day 1.00 370.00 370.003 Mason Class I Day 2.00 385.00 770.004 Mason Class II Day 2.00 345.00 690.005 Crowbarman Day 1.00 345.00 345.006 mazdoor Day 9.00 295.00 2655.00

7Cartman with Double Bullock cart for water Day 1.00 395.00

395.00

Total cost of Labour Rs: 5609.40labour component/unit qty 560.90Add contractor's profit and overhead charges 0.14 78.50labour component/unit qty (including contractor's profit) 639.40

ABSTRACT:A. Cost of Materials Rs: 9486.50B. Hire charges of Machinery Rs: 382.00C. Cost of Labour Rs: 5609.40

Total Rs: 15477.90

14% Rs: 2166.91Total cost for 10.00 cum Rs: 17644.81Rate per cum (A+B+C+D)/10.0 Rs. 1764.50

IRR-CAW-7-47 Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum)

DATA: RATE ANALYSIS UNIT: 10 Cum

A. MATERIALS :

Ratein Rs.

1 Cement 43 Gr Kg 980 4.00 3920.002 Sand (Screened) Cum 3.4 606.00 2060.403 Uncoursed rubble at dump yard Cum 11 155.00 1705.00

7685.4

B. MACHINERY :

Ratein Rs.

1 Hand Mixing Charges Hour 8 5.50 44.005 hp pump (diesel) Hour 4 10.20 40.80Fuel / Energy charges Hour 5 85.30 426.50

511.30

C. LABOUR :

Ratein Rs.

1 Operator pump Hour 4 96.10 384.402 Mason Class I Day 13 385.00 5005.003 Mason Class II Day 6 345.00 2070.004 Mazdoor Day 29 295.00 8555.005 Cartman with double bullock cart Day 1 395.00 395.00

16409.40labour component/unit qty 1640.90Add contractor's profit and overhead charges 0.14 229.70labour component/unit qty (including contractor's profit) 1870.60

Total Cost of Labour Rs.

Total hire charges of Machinery Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

2

Total Cost of Materials Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

215

ABSTRACT :A. Cost of Materials Rs. 7685.4

Rs. 511.3C. Cost of Labour Rs. 16409.40

Total Rs: 24606.10

14% Rs: 3444.85Total cost for 10.00 Cum Rs: 28050.95Rate per Cum (A+B+C+D)/10.0 Rs. 2805.10

IRR-CAW-8 ROCK PITCHING:

IRR-CAW-8-1 Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 persqm including cost of all materials, labour, hand packing, finishing etc., complete with initiallead upto 50 m and all lifts.( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Uncoursed rubble stones at quarry cum 23.00 318.007314.00

2 Pin header (Through stone) 30 cm Nos 200.00 23.004600.00

3 Stone chips at quarry cum 3.75 340.00 1275.00Total cost of Materials Rs: 13189.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 5.00 345.00 1725.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3865.00labour component/unit qty 38.70Add contractor's profit and overhead charges 0.14 5.40labour component/unit qty (including contractor's profit) 44.10

ABSTRACT:A. Cost of Materials Rs: 13189.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3865.00

Total Rs: 17054.00

14% Rs: 2387.56Total cost for 100.00 sqm Rs: 19441.56Rate per sqm (A+B+C+D)/100.0 Rs. 194.40

Note: If 15 cm thick murum bed is to be provided below pitching(Murum : 0.18 cum/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

B. Hire Charges of Machinery

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

216

in Rs. in Rs.1 Murum cum 18.00 107.00 1926.00

0.00 0.00 0.00Total cost of Materials Rs: 1926.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1180.00labour component/unit qty 11.80Add contractor's profit and overhead charges 0.14 1.70labour component/unit qty (including contractor's profit) 13.50

ABSTRACT:A. Cost of Materials Rs: 1926.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1180.00

Total Rs: 3106.00

14% Rs: 434.84Total cost for 100.00 sqm Rs: 3540.84Rate per sqm (A+B+C+D)/100.0 Rs. 35.40

IRR-CAW-8-1-A Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per(New Item4 - 2011-

12) sqm including cost of all materials, labour, hand packing, finishing etc., complete with initiallead upto 50 m and all lifts.( rubble stones : 0.207 cum/sqm, Stone Chips : 0.03375cum/sqm, Pin Headers 30cm : 2/sqm)(For Maintenance works)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Uncoursed rubble stones at quarry cum 20.70 318.006582.60

2 Pin header (Through stone) 30 cm Nos 200.00 23.004600.00

3 Stone chips at quarry cum 3.375 340.00 1147.50Total cost of Materials Rs: 12330.10

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 5.00 345.00 1725.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3865.00labour component/unit qty 38.70

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

217

Add contractor's profit and overhead charges 0.14 5.40labour component/unit qty (including contractor's profit) 44.10

ABSTRACT:A. Cost of Materials Rs: 12330.10B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3865.00

Total Rs: 16195.10

14% Rs: 2267.31Total cost for 100.00 sqm Rs: 18462.41Rate per sqm (A+B+C+D)/100.0 Rs. 184.60

IRR-CAW-8-2 Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete( rubble stones : 0.275 cum/sqm)

DATA: RATE ANALYSIS UNIT: 100 Sqm.

A. MATERIALS :

Ratein Rs.

1 Uncoursed rubble stones at quarry Cum 27.50318.00

8745.00

8745

B. MACHINERY :

Ratein Rs.

0 00 0

0

C. LABOUR :

Ratein Rs.

1 Mason Class II Day 5.50 345.00 1897.502 Mazdoor Day 24.75 295.00 7301.25

9198.75labour component/unit qty 92.00Add contractor's profit and overhead charges 0.14 12.90labour component/unit qty (including contractor's profit) 104.90

ABSTRACT :Rs. 8745Rs. 0Rs. 9198.75

Total Rs: 17943.75

14% Rs: 2512.13Total cost for 100.00 Sqm. Rs: 20455.88Rate per Sqm. (A+B+C+D)/100.0 Rs. 204.60

NOTE:If 15 cm thick murum bed is to be provided below pitching add in Rs. 35.40( As per rate analysis under item IRR-CAW-8-1- Note )

IRR-CAW-8-2-A Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, (New Item5 - 2011-12) hand packing, finishing etc., complete

( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)

Total Cost of Labour Rs.

A. Cost of MaterialsB. Hire Charges of MachineryC. Cost of Labour

D. Add for contractor's profit and overheads on (A+B+C)

Amount in Rs.

1 Nil

Total hire charges of Machinery Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Total Cost of Materials Rs.

Sl. No Particulars Unit Quantity

Sl. No Particulars Unit Quantity Amount in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

218

DATA: RATE ANALYSIS UNIT: 100 Sqm.

A. MATERIALS :

Ratein Rs.

1 Rough Stone for Revetment Cum 24.75 144.00 3564.002 Stone Chips at Quarry Cum 3.40 340.00 1156.00

4720

B. MACHINERY :

Ratein Rs.

0 00 0

0

C. LABOUR :

Ratein Rs.

1 Mason Class II Day 4.95 345.00 1707.752 Mazdoor Day 22.28 295.00 6571.13

8278.88labour component/unit qty 82.80Add contractor's profit and overhead charges 0.14 11.60labour component/unit qty (including contractor's profit) 94.40

ABSTRACT :Rs. 4720Rs. 0Rs. 8278.88

Total Rs: 12998.88

14% Rs: 1819.84Total cost for 100.00 Sqm. Rs: 14818.72Rate per Sqm. (A+B+C+D)/100.0 Rs. 148.20

IRR-CAW-8-3 Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 persqm including cost of all materials, labour, hand packing, finishing etc., complete with initiallead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Uncoursed rubble stones at quarry cum 27.50 318.008745.00

2 Pin header (Through stone) 30 cm Nos 200.00 23.004600.00

3 Stone chips at quarry cum 4.50 340.00 1530.00Total cost of Materials Rs: 14875.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

1 Nil

Total hire charges of Machinery Rs.

Amount in Rs.

Total Cost of Labour Rs.

A. Cost of MaterialsB. Hire Charges of MachineryC. Cost of Labour

D. Add for contractor's profit and overheads on (A+B+C)

Sl. No Particulars Unit Quantity

Total Cost of Materials Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Sl. No Particulars Unit Quantity Amount in Rs.

Canal and Allied Works - Item Unit Rates 2014-15

219

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 5.00 345.00 1725.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3865.00labour component/unit qty 38.70Add contractor's profit and overhead charges 0.14 5.40labour component/unit qty (including contractor's profit) 44.10

ABSTRACT:A. Cost of Materials Rs: 14875.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3865.00

Total Rs: 18740.00

14% Rs: 2623.6Total cost for 100.00 sqm Rs: 21363.60Rate per sqm (A+B+C+D)/100.0 Rs. 213.60

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1- Note )

IRR-CAW-8-4 Providing and Constructing 30 cm thick dry rubble stone pitching including cost of all materials,labour,hand packing,finishing etc.,complete ( rubble stones : 0.33 cum/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS :

Sl No Particulars Unit QuantityRate in Rs

Amount in Rs

1 Uncoursed rubble stones at Quarry Cum 33.00318.00

10494.00

( Included in material Rate)Total Cost of materials Rs : 10494.00

B.MACHINERY :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Nill 0.00 0.000.00 0.00

Total hire charges of machinery Rs :

0.00

C.LABOUR :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Mason Class II Day 6.60 345.00 2277.002 Mazdoor Day 29.70 295.00 8761.50

Total cost of labour Rs :

11038.50

labour component/unit qty 110.40Add contractor's profit and overhead charges 0.14 15.50labour component/unit qty (including contractor's profit) 125.90

ABSTRACTA.Cost of Materials including ryolty charges Rs: 10494.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

220

B. Hire charges of Machinery Rs: 0.00C.Cost of Labour Rs: 11038.50

Total Rs: 21532.50

14% Rs: 3014.55Total cost for 100.00 sqm Rs: 24547.05Rate per sqm (A+B+C+D)/100.0 Rs. 245.50

NOTE:If 15 cm thick murum bed is to be provided below pitching Rs 35.40Add ( As per rate analysis under item IRR-CAW-8-1 - Note)

IRR-CAW-8-5 Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 persqm including cost of all materials, labour, hand packing, finishing etc., complete with initiallead upto 50 m and all lifts.( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Uncoursed rubble stones at quarry cum 40.00 318.0012720.00

2 Pin header (Through stone) 45 cm Nos 200.00 39.007800.00

3 Stone chips at quarry cum 6.75 340.00 2295.00Total cost of Materials Rs: 22815.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00

0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 7.00 345.00 2415.003 mazdoor Day 9.00 295.00 2655.00

Total cost of Labour Rs: 5440.00labour component/unit qty 54.40Add contractor's profit and overhead charges 0.14 7.60labour component/unit qty (including contractor's profit) 62.00

ABSTRACT:A. Cost of Materials Rs: 22815.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5440.00

Total Rs: 28255.00

14% Rs: 3955.7Total cost for 100.00 sqm Rs: 32210.70Rate per sqm (A+B+C+D)/100.0 Rs. 322.10

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-6 Providing and Constructing 45 cm thick dry rubble stone pitching including cost of all materials,labour,hand packing,finishing etc.,complete

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

221

( rubble stones : 0.495 cum/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS :

Sl No Particulars Unit QuantityRate in Rs

Amount in Rs

1 Uncoursed rubble stones at Quarry Cum 49.50318.00

15741.00

( Included in material Rate)Total Cost of materials Rs : 15741.00

B.MACHINERY :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total hire charges of machinery Rs :

0.00

C.LABOUR :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Mason Class II Day 9.90 345.00 3415.502 Mazdoor Day 44.55 295.00 13142.25

Total cost of labour Rs :

16557.75

labour component/unit qty 165.60Add contractor's profit and overhead charges 0.14 23.20labour component/unit qty (including contractor's profit) 188.80

ABSTRACTA.Cost of Materials including ryolty charges Rs: 15741.00B. Hire charges of Machinery Rs: 0.00C.Cost of Labour Rs: 16557.75

Total Rs: 32298.75

14% Rs: 4521.83Total cost for 100.00 sqm Rs: 36820.58Rate per sqm (A+B+C+D)/100.0 Rs. 368.20

NOTE:If 15 cm thick murum bed is to be provided below pitching Rs 35.40Add ( As per rate analysis under item IRR-CAW-8-1 - Note)

IRR-CAW-8-7 Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion withpin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar,finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Uncoursed rubble stones at quarry cum 27.50 318.008745.00

2 Pin header (Through stone) 30 cm Nos 200.00 23.004600.00

3 Stone chips @ 15 % at quarry cum 4.50 340.00 1530.004 Cement kg 3000.00 4.00 12000.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

222

5 Sand (Screened ) cum 10.50 606.00 6363.00Total cost of Materials Rs: 33238.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp pump ( diesel ) 2.00 10.20 20.40

Fuel / Energy charges 2.00 85.30 170.60Total hire charges of Machinery Rs: 191.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 2.00 96.10 192.202 work inspector Day 1.00 370.00 370.003 Mason Class II Day 5.00 345.00 1725.004 mazdoor Day 12.00 295.00 3540.005 Catrman with double bullock cart Day 2.00 395.00 790.00

Total cost of Labour Rs: 6617.20labour component/unit qty 66.20Add contractor's profit and overhead charges 0.14 9.30labour component/unit qty (including contractor's profit) 75.50

ABSTRACT:A. Cost of Materials Rs: 33238.00B. Hire charges of Machinery Rs: 191.00C. Cost of Labour Rs: 6617.20

Total Rs: 40046.20

14% Rs: 5606.47Total cost for 100.00 sqm Rs: 45652.67Rate per sqm (A+B+C+D)/100.0 Rs. 456.50

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-8 Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete( rubble stones : 0.33 cum/sqm )

DATA: RATE ANALYSIS UNIT : 100.00 SqmA. MATERIALS :

Sl No Particulars Unit QuantityRate in Rs

Amount in Rs

1 Uncoursed rubble stones at Quarry Cum 33.00318.00

10494.00

2 Cement Kg 3232.00 4.00 12928.003 Sand (Screened) Cum 11.22 606.00 6799.32

Total Cost of materials Rs : 30221.32

B.MACHINERY :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Nill 0.00 0.00 0.00

Total hire charges of machinery Rs :

0.00

C.LABOUR :

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

223

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Mason Class I Day 0.54 385.00 207.902 Mason Class II Day 1.26 345.00 434.703 Mazdoor Day 2.80 295.00 826.00

Total cost of labour Rs :

1468.60

labour component/unit qty 14.70Add contractor's profit and overhead charges 0.14 2.10labour component/unit qty (including contractor's profit) 16.80

ABSTRACTA.Cost of Materials Rs: 30221.32B. Hire charges of Machinery Rs: 0.00C.Cost of Labour Rs: 1468.60

Total Rs: 31689.92

14% Rs: 4436.59Total cost for 100.00 Sqm Rs: 36126.51Rate per Sqm (A+B+C+D)/100.0 Rs. 361.30

NOTE:If 15 cm thick murum bed is to be provided below pitching Rs 35.40Add ( As per rate analysis under item IRR-CAW-8-1 - Note)

IRR-CAW-8-9 Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm sizekhandki stones with pin headers at 2 per sqm including cost of all materials, labour, handpacking, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Khandki stones 20-25 cm height Nos 1200.00 13.00 15600.00

2 Pin header (Through stone) 30 cm Nos 200.00 23.004600.00

3 Stone chips cum 4.50 340.00 1530.00Total cost of Materials Rs: 21730.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 5.00 345.00 1725.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3865.00labour component/unit qty 38.70Add contractor's profit and overhead charges 0.14 5.40labour component/unit qty (including contractor's profit) 44.10

ABSTRACT:A. Cost of Materials Rs: 21730.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3865.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

224

Total Rs: 25595.00

14% Rs: 3583.3Total cost for 100.00 sqm Rs: 29178.30Rate per sqm (A+B+C+D)/100.0 Rs. 291.80

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-10 Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm sizekhandki stones with pin headers at 2 per sqm including cost of all materials, labour, handpacking, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Khandki stones 25-30 cm height Nos 730.00 16.00 11680.002 Pin headers 45 cm Nos 200.00 39.00 7800.003 Stone chips cum 6.75 340.00 2295.00

Total cost of Materials Rs: 21775.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 7.00 345.00 2415.003 mazdoor Day 9.00 295.00 2655.00

Total cost of Labour Rs: 5440.00labour component/unit qty 54.40Add contractor's profit and overhead charges 0.14 7.60labour component/unit qty (including contractor's profit) 62.00

ABSTRACT:A. Cost of Materials Rs: 21775.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 5440.00

Total Rs: 27215.00

14% Rs: 3810.1Total cost for 100.00 sqm Rs: 31025.10Rate per sqm (A+B+C+D)/100.0 Rs. 310.30

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-11 Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm sizekhandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints inCM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing,

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

225

curing etc.complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Khandki stones 20-25 cm height Nos 1200.00 13.00 15600.00

2 Pin headers 30 cm long Nos 200.00 23.00 4600.003 Stone chips @ 15 % at quarry cum 4.50 340.00 1530.004 Cement kg 2902.00 4.00 11608.005 Sand (Screened ) cum 9.67 606.00 5860.02

Total cost of Materials Rs: 39198.02

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp diesel pump Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.60Total hire charges of Machinery Rs: 191.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 2.00 96.10 192.202 work inspector Day 1.00 370.00 370.003 Cartman with double bullock cart Day 2.00 395.00 790.004 Mason Class II Day 5.00 345.00 1725.005 mazdoor Day 11.00 295.00 3245.00

Total cost of Labour Rs: 6322.20labour component/unit qty 63.20Add contractor's profit and overhead charges 0.14 8.80labour component/unit qty (including contractor's profit) 72.00

ABSTRACT:A. Cost of Materials Rs: 39198.02B. Hire charges of Machinery Rs: 191.00C. Cost of Labour Rs: 6322.20

Total Rs: 45711.22

14% Rs: 6399.57Total cost for 100.00 sqm Rs: 52110.79Rate per sqm (A+B+C+D)/100.0 Rs. 521.10

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-12 Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stoneswith pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3proportion including cost of all materials, labour, packing chips and mortar, finishing, curingetc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Khandki stones 25-30 cm height Nos 730.00 16.00 11680.00

2 Pin headers 45 cm Nos 200.00 39.00 7800.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

226

3 Stone chips @ 15 % at quarry cum 6.75 340.00 2295.004 Cement kg 4050.00 4.00 16200.005 Sand (Screened ) cum 13.99 606.00 8477.94

Total cost of Materials Rs: 46452.94

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 5 hp diesel pump Hour 4.00 10.20 40.80

Fuel / Energy charges Hour 4.00 85.30 341.20Total hire charges of Machinery Rs: 382.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Pump Hour 4.00 96.10 384.402 work inspector Day 1.00 370.00 370.003 Cartman with double bullock cart Day 2.00 395.00 790.004 Mason Class II Day 7.00 345.00 2415.005 mazdoor Day 16.00 295.00 4720.00

Total cost of Labour Rs: 8679.40labour component/unit qty 86.80Add contractor's profit and overhead charges 0.14 12.20labour component/unit qty (including contractor's profit) 99.00

ABSTRACT:A. Cost of Materials Rs: 46452.94B. Hire charges of Machinery Rs: 382.00C. Cost of Labour Rs: 8679.40

Total Rs: 55514.34

14% Rs: 7772.01Total cost for 100.00 sqm Rs: 63286.35Rate per sqm (A+B+C+D)/100.0 Rs. 632.90

NOTE:If 15 cm thick murum bed is to be provided below pitching add 35.40( As per rate analysis under item IRR-CAW-8-1 - Note )

IRR-CAW-8-13 Providing 10 cm thick approved type grass turfing to the side slopes of canal including cost ofall materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.(FA : 2 cum/sqm)

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Turfing sods sqm 100.00 28.00 2800.002 Sand for filling cum 2.00 342.00 684.00

Total cost of Materials Rs: 3484.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.10 370.00 37.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

227

2 Cartman with double bullock cart Day 2.00 395.00 790.003 mazdoor Day 14.00 295.00 4130.00

Total cost of Labour Rs: 4957.00labour component/unit qty 49.60Add contractor's profit and overhead charges 0.14 6.90labour component/unit qty (including contractor's profit) 56.50

ABSTRACT:A. Cost of Materials Rs: 3484.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4957.00

Total Rs: 8441.00

14% Rs: 1181.74Total cost for 100.00 sqm Rs: 9622.74Rate per sqm (A+B+C+D)/100.0 Rs. 96.20

IRR-CAW-8-14 Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of all materials ,labour,watering for minimum 15 days etc.,,complete. with initial lead upto 50 m and all lifts ( WITHOUT USING SAND)

DATA: RATE ANALYSIS UNIT : 100.00 SqmA. MATERIALS :

Sl No Particulars Unit QuantityRate in Rs

Amount in Rs

1 Turfing Sods Sqm 100.00 28.00 2800.00Total Cost of materials Rs : 2800.00

B.MACHINERY :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Nill 0.00 0.00 0.000.00 0.00 0.00

Total hire charges of machinery Rs :

0.00

C.LABOUR :

Sl No Description Unit QuantityRate in Rs

Amount in Rs

1 Mazdoor Day 7.00 295.00 2065.002 Cart men with double bullock cart Day 2.00 395.00 790.00

Total cost of labour Rs :

2855.00

labour component/unit qty 28.60Add contractor's profit and overhead charges 0.14 4.00labour component/unit qty (including contractor's profit) 32.60

ABSTRACTA.Cost of Materials including ryolty charges Rs: 2800.00B. Hire charges of Machinery Rs: 0.00C.Cost of Labour Rs: 2855.00

Total Rs: 5655.00

14% Rs: 791.7Total cost for 100.00 Sqm Rs: 6446.70Rate per Sqm (A+B+C+D)/100.0 Rs. 64.50

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal and Allied Works - Item Unit Rates 2014-15

228

Canal Cross Drainage Works - Item Unit Rates 2014-15

230

CHAPTER-IV

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

FOR THE YEAR :2014-15Index- codeIRR-CCDW

Directions to add Seigniorage Charges and Additional Lead ChargesSeigniorage Charges:1. The unit rate for work item in the Standard Data is exclusive of Seigniorage Charges wherever applicable.2. The appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item while preparing the estimate. (i.e., to the data itself)3. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges while adding Seigniorage Charges to the data in the estimateAdditional Lead and Lift Charges:1. Unless otherwise specified the basic rates are inclusive of all lifts.2. For concrete, masonry and reinforcement items wherever initial lead of 1km is considered in the basic rate, the additional lead as follows:Additional lead charges for Cement, Steel, sand, coarse aggregate, stones and stone chips shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.In case of Cement and Steel, Loading and unloading charges are already added in the work item while arriving the unit rate and hence should not be added againExample:

Total lead for sand from approved sand quarry : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges fo Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km Rs. 210.10Less 1 km initial lead charg Rs. 31.50 (-)Net additional lead charges Rs. 178.60

3. The Leads for Steel and Cement shall be from the nearest market place to the Project area

4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)Example:

Total lead for earth from approved borrow area : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charges fo Rs. 84.10

Lead charges for next 10 km Rs. 126Total lead charges for 15 km Rs. 210.10Less 1 km initial lead charg Rs. 31.50 (-)Net additional lead charges Rs. 178.60

5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges

CCDW - Work Items

IRR-CCDW-1 EXCAVATION & FOUNDATION TREATMENT WORKS :

IRR-CCDW-1-1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canalcross drainage and other appurtenant structures and placing the excavated stuff neatly inspecified dump area or disposing off the same as directed etc., complete with initial lead upto50 m and initial lift upto 3 m.

CANAL CROSS DRAINAGE WORKS - Standard Data

CANAL CROSS DRAINAGE WORKS - DATA RATES

Canal Cross Drainage Works - Item Unit Rates 2014-15

231

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 1862.50labour component/unit qty 186.30Add contractor's profit and overhead charges 0.14 26.10labour component/unit qty (including contractor's profit) 212.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1862.50

Total Rs: 1862.50D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 260.75Total cost for 10.00 cum Rs: 2123.25Rate per cum (A+B+C+D)/10.0 Rs. 212.30

IRR-CCDW-1-2 ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Depth upto 3 m Unit = cum

DATA: Unit 240.00 cumA. Materials:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.NIL 0.00 0.00 0.00

B. Machinery:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hydraulic excavator 1.0 cum bucket capacity hour 6.00 1706.60 10239.60

Fuel/ Energy charges hour 6.00 937.80 5626.80Total in Rs. 15866.40

C. Labour:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector day 0.32 370.00 118.402 Mazdoor day 8.00 295.00 2360.003 crew for excavator hour 6.00 204.10 1224.60

Total in Rs. 3703.00labour component/unit qty 15.40Add contractor's profit and overhead charges 0.14 2.20labour component/unit qty (including contractor's profit) 17.60

Abstracta) Material Rs 0.00

Excavation for Structures- Mechanical Means

Taking output = 240 cum

Canal Cross Drainage Works - Item Unit Rates 2014-15

232

b) Machinery Rs 15866.40c) Labour Rs 3703.00Total Rs 19569.40D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 2739.72Total cost for 240.00 cum Rs: 22309.12Rate per cum (A+B+C+D)/240.0 Rs. 93.00

IRR-CCDW-1-3

excavated stuff neatly in specified dump area or disposing off the same as directed etc.,complete with initial lead upto 50 m and initial lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crowbarman Day 1.25 345.00 431.252 Stone breaker Day 1.25 345.00 431.253 work inspector Day 0.25 370.00 92.504 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 2725.00labour component/unit qty 272.50Add contractor's profit and overhead charges 0.14 38.20labour component/unit qty (including contractor's profit) 310.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2725.00

Total Rs: 2725.00D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 381.5Total cost for 10.00 cum Rs: 3106.5Rate per cum (A+B+C+D)/10.0 Rs. 310.70

IRR-CCDW-1-4 Excavation in ordnary rock without blasting for foundations of canal cross drainageand other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

( Data adopted from MORTH)

Unit = cumDATA: Unit: 180.00 cum

A. Materials:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.NIL 0.00 0.00 0.00

B. Machinery:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1.0 Hydraulic excavator 1.0 cum bucket capacity hour 6.00 1706.60 10239.60

Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia.for foundations of canal cross drainage and other appurtenant structures and placing the

Mechanical Means

Taking output = 180 cum

Canal Cross Drainage Works - Item Unit Rates 2014-15

233

Fuel/ Energy charges hour 6.00 937.80 5626.80Total in Rs. 15866.40

C. Labour:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector day 0.24 370.00 88.802 Mazdoor day 6.00 295.00 1770.003 crew for excavator hour 6.00 204.10 1224.60

Total in Rs. 3083.40

labour component/unit qty 17.10Add contractor's profit and overhead charges 0.14 2.40labour component/unit qty (including contractor's profit) 19.50

AbstractRs 0.00Rs 15866.40Rs 3083.40

Total Rs 18949.80D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 2652.97Total cost for 180.00 cum Rs: 21602.77Rate per cum (A+B+C+D)/180.0 Rs. 120.00

IRR-CCDW-1-5 Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. forfoundations of canal cross drainage and other appurtenant structures and placing theexcavated stuff neatly in specified dump area or disposing off the same as directed etc.,complete with initial lead upto 50 m and initial lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 100 cumA. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of drill rod 1.6 m length Rm 43.50 20.14 876.09

Reconditioning charges @ 10% 87.612 Use rate of air hose 2 Nos. Hour 6.00 0.22 1.313 Explosive small dia ( Kelvex-220 ) kg 20.00 70.00 1400.004 Electric detonators Nos 29.00 13.00 377.005 Detonating fuse coil Rm 70.00 11.00 770.006 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 3532.51

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 8.5 cmm ( diesel ) Hour 3.00 275.60 826.80

Fuel / Energy charges Hour 3.00 959.10 2877.302 Jack hammers 2 Nos. Hour 6.00 19.80 118.80

Fuel / Energy charges Hour 6.00 0.00 0.00Total hire charges of Machinery Rs: 3822.90

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 3.00 182.20 546.602 Crew for Jack hammer Hour 6.00 284.70 1708.203 work inspector Day 1.00 370.00 370.004 Blaster Day 0.50 440.00 220.005 Helper blaster Day 0.50 345.00 172.506 Crowbarman Day 6.00 345.00 2070.007 Stone breaker Day 3.00 345.00 1035.008 mazdoor Day 51.00 295.00 15045.00

Total cost of Labour Rs: 21167.30labour component/unit qty 211.70Add contractor's profit and overhead charges 0.14 29.60labour component/unit qty (including contractor's profit) 241.30

a) Material b) Machinery c) Labour

Canal Cross Drainage Works - Item Unit Rates 2014-15

234

ABSTRACT:A. Cost of Materials Rs: 3532.51B. Hire charges of Machinery Rs: 3822.90C. Cost of Labour Rs: 21167.30

Total Rs: 28522.71D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 3993.18Total cost for 100.00 cum Rs: 32515.892Rate per cum (A+B+C+D)/100.0 Rs. 325.20

IRR-CCDW-1-6 Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. forfoundations of canal cross drainage and other appurtenant structures and placing theexcavated rock neatly in specified dump area or stack yard as directed etc., complete withinitial lead upto 50 m and initial lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 100.00 cumA. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Explosive small dia ( Kelvex-220 ) kg 32.00 70.00 2240.002 Ordinary detonator No. 8.00 9.00 72.003 Electric detonator No. 104.00 13.00 1352.004 Detonating fuse coil Rm 150.00 11.00 1650.005 Use rate of air hose 2 Nos. Hour 16.00 10.94 175.006 Use rate of drill rod Rm 98.30 26.85 2639.68

Reconditioning charges @ 10% 263.97Total cost of Materials Rs: 8392.65

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 8.5 cmm ( diesel ) Hour 8.00 275.60 2204.80

Fuel / Energy charges Hour 8.00 959.10 7672.802 Jack hammer 2 Nos Hour 16.00 19.80 316.80

Fuel / Energy charges Hour 16.00 0.00 0.00Total hire charges of Machinery Rs: 10194.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 8.00 182.20 1457.602 Crew for Jack hammer Hour 16.00 284.70 4555.203 Blaster licensed Day 1.00 440.00 440.004 Helper blasting Day 1.00 345.00 345.005 work inspector Day 1.00 370.00 370.006 Crowbarman Day 6.00 345.00 2070.007 Stone breaker Day 6.00 345.00 2070.008 mazdoor Day 51.00 295.00 15045.00

Total cost of Labour Rs: 26352.80labour component/unit qty 263.50Add contractor's profit and overhead charges 0.14 36.90labour component/unit qty (including contractor's profit) 300.40

ABSTRACT:A. Cost of Materials Rs: 8392.65B. Hire charges of Machinery Rs: 10194.40C. Cost of Labour Rs: 26352.80

Total Rs: 44939.85D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 6291.58Total cost for 100.00 cum Rs: 51231.43Rate per cum (A+B+C+D)/100.0 Rs. 512.30

IRR-CCDW-1-7 Excavation in hard rock with blasting prohibited for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and

Canal Cross Drainage Works - Item Unit Rates 2014-15

235

initial lift upto 3 m.( Data adopted from MORTH)

Unit = cumDATA:

Mechanical Means 10.00 cum

A.Materials:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.NIL 0.00 0.00 0.00

b) MachinerySl No Description Unit Quantity Rate Amount

in Rs. in Rs.1.0 Air Compressor 250 cft with 2 leads of

pneumatic breakerhour 6.00 241.30 1447.80

Fuel/ Energy charges hour 6.00 767.30 4603.80Total in Rs. 6051.60

c) LabourSl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector day 0.20 370.00 74.002 Mazdoor day 5.00 295.00 1475.003 crew for compressor hour 6.00 182.20 1093.20

Total in Rs. 2642.20labour component/unit qty 264.20Add contractor's profit and overhead charges 0.14 37.00labour component/unit qty (including contractor's profit) 301.20

AbstractRs 0.00

b) Machinery Rs 6051.60Rs 2642.20

Total Rs 8693.80D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 1217.13Total cost for 10.00 cum Rs: 9910.93Rate per cum (A+B+C+D)/10.0 Rs. 991.10

IRR-CCDW-1-8 Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded inconcrete / masonry including cost of all materials, machinery, labour, drilling and cleaninghole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial leadupto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 10.00 Nos.A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement for grouting kg 5.00 4.00 20.002 25 mm dia steel kg 101.00 46.50 4696.503 Use rate of 32 mm dia drill rod Rm 12.50 26.85 335.67

Reconditioning charges @ 10% 33.574 Use rate of air hose Hour 2.00 10.94 21.88

Total cost of Materials Rs: 5107.61

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Air compressor 8.5 cmm ( diesel ) Hour 1.00 275.60 275.60

Fuel / Energy charges Hour 1.00 959.10 959.102 Jack hammer 2 Nos Hour 2.00 19.80 39.60

Fuel / Energy charges Hour 2.00 0.00 0.00Total hire charges of Machinery Rs: 1274.30

C. LABOUR:

Hard Rock ( blasting prohibited )

Taking output = 10 cum

a) Material

c) Labour

Canal Cross Drainage Works - Item Unit Rates 2014-15

236

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Crew for Air compressor Hour 1.00 182.20 182.202 Crew for Jack hammer Hour 2.00 284.70 569.403 Mason Class-II Day 0.50 345.00 172.504 Bar bender Day 0.50 450.00 225.005 work inspector Day 0.50 370.00 185.006 mazdoor Day 1.00 295.00 295.00

Total cost of Labour Rs: 1629.10labour component/unit qty 162.90Add contractor's profit and overhead charges 0.14 22.80labour component/unit qty (including contractor's profit) 185.70

ABSTRACT:A. Cost of Materials Rs: 5107.61B. Hire charges of Machinery Rs: 1274.30C. Cost of Labour Rs: 1629.10

Total Rs: 8011.01D. Add for contractor's profit and overheads on (A+B+C) 14.00% Rs: 1121.54Total cost for 10.00 Nos. Rs: 9132.55Rate per each (A+B+C+D)/10.0 Rs. 913.30

IRR-CCDW-2 STEEL AND CEMENT CONCRETE WORKS :

IRR-CCDW-2-1 Providing, fabricating and placing in position reinforcement steel bars for RCC works includingcleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts.

DATA: RATE ANALYSIS UNIT : 1000.00 kgA. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Rein.Steel with 5 % wastage kg 1050.00 46.50 48825.002 Binding wire 1.25 mm dia kg 8.00 70.00 560.003 Sundries ( chairs / spacers etc ) LS 3.00 41.00 123.00

Total cost of Materials Rs: 49508.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Bar bender Day 6.00 450.00 2700.003 mazdoor Day 11.00 295.00 3245.00

Total cost of Labour Rs: 6315.00labour component/unit qty 6.30Add contractor's profit and overhead charges 0.14 0.90labour component/unit qty (including contractor's profit) 7.20

ABSTRACT:A. Cost of Materials Rs: 49508.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 6315.00

Total Rs: 55823.0014.00% Rs: 7815.22

Total cost for 1000.00 kg Rs: 63638.22Rate per kg (A+B+C+D)/1000.0 Rs. 63.60

IRR-CCDW-2-2 Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

237

100 x 10 mm angle and 250 x 12 mm plate for sinking for sinking 4.50 m outer diameter foundation wells foundation wells including cost of all materials, machinery, labour, bending, welding, providing anchors etc., complete with initial lead upto 50 m and all lifts.

