government memorandum information control … · 2 days ago · united states government memorandum...

99
UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Subject: Control # Type Plan Coordinator, OLP, Plans Section (GM 235D) Public Information copy of plan - Control S-8016 - Supplemental Development Operations Coordination Document Lease(s) - OCS 00184 Block -72 East Breaks Area OCS-G 13576 Block -71 East Breaks Area Operator - EC Offshore Properties, Inc. Description Caisson and Well 006, Platform A and Wells A001, A007 and Platform C and Well C007 Attached is a copy of the subject plan. It has been deemed submitted and is under review for approval. Michelle Griffitt Evans Plan Coordinator

Upload: others

Post on 24-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

UNITED STATES

GOVERNMENT MEMORANDUM

To: Public

Information

August 21, 2020

From:

Subject:

Control

# Type

Plan Coordinator, OLP, Plans Section (GM 235D)

Public Information copy of plan

- Control S-8016

- Supplemental Development Operations Coordination

Document

Lease(s) - OCS 00184 Block - 72 East Breaks Area

OCS-G 13576 Block - 71 East Breaks Area

Operator - EC Offshore Properties, Inc.

Description

Caisson and Well 006, Platform A and Wells A001, A007

and Platform C and Well C007

Attached is a copy of the subject plan.

It has been deemed submitted and is under review for approval.

Michelle Griffitt Evans

Plan Coordinator

Page 2: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC OFFSHORE PROPERTIES, INC.

600 Travis St., Suite 600 Houston, Texas 77002

July 17, 2020 SUBMITTED VIA EMAIL TO BOEM Regional Supervisor for Leasing and Plans U.S. Department of the Interior Bureau of Ocean Energy Management 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 ATTN: Plans Section (GM 235D) RE: Supplemental Development Operations Coordination Document (DOCD)

East Cameron Block 71/72, Lease OCS-G 13576 / OCS00184, Respectively OCS Federal Waters, Gulf of Mexico, Louisiana

To whom it may concern: In accordance with the provisions of Title 30 CFR, Parts 250 and 550, Subpart B and further defined in Notice to Lessees (NTL) BOEM 2015-N01, 2009-G27 and 2008-G04 (extended by NTL BOEM 2015-N02), clarifying the information requirements for Exploration Plans and Development Operations Coordination Documents on the OCS, EC Offshore Properties, Inc. (herein referred to as ‘ECOP’) hereby submits for your review and approval a Supplemental DOCD for the above referenced leases. Attached is a complete Proprietary copy and Public Information copy for BOEM review. Under this Supplemental DOCD, ECOP proposes to add a new well located in East Cameron Area, Block 72, Lease OCS00184 to the production facility on Platform C in East Cameron Area, Block 71, Lease OCS-G 13576, and install a lease term pipeline to transport production to existing Platform C. Lease OCS-G 13576 is currently held by workover operations until July 31, 2020 and Lease OCS00184 is currently held by workover operations until August 7, 2020, therefore ECOP respectfully request this review be expedited. Should additional information be required, please contact Kathy Camp at 713.201.9627 or via email to [email protected]. Please forward all approval documents to the undersigned at [email protected]. Sincerely,

David Strassner David Strassner Operations Manager DS:KC Enclosures

PUBLIC INFORMATION COPY

Page 3: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Table of Contents SECTION 1 - CONTENTS OF PLAN .................................................................................................................... 1

Plan Information Form ........................................................................................................................................ 2

Bathymetry Map and Location Plat .................................................................................................................... 2

Safety and Pollution Prevention Features .......................................................................................................... 2

Storage Tanks and Production Vessels ............................................................................................................... 3

Service Fees ........................................................................................................................................................ 3

Pollution Prevention Measures .......................................................................................................................... 3

Additional Measures ........................................................................................................................................... 3

SECTION 2 - GENERAL INFORMATION ............................................................................................................ 4

Applications and Permits .................................................................................................................................... 4

Drilling Fluids ....................................................................................................................................................... 4

Peak Production Rates / Life of Reserves ........................................................................................................... 4

Oil Characteristics ............................................................................................................................................... 4

New or Unusual Technology ............................................................................................................................... 4

Bonding Information ........................................................................................................................................... 4

Oil Spill Financial Responsibility (OSFR) .............................................................................................................. 4

Deepwater Well Control Statement .................................................................................................................. 4

Suspensions of Production .................................................................................................................................. 5

Blowout Scenario ............................................................................................................................................... 5

Chemical Products ............................................................................................................................................. 5

SECTION 3 - GEOLOGICAL AND GEOPHYSICAL INFORMATION ........................................................................ 6

Geological Description ....................................................................................................................................... 6

Structure Contour Maps .................................................................................................................................... 6

Interpreted 2-D or 3-D Seismic Lines ................................................................................................................. 6

Geological Structure Cross-Sections .................................................................................................................. 6

Shallow Hazards Report ..................................................................................................................................... 6

Site Specific Shallow Hazards Assessment ......................................................................................................... 6

High Resolution Seismic Lines ............................................................................................................................ 6

Stratigraphic Column ......................................................................................................................................... 7

Time Versus Depth Tables .................................................................................................................................. 7

Geochemical Information .................................................................................................................................. 7

Future G&G Activities ........................................................................................................................................ 7

PUBLIC INFORMATION COPY

Page 4: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

SECTION 4 - HYDROGEN SULFIDE INFORMATION .......................................................................................... 8

Concentration .................................................................................................................................................... 8

Classification Request ........................................................................................................................................ 8

Contingency Plan ................................................................................................................................................ 8

Modeling Report ................................................................................................................................................ 8

SECTION 5 - MINERAL AND RESOURCE CONSERVATION INFORMATION ........................................................ 9

Technology and Reservoir Engineering Practices and Procedures .................................................................... 9

Technology and Recovery Practices and Procedures ........................................................................................ 9

Reservoir Development ..................................................................................................................................... 9

SECTION 6 - BIOLOGICAL, PHYSICAL AND SOCIOECONOMIC INFORMATION ................................................ 10

Chemosynthetic Communities Report ............................................................................................................. 10

Topographic Features Map ............................................................................................................................... 10

Topographic Features Statement .................................................................................................................... 10

Live Bottom (Pinnacle Trend) Map .................................................................................................................. 10

Live Bottom (Low Relief) Map .......................................................................................................................... 10

Potentially Sensitive Biological Features ......................................................................................................... 10

ROV Monitoring Survey Plan ............................................................................................................................ 10

Threatened and Endangered Species Information .......................................................................................... 10

Archaeological Report ...................................................................................................................................... 11

Air and Water Quality Information .................................................................................................................. 11

Socioeconomic Information ............................................................................................................................. 11

SECTION 7 - WASTE AND DISCHARGE INFORMATION .................................................................................. 12

Projected Generated Wastes ........................................................................................................................... 12

Projected Ocean Discharges ............................................................................................................................ 12

Modeling Report .............................................................................................................................................. 12

NPDES Permits ................................................................................................................................................. 12

Cooling Water Intakes ...................................................................................................................................... 12

SECTION 8 - AIR EMISSIONS INFORMATION ................................................................................................ 13

Screening Checklist .......................................................................................................................................... 13

Summary Table of Emissions ........................................................................................................................... 13

Spreadsheets .................................................................................................................................................... 13

SECTION 9 - OIL SPILL INFORMATION .......................................................................................................... 14

Oil Spill Response Planning ............................................................................................................................... 14

Site Specific OSRP ......................................................................................................................................... 14

Regional or Subregional OSRP Information .................................................................................................. 14

PUBLIC INFORMATION COPY

Page 5: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Spill Response Sites ....................................................................................................................................... 14

OSRO Information ......................................................................................................................................... 14

Worst Case Scenario Determination ............................................................................................................ 14

WCD Calculations Overview ......................................................................................................................... 15

Oil Spill Response Discussion – NEPA / CZMA .................................................................................................. 15

Modeling Report ............................................................................................................................................... 15

SECTION 10 - ENVIRONMENTAL MONITORING INFORMATION .................................................................... 16

Monitoring Systems ......................................................................................................................................... 16

Incidental Takes ................................................................................................................................................ 16

Flower Garden Banks National Marine Sanctuary ........................................................................................... 16

SECTION 11 - LEASE STIPULATIONS INFORMATION ..................................................................................... 17

SECTION 12 - ENVIRONMENTAL MITIGATION MEASURES INFORMATION ................................................... 18

Impacts to Marine & Coastal Environments & Habitats, Biota, and Threatened and Endangered Species .... 18

Incidental Takes ................................................................................................................................................ 18

SECTION 13 - DECOMMISSIONING INFORMATION ...................................................................................... 19

SECTION 14 - RELATED FACILITIES AND OPERATIONS INFORMATION .......................................................... 20

Related OCS Facilities and Operations ............................................................................................................. 20

Transportation System ..................................................................................................................................... 20

Produced Liquid Hydrocarbons Transportation Vessels .................................................................................. 20

SECTION 15 - SUPPORT VESSELS AND AIRCRAFT INFORMATION ................................................................. 21

General .............................................................................................................................................................. 21

Diesel Oil Supply Vessels .................................................................................................................................. 21

Drilling Fluids Transportation ........................................................................................................................... 21

Solid and Liquid Wastes Transportation ........................................................................................................... 21

Vicinity Map ..................................................................................................................................................... 21

SECTION 16 - ONSHORE SUPPORT FACILITIES INFORMATION ...................................................................... 22

General ............................................................................................................................................................. 22

Support Base Construction or Expansion ..................................................................................................... 22

Support Base Construction or Expansion Timetable ................................................................................... 22

Air Emissions .................................................................................................................................................... 22

Unusual Solid and Liquid Wastes ..................................................................................................................... 22

Waste Disposal ................................................................................................................................................. 22

SECTION 17 - SULPHUR OPERATIONS INFORMATION .................................................................................. 23

SECTION 18 - COASTAL ZONE MANAGEMENT ACT (CZMA) INFORMATION .................................................. 24

Consistency Certification ................................................................................................................................. 24

PUBLIC INFORMATION COPY

Page 6: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Other Information ............................................................................................................................................. 24

SECTION 19 - ENVIRONMENTAL IMPACT ANALYSIS (EIA) ............................................................................. 25

Impact Producing Factors (IPFs) from the Proposed Activities ........................................................................ 25

Analysis ....................................................................................................................................................... 26-37

Environmental Hazards .................................................................................................................................... 38

Alternatives ....................................................................................................................................................... 39

Mitigation Measures ........................................................................................................................................ 39

Consultation ..................................................................................................................................................... 39

Preparer(s) ....................................................................................................................................................... 39

References ....................................................................................................................................................... 39

SECTION 20 - ADMINISTRATIVE INFORMATION ........................................................................................... 41

Exempted Information Description (Public Information Copies Only) ............................................................ 41

Bibliography ..................................................................................................................................................... 41

PUBLIC INFORMATION COPY

Page 7: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Attachments

Attachment A Plan Information Form Attachment B Well Location Plat Attachment C Bathy Map Attachment D PF Elevation Drawing Attachment E Pay.gov Service Fee Attachment F Proprietary Data Attachment G Proprietary Data Attachment H Proprietary Data Attachment I Endangered and Threatened Species Attachment J Waste & Discharge Attachment K Air Emissions Spreadsheets Attachment L Oil Spill Response / NEPA Attachment M Bryde’s BiOp Vicinity Map Attachment N Vicinity Map

PUBLIC INFORMATION COPY

Page 8: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 1 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

Supplemental Development Operations Coordination Document (DOCD)

For EC OFFSHORE PROPERTIES, INC. East Cameron Area, Blocks 71 and 72 Lease OCS-G 13576 and OCS00184

Offshore Louisiana

SECTION 1 - CONTENTS OF PLAN Under this Supplemental DOCD, EC Offshore Properties, Inc., Company No. 03147 (herein referred to as ECOP) as designated operator of Leases OCS-G13576 and OCS 00184, is proposing to perform routine maintenance operations by possibly re-entering existing well(s) with a commitment to return the following wells to production: EC 71, OCS-G 13576: A001ST00BP00 / API 17-703-00115-00 A007ST00BP00 / API 17-703-00308-00 EC72, OCS00184: C007ST00BP02 / API 17-703-40958-02 In addition to returning the above referenced existing wells to production, ECOP is proposing to install a 4-inch lease term gas/condensate pipeline from Caisson and Well 006 in East Cameron Block 72 to the Platform C in Block 71 (CID 20217-2). There will be no drilling operations proposed in this Supplemental DOCD. Well 006 will be drilled under a Supplemental Exploration Plan (Control No. S-8005) approved on July 10, 2020 which also included the installation of a temporary caisson to be installed prior to the rig leaving the location. A permanent well protector to be designated Caisson 006 will be designed and permitted via the Regional OSTS Unit. The permanent well protector will require 2 small support piles driven above the surface with an impact hammer. The final design will not be available until the well is drilled and completed. A soil boring must be obtained before the number of strikes and planned days for conducting pile driving activity can be determined. ECOP will follow the guidance of the 2020 NMFS BiOp issued on March 13, 2020 with regards to pile driving measures which are designed to promote environmental protection, consistent environmental policy, compliance with environmental laws, and safety. All activities being proposed in the DOCD are located West of the 87.5°W longitude. Lease OCS00184, East Cameron Block 72 has been in effect since November 19, 1948 when acquired by Continental Oil Company et al. The lease is now operated by EC Offshore Properties, Inc. (effective July 17, 2019) and is currently held by prior workover operations until August 7, 2020. Lease OCS-G 13576, East Cameron Block 71 has been in effect since September 1, 1992 when acquired by King Ranch Oil and Gas, Inc. Fieldwood Energy LLC designated EC Offshore Properties, Inc. (effective June 13, 2018) and is currently held by prior workover operations until July 31, 2020.

PUBLIC INFORMATION COPY

Page 9: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 2 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

Previous and recent activity is outlined below:

Plan Control No. Activity Status

N-6704 Wells A1, A3, A7, C1, C2, C5 Completed by BT Operating Co.

S-6428 OCS-G 13576 Well A / OS00184 Wells A thru C Completed by EC Partners, LP (2004)

R-6843 Flow tests for Wells A007, C001, and C002 and the revision of air emissions for Platforms A (Complex ID 20217-1) and C (Complex ID 20217-2).

Completed – Workover operations held both leases past expiration date (2019)

S-8005 Drill 006 / WP 006 WO Rig (2020)

(a) Plan Information Form An OCS Plan Information Form (BOEM-137) with details of the proposed production operations is included as Attachment A. The proposed operations are in approximately 52 feet of water. Only lift boats and standard workboats will be utilized for the production operations. All vessels will take all precautions necessary to ensure the protection of the ESA-listed species covered by the NMFS 2020 Biological Opinion (BiOp) issued on March 13, 2020. (b) Bathymetry Map and Location Plat Included as Attachments B and C are the associated Location Plat and Bathymetry Maps. The plat shows the surface location of the existing wells. The current bottom hole location, depth of the well (MD and TVD) and the associated water depth is provided. Please note, bottom hole location, MD & TVD depth is omitted from the Public Information Copy. See Attachment D for temporary well protector drawing. (c) Safety and Pollution Prevention Features No drilling or completion operations will be performed under this DOCD. Safety features on Platforms A, C and Caisson 006 will include well control, pollution prevention, welding procedure, and blowout prevention equipment as described in the following Federal Register Notices, Notice to Lessees (NTL) and Subparts located in Title 30 CFR Part 250 and 550:

• Federal Register, Vol. 77, No. 163, August 22, 2012, Final Rule for Increased Safety Measures for Energy Development on the Outer Continental Shelf

• Federal Register, Vol. 75, No. 198, October 14, 2010, Final Rule for Increased Safety Measures for Energy Development on the Outer Continental Shelf

• BOEM 2015-N01 for Information Requirements for Exploration Plans, Development and Production Plans, and Development Operations Coordination Documents on the OCS for Worst Case Discharge and Blowout Scenarios

• NTL 2010-N10 for Statement of Compliance with Applicable Regulations and Evaluation of Information Demonstrating Adequate Spill Response and Well Containment Resources

These regulations may be further clarified by Safety Alerts, and current policy making invoked by the Bureau of Ocean Energy Management (BOEM), Environmental Protection Agency (EPA) and the U.S. Coast Guard (USCG).

PUBLIC INFORMATION COPY

Page 10: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 3 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

In accordance with Title 30 CFR 250.1501, the goal of our training program is safe and clean OCS operations. To accomplish this, ECOP ensures that our employees and contractor personnel engaged in well control understand and can properly perform their duties. Supervisory and certain designated personnel on-board the facilities are to be familiar with the effluent limitations and guidelines for overboard discharges into the receiving waters, as outlined in the EPA’s NPDES General Permit GMG290000. Some of these pollution prevention measures include installation of curbs, gutters, drip pans, and drains on deck areas to collect all contaminants and debris. All discharges related to the operations proposed in this Plan are covered under EPA Region 6’s NPDES General Permit. (d) Storage Tanks and Production Vessels Tanks with a capacity of 25 Bbls or more of oil as defined at 30 CFR 254.6 are listed below:

Type of Storage Tank Type of Facility Tank Capacity

(bbls) Number of

Tanks Total

Capacity (bbls)

Fluid Gravity

(API)

Production EC Pf C (CID 20217) 270 1 270 56o

(e) Service Fees

A copy of the receipt for payment is included as Attachment E. (f) Pollution Prevention Measures Supervisory and certain designated personnel on-board the facility are to be familiar with the effluent limitations and guidelines for overboard discharges into the receiving waters, as outlined in EPA’s NPDES General Permit GMG290000. Some of these pollution prevention measures include installation of curbs, gutters, drip pans, and drains to collect all contaminants and debris to prevent the discharge of oils and greases from drilling rigs or platforms during rainfall and routine operations. ECOP will ensure that our employees and contractor personnel engaged in our offshore production operations understand the state and federal regulations. (g) Additional Measures ECOP does not propose any additional safety, pollution prevention, and early spill detection measures beyond those required by 30 CFR Part 250 and 550. These are also addressed above in section (c) and (f).

PUBLIC INFORMATION COPY

Page 11: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 4 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 2 - GENERAL INFORMATION (a) Applications and Permits

Application / Permit Issuing Agency Status Lease Term Pipeline BSEE Region Pending

Safety System Modification BSEE District Pending Permanent Well Protector BSEE Region – OSTS Pending

(b) Drilling Fluids

There are no wells being drilled under this DOCD. (c) Peak Production Rates / Life of Reserves PROPRIETARY DATA (d) Oil Characteristics Not applicable for the development activity proposed in this plan. (e) New or Unusual Technology ECOP does not propose the use of any new or unusual technology in the development activities proposed under this plan. (f) Bonding Information The bond requirements for the activities and facilities proposed in this Supplemental DOCD will be satisfied by the appropriate bond furnished and maintained according to 30 CFR Part 556.900, Subpart I and applicable NTL’s. (g) Oil Spill Financial Responsibility (OSFR) ECOP (BOEM Operator No. 03147) will demonstrate oil spill financial responsibility for the facilities proposed in this Supplemental DOCD in accordance with 30 CFR Part 553, and NTL No. 2008-N05, “Guidelines for Oil Spill Financial Responsibility for Covered Facilities”. (h) Deepwater Well Control Statement The water depth at the surface location is 52 feet. A deepwater well control statement is not required for the location of the activities proposed in this plan.

PUBLIC INFORMATION COPY

Page 12: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 5 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

(i) Suspensions of Production (SOP) Lease OCS-G13576 is currently held by workover operations until July 31, 2020. A suspension of production is being submitted under separate cover. Lease OCS00184 is currently held by workover operations until August 7, 2020. A suspension of operation is being submitted under separate cover. (j) Blowout Scenario and Worst-Case Discharge Calculations NO DRILLING OR COMPLETION OPERATIONS ARE PROPOSED IN THIS PLAN

PUBLIC INFORMATION COPY

Page 13: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 6 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 3 - GEOLOGICAL AND GEOPHYSICAL INFORMATION In accordance with 43 CFR, Part 2, those items considered proprietary have been omitted from the Public Information copy and have been referenced accordingly. (a) Geological Description PROPRIETARY DATA (b) Structure Contour Maps PROPRIETARY DATA (c) Interpreted 2-D or 3-D Seismic Lines PROPRIETARY DATA (d) Geological Structure Cross-Sections PROPRIETARY DATA (e) Shallow Hazards Report The activity proposed in this plan occurs from previously approved surface locations. A shallow hazards report is not required at this time. (f) Site-Specific Shallow Hazards Assessment The activity proposed in this plan occurs from previously approved surface locations. A site-specific shallow hazards assessment is not required at this time. (g) High Resolution Seismic Lines High resolution seismic lines were submitted and reviewed under Plan Control No. S-8005.

