Bharat Heavy Electrical Limiteds (BHEL)
Experience in
Coal Fired Power Generation
and
Plant Upgrading
-
8/3/2019 Gov in Das Amy
2/41
Indias largest engineering and manufacturing enterpriseOne among the major in the world
Corporate Office New DelhiMajor Units
Construction Management & Services
8 Service Centers18 Regional OfficesAbout 180 Products
-
8/3/2019 Gov in Das Amy
3/41
DIRECTOR(E,R&D)
DIRECTOR( HR )
DIRECTOR( FINANCE)
DIRECTOR(POWER)
DIRECTOR(IS&P)
CHAIRMAN AND MANAGING DIRECTOR
Corporate Functional Structure
ED/ IO ED/ P&D
Major Operating Units
BHOPAL / JHANSIBHOPAL / JHANSI HYDERABADHYDERABAD HARDWARHARDWARTIRUCHIRAPPALLI BANGALOREBANGALORE RANIPETRANIPET
The Board includes two Directors nominated by Govt. of Indiaand Six Independent Directors
-
8/3/2019 Gov in Das Amy
4/41
Global Presence through Exports
Steam Power PlantsSouth East Asia, Mediterranean, Africa
Gas Turbine Power PlantsSouth Asia, South East Asia, Middle East
Hydro Power PlantsFar East, South East Asia, South Asia, CIS
Sub-StationsSouth & South East Asia,
Africa, Middle East
Power Plant RehabSouth & South East Asia,Middle East, Africa
BHEL Overseas Offices : UAE & Malaysia
-
8/3/2019 Gov in Das Amy
5/41
60
80% of Installed Capacity(125414 MW )as of 31.3.07
% of Total Generation during 06-07
BHELs Role in the Indian Power Sector
0
20
40
BHEL others
-
8/3/2019 Gov in Das Amy
6/41
60
65
70
75
80
99-00 00-01 01-02 02-03 03-04 04-05. 05-06. 06-07
All IndiaBHEL Sets
Plant
LoadFactor%
65
70
75
80
85
90
99-00 00-01 01-02 02-03 03-04 04-05. 05-06. 06-07
All India
BHEL SetsAvailability%
-
8/3/2019 Gov in Das Amy
7/41
BHEL Corporate performance
8662
10335
14525
18702
- - - -
1647818238
18938
35633
2003-04 2004-05 2005-06 2006-07
4.24.14.6 4.7
8.9
2.22.6
3.6
4.7Order inflow $ billion Turn Over $ billion
1015
1582
2564
3675
2003-04 2004-05 2005-06 2006-07
26.89
38.95
68.6
97.4
2003-04 2004-05 2005-06 2006-07
0.25
0.40.64
0.92Profit Before Tax $ billionEarnings Per Share
-
8/3/2019 Gov in Das Amy
8/41
BHEL Tiruchirappalli complex
-
8/3/2019 Gov in Das Amy
9/41
High Pressure Boiler Plant (HPBP)
Sub-critical Steam Generators for Utilities / Industries FiringFossil Fuels up to 500 MW (PF, CFBC)
HRSGs
Product Profile
uper cr ca s eam genera ors -
Nuclear Steam Generators
Seamless Steel Tubes
Valves, Fittings & Soot blowers
Pressure Vessels & Heat Exchangers
-
8/3/2019 Gov in Das Amy
10/41
Boiler Auxiliaries Plant
Radial and Axial Fans
Air Pollution Control Equipment
Air Pre heaters
Desalination Plants
Product Profilecontd
Coal & Ash Handling System
Piping Center
High Pressure Piping System Plant Auxiliary Piping System
Pipe Fittings
Blow Down and Chemical Dosing System
-
8/3/2019 Gov in Das Amy
11/41
High Pressure Boiler Plant