DETAILS OF FOUNDATION WELL CUTTING EDGE

DATA: RATE ANALYSIS UNIT : 615.00 kgA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Str.Steel angle with 2.5 % wastage kg 216.10 45.00 9724.502 Str.Steel plate with 2.5 % wastage kg 342.30 46.00 15745.803 Steel for anchors kg 56.60 46.50 2631.904 Acetyline gas cum 0.50 320.00 160.005 Oxygen gas cum 1.50 52.00 78.006 Welding electrodes Nos 300.00 11.00 3300.007 Sundries LS 5.00 41.00 205.00

Total cost of Materials Rs: 31845.20

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Bending machine Hour 8.00 42.60 340.80

Fuel / Energy charges Hour 8.00 114.10 912.802 Welding set Hour 30.00 16.00 480.00

Fuel / Energy charges Hour 30.00 91.30 2739.003 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 4882.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Str. Steel fabricator Day 2.00 440.00 880.002 Welder / Gas cutter Day 5.00 385.00 1925.003 work inspector Day 1.00 370.00 370.004 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 4650.00labour component/unit qty 7.60Add contractor's profit and overhead charges 0.14 1.10labour component/unit qty (including contractor's profit) 8.70

ABSTRACT:A. Cost of Materials Rs: 31845.20B. Hire charges of Machinery Rs: 4882.60C. Cost of Labour Rs: 4650.00

Total Rs: 41377.8014.00% Rs: 5792.89

Total cost for 615.00 kg Rs: 47170.69Rate per kg (A+B+C+D)/615.0 Rs. 76.70

IRR-CCDW-2-3 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

238

CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

Data RATE ANALYSIS UNIT : 15.38 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3998.80 4.00 15995.20Cement for incidentals @ 3 kg / cum kg 46.14 4.00 184.56

2 Coarse aggregate 40-20 mm cum 6.92 1145.00 7924.55Coarse aggregate 20-10 mm cum 4.15 1210.00 5024.65Coarse aggregate 10 mm below cum 2.77 875.00 2422.35

3 Fine aggregate (Un-Screened) cum 6.15 462.00 2842.224 Super Plasticizer kg 16.00 80.00 1279.625 Use rate of shuttering for 40 uses sqm 15.38 244.56 3761.39

Scaffolding @ of shuttering 10% 376.146 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 39831.17

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Needle vibrator Hour 8.00 136.60 1092.805 work inspector Day 1.00 370.00 370.006 Mason Class-I Day 1.00 385.00 385.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.38 295.00 4537.10for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 15.38 75.30 1158.11Labour cost for scaffolding @ 10% 115.81

Total cost of Labour Rs: 14983.38labour component/unit qty 974.20Add contractor's profit and overhead charges 0.14 136.40labour component/unit qty (including contractor's profit) 1110.60

ABSTRACT:A. Cost of Materials Rs: 39831.17B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 14983.38

Total Rs: 56930.2014.00% Rs: 7970.23

Total cost for 15.38 cum Rs: 64900.43Rate per cum (A+B+C+D)/15.38 Rs. 4219.80

IRR-CCDW-2-4 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, gradedaggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

239

complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

DATA: RATE ANALYSIS UNIT : 14.40 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3600.00 4.00 14400.00Cement for incidentals @ 3 kg / cum kg 43.20 4.00 172.80

2 Coarse aggregate 80-40 mm cum 4.94 635.00 3136.39Coarse aggregate 40-20 mm cum 4.23 1145.00 4847.47Coarse aggregate 20-10 mm cum 2.82 1210.00 3415.10Coarse aggregate 10 mm below cum 2.12 875.00 1852.20

3 Fine aggregate (Un-Screened) cum 5.04 462.00 2328.484 Super Plasticizer kg 14.40 80.00 1152.005 Use rate of shuttering for 40 uses sqm 14.40 244.56 3521.72

Scaffolding @ of shuttering 10% 352.176 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 35198.84

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 600/400 ltr ( diesel) Hour 8.00 92.70 741.60

Fuel / Energy charges Hour 8.00 170.50 1364.002 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 60 mm dia ( petrol) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 3201.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Needle vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.40 295.00 4248.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 14.40 75.30 1084.32Labour cost for scaffolding @ 10% 108.43

Total cost of Labour Rs: 14613.10labour component/unit qty 1014.80Add contractor's profit and overhead charges 0.14 142.10labour component/unit qty (including contractor's profit) 1156.90

ABSTRACT:A. Cost of Materials Rs: 35198.84B. Hire charges of Machinery Rs: 3201.25C. Cost of Labour Rs: 14613.10

Total Rs: 53013.1914.00% Rs: 7421.85

Total cost for 14.40 cum Rs: 60435.04Rate per cum (A+B+C+D)/14.40 Rs. 4196.90

IRR-CCDW-2-5 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

240

10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 16.36 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3599.20 4.00 14396.80Cement for incidentals @ 3 kg / cum kg 49.08 4.00 196.32

2 Coarse aggregate 40-20 mm cum 7.36 1145.00 8429.49Coarse aggregate 20-10 mm cum 4.42 1210.00 5344.81Coarse aggregate 10 mm below cum 2.94 875.00 2576.70

3 Fine aggregate (Un-Screened) cum 6.54 462.00 3023.334 Super Plasticizer kg 14.40 80.00 1151.745 Use rate of shuttering for 40 uses sqm 16.36 244.56 4001.07

Scaffolding @ of shuttering 10% 400.116 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 39540.87

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 16.36 295.00 4826.20

8 for cleaning/ washing/ curing Day 1.00 295.00 295.009 Labour cost for shuttering sqm 16.36 75.30 1231.91

Total cost of Labour Rs: 15230.46labour component/unit qty 931.00Add contractor's profit and overhead charges 0.14 130.30labour component/unit qty (including contractor's profit) 1061.30

ABSTRACT:A. Cost of Materials Rs: 39540.87B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 15230.46

Total Rs: 56886.9714.00% Rs: 7964.18

Total cost for 16.36 cum Rs: 64851.15Rate per cum (A+B+C+D)/16.36 Rs. 3964.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

241

IRR-CCDW-2-6 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, gradedaggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

DATA: RATE ANALYSIS UNIT : 14.55 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3201.00 4.00 12804.00Cement for incidentals @ 3 kg / cum kg 43.65 4.00 174.60

2 Coarse aggregate 80-40 mm cum 4.99 635.00 3169.06Coarse aggregate 40-20 mm cum 4.28 1145.00 4897.97Coarse aggregate 20-10 mm cum 2.85 1210.00 3450.68Coarse aggregate 10 mm below cum 2.14 875.00 1871.49

3 Fine aggregate (Un-Screened) cum 5.09 462.00 2352.744 Super Plasticizer kg 12.80 80.00 1024.325 Use rate of shuttering for 40 uses sqm 14.55 244.56 3558.41

Scaffolding @ of shuttering 10% 355.846 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 33679.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 92.70 741.60

Fuel / Energy charges Hour 8.00 170.50 1364.002 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 3201.25

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.55 295.00 4292.25for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 14.55 75.30 1095.62Labour cost for scaffolding @ 10% 109.56

Total cost of Labour Rs: 14669.78labour component/unit qty 1008.20Add contractor's profit and overhead charges 0.14 141.10labour component/unit qty (including contractor's profit) 1149.30

ABSTRACT:A. Cost of Materials Rs: 33679.60B. Hire charges of Machinery Rs: 3201.25C. Cost of Labour Rs: 14669.78

Total Rs: 51550.6314.00% Rs: 7217.09

Total cost for 14.55 cum Rs: 58767.72D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

242

Rate per cum (A+B+C+D)/14.55 Rs. 4039.00

IRR-CCDW-2-7 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 220 kg / cum )(Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 14.19 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4398.90 4.00 17595.60Cement for incidentals @ 3 kg / cum kg 42.57 4.00 170.28

2 Coarse aggregate 40-20 mm cum 6.39 1145.00 7311.40Coarse aggregate 20-10 mm cum 3.83 1210.00 4635.87Coarse aggregate 10 mm below cum 2.55 875.00 2234.93

3 Fine aggregate (Un-Screened) cum 5.68 462.00 2622.314 Super Plasticizer kg 17.60 80.00 1407.655 Use rate of shuttering for 40 uses sqm 14.19 244.56 3470.36

Scaffolding @ of shuttering 10% 347.046 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 39815.93

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.19 295.00 4186.05for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 14.19 75.30 1068.51Labour cost for scaffolding @ 10% 106.85

Total cost of Labour Rs: 14533.76labour component/unit qty 1024.20Add contractor's profit and overhead charges 0.14 143.40labour component/unit qty (including contractor's profit) 1167.60

ABSTRACT:A. Cost of Materials Rs: 39815.93B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 14533.76

Total Rs: 56465.34

Canal Cross Drainage Works - Item Unit Rates 2014-15

243

14.00% Rs: 7905.15Total cost for 14.19 cum Rs: 64370.49Rate per cum (A+B+C+D)/14.19 Rs. 4536.30

IRR-CCDW-2-8 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 15.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4800.00 4.00 19200.00Cement for incidentals @ 5 kg / cum kg 75.00 4.00 300.00

2 Coarse aggregate 40-20 mm cum 6.75 1145.00 7728.75Coarse aggregate 20-10 mm cum 4.05 1210.00 4900.50Coarse aggregate 10 mm below cum 2.70 875.00 2362.50

3 Fine aggregate (Un-Screened) cum 6.00 462.00 2772.004 Super Plasticizer kg 19.20 80.00 1536.005 Use rate of shuttering sqm 30.00 244.56 7336.92

Scaffolding @ of shuttering 25% 1834.236 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 47991.40

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying including lifting Day 4.00 295.00 1180.00for conveying concrete Day 15.00 295.00 4425.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 15.00 75.30 1129.50Labour cost for scaffolding @ 25% 282.38

Total cost of Labour Rs: 15304.23labour component/unit qty 1020.30Add contractor's profit and overhead charges 0.14 142.80labour component/unit qty (including contractor's profit) 1163.10

ABSTRACT:A. Cost of Materials Rs: 47991.40B. Hire charges of Machinery Rs: 2115.65

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

244

C. Cost of Labour Rs: 15304.23Total Rs: 65411.27

14.00% Rs: 9157.58Total cost for 15.00 cum Rs: 74568.85Rate per cum (A+B+C+D)/15.0 Rs. 4971.30

IRR-CCDW-2-9 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of shuttering sqm 31.52 244.56 7708.66

Scaffolding @ of shuttering 25% 1927.166 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 49492.87

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 4.00 295.00 1180.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 31.52 75.30 2373.46Labour cost for scaffolding @ 25% 593.36

Total cost of Labour Rs: 17083.37labour component/unit qty 1084.00Add contractor's profit and overhead charges 0.14 151.80labour component/unit qty (including contractor's profit) 1235.80

ABSTRACT:A. Cost of Materials Rs: 49492.87

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

245

B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 17083.37

Total Rs: 68691.8914.00% Rs: 9616.86

Total cost for 15.76 cum Rs: 78308.751Rate per cum (A+B+C+D)/15.76 Rs. 4968.80

IRR-CCDW-2-10 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 15.71 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4398.80 4.00 17595.20Cement for incidentals @ 5 kg / cum kg 78.55 4.00 314.20

2 Coarse aggregate 20-10 mm cum 8.17 1210.00 9884.73Coarse aggregate 10 mm below cum 4.40 875.00 3848.95

3 Fine aggregate (Un-Screened) cum 7.07 462.00 3266.114 Super Plasticizer kg 17.60 80.00 1407.625 Use rate of shuttering for 40 uses sqm 31.42 244.56 7684.20

Scaffolding @ of shuttering 25% 1921.056 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 45942.56

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 4.00 295.00 1180.00for conveying concrete Day 15.71 295.00 4634.45for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 31.42 75.30 2365.93Labour cost for scaffolding @ 25% 591.48

Total cost of Labour Rs: 17059.21labour component/unit qty 1085.90Add contractor's profit and overhead charges 0.14 152.00labour component/unit qty (including contractor's profit) 1237.90

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

246

A. Cost of Materials Rs: 45942.56B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 17059.21

Total Rs: 65117.4114.00% Rs: 9116.44

Total cost for 15.71 cum Rs: 74233.853Rate per cum (A+B+C+D)/15.71 Rs. 4725.30

IRR-CCDW-2-11 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 18.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3960.00 4.00 15840.00Cement for incidentals @ 5 kg / cum kg 90.00 4.00 360.00

2 Coarse aggregate 20-10 mm cum 9.36 1210.00 11325.60Coarse aggregate 10 mm below cum 5.04 875.00 4410.00

3 Fine aggregate (Un-Screened) cum 8.10 462.00 3742.204 Super Plasticizer kg 15.84 80.00 1267.205 Use rate of shuttering for 40 uses sqm 36.00 244.56 8804.30

Scaffolding @ of shuttering 25% 2201.086 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 47970.88

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.204 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 2115.65

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Crew for Vibrator Hour 8.00 136.60 1092.805 Mason Class-I Day 1.00 385.00 385.006 work inspector Day 1.00 370.00 370.007 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 4.00 295.00 1180.00for conveying concrete Day 18.00 295.00 5310.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

8 Labour cost for shuttering sqm 36.00 75.30 2710.80Labour cost for scaffolding @ 25% 677.70

Total cost of Labour Rs: 18165.85labour component/unit qty 1009.20Add contractor's profit and overhead charges 0.14 141.30labour component/unit qty (including contractor's profit) 1150.50

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

247

ABSTRACT:A. Cost of Materials Rs: 47970.88B. Hire charges of Machinery Rs: 2115.65C. Cost of Labour Rs: 18165.85

Total Rs: 68252.3814.00% Rs: 9555.33

Total cost for 18.00 cum Rs: 77807.707Rate per cum (A+B+C+D)/18.0 Rs. 4322.70

IRR-CCDW-2-12 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for well kerb including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 15.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5250.00 4.00 21000.002 Coarse aggregate 20-10 mm cum 7.80 1210.00 9438.00

Coarse aggregate 10 mm below cum 4.20 875.00 3675.003 Fine aggregate (Un-Screened) cum 6.75 462.00 3118.504 Super Plasticizer kg 21.00 80.00 1680.005 Use rate of curved shutter (40 uses) sqm 82.50 269.02 22194.186 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 61126.18

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.00 295.00 4425.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 82.50 75.30 6212.25Total cost of Labour Rs: 19656.50

labour component/unit qty 1310.40Add contractor's profit and overhead charges 0.14 183.50labour component/unit qty (including contractor's profit) 1493.90

ABSTRACT:A. Cost of Materials Rs: 61126.18B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 19656.50

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

248

Total Rs: 82173.6314.00% Rs: 11504.31

Total cost for 15.00 cum Rs: 93677.937Rate per cum (A+B+C+D)/15.0 Rs. 6245.20

IRR-CCDW-2-13 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for well steining including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 15.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4800.00 4.00 19200.00Cement for incidentals @ 2 kg / cum kg 30.00 4.00 120.00

2 Coarse aggregate 40-20 mm cum 6.75 1145.00 7728.75Coarse aggregate 20-10 mm cum 4.05 1210.00 4900.50Coarse aggregate 10 mm below cum 2.70 875.00 2362.50

3 Fine aggregate (Un-Screened) cum 6.00 462.00 2772.004 Super Plasticizer kg 19.20 80.00 1536.005 Use rate of curved shutter (40 uses) sqm 60.00 269.02 16141.226 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 54781.47

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.00 295.00 4425.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 60.00 75.30 4518.00Total cost of Labour Rs: 17962.25

labour component/unit qty 1197.50Add contractor's profit and overhead charges 0.14 167.70labour component/unit qty (including contractor's profit) 1365.20

ABSTRACT:A. Cost of Materials Rs: 54781.47B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 17962.25

Total Rs: 74134.6714.00% Rs: 10378.85

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

249

Total cost for 15.00 cum Rs: 84513.52Rate per cum (A+B+C+D)/15.0 Rs. 5634.20

IRR-CCDW-2-14 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for well bottom plug by tremie or skip box method including cost of all materials,machinery, labour, batching, mixing, placing in position as per detailed specifications etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 350 kg / cum )(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 14.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4900.00 4.00 19600.002 Coarse aggregate 20-10 mm cum 7.28 1210.00 8808.80

Coarse aggregate 10 mm below cum 3.92 875.00 3430.003 Fine aggregate (Un-Screened) cum 6.30 462.00 2910.604 Super Plasticizer kg 19.60 80.00 1568.00

TOTAL Rs: 36317.40Add for tremie arrangement @ 1% Rs: 363.17

Total cost of Materials Rs: 36680.57

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Sundries( Hopper etc. ) LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 1363.15

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Fitter shuttering Day 1.00 345.00 345.004 work inspector Day 1.00 370.00 370.005 mazdoor

for erecting/ dismantling tremie Day 4.00 295.00 1180.00for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for feeding tremie hopper Day 2.00 295.00 590.00for conveying concrete Day 16.00 295.00 4720.00

Total cost of Labour Rs: 13196.45labour component/unit qty 942.60Add contractor's profit and overhead charges 0.14 132.00labour component/unit qty (including contractor's profit) 1074.60

ABSTRACT:A. Cost of Materials Rs: 36680.57B. Hire charges of Machinery Rs: 1363.15C. Cost of Labour Rs: 13196.45

Total Rs: 51240.1714.00% Rs: 7173.62

Total cost for 14.00 cum Rs: 58413.79Rate per cum (A+B+C+D)/14.0 Rs. 4172.40

IRR-CCDW-2-15 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for well top plug including cost of all materials, machinery, labour, cleaning,batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

250

initial lead upto 50 m and all lifts.Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.

(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 14.29 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4001.20 4.00 16004.802 Coarse aggregate 40-20 mm cum 6.43 1145.00 7362.92

Coarse aggregate 20-10 mm cum 3.86 1210.00 4668.54Coarse aggregate 10 mm below cum 2.57 875.00 2250.68

3 Fine aggregate (Un-Screened) cum 5.72 462.00 2640.794 Super Plasticizer kg 16.00 80.00 1280.38

Total cost of Materials Rs: 34208.12

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.29 295.00 4215.55for cleaning/ washing/ curing Day 1.00 295.00 295.00

Total cost of Labour Rs: 13234.80labour component/unit qty 926.20Add contractor's profit and overhead charges 0.14 129.70labour component/unit qty (including contractor's profit) 1055.90

ABSTRACT:A. Cost of Materials Rs: 34208.12B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 13234.80

Total Rs: 48833.8714.00% Rs: 6836.74

Total cost for 14.29 cum Rs: 55670.61Rate per cum (A+B+C+D)/14.29 Rs. 3895.80

IRR-CCDW-2-16 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for well cap including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

251

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of curved shutter (40 uses) sqm 15.76 244.56 3854.336 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 43711.38

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 15.76 75.30 1186.73Total cost of Labour Rs: 14855.18

labour component/unit qty 942.60Add contractor's profit and overhead charges 0.14 132.00labour component/unit qty (including contractor's profit) 1074.60

ABSTRACT:A. Cost of Materials Rs: 43711.38B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 14855.18

Total Rs: 59957.5114.00% Rs: 8394.05

Total cost for 15.76 cum Rs: 68351.56Rate per cum (A+B+C+D)/15.76 Rs. 4337.00

IRR-CCDW-2-17 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, gradedaggregates for piers and abutments including cost of all materials, labour, machinery,formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

DATA: RATE ANALYSIS UNIT : 14.40 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

252

in Rs. in Rs.1 Cement for mix kg 3600.00 4.00 14400.00

Cement for incidentals @ 5 kg / cum kg 72.00 4.00 288.002 Coarse aggregate 80-40 mm cum 4.94 635.00 3136.39

Coarse aggregate 40-20 mm cum 4.23 1145.00 4847.47Coarse aggregate 20-10 mm cum 2.82 1210.00 3415.10Coarse aggregate 10 mm below cum 2.12 875.00 1852.20

3 Fine aggregate (Un-Screened) cum 5.04 462.00 2328.484 Super Plasticizer kg 14.40 80.00 1152.005 Use rate of shuttering for 40 uses sqm 39.60 256.79 10168.976 Scaffolding @ of shuttering 30% 3050.69

Total cost of Materials Rs: 44639.31

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 92.70 741.60

Fuel / Energy charges Hour 8.00 170.50 1364.002 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 2476.55

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 6.00 295.00 1770.00for conveying concrete Day 14.40 295.00 4248.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 39.60 75.30 2981.88Labour cost for scaffolding @ 30% 894.56

Total cost of Labour Rs: 18028.69labour component/unit qty 1252.00Add contractor's profit and overhead charges 0.14 175.30labour component/unit qty (including contractor's profit) 1427.30

ABSTRACT:A. Cost of Materials Rs: 44639.31B. Hire charges of Machinery Rs: 2476.55C. Cost of Labour Rs: 18028.69

Total Rs: 65144.5514.00% Rs: 9120.24

Total cost for 14.40 cum Rs: 74264.791Rate per cum (A+B+C+D)/14.40 Rs. 5157.30

IRR-CCDW-2-18 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, gradedaggregates for piers and abutments including cost of all materials, labour, machinery,formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

DATA: RATE ANALYSIS UNIT : 14.55 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

253

in Rs. in Rs.1 Cement for mix kg 3201.00 4.00 12804.00

Cement for incidentals @ 5 kg / cum kg 72.75 4.00 291.002 Coarse aggregate 80-40 mm cum 4.99 635.00 3169.06

Coarse aggregate 40-20 mm cum 4.28 1145.00 4897.97Coarse aggregate 20-10 mm cum 2.85 1210.00 3450.68Coarse aggregate 10 mm below cum 2.14 875.00 1871.49

3 Fine aggregate (Un-Screened) cum 5.09 462.00 2352.744 Super Plasticizer kg 12.80 80.00 1024.325 Use rate ofshuttering for 40 uses sqm 40.01 256.79 10274.906 Scaffolding @ of shuttering 30% 3082.47

Total cost of Materials Rs: 43218.62

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 92.70 741.60

Fuel / Energy charges Hour 8.00 170.50 1364.002 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 2476.55

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 6.00 295.00 1770.00for conveying concrete Day 14.55 295.00 4292.25for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 40.01 75.30 3012.94Labour cost for scaffolding @ 30% 903.88

Total cost of Labour Rs: 18113.32labour component/unit qty 1244.90Add contractor's profit and overhead charges 0.14 174.30labour component/unit qty (including contractor's profit) 1419.20

ABSTRACT:A. Cost of Materials Rs: 43218.62B. Hire charges of Machinery Rs: 2476.55C. Cost of Labour Rs: 18113.32

Total Rs: 63808.4914.00% Rs: 8933.19

Total cost for 14.55 cum Rs: 72741.68Rate per cum (A+B+C+D)/14.55 Rs. 4999.40

IRR-CCDW-2-19 Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for piers and abutments including cost of all materials, labour, machinery,formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

DATA: RATE ANALYSIS UNIT : 16.36 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

254

in Rs. in Rs.1 Cement for mix kg 3599.20 4.00 14396.80

Cement for incidentals @ 5 kg / cum kg 81.80 4.00 327.202 Coarse aggregate 40-20 mm cum 7.36 1145.00 8429.49

Coarse aggregate 20-10 mm cum 4.42 1210.00 5344.81Coarse aggregate 10 mm below cum 2.94 875.00 2576.70

3 Fine aggregate (Un-Screened) cum 6.54 462.00 3023.334 Super Plasticizer kg 14.40 80.00 1151.745 Use rate of shuttering for 40 uses sqm 44.99 256.79 11553.086 Scaffolding @ of shuttering 30% 3465.92

Total cost of Materials Rs: 50269.08

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 5.00 295.00 1475.00for conveying concrete Day 16.36 295.00 4826.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 44.99 75.30 3387.75Labour cost for scaffolding @ 30% 1016.32

Total cost of Labour Rs: 18839.52labour component/unit qty 1151.60Add contractor's profit and overhead charges 0.14 161.20labour component/unit qty (including contractor's profit) 1312.80

ABSTRACT:A. Cost of Materials Rs: 50269.08B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 18839.52

Total Rs: 70499.5514.00% Rs: 9869.94

Total cost for 16.36 cum Rs: 80369.49Rate per cum (A+B+C+D)/16.36 Rs. 4912.60

IRR-CCDW-2-20 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for cantiliver / counterfort retaining walls including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.

DATA: RATE ANALYSIS UNIT : 16.25 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

255

in Rs. in Rs.1 Cement for mix kg 5200.00 4.00 20800.00

Cement for incidentals @ 5 kg / cum kg 81.25 4.00 325.002 Coarse aggregate 40-20 mm cum 7.31 1145.00 8372.81

Coarse aggregate 20-10 mm cum 4.39 1210.00 5308.88Coarse aggregate 10 mm below cum 2.93 875.00 2559.38

3 Fine aggregate (Un-Screened) cum 6.50 462.00 3003.004 Super Plasticizer kg 20.80 80.00 1664.005 Use rate of shuttering for 40 uses sqm 52.81 244.56 12916.03

Scaffolding @ of shuttering 25% 3229.016 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 58198.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 5.00 295.00 1475.00for conveying concrete Day 16.25 295.00 4793.75for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 52.81 75.30 3976.78Labour cost for scaffolding @ 25% 994.20

Total cost of Labour Rs: 19373.98labour component/unit qty 1192.20Add contractor's profit and overhead charges 0.14 166.90labour component/unit qty (including contractor's profit) 1359.10

ABSTRACT:A. Cost of Materials Rs: 58198.60B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 19373.98

Total Rs: 78963.5314.00% Rs: 11054.89

Total cost for 16.25 cum Rs: 90018.42Rate per cum (A+B+C+D)/16.25 Rs. 5539.60

IRR-CCDW-2-21 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravitytype retaining walls / piers / abutments etc., including cost of all materials, machinery,labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum, plums of size 150 to 80 mm : 0.25cum )

DATA: RATE ANALYSIS UNIT : 18.09 cum

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

256

A. MATERIALS:Sl No Particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Cement for mix kg 4703.40 4.00 18813.60

Cement for incidentals @ 4 kg / cum kg 72.36 4.00 289.442 Coarse aggregate 40-20 mm cum 6.92 1145.00 7922.74

Coarse aggregate 20-10 mm cum 4.15 1210.00 5023.50Coarse aggregate 10 mm below cum 2.77 875.00 2421.80

3 Plums of size 150 to 80 mm cum 4.52 340.00 1537.654 Fine aggregate (Un-Screened) cum 6.15 462.00 2841.585 Super Plasticizer kg 18.81 80.00 1505.09

Use rate of shuttering for 40 uses sqm 49.75 244.56 12166.446 Scaffolding @ of shuttering 30% 3649.93

Total cost of Materials Rs: 56171.78

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 1481.35

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 5.00 295.00 1475.00for placing plums Day 2.00 295.00 590.00for conveying concrete Day 15.38 295.00 4537.10for conveying plums Day 2.00 295.00 590.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour for shuttering sqm 49.75 75.30 3745.99Labour for scaffolding @ 30% 1123.80

Total cost of Labour Rs: 20196.13labour component/unit qty 1116.40Add contractor's profit and overhead charges 0.14 156.30labour component/unit qty (including contractor's profit) 1272.70

ABSTRACT:A. Cost of Materials Rs: 56171.78B. Hire charges of Machinery Rs: 1481.35C. Cost of Labour Rs: 20196.13

Total Rs: 77849.2614.00% Rs: 10898.9

Total cost for 18.09 cum Rs: 88748.16Rate per cum (A+B+C+D)/18.09 Rs. 4905.90

IRR-CCDW-2-22 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,gradedaggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning,batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete withinitial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

257

DATA: RATE ANALYSIS UNIT : 15.38 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3998.80 4.00 15995.20Cement for incidentals @ 5 kg / cum kg 76.90 4.00 307.60

2 Coarse aggregate 40-20 mm cum 6.92 1145.00 7924.55Coarse aggregate 20-10 mm cum 4.15 1210.00 5024.65Coarse aggregate 10 mm below cum 2.77 875.00 2422.35

3 Fine aggregate (Un-Screened) cum 6.15 462.00 2842.224 Super Plasticizer kg 16.00 80.00 1279.625 Use rate of shuttering for 40 uses sqm 30.76 256.79 7898.93

Scaffolding @ of shuttering 15% 1184.846 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 44900.45

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.38 295.00 4537.10for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour for shuttering sqm 30.76 75.30 2316.23Labour for scaffolding @ 15% 347.43

Total cost of Labour Rs: 16220.01labour component/unit qty 1054.60Add contractor's profit and overhead charges 0.14 147.60labour component/unit qty (including contractor's profit) 1202.20

ABSTRACT:A. Cost of Materials Rs: 44900.45B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 16220.01

Total Rs: 62511.4114.00% Rs: 8751.6

Total cost for 15.38 cum Rs: 71263.01Rate per cum (A+B+C+D)/15.38 Rs. 4633.50

IRR-CCDW-2-23 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, gradedaggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.(Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

258

DATA: RATE ANALYSIS UNIT : 14.40 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 3600.00 4.00 14400.00Cement for incidentals @ 5 kg / cum kg 72.00 4.00 288.00

2 Coarse aggregate 80-40 mm cum 4.94 635.00 3136.39Coarse aggregate 40-20 mm cum 4.23 1145.00 4847.47Coarse aggregate 20-10 mm cum 2.82 1210.00 3415.10Coarse aggregate 10 mm below cum 2.12 875.00 1852.20

3 Fine aggregate (Un-Screened) cum 5.04 462.00 2328.484 Super Plasticizer kg 14.40 80.00 1152.005 Use rate of shuttering for 40 uses sqm 28.80 256.79 7395.616 Scaffolding @ of shuttering 15% 1109.34

Total cost of Materials Rs: 39924.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 600/400 ltr ( diesel ) Hour 8.00 92.70 741.60

Fuel / Energy charges Hour 8.00 170.50 1364.002 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 60 mm dia ( petrol ) Hour 8.00 8.20 65.60

Fuel / Energy charges Hour 8.00 32.20 257.60Total hire charges of Machinery Rs: 2476.55

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 14.40 295.00 4248.00for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 28.80 75.30 2168.64Labour cost for scaffolding @ 15% 325.30

Total cost of Labour Rs: 15761.19labour component/unit qty 1094.50Add contractor's profit and overhead charges 0.14 153.20labour component/unit qty (including contractor's profit) 1247.70

ABSTRACT:A. Cost of Materials Rs: 39924.60B. Hire charges of Machinery Rs: 2476.55C. Cost of Labour Rs: 15761.19

Total Rs: 58162.3414.00% Rs: 8142.73

Total cost for 14.40 cum Rs: 66305.07Rate per cum (A+B+C+D)/14.40 Rs. 4604.50

IRR-CCDW-2-24 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

259

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of shuttering for 30 uses sqm 39.40 297.55 11723.55

Scaffolding @ of shuttering 250% 29308.866 Sundries LS 1.00 41.00 41.00

Total cost of Materials Rs: 80909.96

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 4.00 295.00 1180.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 39.40 75.30 2966.82Labour cost for scaffolding @ 250% 7417.05

Total cost of Labour Rs: 24732.32labour component/unit qty 1569.30Add contractor's profit and overhead charges 0.14 219.70labour component/unit qty (including contractor's profit) 1789.00

ABSTRACT:A. Cost of Materials Rs: 80909.96B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 24732.32

Total Rs: 107033.2314.00% Rs: 14984.65

Total cost for 15.76 cum Rs: 122017.88Rate per cum (A+B+C+D)/15.76 Rs. 7742.30

IRR-CCDW-2-25 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for columns and beams including cost of all materials, labour, machinery,formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

260

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of shuttering sqm 78.80 244.56 19271.64

Scaffolding @ of shuttering 50% 9635.826 Sundries LS 1.00 41.00 41.00

Total cost of Materials Rs: 68785.01

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 3.00 295.00 885.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 78.80 75.30 5933.64Labour cost for scaffolding @ 50% 2966.82

Total cost of Labour Rs: 22568.91labour component/unit qty 1432.00Add contractor's profit and overhead charges 0.14 200.50labour component/unit qty (including contractor's profit) 1632.50

ABSTRACT:A. Cost of Materials Rs: 68785.01B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 22568.91

Total Rs: 92744.8714.00% Rs: 12984.28

Total cost for 15.76 cum Rs: 105729.15Rate per cum (A+B+C+D)/15.76 Rs. 6708.70

IRR-CCDW-2-26 Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 mand all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

261

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of shuttering sqm 7.88 244.56 1927.166 Sundries ( asphalt mortar etc ) LS 5.00 41.00 205.00

Total cost of Materials Rs: 41968.72

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( petrol ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 2.00 385.00 770.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 4.00 295.00 1180.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 2.00 295.00 590.00

7 Labour cost for shuttering sqm 7.88 75.30 593.36Total cost of Labour Rs: 15236.81

labour component/unit qty 966.80Add contractor's profit and overhead charges 0.14 135.40labour component/unit qty (including contractor's profit) 1102.20

ABSTRACT:A. Cost of Materials Rs: 41968.72B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 15236.81

Total Rs: 58596.4814.00% Rs: 8203.51

Total cost for 15.76 cum Rs: 66799.99Rate per cum (A+B+C+D)/15.76 Rs. 4238.60

IRR-CCDW-2-27 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for troughs including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.