PUBLIC INFORMATION COPY

Page 14: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 7 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

(h) Stratigraphic Column The Stratigraphic Column was submitted and reviewed under Plan Control No. S-8005. (i) Time Versus Depth Tables A time versus depth table was included in Plan Control No. S-8005 for drilling and completion operations approved on July 10, 2010. (j) Geochemical Information This information is not required for the activities proposed in this plan in the BOEM GOMR. (k) Future G&G Activities This information is not required for the activities proposed in this plan in the BOEM GOMR.

PUBLIC INFORMATION COPY

Page 15: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 8 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 4 - HYDROGEN SULFIDE INFORMATION (a) Concentration ECOP does not anticipate encountering H2S while conducting our proposed development activities.

(b) Classification Request By letter dated July 10, 2020, BOEM determined the area of operations in EC Block 72, Lease OCS00184 as “absent” of H2S. EC Block 71, Lease OCS-G13576 has been previously determined to be “absent” of H2S in Plan Control No. S-8005 for drilling and completion operations approved on July 10, 2010. c) Contingency Plan An H2S contingency plan is not required for the activities proposed in this plan. (d) Modeling Report A modeling report is not required for the activities proposed in this plan.

PUBLIC INFORMATION COPY

Page 16: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 9 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 5 - MINERAL AND RESOURCE CONVERSATION INFORMATION (a) Technology and Reservoir Engineering Practices and Procedures PROPRIETARY DATA (b) Technology and Recovery Practices and Procedures PROPRIETARY DATA (c) Reservoir Development PROPRIETARY DATA

PUBLIC INFORMATION COPY

Page 17: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 10 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 6 - BIOLOGICAL, PHYSICAL AND SOCIOECONOMIC INFORMATION

(a) Chemosynthetic Communities Report The activities proposed in this plan are in water depths less than 300 meters (984 feet); therefore, information as outlined in Attachment A of NTL No. 2009-G40, "Deepwater Benthic Communities," is not required. (b) Topographic Features Map The activities proposed in this plan are in water depths less than 305 meters (1000 feet) of a topographic “No Activity Zone”; therefore, no map(s) are required per NTL No. 2009-G39, " Biologically Sensitive Underwater Features and Areas." (c) Topographic Features Statement The activities proposed under this plan will be conducted outside all Topographic Feature Protective Zones; therefore, shunting of drill cuttings and drilling fluids is not required per NTL No. 2009-G39, "Biologically Sensitive Underwater Features and Areas." (d) Live Bottom (Pinnacle Trend) Map The activities proposed in this plan are not affected by a live bottom (Pinnacle Trend) stipulation. (e) Live Bottom (Low Relief) Map The activities proposed in this plan are not affected by a live bottom (low relief) stipulation. (f) Potentially Sensitive Biological Features ECOP does not propose bottom-disturbing activities within 30 meters (100 feet) of potentially sensitive biological features; therefore, the map described in NTL No. 2009-G39 “Biologically Sensitive Underwater Features and Areas” is not required. (g) ROV Monitoring Survey Plan This information is no longer required. (h) Threatened and Endangered Species Information Congress passed the Endangered Species Act (ESA) on December 28, 1973, recognizing that the natural heritage of the United States was of “esthetic, ecological, educational, recreational, and scientific value to our Nation and its people.” It was understood that, without protection, many of our nation’s living resources would become extinct. The purpose of the ESA is to conserve threatened and endangered species and their ecosystems. There are more than 1,900 species listed under the ESA. A species is considered endangered if it is in danger of extinction throughout all or a significant portion of its range. A species is considered threatened if it is likely to become endangered in the future. The Interior Department's U.S. Fish and Wildlife Service (USFWS) and the Commerce Department's National Marine Fisheries Service (NMFS) share responsibility for implementing the ESA. The USFWS has primary responsibility for terrestrial and freshwater organisms, while the responsibilities of NMFS for marine species.

PUBLIC INFORMATION COPY

Page 18: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 11 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

The Marine Mammal Protection Act (MMPA) of 1972 was written to maintain the health and stability of the marine ecosystem. Marine mammals were in danger of diminishing, some to the point of extinction, as a result of human activities. The MMPA protects all marine mammals within the waters of the United States. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA): • Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and

Gas Program Activities in the Gulf of Mexico issued on March 13, 2020. Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and Protected

Species Observer Program)

Attachment I is a list of endangered and threatened species common to the Gulf of Mexico and the project area. All vessels related to the proposed operations will not transit the Bryde’s Whale area (see Attachment M for Bryde’s BiOp vicinity map). Further discussions on threatened and endangered species are included in Section 19 (EIA). (i) Archaeological Report The proposed operations will be conducted from previously approved surface locations as provided for in Supplemental EP (Control S-8005). The survey report is on file under BOEM Survey Number 21670, received date of May 4th, 2004. (j) Air and Water Quality Information The State of Florida is not an affected State for the activities proposed in this plan; therefore, this information is not required. (k) Socioeconomic Information The State of Florida is not an affected State for the activities proposed in this plan; therefore, this information is not required.

PUBLIC INFORMATION COPY

Page 19: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 12 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 7 - WASTE AND DISCHARGE INFORMATION

(a) Projected Generated Wastes All projected solid and liquid wastes likely to be generated by our development activities are included in Attachment J (Table 1). This table includes both operational wastes permitted by the appropriate NPDES permit and any other identified wastes. (b) Projected Ocean Discharges All projected solid and liquid wastes likely to be discharged overboard during our development activities are included in Attachment J (Table 1). This table includes both operational wastes permitted by the appropriate NPDES permit and any other identified wastes. (c) Modeling Report Not required by EPA under the OCS General Permit. (d) NPDES Permits This information is not required for the activities proposed in this plan in the BOEM GOMR. (e) Cooling Water Intakes This information is not required for the activities proposed in this plan in the BOEM GOMR.

PUBLIC INFORMATION COPY

Page 20: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 13 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 8 - AIR EMISSIONS INFORMATION (a) Screening Checklist Included in this section, (if applicable) are the Projected Air Emissions Worksheets prepared in accordance with NTLs 2009-G27 and 2008-G04, associated with this development plan. Please note that the complex total emissions are the same as the plan emissions.

Screening Questions for DOCD’s Yes No Is any calculated Complex Total (CT) Emission amount (in tons) associated with your proposed development activities more than 90% of the amounts calculated using the following formulas: CT = 3400D2/3 for CO, and CT = 33.3D for other air pollutants (where D = distance to shore in miles)?

X

Do your emission calculations include any emission reduction measures or modified emission factors?

X

Does or will the facility complex associated with your proposed development and production activities process production from eight or more wells? X

Do you expect to encounter H2S at concentrations greater than 20 parts per million (ppm)?

X

Do you propose to flare or vent natural gas in excess of the criteria set forth under 250.1105(a)(2) and (3)

X

Do you propose to burn produced hydrocarbon liquids? X Are your proposed development and production activities located within 25 miles (40 kilometers) from shore? X

Are your proposed development and production activities located within 124 miles (200 kilometers) of the Breton Wilderness Area?

X The following information was prepared by: Kathy Camp K. Camp & Associates Phone : 713.201.9627 Email : [email protected] (b) Summary Table of Plan Emissions

COMPANY AREA BLOCK(s) LEASE(s) PLATFORM WELL(s)

EC Offshore Properties, INC. East Cameron 71/72 G13576 / OCS00184 A/C/Cais 006 006

Year Emitted Substance PM SOx NOx VOC CO

2021 9.37 2.02 146.82 10.43 31.82 2022-2028 9.37 2.02 146.82 10.43 31.82 Allowable 632.70 632.70 632.70 632.70 24209.25

Detailed spreadsheets are included as Attachment K.

PUBLIC INFORMATION COPY

Page 21: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 14 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 9 - OIL SPILL INFORMATION (a) Oil Spill Response Planning

EC Offshore Properties, INC. (Company No. 03147) has a Regional Oil Spill Response Plan on file at BSEE (O-702) most recently approved on June 3, 2013 and most recent issued a letter of “In-compliance” on September 20, 2019. The proposed activities in this Plan will be covered by the Oil Spill Response Plan approved on June 3, 2013 and most recent issued a letter of “In-compliance” on September 20, 2019 and any future revisions. The calculated WCD for this Supplemental DOCD supersedes the >10-mile production in the approved OSRP. A revised OSRP was submitted on July 15, 2020.

Spill Response Sites

Primary Response Equipment Location Preplanned Staging Location(s)

Houma, LA Harvey, LA Leeville, LA

Houma, LA Harvey, LA

Port Fourchon, LA

OSRO Information

ECOP’s primary equipment provider is Clean Gulf Associates (CGA). The Clean Gulf Associates Services, LLC (CGAS) will provide closest available personnel, as well as a CGAS supervisor to operate the equipment. Witt O’Briens has been contracted as the Spill Management Team by ECOP for the proposed activities.

Worst Case Scenario Determination

Category Regional OSRP WCD Supplemental DOCD

WCD Type of Activity

Production >10

Production >10 Facility Location (area/block) EC 71 EC 72 Facility Designation2 PF C 006 Distance to Nearest Shoreline (miles) 19 15 Volume3

Storage tanks & Flowlines Lease term pipelines Uncontrolled blowout Total Volume

270

0 330

600

0

417 3,940

4,357

Type of Oil(s) (crude oil, condensate, diesel) Condensate Condensate API Gravity(s)4 56° 48°

Footnotes: 1. Types of activities include pipeline, platform, caisson, subsea completion or manifold, and mobile drilling rig. 2. E.g., Well No. 2, Platform JA, Pipeline Segment No. 6373. 3. Take your regional OSRP worst-case scenario volume from the appropriate section of your regional OSRP. For EP’s, the worst-case scenario volume is the daily volume possible from an uncontrolled blowout. Determine this volume using the provisions of 30 CFR 30 CFR 254.47(b). For DOCDs, determine the volume of your worst-case scenario using the provisions of 30 CFR 30 CFR 254.47(a) or (b), as appropriate. 4. Provide API gravity of all oils given under “Type of Oil(s)” above. Estimate for EPs. ECOP has the capability to respond to the appropriate worst-case spill scenario included in its regional OSRP approved on June 3, 2013. I hereby certify that ECOP has the capability to respond, to the maximum extent practicable, to a WCD, or a substantial threat of such a discharge, resulting from the activities proposed in our Supplemental DOCD.

PUBLIC INFORMATION COPY

Page 22: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 15 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

NTL 2015-N01 – WCD Calculations Overview Nodal analysis was used to estimate the production WCD rate for Well 006. A single completion in the highest capacity sand was presumed, with standard 2 7/8" tubing. (b) Oil Spill Response Discussion / NEPA Analysis For the purpose of NEPA and Coastal Zone Management Act analysis, the largest spill volume originating from the proposed activity would be a well blowout during production operations, estimated to be 3,940 barrels of condensate with an API gravity of 48°. ECOP’s spill response discussion for production operations is included as Attachment L. The production WCD is not greater than the drilling scenario accepted in Plan S-8005. (c) Modeling Report A modeling report for a potential oil or hazardous substance spill is not required for the activities proposed in this plan. In the event ECOP proposes to prepare such a report, we would contact the Regional Supervisor of the BOEM GOMR for guidance in preparing the report and the BOEM GOMR would be provided with two copies.

PUBLIC INFORMATION COPY

Page 23: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 16 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 10 - ENVIRONMENTAL MONITORING INFORMATION (a) Monitoring Systems There are no environmental monitoring systems currently in place of planned for the continued development activities in this Plan. (b) Incidental Takes ECOP does not believe that any of the endangered species or marine mammals as listed in the ESA will be taken during the development activities proposed in this plan. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA): • Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and

Gas Program Activities in the Gulf of Mexico issued on March 13, 2020. Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and Protected

Species Observer Program) (c) Flower Garden Banks National Marine Sanctuary ECOP’s activity under this Plan is not located within the Protective Zones of the Flower Garden Banks or Stetson Bank and therefore is not required to monitor the impacts of an oil spill.

PUBLIC INFORMATION COPY

Page 24: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 17 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 11 - LEASE STIPULATIONS INFORMATION Minerals Management Service did not invoke any stipulations for Leases OCS-G 13576 and OCS00184. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA):

• Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and

Protected Species Observer Program)

PUBLIC INFORMATION COPY

Page 25: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 18 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 12 - ENVIRONMENTAL MITIGATION MEASURES INFORMATION (a) Impacts to Marine and Coastal Environments and Habitats, Biota, and Threatened

and Endangered Species The State of Florida is not an affected State for the activities proposed in this plan; therefore, this information is not required. (b) Incidental Takes

ECOP does not believe that any of the endangered species or marine mammals as listed in the ESA will be taken during the development activities proposed in this plan. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA): • Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and

Gas Program Activities in the Gulf of Mexico issued on March 13, 2020. Other guidance documents utilized and issued by the BOEM include: • BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and Protected

Species Observer Program)

PUBLIC INFORMATION COPY

Page 26: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 19 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 13 - DECOMMISSIONING INFORMATION

This information is not required for plans submitted in the BOEM GOMR.

PUBLIC INFORMATION COPY

Page 27: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 20 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 14 - RELATED FACILITIES AND OPERATIONS INFORMATION (a) Related OCS Facilities and Operations All producing wells in East Cameron Blocks 71 and 72 are processed, measured, and metered at existing Platforms A (CID 20217-1) and C (CID 20217-2). ECOP does not anticipate the need to install additional processing equipment to accommodate the new production from Well 006. A gas / condensate lease term pipeline (4 or 6 inch) will be installed to carry production from Well 006 to Platform C Complex. (b) Transportation System Produced hydrocarbons from the A/C Complex is transported via Kinetic 16-inch (SN 1232) for ultimate delivery to MMS Operations System No. 8.1. (c) Produced Liquid Hydrocarbons Transportation Vessels Not applicable for the activities proposed in this plan.

PUBLIC INFORMATION COPY

Page 28: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 21 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 15 - SUPPORT VESSELS AND AIRCRAFT INFORMATION (a) General The following list provides information regarding the vessels and aircraft ECOP will use to support our proposed activities.

Type of Vessel Maximum Fuel Tank Storage Capacity

Maximum No. in Area at Any Time

Trip Frequency or Duration during

Production Supply boat(s) <500 bbl 1 Once every 14 days

Helicopter 760 gals 1 1 / week

ECOP’s proposed operations are in the Gulf of Mexico west of 87.5° W longitude and will not utilize any rigs, vessels, supply boats, etc. that would transit the Bryde’s whale area (see Attachment M for Bryde’s BiOp vicinity map). Vessels utilized by ECOP should not use equipment that has potential for entanglement or entrapment risk during these production activities. ECOP will not use any vessels with moon pools. (b) Diesel Oil Supply Vessels

No diesel oil supply vessels will be required for the development operations proposed in the plan. (c) Drilling Fluids Transportation There are no proposed drilling activities proposed in this plan; therefore, information on the projected drilling fluids transportation is not required at this time. (d) Solid and Liquid Wastes Transportation

All projected solid and liquid wastes likely to be transported during our proposed activities are included in Attachment J (Table 2). (e) Vicinity Map The surface location in East Cameron Area Block 71/72 are located approximately 19 statute miles from the nearest Louisiana shoreline and approximately 48 statute miles from the onshore support base located in Cameron, Louisiana. A Vicinity Plat showing the location of the proposed development activities relative to the shoreline and the primary route (transit lines) of the vessels and aircraft utilized for traveling from Cameron, Louisiana (onshore support base) to the offshore production facility is included as Attachment N.

PUBLIC INFORMATION COPY

Page 29: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 22 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 16 - ONSHORE SUPPORT FACILITIES INFORMATION (a) General ECOP proposes to utilize the following existing onshore base for vessel and helicopter support:

Name Location Existing, New or Modified

Newpark / EcoSource Cameron, LA Existing

(1) Support Base Construction or Expansion

The proposed operations do not mandate any immediate measures for land acquisition or expansion of the existing onshore base facilities.

(2) Support Base Construction or Expansion Timetable The proposed operations do not mandate any immediate measures for land acquisition or expansion of the existing onshore base facilities; therefore, a timetable is not required. (b) Air Emissions Information regarding air emissions generated by onshore support facilities is not required to accompany plans submitted in the BOEM GOMR. (c) Unusual Solid and Liquid Wastes Information regarding unusual solid and liquid wastes generated by onshore support facilities is not required to accompany plans submitted in the BOEM GOMR. (d) Waste Disposal All projected solid and liquid wastes likely to be disposed of during and after our proposed activities are included in Attachment J (Table 2).

PUBLIC INFORMATION COPY

Page 30: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 23 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 17 - SULPHUR OPERATIONS INFORMATION ECOP is not proposing to conduct Sulphur operations in this plan.

PUBLIC INFORMATION COPY

Page 31: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 24 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 18 - COASTAL ZONE MANAGEMENT ACT (CZMA) INFORMATION The States of Texas, Louisiana, Mississippi, Alabama and Florida have federally approved coastal zone management programs (CZMP). Applicants for an OCS plan submitted to the BOEM must provide a certification with necessary data and information for the affected State to determine that the proposed activity(s) complies with the enforceable policies of each States’ approved program, and that such activity will be conducted in a manner consistent with the program. (a) Consistency Certification The Coastal Zone Management Consistency Certification from the State of Louisiana is not required for the supplemental development activities proposed in this plan.

(b) Other Information State of Louisiana: The enforceable policies of the State of Louisiana have been considered and will be complied with.

PUBLIC INFORMATION COPY

Page 32: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 25 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 19 - ENVIRONMENTAL IMPACT ANALYSIS (EIA) (a) and (b) Impact Producing Factors (IPFs) from the Proposed Activities ECOP has placed an “X” in each IPF category that we believe (by using good engineering judgment) would be impacted by the activity proposed in this plan.

Environmental Resources

Impact Producing Factors (IPFs) Categories and Examples

Emissions (air,

subsurface noise,

light, etc.)

Effluents

(muds, cuttings, other

discharges to the water column or seafloor)

Physical

disturbances to the seafloor (rig or anchor

emplacements, etc.)

Wastes sent to

shore for treatment

or disposal

Accidents (e.g., oil spills,

chemical spills, H2S releases)

Other IPFs you identify

Site-specific at Offshore Location

Designated topographic features (1) (1) (1) Pinnacle Trend area live bottoms (2) (2) (2) Eastern Gulf live bottoms (3) (3) (3) Chemosynthetic communities (4) Water quality X X X X Fisheries X X X Marine mammals (8) X X (8) X Sea turtles (8) X X (8) X Air quality (9) X Shipwreck sites (known or potential)

(7)

Prehistoric archaeological sites (7) X Vicinity of Offshore Location Essential fish habitat X X (6) X Marine and pelagic birds X X Public health and safety (5) Coastal and Onshore Beaches (6) X Wetlands (6) X Shore birds and coastal nesting

birds X

(6) X

Coastal wildlife refuges X X Wilderness areas X X Other Resources You Identify Bryde’s Whale Gulf Sturgeon Giant Manta Ray Oceanic Whitetip Shark Smalltooth Sawfish Nassau Grouper

Footnotes for Environmental Impact Analysis Matrix

1. Activities that may affect a marine sanctuary or topographic feature. Specifically, if the well or platform site or any anchors will be on the seafloor

within the: (a) 4-mile zone of the Flower Garden Banks, or the 3-mile zone of Stetson Bank, (b) 1000-m, 1-mile or 3-mile zone of any topographic feature (submarine bank) protected by the Topographic Features Stipulation attached to

an OCS lease; (c) Essential Fish Habitat (EFH) criteria of 500 ft from any no-activity zone; or (d) Proximity of any submarine bank (500 ft buffer zone) with relief greater than 2 meters that is not protected by the Topographic Features

Stipulation attached to an OCS lease. 2. Activities with any bottom disturbance within an OCS lease block protected through the Live Bottom (Pinnacle Trend) Stipulation attached to an

OCS lease. 3. Activities within any Eastern Gulf OCS block where seafloor habitats are protected by the Live Bottom (Low-Relief) Stipulation attached to an OCS

lease.

PUBLIC INFORMATION COPY

Page 33: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 26 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

4. Activities on blocks designated by the BOEM as being in water depths 400 meters or greater. 5. Exploration or production activities where H2S concentrations greater than 500 ppm might be encountered. 6. All activities that could result in an accidental spill of produced liquid hydrocarbons or diesel fuel that you judge would impact these environmental

resources. If the proposed action is located a sufficient distance from a resource that no impact would occur, the EIA can note that in a sentence or two.

7. All activities that involve seafloor disturbances, including anchor emplacements, in any OCS block designated by the BOEM as having high-probability for the occurrence of shipwrecks or prehistoric sites, including such blocks that will be affected that are adjacent to the lease block in which your planned activity will occur. If the proposed activities are located a sufficient distance from a shipwreck or prehistoric site that no impact would occur, the EIA can note that in a sentence or two.

