gourmet oil (australia) pty ltd relocation of oil ... oil - relocation of oil recycling...
TRANSCRIPT
transport | community | mining | industrial | food & beverage | energy
Now part of the pitt&sherry group
Gourmet Oil (Australia) Pty Ltd
Relocation of oil recycling facility 1 Venture Court, Invermay
Environmental Effects Report
Prepared for: Client representative: Date:
Gourmet Oil (Australia) Pty Ltd Doug Hagen 11 July 2018Rev 02
pitt&sherry ref LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc
Table of Contents 1. Introduction ......................................................................................................................................... 1 2. Description of proposed activity........................................................................................................... 2
2.1 Materials handled ..................................................................................................................... 2 2.2 Loading and unloading .............................................................................................................. 2 2.3 Process description ................................................................................................................... 3 2.4 Products ................................................................................................................................... 9 2.5 Hours of operation .................................................................................................................... 9
3. Proposal area ..................................................................................................................................... 10 3.1 General Description ................................................................................................................ 10 3.2 Tenure .................................................................................................................................... 10 3.3 Soils and elevation .................................................................................................................. 10 3.4 Land use and zoning ................................................................................................................ 11 3.5 Climate ................................................................................................................................... 11 3.6 Map and site plan ................................................................................................................... 14 3.7 Biodiversity values .................................................................................................................. 14 3.8 Rationale and alternatives ....................................................................................................... 16
4. Statutory context ............................................................................................................................... 16 4.1 Commonwealth Environment Protection and Biodiversity Conservation Act 1999 .................... 17 4.2 State Policy on Water Quality Management 1997 ................................................................... 18 4.3 Existing activity details ............................................................................................................ 18 4.4 Local ....................................................................................................................................... 18
5. Potential impacts from the proposal .................................................................................................. 28 5.1 Stormwater management ....................................................................................................... 28 5.2 Significant areas ...................................................................................................................... 28 5.3 Air emissions ........................................................................................................................... 29 5.4 Liquid effluent ......................................................................................................................... 29 5.5 Solid wastes ............................................................................................................................ 29 5.6 Noise emissions ...................................................................................................................... 30 5.7 Transport impacts ................................................................................................................... 30 5.8 Other off-site impacts ............................................................................................................. 30 5.9 Hazardous substances ............................................................................................................. 30 5.10 Site contamination (historical) ................................................................................................ 31 5.11 Climate change ....................................................................................................................... 31 5.12 Sites of high public interest ..................................................................................................... 32 5.13 Monitoring .............................................................................................................................. 32 5.14 Rehabilitation ......................................................................................................................... 32
6. Commitments .................................................................................................................................... 33 7. Consultation ...................................................................................................................................... 34
List of figures Figure 1 Materials processing ....................................................................................................................... 4 Figure 2 General locality ............................................................................................................................. 10 Figure 3 Mean maximum temperature over time (Source: Bureau of Meteorology) .................................... 12 Figure 4 Mean minimum temperature over time (Source: Bureau of Meteorology) .................................... 12 Figure 5 Average monthly rainfall over time (Source: Bureau of Meteorology) ............................................ 13 Figure 6 Wind rose for Ti Tree Bend 9:00 am – 1980 to 2017 (Source: Bureau of Meteorology)................... 13 Figure 7 Wind rose for Ti Tree Bend 3:00 pm – 1980 to 2017 (Source: Bureau of Meteorology) .................. 14 Figure 8 Locality map .................................................................................................................................. 15 Figure 9 Zoning map ................................................................................................................................... 19
pitt&sherry ref LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc
List of tables Table 1 Materials stored on site and volumes processed annually ................................................................. 9 Table 2 Environmental legislation and its application to the proposal ......................................................... 16 List of plates Plate 1 Oil stored prior to processing ............................................................................................................ 5 Plate 2 Wash down upon delivery ................................................................................................................. 5 Plate 3 Oil filters stored for processing .......................................................................................................... 6 Plate 4 Part of current water processing system ........................................................................................... 6 Plate 5 Part of current water / oil separation system .................................................................................... 7 Plate 6 Trays of oil solids draining at current site........................................................................................... 7 Plate 7 Labelled drums of recycled product pending sale .............................................................................. 8 Plate 8 Plastic drums waiting for filling with recycled product ....................................................................... 8
Appendices Appendix A: Plans of proposed development Appendix B: Title documents Appendix C: Protected Matters Search Prepared by: …………………………………………………. Date: 11 July 2018 Leigh Knight Reviewed by: …………………………………………………. Date: 11 July 2018
Ian Abernethy Authorised by: …………………………………………………. Date: 11 July 2018 Ian Abernethy
Revision History
Rev No.