Note: If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 15.76 cumA. MATERIALS:

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

262

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 5200.80 4.00 20803.20Cement for incidentals @ 5 kg / cum kg 78.80 4.00 315.20

2 Coarse aggregate 20-10 mm cum 8.20 1210.00 9916.19Coarse aggregate 10 mm below cum 4.41 875.00 3861.20

3 Fine aggregate (Un-Screened) cum 7.09 462.00 3276.504 Super Plasticizer kg 20.80 80.00 1664.265 Use rate of shuttering for 40 uses sqm 70.92 244.56 17344.47

Scaffolding @ of shuttering 25% 4336.126 Sundries LS 0.50 41.00 20.50

Total cost of Materials Rs: 61537.64

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Needle vibrator 40 mm dia ( diesel ) Hour 8.00 7.60 60.80

Fuel / Energy charges Hour 8.00 21.50 172.00Total hire charges of Machinery Rs: 1390.95

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Needle vibrator Hour 8.00 136.60 1092.804 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying Day 5.00 295.00 1475.00for conveying concrete Day 15.76 295.00 4649.20for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering sqm 70.92 75.30 5340.28Labour cost for scaffolding @ 25% 1335.07

Total cost of Labour Rs: 20933.80labour component/unit qty 1328.30Add contractor's profit and overhead charges 0.14 186.00labour component/unit qty (including contractor's profit) 1514.30

ABSTRACT:A. Cost of Materials Rs: 61537.64B. Hire charges of Machinery Rs: 1390.95C. Cost of Labour Rs: 20933.80

Total Rs: 83862.3914.00% Rs: 11740.73

Total cost for 15.76 cum Rs: 95603.12Rate per cum (A+B+C+D)/15.76 Rs. 6066.20

IRR-CCDW-3 FOUNDATION WELL SINKING WORKS :

IRR-CCDW-3-1DATA: Unit = Running meter

Taking output = 1mdiameter of well = 6.00m

(i) Depth below bed level upto 3.0mRate of sinking = 0.50 m /hour

a) Labour0.12 Mate (Mason Cl- ll ) 345.00 day 41.401.00 Sinker ( skilled) 385.00 day 385.002.00 Sinking helper ( Semi skilled) 295.00 day 590.00

sub total (a) 1016.40b) Machinery

D. Add for contractor's profit and overheads on (A+B+C)

Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil, sand

Canal Cross Drainage Works - Item Unit Rates 2014-15

263

2.00 Hire & running charges of crane with grab 519.70 hour 1039.40 bucket of 0.75 cum capacity and accessories.Fuel Charges 322.20 hour 644.40Crew Charges 153.10 hour 306.20Consumables in sinking @ 10% of machinery charges 199.00

sub total (b) 2189.00sub total (a+b) 3205.40

c) Add for Contractor's profit and overhead charges on (A+B) 14.00% 448.76

Rate per metre = (a+b+c)/1.0 3654.16or say ( Rate upto 3.0m for 6.0 m well sinking ) 3654.20labour component/unit qty 1322.60Contractor's profit and overhead charges 14.00% 185.20labour component/unit qty(including contractor's profit) 1507.80

(ii) Beyond 3m and upto 10m depthRate of sinking = 0.33 m per hour.

a) Labour0.15 Mate (Mason Cl- ll ) 345.00 day 51.751.25 Sinker ( skilled) 385.00 day 481.252.50 Sinking helper ( Semi skilled) 295.00 day 737.50

sub total (a) 1270.50b) Machinery

3.00 Hire & running charges of crane with grab 519.70 hour 1559.10 bucket of 0.75 cum capacity and accessories.Fuel Charges 322.20 hour 966.60Crew Charges 153.10 hour 459.30Consumables in sinking @ 10% of machinery charges 298.50

sub total (b) 3283.50sub total (a+b) 4554.00

c) Add for Contractor's profit and overhead charges on (A+B) 14.00% 637.56

Rate per metre = (a+b+c) 5191.56or say ( Rate for 3.0m to 10m well sinking ) 5191.60

labour component/unit qty 1729.80Contractor's profit and overhead charges 0.14 242.20labour component/unit qty(including contractor's profit) 1972.00

IRR-CCDW-3-2 Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering,ramming as directed including cost of all materials, machinery, labour etc., complete withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 15.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand for filling cum 15.75 342.00 5386.500.00 0.00

Total cost of Materials Rs: 5386.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1272.50

Canal Cross Drainage Works - Item Unit Rates 2014-15

264

labour component/unit qty 84.80Add contractor's profit and overhead charges 0.14 11.90labour component/unit qty (including contractor's profit) 96.70

ABSTRACT:A. Cost of Materials Rs: 5386.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1272.50

Total Rs: 6659.0014.00% Rs: 932.26

Total cost for 15.00 cum Rs: 7591.26Rate per cum (A+B+C+D)/15.0 Rs. 506.10

IRR-CCDW-4 MASONRY WORKS :

IRR-CCDW-4-1 Providing and constructing un-coursed rubble stone masonry with approved stones inCM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., includingcost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedgingstone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1430.00 4.00 5720.002 Rubble stones cum 8.50 318.00 2703.003 Stone chips cum 1.50 340.00 510.004 Sand (Screened) cum 4.00 606.00 2424.00

Total cost of Materials Rs: 11357.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.202 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.65Total hire charges of Machinery Rs: 772.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Water tanker Hour 1.00 153.10 153.102 Crew for Pump Hour 0.50 96.10 48.053 work inspector Day 1.00 370.00 370.004 Mason Class-I Day 1.00 385.00 385.005 Mason Class-II Day 2.00 345.00 690.006 mazdoor

for conveying rubble stones Day 4.00 295.00 1180.00for preparing mortar Day 2.00 295.00 590.00for loading mortar pans Day 1.00 295.00 295.00for laying & packing mortar Day 3.00 295.00 885.00for washing rubble / finishing / curing Day 1.00 295.00 295.00for conveying mortar / chips Day 4.00 295.00 1180.00

Total cost of Labour Rs: 6071.15labour component/unit qty 607.10Add contractor's profit and overhead charges 0.14 85.00labour component/unit qty (including contractor's profit) 692.10

ABSTRACT:A. Cost of Materials Rs: 11357.00B. Hire charges of Machinery Rs: 772.45C. Cost of Labour Rs: 6071.15

Total Rs: 18200.6014.00% Rs: 2548.08

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

265

Total cost for 10.00 cum Rs: 20748.68Rate per cum (A+B+C+D)/10.0 Rs. 2074.90

IRR-CCDW-4-2 Providing and constructing un-coursed rubble stone masonry with approved stones inCM 1 : 4 proportion for super-structure portions of return walls / abutments etc., includingcost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedgingstone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1430.00 4.00 5720.002 Rubble stones cum 8.50 318.00 2703.003 Stone chips cum 1.50 340.00 510.004 Sand (Screened) cum 4.00 606.00 2424.00

TOTAL Rs: 11357.00Add for scaffolding @ 2.5% Rs: 283.93

Total cost of Materials Rs: 11640.93

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.202 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.65Total hire charges of Machinery Rs: 772.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Water tanker Hour 1.00 153.10 153.102 Crew for Pump Hour 0.50 96.10 48.053 work inspector Day 1.00 370.00 370.004 Mason Class-I Day 1.00 385.00 385.005 Mason Class-II Day 2.00 345.00 690.006 mazdoor

for conveying rubble stones Day 4.00 295.00 1180.00for preparing mortar Day 2.00 295.00 590.00for loading mortar pans Day 1.00 295.00 295.00for laying & packing mortar Day 3.00 295.00 885.00for washing rubble / finishing / curing Day 1.00 295.00 295.00for conveying mortar / chips Day 4.00 295.00 1180.00

TOTAL Rs: 6071.15Add for labour for scaffolding @ 2.5% Rs: 151.78

Total cost of Labour Rs: 6222.93labour component/unit qty 622.30Add contractor's profit and overhead charges 0.14 87.10labour component/unit qty (including contractor's profit) 709.40

ABSTRACT:A. Cost of Materials Rs: 11640.93B. Hire charges of Machinery Rs: 772.45C. Cost of Labour Rs: 6222.93

Total Rs: 18636.3014.00% Rs: 2609.08

Total cost for 10.00 cum Rs: 21245.38Rate per cum (A+B+C+D)/10.0 Rs. 2124.50

IRR-CCDW-4-3 Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion withstones from approved source including cost of all materials, machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

266

initial lead upto 50 m and initial lift upto 3m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1330.00 4.00 5320.002 Header stones 25x25x45 cm Nos 60.00 39.00 2340.003 Khandki stones 25x25x30 cm Nos 180.00 16.00 2880.004 Rubble stones cum 4.50 318.00 1431.005 Stone chips cum 1.50 340.00 510.006 Sand (Screened) cum 3.50 606.00 2121.00

TOTAL Rs: 14602.00Add for scaffolding materials @ 2.5% Rs: 365.05

Total cost of Materials Rs: 14967.05

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.202 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.65Total hire charges of Machinery Rs: 772.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Water tanker Hour 1.00 153.10 153.102 Crew for Pump Hour 0.50 96.10 48.053 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -II Day 3.00 345.00 1035.005 Mason Class-I Day 1.00 385.00 385.006 Mason Class-II Day 2.00 345.00 690.007 mazdoor

for conveying stones / rubble Day 4.00 295.00 1180.00for preparation of mortar Day 3.00 295.00 885.00for loading mortar pans Day 1.00 295.00 295.00for laying & packing mortar Day 3.00 295.00 885.00for washing rubble / finishing / curing Day 1.00 295.00 295.00for conveying mortar / chips Day 2.00 295.00 590.00

TOTAL Rs: 6811.15Add for labour for scaffolding @ 2.5% Rs: 170.28

Total cost of Labour Rs: 6981.43labour component/unit qty 698.10Add contractor's profit and overhead charges 0.14 97.70labour component/unit qty (including contractor's profit) 795.80

ABSTRACT:A. Cost of Materials Rs: 14967.05B. Hire charges of Machinery Rs: 772.45C. Cost of Labour Rs: 6981.43

Total Rs: 22720.9314.00% Rs: 3180.93

Total cost for 10.00 cum Rs: 25901.86Rate per cum (A+B+C+D)/10.0 Rs. 2590.20

IRR-CCDW-4-4 Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion withstones from approved source including cost of all materials, machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete withinitial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

267

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1330.00 4.00 5320.002 Header stones 25x25x45 cm Nos 60.00 39.00 2340.003 Khandki stones 25x25x30 cm Nos 180.00 16.00 2880.004 Rubble stones cum 4.50 318.00 1431.005 Stone chips cum 1.50 340.00 510.006 Sand (Screened) cum 3.50 606.00 2121.00

TOTAL Rs: 14602.00Add for scaffolding materials @ 2.5% Rs: 365.05

Total cost of Materials Rs: 14967.05

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.202 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.65Total hire charges of Machinery Rs: 772.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Water tanker Hour 1.00 153.10 153.102 Crew for Pump Hour 0.50 96.10 48.053 work inspector Day 1.00 370.00 370.004 Stone chiseller Cl -II Day 6.00 345.00 2070.005 Mason Class-I Day 1.00 385.00 385.006 Mason Class-II Day 2.00 345.00 690.007 mazdoor8 for conveying rubble/ stones Day 4.00 295.00 1180.00

for preparation of mortar Day 3.00 295.00 885.00for loading mortar pans Day 1.00 295.00 295.00for laying & packing mortar Day 3.00 295.00 885.00for washing rubble / finishing / curing Day 1.00 295.00 295.00for conveying mortar / chips Day 2.00 295.00 590.00

TOTAL Rs: 7846.15Add for labour for scaffolding @ 2.5% Rs: 196.15

Total cost of Labour Rs: 8042.30labour component/unit qty 804.20Add contractor's profit and overhead charges 0.14 112.60labour component/unit qty (including contractor's profit) 916.80

ABSTRACT:A. Cost of Materials Rs: 14967.05B. Hire charges of Machinery Rs: 772.45C. Cost of Labour Rs: 8042.30

Total Rs: 23781.8014.00% Rs: 3329.45

Total cost for 10.00 cum Rs: 27111.25Rate per cum (A+B+C+D)/10.0 Rs. 2711.10

IRR-CCDW-4-5 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2proportion by volume including raking and cleaning joints for 50 mm depth, pressing cementmortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 456.00 4.00 1824.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

268

2 Sand (Screened) cum 0.75 606.00 454.50TOTAL Rs: 2278.50

Add for scaffolding / ramps etc @ 2.5% Rs: 56.96Total cost of Materials Rs: 2335.46

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 10.00 385.00 3850.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs: 7170.00labour component/unit qty 71.70Add contractor's profit and overhead charges 0.14 10.00labour component/unit qty (including contractor's profit) 81.70

ABSTRACT:A. Cost of Materials Rs: 2335.46B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 7170.00

Total Rs: 9505.4614.00% Rs: 1330.76

Total cost for 100.00 sqm Rs: 10836.22Rate per sqm (A+B+C+D)/100.0 Rs. 108.40

IRR-CCDW-4-6 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3proportion by volume including raking and cleaning joints for 50 mm depth, pressing cementmortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 322.00 4.00 1288.002 Sand (Screened) cum 0.75 606.00 454.50

TOTAL Rs: 1742.50Add for scaffolding / ramps etc @ 2.5% Rs: 43.56

Total cost of Materials Rs: 1786.06

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 10.00 385.00 3850.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 10.00 295.00 2950.00

Total cost of Labour Rs: 7170.00labour component/unit qty 71.70Add contractor's profit and overhead charges 0.14 10.00labour component/unit qty (including contractor's profit) 81.70

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

269

A. Cost of Materials Rs: 1786.06B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 7170.00

Total Rs: 8956.0614.00% Rs: 1253.85

Total cost for 100.00 sqm Rs: 10209.91Rate per sqm (A+B+C+D)/100.0 Rs. 102.10

IRR-CCDW-4-7 Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including costof all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 629.00 4.00 2516.002 Sand (Screened) cum 1.32 606.00 799.92

TOTAL Rs: 3315.92Add for scaffolding / ramps etc @ 2.5% Rs: 82.90

Total cost of Materials Rs: 3398.82

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 10.00 385.00 3850.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 20.00 295.00 5900.00

Total cost of Labour Rs: 10120.00labour component/unit qty 101.20Add contractor's profit and overhead charges 0.14 14.20labour component/unit qty (including contractor's profit) 115.40

ABSTRACT:A. Cost of Materials Rs: 3398.82B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10120.00

Total Rs: 13518.8214.00% Rs: 1892.63

Total cost for 100.00 sqm Rs: 15411.45Rate per sqm (A+B+C+D)/100.0 Rs. 154.10

IRR-CCDW-4-8 Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including costof all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 472.00 4.00 1888.002 Sand (Screened) cum 1.32 606.00 799.92

TOTAL Rs: 2687.92Add for scaffolding / ramps etc @ 2.5% Rs: 67.20

Total cost of Materials Rs: 2755.12

B. MACHINERY:

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

270

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Nil 0.00 0.00 0.00( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 10.00 385.00 3850.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 20.00 295.00 5900.00

Total cost of Labour Rs: 10120.00labour component/unit qty 101.20Add contractor's profit and overhead charges 0.14 14.20labour component/unit qty (including contractor's profit) 115.40

ABSTRACT:A. Cost of Materials Rs: 2755.12B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 10120.00

Total Rs: 12875.1214.00% Rs: 1802.52

Total cost for 100.00 sqm Rs: 14677.638Rate per sqm (A+B+C+D)/100.0 Rs. 146.80

IRR-CCDW-4-9 Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including costof all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 1050.00 4.00 4200.002 Sand (Screened) cum 2.20 606.00 1333.20

TOTAL Rs: 5533.20Add for scaffolding / ramps etc @ 2.5% Rs: 138.33

Total cost of Materials Rs: 5671.53

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 15.00 385.00 5775.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 25.00 295.00 7375.00

Total cost of Labour Rs: 13520.00labour component/unit qty 135.20Add contractor's profit and overhead charges 0.14 18.90labour component/unit qty (including contractor's profit) 154.10

ABSTRACT:A. Cost of Materials Rs: 5671.53B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 13520.00

Total Rs: 19191.5314.00% Rs: 2686.81

Total cost for 100.00 sqm Rs: 21878.34Rate per sqm (A+B+C+D)/100.0 Rs. 218.80

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

271

IRR-CCDW-4-10 Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including costof all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 100.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 788.00 4.00 3152.002 Sand (Screened) cum 2.20 606.00 1333.20

TOTAL Rs: 4485.20Add for scaffolding / ramps etc @ 2.5% Rs: 112.13

Total cost of Materials Rs: 4597.33

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- I Day 15.00 385.00 5775.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 25.00 295.00 7375.00

Total cost of Labour Rs: 13520.00labour component/unit qty 135.20Add contractor's profit and overhead charges 0.14 18.90labour component/unit qty (including contractor's profit) 154.10

ABSTRACT:A. Cost of Materials Rs: 4597.33B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 13520.00

Total Rs: 18117.3314.00% Rs: 2536.43

Total cost for 100.00 sqm Rs: 20653.76Rate per sqm (A+B+C+D)/100.0 Rs. 206.50

IRR-CCDW-5 COPING & RAILING WORKS :

IRR-CCDW-5-1 Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set inCM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume includingcost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

DATA: RATE ANALYSIS UNIT : 10.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 75.00 4.00 300.002 Sand (Screened) cum 0.30 606.00 181.803 Burnt stone slab 10 cm thick sqm 10.50 300.00 3150.00

Total cost of Materials Rs: 3631.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

272

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 1.00 345.00 345.002 Stone chiseller Cl- II Day 1.00 345.00 345.003 work inspector Day 0.50 370.00 185.004 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1465.00labour component/unit qty 146.50Add contractor's profit and overhead charges 0.14 20.50labour component/unit qty (including contractor's profit) 167.00

ABSTRACT:A. Cost of Materials Rs: 3631.80B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1465.00

Total Rs: 5096.8014.00% Rs: 713.55

Total cost for 10.00 sqm Rs: 5810.35Rate per sqm (A+B+C+D)/10.0 Rs. 581.00

IRR-CCDW-5-2 Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set inCM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume includingcost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

DATA: RATE ANALYSIS UNIT : 10.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 75.00 4.00 300.002 Sand (Screened) cum 0.30 606.00 181.803 Burnt stone slab 10 cm thick sqm 10.50 300.00 3150.00

Total cost of Materials Rs: 3631.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 1.00 345.00 345.002 Stone chiseller Cl- I Day 4.00 385.00 1540.003 work inspector Day 0.50 370.00 185.004 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 2660.00labour component/unit qty 266.00Add contractor's profit and overhead charges 0.14 37.20labour component/unit qty (including contractor's profit) 303.20

ABSTRACT:A. Cost of Materials Rs: 3631.80B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2660.00

Total Rs: 6291.8014.00% Rs: 880.85

Total cost for 10.00 sqm Rs: 7172.65Rate per sqm (A+B+C+D)/10.0 Rs. 717.30

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

273

IRR-CCDW-5-3 Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set inCM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume includingcost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

DATA: RATE ANALYSIS UNIT : 10.00 sqmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 75.00 4.00 300.002 Sand (Screened) cum 0.30 606.00 181.803 Burnt stone slab 10 cm thick sqm 10.50 300.00 3150.00

Total cost of Materials Rs: 3631.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nil 0.00 0.00 0.00

( Manual mixing) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 1.00 345.00 345.002 Stone chiseller Cl-I Day 8.00 385.00 3080.003 work inspector Day 0.50 370.00 185.004 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 4200.00labour component/unit qty 420.00Add contractor's profit and overhead charges 0.14 58.80labour component/unit qty (including contractor's profit) 478.80

ABSTRACT:A. Cost of Materials Rs: 3631.80B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4200.00

Total Rs: 7831.8014.00% Rs: 1096.45

Total cost for 10.00 sqm Rs: 8928.25Rate per sqm (A+B+C+D)/10.0 Rs. 892.80

IRR-CCDW-5-4 Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N /sqmm ) grade cement concrete using 20 mm down size approved clean, hard, gradedaggregates for coping slab including cost of all materials, machinery, labour, formwork,cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curingetc., complete with initial lead upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

DATA: RATE ANALYSIS UNIT : 14.67 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement for mix kg 4401.00 4.00 17604.00Cement for incidentals @ 5 kg / cum kg 73.35 4.00 293.40

2 Coarse aggregate 20-10 mm cum 7.63 1210.00 9230.36Coarse aggregate 10 mm below cum 4.11 875.00 3594.15

3 Fine aggregate (Un-Screened) cum 6.60 462.00 3049.894 Super Plasticizer kg 17.60 80.00 1408.325 Use rate of shuttering sqm 80.69 244.56 19732.646 Sundries sqm 1.00 41.00 41.00

Total cost of Materials Rs: 54953.77

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

274

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Concrete mixer 300/200 ltr ( diesel ) Hour 8.00 53.50 428.00

Fuel / Energy charges Hour 8.00 85.30 682.402 5 hp pump ( diesel ) Hour 0.50 10.20 5.10

Fuel / Energy charges Hour 0.50 85.30 42.653 Water tanker 8000 ltr Hour 1.00 402.50 402.50

Fuel / Energy charges Hour 1.00 322.20 322.20Total hire charges of Machinery Rs: 1882.85

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Concrete mixer Hour 8.00 189.80 1518.402 Crew for Pump Hour 0.50 96.10 48.053 Crew for Water tanker Hour 1.00 153.10 153.104 Mason Class-I Day 1.00 385.00 385.005 work inspector Day 1.00 370.00 370.006 mazdoor

for batching materials Day 11.00 295.00 3245.00for loading mortar pans Day 4.00 295.00 1180.00for laying and tamping Day 3.00 295.00 885.00for conveying concrete Day 14.67 295.00 4327.65for cleaning/ washing/ curing Day 1.00 295.00 295.00

7 Labour cost for shuttering/scaffolding sqm 80.69 75.30 6075.58Total cost of Labour Rs: 18482.78

labour component/unit qty 1259.90Add contractor's profit and overhead charges 0.14 176.40labour component/unit qty (including contractor's profit) 1436.30

ABSTRACT:A. Cost of Materials Rs: 54953.77B. Hire charges of Machinery Rs: 1882.85C. Cost of Labour Rs: 18482.78

Total Rs: 75319.4014.00% Rs: 10544.72

Total cost for 14.67 cum Rs: 85864.12Rate per cum (A+B+C+D)/14.67 Rs. 5853.00

IRR-CCDW-5-5 Providing and constructing protective railing consisting of in-situ railing posts of size 15 x15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 gradeconcrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos.of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mmdia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primerand two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork,finishing, curing etc., complete with lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 10.00 RmA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 30.00 4.00 120.002 20-10 mm coarse aggregate cum 0.04 1210.00 48.403 10-4.75 mm coarse aggregate cum 0.02 875.00 17.504 Fine aggregate (Un-Screened) cum 0.04 462.00 18.485 Reinforcement steel kg 16.39 46.50 762.146 40 mm dia GI pipes B class Rm 30.00 290.00 8700.007 Use rate of shuttering sqm 3.00 244.56 733.698 Sundries ( paints/ binding wire etc ) LS 4.00 41.00 164.00

Total cost of Materials Rs: 10564.21

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

275

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Class I Day 0.50 385.00 192.502 Bar bender Day 0.50 450.00 225.003 work inspector Day 0.50 370.00 185.004 mazdoor Day 1.50 295.00 442.505 Painter Cl- II Day 0.50 345.00 172.506 Fitter shuttering Day 0.50 345.00 172.50

Total cost of Labour Rs: 1390.00labour component/unit qty 139.00Add contractor's profit and overhead charges 0.14 19.50labour component/unit qty (including contractor's profit) 158.50

ABSTRACT:A. Cost of Materials Rs: 10564.21B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1390.00

Total Rs: 11954.2114.00% Rs: 1673.59

Total cost for 10.00 Rm Rs: 13627.80Rate per Rm (A+B+C+D)/10.0 Rs. 1362.80

IRR-CCDW-6 HUME PIPE LAYING & JOINTING WORKS :

IRR-CCDW-6-1 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 99.00 4.00 396.002 Sand (Screened) cum 0.10 606.00 60.603 Hemp yarn kg 0.91 72.00 65.52

Total cost of Materials Rs: 522.12

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 2.00 345.00 690.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1945.00labour component/unit qty 194.50Add contractor's profit and overhead charges 0.14 27.20labour component/unit qty (including contractor's profit) 221.70

ABSTRACT:A. Cost of Materials Rs: 522.12B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1945.00

Total Rs: 2467.12

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

276

14.00% Rs: 345.4Total cost for 10.00 Joints Rs: 2812.52Rate per joint (A+B+C+D)/10.0 Rs. 281.30

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-2 Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 174.00 4.00 696.002 Sand (Screened) cum 0.22 606.00 133.323 Hemp yarn kg 1.27 72.00 91.44

Total cost of Materials Rs: 920.76

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 2.00 345.00 690.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1945.00labour component/unit qty 194.50Add contractor's profit and overhead charges 0.14 27.20labour component/unit qty (including contractor's profit) 221.70

ABSTRACT:A. Cost of Materials Rs: 920.76B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1945.00

Total Rs: 2865.7614.00% Rs: 401.21

Total cost for 10.00 Joints Rs: 3266.97Rate per joint (A+B+C+D)/10.0 Rs. 326.70

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-3 Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 248.00 4.00 992.002 Sand (Screened) cum 0.25 606.00 151.503 Hemp yarn kg 2.20 72.00 158.40

Total cost of Materials Rs: 1301.90

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

277

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 2.50 345.00 862.502 work inspector Day 1.00 370.00 370.003 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 2412.50labour component/unit qty 241.30Add contractor's profit and overhead charges 0.14 33.80labour component/unit qty (including contractor's profit) 275.10

ABSTRACT:A. Cost of Materials Rs: 1301.90B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2412.50

Total Rs: 3714.4014.00% Rs: 520.02

Total cost for 10.00 Joints Rs: 4234.42Rate per joint (A+B+C+D)/10.0 Rs. 423.40

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-4 Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 321.00 4.00 1284.002 Sand (Screened) cum 0.31 606.00 187.863 Hemp yarn kg 2.50 72.00 180.00

Total cost of Materials Rs: 1651.86

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 2.50 345.00 862.502 work inspector Day 1.00 370.00 370.003 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 2412.50labour component/unit qty 241.30Add contractor's profit and overhead charges 0.14 33.80labour component/unit qty (including contractor's profit) 275.10

ABSTRACT:A. Cost of Materials Rs: 1651.86B. Hire charges of Machinery Rs: 0.00

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

278

C. Cost of Labour Rs: 2412.50Total Rs: 4064.36

14.00% Rs: 569.01Total cost for 10.00 Joints Rs: 4633.37Rate per joint (A+B+C+D)/10.0 Rs. 463.30

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-5 Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 396.00 4.00 1584.002 Sand (Screened) cum 0.39 606.00 236.343 Hemp yarn kg 3.10 72.00 223.20

Total cost of Materials Rs: 2043.54

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 3.00 345.00 1035.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 2880.00labour component/unit qty 288.00Add contractor's profit and overhead charges 0.14 40.30labour component/unit qty (including contractor's profit) 328.30

ABSTRACT:A. Cost of Materials Rs: 2043.54B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2880.00

Total Rs: 4923.5414.00% Rs: 689.3

Total cost for 10.00 Joints Rs: 5612.84Rate per joint (A+B+C+D)/10.0 Rs. 561.30

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-6 Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 446.00 4.00 1784.002 Sand (Screened) cum 0.45 606.00 272.70

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

279

3 Hemp yarn kg 3.40 72.00 244.80Total cost of Materials Rs: 2301.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 3.00 345.00 1035.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 2880.00labour component/unit qty 288.00Add contractor's profit and overhead charges 0.14 40.30labour component/unit qty (including contractor's profit) 328.30

ABSTRACT:A. Cost of Materials Rs: 2301.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2880.00

Total Rs: 5181.5014.00% Rs: 725.41

Total cost for 10.00 Joints Rs: 5906.91Rate per joint (A+B+C+D)/10.0 Rs. 590.70

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-7 Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 495.00 4.00 1980.002 Sand (Screened) cum 0.50 606.00 303.003 Hemp yarn kg 3.77 72.00 271.44

Total cost of Materials Rs: 2554.44

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 3.00 345.00 1035.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3175.00labour component/unit qty 317.50Add contractor's profit and overhead charges 0.14 44.50labour component/unit qty (including contractor's profit) 362.00

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

280

A. Cost of Materials Rs: 2554.44B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3175.00

Total Rs: 5729.4414.00% Rs: 802.12

Total cost for 10.00 Joints Rs: 6531.56Rate per joint (A+B+C+D)/10.0 Rs. 653.20

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-8 Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement kg 569.00 4.00 2276.002 Sand (Screened) cum 0.58 606.00 351.483 Hemp yarn kg 4.15 72.00 298.80

Total cost of Materials Rs: 2926.28

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 3.00 345.00 1035.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 3175.00labour component/unit qty 317.50Add contractor's profit and overhead charges 0.14 44.50labour component/unit qty (including contractor's profit) 362.00

ABSTRACT:A. Cost of Materials Rs: 2926.28B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3175.00

Total Rs: 6101.2814.00% Rs: 854.18

Total cost for 10.00 Joints Rs: 6955.46Rate per joint (A+B+C+D)/10.0 Rs. 695.50

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-6-9 Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)

DATA: RATE ANALYSIS UNIT : 10.00 JointsA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

281

1 Cement kg 668.00 4.00 2672.002 Sand (Screened) cum 0.69 606.00 418.143 Hemp yarn kg 4.53 72.00 326.16

Total cost of Materials Rs: 3416.30

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 4.00 345.00 1380.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 7.00 295.00 2065.00

Total cost of Labour Rs: 3815.00labour component/unit qty 381.50Add contractor's profit and overhead charges 0.14 53.40labour component/unit qty (including contractor's profit) 434.90

ABSTRACT:A. Cost of Materials Rs: 3416.30B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3815.00

Total Rs: 7231.3014.00% Rs: 1012.38

Total cost for 10.00 Joints Rs: 8243.68Rate per joint (A+B+C+D)/10.0 Rs. 824.40

Note: (1) For NP3 Class - 10% extra over the rates of NP2 Class(2) For NP4 Class - 20% extra over the rates of NP2 Class

IRR-CCDW-7 BACK FILLING & OTHER WORKS :

IRR-CCDW-7-1 Providing rubble / boulder and sand filling behind abutment and return walls in layersincluding cost of all materials, machinery, labour, watering, ramming etc., complete with initiallead upto 50 m and initial lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble / Boulder cum 10.00 318.00 3180.002 Sand for filling cum 4.00 342.00 1368.00

Total cost of Materials Rs: 4548.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 Mason Cl II Day 1.00 345.00 345.003 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1710.00labour component/unit qty 171.00Add contractor's profit and overhead charges 0.14 23.90labour component/unit qty (including contractor's profit) 194.90

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

282

ABSTRACT:A. Cost of Materials Rs: 4548.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1710.00

Total Rs: 6258.0014.00% Rs: 876.12

Total cost for 10.00 cum Rs: 7134.12Rate per cum (A+B+C+D)/10.0 Rs. 713.40

IRR-CCDW-7-2 Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipesincluding breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earthmasters to achieve density control of not less than 95 percent etc., complete with leadupto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Murum cum 12.00 107.00 1284.000.00 0.00 0.00

Total cost of Materials Rs: 1284.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Nill 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Cartman with double bullock cart Day 0.50 395.00 197.502 work inspector Day 0.50 370.00 185.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 2152.50labour component/unit qty 215.30Add contractor's profit and overhead charges 0.14 30.10labour component/unit qty (including contractor's profit) 245.40

ABSTRACT:A. Cost of Materials Rs: 1284.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2152.50

Total Rs: 3436.5014.00% Rs: 481.11

Total cost for 10.00 cum Rs: 3917.61Rate per cum (A+B+C+D)/10.0 Rs. 391.80

IRR-CCDW-7-3 Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipesincluding breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by powerroller to achieve density control of not less than 98 percent etc., complete with lead upto50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 10.00 cumA. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Murum cum 12.00 107.00 1284.000.00 0.00 0.00

Total cost of Materials Rs: 1284.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

283

in Rs. in Rs.1 Diesel road roller 8-10 tonne Hour 0.17 197.20 33.65

Fuel / Energy charges Hour 0.17 767.30 130.94Total hire charges of Machinery Rs: 164.59

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Operator road roller Hour 0.17 182.20 31.092 Cartman with double bullock cart Day 0.50 395.00 197.503 work inspector Day 0.50 370.00 185.004 mazdoor Day 1.50 295.00 442.50

Total cost of Labour Rs: 856.09labour component/unit qty 85.60Add contractor's profit and overhead charges 0.14 12.00labour component/unit qty (including contractor's profit) 97.60

ABSTRACT:A. Cost of Materials Rs: 1284.00B. Hire charges of Machinery Rs: 164.59C. Cost of Labour Rs: 856.09

Total Rs: 2304.6814.00% Rs: 322.66

Total cost for 10.00 cum Rs: 2627.34Rate per cum (A+B+C+D)/10.0 Rs. 262.70

IRR-CCDW-7-4 Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone incement concrete M-10 grade with 40 mm down size aggregates including excavating pit ofsize 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats syntheticenamel paint of approved quality and colour to exposed surfaces and lettering as directed, costof all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 4 Nos.A. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 One line dressed Km stone No. 4.00 450.00 1800.002 40-20 mm coarse aggregate cum 0.20 1145.00 229.003 20-10 mm coarse aggregate cum 0.15 1210.00 181.504 10-4.75 mm coarse aggregate cum 0.10 875.00 87.505 Sand (Un-Screened) cum 0.20 462.00 92.406 Cement kg 100.00 4.00 400.007 Synthetic enamel paint I st quality ltr 1.00 240.00 240.008 Sundries ( brush / oil etc ) LS 4.00 41.00 164.00

Total cost of Materials Rs: 3194.40

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

( Manual mixing ) 0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Mason Cl- II Day 1.00 345.00 345.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 1.00 295.00 295.004 Painter Cl- I Day 1.00 440.00 440.00

Total cost of Labour Rs: 1450.00labour component/unit qty 362.50Add contractor's profit and overhead charges 0.14 50.80labour component/unit qty (including contractor's profit) 413.30

ABSTRACT:A. Cost of Materials Rs: 3194.40

D. Add for contractor's profit and overheads on (A+B+C)

Canal Cross Drainage Works - Item Unit Rates 2014-15

284

B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1450.00

Total Rs: 4644.4014.00% Rs: 650.22

Total cost for 4.00 Nos. Rs: 5294.62Rate per No. (A+B+C+D)/4.0 Rs. 1323.70

IRR-CCDW-7-5 Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone incement concrete M-10 grade with 40 mm down size aggregates including excavating pit ofsize 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats syntheticenamel paint of approved quality and colour to exposed surfaces and lettering as directed, costof all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 4 Nos.A. MATERIALS:

Sl No Particulars Unit Quantity Rate Amountin Rs. in Rs.

1 One line dressed hectometre stone No. 4.00 240.00 960.002 40-20 mm coarse aggregate cum 0.20 1145.00 229.003 20-10 mm coarse aggregate cum 0.15 1210.00 181.504 10-4.75 mm coarse aggregate cum 0.10 875.00 87.505 Sand (Un-Screened) cum 0.20 462.00 92.406 Cement kg 100.00 4.00 400.007 Synthetic enamel paint I st quality ltr 0.40 240.00 96.008 Sundries ( brush / oil etc ) LS 1.00 41.00 41.00

Total cost of Materials Rs: 2087.40B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.00( Manual mixing ) 0.00 0.00 0.00

Total hire charges of Machinery Rs: 0.00C. LABOUR:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Mason Cl- II Day 1.00 345.00 345.002 work inspector Day 1.00 370.00 370.003 mazdoor Day 1.00 295.00 295.004 Painter Cl- I Day 0.50 440.00 220.00

Total cost of Labour Rs: 1230.00labour component/unit qty 307.50Add contractor's profit and overhead charges 0.14 43.10labour component/unit qty (including contractor's profit) 350.60ABSTRACT:A. Cost of Materials Rs: 2087.40B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1230.00

Total Rs: 3317.4014.00% Rs: 464.44

Total cost for 4.00 Nos. Rs: 3781.84Rate per No. (A+B+C+D)/4.0 Rs. 945.50

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Gates and Allied Works - Item Unit Rates 2014-15

285

CHAPTER-V

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

IRR-GAW

1 All materials / bought out components for embedded parts, gates, hoists and allied worksshall conform to relevant Indian standards / technical specifications and approved drawings.

2 The basic rates are EXCLUSIVEof preparation of designs / drawings / material schedules etc.,as per specifications and other technical data including revisions.If designs &drawings are to be done by private agency 2% of estimated cost be added

3 The basic rates are inclusive of cost of all materials, machinery, labour, fabrication, erection,commissioning and testing of gates, hoists and other related components as per technicalspecifications.

4 The basic rates are inclusive of finishing, wastage of materials , incidental works, temperarysupports, all enabling works, profit, overheads, small tools / plants, hidden coston labour etc.

5 The basic rates are inclusive of taxes, duties (excise ), levies and all other incidental charges includingturn over tax/sales tax on works contract. Separate provision shall be made in the estimate towards suchtax on works contract at the rate prevailing at the time of preparation of estimate.

6 The basic rates are inclusive of all leads and lifts including rehandling.

7 no provision is made for stitch welding and it is part of welding work

8 The basic rates are inclusive of preparatory works such as rectification of damages, repairingshop painting, cleaning, positioning and anchoring first stage embedments,

9 The basic rates are not inclusive of painting with or without sand blasting,and are to be added to the rate as perschedule rates formulated in the same chapter as per applicability and specifications

10 The basic rates are exclusive of cost of river diversion arrangements, dewatering, desilting ,secondary concreting of EM parts etc., which form part of civil works.