8. All activities that you determine might have an adverse effect on endangered or threatened marine mammals or sea turtles or their critical habitats. 9. Production activities that involve transportation of produced fluids to shore using shuttle tankers or barges. (c) ANALYSIS Site-specific Offshore Location – EC 71/72, Leases OCS-G 13576 and OCS00184

1. Designated Topographic Features The topographic features of the Central Gulf provide habitat for coral reef community organisms. Since 1973 stipulations have been made a part of leases on or near these biotic communities so that impacts from nearby oil and gas activities were mitigated to the greatest extent possible. This stipulation does not prevent the recovery of oil and gas resources but serves to protect valuable and sensitive biological resources. There are no IPFs (including effluents, physical disturbances to the seafloor, and accidents) from the proposed activities in East Cameron Area Blocks 71/72 that could cause impacts to topographic features. The activities proposed in this plan will be covered by our regional OSRP. 2. Pinnacle Trend Area Live Bottoms A small portion of the Central Planning Area and the Eastern Gulf of Mexico OCS planning areas include portions of approximately 70 lease blocks that have been classified as being within the “pinnacle trend” area. The Department of the Interior, Bureau of Ocean Energy Management is the agency with jurisdiction over these leases. The term “live bottom” is used to refer to the biological assemblages attached to hard substrates found interspersed between sand and mud bottoms of the continental shelf. These assemblages often consist of colorful sponges, corals, sea whips and sea fans rising from the benthic environment. Some of these features have extensive vertical relief rising far into the water column and serving as a reefal habitat for numerous commercially and recreationally important fish species. A special “Live Bottom (Pinnacle Trend) Stipulation” is assigned to leases in those blocks intended to protect the pinnacle trend and associated hard-bottom communities from damage and, at the same time, provide for recovery of potential oil and gas resources. This stipulation was not invoked with the issuance of these leases. The activities proposed in this plan will be covered by our regional OSRP.

PUBLIC INFORMATION COPY

Page 34: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 27 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

3. Eastern Gulf Live Bottoms A small portion of the Central Planning Area and the Eastern Gulf of Mexico OCS planning areas include portions of approximately 70 lease blocks that have been classified as being within the “pinnacle trend” area. The Department of the Interior, Bureau of Ocean Energy Management is the agency with jurisdiction over these leases. The term “live bottom” is used to refer to the biological assemblages attached to hard substrates found interspersed between sand and mud bottoms of the continental shelf. These assemblages often consist of colorful sponges, corals, sea whips and sea fans rising from the benthic environment. Some of these features have extensive vertical relief rising far into the water column and serving as a reefal habitat for numerous commercially and recreationally important fish species. A special “Live Bottom (Pinnacle Trend) Stipulation” is assigned to leases in those blocks intended to protect the pinnacle trend and associated hard-bottom communities from damage and, at the same time, provide for recovery of potential oil and gas resources. This stipulation was not invoked with the issuance of these leases. There are no IPFs from the proposed activities in East Cameron Area Blocks 71/72 that could cause impacts to Eastern Gulf live bottoms. The site-specific offshore location of the proposed activity is over 100 miles from the eastern gulf live bottoms. The activities proposed in this plan will be covered by our regional OSRP. 4. Benthic Communities There are no IPFs from the proposed activities in East Cameron Area Blocks 71/72 that could cause impacts to Benthic Communities. Chemosynthetic biologic communities that lie in water depths in excess of 300 meters (984 feet) are of concern for environmental protection measures. The water depth at the proposed location is approximately 52 feet. 5. Water Quality Effluents, physical disturbances to the seafloor and accidents from the proposed activities in East Cameron Area Blocks 71/72 could potentially cause impacts to water quality. Routine impact-producing factors that could result in water quality degradation from offshore OCS oil and gas operations include rig / anchor emplacement, platform and pipeline installation and removal, and the discharge of operational wastes. The major discharges from offshore oil and gas exploration and production activities include produced water, drilling fluids and cuttings, ballast water, and uncontaminated seawater. Minor discharges from the offshore oil and gas industry include drilling-waste chemicals, fracturing and acidifying fluids, and well completion and workover fluids; and from production operations, deck drainage, and miscellaneous well fluids (cement, BOP fluid); and other sanitary and domestic wastes, gas and oil processing wastes, and miscellaneous discharges. Since all discharges will be made in accordance with a general National Pollutant Discharge Elimination System (NPDES) permit issued by U.S. Environmental Protection Agency (USEPA), operational discharges are not expected to cause significant adverse impacts to water quality. Additionally, an analysis of the best available information from the National Marine Fisheries Service Endangered Species Act (ESA) Section 7 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico (NMFS, 2020) concludes that exposures to toxicants in discharges from oil and gas activities are not likely to adversely affect ESA-listed species (i.e. to include ESA-listed fish, Giant manta rays, Gulf sturgeon, Oceanic whitetip shark).

PUBLIC INFORMATION COPY

Page 35: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 28 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

Offshore accidents, such as blowouts and spills could also occur and have the potential to alter offshore water quality. Sediment disturbance is expected to result in minor, localized, temporary increases in water-column turbidity in offshore waters. Given the low frequency of blowouts, minimum impacts on water quality due to re-suspension of sediments are expected. Oil spills related to the proposed action are assumed to be mostly very small events (and for spills greater than 50 bbl) to occur very infrequently. It is unlikely that an accidental oil spill would occur from the proposed activities. If a spill were to occur, the dissolved components and small oil droplets would temporarily affect the water quality of marine waters. Dispersion by currents and microbial degradation would remove the oil from the water column or dilute the constituents to background levels. The activities proposed in this plan will be covered by our Regional OSRP. 6. Fisheries Effects on commercial fisheries from activities associated with this plan could come from emplacement of production platform(s), underwater OCS obstructions, oil spills, subsurface blowouts, pipeline installation and offshore discharges of drilling mud and produced waters (See Section 5, Water Quality above). An accidental oil spill that may occur as a result of the proposed action has the potential to cause some detrimental effects to fisheries. However, it is unlikely that an accidental surface or subsurface oil spill would occur from the proposed activities. If a spill were to occur in open waters of the OCS proximate to mobile adult finfish or shellfish, the effects would likely be sublethal and the extent of damage would be reduced to the capability of adult fish and shellfish to avoid a spill, to metabolize Hydrocarbons, and to excrete both metabolites and parent compounds. The effect of oil spills on fisheries is expected to cause less than 1 percent decrease in commercial populations or in commercial fishing. At the expected level of effect, the resultant influence on Central Gulf fisheries is negligible and will be indistinguishable from natural population variations. The activities proposed in this plan will be covered by our regional OSRP. Drilling mud discharges contain chemicals toxic to marine fishes; however, this is only at concentrations 4 or 5 orders of magnitude higher than those found more than a few meters from the discharge point. Offshore discharges of drilling muds will dilute to background levels within 1000 meters of the discharge point and have a negligible effect on Central Gulf fisheries. Additionally, an analysis of the best available information from the National Marine Fisheries Service Endangered Species Act (ESA) Section 7 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico (NMFS, 2020) concludes that exposures to toxicants in discharges from oil and gas activities are not likely to adversely affect ESA-listed species (i.e. to include ESA-listed fish, Giant manta rays, Gulf sturgeon, Oceanic whitetip shark). There are no other IPFs (including emissions and wastes sent to shore for disposal) from the proposed activities which could cause impacts to fisheries.

PUBLIC INFORMATION COPY

Page 36: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 29 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

7. Marine Mammals Marine mammals may be adversely impacted by several IPFs (including vessel traffic, subsurface noise, accidental oil spills, and loss of trash and debris), all of which could occur due to the proposed action in East Cameron Area Blocks 71/72. Chronic and sporadic sublethal effects could occur that may stress and / or weaken individuals of a local group or population and make them more susceptible to infection from natural or anthropogenic sources. Few lethal effects are expected from oil spills, chance collisions with service vessels and ingestion of plastic material. Oil spills of any size are estimated to be periodic events that may contact cetaceans. Disturbance (e.g., subsurface noise) may stress animals, weaken their immune systems, and make them more vulnerable to parasites and diseases that normally would not be fatal. The net result of any disturbance would depend on the size and percentage of the population affected, ecological importance of the disturbed area, environmental and biological parameters that influence an animal’s sensitivity to disturbance and stress, and the accommodation time in response to prolonged disturbance (Geraci and St. Aubin, 1980). Collisions between cetaceans and ships could cause serious injury or death (Laist et al., 2001). Sperm whales are one of 11 whale species that are hit commonly by ships (Laist et al., 2001). Collisions between OCS vessels and cetaceans within the project area are expected to be unusual events. The activities proposed in this plan will be covered by our Regional OSRP. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA):

• Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and

Protected Species Observer Program) There are no other IPFs (including physical disturbances to the seafloor and wastes sent to shore) from the proposed activities which could impact marine mammals.

PUBLIC INFORMATION COPY

Page 37: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 30 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

8. Sea Turtles IPFs that could impact sea turtles include vessel traffic, subsurface noise, trash and debris, and accidental oil spills. Small numbers of turtles could be killed or injured by chance collision with service vessels or by eating indigestible trash, particularly plastic items, accidentally lost from drill rigs, production facilities, and service vessels. Drilling rigs and project vessels produce subsurface noise that could disrupt normal behavior patterns and create some stress potentially making sea turtles more susceptible to disease. Oil spills and oil-spill-response activities are potential threats that could have lethal effects on turtles. Contact with oil, consumption of oil particles, and oil-contaminated prey could seriously affect individual sea turtles. Oil-spill-response planning and the habitat protection requirements of the Oil Pollution Act of 1990 should mitigate these threats. Most OCS-related impacts on sea turtles are expected to be sublethal. Chronic sublethal effects (e.g., stress) resulting in persistent physiological or behavioral changes and / or avoidance of affected areas could cause declines in survival or productivity, resulting in gradual population declines. The activities proposed in this plan will be covered by our Regional OSRP. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement and comply with the most current measures set forth in the following documents, to protect or minimize any of the species listed in the Endangered Species Act (ESA):

• Appendices A, B, C and J to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination)

• BOEM NTL No. 2016-G01 (Vessel Strike Avoidance and Injured/Dead Protected Species Reporting)

• BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and

Protected Species Observer Program) There are no IPFs (including physical disturbances to the seafloor and waste sent to shore) from the proposed activities which could impact sea turtles.

PUBLIC INFORMATION COPY

Page 38: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 31 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

9. Air Quality The proposed development activities are located 19 miles from the nearest Louisiana shoreline. Emissions of pollutants into the atmosphere from the development operations proposed are not expected to have significant impacts on onshore air quality because of the prevailing atmospheric conditions, emission heights, emission rates, and the distance of these emissions from the coastline. The Projected Air Quality Emissions Report indicates that the BOEM exemption level will not be exceeded during the development operations proposed in the plan. 10. Shipwreck Sites (Known or Potential) IPFs that could cause impacts to known or potential shipwreck sites from the proposed activities in East Cameron Area Blocks 71/72 include physical disturbances to the seafloor such as rig emplacement. A current review by Gulf Ocean Services of existing historical hazard and archaeological surveys performed on Lease OCS00184 did not highlight any obstructions or shipwrecks near the proposed well site. Analyses of available shipwreck sources indicate that no shipwrecks have been reported within the survey area. No sonar targets, magnetic anomalies, or other features on the geophysical data were recorded which were interpreted as possible shipwrecks within 1,000 feet of the proposed well location. However, in the event items of significant cultural resource potential are discovered during the proposed operations, ECOP will immediately halt all operations and notify the appropriate department at the BOEM for further evaluation and assistance. 11. Prehistoric Archaeological Sites IPFs that could cause impacts to known or potential prehistoric archaeological sites from the proposed activities include physical disturbances to the seafloor such as rig emplacement. A current review by Gulf Ocean Services of existing historical hazard and archaeological surveys performed on Lease OCS00184 did not identify any features of cultural significance near the proposed well site. No sonar targets, magnetic anomalies, or other features on the geophysical data were recorded which were interpreted as possible high probability areas for prehistoric habitation within 1,000 feet of the proposed well location. However, in the event items of significant cultural resource potential are discovered during the proposed operations, ECOP will immediately halt all operations and notify the appropriate department at the BOEM for further evaluation and assistance.

PUBLIC INFORMATION COPY

Page 39: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 32 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

Vicinity of Offshore Location:

1. Essential Fish Habitat IPFs that could impact essential fish habitats as a result of the proposed operations in East Cameron Area Blocks 71/72 include emissions, effluents and accidents. The major effluent discharges from offshore oil and gas exploration and production activities include produced water, drilling fluids and cuttings, ballast water, and uncontaminated seawater (see Section 5, Water Quality, above). Minor discharges from the offshore oil and gas industry include drilling-waste chemicals, fracturing and acidifying fluids, and well completion and workover fluids; and from production operations, deck drainage, and miscellaneous well fluids (cement, BOP fluid); and other sanitary and domestic wastes, gas and oil processing wastes, and miscellaneous discharges.

Produced water will not be discharged during this operation. The activities proposed in this plan will be covered by our regional OSRP. There are no other IPFs (including physical disturbances or wastes sent to shore) from the proposed activities which could cause impacts to essential fish habitat. 2. Marine and Pelagic Birds IPFs that could impact marine and pelagic birds as a result of the proposed operations in East Cameron Area Blocks 71/72 include emissions, accidents and discarded trash and debris. Emissions of pollutant into the atmosphere from the activities associated with the proposed operations in this plan are not projected to have significant impacts on air quality that could harm marine and pelagic birds because of the prevailing atmospheric conditions, emission heights, emission rates and pollutant concentrations. An accidental oil spill that may occur as a result of the proposed action has the potential to cause some detrimental effects on marine and pelagic birds. Some physical oiling could occur during dives, as well as secondary toxic effects through the uptake of prey. However, it is unlikely that an accidental surface or subsurface oil spill would occur from the proposed activities. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) The activities proposed in this plan will be covered by our Regional OSRP. There are no other IPFs (including effluents and physical disturbances to the seafloor) from the proposed activities which could cause impacts to marine and pelagic birds.

PUBLIC INFORMATION COPY

Page 40: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 33 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

3. Public Health and Safety Due to Accidents There are no IPFs (including an accidental H2S releases) from the proposed activities that could cause impacts to public health and safety. Further, in accordance with 30 CFR 250.490(c) and NTL’s 2009-G27 and 2008-G04 we have submitted sufficient information to justify our request that the area of our proposed activities be classified by BOEM as H2S absent.

Coastal and Onshore: 1. Beaches Primary IPFs associated with offshore oil and gas exploration and development, and most widely recognized as major threats to the enjoyment and use of recreational beaches, are oil spills (accidents) and marine trash and debris. The operations proposed in this plan are not projected to have significant impacts on coastal beaches. An accidental oil spill that may occur as a result of the proposed action has the potential to cause some detrimental effects to beaches, however, it is unlikely that an accidental surface or subsurface oil spill would occur from the proposed development activities in East Cameron Area Blocks 71/72. The level of response to a spill will be based on volume, weather, and the characteristics of the product spilled. ECOP’s objectives for spill response are to ensure the safety of citizens and response personnel; control the source of the spill, have a coordinated response effort; maximize the protection of environmental sensitive areas; contain, recover and remove as much of the spill product as possible; recover and rehabilitate injured wildlife; minimize economic impacts; and keep the general public informed of the response activities.

The activities proposed in this plan will be covered by our regional OSRP. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) The activities proposed in this plan will be covered by our Regional OSRP.

There are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to beaches.

PUBLIC INFORMATION COPY

Page 41: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 34 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

2. Wetlands According to the U.S. Department of the Interior ((Dahl, 1990); Henfer et al., 1994), during the mid-1980’s, 4.4 percent of Texas (3,083,860 ha) (Henfer et al., 1994), 28 percent of Louisiana (3,557,520 ha), 14 percent of Mississippi (17,678,730 ha) and 8 percent of Alabama (1,073,655 ha) were considered wetlands. More recent information indicates recent land change as a result of Hurricanes Katrina and Rita. The most notable was the 217-mi² of Louisiana’s coastal lands that were transformed to water after Hurricanes Katrina and Rita (Barras, 2006). The primary IPF associated with offshore oil and gas exploration and development, and most widely recognized as major threats to the wetlands are oil spills (accidents) and marine trash and debris. The operations proposed in this plan are not projected to have significant impacts on wetlands. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) There are no other IPFs (including emissions, effluents, and physical disturbances to the seafloor) from the proposed activities which could cause impacts to wetlands. The activities proposed in this plan will be covered by our regional OSRP. 3. Shore Birds and Coastal Nesting Birds The primary IPF associated with offshore oil and gas exploration and development, and most widely recognized as a major threat to the shore birds and coastal nesting birds is oil spills (accidents) and marine trash and debris. The operations proposed in this plan are not projected to have significant impacts on shore birds and coastal nesting birds. An accidental oil spill that may occur as a result of the proposed action has the potential to cause some detrimental effects to shore birds and coastal nesting birds, however, it is unlikely that an accidental surface or subsurface oil spill would occur from the proposed activities in East Cameron Area Blocks 71/72. The level of response to a spill will be based on volume, weather, and the characteristics of the product spilled. ECOP’s objectives for spill response are to ensure the safety of citizens and response personnel; control the source of the spill, have a coordinated response effort; maximize the protection of environmental sensitive areas; contain, recover and remove as much of the spill product as possible; recover and rehabilitate injured wildlife; minimize economic impacts; and keep the general public informed of the response activities.

PUBLIC INFORMATION COPY

Page 42: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 35 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) The activities proposed in this plan will be covered by our regional OSRP. There are no other IPFs (including emissions, effluents, and physical disturbances to the seafloor) from the proposed activities which could cause impacts to wetlands. 4. Coastal Wildlife Refuges The primary IPF associated with offshore oil and gas exploration and development, and most widely recognized as a major threat to the coastal wildlife refuges is oil spills (accidents) and marine trash and debris. The operations proposed in East Cameron Area Blocks 71/72 are not projected to have significant impacts on coastal wildlife refuges. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) The activities proposed in this plan will be covered by our Regional OSRP. There are no other IPFs (including emissions, effluents, and physical disturbances to the seafloor) from the proposed activities which could cause impacts to coastal wildlife refuges.

PUBLIC INFORMATION COPY

Page 43: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 36 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

5. Wilderness Areas The primary IPF associated with offshore oil and gas exploration and development, and most widely recognized as a major threat to wilderness areas is oil spills (accidents) and marine trash and debris. The operations proposed in this plan are not projected to have significant impacts on wilderness areas. ECOP and its personnel and subcontractors, while undertaking activities authorized under these leases, must implement, and comply with the most current measures set forth in the following documents:

• Appendix B to the NMFS 2020 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico issued on March 13, 2020.

Other guidance documents utilized and issued by the BOEM include:

• BSEE NTL No. 2015-G03 (Marine Trash and Debris Awareness and Elimination) The activities proposed in this plan will be covered by our Regional OSRP. There are no other IPFs (including emissions, effluents, and physical disturbances to the seafloor) from the proposed activities which could cause impacts to wilderness areas.

Other Environmental Resources Identified: 1. Bryde’s Whale

Gulf of Mexico Bryde's whales are members of the baleen whale family and a subspecies of the Bryde’s whale. With likely less than 100 individuals remaining, Gulf of Mexico Bryde’s whales are one of the most endangered whales in the world. Recovery of the species is dependent upon the protection of each remaining whale. The Gulf of Mexico Bryde’s whale has been consistently located in the northeastern Gulf of Mexico, along the continental shelf break between 100- and 400-meters depth. They are the only resident baleen whale in the Gulf of Mexico and are distinct from Bryde’s whales worldwide. The most significant threats facing Gulf of Mexico Bryde’s whales are energy exploration and development, oil spills and responses, vessel strikes, ocean noise, and entanglement in fishing gear. The Gulf of Mexico Bryde’s whale’s small population size and limited distribution increase their vulnerability. All Bryde’s whales are protected under the Marine Mammal Protection Act, including the Gulf of Mexico subspecies. In 2019, NOAA listed the Gulf of Mexico Bryde’s whale as endangered under the Endangered Species Act. Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the Bryde’s whales.

PUBLIC INFORMATION COPY

Page 44: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 37 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

2. Gulf Sturgeon The Gulf sturgeon is a sub-species of the Atlantic sturgeon that can be found from Lake Pontchartrain and the Pearl River system in Louisiana and Mississippi to the Suwannee River in Florida. Hatched in the freshwater of rivers, Gulf sturgeon head out to sea as juveniles, and return to the rivers of their birth to spawn (lay eggs) when they reach adulthood. In the fall, movement from rivers into estuaries and associated bays begins in September and continues through November. Most subadult and adult Gulf sturgeon spend the cool winter months (October/November to March/ April) in bays, estuaries, and the nearshore Gulf of Mexico. Tagged fish have been found in well-oxygenated shallow water areas that support burrowing macro invertebrates. These areas may include shallow shoals (5 to 7 feet), deep holes near passes, unvegetated sand habitats such as sandbars, and intertidal and subtidal energy zones. Pollution and contamination from industrial, agricultural, and municipal activities is believed to cause a variety of physical, behavioral, and physiological impacts to sturgeon worldwide. In 1991, Gulf sturgeon were listed as threatened under the Endangered Species Act after their population was greatly reduced or eliminated throughout much of their range because of overfishing, dam construction, and habitat degradation. NOAA Fisheries and the U.S. Fish and Wildlife Service jointly manage and protect Gulf sturgeon. Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the Gulf sturgeon.