Description Prepared by Reviewed by Authorised by Date
A Draft to client L. Knight I. Woodward I. Abernethy 3/11/2017
B Draft to EPA L. Knight I. Abernethy I. Abernethy 8/11/2017
C Final to EPA L. Knight I. Abernethy I. Abernethy 29/11/2017
0 Final for DA lodgement L. Knight I. Abernethy I. Abernethy 4/12/2017
1 Revisions for TasWater RFI L Knight I. Abernethy I. Abernethy 8/3/2018
2 Final for advertising L Knight I. Abernethy I. Abernethy 11/7/2018
© 2017 pitt&sherry This document is and shall remain the property of pitt&sherry. The document may only be used for the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form is prohibited.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 1
1. Introduction
The Gourmet Oil Company (Australia), trading as Hagen Oil Pty Ltd, proposes the relocation of an existing oil recycling facility from 26 Murphy St Invermay to 1 Venture Court, Invermay. The Environment Protection Authority (EPA) advised on 4 August 2017 that the environmental impact of the above proposal will be assessed by the Board of the Environment Protection Authority (the Board) as a class 2A assessment under the Environmental Management and Pollution Control Act 1994 (the EMPC Act). The EPA issued guidelines for the preparation of this Environmental Effects Report (EER) in August 2017 and this EER follows the format and heading system as suggested in that advice. The Murphy St site operates under Environment Protection Notice (EPN) No 7804/1 which provides for the use of the site as an oil refinery where “used oil is refined or reprocessed by filtration or physical or chemical separation”. All waste water is discharged to an external treatment plant. This EPN outlines requirements for decommissioning and rehabilitation of the site including a requirement for the submission of a draft Decommissioning and Rehabilitation Plan (DRP) prepared in accordance with any guidelines provided by the Director. This will include removal or mitigation of all environmental hazards or land contamination likely to pose an ongoing risk.
Part A Proponent information
Proponent Gourmet Oil (Australia) Pty Ltd
Trading name Hagen Oil
Registered address of proponent 4-8 Ryan Street, Beechford Tasmania 7252
Postal address of proponent 4-8 Ryan Street, Beechford Tasmania 7252
ABN number 076 085 884
Contact person’s details Doug Hagen 6334 4664 [email protected]
EER prepared by pitt&sherry PO Box 1409 Launceston TAS 7250 6323 1973 [email protected]
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 2
Part B Proposal description The proposal involves the relocation of the existing Hagen Oil facility from 26 Murphy St to 1 Venture Court, Invermay. The operation will be located within an addition to the existing building on that site. This addition was approved by City of Launceston Council (DA0490/2016 on 10 January 2017) and complies with all requirements of the Launceston Interim Planning Scheme 2015 and building requirements. The office component of the approved development has been constructed.
2. Description of proposed activity
The proposed facility will process waste oil and related products which are collected in tankers and delivered to the site. These products will be separated, recycled and packaged for re-sale or disposal. Hagen Oil currently operate under the following permits which will be renewed at the new premises:
• Controlled Waste Handler Certificate of Registration.
• Tasmanian Fire Service approved plan
• Safe Work Tasmania compliance. The following sections of this report outline the processes involved. Site plans showing the location of equipment and processing facilities are provided in Appendix A.
2.1 Materials handled
Waste accepted at the site includes the following:
• used oil
• mixed diesel and petrol fuels
• coolant
• oily water mixtures
• used oil filters and drums
• containers for the above. Solid wastes in small amounts may also be accepted where they form part of the oil or oil/water mixtures. The site will not accept the following:
• any form of PCB or PBB material (these are shipped to Sibelco at Mole Creek with appropriate disposal documents)
• solvents in any form
• organochlorine or organophosphate pesticides
• grease trap waste. The operation may look to expanding its operations to take grease trap waste in the future but that does not form part of this application.
2.2 Loading and unloading
The unloading and processing of all materials will occur within purpose built bunded areas in the approved extension. A triple interceptor will be incorporated into the drainage system servicing the bunded area. Vehicles associated with the use will be parked inside the original building (approved as a bus depot). Approximately 20 trucks per day will be utilised to deliver waste oil to the site plus individual deliveries. Ten employees (FTE) will be present on site at varying times through the day.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 3
2.3 Process description
The process for waste receipt and processing at the site will be as follows:
• Trucks enter the yard with tankered materials or individual 205 L drums. Trucks are compartmentalised to allow for separate containment of coolant, mixed fuels and waste oils. Waste oils, coolant and other product is also delivered to the site in small containers (retails size bottles, etc).
• Material is checked against transmittal papers, the volume measured and logged into a database on arrival.
• A sample of the material is assessed for odour, colour and the presence of solids. A flame test is carried out and laboratory analysis may be undertaken if required.
• If the material does not meet specifications and is unable to be processed it is not accepted by Hagen Oil and is sent back to the source. The responsibility for appropriate disposal lies with the person generating the material. If material does not meet specifications but is suitable for on-processing elsewhere then it will be stored in a bunded and covered area for forwarding to interstate processors.