11 DESIGNS AND DRAWING CHARGES AT 2% BE ADDED EXTRA TO THE ESTIMATES, IF CONTRACTOR'S SCOPE OF WORK INVOLVES DESIGNS COMPONENT ALSO

12 Add AREA ALLOWANCES AS APPLICABLE ON LABOUR COMPONENT ONLY ( SHOWN UNDER EACH ITEM)

13 Add contractors profit and overheads at 14% to all items

14 Painting Charges added extra to the data items as per applicability wherver necessary

15 HOIST EQUIPMENT1.-where sand blasting is not possible, hand and power tool cleaning be adopted - Guidance may be taken from Mechanical workshop in this regard2. Machined surfaces should not be painted3. for maintenance unless sand blasting is essential hand and power tool cleaning be adopted

16 Painting of Hoast Gates is to be done as per IS 14177:1994

DATA and RATES ---GATE / HOIST AND ALLIED WORKS -

(STORED WITH E-N-C &TO INCORPORATE CHANGES YEARLY/AS NEEDED)GAW - Work Items

Index- codeIRR-GAW TYPES OF GATES:

IRR-GAW-1 A. SPILLWAY RADIAL GATESIRR-GAW-1-1 E.M Parts and anchorages

fabrication, supply, erection, testing and commissioning of Embedded parts for radial gate consists of sill beam, wall plates, anchor girders , yoke girders, tie flats, trunnion supports etc., including

HYDRAULIC GATES AND ALLIED EQUIPMENT - Standard Data

FOR THE YEAR : 2014-15

GATE HOIST AND ALLIED WORKS - DATA RATES

Gates and Allied Works - Item Unit Rates 2014-15

286

cost of all materials, machinery, labour, welding, finishing, with leads and lifts &all accessories (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under itemsinthis chapter and add as applicable separately)

Drawing no. MD/CDO/VRSP/90-92/85-86 (Vengalaraya Sagar - Gomukhi Project)

Vent Size: 12.00 X 6.6 Mtrs

DATA: RATE ANALYSIS UNIT : 15.300 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Str steel angle / beam / channel / bars kg 3467.00 45.00 156015.002 Structural steel plate / flats kg 11261.00 46.00 518006.003 Stainless steel plate / flats kg 515.00 275.00 141625.004 MS bolts and nuts kg 48.00 90.00 4320.005 Oxygen gas cum 158.00 52.00 8216.006 Acetyline gas cum 53.00 320.00 16960.007 Welding electrodes Nos 11520.00 11.00 126720.008 Welding electrodes ( LH ) Nos 2880.00 18.00 51840.009 Welding electrodes ( stainless steel ) Nos 1160.00 26.00 30160.0010 Use rate welding holder set Hour 1945.00 7.35 14295.7511 Use rate gas cutting torch set Hour 158.00 23.67 3740.1212 Sundries LS 100.00 41.00 4100.00

Total cost of Materials Rs: 1075997.87

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 1945.00 16.00 31120.00

Fuel / Energy charges Hour 1945.00 91.30 177578.50

2Tower crane/heavy duty tyre mounted crane Hour 16.00 867.10 13873.60Fuel / Energy charges Hour 16.00 197.80 3164.80

3 Plate shearing machine Hour 16.00 41.90 670.40Fuel / Energy charges Hour 16.00 152.20 2435.20

4 Pug cutting machine Hour 76.00 6.40 486.40Fuel / Energy charges Hour 76.00 3.80 288.80

5 Mobile crane 16 Tonnes Hour 22.00 2278.10 50118.20Fuel / Energy charges Hour 22.00 75.00 1650.00

6 Stationery derric crane Hour 64.00 86.10 5510.40Fuel / Energy charges Hour 64.00 0.00 0.00

7 Grinding machine Hour 30.00 22.50 675.00Fuel / Energy charges Hour 30.00 38.00 1140.00

8 Drilling machines Hour 30.00 22.50 675.00Fuel / Energy charges Hour 30.00 38.00 1140.00

9 Planing machine Hour 100.00 117.80 11780.00Fuel / Energy charges Hour 100.00 114.10 11410.00

10 Bending Machine Hour 30.00 42.60 1278.00Fuel / Energy charges Hour 30.00 114.10 3423.00

11 Sundries LS 100.00 41.00 4100.00Total hire charges of Machinery Rs: 322517.30

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Tower crane Hour 16.00 163.30 2612.802 Crew for Mobile crane 16 T Hour 22.00 454.30 9994.603 Crew for Shearing machine Hour 16.00 122.50 1960.004 Crew for Planing machine Hour 100.00 182.20 18220.005 Crew for Drilling machine Hour 30.00 171.60 5148.006 Crew for Grinding machine Hour 30.00 171.60 5148.007 Crew for Bending machine 30.00 113.90 3417.008 Foreman Day 15.00 440.00 6600.009 Marker / Fabricator / Erector Day 75.00 440.00 33000.0010 Gas cutter Day 20.00 385.00 7700.0011 Welder ( General ) Day 212.00 385.00 81620.0012 Welder ( X - ray ) Day 48.00 440.00 21120.00

Gates and Allied Works - Item Unit Rates 2014-15

287

13 Khalasi Day 345.00 385.00 132825.0014 Helper fabrication / erection Day 255.00 345.00 87975.0015 Electrician Day 5.00 440.00 2200.00

Total cost of Labour Rs: 419540.40Add towards highly skilled labour charges @ 30% on total cost of labour 125862.12

Total Cost of Labour 545402.52

labour component/unit qty 35647.20Add contractor's profit and overhead charges 0.14 4990.60labour component/unit qty (including contractor's profit) 40637.80

ABSTRACT:A. Cost of Materials Rs: 1075997.87B. Hire charges of Machinery Rs: 322517.30C. Cost of Labour Rs: 545402.52

Total Rs: 1943917.69D.Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1943917.69E. Add for transportation upto work site @ 3% Rs: 58317.53

Total Rs: 2002235.2214% Rs: 280312.93

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 581.4Unloading charges of fabricated parts Rs 63.30 per tonne 1936.98Total cost for 15.300 tonne Rs: 2285066.54

Rate per tonne Rs: 149350.80

RADIAL GATESA-2 Gates

IRR-GAW-1-2 fabrication, supply, erection, testing and commissioning of radial gate consistingof skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulleysupports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including costof all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings

(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under itemsinthis chapter and add as applicable separately)

Drawing no. MD/CDO/VRSP/170-172/85-86(Vengalaraya Sagar - Gomukhi Project)

Vent Size: 12 X 6.6 Mtr

DATA: RATE ANALYSIS UNIT : 29.000 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel :Angles / beams / channels / bars kg 9700.00 45.00 436500.00Plates / flats kg 16850.00 46.00 775100.00

2 Cast steel components :Trunnion hubs / Guide rollers kg 2100.00 180.00 378000.00

3Alluminium / Bronze alloy components :Bush for Trunnion / Guide roller kg 350.00 912.00 319200.00

4 Bolt / Nut / Washer :GI bolts / nuts / washers kg 250.00 130.00 32500.00

5 Zinc/Babbit Metal kg 50.00 170.00 8500.006 Rubber seals :

Bottom seal Rm 12.00 759.00 9108.00Side seals ( Z - type ) Rm 14.00 1457.00 20398.00

7 Oxygen gas cum 228.00 52.00 11856.008 Acetyline gas cum 76.00 320.00 24320.009 Welding electrodes ( std ) Nos 1000.00 11.00 11000.0010 Welding electrodes ( LH ) Nos 250.00 18.00 4500.0011 Use rate welding holder set Hour 156.00 7.35 1146.6012 Use rate gas cutting torch set Hour 228.00 23.67 5397.1413 Sundries LS 500.00 41.00 20500.00

Total cost of Materials Rs: 2058025.74

F. Add for contractor's profit and overheads on

Gates and Allied Works - Item Unit Rates 2014-15

288

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 156.00 16.00 2496.00

Fuel / Energy charges Hour 156.00 91.30 14242.802 Plate shearing machine Hour 29.00 41.90 1215.10

Fuel / Energy charges Hour 29.00 152.20 4413.803 Pug cutting machine Hour 114.00 6.40 729.60

Fuel / Energy charges Hour 114.00 3.80 433.204 Bending machine Hour 116.00 42.60 4941.60

Fuel / Energy charges Hour 116.00 114.10 13235.605 Tower crane 5 t cpacity Hour 29.00 867.10 25145.90

Fuel / Energy charges Hour 29.00 197.80 5736.206 Mobile derric crane Hour 58.00 519.70 30142.60

Fuel / Energy charges Hour 58.00 322.20 18687.607 Stationery derric crane Hour 58.00 86.10 4993.80

Fuel / Energy charges Hour 58.00 0.00 0.008 Grinding machine Hour 58.00 22.50 1305.00

Fuel / Energy charges Hour 58.00 38.00 2204.009 Drilling machines Hour 58.00 22.50 1305.00

Fuel / Energy charges Hour 58.00 38.00 2204.0010 Mobile Crane 30 T Hour 100.00 3096.80 309680.00

Fuel / Energy charges Hour 100.00 118.80 11880.0011 Sundries LS 500.00 41.00 20500.00

Total hire charges of Machinery Rs: 475491.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane 30T Hour 100.00 454.30 45430.002 Crew for Tower crane Hour 29.00 163.30 4735.703 Crew for Bending machine Hour 116.00 113.90 13212.404 Crew for Drilling machine Hour 58.00 171.60 9952.805 Crew for Grinding machine Hour 58.00 171.60 9952.806 Foreman Day 29.00 440.00 12760.007 Marker / Fabricator / Erector Day 145.00 440.00 63800.008 Gas cutter Day 29.00 385.00 11165.009 Welder ( General ) Day 17.00 385.00 6545.0010 Welder ( X - ray ) Day 5.00 440.00 2200.0011 Khalasi Day 493.00 385.00 189805.0012 Helper fabrication / erection Day 667.00 345.00 230115.0013 Electrician Day 15.00 440.00 6600.00

Total cost of Labour Rs: 606273.70Add towards highly skilled labour charges @ 30% on total cost of labour 181882.11

Total Cost of Labour 788155.81

labour component/unit qty 27177.80Add contractor's profit and overhead charges 0.14 3804.90labour component/unit qty (including contractor's profit) 30982.70

ABSTRACT:A. Cost of Materials Rs: 2058025.74B. Hire charges of Machinery Rs: 475491.80C. Cost of Labour Rs: 788155.81

Total Rs: 3321673.35D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 3321673.35E. Add for transportation upto work site @ 3% Rs: 99650.20

Total Rs: 3421323.5514% Rs: 478985.30

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 1102Unloading charges of fabricated parts Rs 63.30 per tonne 3671.4Total cost for 29.000 tonne Rs: 3905082.25

Rate per tonne Rs. 134658.00

IRR-GAW-1-3 RADIAL GATES-ROPE DRUM HOISTS WITH HOIST BRIDGES

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

289

fabrication, supply, erection, testing and commissioning of electrically operated ropedrum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gearsystem, brake system, electric motor, wire ropes, gate position indicator, manual operationarrangement etc., with all accessories for spillway radial gate including cost of all materials,machinery, labour,, greasing, providing hand railing and approach staircase with gate to hoist platform, , complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under itemsinthis chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 15.440 tonne wtA. MATERIALS: 90.00 t capacity

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 2571.00 45.00 115695.00Plates / flats kg 3632.00 46.00 167072.00

2 Cast steel components :Rope drums 2 Nos / Gears 4 Nos kg 3680.00 220.00 809600.00Pinions kg 218.00 210.00 45780.00Pulleys 720 PCD 6 Nos kg 1080.00 180.00 194400.00Plummer blocks / Hubs kg 322.00 180.00 57960.00

3 Alloy steel componentsShafts kg 557.00 210.00 116970.00Pins kg 546.00 420.00 229320.00

4 Bronze alloy components :Bronze bearings / bush kg 144.00 912.00 131328.00

5Wire rope 36 mm dia 6/37 construction kg 448.00 250.00 112000.00

6 MS Bolt / Nut / Washer kg 85.00 90.00 7650.007 Worm reducers No. 1.00 224400.00 224400.008 Electric motor 20 hp No. 1.00 121000.00 121000.009 Floating shaft 300 mm dia kg 1000.00 180.00 180000.0010 Manual operating system No. 1.00 28820.00 28820.0011 Gate position indicator No. 1.00 195800.00 195800.0012 Ele-magnetic brake No. 1.00 35200.00 35200.00

13Electric cable / switch / control panel etc LS 1.00 50380.00 50380.00

14 Oxygen gas cum 213.00 52.00 11076.0015 Acetyline gas cum 71.00 320.00 22720.0016 Welding electrodes Nos 530.00 11.00 5830.0017 Welding electrodes ( LH ) Nos 4776.00 18.00 85968.0018 Grease kg 50.00 260.00 13000.0019 Use rate welding holder set Hour 566.00 7.35 4160.1020 Use rate gas cutting torch set Hour 90.00 23.67 2130.4521 Sundries ( hand rail /staircase / gate et LS 200.00 41.00 8200.00

Total cost of Materials Rs: 2976459.55

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 566.00 16.00 9056.00

Fuel / Energy charges Hour 353.00 91.30 32228.902 Tower crane 5 t capacity Hour 4.00 867.10 3468.40

Fuel / Energy charges Hour 4.00 197.80 791.203 Pug cutting machine Hour 53.00 6.40 339.20

Fuel / Energy charges Hour 53.00 3.80 201.404 Mobile derric crane Hour 50.00 519.70 25985.00

Fuel / Energy charges Hour 50.00 322.20 16110.005 Grinding machine Hour 8.00 22.50 180.00

Fuel / Energy charges Hour 8.00 38.00 304.006 Drilling machines Hour 16.00 22.50 360.00

Fuel / Energy charges Hour 16.00 38.00 608.007 Sundries LS 100.00 41.00 4100.00

Total hire charges of Machinery Rs: 93732.10

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

Gates and Allied Works - Item Unit Rates 2014-15

290

1 Crew for Mobile crane Hour 50.00 153.10 7655.002 Crew for Tower crane Hour 4.00 163.30 653.203 Crew for Drilling machine Hour 16.00 171.60 2745.604 Crew for Grinding machine Hour 8.00 171.60 1372.805 Foreman Day 35.00 440.00 15400.00

6Marker / Fabricator / Erector / Mechanic Day 58.00 440.00 25520.00

7 Gas cutter Day 18.00 385.00 6930.008 Welder ( General ) Day 53.00 385.00 20405.009 Khalasi Day 20.00 385.00 7700.0010 Helper fabrication / erection Day 175.00 345.00 60375.0011 Electrician Day 3.00 440.00 1320.00

Total cost of Labour Rs: 150076.60Add towards highly skilled labour charges @ 30% on total cost of labour 45022.98

Total Cost of Labour 195099.58

labour component/unit qty 2167.80Add contractor's profit and overhead charges 0.14 303.50labour component/unit qty (including contractor's profit) 2471.30

ABSTRACT:A. Cost of Materials Rs: 2976459.55B. Hire charges of Machinery Rs: 93732.10C. Cost of Labour Rs: 195099.58

Total Rs: 3265291.23D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 3265291.23E. Add for transportation upto work site @ 3% Rs: 97958.74

Total Rs: 3363249.9714% Rs: 470855.00

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 586.72Unloading charges of fabricated parts Rs 63.30 per tonne 1954.704Total cost for 15.440 tonne wt Rs: 3836646.39Total cost for 90.00 t capacity Rs:

Rate per tonne wt Rs: 248487.50Rate per tonne capacity of hoist 42629.40

IRR-GAW-1-4 Walk way(cat walk) fabrication, supply, erection and commissioning of 1 metre wide walkway connectingspillway piers / abutments at trunnion platform level including cost of all materials,machinery, labour, cutting, welding etc, complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under itemsinthis chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 5.22 MTA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 4258.00 45.00 191610.00Plates / flats kg 98.00 46.00 4508.00Chequered plates kg 856.00 60.00 51360.00

2 MS bolts / nuts / washers kg 8.00 90.00 720.003 Oxygen gas cum 51.00 52.00 2652.004 Acetyline gas cum 17.00 320.00 5440.005 Welding electrodes Nos 1195.00 11.00 13145.006 Use rate welding holder set Hour 150.00 7.35 1102.507 Use rate gas cutting torch set Hour 30.00 23.67 710.158 Sundries LS 10.00 41.00 410.00

Total cost of Materials Rs: 271657.65

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 150.00 16.00 2400.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

291

Fuel / Energy charges Hour 150.00 91.30 13695.002 Tower crane Hour 6.00 867.10 5202.60

Fuel / Energy charges Hour 6.00 197.80 1186.803 Pug cutting machine Hour 12.00 6.40 76.80

Fuel / Energy charges Hour 12.00 3.80 45.604 Mobile CRANE 16T Hour 8.00 2278.10 18224.80

Fuel / Energy charges Hour 8.00 75.00 600.005 Grinding machine Hour 12.00 22.50 270.00

Fuel / Energy charges Hour 12.00 38.00 456.006 Drilling machines Hour 12.00 22.50 270.00

Fuel / Energy charges Hour 12.00 38.00 456.007 Bending Machine Hour 10.00 42.60 426.00

Fuel / Energy charges Hour 10.00 114.10 1141.008 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 44860.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane 16T Hour 10.00 454.30 4543.002 Crew for Tower crane Hour 6.00 163.30 979.803 Crew for Drilling machine Hour 12.00 171.60 2059.204 Crew for Grinding machine Hour 12.00 171.60 2059.205 Crew for Bending machine Hour 10.00 113.90 1139.006 Foreman Day 6.00 440.00 2640.007 Marker / Fabricator / Erector Day 25.00 440.00 11000.008 Gas cutter Day 5.00 385.00 1925.009 Welder ( General ) Day 20.00 385.00 7700.0010 Helper fabrication / erection Day 200.00 345.00 69000.0011 Electrician Day 2.00 440.00 880.00

Total cost of Labour Rs: 103925.20Add towards highly skilled labour charges @ 30% on total cost of labour 31177.56

Total Cost of Labour 135102.76

labour component/unit qty 25881.80Add contractor's profit and overhead charges 0.14 3623.50labour component/unit qty (including contractor's profit) 29505.30

ABSTRACT:A. Cost of Materials Rs: 271657.65B. Hire charges of Machinery Rs: 44860.60C. Cost of Labour Rs: 135102.76

Total Rs: 451621.01D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 451621.01E. Add for transportation upto work site @ 3% Rs: 13548.63

Total Rs: 465169.6414% Rs: 65123.75

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 198.36Unloading charges of fabricated parts Rs 63.30 per tonne 660.852Total cost for 5.22 MT Rs: 531152.60

Rate per MT Rs: 101753.40

IRR-GAW-2 VERTICAL LIFT GATES-EM PARTSIRR-GAW-2-1 Design, fabrication, supply, erection and commissioning of embedded parts consisting of

sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elementsetc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials,machinery, labour, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

Drawing No. MD/CDO/GNCP/HR/1759,1760/94 (GNSS Project)Vent Size: 3.6 X 6.1 Mtr

DATA: RATE ANALYSIS UNIT : 6.300 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amount

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

292

in Rs. in Rs.1 Str steel angle / beam / channel / bars kg 1885.00 45.00 84825.002 Structural steel plate / flats kg 3890.00 46.00 178940.003 Stainless steel plate / flats kg 271.00 275.00 74525.004 MS bolts and nuts kg 50.00 90.00 4500.005 Oxygen gas cum 225.00 52.00 11700.006 Acetyline gas cum 75.00 320.00 24000.007 Welding electrodes Nos 1410.00 11.00 15510.008 Welding electrodes ( LH ) Nos 350.00 18.00 6300.009 Welding electrodes ( stainless steel ) Nos 1320.00 26.00 34320.0010 Use rate welding holder set Hour 385.00 7.35 2829.7511 Use rate gas cutting torch set Hour 225.00 23.67 5326.1312 Sundries LS 40.00 41.00 1640.00

Total cost of Materials Rs: 444415.88

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 385.00 16.00 6160.00

Fuel / Energy charges Hour 385.00 91.30 35150.502 Plate shearing machine Hour 8.00 41.90 335.20

Fuel / Energy charges Hour 8.00 152.20 1217.603 Pug cutting machine Hour 110.00 6.40 704.00

Fuel / Energy charges Hour 110.00 3.80 418.004 Planing machine Hour 270.00 117.80 31806.00

Fuel / Energy charges Hour 270.00 114.10 30807.005 Mobile Crane 16 T Hour 24.00 2278.10 54674.40

Fuel / Energy charges Hour 24.00 75.00 1800.006 Stationery derric crane Hour 14.00 86.10 1205.40

Fuel / Energy charges Hour 14.00 0.00 0.007 Grinding machine Hour 14.00 22.50 315.00

Fuel / Energy charges Hour 14.00 38.00 532.008 Drilling machines Hour 21.00 22.50 472.50

Fuel / Energy charges Hour 21.00 38.00 798.009 Bending Machine Hour 14.00 42.60 596.40

Fuel / Energy charges Hour 14.00 114.10 1597.4010 Sundries LS 40.00 41.00 1640.00

Total hire charges of Machinery Rs: 170229.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane 16 T Hour 24.00 454.30 10903.202 Crew for Planing machine Hour 270.00 182.20 49194.003 Crew for Drilling machine Hour 21.00 171.60 3603.604 Crew for Grinding machine Hour 14.00 171.60 2402.405 Crew for Bending machine Hour 14.00 113.90 1594.606 Foreman Day 32.00 440.00 14080.007 Marker / Fabricator / Erector Day 35.00 440.00 15400.008 Gas cutter Day 9.00 385.00 3465.009 Welder ( General ) Day 46.00 385.00 17710.0010 Welder ( X - ray ) Day 6.00 440.00 2640.0011 Helper fabrication / erection Day 240.00 345.00 82800.0012 Electrician Day 4.00 440.00 1760.00

Total cost of Labour Rs: 205552.80Add towards highly skilled labour charges @ 30% on total cost of labour 61665.84

Total Cost of Labour 267218.64

labour component/unit qty 42415.70Add contractor's profit and overhead charges 0.14 5938.20labour component/unit qty (including contractor's profit) 48353.90

ABSTRACT:A. Cost of Materials Rs: 444415.88B. Hire charges of Machinery Rs: 170229.40C. Cost of Labour Rs: 267218.64

Total Rs: 881863.92D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 881863.92

Gates and Allied Works - Item Unit Rates 2014-15

293

E. Add for transportation upto work site @ 3% Rs: 26455.92Total Rs: 908319.83

14% Rs: 127164.78Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 239.4Unloading charges of fabricated parts Rs 63.30 per tonne 797.58Total cost for 6.30 tonne Rs: 1036521.59

Rate per tonne Rs: 164527.20

vertical lift gates and stop log gate elements ( SLIDING GATES)IRR-GAW-2-2 Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and

stoplog gate elements, consisting of skin plate,horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes,rubber seals, clamps etc., with all accessories including cost of all materials,machinery, labour, seal fixing etc.,complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

Drawing NO. CE/CDO/CL3/MRP/783/2002 (Spillway Stop log gate Elements of Madduvalasa Project)Vent Size: 12.624 X 0.50 M 16 Elements

DATA: RATE ANALYSIS UNIT : 119.000 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 5280.00 45.00 237600.00Plates / flats kg 112880.00 46.00 5192480.00

2 Alloy steel componentsLifting pins kg 520.00 420.00 218400.00

3 Bolt / Nut / WasherGI bolts / nuts / washers kg 600.00 130.00 78000.00

4 Rubber sealsBottom seal Rm 210.00 759.00 159390.00Side seals Rm 18.00 1155.00 20790.00

5 Oxygen gas cum 2714.00 52.00 141128.006 Acetyline gas cum 905.00 320.00 289600.007 Welding electrodes Nos 86554.00 11.00 952094.008 Welding electrodes ( LH ) Nos 16486.00 18.00 296748.009 Use rate welding holder set Hour 12880.00 7.35 94668.0010 Use rate gas cutting torch set Hour 2714.00 23.67 64244.9011 Sundries LS 400.00 41.00 16400.00

Total cost of Materials Rs: 7761542.90

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 12880.00 16.00 206080.00

Fuel / Energy charges Hour 12880.00 91.30 1175944.002 Pug cutting machine Hour 6440.00 6.40 41216.00

Fuel / Energy charges Hour 6440.00 3.80 24472.003 Mobile crane 16 T Hour 360.00 2278.10 820116.00

Fuel / Energy charges Hour 360.00 75.00 27000.004 Stationery derric crane Hour 238.00 86.10 20491.80

Fuel / Energy charges Hour 238.00 0.00 0.005 Grinding machine Hour 238.00 22.50 5355.00

Fuel / Energy charges Hour 238.00 38.00 9044.006 Drilling machines Hour 357.00 22.50 8032.50

Fuel / Energy charges Hour 357.00 38.00 13566.007 Bending Machine Hour 240.00 42.60 10224.00

Fuel / Energy charges Hour 240.00 114.10 27384.008 Sundries LS 180.00 41.00 7380.00

Total hire charges of Machinery Rs: 2396305.30

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

294

1 Crew for Mobile crane 16T Hour 360.00 454.30 163548.002 Crew for Drilling machine Hour 357.00 171.60 61261.203 Crew for Grinding machine Hour 238.00 171.60 40840.804 Crew for Bending machine Hour 240.00 113.90 27336.005 Foreman Day 120.00 440.00 52800.006 Marker / Fabricator / Erector Day 195.00 440.00 85800.007 Gas cutter Day 100.00 385.00 38500.008 Welder ( General ) Day 1442.00 385.00 555170.009 Welder ( X - ray ) Day 275.00 440.00 121000.0010 Khalasi Day 2023.00 385.00 778855.0011 Helper fabrication / erection Day 2727.00 345.00 940815.0012 Electrician Day 10.00 440.00 4400.00

Total cost of Labour Rs: 2870326.00Add towards highly skilled labour charges @ 30% on total cost of labour 861097.80

Total Cost of Labour 3731423.80

labour component/unit qty 31356.50Add contractor's profit and overhead charges 0.14 4389.90labour component/unit qty (including contractor's profit) 35746.40

ABSTRACT:A. Cost of Materials Rs: 7761542.90B. Hire charges of Machinery Rs: 2396305.30C. Cost of Labour Rs: 3731423.80

Total Rs: 13889272.00D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 13889272.00E. Add for transportation upto work site @ 3% Rs: 416678.16

Total Rs: 14305950.1614% Rs: 2002833.02

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 4522.000Unloading charges of fabricated parts Rs 63.30 per tonne 15065.4Total cost for 119.00 tonne Rs: 16328370.59

Rate per tonne Rs: 137213.20

STOP LOGS-automatic lifting beamIRR-GAW-2-3 fabrication, supply, erection, testing and commissioning of automatic lifting beam

with all accessories for handling, lowering and lifting of spillway stop log gate elementsincluding cost of all materials, machinery, labour, cutting, aligning, welding, finishing, etc., complete as per specifications and drawings with all leads and lifts.(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 3.528 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 13.00 45.00 585.00Plates / flats kg 3389.00 46.00 155894.00

2 Alloy steel componentsLifting pins kg 101.00 420.00 42420.00

3 Bronze alloy components :Bronze bush kg 5.00 912.00 4560.00

4 Forged steel components :Lifting hooks kg 103.00 260.00 26780.00

5 MS pipe 100 mm dia kg 11.00 175.00 1925.006 Bolt / Nut / Washer

MS bolts / nuts / washers kg 3.00 90.00 270.007 Oxygen gas cum 126.00 52.00 6552.008 Acetyline gas cum 42.00 320.00 13440.009 Welding electrodes Nos 175.00 11.00 1925.0010 Welding electrodes ( LH ) Nos 1575.00 18.00 28350.0011 Use rate welding holder set Hour 187.00 7.35 1374.4512 Use rate gas cutting torch set Hour 24.00 23.67 568.1213 Sundries LS 25.00 41.00 1025.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

295

Total cost of Materials Rs: 285668.57

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 187.00 16.00 2992.00

Fuel / Energy charges Hour 117.00 91.30 10682.102 Pug cutting machine Hour 60.00 6.40 384.00

Fuel / Energy charges Hour 60.00 3.80 228.003 Mobile derric crane Hour 4.00 519.70 2078.80

Fuel / Energy charges Hour 4.00 322.20 1288.804 Stationery derric crane Hour 8.00 86.10 688.80

Fuel / Energy charges Hour 8.00 0.00 0.005 Grinding machine Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.006 Drilling machines Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.007 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 18994.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 4.00 153.10 612.402 Crew for Drilling machine Hour 2.00 171.60 343.203 Crew for Grinding machine Hour 2.00 171.60 343.204 Foreman Day 10.00 440.00 4400.005 Marker / Fabricator / Erector Day 18.00 440.00 7920.006 Gas cutter Day 10.00 385.00 3850.007 Welder ( General ) Day 18.00 385.00 6930.008 Helper fabrication / erection Day 52.00 345.00 17940.009 Electrician Day 1.00 440.00 440.00

Total cost of Labour Rs: 42778.80Add towards highly skilled labour charges @ 30% on total cost of labour 12833.64

Total Cost of Labour 55612.44

labour component/unit qty 15763.20Add contractor's profit and overhead charges 0.14 2206.80labour component/unit qty (including contractor's profit) 17970.00

ABSTRACT:A. Cost of Materials Rs: 285668.57B. Hire charges of Machinery Rs: 18994.50C. Cost of Labour Rs: 55612.44

Total Rs: 360275.51D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 360275.51E. Add for transportation upto work site @ 3% Rs: 10808.27

Total Rs: 371083.7814% Rs: 51951.73

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 134.064Unloading charges of fabricated parts Rs 63.30 per tonne 446.644Total cost for 3.528 tonne Rs: 423616.21

Rate per tonne Rs: 120072.60

MOVING GANTRY CRANE-CLASS IIIRR-GAW-2-4 fabrication, supply, erection, testing and commissioning of adequate capacity Class- II

type moving gantry crane consisting of rail mounted gantry frame, top platform with handrailing, long / cross travel arrangements, rope drums, gear systems, electric motors, electro-magnetic brake system, cabin, control panel, wire rope, ladder, motorised cable reeling drumetc., with all accessories for operating spillway stop log gate elements and river sluice /canal sluice emergency gates including cost of all materials, machinery, labour, etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

296

DATA: RATE ANALYSIS UNIT : 30.856 tonneA. MATERIALS: 25 t capacity

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 1743.00 45.00 78435.00Plates / flats kg 19700.00 46.00 906200.00Chequered plates kg 820.00 60.00 49200.00

2 Cast steel components :Rope drums 2 Nos/Gears kg 1320.00 220.00 290400.00pinions kg 1165.00 210.00 244650.00Wheels / Pulleys kg 2255.00 180.00 405900.00Plummer blocks / Couplings kg 817.00 180.00 147060.00

3 Forged steel componentsHook / Shackle kg 127.00 260.00 33020.00

4 Alloy steel componentsShafts kg 556.00 210.00 116760.00Pins kg 524.00 420.00 220080.00

5 Bronze alloy components :Bronze bearings / bush kg 181.00 912.00 165072.00

6 Wire rope 28 mm dia 6/37 construction kg 406.00 250.00 101500.007 MS Bolt / Nut / Washer kg 63.00 90.00 5670.008 MS pipe 32 mm dia for railing Rm 50.00 185.00 9250.009 Worm reducers Nos. 4.00 224400.00 897600.0010 Electric motor 17.5 hp No. 1.00 85800.00 85800.00

Electric motor 5 hp Nos. 2.00 33000.00 66000.00Electric motor 3 hp No. 1.00 23100.00 23100.00

11 Ele-magnetic / Thruster brakes Nos. 4.00 35200.00 140800.00

12Electric cable / switch / control panel etc LS 3.00 50380.00 151140.00

13 Oxygen gas cum 579.00 52.00 30108.0014 Acetyline gas cum 193.00 320.00 61760.0015 Welding electrodes Nos 1123.00 11.00 12353.0016 Welding electrodes ( LH ) Nos 10110.00 18.00 181980.0017 Grease kg 50.00 260.00 13000.0018 Use rate welding holder set Hour 1197.00 7.35 8797.9519 Use rate gas cutting torch set Hour 150.00 23.67 3550.7520 Sundries LS 200.00 41.00 8200.00

Total cost of Materials Rs: 4457386.70

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 1197.00 16.00 19152.00

Fuel / Energy charges Hour 748.00 91.30 68292.402 Tower crane 5 t capacity Hour 6.00 867.10 5202.60

Fuel / Energy charges Hour 6.00 197.80 1186.803 Pug cutting machine Hour 235.00 6.40 1504.00

Fuel / Energy charges Hour 235.00 3.80 893.004 Mobile derric crane Hour 100.00 519.70 51970.00

Fuel / Energy charges Hour 100.00 322.20 32220.005 Grinding machine Hour 32.00 22.50 720.00

Fuel / Energy charges Hour 32.00 38.00 1216.006 Drilling machines Hour 16.00 22.50 360.00

Fuel / Energy charges Hour 16.00 38.00 608.007 Sundries LS 500.00 41.00 20500.00

Total hire charges of Machinery Rs: 203824.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 100.00 153.10 15310.002 Crew for Tower crane Hour 6.00 163.30 979.803 Crew for Drilling machine Hour 16.00 171.60 2745.604 Crew for Grinding machine Hour 32.00 171.60 5491.205 Foreman Day 74.00 440.00 32560.006 Marker / Fabricator / Erector Day 124.00 440.00 54560.007 Gas cutter Day 48.00 385.00 18480.00

Gates and Allied Works - Item Unit Rates 2014-15

297

8 Welder ( General ) Day 112.00 385.00 43120.009 Khalasi Day 20.00 385.00 7700.0010 Helper fabrication / erection Day 350.00 345.00 120750.0011 Electrician Day 10.00 440.00 4400.00

Total cost of Labour Rs: 306096.60Add towards highly skilled labour charges @ 30% on total cost of labour 91828.98

Total Cost of Labour 397925.58

labour component/unit qty 15917.00Add contractor's profit and overhead charges 0.14 2228.40labour component/unit qty (including contractor's profit) 18145.40

ABSTRACT:A. Cost of Materials Rs: 4457386.70B. Hire charges of Machinery Rs: 203824.80C. Cost of Labour Rs: 397925.58

Total Rs: 5059137.08D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 5059137.08E. Add for transportation upto work site @ 3% Rs: 151774.11

Total Rs: 5210911.1914% Rs: 729527.57

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 1172.528Unloading charges of fabricated parts Rs 63.30 per tonne 3906.37Total cost for 30.856 tonne Rs: 5945517.66

25.000 t capacity Rs:Rate per tonne Rs: 192685.90

Rate per tonne capac Rs: 237820.70

RAIL TRACK FOR GANTRY CRANEIRR-GAW-2-5 Design, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard

rails on spillway bridge for movement of gantry crane for handling and operating spillwaystoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials,machinery, labour, complete as per specifications(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 200.000 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Str steel angle / beam / channel / bars kg 1570.00 45.00 70650.002 Structural steel plate / flats kg 975.00 46.00 44850.003 Rails kg 18450.00 51.50 950175.004 MS bolts and nuts kg 246.00 90.00 22140.005 Oxygen gas cum 201.00 52.00 10452.006 Acetyline gas cum 67.00 320.00 21440.007 Welding electrodes Nos 1805.00 11.00 19855.008 Use rate welding holder set Hour 193.00 7.35 1418.559 Use rate gas cutting torch set Hour 133.00 23.67 3148.3310 Sundries LS 10.00 41.00 410.00

Total cost of Materials Rs: 1144538.88

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 193.00 16.00 3088.00

Fuel / Energy charges Hour 121.00 91.30 11047.302 Mobile derric crane Hour 4.00 519.70 2078.80