3. Giant Manta Ray

The giant manta ray is found worldwide in tropical, subtropical, and temperate bodies of water and is commonly found offshore, in oceanic waters, and near productive coastlines. As such, giant manta rays can be found in cool water, as low as 19°C, although temperature preference appears to vary by region. For example, off the U.S. East Coast, giant manta rays are commonly found in waters from 19 to 22°C, whereas those off the Yucatan peninsula and Indonesia are commonly found in waters between 25 to 30°C. The species has also been observed in estuarine waters near oceanic inlets, with use of these waters as potential nursery grounds. Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the giant manta ray.

4. Oceanic Whitetip Shark

The oceanic whitetip shark is found throughout the world in tropical and sub-tropical waters. It is a pelagic species, generally remaining offshore in the open ocean, on the outer continental shelf, or around oceanic islands in water depths greater than 600 feet. They live from the surface of the water to at least 498 feet deep. Oceanic whitetip sharks have a strong preference for the surface mixed layer in warm waters above 20°C and are therefore a surface-dwelling shark. The primary threat to the oceanic whitetip shark is incidental bycatch in commercial fisheries. Because of their preferred distribution in warm, tropical waters, and their tendency to remain at the surface, oceanic whitetip sharks have high encounter and mortality rates in fisheries throughout their range Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the oceanic whitetip shark.

PUBLIC INFORMATION COPY

Page 45: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 38 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

5. Smalltooth Sawfish

Smalltooth sawfish live in tropical seas and estuaries (semi-enclosed areas where rivers meet the sea) of the Atlantic Ocean. They are most at home in shallow, coastal waters, and sometimes enter the lower reaches of freshwater river systems. There are few data about historical Smalltooth sawfish numbers. Smalltooth sawfish were once found in the Gulf of Mexico from Texas to Florida and along the East Coast from Florida to North Carolina. Their distribution has decreased greatly in U.S. waters over the past century, and today, the species is only found off the coast of Florida. Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the oceanic Smalltooth sawfish.

6. Nassau Grouper

The Nassau grouper is a reef fish. These large fish are associated with hard structure such as reefs (both natural and artificial), rocks, and ledges. They are late-maturing, long-lived, top-level predators found in southern coastal Florida, the Florida Keys, Bermuda, the Yucatan, and the Caribbean Sea. As juveniles they are found in nearshore shallow waters in macroalgal and seagrass habitats. They shift deeper as they grow, to predominantly reef habitat (forereef and reef crest). Nassau grouper are mostly absent from the continental United States—except Florida, where larger juveniles and adults have been recorded. No larval Nassau grouper or juveniles smaller than 20 inches in length have been collected or observed in Florida waters. However, sampling along shoreline habitats of the Florida Keys—where smaller juveniles might be expected—has been limited to date. Based on the location of the proposed activities in this Plan, there are no other IPFs (including emissions, effluents, physical disturbances to the seafloor, and wastes sent to shore) from the proposed activities which could cause impacts to the Nassau grouper.

(d) Environmental Hazards The site-specific environmental conditions have been taken into account for the proposed activities under this plan. Being located in the Gulf of Mexico, all oil and gas exploratory and development operations may at some time experience hurricane force winds, tropical storm activity and unusual surge and sea currents. In accordance with requirements set forth in Title 33 CFR 146.140, an Emergency Evacuation Plan (EEP) is prepared and submitted to the appropriate USCG Marine Safety Office or Unit for review and ultimate approval. This plan provides descriptions to help define the type of storm based on the winds associated with it (i.e., major gulf storm, squall, tropical depression, tropical storm, gale warning, storm warning, hurricane, etc). Major hurricanes (storm having wind speeds in excess of 74 mph) in the Gulf normally form in the southern Gulf or Caribbean Sea. Tropical disturbances (storms having wind speeds greater than 40 mph but less than 74 mph) that originate near the facility do not provide much warning, but usually pass the rig or facility prior to attaining hurricane status. Each tropical disturbance will be evaluated on its own merit and the operations modified accordingly. No impacts are expected on the proposed activities from site-specific environmental conditions.

PUBLIC INFORMATION COPY

Page 46: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 39 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

(e) Alternatives There are no alternatives other than those required by regulation to be considered to reduce the environmental impacts of the activities proposed in this plan. (f) Mitigation Measures No mitigation measures other than those required by regulation will be considered to avoid, lessen, or eliminate potential impacts on environmental resources. (g) Consultation There were no outside agencies or persons consulted regarding the potential environmental impacts associated with the activities proposed under this Supplemental DOCD. (h) Preparer(s) Kathy Camp K. Camp & Associates Phone: 713.201.9627 Email: [email protected] (i) References Federal Register, Vol. 84, No. 94, May 15, 2019, Final Rule for Oil and Gas and Sulfur Operations in the Outer Continental Shelf – Blowout Preventer Systems and Well Control Revisions Federal Register, Vol. 77, No. 163, August 22, 2012, Final Rule for Increased Safety Measures for Energy Development on the Outer Continental Shelf Federal Register, Vol. 75, No. 198, October 14, 2010, Final Rule for Increased Safety Measures for Energy Development on the Outer Continental Shelf National Marine Fisheries Service (NMFS) Endangered Species Act (ESA) Section 7 Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico (NMFS, 2020) BSEE NTL No. 2015-G03 effective December 17, 2015 for Marine Trash and Debris Awareness and Elimination BOEM NTL No. 2016-G01 effective January 1, 2012 for Vessel Strike Avoidance and Injured / Dead Protected Species Reporting BOEM NTL No. 2016-G02 (Implementation of Seismic Survey Mitigation Measures and Protected Species Observer Program) BOEM NTL 2015-N01 effective January 14, 2015 for Information Requirements for Exploration Plans, Development and Production Plans, and Development Operations Coordination Documents on the OCS for Worst Case Discharge and Blowout Scenarios NTL 2009-G40 effective January 27, 2010 for Deepwater Benthic Communities NTL 2009-G39 effective January 27, 2010 for Biologically Sensitive Underwater Features and Areas NTL 2009-G27 effective September 9, 2009 for Submitting Exploration Plans and Development Operations Coordination Documents NTL 2008-G04 effective May 1, 2008 for Information Requirements for Exploration Plans and Development Operations Coordination Documents Final NOS, Central Planning Area Lease Sale 231 Information Marine Mammal Protection Act of 1972 (MMPA)

PUBLIC INFORMATION COPY

Page 47: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 40 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

Endangered Species Act of 1973 (ESA) Gulf of Mexico’s Fisheries NOAA Website: https://www.fisheries.noaa.gov/topic/endangered-species-conservation NOAA Fisheries – Biological Opinion on the Federally Regulated Oil and Gas Program Activities in the Gulf of Mexico Website - https://www.fisheries.noaa.gov/resource/document/biological-opinion-federally-regulated-oil-and-gas-program-activities-gulf-mexico

NOAA Fisheries Species Directory

- https://www.fisheries.noaa.gov/species/gulf-mexico-brydes-whale

- https://www.fisheries.noaa.gov/species/gulf-sturgeon

- https://www.fisheries.noaa.gov/species/giant-manta-ray

- https://www.fisheries.noaa.gov/species/smalltooth-sawfish

- https://www.fisheries.noaa.gov/species/nassau-grouper

PUBLIC INFORMATION COPY

Page 48: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

EC Offshore Properties, Inc. 41 East Cameron Area, Blocks 71/72 Supplemental DOCD Leases OCS-G13576 & OCS00184

SECTION 20 - ADMINISTRATIVE INFORMATION (a) Exempted Information Description (Public Information Copies Only) In accordance with 43 CFR Part 2, the following information is exempt from disclosure and has been omitted from the Public Information copy of this plan:

• The geologic objectives, BHL, TVD, and MD information on form BOEM-137 (OCS Plan Information Form) in Attachment A

• All items under Geological and Geophysical Information, except for the non-proprietary version of shallow hazards assessment

• Correlative well information used to justify H2S classification request under Hydrogen Sulfide Information

• Worst Case Discharge Calculations • Mineral Resource Conservation

(b) Bibliography Gulf Ocean Services Shallow Hazard Analysis and Archaeological Assessment of OCS00184 Block 72, East Cameron Area Antoine and Associates Archaeological Reevaluation and Site-Specific Analysis on Block 72, Lease OCS00184 for Conoco, Inc.

PUBLIC INFORMATION COPY

Page 49: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

U.S. Department of the Interior Bureau of Ocean Energy Management

OCS PLAN INFORMATION FORM

OMB Control Number: 1010-0151 OMB Approval Expires: 6/30/2021

General Information Type of OCS Plan: Exploration Plan (EP)

Development Operations Coordination Document (DOCD) X

Company Name: EC Offshore Properties, Inc. BOEM Operator Number: 03147

Address: 600 Travis Street, Suite 600 Houston, Texas 77002

Contact Person: Kathy Camp

Phone Number: 713.201.9627

E-Mail Address: [email protected]

If a service fee is required under 30 CFR 550.125(a), provide the Amount paid 4238.00 Receipt No. ID 26PFBSSJ ID 76016926287

Project and Worst-Case Discharge (WCD) Information Lease(s): OCS-G13576 / OCS00184 Area: EC Block(s):

71 / 72 Project Name (If Applicable):

Objective(s) Oil X Gas X Sulphur Salt Onshore Support Base(s): CAMERON, LA

Platform/Well Name: 006 Total Volume of WCD: 3940 BCPD API Gravity: 48.0

Distance to Closest Land (Miles): 15 Volume from uncontrolled blowout: 3940 BCPD

Have you previously provided information to verify the calculations and assumptions for your WCD? X Yes No

If so, provide the Control Number of the EP or DOCD with which this information was provided N-8005

Do you propose to use new or unusual technology to conduct your activities? Yes X No

Do you propose to use a vessel with anchors to install or modify a structure? Yes X No

Do you propose any facility that will serve as a host facility for deepwater subsea development? Yes X No

Description of Proposed Activities and Tentative Schedule (Mark all that apply) Proposed Activity Start Date End Date No. of Days

Install Compressor on EC71 A/C 03/01/2021 03/15/2021 14 Commence Production from EC71 Well A007 03/15/2021 12/31/2028 8 YRS Install Permanent Well Protector / Caisson 006 04/01/2021 04/09/2021 8 Install & Hydrotest Lease Term Pipeline from EC72 #006 to EC 71 A/C

05/01/2021 05/15/2021 14

Commence Production from EC72 #006 06/01/2021 12/31/2028 8 YRS

Description of Drilling Rig Description of Structure Jackup Drillship X Caisson Tension leg platform

Gorilla Jackup Platform rig X Fixed platform Compliant tower

Semisubmersible Submersible Spar Guyed tower

DP Semisubmersible Other (Attach Description) Floating production system

Other (Attach Description)

Drilling Rig Name (If Known):

Description of Lease Term Pipelines From (Facility/Area/Block) To (Facility/Area/Block) Diameter (Inches) Length (Feet)

EC72 006 EC71 A/C 4 +/- 12,000

Page 1 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 50: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): Caisson 006

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

PENDING Yes No

If this is an existing well or structure, list the Complex ID or API No. PENDING

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day): 3940

For structures, volume of all storage and pipelines (Bbls):

API Gravity of fluid 48

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS00184 OCS OCS

Area Name EAST CAMERON

Block No. 072

Blockline Departures (in feet)

N/S Departure: 449.66 FNL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 6910.34 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,576,396 X: X: X:

Y: 256,244 Y: Y: Y:

Latitude/ Longitude

Latitude 29° 21’ 52.392” Latitude Latitude Latitude

Longitude 92° 39’ 42.272” Longitude Longitude Longitude

Water Depth (Feet): 52 MD (Feet):

TVD (Feet):

MD (Feet): MD (Feet): MD (Feet):

TVD (Feet): TVD (Feet): TVD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 2 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 51: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): Platform A

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

20217-1

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day):

For structures, volume of all storage and pipelines (Bbls): 0

API Gravity of fluid

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS-G 13576 OCS OCS

Area Name EAST CAMERON

Block No. 071

Blockline Departures (in feet)

N/S Departure: 5180 FSL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 918 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,567,630.28 X: X: X:

Y: 247,115.61 Y: Y: Y:

Latitude/ Longitude

Latitude: 29.339169 Latitude Latitude Latitude

Longitude: -92.690307 Longitude Longitude Longitude

Water Depth (Feet): 51 MD (Feet):

TVD (Feet):

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 3 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 52: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): Platform C

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

20217-2

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day):

For structures, volume of all storage and pipelines (Bbls): 600

API Gravity of fluid

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS-G 13576 OCS OCS

Area Name EAST CAMERON

Block No. 071

Blockline Departures (in feet)

N/S Departure: 5373’ FSL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 878’ FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,567,670.28

X: X: X:

Y: 247,308.61

Y: Y: Y:

Latitude/ Longitude

Latitude 29.339701 Latitude Latitude Latitude

Longitude -92.690189 Longitude Longitude Longitude

Water Depth (Feet): 51 MD (Feet):

TVD (Feet):

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 4 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 53: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): 006

Previously reviewed under an approved EP or DOCD?

X Yes X No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

PENDING

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day): 3,940 BCPD

For structures, volume of all storage and pipelines (Bbls): 0

API Gravity of fluid

50.0

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS00184 OCS OCS

Area Name EAST CAMERON

Block No. 072

Blockline Departures (in feet)

N/S Departure: 449.66 FNL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 6910.34 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,576,396 X: X: X:

Y: 256,244 Y: Y: Y:

Latitude/ Longitude

Latitude 29° 21’ 52.392” Latitude Latitude Latitude

Longitude 92° 39’ 42.272” Longitude Longitude Longitude

Water Depth (Feet): 52 MD (Feet): 12,300

TVD (Feet): 10,843

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 5 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 54: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): A007ST00BP00

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

17-703-00308-00

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day): NA

For structures, volume of all storage and pipelines (Bbls): NA

API Gravity of fluid

NA

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS-G 13576 OCS OCS

Area Name EAST CAMERON

Block No. 071

Blockline Departures (in feet)

N/S Departure: 5165 FSL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 922 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,567,626 X: X: X:

Y: 247,100 Y: Y: Y:

Latitude/ Longitude

Latitude 29.339128 Latitude Latitude Latitude

Longitude -92.690319 Longitude Longitude Longitude

Water Depth (Feet): 52 MD (Feet): 15,050

TVD (Feet): 14,746

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 6 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 55: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): A001ST00BP00

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

17-703-00115-00

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day): NA

For structures, volume of all storage and pipelines (Bbls): NA

API Gravity of fluid

NA

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS-G 13576 OCS OCS

Area Name EAST CAMERON

Block No. 071

Blockline Departures (in feet)

N/S Departure: 5196 FSL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 914 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,567,634.28 X: X: X:

Y: 247,131.61 Y: Y: Y:

Latitude/ Longitude

Latitude 29° 20’ 21.168” Latitude Latitude Latitude

Longitude 92° 41’ 25.062” Longitude Longitude Longitude

Water Depth (Feet): 54 MD (Feet): 9750

TVD (Feet): 9750

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 7 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 56: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

OCS PLAN INFORMATION FORM (CONTINUED)

Form BOEM- 0137 (June 2021- Supersedes all previous editions of this form which may not be used.)

Include one copy of this page for each proposed well/structure Proposed Well/Structure Location

Well or Structure Name/Number (If renaming well or structure, reference previous name): C007ST00BP02

Previously reviewed under an approved EP or DOCD?

X Yes No

Is this an existing well or structure?

X Yes No If this is an existing well or structure, list the Complex ID or API No.

17-703-40958-00

Do you plan to use a subsea BOP or a surface BOP on a floating facility to conduct your proposed activities? Yes No X

WCD info For wells, volume of uncontrolled blowout (Bbls/day): NA

For structures, volume of all storage and pipelines (Bbls): NA

API Gravity of fluid

NA

Surface Location Bottom-Hole Location (For Wells) Completion (For multiple completions, enter separate lines)

Lease No. OCS-G 13576 OCS OCS

Area Name EAST CAMERON

Block No. 071

Blockline Departures (in feet)

N/S Departure: 5355 FSL N/S Departure: F L N/S Departure: F L N/S Departure: F L

E/W Departure: 872 FEL E/W Departure: F L E/W Departure: F L E/W Departure: F L

Lambert X- Y coordinates

X: 1,567,676.29 X: X: X:

Y: 247,290.65 Y: Y: Y:

Latitude/ Longitude

Latitude 29° 20’ 22.747” Latitude Latitude Latitude

Longitude -92° 41’ 24.609” Longitude Longitude Longitude

Water Depth (Feet): 51 MD (Feet): 11,216

TVD (Feet): 10,525

MD (Feet): MD (Feet): MD (Feet):

MD (Feet): MD (Feet): MD (Feet): Anchor Radius (if applicable) in feet: NA

Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name or No.

Area Block X Coordinate Y Coordinate Length of Anchor Chain on Seafloor

X = Y =

X = Y =

X = Y =

X = Y =

X = Y =

Page 8 of 8

ATTACHMENT APUBLIC INFORMATION COPY

Page 57: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

PUBLIC INFORMATION COPY ATTACHMENT B

Page 58: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

PUBLIC INFORMATION COPY ATTACHMENT B

Page 59: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

PUBLIC INFORMATION COPY ATTACHMENT B

Page 60: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

ATTACHMENT C

PUBLIC INFORMATION COPY

Page 61: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

ATTACHMENT D

PUBLIC INFORMATION COPY

Page 62: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Your payment has been submitted to Pay.gov and the details are below. If you have any questions regarding this payment, please contact Brenda Dickerson at (703) 787-1617 or [email protected].

Application Name: BOEM Development/DOCD Plan - BD Pay.gov Tracking ID: 26PFBSSJ Agency Tracking ID: 76016926287 Transaction Type: Sale Transaction Date: 07/16/2020 09:49:14 PM EDT Account Holder Name: EC OFFSHORE PROPERTIES, INC. Transaction Amount: $4,238.00 Card Type: Visa Card Number: ************0689 Region: Gulf of Mexico Contact: Kathy Camp 713-201-9627 Company Name/No: EC Offshore Properties, Inc, 03147 Lease Number(s): 13576, 00184, , , Area-Block: East Cameron EC, 71: East Cameron EC, 72: , : , : , Type-Wells: Supplemental Plan, 1

ATTACHMENT EPUBLIC INFORMATION COPY

Page 63: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Listed Species Scientific Name Status Critical Habitat Designated in Gulf of Mexico

Potential Presence Lease/

Projected Area

Coastal

Marine Mammals

Blue whale Balaenoptera musculus E None X³ -

Fin whale Balaenoptera physalus E None X³ -

Humpback whale Megaptera novaeangliae E None X³ -

Sei whale Balaenoptera borealis E None X³ -

Sperm whale Physeter macrocephalus E None X -

West Indian manatee¹

Trichechus manatus E Florida (peninsular) - X

North Atlantic Right whale

Eubalaena glacialis E None X³ -

Bryde’s whale² Balaenoptera edeni E None X³ -

Terrestrial Mammals Beach Mice (Alabama, Choctawhatchee, Perdido Key, St. Andrew)

Peromyscus polionotus E Alabama and Florida (Panhandle) Beaches - X

Sea Turtles Green sea turtle Chelonia mydas T None X X Hawksbill sea turtle

Eretmochelys imbricata E None X X

Kemp’s ridley sea turtle

Lepidochelys kempii E None X X

Leatherback sea turtle

Dermochelys coriacea E None X X

Loggerhead sea turtle Caretta caretta T

Nesting beaches and nearshore reproductive habitat in Mississippi, Alabama, and Florida (Panhandle);

Sargassum habitat including most of the central & western Gulf of Mexico.