Tiruchirappalli
-
8/3/2019 Gov in Das Amy
12/41
2201
3536
4607
HPBP performance
502
550
884
1152Turn over in $ million
2003-04 2004-05 2005-06 2006-07
-
8/3/2019 Gov in Das Amy
13/41
Shop Area ( M2)
Boiler Plant 166,300SSTP 37,900
BAP 46,600
Resources
Goindwal 3,600
Total 254,400
Work force 11,262
Support facilities for fabrication: 320ancillary units
-
8/3/2019 Gov in Das Amy
14/41
Human Resources
Category Tiruchy Ranipet Total
EmployeesExecutives 1651 368 2019
Artisans &Others 5872 1456 7328
Total 9139 2123 11262
Includes IVP Goindwal & Piping Centre Chennai
-
8/3/2019 Gov in Das Amy
15/41
Technology Development
1960s 30, 60 MW Czechoslovakian technology
1970s 110, 210 MW(Low Pressure) Technology from CE, USA
1980s 210, 500 MW (170 plus pressure)
Firing system design for Low NOx emission
Desi n Chan e to meet deterioratin coal
Tower type boilers for highly erosive coals
1990s 500 MW Design ImprovementsLower Exit Gas Temperature
2000s Technology for Supercritical BoilersIT based Soot blowing
Design for Washed Coals
-
8/3/2019 Gov in Das Amy
16/41
Steam Generators - Contracted
Power Boilers30 to 130 MW 130
200/210/250 MW 177500 MW 66
CFBC 10HRSG 80
Process Plant Boilers
Chemical Recovery 17Stoker/PF/ Oil/Gas Firing 135
CFBC 8
BFBC 66HRSG 51
Total 740
-
8/3/2019 Gov in Das Amy
17/41
BoilerComponents
USAChinaEgypt
Valves
USA
Japan
IndonesiaMalta
Cyprus
E t
Steam Generators
Malaysia 11 Nos 1110 MWLibya 2 Nos 240 MWEgypt 2 Nos 60 MWSudan 4 Nos 500 MW
R&M jobsin Libya
R&M andgas conversion
in Malaysia
-
8/3/2019 Gov in Das Amy
18/41
Technology Base
Product Technology Source
Utility & Industrial SGs : Combustion Engineering, USAOnce Through Boilers : Alstom, France
CFB Boilers : LLB-Lurgi Lentjes, Germany
HRSG : VOGT-NeM, USAAirpreheaters : CE Airpreheater, U.S.A
Electrostatic Precipitators : Flakt AB, Sweden
Fans : KKK Germany., TLT , Germany
-
8/3/2019 Gov in Das Amy
19/41
BMCR
Steam flow at SHO t/h 1675
Steam pressure at SHO kg/Sq.Cm(g) 178
Boiler Parameters 500 MW
Steam temperature at SHO Deg.C 540
Reheat steam flow t/hr. 1387.2
Steam temperature at RHO Deg.C 540
Feed water temperature Deg.C 253.7
-
8/3/2019 Gov in Das Amy
20/41
Typical Coal
Design Worst Best
Total Moisture % 12 15 11
Ash % 43 45 36
Volatile Matter % 21 20 24Fixed Carbon % 24 20 29
HHV kcal/kg 3300 3000 3750
-
8/3/2019 Gov in Das Amy
21/41
500 MW Thermal Power Stations - India
Station Trombay - 6 Singrauli TalcherCustomer TATA Electric NTPC NTPCSteam (t/h) 1614/1490 1725/1530 1700/1525Fuel Oil/Gas /(Coal) Coal CoalPasses Two Pass Two Pass Single PassCirculation Controlled Controlled Once thro
Draft / Firing Balanced / Tilting Tangential
-
8/3/2019 Gov in Das Amy
22/41
Thermal Power Stations India contd..