Fuel / Energy charges Hour 4.00 322.20 1288.803 Grinding machine Hour 8.00 22.50 180.00

Fuel / Energy charges Hour 8.00 38.00 304.004 Drilling machines Hour 50.00 22.50 1125.00

Fuel / Energy charges Hour 50.00 38.00 1900.005 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 21421.90

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

298

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 4.00 153.10 612.402 Crew for Drilling machine Hour 50.00 171.60 8580.003 Crew for Grinding machine Hour 8.00 171.60 1372.804 Foreman Day 8.00 440.00 3520.005 Marker / Fabricator / Erector Day 32.00 440.00 14080.006 Gas cutter Day 17.00 385.00 6545.007 Welder ( General ) Day 18.00 385.00 6930.008 Helper fabrication / erection Day 52.00 345.00 17940.009 Electrician Day 1.00 440.00 440.00

Total cost of Labour Rs: 60020.20Add towards highly skilled labour charges @ 30% on total cost of labour 18006.06

Total Cost of Labour 78026.26

labour component/unit qty 390.10Add contractor's profit and overhead charges 0.14 54.60labour component/unit qty (including contractor's profit) 444.70

ABSTRACT:A. Cost of Materials Rs: 1144538.88B. Hire charges of Machinery Rs: 21421.90C. Cost of Labour Rs: 78026.26

Total Rs: 1243987.04D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1243987.04E. Add for transportation upto work site @ 3% Rs: 37319.61

Total Rs: 1281306.6514% Rs: 179382.93

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 787.436Unloading charges of fabricated parts Rs 63.30 per tonne 2623.406Total cost for 200.000 Rm Rs: 1464100.43

Rate per Rm Rs: 7320.50

VERTICAL LIFT GATES/STOP LOGS - ROLLER MOUNTEDIRR-GAW-2-6 Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical

lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, liftingbrackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories forriver sluice / canal sluice vent including cost of all materials, machinery, labour,welding ,aligning finishing seal fixing etc.with allleads and lifts, complete as per specifications andvapproved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

Drawing No. CE/CDO/DEE/DEE4/GNC/HR/2150/96,2137/98 (GNSS Project)Gate Size: 3.66 X 6.1 Mtr

DATA: RATE ANALYSIS UNIT : 10.000 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelPlates / flats kg 7103.00 46.00 326738.00Beams/Channels kg 2727.00 45.00 122715.00

2 Alloy steel componentsWheel axles / Pins kg 108.00 420.00 45360.00

3 Cast steel componentsWheels / Guide rollers kg 504.00 180.00 90720.00

4Alluminium / Bronze alloy componentsBearings kg 12.00 912.00 10944.00

5 Bolt / Nut / WasherGI bolts / nuts / washers kg 36.00 106.00 3816.00MS bolts / nuts / washers kg 6.00 90.00 540.00

6 Rubber sealsBottom seal ( flat uncladed ) Rm 3.72 759.00 2823.48

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

299

Side seals ( bulb teflon claded ) Rm 12.30 1518.00 18671.40Top seal ( bulb teflon claded ) Rm 3.72 1518.00 5646.96Corner seals ( bulb teflon claded ) Nos 2.00 1485.00 2970.00

7 Oxygen gas cum 170.00 52.00 8840.008 Acetyline gas cum 56.00 320.00 17920.009 Welding electrodes Nos 3200.00 11.00 35200.0010 Welding electrodes ( LH ) Nos 800.00 18.00 14400.0011 Use rate welding holder set Hour 500.00 7.35 3675.0012 Use rate gas cutting torch set Hour 40.00 23.67 946.8713 Sundries LS 60.00 41.00 2460.00

Total cost of Materials Rs: 714386.71

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 500.00 16.00 8000.00

Fuel / Energy charges Hour 500.00 91.30 45650.002 Pug cutting machine Hour 85.00 6.40 544.00

Fuel / Energy charges Hour 85.00 3.80 323.003 Tower crane Hour 10.00 867.10 8671.00

Fuel / Energy charges Hour 10.00 197.80 1978.004 Mobile crane 16 T Hour 30.00 2278.10 68343.00

Fuel / Energy charges Hour 30.00 75.00 2250.005 Stationery derric crane Hour 20.00 86.10 1722.00

Fuel / Energy charges Hour 20.00 0.00 0.006 Grinding machine Hour 10.00 22.50 225.00

Fuel / Energy charges Hour 10.00 38.00 380.007 Drilling machines Hour 30.00 22.50 675.00

Fuel / Energy charges Hour 30.00 38.00 1140.008 Bending machine Hour 10.00 42.60 426.00

Fuel / Energy charges Hour 10.00 114.10 1141.009 Sundries LS 50.00 41.00 2050.00

Total hire charges of Machinery Rs: 143518.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane 16 T Hour 30.00 454.30 13629.002 Crew for Tower crane Hour 10.00 163.30 1633.003 Crew for Drilling machine Hour 30.00 171.60 5148.004 Crew for Grinding machine Hour 10.00 171.60 1716.005 Crew for Bending machine Hour 10.00 113.90 1139.006 Foreman Day 16.00 440.00 7040.007 Marker / Fabricator / Erector Day 50.00 440.00 22000.008 Gas cutter Day 8.00 385.00 3080.009 Welder ( General ) Day 52.00 385.00 20020.0010 Welder ( X - ray grade ) Day 14.00 440.00 6160.0011 Khalasi Day 170.00 385.00 65450.0012 Helper fabrication / erection Day 230.00 345.00 79350.0013 Electrician Day 4.00 440.00 1760.00

Total cost of Labour Rs: 228125.00Add towards highly skilled labour charges @ 30% on total cost of labour 68437.50

Total Cost of Labour 296562.50

labour component/unit qty 29656.30Add contractor's profit and overhead charges 0.14 4151.90labour component/unit qty (including contractor's profit) 33808.20

ABSTRACT:A. Cost of Materials Rs: 714386.71B. Hire charges of Machinery Rs: 143518.00C. Cost of Labour Rs: 296562.50

Total Rs: 1154467.21D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1154467.21E. Add for transportation upto work site @ 3% Rs: 34634.02

Total Rs: 1189101.2214% Rs: 166474.17

Add 2 leadsF. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

300

Add 1 km lead charges for fabricated parts R 19.00 per tonne 380Unloading charges of fabricated parts Rs 63.30 per tonne 1266Total cost for 10.000 tonne Rs: 1357221.39

Rate per tonne Rs: 135722.10

VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATEDIRR-GAW-2-7 Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope

drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc.,with all accessories for operating river sluice / canal sluice service gate including cost ofall materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA:RATE ANALYSIS UNIT : 6.243 tonne wt

A. MATERIALS: 25 t capacitySl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Structural steel

Angles / beams / channels / bars kg 1487.00 45.00 66915.00Plates / flats kg 402.00 46.00 18492.00Chequered plate kg 290.00 60.00 17400.00

2 Cast steel components :Rope drums 2 Nos / Gears kg 1926.00 220.00 423720.00Pinions kg 79.00 210.00 16590.00Pulleys 3 Nos / Couplings 2 Nos kg 306.00 180.00 55080.00Plummer blocks / Hubs kg 72.00 180.00 12960.00

3 Alloy steel componentsShafts kg 346.00 210.00 72660.00Pins kg 73.00 420.00 30660.00

4 Bronze alloy components :Bronze bearings / bush kg 57.00 912.00 51984.00

5Wire rope 28 mm dia 6/37 construction kg 325.00 250.00 81250.00

6 MS Bolt / Nut / Washer kg 32.00 90.00 2880.007 Worm reducers No. 1.00 224400.00 224400.008 Electric motor 5 hp No. 1.00 33000.00 33000.009 Manual operating system No. 1.00 28820.00 28820.0010 Gate position indicator No. 1.00 195800.00 195800.0011 Ele-magnetic brake No. 1.00 35200.00 35200.00

12Electric cable / switch / control panel etc LS 1.00 50380.00 50380.00

13 Oxygen gas cum 45.00 52.00 2340.0014 Acetyline gas cum 15.00 320.00 4800.0015 Welding electrodes Nos 80.00 11.00 880.0016 Welding electrodes ( LH ) Nos 720.00 18.00 12960.0017 Grease kg 50.00 260.00 13000.0018 Use rate welding holder set Hour 85.00 7.35 624.7519 Use rate gas cutting torch set Hour 16.00 23.67 378.7520 Sundries LS 25.00 41.00 1025.00

Total cost of Materials Rs: 1454199.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 85.00 16.00 1360.00

Fuel / Energy charges Hour 53.00 91.30 4838.902 Tower crane 5 t capacity Hour 2.00 867.10 1734.20

Fuel / Energy charges Hour 2.00 197.80 395.603 Pug cutting machine Hour 15.00 6.40 96.00

Fuel / Energy charges Hour 15.00 3.80 57.004 Mobile derric crane Hour 10.00 519.70 5197.00

Fuel / Energy charges Hour 10.00 322.20 3222.005 Grinding machine Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.006 Drilling machines Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.00

Gates and Allied Works - Item Unit Rates 2014-15

301

7 Sundries LS 25.00 41.00 1025.00Total hire charges of Machinery Rs: 18167.70

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 10.00 153.10 1531.002 Crew for Tower crane Hour 2.00 163.30 326.603 Crew for Drilling machine Hour 2.00 171.60 343.204 Crew for Grinding machine Hour 2.00 171.60 343.205 Foreman Day 15.00 440.00 6600.006 Marker / Fabricator / Erector Day 19.00 440.00 8360.007 Gas cutter Day 4.00 385.00 1540.008 Welder ( General ) Day 8.00 385.00 3080.009 Khalasi Day 4.00 385.00 1540.0010 Helper fabrication / erection Day 44.00 345.00 15180.0011 Electrician Day 2.00 440.00 880.00

Total cost of Labour Rs: 39724.00Add towards highly skilled labour charges @ 30% on total cost of labour 11917.20

Total Cost of Labour 51641.20

labour component/unit qty 2065.60Add contractor's profit and overhead charges 0.14 289.20labour component/unit qty (including contractor's profit) 2354.80

ABSTRACT:A. Cost of Materials Rs: 1454199.50B. Hire charges of Machinery Rs: 18167.70C. Cost of Labour Rs: 51641.20

Total Rs: 1524008.40D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1524008.40E. Add for transportation upto work site @ 3% Rs: 45720.25

Total Rs: 1569728.6514% Rs: 219762.01

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 237.234Unloading charges of fabricated parts Rs 63.30 per tonne 790.364Total cost for 6.243 tonne wt Rs: 1790518.26

25.000 t capacity Rs:Rate per tonne wt Rs: 286804.10

Rate per tonne capacity of hoist Rs: 71620.70

HOIST BRIDGE/ WITH TRESSELSIRR-GAW-2-8 Design, fabrication, supply, erection and commissioning of structural steel hoist bridge

consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing,ladder etc., with all accessories for supporting rope drum hoist for operating barragegates including cost of all materials, machinery, labour, welding, finishing, etc., completecomplete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)Drawing No. CE/CDO/VRSP/215,216/86-87 (Vengalaraya Sagar - Gomukhi Project)

Vent Size: 12 X 6.6 MtrDATA: RATE ANALYSIS UNIT : 10.500 tonne

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.

1Structural steel angles/ beams / channels kg 1494.00 45.00 67230.00Structural steel plates / flats kg 6564.00 46.00 301944.00Chequered plate kg 2442.00 60.00 146520.00

2 MS pipe 25 mm dia Rm 60.00 150.00 9000.003 Bolt / Nut / Washers kg 18.00 90.00 1620.004 Oxygen gas cum 105.00 52.00 5460.005 Acetyline gas cum 35.00 320.00 11200.006 Welding electrodes Nos 3150.00 11.00 34650.007 Use rate welding holder set Hour 394.00 7.35 2895.90

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

302

8 Use rate gas cutting torch set Hour 105.00 23.67 2485.539 Sundries LS 50.00 41.00 2050.00

Total cost of Materials Rs: 585055.43

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 394.00 16.00 6304.00

Fuel / Energy charges Hour 394.00 91.30 35972.202 Pug cutting machine Hour 52.00 6.40 332.80

Fuel / Energy charges Hour 52.00 3.80 197.603 Mobile crane 30 T Hour 30.00 3096.80 92904.00

Fuel / Energy charges Hour 30.00 118.80 3564.004 Stationery derric crane Hour 20.00 86.10 1722.00

Fuel / Energy charges Hour 20.00 0.00 0.005 Drilling machine Hour 20.00 22.50 450.00

Fuel / Energy charges Hour 20.00 38.00 760.006 Grinding machine Hour 20.00 22.50 450.00

Fuel / Energy charges Hour 20.00 38.00 760.007 Tower Crane Hour 20.00 867.10 17342.00

Fuel / Energy charges Hour 20.00 197.80 3956.008 Sundries LS 50.00 41.00 2050.00

Total hire charges of Machinery Rs: 166764.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane 30 T Hour 30.00 454.30 13629.002 Crew for Drilling machine Hour 20.00 171.60 3432.003 Crew for Grinding machine Hour 20.00 171.60 3432.004 Crew for Tower Crane Hour 20.00 163.30 3266.005 Foreman Day 10.00 440.00 4400.006 Marker / Fabricator / Erector Day 50.00 440.00 22000.007 Gas cutter Day 14.00 385.00 5390.008 Welder ( General ) Day 53.00 385.00 20405.009 Helper fabrication / erection Day 400.00 345.00 138000.0010 Electrician Day 6.00 440.00 2640.00

Total cost of Labour Rs: 216594.00Add towards highly skilled labour charges @ 30% on total cost of labour 64978.20

Total Cost of Labour 281572.20

labour component/unit qty 26816.40Add contractor's profit and overhead charges 0.14 3754.30labour component/unit qty (including contractor's profit) 30570.70

ABSTRACT:A. Cost of Materials Rs: 585055.43B. Hire charges of Machinery Rs: 166764.60C. Cost of Labour Rs: 281572.20

Total Rs: 1033392.23D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1033392.23E. Add for transportation upto work site @ 3% Rs: 31001.77

Total Rs: 1064393.9914% Rs: 149015.16

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 399Unloading charges of fabricated parts Rs 63.30 per tonne 1329.3Total cost for 10.500 tonne Rs: 1215137.45

Rate per tonne Rs: 115727.40

ROPE DRUM HOIST WITHOUT HOIST BRIDGE FOR BARRAGE GATESIRR-GAW-2-9 Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope

drum hoist consisting of rope drum, pulleys, gear system, electri c motor,electro-magnetic brake system, manual operation assembly, position indicator, control panel,wire rope etc., with all accessories for operating vertical lift roller gates for barrageincluding cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc., complete with all leads and lifts.

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

303

(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 5.069 tonne wtA. MATERIALS: 50.00 t capacity

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 420.00 45.00 18900.00Plates / flats kg 225.00 46.00 10350.00

2 Cast steel components :Rope drums 2 Nos / Gears kg 1290.00 220.00 283800.00Pinions kg 98.00 210.00 20580.00Pulleys 3 Nos / Couplings 2 Nos kg 650.00 180.00 117000.00Plummer blocks / Hubs kg 250.00 180.00 45000.00

3 Alloy steel componentsShafts / Keys kg 350.00 210.00 73500.00Pins kg 96.00 420.00 40320.00

4 Bronze alloy components :Bronze bearings / bush kg 100.00 912.00 91200.00

5Wire rope 28 mm dia 6/37 construction kg 435.00 250.00 108750.00

6 MS Bolt / Nut / Washer kg 26.00 90.00 2340.007 Worm reducers No. 1.00 224400.00 224400.008 Electric motor 12.5 hp No. 1.00 72600.00 72600.009 Manual operating system No. 1.00 28820.00 28820.0010 Gate position indicator No. 1.00 195800.00 195800.0011 Ele-magnetic brake No. 1.00 35200.00 35200.00

12Electric cable / switch / control panel etc LS 1.00 50380.00 50380.00

13 Oxygen gas cum 30.00 52.00 1560.0014 Acetyline gas cum 10.00 320.00 3200.0015 Welding electrodes Nos 44.00 11.00 484.0016 Welding electrodes ( LH ) Nos 392.00 18.00 7056.0017 Grease kg 50.00 260.00 13000.0018 Use rate welding holder set Hour 47.00 7.35 345.4519 Use rate gas cutting torch set Hour 12.00 23.67 284.0620 Sundries LS 25.00 41.00 1025.00

Total cost of Materials Rs: 1445894.51

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 47.00 16.00 752.00

Fuel / Energy charges Hour 47.00 91.30 4291.102 Tower crane 5 t capacity Hour 2.00 867.10 1734.20

Fuel / Energy charges Hour 2.00 197.80 395.603 Pug cutting machine Hour 9.00 6.40 57.60

Fuel / Energy charges Hour 9.00 3.80 34.204 Mobile derric crane Hour 10.00 519.70 5197.00

Fuel / Energy charges Hour 10.00 322.20 3222.005 Grinding machine Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.006 Drilling machines Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.007 Sundries LS 25.00 41.00 1025.00

Total hire charges of Machinery Rs: 16950.70

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 10.00 153.10 1531.002 Crew for Tower crane Hour 2.00 163.30 326.603 Crew for Drilling machine Hour 2.00 171.60 343.204 Crew for Grinding machine Hour 2.00 171.60 343.205 Foreman Day 13.00 440.00 5720.006 Marker / Fabricator / Erector Day 17.00 440.00 7480.007 Gas cutter Day 3.00 385.00 1155.008 Welder ( General ) Day 5.00 385.00 1925.00

Gates and Allied Works - Item Unit Rates 2014-15

304

9 Khalasi Day 4.00 385.00 1540.0010 Helper fabrication / erection Day 36.00 345.00 12420.0011 Electrician Day 2.00 440.00 880.00

Total cost of Labour Rs: 33664.00Add towards highly skilled labour charges @ 30% on total cost of labour 10099.20

Total Cost of Labour 43763.20

labour component/unit qty 875.30Add contractor's profit and overhead charges 0.14 122.50labour component/unit qty (including contractor's profit) 997.80

ABSTRACT:A. Cost of Materials Rs: 1445894.51B. Hire charges of Machinery Rs: 16950.70C. Cost of Labour Rs: 43763.20

Total Rs: 1506608.41D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 1506608.41E. Add for transportation upto work site @ 3% Rs: 45198.25

Total Rs: 1551806.6614% Rs: 217252.93

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 192.622Unloading charges of fabricated parts Rs 63.30 per tonne 641.736Total cost for 5.069 tonne wt Rs: 1769893.95

50.000 t capacity Rs:Rate per tonne wt Rs: 349160.40

Rate per tonne capacity of hoist Rs: 35397.90

SCREW GEAR HOISTS including plat form( UPTO 10 TON CAP)IRR-GAW-2-10

Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw geartype hoist consisting of supporting structure, platform, ladder etc., with all accessories foroperating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc.,complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 0.871 tonneA. MATERIALS: 3.00 t capacity

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steelAngles / beams / channels / bars kg 402.00 45.00 18090.00Plates / flats kg 145.00 46.00 6670.00Chequered plate kg 176.00 60.00 10560.00

2 Cast iron components :Hoist body / Lock nut / Main nut kg 55.00 220.00 12100.00

3 Alloy steel componentsHoist stem kg 75.00 210.00 15750.00

4 Bronze alloy components :Thrust bearings kg 4.00 912.00 3648.00

5 MS Bolt / Nut / Washer kg 8.00 90.00 720.006 Oxygen gas cum 18.00 52.00 936.007 Acetyline gas cum 6.00 320.00 1920.008 Welding electrodes Nos 7.00 11.00 77.009 Welding electrodes ( LH ) Nos 66.00 18.00 1188.0010 Grease kg 2.00 260.00 520.0011 Use rate welding holder set Hour 8.00 7.35 58.8012 Use rate gas cutting torch set Hour 11.00 23.67 260.3913 Sundries LS 2.00 41.00 82.00

Total cost of Materials Rs: 72580.19

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 8.00 16.00 128.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

305

Fuel / Energy charges Hour 5.00 91.30 456.502 Grinding machine Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.003 Drilling machines Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.004 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 908.50

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling machine Hour 2.00 171.60 343.202 Crew for Grinding machine Hour 2.00 171.60 343.203 Foreman Day 4.00 440.00 1760.004 Marker / Fabricator / Erector Day 5.00 440.00 2200.005 Gas cutter Day 2.00 385.00 770.006 Welder ( General ) Day 1.00 385.00 385.007 Helper fabrication / erection Day 9.00 345.00 3105.008 Electrician Day 0.50 440.00 220.00

Total cost of Labour Rs: 9126.40Add towards highly skilled labour charges @ 30% on total cost of labour 2737.92

Total Cost of Labour 11864.32

labour component/unit qty 3954.80Add contractor's profit and overhead charges 0.14 553.70labour component/unit qty (including contractor's profit) 4508.50

ABSTRACT:A. Cost of Materials Rs: 72580.19B. Hire charges of Machinery Rs: 908.50C. Cost of Labour Rs: 11864.32

Total Rs: 85353.01D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 85353.01E. Add for transportation upto work site @ 3% Rs: 2560.59

Total Rs: 87913.6014% Rs: 12307.90

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 33.098Unloading charges of fabricated parts Rs 63.30 per tonne 110.268Total cost for 0.871 tonne Rs: 100364.87

3.000 t capacity Rs:Rate per tonne Rs: 115229.50

Rate per tonne capacity Rs: 33455.00

MANUAL OPERATED ROPE DRUM HOISTSIRR-GAW-2-11

Design, fabrication, supply, erection, testing and commissioning of adequate capacitymanually operated rope drum hoist consisting of hoist platform, rope drum, gear system,brake system, wire rope, ladder etc., with all accessories for operating canal regulatorradial gate including cost of all materials, machinery, labour, welding, finishing, cleaning, ., complete with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 2.804 tonne A. MATERIALS: 10.00 t capacitySl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Structural steel

Angles / beams / channels / bars kg 1229.00 45.00 55305.00Plates / flats kg 453.00 46.00 20838.00Chequered plate kg 195.00 60.00 11700.00

2 Cast steel components :Rope drums 2 Nos / Gears kg 384.00 220.00 84480.00Pinions kg 14.00 210.00 2940.00Pulleys 6 Nos kg 108.00 180.00 19440.00Plummer blocks / Couplings kg 47.00 180.00 8460.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

306

3 Alloy steel componentsShafts kg 75.00 210.00 15750.00Pins kg 24.00 420.00 10080.00

4 Bronze alloy components :Bronze bearings / bush kg 11.00 912.00 10032.00

5Wire rope 12 mm dia 6/36 construction kg 42.00 250.00 10500.00

6 MS Bolt / Nut / Washer kg 64.00 90.00 5760.007 Worm reducers No. 1.00 224400.00 224400.008 Manual operating system No. 1.00 28820.00 28820.009 Brake No. 1.00 35200.00 35200.00

10 Wire rope sockets No 2.00 4620.00 9240.0011 Oxygen gas cum 75.00 52.00 3900.0012 Acetyline gas cum 25.00 320.00 8000.0013 Welding electrodes Nos 69.00 11.00 759.0014 Welding electrodes ( LH ) Nos 622.00 18.00 11196.0015 Grease kg 10.00 260.00 2600.0016 Use rate welding holder set Hour 73.00 7.35 536.5517 Use rate gas cutting torch set Hour 42.00 23.67 994.2118 Sundries LS 25.00 41.00 1025.00

Total cost of Materials Rs: 581955.76

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 73.00 16.00 1168.00

Fuel / Energy charges Hour 46.00 91.30 4199.802 Pug cutting machine Hour 8.00 6.40 51.20

Fuel / Energy charges Hour 8.00 3.80 30.403 Mobile derric crane Hour 4.00 519.70 2078.80

Fuel / Energy charges Hour 4.00 322.20 1288.804 Stationery derric crane Hour 8.00 86.10 688.80

Fuel / Energy charges Hour 8.00 0.00 0.005 Grinding machine Hour 8.00 22.50 180.00

Fuel / Energy charges Hour 8.00 38.00 304.006 Drilling machines Hour 16.00 22.50 360.00

Fuel / Energy charges Hour 16.00 38.00 608.007 Sundries LS 25.00 41.00 1025.00

Total hire charges of Machinery Rs: 11982.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Mobile crane Hour 4.00 153.10 612.402 Crew for Drilling machine Hour 16.00 171.60 2745.603 Crew for Grinding machine Hour 8.00 171.60 1372.804 Foreman Day 14.00 440.00 6160.005 Marker / Fabricator / Erector Day 20.00 440.00 8800.006 Gas cutter Day 6.00 385.00 2310.007 Welder ( General ) Day 7.00 385.00 2695.008 Helper fabrication / erection Day 44.00 345.00 15180.009 Electrician Day 2.00 440.00 880.00

Total cost of Labour Rs: 40755.80Add towards highly skilled labour charges @ 30% on total cost of labour 12226.74

Total Cost of Labour 52982.54

labour component/unit qty 5298.30Add contractor's profit and overhead charges 0.14 741.80labour component/unit qty (including contractor's profit) 6040.10

ABSTRACT:A. Cost of Materials Rs: 581955.76B. Hire charges of Machinery Rs: 11982.80C. Cost of Labour Rs: 52982.54

Total Rs: 646921.10D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 646921.10E. Add for transportation upto work site @ 3% Rs: 19407.63

Total Rs: 666328.73

Gates and Allied Works - Item Unit Rates 2014-15

307

14% Rs: 93286.02Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 106.552Unloading charges of fabricated parts Rs 63.30 per tonne 354.986Total cost for 2.804 tonne Rs: 760076.29

10.000 t capacityRate per tonne Rs: 271068.60

Rate per tonne Rs: 76007.60capacity of hoist

IRR-GAW-2-12New Item 2014-15-2 OT SLUICE SHUTTERS Screw Gear Hoist Including Platform for below 5 Tons Capacity (Small Gates)

As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta SystemFabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of allmaterials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete as per Specification and approved drawings(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

DATA: RATE ANALYSIS UNIT : 0.869 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel angles/ beams / chann kg 445.78 45.00 20060.102 Structural steel plates / flats kg 28.00 46.00 1288.003 Chequered plate kg 144.80 60.00 8688.00

Cast iron Components4 Hoist Body/lock nut/Main Nut etc. Kg 83.00 220.00 18260.00

Bronze Alloy Steel Components5 Thrust Bearings kg 3.00 912.00 2736.006 MS Bolt/Nut/ Washer kg 16.00 90.00 1440.007 Oxygen gas cum 21.00 52.00 1092.008 Acetyline gas cum 7.00 320.00 2240.009 Welding electrodes Nos 200.00 11.00 2200.0010 Welding electrodes (LH) Nos 40.00 18.00 720.0011 Use rate welding holder set Hour 72.00 7.35 529.2012 Use rate gas cutting torch set Hour 36.00 23.67 852.1813 Sundries LS 20.00 41.00 820.00

Total cost of Materials Rs: 60925.48

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 30.00 16.00 480.00

Fuel / Energy charges Hour 30.00 91.30 2739.002 Pug cutting machine Hour 12.00 6.40 76.80

Fuel / Energy charges Hour 12.00 3.80 45.603 Drilling machine Hour 8.00 22.50 180.00

Fuel / Energy charges Hour 8.00 38.00 304.004 Grinding machine Hour 36.00 22.50 810.00

Fuel / Energy charges Hour 36.00 38.00 1368.005 Lathe machine (Screw Rod M/C) Hour 16.00 300.00 4800.006 Sundries LS 10.00 41.00 410.00

Total hire charges of Machinery Rs: 11213.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling machine Hour 8.00 171.60 1372.802 Crew for Grinding machine Hour 36.00 171.60 6177.603 Foreman Day 2.00 440.00 880.004 Marker / Fabricator / Erector Day 10.00 440.00 4400.005 Gas cutter Day 4.00 385.00 1540.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

308

6 Welder ( General ) Day 4.00 385.00 1540.007 Mazdoors Day 6.00 295.00 1770.008 Helper fabrication / erection Day 6.00 345.00 2070.00

Total cost of Labour Rs: 19750.40labour component/unit qty 19750.40Add contractor's profit and overhead charges 0.14 2765.10labour component/unit qty (including contractor's profit) 22515.50

ABSTRACT:A. Cost of Materials Rs: 60925.48B. Hire charges of Machinery Rs: 11213.40C. Cost of Labour Rs: 19750.40

Total Rs: 91889.28D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 91889.28E. Add for transportation upto work site @ 3% Rs: 2756.68

Total Rs: 94645.9614% Rs: 13250.43

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 33.022Unloading charges of fabricated parts Rs 63.30 per tonne 110.016Total cost for 0.869 tonne Rs: 108039.43

Rate per tonne Rs: 124326.20

IRR-GAW-2-13New Item 2014-15-3 OT SLUICE SHUTTERS EM parts for Below 5 Tons capacity (small gates)

As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta SystemFabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings.

(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

Height of EM parts: 5.4 M Gate Size: 0.99 X 0.875 M

DATA: RATE ANALYSIS UNIT : 1.334 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel angles/ beams / chann kg 440.57 45.00 19825.652 Structural steel plates / flats kg 869.00 46.00 39974.003 Stainless Steel Flats kg 25.12 275.00 6908.004 Oxygen gas cum 12.00 52.00 624.005 Acetyline gas cum 4.00 320.00 1280.006 Welding electrodes Nos 210.00 11.00 2310.007 Welding electrodes (Stainless Steel) Nos 30.00 26.00 780.008 Use rate welding holder set Hour 62.00 7.35 455.709 Use rate gas cutting torch set Hour 32.00 23.67 757.4910 Sundries LS 3.00 41.00 123.00

Total cost of Materials Rs: 73037.84

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Welding transformer Hour 30.00 16.00 480.00

Fuel / Energy charges Hour 30.00 91.30 2739.002 Pug cutting machine Hour 20.00 6.40 128.00

Fuel / Energy charges Hour 20.00 3.80 76.003 Drilling machine Hour 4.00 22.50 90.00

Fuel / Energy charges Hour 4.00 38.00 152.004 Grinding machine Hour 20.00 22.50 450.00

Fuel / Energy charges Hour 20.00 38.00 760.005 Sundries LS 3.00 41.00 123.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

309

Total hire charges of Machinery Rs: 4998.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling machine Hour 4.00 171.60 686.402 Crew for Grinding machine Hour 20.00 171.60 3432.003 Foreman Day 8.00 440.00 3520.004 Marker / Fabricator / Erector Day 6.00 440.00 2640.005 Gas cutter Day 2.00 385.00 770.006 Welder ( General ) Day 4.00 385.00 1540.007 Mazdoors Day 4.00 295.00 1180.008 Helper fabrication / erection Day 8.00 345.00 2760.00

Total cost of Labour Rs: 16528.40labour component/unit qty 16528.40Add contractor's profit and overhead charges 0.14 2314.00labour component/unit qty (including contractor's profit) 18842.40

ABSTRACT:A. Cost of Materials Rs: 73037.84B. Hire charges of Machinery Rs: 4998.00C. Cost of Labour Rs: 16528.40

Total Rs: 94564.24D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 94564.24E. Add for transportation upto work site @ 3% Rs: 2836.93

Total Rs: 97401.1714% Rs: 13636.16

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 50.692Unloading charges of fabricated parts Rs 63.30 per tonne 168.884Total cost for 1.334 tonne Rs: 111256.91

Rate per tonne Rs: 83401.00

IRR-GAW-2-14New Item 2014-15 -4 OT SLUICE SHUTTERS for Below 5 Tons capacity (small gates)

As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta SystemFabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings

(without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)

Gate Size: 0.99 X 0.875 M

DATA: RATE ANALYSIS UNIT : 0.161 tonneA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Structural steel angles/ beams / chann kg 63.72 45.00 2867.402 Structural steel plates / flats kg 96.50 46.00 4439.003 GI Bolts/Nut/Washer kg 20.00 130.00 2600.00

Rubber Seals4 Bottom Seal Rm 0.82 759.00 622.385 Side Seal/ Top Seal Rm 1.75 1155.00 2021.256 Oxygen gas cum 15.00 52.00 780.007 Acetyline gas cum 5.00 320.00 1600.008 Welding electrodes Nos 110.00 11.00 1210.009 Use rate welding holder set Hour 30.00 7.35 220.5010 Use rate gas cutting torch set Hour 12.00 23.67 284.0611 Sundries LS 3.00 41.00 123.00

Total cost of Materials Rs: 16767.59

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

310

in Rs. in Rs.1 Welding transformer Hour 14.00 16.00 224.00

Fuel / Energy charges Hour 14.00 91.30 1278.202 Pug cutting machine Hour 4.00 6.40 25.60

Fuel / Energy charges Hour 4.00 3.80 15.203 Drilling machine Hour 2.00 22.50 45.00

Fuel / Energy charges Hour 2.00 38.00 76.004 Grinding machine Hour 4.00 22.50 90.00

Fuel / Energy charges Hour 4.00 38.00 152.005 Sundries LS 3.00 41.00 123.00

Total hire charges of Machinery Rs: 2029.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Drilling machine Hour 2.00 171.60 343.202 Crew for Grinding machine Hour 4.00 171.60 686.403 Foreman Day 2.00 440.00 880.004 Marker / Fabricator / Erector Day 3.00 440.00 1320.005 Gas cutter Day 1.00 385.00 385.006 Welder ( General ) Day 4.00 385.00 1540.007 Mazdoors Day 4.00 295.00 1180.008 Helper fabrication / erection Day 6.00 345.00 2070.00

Total cost of Labour Rs: 8404.60labour component/unit qty 8404.60Add contractor's profit and overhead charges 0.14 1176.60labour component/unit qty (including contractor's profit) 9581.20

ABSTRACT:A. Cost of Materials Rs: 16767.59B. Hire charges of Machinery Rs: 2029.00C. Cost of Labour Rs: 8404.60

Total Rs: 27201.19D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 27201.19E. Add for transportation upto work site @ 3% Rs: 816.04

Total Rs: 28017.2314% Rs: 3922.41

Add 2 leadsAdd 1 km lead charges for fabricated parts R 19.00 per tonne 6.118Unloading charges of fabricated parts Rs 63.30 per tonne 20.382Total cost for 0.161 tonne Rs: 31966.14

Rate per tonne Rs: 198547.40

IRR-GAW-3 SAND BLASTING AND PAINTING AS PER IS:14177-1994

IRR-GAW-3-1 Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.