X X

Fish

Gulf Sturgeon Acipenser oxyrinchus desotoi

T Coastal Louisiana, Mississippi, Alabama, and Florida (Panhandle) X X

Giant manta ray Manta birostris E None X - Oceanic whitetip shark

Carcharhinus longimanus T None X -

Smalltooth sawfish Pristis pectinate E Southwest Florida - X

Nassau grouper Epinephelus striatus T None - X

ATTACHMENT I

PUBLIC INFORMATION COPY

Page 64: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Listed Species Scientific Name Status Critical Habitat Designated in Gulf of Mexico

Potential Presence Lease/

Projected Area

Coastal

Birds

Piping Plover Charadrius melodus T Coastal Texas, Louisiana, Mississippi,

Alabama, and Florida (Panhandle) - X

Whooping Crane Grus americana E Coastal Texas, Louisiana, Mississippi, Alabama, and Florida (Panhandle) - X

Invertebrates

Elkhorn coral Acropora palmata T Florida Keys and the Dry Tortugas - X

Staghorn coral Acropora cervicornis T Florida Keys and the Dry Tortugas - X

Pillar coral Dendrogyra cylindrus T None - X

Rough cactus coral Mycerophyllia ferox T None - X

Lobed star coral Orbicella annularis T None - X

Mountainous star coral

Orbicella faveolata T None - X

Boulder star coral Orbicella franksi T None - X Abbreviations: E = Endangered; T = Threatened; X = Potential Presence

¹ There are two subspecies of West Indian manatee: the Florida manatee (T. m. latirostris), which ranges from the northern Gulf of Mexico to Virginia, and the Antillean manatee (T. m. manatus), which ranges from northern Mexico to eastern Brazil. Only the Florida manatee subspecies is likely to be found in the northern Gulf of Mexico. On 30 March 2017, the USFWS announced the West Indian manatee, including the Florida manatee subspecies, was reclassified as Threatened. ² The Gulf of Mexico DPS of Bryde’s whales are protected by the Marine Mammal Protection Act (MMPA). Per 84 FR 15446, NMFS determined the Gulf of Mexico Bryde’s whale warranted listing as Endangered under the Endangered Species Act (ESA). ³ The Blue, Fin, Humpback, Sei, North Atlantic Right and Bryde’s Whales are uncommon in the Gulf of Mexico and are unlikely to be present in the projected area.

ATTACHMENT I

PUBLIC INFORMATION COPY

Page 65: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

please specify if the amount reported is a total or per well amount

Projected generated waste based on single well Projected ocean discharges

Type of Waste Composition Projected Amount Discharge rate Discharge Method Answer yes or noWill drilling occur ? If yes, you should list muds and cuttings

Water-based drilling fluid N/A N/A N/A N/A N/ACuttings wetted with water-based fluid N/A N/A N/A N/A N/ASynthetic-based drilling fluid N/A N/A N/A N/A N/A

Cuttings wetted with synthetic-based fluid N/A N/A N/A N/A N/A

Will humans be there? If yes, expect conventional wasteDomestic waste Trash/Debris 1000 ft3/well 20 ft3/day/well Transport To Dock NoSanitary waste Sanitary Waste 100 bbls/well 5 bbls/day/well Treated - Overboard No

Is there a deck? If yes, there will be Deck DrainageDeck Drainage Rainfall 35 bbls/well 1 bbl/day/well Treated - Overboard No

Will you conduct well treatment, completion, or workover? Well treatment fluids N/A N/A N/A N/A NoWell completion fluids N/A N/A N/A N/A NoWorkover fluids N/A N/A N/A N/A No

Miscellaneous discharges. If yes, only fill in those associated with your activity. Desalinization unit discharge N/A N/A N/A N/A N/ABlowout prevent fluid N/A N/A N/A N/A N/ABallast water N/A N/A N/A N/A N/ABilge water N/A N/A N/A N/A N/AExcess cement at seafloor N/A N/A N/A N/A N/AFire water N/A N/A N/A N/A N/ACooling water N/A N/A N/A N/A N/A

Will you produce hydrocarbons? If yes fill in for produced water.Produced water Produced Water 100 bbls/well 10 bbls/day Treated - Overboard No

Will you be covered by an individual or general NPDES permit ? General

NOTE: If you will not have a type of waste, enter NA in the row.

TABLE 1. WASTES YOU WILL GENERATE, TREAT AND DOWNHOLE DISPOSE OR DISCHARGE TO THE GOM

Projected Downhole Disposal

No drilling proposed in this DOCD

ATTACHMENT J

PUBLIC INFORMATION COPY

Page 66: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

Please specify whether the amount reported is a total or per wellProjected

generated wasteSolid and Liquid Wastes

transportation

Type of Waste Composition Transport MethodName/Location of

Facility Amount Disposal Method

Will drilling occur ? If yes, fill in the muds and cuttings.Oil-based drilling fluid or mud N/A N/A N/A N/A N/ASynthetic-based drilling fluid or mud N/A N/A N/A N/A N/ACuttings wetted with Water-based fluid N/A N/A N/A N/A N/ACuttings wetted with Synthetic-based fluid N/A N/A N/A N/A N/ACuttings wetted with oil-based fluids N/A N/A N/A N/A N/A

Will you produce hydrocarbons? If yes fill in for produced sand.Produced sand N/A N/A N/A N/A N/A

Trash and debris Trash & Debris Storage Bins on Crewboat Cameron, La. 1000 ft3/well LandfillUsed oil Motor Oil Drums on Crewboat Ecosource-Fourchon 100 bbls/well RecycledWash water N/A N/A N/A N/A N/AChemical product wastes Chemical Product Waste Drums on Crewboat Ecosource-Fourchon 50 lbs/well Treatment / Recycled

NOTE: If you will not have a type of waste, enter NA in the row.

Waste Disposal

TABLE 2. WASTES YOU WILL TRANSPORT AND /OR DISPOSE OF ONSHORE

Will you have additional wastes that are not permitted for discharge? If yes, fill in the appropriate rows.

ATTACHMENT J

PUBLIC INFORMATION COPY

Page 67: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

DOCD AIR QUALITY SCREENING CHECKLIST OMB Control No. 1010-0151OMB Approval Expires: 06/30/2021

COMPANY EC OFFSHORE PROPERTIES, INC.AREA EAST CAMERONBLOCK 71 / 72LEASE OCS-G13576 / OCS00184PLATFORM A / C / CAISSON 006WELL VariousCOMPANY CONTACT KATHY CAMPTELEPHONE NO. 713-201-9627

REMARKS

This AQR is being submitted to update air quality emissions for 2020 through 2028 based on current and projected platform equipment and operations.

LEASE TERM PIPELINE CONSTRUCTION INFORMATION:YEAR NUMBER OF TOTAL NUMBER OF CONSTRUCTION DAYS

PIPELINES2020 NA2021 1 14202220232024202520262027202820292030

BOEM FORM 0139 (June 2018- Supersedes all previous versions of this form which may not be used). Page 1 of 8

ATTACHMENT K

PUBLIC INFORMATION COPY

Page 68: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

AIR EMISSIONS CUMPUTATION FACTORS

Fuel Usage Conversion Factors Natural Gas Turbines Natural Gas Engines Diesel Recip. Engine REF. DATESCF/hp-hr 9.524 SCF/hp-hr 7.143 GAL/hp-hr 0.0483 AP42 3.2-1 4/76 & 8/84

Equipment/Emission Factors units PM SOx NOx VOC CO REF. DATE

NG Turbines gms/hp-hr 0.00031 1.4 0.01 0.36 AP42 3.1-1& 3.1-2a 07/00NG 2-cycle lean gms/hp-hr 0.00196 6.4 0.40 1.2 AP42 3.2-1 07/00NG 4-cycle lean gms/hp-hr 0.00196 2.8 0.39 1.8 AP42 3.2-2 07/00NG 4-cycle rich gms/hp-hr 0.00196 7.5 0.10 11.6 AP42 3.2-3 07/00

Diesel Recip. < 600 hp. gms/hp-hr 1 0.1835 14 1.12 3.03 AP42 3.3-1 10/96Diesel Recip. > 600 hp. gms/hp-hr 0.32 0.1835 11 0.33 2.4 AP42 3.4-1 10/96Diesel Boiler lbs/bbl 0.084 0.3025 0.84 0.008 0.21 AP42 1.3-12,14 9/98

NG Heaters/Boilers/Burners lbs/mmscf 7.6 0.593 100 5.5 84 AP42 1.4-1, 14-2, & 14-3 7/98NG Flares lbs/mmscf 26715.000 71.4 60.3 388.5 AP42 11.5-1* 9/91Liquid Flaring lbs/bbl 0.42 6.83 2 0.01 0.21 AP42 1.3-1 & 1.3-3 9/98Tank Vapors lbs/bbl 0.03 E&P Forum 1/93Fugitives lbs/hr/comp. 0.0005 API Study 12/93Glycol Dehydrator Vent lbs/mmscf 6.6 La. DEQ 1991

Gas Venting lbs/scf 0.0034

Sulphur Content Source Value UnitsFuel Gas 3.33 ppm

Diesel Fuel 0.05 % weightProduced Gas( Flares)** 150000 ppm

Produced Oil (Liquid Flaring) 1 % weight*NG Flares SO2 factor is based on a mass balance where all H 2S is assumed to be converted to SO 2.**Produced Gas( Flares) Sulfur Content Value represents the average H2S concentration of the flare gas stream, which includes acid gas from the amine regenerator still column.

BOEM FORM 0139 (June 2018 - Supersedes all previous versions of this form which may not be used). Page 2 of 8

ATTACHMENT K

PUBLIC INFORMATION COPY

Page 69: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

AIR EMISSIONS CALCULATIONS - FIRST YEAR

COMPANY AREA BLOCK LEASE PLATFORM CONTACT PHONE

EC OFFSHORE PROPERTIES, INC. EAST CAMERON 71 / 72 OCS-G13576 /

OCS00184A / C / CAISSON

006 713-201-9627

OPERATIONS EQUIPMENT RATING MAX. FUEL ACT. FUEL RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONSDiesel Engines HP GAL/HR GAL/D

Nat. Gas Engines HP SCF/HR SCF/DBurners MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC CO PM SOx NOx VOC CO

DRILLING PRIME MOVER>600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00NA PRIME MOVER>600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BURNER diesel 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AUXILIARY EQUIP<600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(crew) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(supply) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(tugs) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PIPELINE Pipeline Lay Barge with Tug 3160 152.628 3663.07 24 14 2.23 1.28 76.56 2.30 16.70 0.37 0.21 12.86 0.39 2.81INSTALLATION Support Vessel .600hp 2800 135.24 3245.76 24 12 1.97 1.13 67.84 2.04 14.80 0.28 0.16 9.77 0.29 2.13From EC72 to EC71 PERM WELL PROT Liftboat 175' Class >600hp 1080 52.164 1251.94 24 8 0.76 0.44 26.17 0.79 5.71 0.07 0.04 2.51 0.08 0.55INSTALLATION Utility Boat >600hp 2800 135.24 3245.76 14 2 1.97 1.13 67.84 2.04 14.80 0.03 0.02 0.95 0.03 0.21Located in EC72 PRODUCTION 125 Kw Diesel Generator <600hp 250 12.075 289.80 24 365 0.55 0.10 7.71 0.62 1.67 2.41 0.44 33.77 2.70 7.31

Compressor 600 28.98 695.52 23 340 1.32 0.24 18.50 1.48 4.00 5.06 0.93 70.77 5.66 15.32Pf A and C Complex <600hp Diesel Crane 100 4.83 115.92 2 52 0.22 0.04 3.08 0.25 0.67 0.01 0.00 0.16 0.01 0.03Located in EC71 Utility Boat >600hp 2800 135.24 3245.76 14 26 6.17 1.13 86.34 6.91 18.69 1.12 0.21 15.71 1.26 3.40

Helicopter <600hp Bell 407 250 12.075 289.80 2 52 0.18 0.10 6.06 0.18 1.32 0.01 0.01 0.31 0.01 0.07MISC. BPD SCF/HR COUNTTANK-N/A 0 0 0 0.00 0.00 FLARE-(Routine Flaring) 0 24 365 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PROCESS VENT-(Intermittent Venting) 0 0.2 100 0.00 0.00 FUGITIVES- 0.0 365 0.00 0.00 AMINE UNIT VENT-(routed to flare) 0.0 0 0 0.00 0.00GLYCOL STILL VENT- 0.0 24 365 0.00 0.00

DRILLING OIL BURN 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00WELL TEST GAS FLARE 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2021 YEAR TOTAL 15.37 5.59 360.11 16.59 78.37 9.37 2.02 146.82 10.43 31.82

EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 632.70 632.70 632.70 632.70 24209.25

19.0

Various

WELL

KATHY CAMP This AQR is being submitted to update air quality emissions for 2020 through 2028 based on current and projected platform equipment and operations.

REMARKS

BOEM FORM 0139 (June 2018 - Supersedes all previous versions of this form which may not be used). Page 3 of 8

ATTACHMENT K

PUBLIC INFORMATION COPY

Page 70: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

AIR EMISSIONS CALCULATIONS - SECOND YEAR

COMPANY AREA BLOCK LEASE PLATFORM CONTACT PHONE

EC OFFSHORE PROPERTIES, INC. EAST CAMERON 71 / 72 OCS-G13576 /

OCS00184A / C /

CAISSON 006 713-201-9627

OPERATIONS EQUIPMENT RATING MAX. FUEL ACT. FUEL RUN TIME MAXIMUM POUNDS PER HOUR ESTIMATED TONSDiesel Engines HP GAL/HR GAL/D

Nat. Gas Engines HP SCF/HR SCF/DBurners MMBTU/HR SCF/HR SCF/D HR/D D/YR PM SOx NOx VOC CO PM SOx NOx VOC CO

DRILLING PRIME MOVER>600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00NA PRIME MOVER>600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BURNER diesel 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00AUXILIARY EQUIP<600hp diesel 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(crew) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(supply) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00VESSELS>600hp diesel(tugs) 0 0 0.00 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PIPELINE Pipeline Lay Barge with Tug 3160 152.628 3663.07 24 14 2.23 1.28 76.56 2.30 16.70 0.37 0.21 12.86 0.39 2.81INSTALLATION Support Vessel .600hp 2800 135.24 3245.76 24 12 1.97 1.13 67.84 2.04 14.80 0.28 0.16 9.77 0.29 2.13From EC72 to EC71 PERM WELL PROT Liftboat 175' Class >600hp 1080 52.164 1251.94 24 8 0.76 0.44 26.17 0.79 5.71 0.07 0.04 2.51 0.08 0.55INSTALLATION Utility Boat >600hp 2800 135.24 3245.76 14 2 1.97 1.13 67.84 2.04 14.80 0.03 0.02 0.95 0.03 0.21Located in EC72

PRODUCTION 125 Kw Diesel Generator <600hp 250 12.075 289.80 24 365 0.55 0.10 7.71 0.62 1.67 2.41 0.44 33.77 2.70 7.31

Compressor 600 28.98 695.52 23 340 1.32 0.24 18.50 1.48 4.00 5.06 0.93 70.77 5.66 15.32Pf A and C Complex <600hp Diesel Crane 100 4.83 115.92 2 52 0.22 0.04 3.08 0.25 0.67 0.01 0.00 0.16 0.01 0.03Located in EC71 Utility Boat >600hp 2800 135.24 3245.76 14 26 6.17 1.13 86.34 6.91 18.69 1.12 0.21 15.71 1.26 3.40

Helicopter <600hp Bell 407 250 12.075 289.80 2 52 0.18 0.10 6.06 0.18 1.32 0.01 0.01 0.31 0.01 0.07MISC. BPD SCF/HR COUNTTANK-N/A 0 0 0 0.00 0.00 FLARE-(Routine Flaring) 0 24 365 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00PROCESS VENT-(Intermittent Venting) 0 0.2 100 0.00 0.00 FUGITIVES- 0.0 365 0.00 0.00 AMINE UNIT VENT-(routed to flare) 0.0 0 0 0.00 0.00GLYCOL STILL VENT- 0.0 24 365 0.00 0.00

DRILLING OIL BURN 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00WELL TEST GAS FLARE 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2022-2028 YEAR TOTAL 15.37 5.59 360.11 16.59 78.37 9.37 2.02 146.82 10.43 31.82

EXEMPTION CALCULATION DISTANCE FROM LAND IN MILES 632.70 632.70 632.70 632.70 24209.25

19.0

Various

WELL

KATHY CAMP This AQR is being submitted to update air quality emissions for 2020 through 2028 based on current and projected platform equipment and operations.

REMARKS

BOEM FORM 0139 (June 2018 - Supersedes all previous versions of this form which may not be used). Page 4 of 8

ATTACHMENT K

PUBLIC INFORMATION COPY

Page 71: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

AIR EMISSIONS CALCULATIONS

COMPANY AREA BLOCK LEASE PLATFORM WELLEC OFFSHORE PROPERTIES, INC

EAST CAMERON 71 / 72 OCS-G13576 / OCS00 A / C / CAISSON 006 Various

Emitted SubstanceYear

PM SOx NOx VOC CO2021 9.37 2.02 146.82 10.43 31.82

2022-2028 9.37 2.02 146.82 10.43 31.82Allowable 632.70 632.70 632.70 632.70 24209.25

BOEM FORM 0139 (June 2018 - Supersedes all previous versions of this form which may not be used). Page 8 of 8

ATTACHMENT K

PUBLIC INFORMATION COPY

Page 72: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

1

SPILL RESPONSE DISCUSSION For the purpose of NEPA and Coastal Zone Management Act analysis, the largest spill volume originating from the proposed activity would be a well blowout during production operations, estimated to be 3,940 barrels of condensate with an API gravity of 48°. Land Segment and Resource Identification Trajectories of a spill and the probability of it impacting a land segment have been projected utilizing information in the BOEM Oil Spill Risk Analysis Model (OSRAM) for the Central and Western Gulf of Mexico available on the BOEM website. The results are shown in Figure 1. The BOEM OSRAM identifies the highest probability of impact to the shorelines of Cameron Parish, Louisiana. Cameron Parish includes the east side of Sabine Lake, Sabine National Wildlife Refuge, Calcasieu Lake, Lacassine National Wildlife Refuge (inland) and Grand Lake. Cameron Parish also includes the area along the coastline from Sabine Pass to Big Constance Lake in Rockefeller Wildlife Refuge. This region is composed of open public beaches, marshlands and swamps. It serves as a habitat for numerous birds, finfish and other animals, including several rare, threatened and endangered species. Response EC Offshore Properties, Inc. will make every effort to respond to the Worst Case Discharge as effectively as practicable. A description of the response equipment under contract to contain and recover the Worst Case Discharge is shown in Figure 2. Using the estimated chemical and physical characteristics of condensate, an ADIOS weathering model was run on a similar product from the ADIOS oil database. The results indicate 61% or approximately 2,403 barrels of condensate would be evaporated/dispersed within 24 hours, with approximately 1,537 barrels remaining.

Natural Weathering Data: EC 72, Well 006 Barrels of Oil WCD Volume 3,940 Less 61% natural evaporation/dispersion 2,403 Remaining volume 1,537

Figure 2 outlines equipment, personnel, materials and support vessels as well as temporary storage equipment available to respond to the worst case discharge. The volume accounts for the amount remaining after evaporation/dispersion at 24 hours. The list estimates individual times needed for procurement, load out, travel time to the site and deployment. Figure 2 also indicates how operations will be supported. EC Offshore Properties, Inc.’s Oil Spill Response Plan includes alternative response technologies such as dispersants. Strategies will be decided by Unified Command based on a safety analysis, the size of the spill, weather and potential impacts. Although unlikely, if aerial dispersants are

ATTACHMENT LPUBLIC INFORMATION COPY

Page 73: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

2

utilized, 8 sorties (9,600 gallons) from two of the DC-3 aircrafts and 4 sorties (8,000 gallons) from the Basler aircraft would provide a daily dispersant capability of 7,540 barrels. Slick containment boom and sorbent boom would be immediately called out and on-scene as soon as possible. Offshore response strategies may include collection of condensate with sorbent boom (inside hard boom), attempting to skim utilizing CGA spill response equipment, with a total derated skimming capacity of 122,055 barrels. Temporary storage associated with skimming equipment equals 4,498 barrels. If additional storage is needed, various storage barges with a total capacity 131,000 bbls may be mobilized and centrally located to provide temporary storage and minimize off-loading time. Safety is first priority. Air monitoring will be accomplished and operations deemed safe prior to any containment/skimming attempts. If the spill went unabated, shoreline impact in Cameron Parish, Louisiana would depend upon existing environmental conditions. Shoreline protection would include the use of CGA’s near shore and shallow water skimmers with a totaled derated skimming capacity of 34,874 barrels. Temporary storage associated with skimming equipment equals 903 barrels. If additional storage is needed, various storage barges with a total capacity 70,000 bbls may be mobilized and centrally located to provide temporary storage and minimize off-loading time. Onshore response may include the deployment of shoreline boom on beach areas, or protection and sorbent boom on vegetated areas. A Master Service Agreement with AMPOL will ensure access to 29,700 feet of 18” shoreline protection boom. Figure 2 outlines individual times needed for procurement, load out, travel time to the site and deployment. Strategies would be based upon surveillance and real time trajectories that depict areas of potential impact given actual sea and weather conditions. Applicable Area Contingency Plans (ACPs), Geographic Response Plans (GRPs), and Unified Command (UC) will be consulted to ensure that environmental and special economic resources are correctly identified and prioritized to ensure optimal protection. Shoreline protection strategies depict the protection response modes applicable for oil spill clean-up operations. As a secondary resource, the State of Louisiana Initial Oil Spill Response Plan will be consulted as appropriate to provide detailed shoreline protection strategies and describe necessary action to keep the oil spill from entering Louisiana’s coastal wetlands. The UC should take into consideration all appropriate items detailed in Tactics discussion of this Appendix. The UC and their personnel have the option to modify the deployment and operation of equipment to allow for a more effective response to site-specific circumstances. EC Offshore Properties, Inc.’s contract Incident Management Team has access to the applicable ACP(s) and GRP(s). Based on the anticipated worst case discharge scenario, EC Offshore Properties, Inc. can be onsite with contracted oil spill recovery equipment with adequate response capacity to contain and recover surface hydrocarbons, and prevent land impact, to the maximum extent practicable, within an estimated 48 hours (based on the equipment’s Effective Daily Recovery Capacity (EDRC)).