Station Vijayawada 3&4 Neyveli 4-7 TalcherCustomer APSEB NLC NTPCCapacity 210 MW 210 MW 500 MW
Steam (t/h) 690 690 1700Fuel Coal Lignite CoalPasses Single Pass Single Pass Single PassCirculation Natural Natural Once throDraft Balanced Balanced BalancedFiring Tilting Tangential Fixed Tangential Tilting Tangential
-
8/3/2019 Gov in Das Amy
23/41
120 MW Thermal Power Stations - Export
Station Libya Pasirgudang PraiCustomer Electricity Corp. NEB, Malaysia NEB, MalaysiaSteam flow (t/h) 375 390 382Fuel Oil/Gas Oil / Gas Oil
Box Type / Natural Circulation / Balanced Draft / Tilting Tangential
-
8/3/2019 Gov in Das Amy
24/41
Improvements
Higher Capacity ( pressure, temperature) units State of the art Technologies
Lower gas exit temperature
Steam Leak Detection System High Efficiency Axial Fans for FD & PA
VFD Drives
-
8/3/2019 Gov in Das Amy
25/41
12
15
18
210/250 MW
500 MW
BHEL Unit capacity trend
0
3
6
9
1 2 3 4
2004-05 2007-082006-072005-06
-
8/3/2019 Gov in Das Amy
26/41
Unit size increase - India
size MW number of units during
2007-12 2012-17
125 7 nil
210/250/310 45 4
500 47 18
660 10 1
800 2 39
-
8/3/2019 Gov in Das Amy
27/41
GAS TEMP. LEAVING175
8687
88
89
AH (CORRECTED) Deg.C
0
125
150
1980s 2000
-
8/3/2019 Gov in Das Amy
28/41
99
100
101
Auxiliary Power Consumption
94
95
96
97
1980's 2000
-
8/3/2019 Gov in Das Amy
29/41
R &M the need & benefit
Meeting statutory regulations
Ageing shut down, low out put, efficiency, availability
Deterioration in coal quality/change of type of coal
Availability / quality of spares
Obsolete technology/operation philosophy
Capacity uprating
Enhanced life
State of the art systems
-
8/3/2019 Gov in Das Amy
30/41
R&M by BHEL in India - completed
unit capacity MW remarks
Kothagudam 2 x 110 up rated to 120 MW
Korba 1 x 120 from 85/90 MW to 120;availability from 79 to 99 %
Ennore 2 x 110 up rated to 120 MW
Bokaro 3 x 50 capacity restoredreliability improved
Neyveli 4 x 50 capacity restoredexit temp reduced (190 to 140 C)
-
8/3/2019 Gov in Das Amy
31/41
R&M by BHEL in India being executed
Sl No unit capacity MW remarks
1 Ukai 2 x 120 in progress
2 Gandhinagar 1 x 120 supply andpre s u own wor n progress
3 Panipat 1 x 110 in progress; up rating to 117.8 MW
4 Batinda 2 x 110 up rating to 120 MW
5 Obra 5 x 200 up rating to 216 MW
-
8/3/2019 Gov in Das Amy
32/41
R & D Facilities
-
8/3/2019 Gov in Das Amy
33/41
Fuel Evaluation Test Facility(Set-up with assistance from USAID)
To study the effects of: Fuel characteristics and burner configurations
Combustion performance
F l B i T F ili i
-
8/3/2019 Gov in Das Amy
34/41
Fuel Burning Test Facilities
SOLID FUELS 10 Million kcal / hr capacity
Coal burner/nozzledevelopment
Study of flame stability,combustion efficiency,turndown
LIQUID FUELS
15 Million kcal / hr capacity
For testing of burners and
fuel handling systems
Development of low ExcessAir, low NOx burners.
Fuels - LSHS, vacuum residue
oil, orimulsion, Crude etc.
FBC T t F iliti / P t t B il
-
8/3/2019 Gov in Das Amy
35/41
7.5 t/h Prototype Shell Boiler
FBC Test Facilities / Prototype Boilers
10 t/h Prototype Boiler
4 Mkcal/h test rig1979
1 M x 1 M Test Facility-1986
With US AID
(90 t/h Hot water)
CFBC Test Facility - 1991
(90 t/h Hot water)
-
8/3/2019 Gov in Das Amy
36/41
Clean Coal Technology - I G C C
Test facility to develop clean coal technology for power generation
Scale up of IGCC to 125 MW under progress demo plant at Uttar Pradeshunderway in collaboration with NTPC
-
8/3/2019 Gov in Das Amy
37/41
-
8/3/2019 Gov in Das Amy
38/41
Welding Research Institute
Established in 1975 with UNDP/UNIDO aid,
Research in advanced welding processes & welding equipment
Consultancy & training in welding
Developing WRI as a Centre for Manufacturing Excellence
-
8/3/2019 Gov in Das Amy
39/41
Clean Coal
Large CapacityIGCC
Super CriticalBoilers
Emission ControlTechnologies
Technology
Super CriticalCFBCs
CO2Sequestration
Demo plantAdvanced
Test Facilities
-
8/3/2019 Gov in Das Amy
40/41
Thank you
-
8/3/2019 Gov in Das Amy
41/41