DATA: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand (Screened) cum 30.00 606.00 18180.002 Use rate of air hose Hour 8.00 18.63 149.003 Use rate of sand blast gun nozzle Hour 8.00 3.50 28.004 Sundries( Rust inhibitive, seive etc ) LS 5.00 41.00 205.00

Total 18562.00Add 10% towards scaffolding/laddor @ 0.10 1856.20

Total cost of Materials 20418.20B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Air compressor 7 cmm diesel Hour 8.00 241.30 1930.40Fuel / Energy charges Hour 8.00 767.30 6138.40

2 Sand blasting equipment Hour 8.00 110.10 880.80

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

311

Fuel / Energy charges Hour 8.00 0.00 0.00Total hire charges of Machinery 8949.60

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Air compressor Hour 8.00 182.20 1457.602 Crew for Sand blasting equipment Hour 8.00 189.80 1518.403 mazdoor Day 15.00 295.00 4425.00

Total cost of Labour 7401.00labour component/unit qty 74.00Add contractor's profit and overhead charges 0.14 10.40labour component/unit qty (including contractor's profit) 84.40

ABSTRACT:A. Cost of Materials Rs: 20418.20B. Hire charges of Machinery Rs: 8949.60C. Cost of Labour Rs: 7401.00

Total Rs: 36768.80D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 36768.80E. Add for transportation upto work site @ 3% Rs: 1103.06

Total Rs: 37871.8614% Rs: 5302.06

Total cost for 100.00 sqm Rs: 43173.92Rate per sqm Rs: 431.70

IRR-GAW-3-2 painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns)cost of all materials, labour, scaffolding etc., complete with all leads andall lifts

(Upstream surface of gates portion may be painted with solventless coaltar epoxy brown paint instead of solventless coaltar black. The rate for coaltar epoxy brown shall be adopted in data for Upstream side painting)

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 inorganic zinc silicate ltr 12.00 689.00 82682 Thinner @ 10% ltr 1.20 140.00 1683 Solventless Coal tar epoxy paint ltr 40.00 271.00 108404 Thinner @ 10% ltr 4.00 140.00 560

5Sundries ( brushes,ladders,platforms etc ) 3.00 41.00 123

Total cost of Materials Rs: 19959.00B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80

Total cost of Machinery Rs: 6780.00

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

312

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 20.00 440.00 8800.003 Helper Day 20.00 295.00 5900.00

Total cost of Labour Rs: 15793.20labour component/unit qty 157.90Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.00

ABSTRACT:A. Cost of Materials Rs: 19959.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 15793.20

Total Rs: 42532.20D. Add for excise duty 0 Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 42532.20E. Add for transportation upto work site @ 0.03 Rs: 1275.97

Total Rs: 43808.1714% Rs: 6133.14 6133.14

Total cost fo 100.00 sqm Rs: 49941.31Rate per sqm Rs: 499.40

IRR-GAW-3-3 painting of Lifting beams,cat walks and other similar structures-painting hoist machinery, on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and twocoats of alkyd based micaccous iron oxide paint , 65 microns/coatcost of all materials, labour, scaffolding etc., complete with all leads andall lifts

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 zinc phosphate primer ltr 28.00 223.00 62442 Thinner@10% ltr 2.80 140.00 392

3alkyd based micaccous iron oxide paint ltr 20.00 196.00 3920

4 Thinner@10% ltr 2.00 140.00 280

5Sundries ( brushes,ladders,platforms etc ) 3.00 41.00 123

Total cost of Materials Rs: 10959.00B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of machinery RS: 6780.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 15.00 440.00 6600.003 Helper Day 15.00 295.00 4425.00

Total cost of Labour Rs: 12118.20

F. Add for contractor's profit and overheads on

Gates and Allied Works - Item Unit Rates 2014-15

313

labour component/unit qty 121.20Add contractor's profit and overhead charges 0.14 17.00labour component/unit qty (including contractor's profit) 138.20

ABSTRACT:A. Cost of Materials Rs: 10959.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 12118.20

Total Rs: 29857.20D. Add for excise duty 0 Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 29857.20E. Add for transportation upto work site @ 0.03 Rs: 895.72

Total Rs: 30752.9214% Rs: 4305.41 4305.41

Total cost for 100.00 sqm Rs: 35058.32Rate per sqm Rs: 350.60

IRR-GAW-3-4 HOISTS:STRUCTURAL COMPONENTS--painting structurals on sand blasted surfaces withtwo coats of zinc phosphate primer (airless spray preferred) 40microns/coatand one coat 65+/-5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and

. all liftsDATA: Consider 100 sqm area for painting:

Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 zinc phosphate primer ltr 28.00 223.00 62442 Thinner@10% ltr 2.80 140.00 392

3alkyd based micaccous iron oxide paint ltr 15.00 196.00 2940

4 Thinner@10% ltr 1.50 140.00 2105 synthetic enamel paint ltr 17.00 240.00 40806 Thinner@10% ltr 1.70 140.00 238

7Sundries ( brushes,ladders,platforms etc ) 3.00 41.00 123

Total cost of Materials Rs: 14227.00B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of Machinery Rs: 6780.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 20.00 440.00 8800.003 Helper Day 20.00 295.00 5900.00

Total cost of Labour Rs: 15793.20labour component/unit qty 157.90Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.00

ABSTRACT:

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

314

A. Cost of Materials Rs: 14227.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 15793.20

Total Rs: 36800.20D. Add for excise duty 0 Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 36800.20E. Add for transportation upto work site @ 0.03 Rs: 1104.01

Total Rs: 37904.2114% Rs: 5306.59 5306.59

Total cost for 100.00 sqm Rs: 43210.79Rate per sqm Rs: 432.10

IRR-GAW-3-5 HOISTS:machineryCOMPONENTS--painting hoist machinery, on sand blasted surfaces withone coats of zinc phosphate primer (airless spray preferred) 50microns/coatand three coats of aluminium paint or synthetic enamel , 25 microns/coatcost of all materials, labour, scaffolding etc., complete with all leads andall lifts

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 zinc phosphate primer ltr 14.00 223.00 31222 Thinner@10% ltr 1.40 140.00 196

3 aluminium paint or synthetic enamel per coat ltr 26.00 240.00 6240

4 Thinner@10% ltr 2.60 140.00 364

5Sundries ( brushes,ladders,platforms etc ) 3.00 41.00 123

Total cost of Materials Rs: 10045.00B. MACHINERY:

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of Machinery Rs: 6780.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 20.00 440.00 8800.003 Helper Day 20.00 295.00 5900.00

Total cost of Labour Rs: 15793.20labour component/unit qty 157.90Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.00

ABSTRACT:A. Cost of Materials Rs: 10045.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 15793.20

Total Rs: 32618.20D. Add for excise duty 0 Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 32618.20E. Add for transportation upto work site @ 0.03 Rs: 978.55

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

315

Total Rs: 33596.7514% Rs: 4703.54 4703.54

Total cost for 100.00 sqm Rs: 38300.29Rate per sqm Rs: 383.00

IRR-GAW-4 PAINTING WITHOUT SAND BLASTING

IRR-GAW-4-1 E.M Parts OF ALL TYPES OF GATESSurface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns ,followed by finishing coats 2 coats with Solventless Coal tar epoxy each coat with a DFT of 150+5 micronsand total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and allaccessories with all leads and lifts(in respect of Heavily rusted (30 to 40% rusted) surfaces)

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100.000 Sq.mA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rust cleaner / inhibitor ltr 13 140 1820.002 Protective Mastic ltr 25 483 12075.003 Thinner@10% ltr 2.5 140.00 350.004 Solventless Coal tar epoxy paint ltr 40.00 271.00 10840.005 Thinner@10% ltr 4 140.00 560.006 Wire brush Nos 2 41.00 82.007 Sundries LS 3.00 41.00 123.00

Total cost of Materials Rs: 25850.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of Machinery 6780.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 20.00 440.00 8800.003 Helper Day 20.00 295.00 5900.00

Total cost of Labour Rs: 15793.20labour component/unit qty 157.90Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.00

ABSTRACT:A. Cost of Materials Rs: 25850.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 15793.20

Total Rs: 48423.20D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 48423.20E. Add for transportation upto work site @ 3% Rs: 1452.70

Total Rs: 49875.9014% Rs: 6982.63

F. Add for contractor's profit and overheads on (A+B

F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

316

Total cost for 100.00 sqm Rs: 56858.52Rate per sq.meter Rs: 568.60

IRR-GAW-4-3 HOIST BRIDGES ,HOISTING EQUIPMENT AND CRANES,Etc,

Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer ,followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100.000 Sq.m A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rust cleaner / inhibitor ltr 13 140 1820.002 Zinc Chromite Red Oxide Primer ltr 28 175 4900.003 Thinner@10% ltr 2.8 140.00 392.004 Synthetic enamel Paint ltr 17.00 240.00 4080.005 Thinner@10% ltr 1.7 140.00 238.006 Wire brush Nos 2 41.00 82.007 Sundries LS 3.00 41.00 123.00

Total cost of Materials 11635.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of Machinery 6780.00

C. LABOURSl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 20.00 440.00 8800.003 Helper Day 20.00 295.00 5900.00

Total cost of Labour 15793.20labour component/unit qty 157.90Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.00

ABSTRACT:A. Cost of Materials Rs. 11635.00B. Hire charges of Machinery Rs. 6780.00C. Cost of Labour Rs. 15793.20

Total Rs: 34208.20D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 34208.20E. Add for transportation upto work site @ 3% Rs: 1026.25

Total Rs: 35234.4514% Rs: 4932.82F. Add for contractor's profit and overheads on (A+B

Gates and Allied Works - Item Unit Rates 2014-15

317

Total cost for 100.00 sqm Rs: 40167.27Rate per sq.meter 401.70

WALK WAYS( CAT WALKS), LIFTING BEAMS,etc,IRR-GAW-4-4 Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners

and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 2 coats with Solventless Coal tar epoxy with material, labour and all accessories with all leads and lifts

DATA: Consider 100 sqm area for painting:Requirement of materials :

Theoretical spreading rate per one Coat of Paint 25 Sqm/HrAssume Losses at 30% of the spreading area (as per field obserations)

Actual Spreading Area 17.50 Sqm/HrTotal time required for 100 Sqm Area 5.71 Hr

Say 6 Hr

DATA: RATE ANALYSIS UNIT : 100.000 Sq.mA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rust cleaner / inhibitor ltr 13 140 1820.002 Zinc rich epoxy primer ltr 14 689 9646.003 Thinner@10% ltr 1.4 140.00 196.004 Solvetnless Coal tar epoxy paint ltr 40 271 10840.005 Thinner@10% ltr 4 140.00 560.006 Wire brush Nos 2 41 82.007 Sundries LS 3 41 123.00

Total cost of Materials Rs: 23267.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Hire Charges of Airless Spray Gun Hr 6.00 121.40 728.40

2Hire Charges of Air Compressor-7 Cmm (diesel) Hr 6.00 241.30 1447.80

3 Fuel Charges of Air Compressor Hr 6.00 767.30 4603.80Total cost of Machinery Rs: 6780.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew Charges of Air Compressor Day 6.00 182.20 1093.202 Painter Class-I Day 13.00 440.00 5720.003 Helper Day 13.00 295.00 3835.00

Total cost of Labour Rs: 10648.20labour component/unit qty 106.50Add contractor's profit and overhead charges 0.14 14.90labour component/unit qty (including contractor's profit) 121.40

ABSTRACT:A. Cost of Materials Rs: 23267.00B. Hire charges of Machinery Rs: 6780.00C. Cost of Labour Rs: 10648.20

Total Rs: 40695.20D. Add for excise duty 0.00% Rs: 0.00(on 75 percent cost excluding cost of materials) Total Rs: 40695.20E. Add for transportation upto work site @ 3% Rs: 1220.86

Total Rs: 41916.0614% Rs: 5868.25

Total cost for 100.00 sqm Rs: 47784.30Rate per sq.meter Rs: 477.80

F. Add for contractor's profit and overheads on (A+B

Preliminary and Maintenance Works - Item Unit Rates 2014-15

318

CHAPTER-VI

PRELIMINARY AND MAINTENANCE WORKS - Standard Data

(STORED WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

For the Year:2014-15Index- codeIRR-PMW PRELIMINARY & MAINTENANCE WORKS - DATA RATES

Directions to add Seigniorage Charges and Additional Lead ChargesSeigniorage Charges:1. The unit rate for work item in the Standard Data is exclusive of Seigniorage Charges wherever applicable.2. The appropriate Seigniorage Charges for relevant materials are to be added to the Unit rate of work item while preparing the estimate. (i.e., to the data itself)3. The Provision towards Contractor's Profit and Overhead charges should not be operated on the Seigniorage Charges while adding Seigniorage Charges to the data in the estimateAdditional Lead and Lift Charges:1. Unless otherwise specified the basic rates are inclusive of all lifts.2. For concrete, masonry and reinforcement items wherever initial lead of 1km is considered in the basic rate, the additional lead as follows:Additional lead charges for Cement, Steel, sand, coarse aggregate, stones and stone chips shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item.In case of Cement and Steel, Loading and unloading charges are already added in the work item while arriving the unit rate and hence should not be added againExample:

Total lead for sand from approved sand quarry : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charg Rs. 84.10

Lead charges for next 10 Rs. 126Total lead charges for 15 Rs. 210.10Less 1 km initial lead cha Rs. 31.50 (-)Net additional lead charg Rs. 178.60

3. The Leads for Steel and Cement shall be from the nearest market place to the Project area

4. For earth/rockfill embankments wherever initial lead of 1km is considered in the basic rate, the additional lead charges are to be added as follows:Additional lead charges for Earth, Murrum etc., shall be worked out for total lead involved and 1 km lead charges included in basic rate shall be deducted from total lead charges. No loading and unloading charges shall be allowed for any item. (same as above)Example:

Total lead for earth from approved borrow area : 15 KmInitial lead included in the basic rate in the SR : 1 KmAdditional lead charges : Lead charg Rs. 84.10

Lead charges for next 10 Rs. 126Total lead charges for 15 Rs. 210.10Less 1 km initial lead cha Rs. 31.50 (-)Net additional lead charg Rs. 178.60

5. The initial lead up to 50 m as mentioned in some standard data items is meant for manual lead within the working area. For conveyance of materials, the lead required from quarry/Borrow area/ Dump Area to worksite shall be added to the data without deducting the 50 m initial lead charges

PMW - Work Items

IRR-PMW-1 JUNGLE CLEARANCE :

IRR-PMW-1-1 Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.

DATA: RATE ANALYSIS UNIT : 1000 sqmA. MATERIALS:

Preliminary and Maintenance Works - Item Unit Rates 2014-15

319

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1070.00labour component/unit qty 1.10Add contractor's profit and overhead charges 0.14 0.20labour component/unit qty (including contractor's profit) 1.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1070.00

Total Rs: 1070.00

14.00% Rs: 149.8Total cost for 1000.00 sqm Rs: 1219.80Rate per sqm (A+B+C+D)/1000.0 Rs. 1.20

IRR-PMW-1-2 Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same asdirected etc., complete.

DATA: RATE ANALYSIS UNIT : 1000 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 1660.00labour component/unit qty 1.70Add contractor's profit and overhead charges 0.14 0.20labour component/unit qty (including contractor's profit) 1.90

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

320

A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1660.00

Total Rs: 1660.00

14.00% Rs: 232.4Total cost for 1000.00 sqm Rs: 1892.40Rate per sqm (A+B+C+D)/1000.0 Rs. 1.90

IRR-PMW-1-3 Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girthincluding excavation, stacking the materials neatly and levelling the surface etc., complete with initial lead upto 50 m and all lifts.

DATA:

RATE ANALYSIS UNIT : 18 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 682.50labour component/unit qty 37.90Add contractor's profit and overhead charges 0.14 5.30labour component/unit qty (including contractor's profit) 43.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 682.50

Total Rs: 682.50

14.00% Rs: 95.55Total cost for 18.00 Nos. Rs: 778.05Rate per each (A+B+C+D)/18.0 Rs. 43.20

IRR-PMW-1-4 Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc.,complete with initial lead upto 50 m and all lifts.

DATA:

RATE ANALYSIS UNIT : 8 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

321

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 682.50labour component/unit qty 85.31Add contractor's profit and overhead charges 0.14 11.94labour component/unit qty (including contractor's profit) 97.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 682.50

Total Rs: 682.50

14.00% Rs: 95.55Total cost for 8.00 Nos. Rs: 778.10Rate per each (A+B+C+D)/8.0 Rs. 97.30

IRR-PMW-1-5 Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 5 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1365.00labour component/unit qty 273.00Add contractor's profit and overhead charges 0.14 38.20labour component/unit qty (including contractor's profit) 311.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1365.00

Total Rs: 1365.00

14.00% Rs: 191.1Total cost for 5.00 Nos. Rs: 1556.10Rate per each (A+B+C+D)/5.0 Rs. 311.20

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

322

IRR-PMW-1-6 Additional rate for every 0.5 m increase in girth of tree stump / stumps of bamboo clusterbeyond 5 m.

DATA: RATE ANALYSIS UNIT : 7 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.22 370.00 81.402 mazdoor Day 0.88 295.00 258.13

Total cost of Labour Rs: 339.53labour component/unit qty 48.50Add contractor's profit and overhead charges 0.14 6.80labour component/unit qty (including contractor's profit) 55.30

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 339.53

Total Rs: 339.53

14.00% Rs: 47.5335Total cost for 7.00 Nos. Rs: 387.06Rate per each (A+B+C+D)/7.0 Rs. 55.30

IRR-PMW-1-7 Cutting and stacking bamboos excluding removing stumps and roots etc., complete withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 150 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

323

2 mazdoor Day 5.00 295.00 1475.00Total cost of Labour Rs: 1660.00

labour component/unit qty 11.07Add contractor's profit and overhead charges 0.14 1.55labour component/unit qty (including contractor's profit) 12.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1660.00

Total Rs: 1660.00

14.00% Rs: 232.4Total cost for 150.00 Nos. Rs: 1892.40Rate per each (A+B+C+D)/150.0 Rs. 12.60

IRR-PMW-1-8 Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps andincluding burning or disposing off the materials as directed with initial lead upto 50 m and alllifts.

DATA: RATE ANALYSIS UNIT : 100 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1070.00labour component/unit qty 10.70Add contractor's profit and overhead charges 0.14 1.50labour component/unit qty (including contractor's profit) 12.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1070.00

Total Rs: 1070.00

14.00% Rs: 149.8Total cost for 100.00 Nos Rs: 1219.80Rate per each (A+B+C+D)/100.0 Rs. 12.20

IRR-PMW-1-9 Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 50 Nos

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

324

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1070.00labour component/unit qty 21.40Add contractor's profit and overhead charges 0.14 3.00labour component/unit qty (including contractor's profit) 24.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1070.00

Total Rs: 1070.00

14.00% Rs: 149.8Total cost for 50.00 Nos Rs: 1219.80Rate per each (A+B+C+D)/50.0 Rs. 24.40

IRR-PMW-1-10 Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and includingstacking the materials neatly as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 14 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.25 150.00 37.50

0.00 0.00 0.00Total cost of Materials Rs: 37.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 977.50labour component/unit qty 69.80Add contractor's profit and overhead charges 0.14 9.80labour component/unit qty (including contractor's profit) 79.60

ABSTRACT:A. Cost of Materials Rs: 37.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 977.50

Total Rs: 1015.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

325

14.00% Rs: 142.1Total cost for 14.00 Nos. Rs: 1157.10Rate per each (A+B+C+D)/14.0 Rs. 82.70

IRR-PMW-1-11 Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and includingstacking the materials neatly as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 4 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.25 150.00 37.50

0.00 0.00 0.00Total cost of Materials Rs: 37.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 977.50labour component/unit qty 244.40Add contractor's profit and overhead charges 0.14 34.20labour component/unit qty (including contractor's profit) 278.60

ABSTRACT:A. Cost of Materials Rs: 37.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 977.50

Total Rs: 1015.00

14.00% Rs: 142.1Total cost for 4.00 Nos. Rs: 1157.10Rate per each (A+B+C+D)/4.0 Rs. 289.30

IRR-PMW-1-12 Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and includingstacking the materials neatly as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 2 Nos.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.25 150.00 37.50

0.00 0.00 0.00Total cost of Materials Rs: 37.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

326

Sl No Description Unit Quantity Rate Amountin Rs. in Rs.

1 work inspector Day 0.25 370.00 92.502 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 977.50labour component/unit qty 488.80Add contractor's profit and overhead charges 0.14 68.40labour component/unit qty (including contractor's profit) 557.20

ABSTRACT:A. Cost of Materials Rs: 37.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 977.50

Total Rs: 1015.00

14.00% Rs: 142.1Total cost for 2.00 Nos. Rs: 1157.10Rate per each (A+B+C+D)/2.0 Rs. 578.60

IRR-PMW-1-13 Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and includingstacking the materials neatly as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 1 No.

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.25 150.00 37.50

0.00 0.00 0.00Total cost of Materials Rs: 37.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 977.50labour component/unit qty 977.50Add contractor's profit and overhead charges 0.14 136.90labour component/unit qty (including contractor's profit) 1114.40

ABSTRACT:A. Cost of Materials Rs: 37.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 977.50

Total Rs: 1015.00

14.00% Rs: 142.1Total cost for 1.00 No. Rs: 1157.10Rate per each (A+B+C+D)/1.0 Rs. 1157.10

IRR-PMW-1-14 Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and includingstacking the materials neatly as directed with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 1 Nos.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

327

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.50 150.00 75.00

0.00 0.00 0.00Total cost of Materials Rs: 75.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.25 370.00 92.502 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 1567.50labour component/unit qty 1567.50Add contractor's profit and overhead charges 0.14 219.50labour component/unit qty (including contractor's profit) 1787.00

ABSTRACT:A. Cost of Materials Rs: 75.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1567.50

Total Rs: 1642.50

14.00% Rs: 229.95Total cost for 1.00 Nos. Rs: 1872.45Rate per each (A+B+C+D)/1.0 Rs. 1872.50

IRR-PMW-1-15 Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m.

DATA: RATE ANALYSIS UNIT : 1 No

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of ropes etc LS 0.15 150.00 22.50

0.00 0.00 0.00Total cost of Materials Rs: 22.50

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.10 370.00 37.002 mazdoor Day 1.75 295.00 516.25

Total cost of Labour Rs: 553.25labour component/unit qty 553.30Add contractor's profit and overhead charges 0.14 77.50labour component/unit qty (including contractor's profit) 630.80

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

328

ABSTRACT:A. Cost of Materials Rs: 22.50B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 553.25

Total Rs: 575.75

14.00% Rs: 80.605Total cost for 1.00 No Rs: 656.36Rate per each (A+B+C+D)/1.0 Rs. 656.40

IRR-PMW-1-16 Cutting and burning or disposing off Apu / Jondu from marshy areas as directed withinitial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 1000 sqm

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 12.00 295.00 3540.00

Total cost of Labour Rs: 3910.00labour component/unit qty 3.90Add contractor's profit and overhead charges 0.14 0.50labour component/unit qty (including contractor's profit) 4.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 3910.00

Total Rs: 3910.00

14.00% Rs: 547.4Total cost for 1000.00 sqm Rs: 4457.40Rate per sqm (A+B+C+D)/1000.0 Rs. 4.50

IRR-PMW-2 PRELIMINARY WORKS :

IRR-PMW-2-1 Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds ofsoil including boulders upto 30 cm dia and disposing off excavated soil as directed with leadupto 10 m and lift upto 3 m.

DATA: RATE ANALYSIS UNIT : 10 cum

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

329

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 1955.00labour component/unit qty 195.50Add contractor's profit and overhead charges 0.14 27.37labour component/unit qty (including contractor's profit) 222.90

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1955.00

Total Rs: 1955.00

14.00% Rs: 273.7Total cost for 10.00 cum Rs: 2228.70Rate per cum (A+B+C+D)/100.0 Rs. 222.90

IRR-PMW-2-2 Earthwork excavation for trial pits / borrow pits and other investigation works in softrock including disposing off the excavated rock as directed with lead upto 10 m and liftupto 3 m.

DATA: RATE ANALYSIS UNIT : 10 cum

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 0.50 370.00 185.002 Crowbarman Day 1.00 345.00 345.003 mazdoor Day 7.50 295.00 2212.50

Total cost of Labour Rs: 2742.50labour component/unit qty 274.30Add contractor's profit and overhead charges 0.14 38.40labour component/unit qty (including contractor's profit) 312.70

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2742.50

Total Rs: 2742.50

14.00% Rs: 383.95Total cost for 10.00 cum Rs: 3126.45Rate per cum (A+B+C+D)/10.0 Rs. 312.60

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

330

IRR-PMW-2-3 Conducting geophysical investigation studies by electrical resistivity method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete excluding cost of transportation arrangements.

DATA: RATE ANALYSIS UNIT : 20 StagesA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sundries ( misc. consumables ) 5.00 41.00 205.000.00 0.00 0.00

Total cost of Materials Rs: 205.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Electric resistivity meter Hour 8.00 99.00 792.00

Battery / charging cost etc @ 20% 158.40Total hire charges of Machinery Rs: 950.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Geophysist / Geologist Day 2.00 735.00 1470.002 Graduate Engineer Day 1.00 735.00 735.003 Lab Assistant Day 1.00 440.00 440.004 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 3825.00labour component/unit qty 191.30Add contractor's profit and overhead charges 0.14 26.80labour component/unit qty (including contractor's profit) 218.10

ABSTRACT:A. Cost of Materials Rs: 205.00B. Hire charges of Machinery Rs: 950.40C. Cost of Labour Rs: 3825.00

Total Rs: 4980.40

14.00% Rs: 697.256Total cost for 20.00 Stages Rs: 5677.66Rate per stage (A+B+C+D)/20.0 Rs. 283.90

IRR-PMW-2-4 Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, watercharges, reaming, collection of wash samples at suitable intervals, logging and lebelling,supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc.,complete for depth upto 30 m from surface.Note: 1. For drilling through over-burden beyond 30 m from surface increase the basic rate per Rm by 10 percent.

Data: RATE ANALYSIS UNIT : 3.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of casing shoe bit Rm 3.00 116.67 350.002 Use rate of reamer shell Rm 3.00 28.61 85.833 Use rate of extension rod set 16.5 m Rm 3.00 1.75 5.254 Use rate of honne core box Rm 3.00 247.50 742.50

Total cost of Materials Rs: 1183.58

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 1.00 319.00 319.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

331

Fuel / Energy charges Hour 1.00 255.80 255.802 5 hp pump ( diesel ) 2 Nos. Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.603 Sundries ( samplers etc ) LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 847.80

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 1.00 244.90 244.902 Crew for Pump Hour 2.00 96.10 192.203 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 1027.10labour component/unit qty 342.40Add contractor's profit and overhead charges 0.14 47.90labour component/unit qty (including contractor's profit) 390.30

ABSTRACT:A. Cost of Materials Rs: 1183.58B. Hire charges of Machinery Rs: 847.80C. Cost of Labour Rs: 1027.10

Total Rs: 3058.48

14.00% Rs: 428.1872467Total cost for 3.00 Rm Rs: 3486.67Rate per Rm (A+B+C+D)/3.0 Rs. 1162.20

IRR-PMW-2-5 Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclinedupto 10 degree to vertical as directed including cost of all materials, machinery, labour, watercharges, collection of core samples, logging and lebelling, supplying honne wood core boxand redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

Data: RATE ANALYSIS UNIT : 3.00 Rm

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of diamond core bit Rm 3.00 848.00 2544.002 Use rate of reamer shell Rm 3.00 85.83 257.503 Use rate of double tube core barrel Rm 3.00 226.13 678.404 Use rate of extension rod set 16.5 m Rm 3.00 23.32 69.965 Use rate of honne core box Rm 3.00 556.88 1670.63

Total cost of Materials Rs: 5220.49

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 8.00 319.00 2552.00

Fuel / Energy charges Hour 8.00 255.80 2046.402 5 hp pump ( diesel ) 2 Nos. Hour 16.00 10.20 163.20

Fuel / Energy charges Hour 16.00 85.30 1364.803 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 6331.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 8.00 244.90 1959.202 Crew for Pump Hour 16.00 96.10 1537.603 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 4086.80labour component/unit qty 1362.30Add contractor's profit and overhead charges 0.14 190.70labour component/unit qty (including contractor's profit) 1553.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

332

ABSTRACT:A. Cost of Materials Rs: 5220.49B. Hire charges of Machinery Rs: 6331.40C. Cost of Labour Rs: 4086.80

Total Rs: 15638.69

14.00% Rs: 2189.4159Total cost for 3.00 Rm Rs: 17828.10Rate per Rm (A+B+C+D)/3.0 Rs. 5942.70

NOTE: 1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the basic rate per Rm by 25 percent.2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic rate per Rm by 40 percent.

IRR-PMW-2-5-ANew Item 2014-15-5 Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including

Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface for Primary and Secondary Holes Drilling 76 mm dia ( NX ) core hole in all types of rock

DATA: For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.For rate analysis combination of diamond bit and reamer shell is assumed.500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.For 30 m drilling average 16.5 m extension rods with coupling sleeves required.Use rate of materials :Cost of NX diamond core bit @ Rs: 12720.00 / Each Rs: 12720.00Life of diamond core bit in all types of rock (other than hard rock) : 10.57 mUse rate of diamond core bit per m drilling ( cost / life ) Rs: 1203.41Cost of reamer shell @ Rs: 5150.00 / Each Rs: 5150.00Life of reamer shell in all types of rock (other than hard rock) : 100 mUse rate of reamer shell per m drilling ( cost / life ) Rs: 51.50Cost of 16.5 m extension rod @ Rs: 2120.00 / Rm Rs: 34980.00Life of extension rods : 2500 mUse rate of 16.5 m length extension rods ( cost / life ) Rs: 13.99

Data: RATE ANALYSIS UNIT : 3.00 Rm

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of diamond core bit Rm 3.00 1203.41 3610.222 Use rate of reamer shell Rm 3.00 51.50 154.504 Use rate of extension rod set 16.5 m Rm 3.00 13.99 41.98

Total cost of Materials Rs: 3806.69

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 4.78 319.00 1523.54

Fuel / Energy charges Hour 4.78 255.80 1221.702 5 hp pump ( diesel ) 2 Nos. Hour 9.55 10.20 97.43

Fuel / Energy charges Hour 9.55 85.30 814.793 Sundries LS 2.99 41.00 122.59

Total hire charges of Machinery Rs: 3780.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 4.78 244.90 1169.642 Crew for Pump Hour 9.55 96.10 917.763 mazdoor Day 1.19 295.00 351.05

Total cost of Labour Rs: 2438.45labour component/unit qty 812.80Add contractor's profit and overhead charges 0.14 113.80labour component/unit qty (including contractor's profit) 926.60

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

333

ABSTRACT:A. Cost of Materials Rs: 3806.69B. Hire charges of Machinery Rs: 3780.05C. Cost of Labour Rs: 2438.45

Total Rs: 10025.1914.00% Rs: 1403.526852

Total cost for 3.00 Rm Rs: 11428.72Rate per Rm (A+B+C+D)/3.0 Rs. 3809.60

NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the basic rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.

IRR-PMW-2-5-BNew Item 2014-15-6 Drilling 76 mm dia ( NX ) core hole in all types of rocks (other than Hard Rock) including

Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, collection of core samples, logging and lebelling, supplying honne wood core box and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface for Test Holes

DATA: For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.For rate analysis combination of diamond bit and reamer shell is assumed.500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.For 30 m drilling average 16.5 m extension rods with coupling sleeves required.Use rate of materials :Cost of NX diamond core bit @ Rs: 12720.00 / Each Rs: 12720.00Life of diamond core bit in all types of rock (other than hard rock) : 10.57 mUse rate of diamond core bit per m drilling ( cost / life ) Rs: 1203.41Cost of reamer shell @ Rs: 5150.00 / Each Rs: 5150.00Life of reamer shell in all types of rock (other than hard rock) : 100 mUse rate of reamer shell per m drilling ( cost / life ) Rs: 51.50Cost of double core barrel @ Rs: 13568.00 / Each Rs: 13568.00Life of double tube core barrel : 100 mUse rate of double tube core barrel per m drilling ( cost / life ) Rs: 135.68Cost of 16.5 m extension rod @ Rs: 2120.00 / Rm Rs: 34980.00Life of extension rods : 2500 mUse rate of 16.5 m length extension rods ( cost / life ) Rs: 13.99Honne wood core box 1.5 x 0.32 x 0.12 mHonne wood 0.033 cum @ Rs: 54000.00 / cum Rs: 1782.00Add for fixtures and painting @ 10% Rs: 178.20Add for labour charges @ 15% Rs: 267.30Cost of one box for storing 4 m samples Rs: 2227.50Use rate of core box per m drilling Rs: 556.88

Data: RATE ANALYSIS UNIT : 3.00 Rm

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of diamond core bit Rm 3.00 1203.41 3610.222 Use rate of reamer shell Rm 3.00 51.50 154.503 Use rate of double tube core barrel Rm 3.00 135.68 407.044 Use rate of extension rod set 16.5 m Rm 3.00 13.99 41.985 Use rate of honne core box Rm 3.00 556.88 1670.63

Total cost of Materials Rs: 5884.36

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 4.78 319.00 1523.54

Fuel / Energy charges Hour 4.78 255.80 1221.702 5 hp pump ( diesel ) 2 Nos. Hour 9.55 10.20 97.43

Fuel / Energy charges Hour 9.55 85.30 814.793 Sundries LS 2.99 41.00 122.59

D. Add for contractor's profit and overheads on

Preliminary and Maintenance Works - Item Unit Rates 2014-15

334

Total hire charges of Machinery Rs: 3780.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 4.78 244.90 1169.642 Crew for Pump Hour 9.55 96.10 917.953 mazdoor Day 1.19 295.00 352.23

Total cost of Labour Rs: 2439.82labour component/unit qty 813.30Add contractor's profit and overhead charges 0.14 113.90labour component/unit qty (including contractor's profit) 927.20

ABSTRACT:A. Cost of Materials Rs: 5884.36B. Hire charges of Machinery Rs: 3780.05C. Cost of Labour Rs: 2439.82

Total Rs: 12104.2314.00% Rs: 1694.59206

Total cost for 3.00 Rm Rs: 13798.82Rate per Rm (A+B+C+D)/3.0 Rs. 4599.60

NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the basic rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.

IRR-PMW-2-6 Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, watercharges,collection of core samples,logging, lebelling, supplying honne wood core box and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

Data: RATE ANALYSIS UNIT : 3.00 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Use rate of diamond core bit Rm 3.00 706.67 2120.002 Use rate of reamer shell Rm 3.00 85.83 257.503 Use rate of double tube core barrel Rm 3.00 226.13 678.404 Use rate of extension rod set 16.5 m Rm 3.00 23.32 69.965 Use rate of honne core box Rm 3.00 556.88 1670.63

Total cost of Materials Rs: 4796.49

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 8.00 319.00 2552.00

Fuel / Energy charges Hour 8.00 255.80 2046.402 5 hp pump ( diesel ) 2 Nos. Hour 16.00 10.20 163.20

Fuel / Energy charges Hour 16.00 85.30 1364.803 Sundries LS 5.00 41.00 205.00

Total hire charges of Machinery Rs: 6331.40

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 8.00 244.90 1959.202 Crew for Pump Hour 16.00 96.10 1537.603 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 4086.80labour component/unit qty 1362.30Add contractor's profit and overhead charges 0.14 190.70labour component/unit qty (including contractor's profit) 1553.00

ABSTRACT:A. Cost of Materials Rs: 4796.49

D. Add for contractor's profit and overheads on

Preliminary and Maintenance Works - Item Unit Rates 2014-15

335

B. Hire charges of Machinery Rs: 6331.40C. Cost of Labour Rs: 4086.80

Total Rs: 15214.69

14.00% Rs: 2130.0559Total cost for 3.00 Rm Rs: 17344.74Rate per Rm (A+B+C+D)/3.0 Rs. 5781.60

NOTE: 1. For drilling in hard rock beyond 30 m upto 60 m from surface increase the basic rate for drilling upto 30 m from surface by 25 percent per Rm.2. For drilling in hard rock beyond 60 m upto 90 m from surface increase the basic rate for drilling upto 30 m from surface by 40 percent per Rm.