ATTACHMENT LPUBLIC INFORMATION COPY

Page 74: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

3

Initial Response Considerations Actual actions taken during an oil spill response will be based on many factors to include but not be limited to:

• Safety • Weather • Equipment and materials availability • Ocean currents and tides • Location of the spill • Product spilled • Amount spilled • Environmental risk assessments • Trajectory and product analysis • Well status, i.e., shut in or continual release

EC Offshore Properties, Inc. will take action to provide a safe, aggressive response to contain and recover as much of the spilled oil as quickly as it is safe to do so. In an effort to protect the environment, response actions will be designed to provide an “in-depth” protection strategy meant to recover as much oil as possible as far from environmentally sensitive areas as possible. Safety will take precedence over all other considerations during these operations. Coordination of response assets will be supervised by the designation of a SIMOPS group as necessary for close quarter vessel response activities. Most often, this group will be used during source control events that require a significant number of large vessels operating independently to complete a common objective, in close coordination and support of each other. This group must also monitor the subsurface activities of each vessel (ROV, dispersant application, well control support, etc.). The SIMOPS group leader reports to the Source Control Section Chief. In addition, these activities will be monitored by the Incident Management Team (IMT) and Unified Command via a structured Common Operating Picture (COP) established to track resource and slick movement in real time. Upon notification of a spill, the following actions will be taken:

• Information will be confirmed • An assessment will be made and initial objectives set • OSROs and appropriate agencies will be notified • ICS 201, Initial Report Form completed • Initial Safety plan will be written and published • Unified Command will be established

o Overall safety plan developed to reflect the operational situation and coordinated objectives

o Areas of responsibility established for Source Control and each surface operational site

o On-site command and control established

ATTACHMENT LPUBLIC INFORMATION COPY

Page 75: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

4

Offshore Response Actions Equipment Deployment Surveillance

• Surveillance Aircraft: within two hours of QI notification, or at first light • Provide trained observer to provide on site status reports • Provide command and control platform at the site if needed • Continual surveillance of oil movement by remote sensing systems, aerial photography

and visual confirmation • Continual monitoring of vessel assets using vessel monitoring systems

Dispersant application assets

• Put ASI on standby • With the FOSC, conduct analysis to determine appropriateness of dispersant application

(refer to Section 18) • Gain FOSC approval for use of dispersants on the surface • Deploy aircraft in accordance with a plan developed for the actual situation • Coordinate movement of dispersants, aircraft, and support equipment and personnel • Confirm dispersant availability for current and long range operations • Start ordering dispersant stocks required for expected operations

Containment boom

• Call out early and expedite deployment to be on scene ASAP • Ensure boom handling and mooring equipment is deployed with boom • Provide continuing reports to vessels to expedite their arrival at sites that will provide for

their most effective containment • Use Vessels of Opportunity (VOO) to deploy and maintain boom

Oceangoing Boom Barge

• Containment at the source • Increased/enhanced skimmer encounter rate • Protection booming

In-situ Burn assets

• Determine appropriateness of in-situ burn operation in coordination with the FOSC and affected SOSC

• Determine availability of fire boom and selected ignition systems • Start ordering fire boom stocks required for expected operations • Contact boom manufacturer to provide training & tech support for operations, if required • Determine assets to perform on water operation • Build operations into safety plan • Conduct operations in accordance with an approved plan • Initial test burn to ensure effectiveness

ATTACHMENT LPUBLIC INFORMATION COPY

Page 76: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

5

Dedicated off-shore skimming systems General

• Deployed to the highest concentration of oil • Assets deployed at safe distance from aerial dispersant and in-situ burn operations

CGA HOSS Barge

• Use in areas with heaviest oil concentrations • Consider for use in areas of known debris (seaweed, and other floating materials)

CGA 95’ Fast Response Vessels (FRVs)

• Designed to be a first vessel on scene • Capable of maintaining the initial Command and Control function for on water recovery

operations • 24 hour oil spill detection capability • Highly mobile and efficient skimming capability • Use as far off-shore as safely possible

CGA FRUs

• To the area of the thickest oil • Use as far off-shore as allowed • VOOs 140’ – 180’ in length • VOOs with minimum of 18’ x 38’ or 23’ x 50’ of optimum deck space • VOOs in shallow water should have a draft of <10 feet when fully loaded

T&T Koseq Skimming Systems • To the area of the thickest oil • Use as far off-shore as allowed • VOOs with a minimum of 2,000 bbls storage capacity • VOOs at least 200’ in length • VOOs with deck space of 100’ x 40’ to provide space for arms, tanks, and crane • VOOs for shallow water should be deck barges with a draft of <10 feet when fully loaded

Storage Vessels

• Establish availability of CGA contracted assets (See Appendix E) • Early call out (to allow for tug boat acquisition and deployment speeds) • Phase mobilization to allow storage vessels to arrive at the same time as skimming

systems • Position as closely as possible to skimming assets to minimize offloading time

ATTACHMENT LPUBLIC INFORMATION COPY

Page 77: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

6

Vessels of Opportunity (VOO) • Use EC Offshore Properties, Inc.’s contracted resources as applicable • Industry vessels are ideal for deployment of Vessel of Opportunity Skimming Systems

(VOSS) • Acquire additional resources as needed • Consider use of local assets, i.e. fishing and pleasure craft for ISB operations or boom

tending • Expect mission specific and safety training to be required • Plan with the US Coast Guard for vessel inspections • Place VOOs in Division or Groups as needed • Use organic on-board storage if appropriate • Maximize non-organic storage appropriate to vessel limitations • Decant as appropriate after approval to do so has been granted • Assign bulk storage barges to each Division/Group • Position bulk storage barges as close to skimming units as possible • Utilize large skimming vessel (e.g. barges) storage for smaller vessel offloading • Maximize skimming area (swath) to the optimum width given sea conditions and available

equipment • Maximize use of oleophilic skimmers in all operations, but especially offshore • Nearshore, use shallow water barges and shuttle to skimming units to minimize offloading

time • Plan and equip to use all offloading capabilities of the storage vessel to minimize

offloading time Adverse Weather Operations: In adverse weather, when seas are > 3 feet, the use of larger recovery and storage vessels, oleophilic skimmers, and large offshore boom will be maximized. KOSEQ Arm systems are built for rough conditions, and they should be used until their operational limit (9.8’ seas) is met. Safety will be the overriding factor in all operations and will cease at the order of the Unified Command, vessel captain, or in an emergency, ”stop work” may be directed by any crew member. Surface Oil Recovery Considerations and Tactics (Offshore and Near-shore Operations)

Maximization of skimmer-oil encounter rate

• Place barges in skimming task forces, groups, etc., to reduce recovered oil offloading time

• Place barges alongside skimming systems for immediate offloading of recovered oil when practicable

• Use two vessels, each with heavy sea boom, in an open-ended “V” configuration to funnel surface oil into a trailing skimming unit’s organic, V-shaped boom and skimmer (see page 7, CGA Equipment Guide Book and Tactic Manual (CGATM)

ATTACHMENT LPUBLIC INFORMATION COPY

Page 78: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

7

• Use secondary vessels and heavy sea boom to widen boom swath beyond normal skimming system limits (see page 15, CGATM)

• Consider night-time operations, first considering safety issues • Utilize all available advanced technology systems ( IR, X-Band Radar, etc.) to determine

the location of, and move to, recoverable oil • Confirm the presence of recoverable oil prior to moving to a new location

Maximize skimmer system efficiency

• Place weir skimming systems in areas of calm seas and thick oil • Maximize the use of oleophilic skimming systems in heavier seas • Place less mobile, high EDRC skimming systems (e.g. HOSS Barge) in the largest

pockets of the heaviest oil • Maximize onboard recovered oil storage for vessels. • Obtain authorization for decanting of recovered water as soon as possible • Use smaller, more agile skimming systems to recover streamers of oil normally found

farther from the source. Place recovered oil barges nearby

Recovered Oil Storage • Smaller barges in larger quantities will increase flexibility for multi-location skimming

operations • Place barges in skimming task forces, groups, etc., to reduce recovered oil offloading

time • Procure and deploy the maximum number of portable tanks to support Vessel of

Opportunity Skimming Systems if onboard storage is not available • Maximize use of the organic recovered oil storage capacity of the skimming vessel

Command, Control, and Communications (C3)

• Publish, implement, and fully test an appropriate communications plan • Design an operational scheme, maintaining a manageable span of control • Designate and mark C3 vessels for easy aerial identification • Designate and employ C3 aircraft for task forces, groups, etc. • Use reconnaissance air craft and Rapid Response Teams (RAT) to confirm the presence

of recoverable oil

ATTACHMENT LPUBLIC INFORMATION COPY

Page 79: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

8

On Water Recovery Group When the first skimming vessel arrives on scene, a complete site assessment will be conducted before recovery operations begin. Once it is confirmed that the air monitoring readings for O2, LEL, H2S, CO, VOC, and Benzene are all within the permissible limits, oil recovery operations may begin. As skimming vessels arrive, they will be organized to work in areas that allow for the most efficient vessel operation and free vessel movement in the recovery of oil. Vessel groups will vary in structure as determined by the Operations Section of the Unified Command, but will generally consist, at a minimum, of the following dedicated assets:

• 3 to 5 – Offshore skimming vessels (recovery) • 1 – Tank barge (temporary storage) • 1 – Air asset (tactical direction) • 2 – Support vessels (crew/utility for supply) • 6 to 10 – Boom vessels (enhanced booming )

Example (Note: Actual organization of TFs will be dependent on several factors including, asset availability, weather, spilled oil migration, currents, etc.) The 95’ FRV Breton Island out of Venice arrives on scene and conducts an initial site assessment. Air monitoring levels are acceptable and no other visual threats have been observed. The area is cleared for safe skimming operations. The Breton Island assumes command and control (CoC) of on-water recovery operations until a dedicated non-skimming vessel arrives to relieve it of those duties. A second 95’ FRV arrives and begins recovery operations alongside the Breton Island. Several more vessels begin to arrive, including a third 95’ FRV out of Galveston, the HOSS Barge (High Volume Open Sea Skimming System) out of Harvey, a boom barge (CGA 300) with 25,000’ of 42” auto boom out of Leeville, and 9 Fast Response Units (FRUs) from the load-out location at C-Port in Port Fourchon. As these vessels set up and begin skimming, they are grouped into task forces (TFs) as directed by the Operations Section of the Unified Command located at the command post. Initial set-up and potential actions:

• A 1,000 meter safety zone has been established around the incident location for vessels involved in Source Control

• The HOSS Barge is positioned facing the incident location just outside of this safety zone or at the point where the freshest oil is reaching the surface

• The HOSS Barge engages its Oil Spill Detection (OSD) system to locate the heaviest oil and maintains that ability for 24-hour operations

ATTACHMENT LPUBLIC INFORMATION COPY

Page 80: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

9

• The HOSS Barge deploys 1,320’ of 67” Sea Sentry boom on each side, creating a swath width of 800’

• The Breton Island and H.I. Rich skim nearby, utilizing the same OSD systems as the HOSS Barge to locate and recover oil

• Two FRUs join this group and it becomes TF1 • The remaining 7 FRUs are split into a 2 and 3 vessel task force numbered TF2 and TF3 • A 95’ FRV is placed in each TF • The boom barge (CGA 300) is positioned nearby and begins deploying auto boom in

sections between two utility vessels (1,000’ to 3,000’ of boom, depending on conditions) with chain-link gates in the middle to funnel oil to the skimmers

• The initial boom support vessels position in front of TF2 and TF3 • A 100,000+ barrel offshore tank barge is placed with each task force as necessary to

facilitate the immediate offload of skimming vessels The initial task forces (36 hours in) may be structured as follows: TF 1

• 1 – 95’ FRV • 1 – HOSS Barge with 3 tugs • 2 – FRUs • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 8 – 500’ sections of auto boom with gates • 8 – Boom-towing vessels • 2 – Support vessels (crew/utility)

TF 2

• 1 – 95’ FRV • 4 – FRUs • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 10 – 500’ sections of auto boom with gates • 10 – Boom-towing vessels • 2 – Support vessels (crew/utility)

TF 3

• 1 – 95’ FRV • 3 – FRUs • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 8 – 500’ sections of auto boom with gates • 8 – Boom-towing vessels • 2 – Support vessels (crew/utility)

ATTACHMENT LPUBLIC INFORMATION COPY

Page 81: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

10

Offshore skimming equipment continues to arrive in accordance with the ETA data listed in figure H.3a; this equipment includes 2 AquaGuard skimmers and 11 sets of Koseq Rigid Skimming Arms. These high volume heavy weather capable systems will be divided into functional groups and assigned to specific areas by the Operations Section of the Unified Command. At this point of the response, the additional TFs may assume the following configurations: TF 4

• 2 – Sets of Koseq Rigid Skimming Arms w/ associated 200’+ PIDVs • 1 – AquaGuard Skimmer • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 2 – Support vessels (crew/utility) • 6 – 500’ sections of auto boom with gates • 6 – Boom-towing vessels

TF 5

• 3 – Sets of Koseq Rigid Skimming Arms w/ associated 200’+ PIDVs • 1 – AquaGuard Skimmer • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 2 – Support vessels (crew/utility) • 8 – 500’ sections of auto boom with gates • 8 – Boom-towing vessels

TF 6

• 3 – Sets of Koseq Rigid Skimming Arms w/ associated 200’+ PIDVs • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 2 – Support vessels (crew/utility) • 6 – 500’ sections of auto boom with gates • 6 – Boom-towing vessels

TF 7

• 3 – Sets of Koseq Rigid Skimming Arms w/ associated 200’+ PIDVs • 1 – 100,000+ barrel tank barge and associated tug(s) • 1 – Dedicated air asset for tactical direction • 2 – Support vessels (crew/utility) • 6 – 500’ sections of auto boom with gates • 6 – Boom-towing vessels

ATTACHMENT LPUBLIC INFORMATION COPY

Page 82: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

11

CGA Minimum Acceptable Capabilities for Vessels of Opportunity (VOO) Minimum acceptable capabilities of Petroleum Industry Designed Vessels (PIDV) for conducting Vessel of Opportunity (VOO) skimming operations are shown in the table below. PIDVs are “purpose-built” to provide normal support to offshore oil and gas operators. They include but are not limited to utility boats, offshore supply vessels, etc. They become VOOs when tasked with oil spill response duties. Capability FRU KOSEQ AquaGuard

Type of Vessel Utility Boat Offshore Supply Vessel Utility Boat

Operating parameters Sea State 3-5 ft max 9.8 ft max 3-5 ft max

Skimming speed ≤1 kt ≤3 kts ≤1 kt Vessel size

Minimum Length 100 ft 200 ft 100 ft Deck space for: • Tank(s) • Crane(s) • Boom Reels • Hydraulic Power

Units • Equipment Boxes

18x32 ft 100x40 ft 18x32 ft

Communication Assets Marine Band Radio Marine Band Radio Marine Band

Radio Tactical use of Vessels of Opportunity (VOO): EC Offshore Properties, Inc. will take all possible measures to maximize the oil-to-skimmer encounter rate of all skimming systems, to include VOOs, as discussed in this section. VOOs will normally be placed within an On-water recovery unit as shown in figures below. Skimming Operations: PIDVs are the preferred VOO skimming platform. OSROs are more versed in operating on these platforms and the vessels are generally large enough with crews more likely versed in spill response operations. They also have a greater possibility of having on-board storage capacity and the most likely vessels to be under contract, and therefore more readily available to the operator. These vessels would normally be assigned to an on-water recovery group/division (see figure below) and outfitted with a VOSS suited for their size and capabilities. Specific tactics used for skimming operations would be dependent upon many parameters which include, but are not limited to, safety concerns, weather, type VOSS on board, product being recovered, and area of oil coverage. Planners would deploy these assets with the objective of safely maximizing oil- to-skimmer encounter rate by taking actions to minimize non-skimming time and maximizing boom swath. Specific tactical configurations are shown in figures below.

ATTACHMENT LPUBLIC INFORMATION COPY

Page 83: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

12

The Fast Response Unit (FRU): A self-contained, skid based, skimming system that is deployed from the right side of a vessel of opportunity (VOO). An outrigger holds a 75’ long section of air inflatable boom in place that directs oil to an apex for recovery via a Foilex 250 weir skimmer. The outrigger creates roughly a 40’ swath width dependent on the VOO beam. The lip of the collection bowl on the skimmer is placed as close to the oil and water interface as possible to maximize oil recovery and minimize water retention. The skimmer then pumps all fluids recovered to the storage tank where it is allowed to settle, and with the approval of the Coast Guard, the water is decanted from the bottom of the tank back into the water ahead of the containment boom to be recycled through the system. Once the tank is full of as much pure recovered oil as possible it is offloaded to a storage barge for disposal in accordance with an approved disposal plan. A second 100 barrel storage tank can be added if the appropriate amount of deck space is available to use as secondary storage. Tactical Overview Mechanical Recovery – The FRU is designed to provide fast response skimming capability in the offshore and nearshore environment in a stationary or advancing mode. It provides a rated daily recovery capacity of 4,100 barrels. An additional boom reel with 440’ of offshore boom can be deployed along with the FRU, and a second support vessel for boom towing, to extend the swath width when attached to the end of the fixed boom. The range and sustainability offshore is dependent on the VOO that the unit is placed on, but generally these can stay offshore for extended periods. The FRU works well independently or assigned with other on-water recovery assets in a task force. In either case, it is most effective when a designated aircraft is assigned to provide tactical direction to ensure the best placement in recoverable oil. Maximum Sea Conditions – Under most circumstances the FRU can maintain standard oil spill recovery operations in 2’ to 4’ seas. Ultimately, the Coast Guard licensed Captain in charge of the VOO (with input from the CGAS Supervisor assigned) will be responsible to determine when the sea conditions have surpassed the vessel’s safe operating capabilities. Possible Task Force Configuration (Multiple VOOs can be deployed in a task force) 1 – VOO (100’ to 165’ Utility or Supply Vessel) 1 – Boom reel w/support vessel for towing 1 – Tank barge (offshore) for temporary storage 1 – Utility/Crewboat (supply) 1 – Designated spotter aircraft

ATTACHMENT LPUBLIC INFORMATION COPY

Page 84: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

13

The VOSS (yellow) is being deployed and connected to an out-rigged arm. This is suitable for collection in both large pockets of oil and for recovery of streaming oil. The oil-to-skimmer encounter rate is limited by the length of the arm. Skimming pace is < 1 knot.

Through the use of an additional VOO, and using extended sea boom, the swath of the VOSS is increased therefore maximizing the oil-to-skimmer encounter rate. Skimming pace is < 1 knot.

ATTACHMENT LPUBLIC INFORMATION COPY

Page 85: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

14

The Koseq Rigid Sweeping Arm: A skimming system deployed on a vessel of opportunity. It requires a large Offshore or Platform Supply Vessel (OSV/PSV), greater than 200’ with at least 100’ x 50’ of free deck space. On each side of the vessel, a 50’ long rigid framed Arm is deployed that consists of pontoon chambers to provide buoyancy, a smooth nylon face, and a hydraulically adjustable mounted weir skimmer. The Arm floats independently of the vessel and is attached by a tow bridle and a lead line. The movement of the vessel forward draws the rubber end seal of the arm against the hull to create a collection point for free oil directed to the weir by the Arm face. The collection weir is adjusted to keep the lip as close to the oil water interface as possible to maximize oil recovery while attempting to minimize excess water collection. A transfer pump (combination of positive displacement, screw type and centrifuge suited for highly viscous oils) pump the recovered liquid to portable tanks and/or dedicated fixed storage tanks onboard the vessel. After being allowed to sit and separate, with approval from the Coast Guard, the water can be decanted (pumped off) in front of the collection arm to be reprocessed through the system. Once full with as much pure recovered oil as possible, the oil is transferred to a temporary storage barge where it can be disposed of in accordance with an approved disposal plan. Tactical Overview Mechanical Recovery – Deployed on large vessels of opportunity (VOO) the Koseq Rigid Sweeping Arms are high volume surge capacity deployed to increase recovery capacity at the source of a large oil spill in the offshore and outer nearshore environment of the Gulf of Mexico. They are highly mobile and sustainable in rougher sea conditions than normal skimming vessels (9.8’ seas). The large Offshore Supply Vessels (OSV) required to deploy the Arms are able to remain on scene for extended periods, even when sea conditions pick up. Temporary storage on deck in portable tanks usually provides between 1,000 and 3,000 bbls. In most cases, the OSV will be able to pump 20% of its deadweight into the liquid mud tanks in accordance with the vessels Certificate of Inspection (COI). All storage can be offloaded utilizing the vessels liquid transfer system. Maximum Sea Conditions - Under most circumstances the larger OSVs are capable of remaining on scene well past the Skimming Arms maximum sea state of 9.8’. Ultimately it will be the decision of the VOO Captain, with input from the T&T Supervisor onboard, to determine when the sea conditions have exceeded the safe operating conditions of the vessel. Command and Control – The large OSVs in many cases have state of the art communication and electronic systems, as well as the accommodations to support the function of directing all skimming operations offshore and reporting back to the command post. Possible Task Force Configuration (Multiple Koseq VOOs can be deployed in a task force) 1 – > 200’ Offshore Supply Vessels (OSV) with set of Koseq Arms 2 to 4 portable storage tanks (500 bbl) 1 – Modular Crane Pedestal System set (MCPS) or 30 cherry picker (crane) for deployment 1 – Tank barge (offshore) for temporary storage 1 – Utility/Crewboat (supply) 1 – Designated spotter aircraft 4 – Personnel (4 T&T OSRO)

ATTACHMENT LPUBLIC INFORMATION COPY

Page 86: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

15

Scattered oil is “caught” by two VOO and collected at the apex of the towed sea boom. The oil moves thought a “gate” at that apex, forming a larger stream of oil which moves into the boom of the skimming vessel. Operations are paced at >1. A recovered oil barge stationed nearby to minimize time taken to offload recovered oil.

This is a depiction of the same operation as above but using KOSEQ Arms. In this configuration, the collecting boom speed dictates the operational pace at > 1 knot to minimize entrainment of the oil.

ATTACHMENT LPUBLIC INFORMATION COPY

Page 87: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

16

Clean Gulf Associates (CGA) Procedure for Accessing Member-Contracted and other Vessels of Opportunity (VOOs) for Spill Response

• CGA has procedures in place for CGA member companies to acquire vessels of opportunity (VOOs) from an existing CGA member’s contracted fleet or other sources for the deployment of CGA portable skimming equipment including Koseq Arms, Fast Response Units (FRUs) and any other portable skimming system(s) deemed appropriate for the response for a potential or actual oil spill, WCD oil spill or a Spill of National Significance (SONS).

• CGA uses Port Vision, a web-based vessel and terminal interface that empowers CGA to

track vessels through Automatic Identification System (AIS) and terminal activities using a Geographic Information System (GIS). It provides live AIS/GIS views of waterways showing current vessel positions, terminals, created vessel fleets, and points-of-interest. Through this system, CGA has the ability to get instant snapshots of the location and status of all vessels contracted to CGA members, day or night, from any web-enabled PC.

ATTACHMENT LPUBLIC INFORMATION COPY

Page 88: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

17

Near Shore Response Actions Timing

• Put near shore assets on standby and deployment in accordance with planning based on the actual situation, actual trajectories and oil budgets

• VOO identification and training in advance of spill nearing shoreline if possible • Outfitting of VOOs for specific missions • Deployment of assets based on actual movement of oil

Considerations

• Water depth, vessel draft • Shoreline gradient • State of the oil • Use of VOOs • Distance of surf zone from shoreline

Surveillance

• Provide trained observer to direct skimming operations • Continual surveillance of oil movement by remote sensing systems, aerial photography

and visual confirmation • Continual monitoring of vessel assets

Dispersant Use

• Generally will not be approved within 3 miles of shore or with less than 10 meters of water depth

• Approval would be at Regional Response Team level (Region 6) Dedicated Near Shore skimming systems

• FRVs • Egmopol and Marco SWS • Operate with aerial spotter directing systems to observed oil slicks

VOO

• Use EC Offshore Properties, Inc.’s contracted resources as applicable • Industry vessel are usually best for deployment of Vessel of Opportunity Skimming

Systems (VOSS) • Acquire additional resources as needed • Consider use of local assets, i.e. fishing and pleasure craft • Expect mission specific and safety training to be required • Plan with the US Coast Guard for vessel inspections • Operate with aerial spotter directing systems to oil patches

ATTACHMENT LPUBLIC INFORMATION COPY

Page 89: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

18

Shoreline Protection Operations Response Planning Considerations

• Review appropriate Area Contingency Plan(s) • Locate and review appropriate Geographic Response and Site Specific Plans • Refer to appropriate Environmentally Sensitive Area Maps • Capability for continual analysis of trajectories run periodically during the response • Environmental risk assessments (ERA) to determine priorities for area protection • Time to acquire personnel and equipment and their availability • Refer to the State of Louisiana Initial Oil Spill Response Plan, Deep Water Horizon,

dated 2 May 2010, as a secondary reference • Aerial surveillance of oil movement • Pre-impact beach cleaning and debris removal • Shoreline Cleanup Assessment Team (SCAT) operations and reporting procedures • Boom type, size and length requirements and availability • Possibility of need for In-situ burning in near shore areas • Current wildlife situation, especially status of migratory birds and endangered species in

the area • Check for Archeological sites and arrange assistance for the appropriate state agency

when planning operations the may impact these areas Placement of boom

• Position boom in accordance with the information gained from references listed above and based on the actual situation

• Determine areas of natural collection and develop booming strategies to move oil into those areas

• Assess timing of boom placement based on the most current trajectory analysis and the availability of each type of boom needed. Determine an overall booming priority and conduct booming operations accordingly. Consider:

o Trajectories o Weather forecast o Oil Impact forecast o Verified spill movement o Boom, manpower and vessel (shallow draft) availability o Near shore boom and support material, (stakes, anchors, line)

Beach Preparation - Considerations and Actions

• Use of a 10 mile go/no go line to determine timing of beach cleaning • SCAT reports and recommendations • Determination of archeological sites and gaining authority to enter • Monitoring of tide tables and weather to determine extent of high tides • Pre cleaning of beaches by moving waste above high tide lines to minimize waste • Determination of logistical requirements and arranging of waste removal and disposal

ATTACHMENT LPUBLIC INFORMATION COPY

Page 90: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

19

• Staging of equipment and housing of response personnel as close to the job site as possible to maximize on-site work time

• Boom tending, repair, replacement and security (use of local assets may be advantageous) • Constant awareness of weather and oil movement for resource re-deployment as

necessary • Earthen berms and shoreline protection boom may be considered to protect sensitive

inland areas • Requisitioning of earth moving equipment • Plan for efficient and safe use of personnel, ensuring:

o A continual supply of the proper Personal Protective Equipment o Heating or cooling areas when needed o Medical coverage o Command and control systems (i.e. communications) o Personnel accountability measures

• Remediation requirements, i.e., replacement of sands, rip rap, etc. • Availability of surface washing agents and associated protocol requirements for their use

(see National Contingency Plan Product Schedule for list of possible agents) • Discussions with all stakeholders, i.e., land owners, refuge/park managers, and others as

appropriate, covering the following: o Access to areas o Possible response measures and impact of property and ongoing operations o Determination of any specific safety concerns o Any special requirements or prohibitions o Area security requirements o Handling of waste o Remediation expectations o Vehicle traffic control o Domestic animal safety concerns o Wildlife or exotic game concerns/issues

Inland and Coastal Marsh Protection and Response Considerations and Actions

• All considered response methods will be weighed against the possible damage they may do to the marsh. Methods will be approved by the Unified Command only after discussions with local Stakeholder, as identified above.

o In-situ burn may be considered when marshes have been impacted • Passive clean up of marshes should considered and appropriate stocks of sorbent boom

and/or sweep obtained. • Response personnel must be briefed on methods to traverse the marsh, i.e.,

o use of appropriate vessel o use of temporary walkways or road ways

• Discuss and gain approval prior cutting or moving vessels through vegetation • Discuss use of vessels that may disturb wildlife, i.e, airboats • Safe movement of vessels through narrow cuts and blind curves

ATTACHMENT LPUBLIC INFORMATION COPY

Page 91: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

20

• Consider the possibility that no response in a marsh may be best • In the deployment of any response asset, actions will be taken to ensure the safest, most

efficient operations possible. This includes, but is not limited to: o Placement of recovered oil or waste storage as near to vessels or beach cleanup

crews as possible. o Planning for stockage of high use items for expeditious replacement o Housing of personnel as close to the work site as possible to minimize travel time o Use of shallow water craft o Use of communication systems appropriate ensure command and control of assets o Use of appropriate boom in areas that I can offer effective protection o Planning of waste collection and removal to maximize cleanup efficiency

• Consideration or on-site remediation of contaminated soils to minimize replacement operations and impact on the area

ATTACHMENT LPUBLIC INFORMATION COPY

Page 92: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

21

Decanting Strategy Recovered oil and water mixtures will typically separate into distinct phases when left in a quiescent state. When separation occurs, the relatively clean water phase can be siphoned or decanted back to the recovery point with minimal, if any, impact. Decanting therefore increases the effective on-site oil storage capacity and equipment operating time. FOSC/SOSC approval will be requested prior to decanting operations. This practice is routinely used for oil spill recovery. CGA Equipment Limitations The capability for any spill response equipment, whether a dedicated or portable system, to operate in differing weather conditions will be directly in relation to the capabilities of the vessel the system in placed on. Most importantly, however, the decision to operate will be based on the judgment of the Unified Command and/or the Captain of the vessel, who will ultimately have the final say in terminating operations. Skimming equipment listed below may have operational limits which exceed those safety thresholds. As was seen in the Deepwater Horizon (DWH) oil spill response, vessel skimming operations ceased when seas reached 5-6 feet and vessels were often recalled to port when those conditions were exceeded. Systems below are some of the most up-to-date systems available and were employed during the DWH spill.

Boom 3 foot seas, 20 knot winds Dispersants Winds more than 25 knots

Visibility less than 3 nautical miles Ceiling less than 1,000 feet.

FRU 8 foot seas HOSS Barge/OSRB 8 foot seas Koseq Arms 8 foot seas OSRV 4 foot seas

ATTACHMENT LPUBLIC INFORMATION COPY

Page 93: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

22

Environmental Conditions in the GOM Louisiana is situated between the easterly and westerly wind belts, and therefore, experiences westerly winds during the winter and easterly winds in the summer. Average wind speed is generally 14-15 mph along the coast. Wave heights average 4 and 5 feet. However, during hurricane season, Louisiana has recorded wave heights ranging from 40 to 50 feet high and winds reaching speeds of 100 mph. Because much of southern Louisiana lies below sea level, flooding is prominent. Surface water temperature ranges between 70 and 80˚F during the summer months. During the winter, the average temperature will range from 50 and 60˚F. The Atlantic and Gulf of Mexico hurricane season is officially from 1 June to 30 November. 97% of all tropical activity occurs within this window. The Atlantic basin shows a very peaked season from August through October, with 78% of the tropical storm days, 87% of the minor (Saffir-Simpson Scale categories 1 and 2) hurricane days, and 96% of the major (Saffir-Simpson categories 3, 4 and 5) hurricane days occurring then. Maximum activity is in early to mid September. Once in a few years there may be a hurricane occurring "out of season" - primarily in May or December. Globally, September is the most active month and May is the least active month.

ATTACHMENT LPUBLIC INFORMATION COPY

Page 94: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

23

FIGURE 1 TRAJECTORY BY LAND SEGMENT

Trajectory of a spill and the probability of it impacting a land segment have been projected utilizing EC Offshore Properties, Inc.’s WCD and information in the BOEM Oil Spill Risk Analysis Model (OSRAM) for the Central and Western Gulf of Mexico available on the BOEM website using 3 and 10 day impact. The results are tabulated below.

Area/Block OCS-G Launch Area

Land Segment and/or Resource

Conditional Probability (%)

Production Operations

EC 72, Well 006

15 miles from shore

00184

C30

Jefferson, TX Cameron, LA Vermilion, LA

3 day 5 27 1

Matagorda, TX Brazoria, TX

Galveston, TX Chambers, TX Jefferson, TX Cameron, LA Vermilion, LA

10 day 1 2 9 1 14 41 2

ATTACHMENT LPUBLIC INFORMATION COPY

Page 95: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

24

WCD Scenario– BASED ON WELL BLOWOUT DURING PRODUCTION OPERATIONS (15 miles from shore) 1,537 bbls of condensate (Volume considering natural weathering) API Gravity 48°

FIGURE 2 – Equipment Response Time to EC 72, Well 006

Dispersants/Surveillance

Dispersant/Surveillance Dispersant Capacity (gal)

Persons Req. From Hrs to

Procure Hrs to

Loadout Travel to site Total Hrs

ASI Basler 67T 2000 2 Houma 2 2 0.6 4.6 DC 3 1200 2 Houma 2 2 0.8 4.8 DC 3 1200 2 Houma 2 2 0.8 4.8 Aero Commander NA 2 Houma 2 2 0.6 4.6

Offshore Response

Offshore Equipment Pre-Determined Staging EDRC Storage

Capacity VOO Persons Required From Hrs to

Procure Hrs to

Loadout Hrs to GOM Travel to Spill Site

Hrs to Deploy

Total Hrs

CGA HOSS Barge 76285 4000 3 Tugs 12 Harvey 6 0 12 16 2 36 95’ FRV 22885 249 NA 6 Galveston 2 0 2 6 1 11 95’ FRV 22885 249 NA 6 Vermilion 2 0 3 4 1 10 Boom Barge (CGA-300) 42” Auto Boom (25000’) NA NA 1 Tug

50 Crew 4 (Barge)

2 (Per Crew) Leeville 8 0 4 23 2 37

Enterprise Marine Services LLC (Available through contract with CGA) CTCo 2603 NA 25000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48 CTCo 2604 NA 20000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48 CTCo 2605 NA 20000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48 CTCo 2606 NA 20000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48 CTCo 2607 NA 23000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48 CTCo 2608 NA 23000 1 Tug 6 Amelia 31.5 0 6 9.5 1 48

ATTACHMENT LPUBLIC INFORMATION COPY

Page 96: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

25

Nearshore Response Nearshore Equipment

Pre-determined Staging EDRC Storage Capacity VOO Persons

Required From Hrs to Procure

Hrs to Loadout

Hrs to GOM

Travel to Spill Site

Hrs to Deploy

Total Hrs

CGA 46’ FRV 15257 65 NA 4 Lake Charles 2 0 2 2.5 1 7.5

Enterprise Marine Services LLC (Available through contract with CGA) CTCo 2609 NA 23000 1 Tug 6 Amelia 26 0 6 15 1 48 CTCo 5001 NA 47000 1 Tug 6 Amelia 26 0 6 15 1 48

Staging Area: Cameron

Nearshore Equipment With Staging EDRC Storage

Capacity VOO Persons Req. From Hrs to

Procure Hrs to

Load Out Travel to Staging

Travel to Deployment

Hrs to Deploy

Total Hrs

CGA SWS Egmopol 1810 100 NA 3 Galveston 2 2 5 2 1 12 SWS Egmopol 1810 100 NA 3 Leeville 2 2 7 2 1 14 SWS Marco 3588 20 NA 3 Lake Charles 2 2 2 2 1 9 SWS Marco 3588 34 NA 3 Leeville 2 2 7 2 1 14 SWS Marco 3588 34 NA 3 Venice 2 2 9.5 2 1 16.5 Foilex Skim Package (TDS 150) 1131 50 1 Uility 3 Lake Charles 4 12 2 2 2 22 Foilex Skim Package (TDS 150) 1131 50 1 Uility 3 Galveston 4 12 5 2 2 25 Foilex Skim Package (TDS 150) 1131 50 1 Uility 3 Harvey 4 12 7 2 2 27 4 Drum Skimmer (Magnum 100) 680 100 1 Crew 3 Lake Charles 2 2 2 2 1 9 4 Drum Skimmer (Magnum 100) 680 100 1 Crew 3 Harvey 2 2 7 2 1 14 2 Drum Skimmer (TDS 118) 240 100 1 Crew 3 Lake Charles 2 2 2 2 1 9 2 Drum Skimmer (TDS 118) 240 100 1 Crew 3 Harvey 2 2 7 2 1 14

ATTACHMENT LPUBLIC INFORMATION COPY

Page 97: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

26

Shoreline Protection Staging Area: Cameron

Shoreline Protection Boom VOO Persons

Req. Storage/Warehouse

Location Hrs to

Procure Hrs to

Loadout Travel to Staging

Travel to Deployment

Hrs to Deploy Total Hrs

AMPOL (available through MSA)

12,850’ 18” Boom 7 Crew 14 Chalmette, LA 2 2 7.5 2 6 19.5

900’ 18” Boom 1 Crew 2 Morgan City, LA 2 2 5 2 2 13

3,200’ 18” Boom 2 Crew 4 Venice, LA 2 2 9 2 2 17

12,750’ 18” Boom 7 Crew 14 Port Arthur, TX 2 2 1.5 2 6 13.5

Wildlife Response EDRC Storage Capacity VOO Persons

Req. From Hrs to Procure

Hrs to Loadout

Travel to Staging

Travel to Deployment

Hrs to Deploy

Total Hrs

CGA Wildlife Support Trailer NA NA NA 2 Harvey 2 2 7 1 2 14 Bird Scare Guns (24) NA NA NA 2 Harvey 2 2 7 1 2 14 Bird Scare Guns (12) NA NA NA 2 Galveston 2 2 5 1 2 12 Bird Scare Guns (12) NA NA NA 2 Aransas Pass 2 2 9.5 1 2 16.5 Bird Scare Guns (48) NA NA NA 2 Lake Charles 2 2 2 1 2 9 Bird Scare Guns (24) NA NA NA 2 Leeville 2 2 7 1 2 14

Response Asset Total

Offshore EDRC 122,055

Offshore Recovered Oil Capacity 135,498

Nearshore / Shallow Water EDRC 34,874

Nearshore / Shallow Water Recovered Oil Capacity 70,903

ATTACHMENT LPUBLIC INFORMATION COPY

Page 98: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

B R A Z O S

G A L V E S T O N

x x

S O U T HP A D R EI S L A N D

S O U T HP A D R EI S L A N DE A S TA D D I T I O N

N O R T HP A D R EI S L A N D

N O R T HP A D R EI S L A N DE A S TA D D I T I O N

P O R TI S A B E L

C O R P U SC H R I S T I

M U S TA N GI S L A N D

M U S T A N GI S L A N DE A S TA D D I T I O N

M AT A G O R D AI S L A N D

P O R T I S A B E L

A L A M I N O SC A N Y O N

E A S TB R E A K S

B R A Z O SS O U T HA D D I T I O N

G A L V E S T O NS O U T HA D D I T I O N

H I G HI S L A N DS O U T HA D D I T I O N

H I G HI S L A N D H I G H

I S L A N DE A S TA D D I T I O N

H I G HI S L A N DE A S TA D D I T I O NS O U T HE X T E N S I O N

S A B I N E P A S S

W E S TC A M E R O N

W E S TA D D I T I O N

W E S TC A M E R O N

W E S TC A M E R O NS O U T HA D D I T I O N

E A S TC A M E R O N

E A S TC A M E R O NS O U T HA D D I T I O N

V E R M I L I O N

V E R M I L I O NS O U T HA D D I T I O N

S O U T HM A R S HI S L A N DN O R T HA D D I T I O N

S O U T HM A R S HI S L A N D

S O U T HM A R S HI S L A N DS O U T HA D D I T I O N

E U G E N EI S L A N DS O U T HA D D I T I O N

S H I PS H O A LS O U T HA D D I T I O N

G A R D E NB A N K S

K E A T H L E YC A N Y O N

S I G S B E EE S C A R P M E N T

W A L K E RR I D G E

A M E R YT E R R A C E

G R E E NC A N Y O N

E W I N GB A N K

S O U T HT I M B A L I E RS O U T HA D D I T I O N

E U G E N EI S L A N D

S H I PS H O A L

S O U T HP E LT O

S O U T HT I M B A L I E R

a n dB AY M A R C H A N D

G R A N DI S L E

G R A N DI S L ES O U T HA D D I T I O N

L U N DS O U T H

L U N D

AT W AT E RV A L L E Y

F L O R I D AP L A I N

H E N D E R S O N

L L O Y DR I D G E

D E S O T OC A N Y O N

M I S S I S S I P P IC A N Y O N

D E S T I ND O M E

P E N S A C O L AM O B I L E

CH A N D EL E UR

M A I NP A S S

W E S TD E L TA

E W I N G B A N K

B R E T O NS O U N D

V I O S C AK N O L L

M A I NP A S SS O U T Ha n dE A S TA D D I T I O N

W E S TD E L T AS O U T HA D D I T I O N

C H A N D E L E U RE A S T A D D I T I O N

S O U T H PA S S

S O U T H a n d E A S T

A D D I T I O N

S O U T HP A S S xx

A P A L A C H I C O L A G A I N E S V I L L E

F L O R I D AM I D D L EG R O U N D

TA R P O NS P R I N G S

T H EE L B O W

S T . P E T E R S B U R G

V E R N O NB A S I N

C H A R L O T T EH A R B O R

H O W E L LH O O K

P U L L E YR I D G E

RANKIN

D R YT O R T U G A S

T O R T U G A SV A L L E Y

M I A M I

K E Y W E S T

B A Y M A R C H A N D

C A M P E C H E E S C A R P M E N T

1

1

1

1

1

7 8

1

1 1 7

1

1

1

1

1

1

1

1

1

1

11

11

11

1

69

533

2

8

6 7

8

4

89

45

89

45

89

45

89

45

89

45

99

7555 60 61 65

3111 16 17 21

96 97 98

7352 54 63

2910 19

87

43

99

7555 6867

3111 2524

99

7555 7069

3111 2625

99

7555 6665

3111 2221

5563

11 19

8999

9989 8985 4575 5565 65

5545 87 4541

31 1121 2111 43

8999

9185 45

76 5566 65564685 87

4031 11

21 211141 42

8999

99894583

75 5565 6555 744585

3931 1121 21 291141

8999

9989458275 5565 64

5545853831 1121 201141

8999

99894581

75 556365 64 65 66554585

3731 11 18211141

899389

4580484582 36

38

89 999989

86 4575 5565 6555 754585 85754231 1121 2111 3141 41312118 19

A1A2A3A4A5A6

89899999 998989 99

8586 4545 7575 5555 65 6565 55 7575 4585 8585 45 7555 58 59 65 41423132 1111 21 2121 11 3131 41 4141 3111 13 14 21