IRR-PMW-2-6-ANew Item 2014-15-7 Drilling 47 mm (BX )dia core hole in all types of rocks (other than Hard Rock) including

Masonry/CC (where drilling is not possible by casing shoe) using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, and redrilling in case of collapse of sides etc., complete for depth upto 30 m

DATA: For drilling upto 30 m from surface the rate of drilling is assumed at 3 m per day for analysis.For rate analysis combination of diamond bit and reamer shell is assumed.500 m long 25 mm dia GI pipe line and 50 m long 25 mm dia water hose are assumed.For 30 m drilling average 16.5 m extension rods with coupling sleeves required.Use rate of materials :Cost of BX diamond core bit @ Rs: 10600.00 / Each Rs: 10600.00Life of diamond core bit in all types of rock (other than hard rock) : 10.57 mUse rate of diamond core bit per m drilling ( cost / life ) Rs: 1002.84Cost of reamer shell @ Rs: 5150.00 / Each Rs: 5150.00Life of reamer shell in all types of rock (other than hard rock) : 100 mUse rate of reamer shell per m drilling ( cost / life ) Rs: 51.50Cost of 16.5 m extension rod @ Rs: 2120.00 / Rm Rs: 34980.00Life of extension rods : 2500 mUse rate of 16.5 m length extension rods ( cost / life ) Rs: 13.99

Data: RATE ANALYSIS UNIT : 3.00 Rm

A. MATERIALS:Sl No particulars Unit Quantity Rate Amount

in Rs. in Rs.1 Use rate of diamond core bit Rm 3.00 1002.84 3008.512 Use rate of reamer shell Rm 3.00 51.50 154.504 Use rate of extension rod set 16.5 m Rm 3.00 13.99 41.98

Total cost of Materials Rs: 3204.99

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Core drilling machine Hour 4.78 319.00 1523.54

Fuel / Energy charges Hour 4.78 255.80 1221.702 5 hp pump ( diesel ) 2 Nos. Hour 9.55 10.20 97.43

Fuel / Energy charges Hour 9.55 85.30 814.793 Sundries LS 2.99 41.00 122.59

Total hire charges of Machinery Rs: 3780.05

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Core drilling machine Hour 4.78 244.90 1169.642 Crew for Pump Hour 9.55 96.10 917.763 mazdoor Day 1.19 295.00 351.05

Total cost of Labour Rs: 2438.45labour component/unit qty 812.80Add contractor's profit and overhead charges 0.14 113.80labour component/unit qty (including contractor's profit) 926.60

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

336

ABSTRACT:A. Cost of Materials Rs: 3204.99B. Hire charges of Machinery Rs: 3780.05C. Cost of Labour Rs: 2438.45

Total Rs: 9423.4914.00% Rs: 1319.288441

Total cost for 3.00 Rm Rs: 10742.78Rate per Rm (A+B+C+D)/3.0 Rs. 3580.90

NOTE: 1. For drilling in all types of rocks (other than hard rock) including masonry/CC beyond 30 m upto 60 m from surface increase the basic rate per Rm by 25 percent.2. For drilling in all types of rocks (other than hard rock) including masonry/CC m from surface increase the basic beyond 60 m upto 90 rate per Rm by 40 percent.

IRR-PMW-2-7 Providing and fixing 20 x 20 x 75 cm size roughly dressed boundary / demarcation /chainage / arrow stones including cost of all materials, labour, engraving marks, fixing inposition, murum filling etc., complete with lead upto 50 m and all lifts.

Data: RATE ANALYSIS UNIT : 18 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rough stone 20x20x75 cm Each 18.00 23.00 414.002 Murrum cum 1.00 107.00 107.00

Total cost of Materials Rs: 521.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Stone chiseller Cl- I Day 1.00 385.00 385.003 mazdoor Day 3.00 295.00 885.00

Total cost of Labour Rs: 1640.00labour component/unit qty 91.10Add contractor's profit and overhead charges 0.14 12.80labour component/unit qty (including contractor's profit) 103.90

ABSTRACT:A. Cost of Materials Rs: 521.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1640.00

Total Rs: 2161.00

14.00% Rs: 302.54Total cost for 18.00 Nos. Rs: 2463.54Rate per each (A+B+C+D)/18.0 Rs. 136.90

IRR-PMW-2-8 Providing and fixing 20 x 20 x 75 cm size temporary bench mark stone in CC 1 : 4 : 8using 40 mm down size graded coarse aggregate including cost of all materials, labour,dressing top surface, engraving BM data etc.,complete with lead upto 50 m and all lifts.

Data: RATE ANALYSIS UNIT : 10 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rough stone 20x20x75 cm Each 10.00 23.00 230.002 Cement for CC & top finishing kg 91.00 4.00 364.003 Coarse aggregate 40-20 mm cum 0.25 1145.00 286.25

D. Add for contractor's profit and overheads on

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

337

Coarse aggregate 20-10 mm cum 0.15 1210.00 181.50Coarse aggregate 10-4.75 mm cum 0.10 875.00 87.50

4 Sand (Un-Screened ) cum 0.25 462.00 115.50Total cost of Materials Rs: 1264.75

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Stone chiseller Cl- I Day 3.00 385.00 1155.003 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 2705.00labour component/unit qty 270.50Add contractor's profit and overhead charges 0.14 37.90labour component/unit qty (including contractor's profit) 308.40

ABSTRACT:A. Cost of Materials Rs: 1264.75B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2705.00

Total Rs: 3969.75

14.00% Rs: 555.765Total cost for 10.00 Nos. Rs: 4525.52Rate per each (A+B+C+D)/10.0 Rs. 452.60

NOTE: For providing 30 cm thick compacted murum bed in B.C soil area including additional excavation for thickness of murum bedding add pe Each Rs: 4.00

IRR-PMW-2-9 Providing and fixing 20 x 20 x 75 cm size permanent bench mark stone in CC 1 :3 : 6block of size 90 x 90 x 120 cm using 40 mm down size graded coarse aggregate and providing35 cm thick 30 cm high UCR masonry in CM 1 : 5 proportion protective wall alround the BMstone, including cost of all materials, labour, dressing top surface of stone, engraving BM dataon top surface, excavation, finishing, curing etc., complete with lead upto 50 m and all lifts.

Data: RATE ANALYSIS UNIT : 1 No.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rough stone 20x20x75 cm Each 1.00 23.00 23.002 Cement kg 262.00 4.00 1048.003 Coarse aggregate 40-20 mm cum 0.50 1145.00 572.50

Coarse aggregate 20-10 mm cum 0.30 1210.00 363.00Coarse aggregate 10-4.75 mm cum 0.20 875.00 175.00

4 Rubble stone at quarry cum 0.25 318.00 79.505 Stone chips at quarry cum 0.04 340.00 13.606 Sand (Un-Screened ) cum 0.60 462.00 277.20

Total cost of Materials Rs: 2551.80

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

338

2 Stone chiseller Cl- I Day 0.50 385.00 192.503 Mason Cl- II Day 1.00 345.00 345.004 mazdoor Day 5.00 295.00 1475.00

Total cost of Labour Rs: 2382.50labour component/unit qty 2382.50Add contractor's profit and overhead charges 0.14 333.60labour component/unit qty (including contractor's profit) 2716.10

ABSTRACT:A. Cost of Materials Rs: 2551.80B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2382.50

Total Rs: 4934.30

14.00% Rs: 690.802Total cost for 1.00 No. Rs: 5625.10Rate per each (A+B+C+D)/1.0 Rs. 5625.10

IRR-PMW-3 MAINTENANCE WORKS :

IRR-PMW-3-1 Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment including stacking all materials separately as directed with initial lead upto 50 m and all lifts.

Data: RATE ANALYSIS UNIT : 105 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Cl- II Day 6.00 345.00 2070.003 mazdoor Day 48.00 295.00 14160.00

Total cost of Labour Rs: 16600.00labour component/unit qty 158.10Add contractor's profit and overhead charges 0.14 22.10labour component/unit qty (including contractor's profit) 180.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 16600.00

Total Rs: 16600.00

14.00% Rs: 2324Total cost for 105.00 cum Rs: 18924.00Rate per cum (A+B+C+D)/105.0 Rs. 180.20

IRR-PMW-3-2 Re-constructing 60 cm thick hand packed rough stone revetment with through stones at 1.5 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from revetment removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

339

Data: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Sand (Un-Screened ) ( from quarry) cum 15.30 462.00 7068.602 Coarse aggregate 10 mm (available) cum 15.30 0.00 0.003 Coarse aggr. 40-20 mm ( available) cum 15.30 0.00 0.004 Stone chips ( available ) cum 9.00 0.00 0.005 Rough stones ( available ) cum 57.60 0.00 0.006 Through stones ( available ) Nos 44.00 0.00 0.00

Total cost of Materials Rs: 7068.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Cl- II Day 5.00 345.00 1725.003 mazdoor Day 33.00 295.00 9735.00

Total cost of Labour Rs: 11830.00labour component/unit qty 118.30Add contractor's profit and overhead charges 0.14 16.60labour component/unit qty (including contractor's profit) 134.90

ABSTRACT:A. Cost of Materials Rs: 7068.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 11830.00

Total Rs: 18898.60

14.00% Rs: 2645.804Total cost for 100.00 sqm Rs: 21544.40Rate per sqm (A+B+C+D)/100.0 Rs. 215.40

IRR-PMW-3-3 Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained fromrock-toe removed for re-construction including cost of all machinery, labour, laying filter andstones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto50 m and all lifts.

Data: RATE ANALYSIS UNIT : 100 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Rubble ( available ) cum 58.20 0.00 0.002 Stone chips ( available ) cum 8.70 0.00 0.003 80-20 mm filter ( available ) cum 19.40 0.00 0.004 20 mm down filter ( available ) cum 12.10 0.00 0.005 Sand (Un-Screened) ( fresh from quarry ) cum 9.80 462.00 4527.60

Total cost of Materials Rs: 4527.60

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

340

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Cl- II Day 7.00 345.00 2415.003 mazdoor Day 48.00 295.00 14160.00

Total cost of Labour Rs: 16945.00labour component/unit qty 169.50Add contractor's profit and overhead charges 0.14 23.70labour component/unit qty (including contractor's profit) 193.20

ABSTRACT:A. Cost of Materials Rs: 4527.60B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 16945.00

Total Rs: 21472.60

14.00% Rs: 3006.164Total cost for 100.00 cum Rs: 24478.76Rate per cum (A+B+C+D)/100.0 Rs. 244.80

IRR-PMW-3-4 Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with lead upto 50 m and all lifts.

Data: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Cement 43 Gr kg 101.00 4.00 404.002 Sand (Screened ) cum 0.21 606.00 127.26

Total cost of Materials Rs: 531.26

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class I Day 4.00 385.00 1540.003 mazdoor Day 6.00 295.00 1770.004 Cartman with Double Bullock cart for water Day 1.00 395.00 395.00

Total cost of Labour Rs: 4075.00labour component/unit qty 40.80Add contractor's profit and overhead charges 0.14 5.70labour component/unit qty (including contractor's profit) 46.50

ABSTRACT:A. Cost of Materials Rs: 531.26B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4075.00

Total Rs: 4606.26

14.00% Rs: 644.8764Total cost for 100.00 sqm Rs: 5251.14Rate per sqm (A+B+C+D)/100.0 Rs. 52.50

IRR-PMW-3-5 Removing and resetting disturbed dry rubble / khandki stone pitching 25 to 45 cm thick including packing, wedging, finishing etc., complete with all leads and lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

341

Data: RATE ANALYSIS UNIT : 100 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 Mason Class II Day 6.00 345.00 2070.003 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 4210.00labour component/unit qty 42.10Add contractor's profit and overhead charges 0.14 5.90labour component/unit qty (including contractor's profit) 48.00

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 4210.00

Total Rs: 4210.00

14.00% Rs: 589.4Total cost for 100.00 sqm Rs: 4799.40Rate per sqm (A+B+C+D)/100.0 Rs. 48.00

IRR-PMW-3-6 Removing and refixing disturbed chainage / demarcation / hectometre / guard stonesincluding excavation, back filling etc., complete with all leads and lifts.

DATA: RATE ANALYSIS UNIT : 18 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 960.00labour component/unit qty 53.33Add contractor's profit and overhead charges 0.14 7.47labour component/unit qty (including contractor's profit) 60.80

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

342

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 960.00

Total Rs: 960.00

14.00% Rs: 134.4Total cost for 18.00 Nos. Rs: 1094.40Rate per each (A+B+C+D)/18.0 Rs. 60.80

IRR-PMW-3-7 Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., includingexcavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x7.5 cm including watering, ramming etc complete with all leads and lifts.

DATA: RATE ANALYSIS UNIT : 8 Nos.A. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 960.00labour component/unit qty 120.00Add contractor's profit and overhead charges 0.14 16.80labour component/unit qty (including contractor's profit) 136.80

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 960.00

Total Rs: 960.00

14.00% Rs: 134.4Total cost for 8.00 Nos. Rs: 1094.40Rate per each (A+B+C+D)/18.0 Rs. 136.80

IRR-PMW-3-8 Providing impervious hearting for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

Data: RATE ANALYSIS UNIT : 480 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

343

in Rs. in Rs.1 Angle dozer Hour 5.00 1715.50 8577.50

Fuel / Energy charges Hour 5.00 656.00 3280.002 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Pump 5 hp ( diesel ) Hour 2.00 10.20 20.40

Fuel / Energy charges Hour 2.00 85.30 170.605 Water tanker 8000 ltr Hour 4.00 402.50 1610.00

Fuel / Energy charges Hour 4.00 322.20 1288.806 Vibratory pad foot roller 8 tonne Hour 6.00 1342.20 8053.20

Fuel / Energy charges Hour 6.00 1108.30 6649.807 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 66453.90

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.00 204.10 816.402 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 5.00 153.10 765.506 Crew for Roller Hour 6.00 227.80 1366.807 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 11689.00labour component/unit qty 24.40Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 27.80

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 66453.90C. Cost of Labour Rs: 11689.00

Total Rs: 78142.90

14.00% Rs: 10940.006Total cost for 480.00 cum Rs: 89082.91Rate per cum (A+B+C+D)/480.0 Rs. 185.60

IRR-PMW-3-9 Providing pervious/semi-pervious casing for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

Data: RATE ANALYSIS UNIT : 325 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.50 1715.50 6004.25

Fuel / Energy charges Hour 3.50 656.00 2296.002 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 3 Nos. Hour 24.00 446.70 10720.80

Fuel / Energy charges Hour 24.00 322.20 7732.80

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

344

4 Pump 5 hp ( diesel ) Hour 1.50 10.20 15.30Fuel / Energy charges Hour 1.50 85.30 127.95

5 Water tanker 8000 ltr Hour 3.00 402.50 1207.50Fuel / Energy charges Hour 3.00 322.20 966.60

6 Vibratory pad foot roller 8 tonne Hour 4.00 1342.20 5368.80Fuel / Energy charges Hour 4.00 1108.30 4433.20

7 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 51072.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.50 204.10 714.352 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 24.00 153.10 3674.404 Crew for Pump Hour 1.50 96.10 144.155 Crew for Water tanker Hour 3.00 153.10 459.306 Crew for Roller Hour 4.00 227.80 911.207 work inspector Day 2.00 370.00 740.008 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 9456.20labour component/unit qty 29.10Add contractor's profit and overhead charges 0.14 4.10labour component/unit qty (including contractor's profit) 33.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 51072.00C. Cost of Labour Rs: 9456.20

Total Rs: 60528.20

14.00% Rs: 8473.948Total cost for 325.00 cum Rs: 69002.15Rate per cum (A+B+C+D)/325.0 Rs. 212.30

IRR-PMW-3-10 Providing impervious hearting for breached / damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil,sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

Data: RATE ANALYSIS UNIT : 612 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer Hour 4.00 1715.50 6862.00

Fuel / Energy charges Hour 4.00 656.00 2624.002 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 446.70 17868.00

Fuel / Energy charges Hour 40.00 322.20 12888.004 Pump 5 hp ( diesel ) Hour 4.00 10.20 40.80

Fuel / Energy charges Hour 4.00 85.30 341.205 Water tanker 8000 ltr Hour 7.00 402.50 2817.50

Fuel / Energy charges Hour 7.00 322.20 2255.406 Vibratory pad foot roller 8 tonne Hour 7.50 1342.20 10066.50

Fuel / Energy charges Hour 7.50 1108.30 8312.257 Sundries LS 2.00 41.00 82.00

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

345

Total hire charges of Machinery Rs: 76274.45

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 4.00 204.10 816.402 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 40.00 153.10 6124.004 Crew for Pump Hour 4.00 96.10 384.405 Crew for Water tanker Hour 7.00 153.10 1071.706 Crew for Roller Hour 7.50 227.80 1708.507 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 14247.80labour component/unit qty 23.30Add contractor's profit and overhead charges 0.14 3.30labour component/unit qty (including contractor's profit) 26.60

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 76274.45C. Cost of Labour Rs: 14247.80

Total Rs: 90522.25

14.00% Rs: 12673.115Total cost for 612.00 cum Rs: 103195.37Rate per cum (A+B+C+D)/612.0 Rs. 168.60

IRR-PMW-3-11 Providing pervious /semi-pervious casing for breached /damaged portion of embankmentwith soil from approved dump areas in layers of 10 to 15 cm before compaction includingcost of all materials, machinery, labour, all operations such as collection of soil, sorting out,spreading soil to specified thickness, breaking clods, sectioning, watering, compacting eachlayer to density control of not less than 98 percent or as stipulated by rolling or by usingmechanical tampers etc., complete with initial lead upto 1 km and all lifts.

Data: RATE ANALYSIS UNIT : 440 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Angle dozer 90 hp Hour 3.00 1715.50 5146.50

Fuel / Energy charges Hour 3.00 656.00 1968.002 Shovel 0.50 cum capacity Hour 8.00 1003.10 8024.80

Fuel / Energy charges Hour 8.00 511.50 4092.003 Tippers 5.00 cum capacity 4 Nos. Hour 32.00 446.70 14294.40

Fuel / Energy charges Hour 32.00 322.20 10310.404 Pump 5 hp ( diesel ) Hour 3.00 10.20 30.60

Fuel / Energy charges Hour 3.00 85.30 255.905 Water tanker 8000 ltr Hour 6.00 402.50 2415.00

Fuel / Energy charges Hour 6.00 322.20 1933.206 Vibratory pad foot roller 8 tonne Hour 5.50 1342.20 7382.10

Fuel / Energy charges Hour 5.50 1108.30 6095.657 Sundries LS 2.00 41.00 82.00

Total hire charges of Machinery Rs: 62030.55

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Crew for Dozer Hour 3.00 204.10 612.302 Crew for Shovel Hour 8.00 204.10 1632.80

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

346

3 Crew for Tipper Hour 32.00 153.10 4899.204 Crew for Pump Hour 3.00 96.10 288.305 Crew for Water tanker Hour 6.00 153.10 918.606 Crew for Roller Hour 5.50 227.80 1252.907 work inspector Day 2.00 370.00 740.008 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 12114.10labour component/unit qty 27.50Add contractor's profit and overhead charges 0.14 3.90labour component/unit qty (including contractor's profit) 31.40

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 62030.55C. Cost of Labour Rs: 12114.10

Total Rs: 74144.65

14.00% Rs: 10380.251Total cost for 440.00 cum Rs: 84524.90Rate per cum (A+B+C+D)/440.0 Rs. 192.10

IRR-PMW-3-12 Repairing rain cuts / resectioning canal slopes to required lines and grades as directed using available soil including dressing, clod breaking, packing, tamping etc., complete with all leads and lifts.

DATA: RATE ANALYSIS UNIT : 1000 sqmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 work inspector Day 1.00 370.00 370.002 mazdoor Day 8.00 295.00 2360.00

Total cost of Labour Rs: 2730.00labour component/unit qty 2.73Add contractor's profit and overhead charges 0.14 0.38labour component/unit qty (including contractor's profit) 3.10

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2730.00

Total Rs: 2730.00

14.00% Rs: 382.2Total cost for 1000.00 sqm Rs: 3112.20Rate per sqm (A+B+C+D)/1000.0 Rs. 3.10

IRR-PMW-3-13 Cleaning drainage gallery, adits, instrumentation galleries etc., by scrubbing / brushingincluding chiselling and removing leached lime deposit and disposing off all the waste materialout side adits in specified location etc., complete with all leads and lifts.

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

347

DATA: RATE ANALYSIS UNIT : 100 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Wire brush Each 5.00 41.00 205.002 Coir brush Each 10.00 45.00 450.003 Sundries ( brooms, gloves etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 737.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 Chiseller Cl II Day 2.00 345.00 690.002 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 2460.00labour component/unit qty 24.60Add contractor's profit and overhead charges 0.14 3.40labour component/unit qty (including contractor's profit) 28.00

ABSTRACT:A. Cost of Materials Rs: 737.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 2460.00

Total Rs: 3197.00

14.00% Rs: 447.58Total cost for 100.00 Rm Rs: 3644.58Rate per Rm (A+B+C+D)/100.0 Rs. 36.40

IRR-PMW-3-14 Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing / brushing and washing to remove all surface coatings etc., complete .

DATA: RATE ANALYSIS UNIT : 100 RmA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 Oxalic acid ltr 5.00 76.00 380.002 Wire brush Each 5.00 41.00 205.003 Coir brush Each 10.00 45.00 450.004 Sundries ( brooms, gloves etc ) LS 2.00 41.00 82.00

Total cost of Materials Rs: 1117.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 1770.00labour component/unit qty 17.70Add contractor's profit and overhead charges 0.14 2.50labour component/unit qty (including contractor's profit) 20.20

ABSTRACT:

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

348

A. Cost of Materials Rs: 1117.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1770.00

Total Rs: 2887.00

14.00% Rs: 404.18Total cost for 100.00 Rm Rs: 3291.18Rate per Rm (A+B+C+D)/100.0 Rs. 32.90

IRR-PMW-3-20 Excavation and removal of silt and silt mixed with sand from canal bed in dry conditionincluding disposing off the same in spoil bank or on the canal embankment in layers asdirected etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 10 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 4.00 295.00 1180.00

Total cost of Labour Rs: 1180.00labour component/unit qty 118.00Add contractor's profit and overhead charges 0.14 16.50labour component/unit qty (including contractor's profit) 134.50

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1180.00

Total Rs: 1180.00

14.00% Rs: 165.2Total cost for 10.00 cum Rs: 1345.20Rate per cum (A+B+C+D)/10.0 Rs. 134.50

IRR-PMW-3-21 Excavation and removal of silt or silt mixed with sand in slussy condition from canal bedincluding disposing off the same in spoil bank or on the canal embankment in layers asdirected etc., complete with initial lead upto 50 m and all lifts.

DATA: RATE ANALYSIS UNIT : 12 cumA. MATERIALS:

Sl No particulars Unit Quantity Rate Amountin Rs. in Rs.

1 NIL 0.00 0.00 0.000.00 0.00 0.00

Total cost of Materials Rs: 0.00

B. MACHINERY:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 NIL 0.00 0.00 0.00

0.00 0.00 0.00

D. Add for contractor's profit and overheads on (A+B+C)

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

349

Total hire charges of Machinery Rs: 0.00

C. LABOUR:Sl No Description Unit Quantity Rate Amount

in Rs. in Rs.1 mazdoor Day 6.00 295.00 1770.00

Total cost of Labour Rs: 1770.00labour component/unit qty 147.50Add contractor's profit and overhead charges 0.14 20.70labour component/unit qty (including contractor's profit) 168.20

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 0.00C. Cost of Labour Rs: 1770.00

Total Rs: 1770.00

14.00% Rs: 247.8Total cost for 12.00 cum Rs: 2017.80Rate per cum (A+B+C+D)/12.0 Rs. 168.20

IRR-PMW-3-22New Item5 - 2010-11

(For Minor Works)

A. MATERIALS: Unit: 807.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Angle dozer 90 hp Hour 2.70 1715.50 4631.85Fuel / Energy charges Hour 2.70 656.00 1771.20

2 Shovel 0.85 cum capacity Hour 8.00 1706.60 13652.80Fuel / Energy charges Hour 8.00 937.80 7502.40

3 Tippers 5.00 cum capacity 5 Nos. Hour 40.00 446.70 17868.00Fuel / Energy charges Hour 40.00 322.20 12888.00Total hire charges of Machinery Rs: 58314.25

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Dozer Hour 2.70 204.10 551.072 Crew for Shovel Hour 8.00 204.10 1632.803 Crew for Tipper Hour 40.00 153.10 6124.004 work inspector Day 1.00 370.00 370.005 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 9267.87labour component/unit qty 11.50Add contractor's profit and overhead charges 14% 1.60labour component/unit qty (including contractor's profit) 13.10

Rs: 0.00Rs: 58314.25Rs: 9267.87Rs: 67582.12

14% Rs. 9461.5

807.00 cum Rs: 77043.62Rate per cum (A+B+C+D)/807 Rs: 95.50

IRR-PMW-3-23 Providing homogeneous embankment using soil from approved borrow

B. Hire charges of MachineryC. Cost of LabourTotalD.Add for contractor's profit and overheads on (A+B+C)

Total cost for

RATE ANALYSIS

B. MACHINERY:

C. LABOUR:

ABSTRACT:A. Cost of Materials

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.

D. Add for contractor's profit and overheads on (A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

350

New Item6 - 2010-11

(For Minor Works)

A. MATERIALS: UNIT : 807.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Angle dozer 90 hp Hour 2.70 1715.50 4631.85Fuel / Energy charges Hour 2.70 656.00 1771.20

2 Pump 5 hp ( ele ) Hour 4.00 3.00 12.00Fuel / Energy charges Hour 4.00 38.00 152.00

3 Water tanker 8000 ltr Hour 8.00 402.50 3220.00Fuel / Energy charges Hour 8.00 322.20 2577.60

4 Vibratory pad foot roller 8 tonne Hour 6.40 1342.20 8590.08Fuel / Energy charges Hour 6.40 1108.30 7093.12

5 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 28129.85

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Crew for Dozer Hour 2.70 204.10 551.074 Crew for Pump Hour 4.00 72.10 288.405 Crew for Water tanker Hour 8.00 153.10 1224.806 Crew for Roller Hour 6.40 227.80 1457.927 work inspector Day 1.00 370.00 370.008 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 4482.19labour component/unit qty 5.60Add contractor's profit and overhead charges 14% 0.80labour component/unit qty (including contractor's profit) 6.40

A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 28129.85C. Cost of Labour Rs: 4482.19Total Rs: 32612.04D.Add for contractor's profit and overheads on (A+B+C) 14% Rs. 4565.69

Total cost for 807.00 cum Rs: 37177.73Rate per cum (A+B+C+D)/807 Rs: 46.10

IRR-PMW-3-24

New Item 7 - 2010-11

A. MATERIALS: UNIT : 807.00 cumSl No Particulars Unit Quantity Rate Amount

in Rs. in Rs1 NIL 0.00 0.00 0.00

0.00 0.00 0.00Total cost of Materials Rs: 0.00

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 Tractor with 2T Roller Hour 10.00 345.00 3450.00

to density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.

RATE ANALYSIS

B. MACHINERY:

B. MACHINERY:

C. LABOUR:

ABSTRACT:

Providing homogeneous embankment using soil from approved borrow

area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compacting

area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as watering, compactingto density control of not less than 95 percent or as stipulated using 8T roller etc., complete with initial lead upto 1 km and all lifts.

RATE ANALYSIS

Preliminary and Maintenance Works - Item Unit Rates 2014-15

351

2 Sundries LS 2.00 41.00 82.00Total hire charges of Machinery Rs: 3532.00

Sl No Description Unit Quantity Rate Amount in Rs. in Rs

1 work inspector Day 0.50 370.00 185.002 mazdoor Day 2.00 295.00 590.00

Total cost of Labour Rs: 775.00labour component/unit qty 1.00Add contractor's profit and overhead charges 14% 0.10labour component/unit qty (including contractor's profit) 1.10

ABSTRACT:A. Cost of Materials Rs: 0.00B. Hire charges of Machinery Rs: 3532.00C. Cost of Labour Rs: 775.00Total Rs: 4307.00

14% Rs. 602.98

Total cost for 807.00 cum Rs: 4909.98Rate per cum (A+B+C+D)/807 Rs: 6.10

IRR-PMW-3-25 Weed Removal by Manual Means(New Item 2012-13-3)

IRR-PMW-3-25(a) Removal of Water Hyacinth up to 30 cm thick

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

C. LABOUR

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 3.5 370.00 12952 Mazdoor Day 28 295.00 8260

Rs. 9555.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 9555.00

Total 9555.00D. Add for Contractor's Profit and overheads 14% 1337.7Total Cost for removal weed in the extent of 2000 Sqm 10892.70Rate per Sqm (A+B+C+D)/2000 5.4

IRR-PMW-3-25(b) Removal of Water Hyacinth beyond 30 cm thick

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

Total Cost of Materials

Total hire charges of Machinery

Total Cost of Labour

Total Cost of Materials

C. LABOUR:

(A+B+C)

Preliminary and Maintenance Works - Item Unit Rates 2014-15

352

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

C. LABOUR

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 5 370.00 18502 Mazdoor Day 38 295.00 11210

Rs. 13060.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 13060.00

Total 13060.00D. Add for Contractor's Profit and overheads 14% 1828.4Total Cost for removal weed in the extent of 2000 Sqm 14888.40Rate per Sqm (A+B+C+D)/2000 7.4

IRR-PMW-3-25(c) Clearing Alchi Tilla

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

C. LABOUR

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 3 370.00 11102 Mazdoor Day 26 295.00 7670

Rs. 8780.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 8780.00

Total 8780.00D. Add for Contractor's Profit and overheads 14% 1229.2Total Cost for removal weed in the extent of 2000 Sqm 10009.20Rate per Sqm (A+B+C+D)/2000 5

IRR-PMW-3-25(d) Removal of Jammu

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Total Cost of Materials

Total hire charges of Machinery

Total Cost of Labour

Total Cost of Materials

Total hire charges of Machinery

Total Cost of Labour

Preliminary and Maintenance Works - Item Unit Rates 2014-15

353

Rs. 0.00

C. LABOUR

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 2.5 370.00 9252 Mazdoor Day 22 295.00 6490

Rs. 7415.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 7415.00

Total 7415.00D. Add for Contractor's Profit and overheads 14% 1038.1Total Cost for removal weed in the extent of 2000 Sqm 8453.10Rate per Sqm (A+B+C+D)/2000 4.2

IRR-PMW-3-25(e) Removal of Imponea, Cornea

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

C. LABOUR

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 3 370.00 11102 Mazdoor Day 26 295.00 7670

Rs. 8780.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 8780.00

Total 8780.00D. Add for Contractor's Profit and overheads 14% 1229.2Total Cost for removal weed in the extent of 2000 Sqm 10009.20Rate per Sqm (A+B+C+D)/2000 5

IRR-PMW-3-25(f) Removal of Natchu, goobi, thooti, etc.

RATE ANALYSISUnit : 2000 Sqm

A. MATERIALS

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

B. MACHINERY

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 NIL 0 0 0

Rs. 0.00

C. LABOUR

Total Cost of Materials

Total hire charges of Machinery

Total Cost of Labour

Total Cost of Materials

Total hire charges of Machinery

Total hire charges of Machinery

Total Cost of Labour

Preliminary and Maintenance Works - Item Unit Rates 2014-15

354

Sl. No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Work Inspector Day 1.2 370.00 4442 Mazdoor Day 8 295.00 2360

Rs. 2804.00

ABSTRACT:A.COST OF MATERIALS Rs. 0.00B.COST OF MACHINERY Rs. 0.00C.COST OF LABOUR Rs. 2804.00

Total 2804.00D. Add for Contractor's Profit and overheads 14% 392.56Total Cost for removal weed in the extent of 2000 Sqm 3196.56Rate per Sqm (A+B+C+D)/2000 1.6

IRR-PMW-3-26New Item 2014-15-8 PAINTING OF SLUICES FOR MAINTENANCE WORKS

Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners

and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with Coal tar epoxy with material, labour, and all accessories with all leads and lifts.

Data: Rate Analysis Unit: 100 SqmA. Materials

Sl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.1 Rust Cleaner/ Inhibitor ltr 13 140.00 18202 Zinc rich epoxy primer ltr 14 689.00 96463 Thinner@10% ltr 1.4 140.00 1964 Coal Tar epoxy paint ltr 40 215 86005 Thinner@10% ltr 4 140.00 5606 Wire Brush ltr 2 41 82

7Sundries (brushes, Ladders, platforms) LS 3 41 123

Total Cost of Materials 21027

B. MachinerySl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.

NILTotal Cost of Machinery 0

C. LabourSl. No. Particulars Unit Quantity Rate in Rs. Amount in Rs.

1 Painter Class-II Day 20 345.00 69002 Helper Day 20 295.00 5900

Total Cost of Machinery 12800Labour Component/ Unit Qty. 128Add Contractor's Profit and and Overhead Charges @ 14% 17.92Labour Component/ Unit Qty (including contractor' profit) 145.92

ABSTRACT:A. Cost of Materials: 21027B. Hire Charges of Machinery 0C. Cost of Labour 12800

Total 33827D. Add for Excise Duty on 75% cost excluding cost of material 0% 0

Total 33827E. Add for transportation Charges upto worksite @ 3% 1014.81

Total 34841.81F. Add for Contractor's Profit and Overhead Charges @ 14% 14% 4877.8534

Total Cost per 100 Sqm 39719.6634Rate per Sqm 397.2

Total Cost of Labour

Manual works - 2014-15

355

(Common to all Departments)Index_code

COM_MWRK A. Manual Works New extra items-- common item for all earth works using only manual labour for all other works without involving contractors

COM_MWRK-1 (Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. forfoundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposingoff the same as directed etc., complete with initial lead upto 10 m and per cum 98.30initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 3 Cum per day output

COM_MWRK-2 (Manual)Excavation in all kinds of soil/ HDR including boulders upto 0.30 m dia. forfoundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposingoff the same as directed etc., complete with initial lead upto 10 m and per cum 118.00initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 2.5 Cum per day output

COM_MWRK-3 (Manual)Excavation in soft rock (including F&F) without blasting, including boulders upto 0.30 m dia. forfoundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposingoff the same as directed etc., complete with initial lead upto 10 m and per cum 221.80initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Soft rock 1.33 Cum/Day

COM_MWRK-4 (Manual)Excavation in hard rock, including boulders upto 0.30 m dia. forfoundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposingoff the same as directed etc., complete with initial lead upto 10 m and per cum 440.30initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Hard rock 0.67Cum/ day

COM-LDLFT-2014-15

356

COM-LDLFT Chapter VII

(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS

COM-LDLFT 1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall beadopted irrespective of mode of conveyance.2. For total lead exceeding 150 m conveyance by mechanical means only shall be adoptedirrespective of mode of conveyance.3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stonesare for loose volume and not for compacted or in-situ volume.5. The rates for lift charges,lead charges, hire charges are cumulative and inclusive of rates for preceding lift,lead and hire charges6. Lift charges are not payable where conveyance of materials is by mechanical means tofinal placing point.7. Loading and unloading charges are not payable for conveyance by head load.8. Loading charges are not payable for conveyance by mechanical means for disposal ofexcavated materials beyond initial lead of 50 m wherever specified.9. Loading and unloading charges are not payable for conveyance by mechanical means fordisposal of excavated materials beyond initial lead of 1 km wherever specified.10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,size stone and cut stone are inclusive of stacking.11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump yard and other places are cumulative& includes previous km upto 5 kms

14%

FOR THE YEAR: 2013-14COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head load

1 2 3 4 5

1Total lead upto 50 m

(covered by item rate) initial lead initial lead initial lead2 Total lead upto 100 m 48.00 28.00 61.103 Total lead upto 150 m 96.10 56.10 122.30

Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of mode of conveyance. 3. The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading and idle hire charges of machinery.