A1A2A3A4A5A6A7A8A9

A9

A8A6

A4A5

A3A2

A1

89A5A6A7A8A9 999989

84 45A4 75 556585 45 6555 75 8540A1 31 1121 2111 31 41

A4

A3

A1

9896

979589 93

929484 80

918973 7796

8870 65

93878657 62

99 89808556 51A6

98 86797443 48A5 75 87 8068734274A1 62 77

676229 2521 5953 505698566128 162092 4450 49435550 75 8515 20 861580

951191 4135 33

4449 3114 4179 1068 2632 718070

433862562321 7061

3237 5750 6755

6967603127373292 49

6239 66A9A82081 23263191

A3A5273680 1170

A2A1105992 69

93 5782 489183 90 72 394781

82 7175 3326 6462

5265 72 2585 2186 61 5696

5164 5776

74 41 4373655047 54 3740

45464753

314615 13 39 3021 26

3837 3033

10 2911 203620 1821 2740

28 23 20

12 9815 1869

1153 979268

48 86903418 2622 23 44342827 29

22

363521

14

65 82

20 38

237

325

281

265

221

177

133

969

925

881

837

793

749

705

661

617

573

529

485

441

397

353

309

265

221

177

133

969

925

881

837

793

749

705

661

617

573

529

485

441

397

353

309

265

221

177

133

969

925

881

837

793

749

705

661

617

573

529

485

441

397

353

309

969

925

881

837

793

749

705

661

617

573

529

485

441

397

353

309

265

221

177

133

969

925

881

837

793

265

221

177

133

427407 413 417415

383363 369 373

339319 329

295275 285282

251231 241238

207187 192 193 197194

163143 148 149 153

119104 105 109

997981 987982

953936 937 943

909892 893 899

865848 849 855

821804 805 811

777759 760 767

733715 716 723

689671 672 679

645627 628 635

601591

557547

513494 495 503

469450 451 459

425405 406 415

381361 362 371

337317 318 327

293273 274 283

249228 229 230 239

205184 185 186 195

161140 141 142 151

117107

997975 976 978 987

953934 943

909886 887 890 899

865841 846 855

821797 811808

776767771

965

921

877

833

789

745

701

823

779

735

691

647

603

559549

515505

471461459

427417415

383373371

339319 329326 328327

295275 285284283

251231 241240

207187 198197196

163143 155154153

119111110109

999979 994993

955935 950949

911891 907906

867864847 863

823821820803

779777776759

735733732715

691689688671

647644627 643

603600583 599

559556539 555

515512495

471468451467

427407 423422

383363 379378

339319 335334

295275 291290

251231 247246

207187 202201

163143 158157

119114113

999979 993992

955935 949948

911891 905904

867847 861860

823803 817816

779759 772771

735715 728727

691671 683

647627 639

603583 595

559539 551550

515495 507506

471451 463462

427407 419418

383363 375374

339319 331330

295275 287286

251231 242241

207187 198197

163143 154153

119110109

999979 989988

955935 945944

911891 901900

867847 857856

823803 813812

779759 769768

735715 725724723

691671 681680679

647627 637636635

603583 593592591

559539 549548547

515495 505502 503

471451 457 461459

107

969 979 987

966 925935 943

922 881891 899

878 837847 855

834 793803 811

790 749779 759 767

746 705735 715

723

702 661691 671

679

658 617647 627635

614 573603 583 591593

570 529559 539 547549

526 485515 495 503505

482 441471 451 458461

438 397427 407 413417

394 353383 363 369373

372 378349 309

339 319 325329 336319 342

305 265295 275 281285 292275 299

261 221251 231

238241 248231 255217 177207 187 195197 203187

219173 133163 143153 153143

175 133129

119109 109

131

969979

989991 969

982986 925

976 935966 945956946 967 925 937941 881

931 891921 901911901 923 881 892

896 837886 847

876 857866856 879 837 848851 793

841 803831 813821811 835 793 804

806 749796 759786 769776766 791 749 759761 705751 715741 725731721 747 705 715716 661706 671696 681686

676 703 661 672671 617661 627651 637641631657 659 617 628626 573

616 583606 593596586613 615 573 584581 529

571 539561 549551541569 571 529 539536 485

526 495516 505506496525 527 485 495

491 441481 451

471 461461451481 483 441 450445 397

436 407426 417416406437 439 397 405

400 353391 363

381 373371361393 395 353 360355 309

346 319336 329326316349 351 309 316310 265301 275291 285281271305 307 265265 221256 231246 241

236226261 263 221220 177211 187201 197191181217 219 177175 133

166 143156 153146136173 175 133

130121111 109101129 131

969999 979

989 989979969964 925

955 935945 945935925965 966

920 881911 891901 901891881921 921

876 837867 847857 857847837877 877

832 793823 803813 813803793833 833

788 749779 759769 769759749789 789744 705

735 715725 725715705745 745700 661

691 671681 681671 697661701

656 617647 627

637 637627 651617657612 573

603 583593 593583 606573613

568 529559 539

549 549539 562529569524 485

515 495505 505495 517485525

480 441471 451461 461451 473441481

397435427 407417 417407 429397437

353391383 363373 373363 384353393309347339 319329 329319 340309349

265303295 275285 285275 296265305

221259251 231

241 241231 252221261177215

207 187197 197187 207177217

133171163 143

153 153143 163133173127

119109 109 118129

969999 979989 989

997979969925963955 935945 945 952935925965881919911 891901 901 908891881921837875

867 847857 857 863847837877793831

823 803813 813 819803793833

749787779 759

769 769 774759749789705743

735 715725 725 730715705745

661699691 671

681 681 685671661701617655

647 627637 637 640627

617657573611

603 583593 593 596583573613529567

559 539549 549 551539529569485523515 495505 507495485525

441479471 451461 462451441481397434

427 407417 418407397437353390

383 363373 374363353393

309346339 319

329 330319309349265302

295 275285 286275265305

221258251 231

241 241231221261177214

207 187197 197187

177217133170163 143153 152

143133173126119

109 108129

969999 979989 988979969

925962955 935

945 944935925965881918

911 891901 900891881921

837874867 847

857 856847837877793830

823 803813 812803

793833749786

779 759769 768

759749789705742

735 715725 724

715705745661698691 671681 681

671661701617654647 627637 637627617657573610603 583593 595583573613

529565559 539549 551539529569485521

515 495505 507495485525

441477471 451

461 464451441481397433

427 407417 420407397437

353389383 363

373 376363353393

309345339 319329 331319309349

265301295 275285 287275265305

221257251 231241 243231221261177213207 187197 198187177217133169163 143153 154143133173

125119109 110

129

969999 979 985989979

969925961

955 935 940945935925962

881917911 891 896901

891881918837873867 847 852857

847837874793828823 803 808

813803793830

749784779 759 763769759749786

705740735 715 718725715705742

661696691 671 674681671661698

617652647 627 629637627617654

573608603 583

593583573610529564

559 538549544539

529566485520515 494

505498495485522

441476471 450463

441478397432427 406421

404397434

353388 361383378359353390

309344 315339335315

309346265300 271295293

270265302221256 226251250

226221258177212 182

182177214168

137133170124

126

961

916

870

309349

275265305 305295285

241 241231 251221261 261251241

187197 197187 207177217 217207197195 174 133163 143153 153143 163133173 173163153150 151130

119109 109 119129 129119

969999 979989 989979 999969999979 989986 987966

96 7925

92 5959 955 935935A9 0A8 9A8 7 945A8 6A8 5A8 4 945945 935 955955 925965 965965 925 955935 945942 943922923922921920919 881881918917916915 911 891891A7 8 901 901901 891 911911 881921 921921 881 911891 901898 899878879 837837870 867 847847A7 7 857 857857 847 867867 837877 877877 837 867847 857854 855 834835 793793826 823 803803A6 8 813 813813 803 823823 793833 833833 793 823803 809 813810 790791 749749782 779 759759A6 7 769 769769 759 779779 749789 789789 749 779759 765 769766 746747 705705739 735 715715A5 6 725 725725 715 735735 705745 745745 705 735715 721 725722 702703 661661

695 691 671671A5 5 681 681681 671 691691 661701 701701 661 691671 677 681678 658659 617617651 647 627627A4 2 637 637637 627 647647 617657 657657 617 647627 633 637634 614615 573573607 603 583583A4 1 593 593593 583 603603 573613 613613 573 603583 589 593590570571 529529563 559 539539A2 8 549 549549 539 559559 529569 569569 529 559539 544 545 549526527 485485

518 515 495495A2 7 505 505505 495 515515 485525 525525 485 515495 505482483 441441474 471 451451A1 4 461 461461 451 471471 441481 481481 441 471451 461

439 437 397397430 427 407407A1 3 417 417417 407 427427 397437 437437 397 427407 412 413 417 393394 353353 383 363363 373 373373 363 383383 353393 393393 353 383363 367 368 373 349350 309309 339 319319 329 329329A9 9A9 8 319 339339 309349 349349 309 339319 323 324 329 305306 265265 295 275275 285A9 2 285285 275 295295 265305 305305 265 295275 279 280 285 261262 221221 251252 231231 241A9 1 241241996 231997 251251 221261 261261 221 251231 235 236 241217218 177177 207208 187187 197A7 9 197197990 187989986 207207 177217 217217 177 207187 190 191 197173174 133133 163163 143143 153A7 8 153153975 143976979 163163 133173 173173 133 163143 146 147 153129130

119119 109A6 7 109109970969 119119965 129 129129 119102 103 109

A6 6953954958

A5 2950949945

969969 999 979979 989A5 1 989989933 979934 999999938 969969 999979 981 982 989 965967 925925 955957 935935 945A3 6 945945930 935929 955955925 925965 965965 925 955935 937 938 945 921923 881881 911913 891891 901A3 5 901901913 891914 911911918 881921 921921 881 911891 893 894 901 877879 837837870 867 847847A1 9 857 857857910 847909 867867905 837877 877877 837 867847 848 849 857 833835 793793826 823 803803A1 8 813 813813893 803894 823823898 793833 833833 793 823803 804 805 813 789791 749749783 779 759759 769 769769891890889 759888887886885 779779884 749789 789789 749 779759 760 761 769745747 705705739 735 715715 725A3 8A3 7A3 6 725725A3 5A3 4A3 3872873874 715875876877878 735735879 705745 745745 705 735715 716 717 725701703 661661696 691 671671 681A2 7 681681A3 1 671865 691691 661701 701701 661 691671 672 673 681657659 617617653 647 627627 637A2 6 637637A2 3A2 2 627858 647647 617657 657657 617 647627 628 637 613614 573573610 603 583583 593A1 7 593A2 0A2 1 583843 603603 573613 613613 573 603583 584 593 569570 529529566 559 539539 549A1 6 549A1 3 539837 559559 529569 569569 529 559549 524526 485485523 515 495495 505 505505A1 2 495822 515515 485525 525525 485 515505 480482480 441441 471 451451 461 461461808 451815 471471 441481 481481 441 471451 452 461 436438437 397397 427 407407 417807 417417 407799 427427 397437 437437 397 427407 408 417

392 353353 383 363363 373785 373373 363792 383383 353393 393393 353 383363 364 373348 309309 339 319319 329784 329329 319776 339339 309349 349349 309 339319 320 329304 265295 275275 285A9 1761 285285

769 275 295295 265305 305305 265 295275 276 285260 221224A7 7 251 231231 241760759

241241752231 251251 221261 261261 221 251231 232 241

187 216A7 6A7 5 177A7 4A7 3A7 2 207 187197736737 197197744 187 207207 177217 217217 177 207187 188 197A3 9A4 0A4 1A4 2A4 3A4 4A4 5A4 6 172A4 7A4 8A4 9 133A5 0A5 1A5 2A5 3A5 4 163A5 5A5 6144A5 7A5 8 143734733 14 6732731730 153729728727 153153726725 143 163163 133173173 173163141 153 128662 661 119708709710711712713 109714715 109716 109717718 118 119129 129119109

655 656696 A8 9

381652 651 395644 201 205689A8 8 371 377 394635 636 408 969643 400A7 4676 196 979192664 989 989978 982388 999976

393A5 9 370 364633 632 631 391 966624 399 925A7 3646 185 189 935948657387 945379 364 955 965353A5 8 359A5 7A5 6 614 615A5 5 616A5 4A5 3 386

A52623A5 1A5 0 378 922A4 9A4 8

A47881A4 6A4 5A4 4 180 176642 912378

891368633 320316355344 901 911352 921346A3 2 611 610A3 3 609A3 4A3 5 369A3 6 602A3 7 377A3 8A3 9A4 0 878A4 1A4 2A4 3 357 837169613 173614615616 869367 847315332343

624309 857335 867341592 877594 595A3 1 364601 356 356 834164 160 793608607 300331 826346 320 803601 307 813334 328 823589 587 335586 833347A1 4

580355 153 157 790788299308 749319345585586 287

591759317 334 769323569 572 573 779342579 121 789334A1 3 148 144 272307296 746323 705570569 284333565715316 310567 725325 735120

557 118333 745271284295322 702312 661259553554 A9 9557 299 671305546 681320556 312 691244 701283272311 301 256 618530529527298A9 8 627292543 302 113 637533 311 243260 647271290 657A8 4 300 231 574517 281518

287A7 0 522 583525 526 301532 292 216259 593289 248116 603112 279 613503502228 529280489 274519A6 9 516 515 539268282509 215236291 247 549105 109 559278464 569465466 209263477 485269497 267501 502 197235281A4 6

224508 100 495272100 505257 515463462 525460459 184246262450 256495 441492 491 196212223262484A4 5 271 451

256 461425 471426 481429 181430 245245 251437 472 169211475 200476 397261483 252A2 8 407234 417424423 244 427156 437418417 244 168188238469 199411466 465 242458 353251A2 7 233223 373388 154389 152153 383 393395 227396 14118717644 5 234446 448400 449 241457 232 348 309212A1 5 222 322146A2 0387 329133 339112164175226 349379 444378 219441 440375

222 265433 305286 231 201 211A1 4 145A1 0354 137130163152209 295421 216 305363 424 425364 221432 285 212 200 190 128136353 124140151208418 251201416415 261343

342179202408 283 284 211 189 127A8 9

139 119128323 191398 198400 401 178 207333 407 201282A7 6 217280 192 167110116127A8 8 118322

190 177395 183393 392 163386 182277312

279 191A7 5 173166115104A6 3293294 156173376 180378 108379 385 276 181273

304119172 145A5 1 129

103155A6 2292291 172375 165373 372 367 268 162272 171281144A5 0

A4 4 134A4 1A4 0264 155265 358 162360 361 366 267 161263 152 123273A3 0

133A3 7A3 8 154260 147259348 257 142262 151 122252 287 996A2 9

A2 3 137 144236 347237 256 141251 103132243 942283 113 952A1 3 962A1 8 136337 336 129335 331 244228 122227 250 102131222275 280 900 908A1 2 918

119324 325 326 126330 243 121236208 112209213274 269 858316 864313153152 874118322 321 320 111316 228

102235 111

193192190

815308312150 820 830169 101310 311108315 227 101219179180181

776773307301149167166 778165 100 786307 306 303 209 218153152

734283128 291129130 298 737131 299 742300302 146208193143

144 28228128027229 6 145295 292 188117 698192 233 238 255106

271287 134288 291 187 177 232227 254

237161 133162 164 165 176 220 224 221236156 122154 153

141 566219 217 220219206121128 140 519 522210 211 193205110118 105

474 478192181109

104428 434171180

383 390170162

338 346154161

293 302

247 258

202 214

155 170

110 126

987 998

943 954 962

899 910 918

854 866 874

827810 822 823

100 9

103 1102 11011

100 1 1011

100 8

100 9 101 0

100 7

100 9

100 6

100 9

100 5

100 6

100 6

101 0

100 9 100 9

1159116011611162116311641165

115511541152

114211431145

113511341131

112111221125

111511141111

11001104

109 5109 1

108 0108 4

107 5107 4107 0

105 8105 9106 3

105 5105 4105 0

103 7103 8104 3

103 5103 4103 3103 2103 1103 0102 9102 8

A104A1 03A1 02A1 01A1 00101 5101 6101 7101 8101 9102 0102 1

1011101 0100 7

100 0

100 910111001

100 9 100 9100 9

A175A174A173

A169A172

A168A164

A158A163

A157A152

A145A151

A144A137

A128A136

A127A126A117

A1 05A116

A1 04

A401A2 5 3A119A120A121A122A123A124A125A126A127A128A129A130A131A132A133A394A3 95A3 96A3 97A3 98A3 99A400A5 9 6

A252A118A595A594A593A592A591A590A589

A588A587A104 A586A248 A3 91A247A246A245A3 89

A244A243A242A241A240A239A238A237A236A382

A235 A5 7 3A234

A103 A585A219 A3 73A381A572A233

101 0A560A218

A3 68A360 100 9

A547A204A559A189 A3 51

A359A546A203

A534A188 A3 48A340A521A174

A533A159 A3 32A339A520A173

A508A158

A320A495A144

A507A129

A319A4 9 4A143

A482A128A127A126A125A124A123A122A121A120A119A118A117A116 A302A115 A469A114

A481A100A101A102A103A104A105A106A107A108A109A110A111 A301A112 A468A113

A456A284A443

A455A2 77A283A442

A430 A2 74A268A417

A429A262A263A264A265A266A267A416A415A414A413A412A411A410A409A408A407A406A405A404A257A256A255A254A253A252A154A155A156A157A158A159A160A161A162A163A164A165A166 A2 46

A251A153

A141A2 43

A238A128

A140A2 32

A237A127

A115A2 28

A224A102

A114A2 19

A223A101

A2 16A212

A2 07A211

A2 03A200

A1 96A199

A1 93A190

A1 86A189 113A 100 6

A1 82A180

A1 77A179

A1 74A172

A1 69A171

100 6

37

34

23

593

549

564 563 137 141

549 550 132 128540 539

121 125

261 266

260 255

247

246

1101

109 4

108 1

")

")

")

")

")

")

") ")

")

")

")

")")

")

")

")

")

")

")

")

")

")")

")

")

")

TAMPA

HOUMAVENICE

MOBILE

CAMERON

THEODORE

LEEVILLEFREEPORT

LAFAYETTE

INGLESIDE

GALVESTON

ABBEVILLE

PASCAGOULA

GRAND ISLE

PANAMA CITY

MORGAN CITY

LAKE JACKSON

LAKE CHARLES

CORPUS CHRISTI

INTRACOASTAL CITY

Bryde's Whale Area

µUnited States Department of the InteriorBureau of Ocean Energy Management

Gulf of Mexico OCS Region

") Support Bases

OCS Blocks

OCS Protractions

Bryde's Whale Area

Office of Leasing and Plans, Mapping and Automation Section | MAS202000234 | 21 April 2020

0 80 160 240 32040Miles

FOURCHON

BOOTHVILLE

ST. PETERSBURG

NEW ORLEANSSABINE-NACHES

PENSACOLA

MANATEE")

PUBLIC INFORMATION COPY

The development activity proposed EC 71 / 72 and the support base in Cameron, LA is > 320 miles from the Bryde's Whale Area

Page 99: GOVERNMENT MEMORANDUM Information Control … · 2 days ago · UNITED STATES GOVERNMENT MEMORANDUM To: Public Information August 21, 2020 From: Plan Coordinator, OLP, Plans Section

PUBLIC INFORMATION COPY ATTACHMENT N