FOR THE YEAR: 2013-14( No loading and unloading charges allowed for machinery loading and unloading )

Sl No. Distance

(Lead) charges for trucks and

tippers for Earth / Sand /Gravel / Murrum/ Lime/

Surki/ per cu.meter

(Lead) charges for trucks and tippers for

Rubble/Size stones/ Cut

Stones/ Coarse

aggregate per cu.meter

(Lead) charges for trucks and tippers for Cement/ Steel/ RCC

poles/ AC & GI sheets/ Packed

materials/tonne

(Lead) charges for trucks and

tippers per cu.meter for PCC slabs/ Shahabad

slabs/ CC & Laterite blocks/

Wood/ cum

(Lead) charges for per

cu.meter for water/ 1000 litres

(Lead) charges

for trucks per 1000 Nos. of Bricks

1 2 3 4 5 6 7 81 Lead upto 1 km 31.50 30.40 19.00 44.70 18.80 50.702 Lead upto 2 km 44.10 42.60 26.60 62.60 26.30 71.003 Lead upto 3 km 58.90 58.90 36.80 86.60 35.00 94.604 Lead upto 4 km 71.50 71.50 44.70 105.10 42.50 114.905 Lead upto 5 km 84.10 84.10 52.60 123.70 50.00 135.20

6 for Every km beyond 5 km

upto 30 km 12.60 12.60 7.90 18.50 7.50 20.30

7 for Every km beyond 30 km 10.50 10.50 6.60 15.50 6.30 62.60

LEAD/LIFT/LOADING & UNLOADING CHARGES

12. The lead & lift charges are inclusive of contractor's profit and overhead charges of

FOR THE YEAR : 2014-15

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

PCC slab/ Shahbad slab / CC block/ BS slab/ Late-rite / Wood Rs / cum

Sl No.Total distance ( Total lead includes initial lead )

Earth / Sand /Gravel / Murrum/ Lime/ Surki/ Size stone / Cut stone Rubble / Coarse aggregate Rs/ Cum

Cement / Reinforce-ment steel Str steel Rs / tonne

COM-LDLFT-2014-15

357

COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)

Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut

stone/ Coarse

aggregate,Lime in

Rs/cum

cement in Rs/tonnesteel in

Rs./tonne

brick work Rs/1000

No

1 2 3 4 5 6 71 Loading 16.00 32.00 52.80 63.30 44.002 Unloading 8.00 16.00 52.80 63.30 44.00

COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut

stone/ Coarse

aggregate,Lime in

Rs/cum

cement in Rs/tonnesteel in

Rs./tonne

brick work Rs/1000

No

1 2 3 4 5 6 71 Loading 108.20 124.20 154.20 164.70 211.302 Unloading 38.60 62.10 154.20 164.70 211.30

E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

COM-LDLFT-5 Sl No. Description of item

Earth / Sand /Gravel

Murrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut

stone/ Coarse

aggregate,Lime in

Rs/cum1 2 3 41 Loading 52.50 105.002 Unloading 15.90 15.90

F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

COM-LDLFT-6 Sl No.Total lift

( Total lift includes initial lift )

Earth / Sand /Gravel

Murrum/ Lime/ Surki/

Size stone / Cut stone

Rubble / CoarseaggregateRs / cum

Cement /Reinforce-ment steelStr steel

Rs / tonne

PCC slab/Shahbadslab / CCblock/ BS

slab / Laterite/ Wood

Rs / cum

1 2 3 4 5

1Total lift upto 3 m (covered

by item rate) Initial lift Initial lift Initial lift2 For Every 1.00 Lift beyond 5.60 4.10 7.50

initial lift of 3 meters

DETAILED DATA

LEAD / LIFT / LOADING & UNLOADING CHARGES - DATA RATES

I. GENERAL DATA FOR LEAD / LIFT / LOADING & UNLOADING:A . DATA FOR LEAD CHARGES BY HEAD LOAD :

For the purpose of working out conveyance charges by head load the category of materials asclassified in ( I ) above are grouped together as under :CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /Rubble stone / Size stone / Cut stone In this group materials which are comperatively lighter and generally conveyed by head loadby light / heavy mazdoor are included. Method of conveyance, approximate weight per loadand time required to cover specified additional distance will be generally sameTherefore common data is considered for conveyance by head load for materials under this category.

CATEGORY : Cement in bag / Reinforcement steel / Structural steel sections In this group the materials in packed / rolled / fabricated condition which are heavier per loadcompared to the materials under Category above and which can not be split into smallquantities for the purpose of conveyance are included. The unit of measurement for thesematerials is per tonne.

CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood In this group the materials in moulded condition / cut to standard size which are heavier perload compared to materials under Category above are included.

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

COM-LDLFT-2014-15

358

COM-DTL-LDLFT-1 A. (Lead) Conveyance Charges for materials by head loadCATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stoneLead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 60 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 60 ) 1 minNo. of trips per day for additional lead ( 8 x 60 / 1 ) 480Quantity of material by head load per load 0.015 cumQuantity of material by head load per day ( 480 x 0.015 ) say 7 cumDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 7 cum

Sl No. Description Unit QuantityRatein Rs. Amount in Rs.

1 Mazdoor Day 1 295 295Total Rs: 295

Contractor's profit and overhead charges 14% 41.3

7 cum Rs: 336.3Rate per cum Rs: 48.00

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 7 cum

Sl No. Description Unit QuantityRatein Rs. Amount in Rs.

1 Mazdoor Day 2 295 590Total Rs: 590

Contractor's profit and overhead charges 14% 82.6

7 cum Rs: 672.6Rate per cum Rs: 96.10

CATEGORY : Cement in bag / Reinforcement steel / Structural steel sectionsLead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 30 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 30 ) 2 minNo. of trips per day for lead upto 100 m ( 8 x 60 / 2 ) 240Quantity of material by head load per load 50 kgQuantity of material by head load per day ( 240 x 50 / 1000 ) 12 tonneDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 12 tonneSl No. Description Unit Quantity Rate in Rs. Amount in Rs.

1Cement /steel handling mazdoor Day 1 295 295

Total Rs: 295Contractor's profit and overhead charges 14% 41.3

12.00 tonne Rs: 336.3Rate per tonne Rs: 28.00

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 12 tonneSl No. Description Unit Quantity Rate in Rs. Amount in Rs.

1Cement /steel handling Mazdoor Day 2 295 590

Total Rs: 590Contractor's profit and overhead charges 14% 82.6

12.00 tonne Rs: 672.6Rate per tonne Rs: 56.10

CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood

Lead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 40 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 40 ) 1.5 min

Total for materials under this Category

Total for materials under this Category

Total for materials under this Category

Total for materials under this Category

COM-LDLFT-2014-15

359

No. of trips per day for lead upto 100 m ( 8 x 60 / 1.5 ) 320Quantity of material by head load per load 0.017 cumQuantity of material by head load per day ( 320 x 0.017 ) say 5.5 cumDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 5.5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Mazdoor Day 1 295 295

Total Rs: 295Contractor's profit and overhead charges 14% 41.3

5.5 cum Rs: 336.3Rate per cum Rs: 61.10

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 5.5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Mazdoor Day 2 295 590

Total Rs: 590Contractor's profit and overhead charges 14% 82.6

5.5 cum Rs: 672.6Rate per cum Rs: 122.30

COM-DTL-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucksexcluding loading, unloading and idle hire charges of machinery.

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki /

For total lead upto 1 km Unit: 5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Tipper hire charges Hour 0.15 446.70 67.01

Fuel charges Hour 0.15 322.20 48.332 Crew charges Hour 0.15 153.10 22.97

Total Rs: 138.31Contractor's profit and overhead charges 14% 19.36Total for 5 cum Rs: 157.67Rate per cum 31.50

For total lead more than 1 km upto 2 km Unit: 5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Tipper hire charges Hour 0.21 446.70 93.81

Fuel charges Hour 0.21 322.20 67.662 Crew charges Hour 0.21 153.10 32.15

Total Rs: 193.62Contractor's profit and overhead charges 14% 27.11Total for 5 cum Rs: 220.73Rate per cum 44.10

For total lead more than 2 km upto 3 km Unit: 5 cum

Sl No. Description Unit Quantity Rate in Rs.Amountin Rs.

1 Tipper hire charges Hour 0.28 446.70 125.08Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 258.17

Contractor's profit and overhead charges 14% 36.14Total for 5 cum Rs: 294.31Rate per cum 58.90

For total lead more than 3 km upto 4 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.34 446.70 151.88Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 313.48

Contractor's profit and overhead charges 14% 43.89Total for 5 cum Rs: 357.37Rate per cum 71.50

For total lead more than 4 km upto 5 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.4 446.70 178.68Fuel charges Hour 0.4 322.20 128.88

2 Crew charges Hour 0.4 153.10 61.24Total Rs: 368.80

Total for materials under this Category

Total for materials under this Category

COM-LDLFT-2014-15

360

Contractor's profit and overhead charges 14% 51.63Total for 5 cum Rs: 420.43Rate per cum 84.10

For lead beyond 5 km upto 30 km for every km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.06 446.70 26.80Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 55.32

Contractor's profit and overhead charges 14% 7.74Total for 5 cum Rs: 63.06Rate per cum 12.60

For lead beyond 30 km for every km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.05 446.70 22.34Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 46.11

Contractor's profit and overhead charges 14% 6.46Total for 5 cum Rs: 52.57Rate per cum 10.50

CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone

For total lead upto 1 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.15 414.10 62.12Fuel charges Hour 0.15 322.20 48.33

2 Crew charges Hour 0.15 153.10 22.97Total Rs: 133.42

Contractor's profit and overhead charges 14% 18.68Total for 5 cum Rs: 152.10Rate per cum 30.40

For total lead more than 1 km upto 2 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.21 414.10 86.96Fuel charges Hour 0.21 322.20 67.66

2 Crew charges Hour 0.21 153.10 32.15Total Rs: 186.77

Contractor's profit and overhead charges 14% 26.15Total for 5 cum Rs: 212.92Rate per cum 42.60

For total lead more than 2 km upto 3 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.28 446.70 125.08Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 258.17

Contractor's profit and overhead charges 14% 36.14Total for 5 cum Rs: 294.31Rate per cum 58.90

For total lead more than 3 km upto 4 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.34 446.70 151.88Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 313.48

Contractor's profit and overhead charges 14% 43.89Total for 5 cum Rs: 357.37Rate per cum 71.50

For total lead more than 4 km upto 5 km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.4 446.70 178.68Fuel charges Hour 0.4 322.20 128.88

2 Crew charges Hour 0.4 153.10 61.24

COM-LDLFT-2014-15

361

Total Rs: 0.00 368.80Contractor's profit and overhead charges 14% 51.63Total for 5 cum Rs: 420.43Rate per cum 84.10

For lead beyond 5 km upto 30 km for every km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.06 446.70 26.80Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 55.32

Contractor's profit and overhead charges 14% 7.74Total for 5 cum Rs: 63.06Rate per cum 12.60

For lead beyond 30 km for every km Unit: 5 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.05 446.70 22.34Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 46.11

Contractor's profit and overhead charges 14% 6.46Total for 5 cum Rs: 52.57Rate per cum 10.50

CATEGORY : Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials

For total lead upto 1 km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.15 414.10 62.12Fuel charges Hour 0.15 322.20 48.33

2 Crew charges Hour 0.15 153.10 22.97Total Rs: 133.42

Contractor's profit and overhead charges 14% 18.68Total for 8 tonne Rs: 152.10Rate per tonne 19.00

For total lead more than 1 km upto 2 km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.21 414.10 86.96Fuel charges Hour 0.21 322.20 67.66

2 Crew charges Hour 0.21 153.10 32.15Total Rs: 186.77

Contractor's profit and overhead charges 14% 26.15Total for 8 tonne Rs: 212.92Rate per tonne 26.60

For total lead more than 2 km upto 3 km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.28 446.70 125.08Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 258.17

Contractor's profit and overhead charges 14% 36.14Total for 8 tonne Rs: 294.31Rate per tonne 36.80

For total lead more than 3 km upto 4 km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.34 446.70 151.88Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 313.48

Contractor's profit and overhead charges 14% 43.89Total for 8 tonne Rs: 357.37Rate per tonne 44.70

For total lead more than 4 km upto 5 km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.4 446.70 178.68Fuel charges Hour 0.4 322.20 128.88

COM-LDLFT-2014-15

362

2 Crew charges Hour 0.4 153.10 61.24Total Rs: 368.80

Contractor's profit and overhead charges 14% 51.63Total for 8 tonne Rs: 420.43Rate per tonne 52.60

For lead beyond 5 km upto 30 km for every km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.06 446.70 26.80Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 55.32

Contractor's profit and overhead charges 14% 7.74Total for 8 tonne Rs: 63.06Rate per tonne 7.90

For lead beyond 30 km for every km Unit: 8 tonne

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.05 446.70 22.34Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 46.11

Contractor's profit and overhead charges 14% 6.46Total for 8 tonne Rs: 52.57Rate per tonne 6.60

CATEGORY : PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood

For total lead upto 1 km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.15 414.10 62.12Fuel charges Hour 0.15 322.20 48.33

2 Crew charges Hour 0.15 153.10 22.97Total Rs: 133.42

Contractor's profit and overhead charges 14% 18.68Total for 3.4 cum Rs: 152.10Rate per cum 44.70

For total lead more than 1 km upto 2 km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck hire charges Hour 0.21 414.10 86.96Fuel charges Hour 0.21 322.20 67.66

2 Crew charges Hour 0.21 153.10 32.15Total Rs: 186.77

Contractor's profit and overhead charges 14% 26.15Total for 3.4 cum Rs: 212.92Rate per cum 62.60

For total lead more than 2 km upto 3 km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.28 446.70 125.08Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 258.17

Contractor's profit and overhead charges 14% 36.14Total for 3.4 cum Rs: 294.31Rate per cum 86.60

For total lead more than 3 km upto 4 km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.34 446.70 151.88Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 313.48

Contractor's profit and overhead charges 14% 43.89Total for 3.4 cum Rs: 357.37Rate per cum 105.10

For total lead more than 4 km upto 5 km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.4 446.70 178.68

COM-LDLFT-2014-15

363

Fuel charges Hour 0.4 322.20 128.882 Crew charges Hour 0.4 153.10 61.24

Total Rs: 368.80Contractor's profit and overhead charges 14% 51.63Total for 3.4 cum Rs: 420.43Rate per cum 123.70

For lead beyond 5 km upto 30 km for every km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.06 446.70 26.80Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 55.32

Contractor's profit and overhead charges 14% 7.74Total for 3.4 cum Rs: 63.06Rate per cum 18.50

For lead beyond 30 km for every km Unit: 3.4 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Tipper hire charges Hour 0.05 446.70 22.34Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 46.11

Contractor's profit and overhead charges 14% 6.46Total for 3.4 cum Rs: 52.57Rate per cum 15.50

CATEGORY : water

For total lead upto 1 km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.15 402.50 60.38Fuel charges Hour 0.15 322.20 48.33

2 Crew charges Hour 0.15 153.10 22.97Total Rs: 131.68

Contractor's profit and overhead charges 14% 18.44Total for 8000 litres Rs: 150.12Rate per 1000 litres 18.80

For total lead more than 1 km upto 2 km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.21 402.50 84.53Fuel charges Hour 0.21 322.20 67.66

2 Crew charges Hour 0.21 153.10 32.15Total Rs: 184.34

Contractor's profit and overhead charges 14% 25.81Total for 8000 litres Rs: 210.15Rate per 1000 litres 26.30

For total lead more than 2 km upto 3 km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.28 402.50 112.70Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 245.79

Contractor's profit and overhead charges 14% 34.41Total for 8000 litres Rs: 280.20Rate per 1000 litres 35.00

For total lead more than 3 km upto 4 km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.34 402.50 136.85Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 298.45

Contractor's profit and overhead charges 14% 41.78Total for 8000 litres Rs: 340.23Rate per 1000 litres 42.50

For total lead more than 4 km upto 5 km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

COM-LDLFT-2014-15

364

1 Water tanker hire charges Hour 0.4 402.50 161.00Fuel charges Hour 0.4 322.20 128.88

2 Crew charges Hour 0.4 153.10 61.24Total Rs: 351.12

Contractor's profit and overhead charges 14% 49.16Total for 8000 litres Rs: 400.28Rate per 1000 litres 50.00

For lead beyond 5 km upto 30 km for every km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.06 402.50 24.15Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 52.67

Contractor's profit and overhead charges 14% 7.37Total for 8000 litres Rs: 60.04Rate per 1000 litres 7.50

For lead beyond 30 km for every km Unit: 8000 litres

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Water tanker hire charges Hour 0.05 402.50 20.13Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 43.90

Contractor's profit and overhead charges 14% 6.15Total for 8000 litres Rs: 50.05Rate per 1000 litres 6.30

CATEGORY : Bricks (as adopted by R&B(Buildings))

For total lead upto 1 km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.15 414.10 62.12Fuel charges Hour 0.15 322.20 48.33

2 Crew charges Hour 0.15 153.10 22.97Total Rs: 133.42

Contractor's profit and overhead charges 14% 18.68Total for 3000 bricks Rs: 152.10Rate per 1000 bricks 50.70

For total lead more than 1 km upto 2 km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.21 414.10 86.96Fuel charges Hour 0.21 322.20 67.66

2 Crew charges Hour 0.21 153.10 32.15Total Rs: 186.77

Contractor's profit and overhead charges 14% 26.15Total for 3000 bricks Rs: 212.92Rate per 1000 bricks 71.00

For total lead more than 2 km upto 3 km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.28 414.10 115.95Fuel charges Hour 0.28 322.20 90.22

2 Crew charges Hour 0.28 153.10 42.87Total Rs: 249.04

Contractor's profit and overhead charges 14% 34.87Total for 3000 bricks Rs: 283.91Rate per 1000 bricks 94.60

For total lead more than 3 km upto 4 km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.34 414.10 140.79Fuel charges Hour 0.34 322.20 109.55

2 Crew charges Hour 0.34 153.10 52.05Total Rs: 302.39

Contractor's profit and overhead charges 14% 42.33Total for 3000 bricks Rs: 344.72Rate per 1000 bricks 114.90

For total lead more than 4 km upto 5 km Unit: 3000 bricks

COM-LDLFT-2014-15

365

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.4 414.10 165.64Fuel charges Hour 0.4 322.20 128.88

2 Crew charges Hour 0.4 153.10 61.24Total Rs: 355.76

Contractor's profit and overhead charges 14% 49.81Total for 3000 bricks Rs: 405.57Rate per 1000 bricks 135.20

For lead beyond 5 km upto 30 km for every km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.06 414.10 24.85Fuel charges Hour 0.06 322.20 19.33

2 Crew charges Hour 0.06 153.10 9.19Total Rs: 53.37

Contractor's profit and overhead charges 14% 7.47Total for 3000 bricks Rs: 60.84Rate per 1000 bricks 20.30

For lead beyond 30 km for every km Unit: 3000 bricks

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 Truck 10 T charges Hour 0.05 414.10 20.71Fuel charges Hour 0.05 322.20 16.11

2 Crew charges Hour 0.05 153.10 7.66Total Rs: 44.48

Contractor's profit and overhead charges 14% 6.23Total for 3000 bricks Rs: 50.71Rate per 1000 litres 16.90

COM-DTL-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)MORD -data

1 Loading of Lime, Aggregate, Stone Boulder,a) Loading Brick Aggregate, Kankar, Building Rubbish, Unit Quantity Rate Rs. Amount Rs.

Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.02 345.00 6.90Mazdoor day 0.5 295 147.50

Total in Rs. 154.40contractor's profit and overhead charges 14% 21.62Rate per cum = Rs. 32.00

b) Unloading50% of the loading charges 16.00

2 Loading of Earth, Sand, Moorum, Manure, Flya Unit Quantity Rate Rs.Amount

Rs.a) Loading by manual means including a lead upto 30 m

Unit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.01 345.00 3.45Mazdoor day 0.25 295 73.75

Total in Rs. 77.20contractor's profit and overhead charges 14% 10.81Rate per cum = Rs. 16.00

b) Unloading50% of the loading charges 8.00

3 Loading of Bricks by manual means Unit Quantity Rate Rs. Amount Rs.a) Loading including a lead upto 30 m

Unit = 1000 Nos.Taking output = 2000 Nosa) LabourHead Mazdoor day 0.01 345.00 3.45Mazdoor day 0.25 295 73.75Cost for 2000 Nos. = 77.20contractor's profit and overhead charges 14% 10.81Rate per cum = Rs. 44.00

b) Unloading 100% of loading charges i.e., Rs. 44.00

4 Loading of Cement by manual means Unit Quantity Rate Rs. Amount Rs.

COM-LDLFT-2014-15

366

a) Loading including a lead upto 30 mUnit = 1 tTaking output = 10 ta) LabourHead mazdoor day 0.06 345.00 20.70Mazdoor day 1.5 295 442.50Cost for 10 t = 463.20contractor's profit and overhead charges 14% 64.85Rate per 1 tonne = Rs. 52.80

b) Unloading 100% of loading charges I.e 52.80

5 Loading of Structural Steel, Steel Bars by man Unit Quantity Rate Rs. Amount Rs.a) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) Labourhead Mazdoor day 0.07 345.00 24.15Mazdoor day 1.8 295 531.00Cost for 10 t = 555.15contractor's profit and overhead charges 14% 77.72Rate per 1 tonne = Rs. 63.30

b) Unloading 100% of loading charges I.e., Rs. 63.30

6 Unit Quantity Rate Rs. Amount Rs.a) Loading

Unit = 1000 Nos.Taking output = 2000 Nos.a) Labourhead Mazdoor day 0.01 345.00 3.45Mazdoor day 0.25 295.00 73.75Cost for 2000 Nos. = 77.20contractor's profit and overhead charges 14% 10.81Rate per 1000 Nos. = Rs. 44.00

b) Unloading 100% of loading charges I.e., Rs. 44.00

COM-DTL-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

1 Loading of Lime, Aggregate, Stone Boulder,a) Loading Brick Aggregate, Kankar, Building Rubbish,

Building Rubbish, Crushed Slag, Stone for Mas Unit Quantity Rate Rs. Amount Rs.Work by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cuma) LabourHead Mazdoor day 0.02 345.00 6.90Mazdoor day 0.5 295 147.50b) MachineryTruck 10t hour 0.5 889.40 444.70Cost for 5.5 cum = 599.10contractor's profit and overhead charges 14% 83.87Rate per cum = Rs. 124.20

b) Unloading50% of the loading charges i.e., 62.1

2 Loading of Earth, Sand, Moorum, Manure, Flya Unit Quantity Rate Rs. Amount Rs.a) Loading by manual means including a lead upto 30 m

Unit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.01 345.00 3.45Mazdoor day 0.25 295 73.75b) MachineryTruck 10t hour 0.5 889.40 444.70Cost for 5.5 cum = 521.90contractor's profit and overhead charges 14% 73.07Rate per cum = Rs. 108.20

b) UnloadingUnloading of Earth, Sand, Moorum, Manure, F Unit Quantity Rate Rs. Amount Rs. by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cuma) LabourMate day 0.005 345.00 1.73Mazdoor(unskilled) day 0.125 295 36.88

Loading of Bricks - 1000 Nos (Regular sizes - 225x140x70 mm) by manual means including

COM-LDLFT-2014-15

367

b) MachineryTruck 10t hour 0.166 889.40 147.64Cost for 5.5 cum = 186.25contractor's profit and overhead charges 14% 26.08Rate per cum = Rs. 38.60

3 Loading of Bricks by manual means Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1000 Nos.Taking output = 2000 Nosa) LabourMate day 0.01 345.00 3.45Mazdoor(unskilled) day 0.25 295 73.75b) MachineryTruck 10t hour 0.33 889.40 293.50Cost for 2000 Nos. = 370.70contractor's profit and overhead charges 14% 51.90Rate per 1000 bricks = Rs. 211.30

b) Unloading 100% of loading charges i.e 211.30

4 Loading of Cement by manual means Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) LabourMate day 0.06 345.00 20.70Mazdoor(unskilled) day 1.5 295 442.50b) MachineryTruck 10t hour 1 889.40 889.40Cost for 10 t = 1352.60contractor's profit and overhead charges 14% 189.36Rate per 1 tonne = Rs. 154.20

b) Unloading 100% of loading charges i.e 154.20

5 Loading of Structural Steel, Steel Bars by man Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) LabourMate day 0.07 345.00 24.15Mazdoor(unskilled) day 1.8 295 531.00b) MachineryTruck 10t hour 1 889.40 889.40Cost for 10 t = 1444.55contractor's profit and overhead charges 14% 202.24Rate per 1 tonne = Rs. 164.70

b) Unloading 100% of loading charges i.e 164.70

COM-DTL-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

COM-DTL-LDLFT-5-A 1 Loading of Lime, Aggregate, Stone Boulder, a) Loading Brick Aggregate, Kankar, Building Rubbish,

Crushed Slag, Stone for Masonry work by mechanical means including a lead upto 30 m Unit Quantity Rate Rs. TotalPlacing tipper at loading point, loading with front end loader excluding time for haulage and return trip.Unit = cumTaking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket ca Min 7.33@ 45 / 25 cum per houriii) Manoevouring, reversing, dumping and turn Min - for returniv) Waiting time, unforeseen contingencies, etcMin 2Total Min 10.33a) MachineryTipper 10 t capacity hour 0.17 922.00 158.74Front end-loader 1 cum bucket capacity @ 45 c hour 0.12 2848.50 347.99per hourCost for 5.5 cum = 506.73b) contractor's profit and overhead charges 14% 70.94Rate per cum = (a+b)/5.5 Rs. 105.00

b) Unloadingsee below. COM-LDLFT-5-B

COM-LDLFT-2014-15

368

COM-DTL-LDLFT-5-B 2 Loading of Earth, sand, Moorum, Manure, Flyash, a) Loading by mechanical means including a lead upto 30 m

Placing tipper at loading point, loading with frontend loader excluding time for haulage and retu Unit Quantity Rate Rs. TotalPlacing tipper at loading point, loading with frontend loader excluding time for haulage and return trip.Unit = cumTaking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket ca Min 3.3@ 45 / 25 cum per houriii) Waiting time, unforeseen contingencies, etcMin 2Total Min 6.3a) MachineryTipper 10 t capacity hour 0.105 922.00 96.81Front end-loader 1 cum bucket capacity @ 45 c hour 0.055 2848.50 156.67per hourCost for 5.5 cum = 253.48b) contractor's profit and overhead charges 14% 35.49Rate per cum = (a+b)/5.5 Rs. 52.50

b) UnloadingUnloading of Earth, sand, Moorum, Manure, Flyash, lime, Aggregate, Stone boulder, Brick aggregate, Kankar, Building rubbish, Manure, Crushed Sla Unit Quantity Rate Rs. TotalFlyash, Stone for Masonry work by mechanical means including a lead upto 30 mPlacing tipper at unloading point, excluding time for haulage and return trip.Taking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket ca Min 2@ 45 / 25 cum per houriii) Waiting time, unforeseen contingencies, etcMin 2Total 5a) MachineryTipper 10 t capacity hour 0.08 922.00 76.83Cost for 5.5 cum = 76.83b) contractor's profit and overhead charges 14% 10.76Rate per cum = (a+b)/5.5 15.90

COM-DTL-LDLFT-6 F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

FOR CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /Rubble stone / Size stone / Cut stone

Lift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 60 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working1 x6x 60 / 50 / 60 ) 0.12 minNo. of trips per day for lift 1.0 m above 3 m ( 8 x 60 / 0..12) 4000Quantity of material by head load 0.015 cumQuantity of material by head load per day ( 4000x 0.015 ) 60 cumDeploy 1 mazdoor for every additional lift of 1.0 m beyond initial lift.Lift : Upto 3.00 m for materials under this Category Unit: 60 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 2 3 4 5 6Mazdoor Day 1.00 295.00 295.00contractor's profit and overhead charges 14% 41.30

Total Rs: for 60 cum 336.30

Rate per cum 5.60FOR CATEGORY: Cement bag / Reinforcement steel / Structural steel sectionsLift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 25 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working

COM-LDLFT-2014-15

369

1 x6x 60 / 50 / 25 ) 0.29 minNo. of trips per day foradditional lift 1.0 m above 3 m ( 8 x 60 / 0.29) 1655Quantity of material by head load 50 kgsQuantity of material by head load per day ( 1655x50x 0.015 ) 83 tonsDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoorLift : Upto 3.00 m for materials under this Category Unit: 83 TONS

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 2 3 4 5 6Mazdoor Day 1.00 295.00 295.00contractor's profit and overhead charges 14% 41.30

Total Rs: for 83 Tonnes 336.30

Rate per tonne 4.10FOR CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood

Lift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.Lift : ADDITIONAL LIFT CHARGES FOR EACH 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 40 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working1 x6x 60 / 50 / 40 ) 0.18 minNo. of trips per day for lift 1.0 m ( 8 x 60 / 0.18 ) 2667Quantity of material by head load 0.017 cumQuantity of material by head load per day ( 1667x 0.018 ) 45 cumDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor

Lift : Upto 3.00 m for materials under Category Unit: 45 cum

Sl No. Description Unit QuantityRatein Rs.

Amountin Rs.

1 2 3 4 5 6Mazdoor Day 1.00 295.00 295.00contractor's profit and overhead charges 14% 41.30

Total Rs: for 45 cum 336.30

Rate per cum 7.50

Hire Charges- for the year 2014-15

370

1 2 3 4 5 6 71 Agitator car / Transit mixer 2 cum Hour 758.40 937.80 244.90 1941.102 Air compressor 5 cmm ( electric ) Hour 108.30 256.80 142.40 507.503 Air compressor 7 cmm ( diesel ) Hour 241.30 767.30 182.20 1190.804 Air compressor 7 cmm ( electric ) Hour 131.90 342.40 142.40 616.705 Air compressor 8.5 cmm ( diesel Hour 275.60 959.10 182.20 1416.906 Air compressor 8.5 cmm ( electric) Hour 170.80 428.00 142.40 741.207 Air compressor 15 cmm ( electric) Hour 138.80 951.20 151.80 1241.808 Angle Dozer 90 hp Hour 1715.50 656.00 204.10 2575.609 Batching plant 0.5 cum( 6 cum/hr) Hour 114.60 114.10 293.80 522.50

10 Batching plant 2 x 1.00 cum(15 cum/hr) Hour 405.40 342.40 293.80 1041.6011 Batching plant 2 x 1.50 cum(50 cum/hr) Hour 518.10 418.50 293.80 1230.4012 Bending machine 3000 x 12 mm Hour 42.60 114.10 113.90 270.6013 Clamp shell and hoisting ropes Hour 5.40 0.00 0.00 5.4014 Concrete bucket 1.5 cum Hour 15.80 0.00 0.00 15.8015 Concrete hand mixer 45 / 30 ltr Hour 5.50 0.00 0.00 5.5016 Concrete mixer 300 / 200 ( diesel) Hour 53.50 85.30 189.80 328.6017 Concrete mixer 300 / 200 ltr ( electric) Hour 51.70 38.00 189.80 279.5018 Concrete mixer 600 / 400 ( diesel) Hour 92.70 170.50 189.80 453.0019 Concrete mixer 600 / 400 ltr ( electric Hour 91.00 76.10 189.80 356.9020 Concrete paver 100 sqm / hr Hour 356.50 0.00 364.40 720.9021 Convey mucker Hour 822.80 264.80 151.80 1239.4022 Core drilling machine Hour 319.00 255.80 244.90 819.7023 Diesel generating set 30 KVA Hour 65.80 682.00 113.90 861.7024 Diesel generating set 50 KVA Hour 85.10 1023.00 113.90 1222.0025 Diesel Loco 45 hp Hour 381.60 575.40 142.40 1099.4026 Dewatering pump 5 hp ( diesel ) Hour 10.20 85.30 96.10 191.6027 Dewatering pump 5 hp ( electric ) Hour 3.00 38.00 72.10 113.1028 Dewatering pump 10 hp ( diesel ) Hour 15.20 170.50 96.10 281.8029 Dewatering pump 10 hp ( electric Hour 6.70 76.10 72.10 154.9030 Dewatering pump 20 hp ( diesel ) Hour 48.30 341.00 96.10 485.4031 Dewatering pump 20 hp ( electric Hour 12.30 152.20 72.10 236.6032 Drifter Hour 322.70 0.00 306.20 628.9033 Drilling jumbo Hour 368.40 46.00 151.80 566.2034 Dumper 4.5 cum Hour 580.70 429.70 195.90 1206.3035 Geophysical Electric resistivity meter Hour 99.00 0.00 0.00 99.0036 Grouting pump Hour 24.90 38.00 227.80 290.7037 Guniting / sand blast equipment Hour 110.10 0.00 189.80 299.9038 Ice plant & accessories 30 t / day Hour 170.20 1084.30 113.90 1368.4039 Jack hammer Hour 19.80 0.00 284.70 304.5040 Needle vibrator 40 mm ( petrol ) Hour 7.60 21.50 136.60 165.7041 Needle vibrator 40 mm ( electric ) Hour 8.00 7.60 136.60 152.2042 Needle vibrator 60 mm ( petrol ) Hour 8.20 32.20 136.60 177.0043 Needle vibrator 60 mm ( electric ) Hour 9.70 11.40 136.60 157.7044 Planing machine 4 m stroke Hour 117.80 114.10 182.20 414.1045 Plate shearing machine upto 12 mm Hour 41.90 152.20 122.50 316.6046 Pneumatic placer 0.5 cum Hour 171.10 0.00 75.10 246.2047 Pneumatic tamper Hour 20.70 0.00 227.80 248.5048 Pug cutting machine Hour 6.40 3.80 0.00 10.2049 Pusher leg Hour 12.70 0.00 0.00 12.7050 Road roller diesel 10 t Hour 197.20 767.30 182.20 1146.70

HIRE CHARGES OF MACHINERY

FOR THE YEAR : 2014-15

Crew Charge in Rs.

Total in Rs

S.No Description of machinery Unit Hire charge in Rs

Fuel charge in Rs

Hire Charges- for the year 2014-15

371

1 2 3 4 5 6 7

HIRE CHARGES OF MACHINERY

FOR THE YEAR : 2014-15

Crew Charge in Rs.

Total in Rs

S.No Description of machinery Unit Hire charge in Rs

Fuel charge in Rs

51 Shovel 0.50 cum 75 hp Hour 1003.10 511.50 204.10 1718.7052 Shovel 0.85 cum 110 hp Hour 1706.60 937.80 204.10 2848.5053 Stationery derric crane Hour 86.10 0.00 0.00 86.1054 Tipper 5 cum Hour 446.70 322.20 153.10 922.0055 Tipping tub 1.5 cum Hour 64.20 0.00 0.00 64.2056 Tower crane 5 tonne Hour 867.10 197.80 163.30 1228.2057 Transformer 250 KVA Hour 5041.00 0.00 0.00 5041.0058 Truck 10 t Hour 414.10 322.20 153.10 889.4059 Truck mounted derric crane 5 t Hour 519.70 322.20 153.10 995.0060 Upright drilling machine/Grinder Hour 22.50 38.00 171.60 232.1061 Ventilation fan 20 hp Hour 11.50 152.20 24.90 188.6062 Vibratory pad foot roller 8 t Hour 1342.20 1108.30 227.80 2678.3063 Wagon drill Hour 188.50 0.00 244.90 433.4064 Water tanker 8000 ltr Hour 402.50 322.20 153.10 877.8065 Welding set Hour 16.00 91.30 0.00 107.3066 Winch 35 hp ( electric ) Hour 129.40 186.40 227.80 543.6067 Tractor with 2T roller Hour 345.006869 Hydraulic Truck Crane 30T Hour 3096.80 118.80 454.30 3669.9070 Hydraulic Truck Crane 16T Hour 2278.10 75.00 454.30 2807.40

71Heavy Duty Airless Spray Painting Equipment Hour 121.40 121.40