• After initial assessment, the liquid oil wastes are discharged via hose to a waste oil settling tank which allows oil to be skimmed off and water to be discharged to holding tanks.
• Other materials (coolant, oil filters, etc) are transferred to respective storage areas. Coolant is treated using separation by gravity to remove any solids then is stored for re-sale or discharged to the general waste water stream for processing (see below). The resultant effluent is discharged to the TasWater system in accordance with the relevant trade waste agreement (TWA). Containers are stored for processing (see below).
• Oil filters are drained and then stored pending sale – they are not washed
• Plastic bottles are drained, rinsed, crushed or shredded then either stored in bins or baled up and stored on the floor until a sufficient quantity is accumulated for sale
• Oil drums have the tops removed, are drained, washed then crushed and baled up – these are stored on the floor pending sale as scrap
• Water from rinsing drums or containers goes through the waste water stream
• Mixed diesel/petrol is collected for storage for sale - this generally occurs within 3 months of collection
• Waste oil and oil/water mixes are directed to a series of oil settling tanks for further refinement
• Some of the settling processes may take up to several months to achieve the objective of separation for reuse or management. No mechanical agitation processes or chemicals are utilised. Any solid material that settles to the bottom of the tank is treated as solid waste after excess oil is drained
• Oil is decanted off and put through a number of further settlement/filtration processes until graded and placed into individual containers for storage prior to sale
• Sludge is allowed to settle and separate multiple times until it is reduced enough to be dried (in the open air – no heat application or other means) – then sold or disposed of to landfill
• Any waste water generated is processed prior to discharge to sewer. This is treated by settling and decanting and removal of solids. The final step involves detention and treatment to reduce the levels of glycol, hydrocarbons, metals and BOD/COD. This will aim to reduce the concentration of these contaminants to levels suitable for discharge to the sewage treatment plant (STP). The final waste water will be discharged as trade waste in accordance with the TWA.
• Waste will be stored in JJ Richards skip bins under cover. No bins will be stored in the open. This process is indicated schematically in Figure 1 with photographs of the current operation in Plate 1 to Plate 8.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 4
Figure 1 Materials processing
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 5
Plate 1 Oil stored prior to processing
Plate 2 Wash down upon delivery
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 6
Plate 3 Oil filters stored for processing
Plate 4 Part of current water processing system
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 7
Plate 5 Part of current water / oil separation system
Plate 6 Trays of oil solids draining at current site
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 8
Plate 7 Labelled drums of recycled product pending sale
Plate 8 Plastic drums waiting for filling with recycled product
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 9
2.4 Products
The operation will generate approximately 3000 tonnes of recycled oil products per annum. Oil drums are cleaned for resale while containers (including surplus drums) are drained and/or cleaned and sold for recycling. The following volumes of material/product are present on site at any given time (Table 1). Table 1 Materials stored on site and volumes processed annually
Material Maximum present
on site
From 2015 return Volume sold /
disposed of per
annum
From 2016 return
Oil 300,000 L 2,000,000 L 1,700,000 L
Oily solids 7 m3 2-3 tonnes sold
Oil water mix 250,000 L
Coolant 20,000 L 31,800 L As much as possible
31,800 L
Diesel / fuel mix 5000 L All received
Oil filters 2 tonnes 40 tonnes All received 40.5 tonnes
General solid waste (eg plastics in oil)
1 skip bin 21.6 tonnes To waste management facility (21.6 tonnes year ending June 15)
21.6 tonnes
Waste water 1,100,000 L To sewerage as trade waste
1,900,000 L including truck washout
Drums 2329 All 282
2.5 Hours of operation
The facility will operate Monday to Friday between 7:00 am and 5:00 pm. Construction of the building has been approved and is expected to commence upon approval of the use of the facility.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 10
3. Proposal area
3.1 General Description
The site is located at 1 Venture Court in the Launceston suburb of Invermay, approximately 1.5 km north of the Central Business District in the north of Tasmania. The land is located on the outskirts of Invermay, separated from the Tamar River (Ti-Tree Bend) by the STP. Land to the east, between the site and the highway, is filled land developed as sporting fields for Launceston Grammar. Land to the west is developed for industrial purposes and is separated from the river, 630 m to the west, by rural land.
Figure 2 General locality
3.2 Tenure
The land parcel is legally described as PID: 2903297 and Title Reference: 155196/1. A copy of the title is provided in Appendix B. Figure 2 presents an aerial image which shows the site and general location.
3.3 Soils and elevation
The area is generally low-lying and subject to flood inundation. However, the land comprising Venture Court has been filled and the site of the proposed activity is above flood level. Land in the locality has been cleared and there is no native vegetation in close proximity other than limited riparian vegetation 300 m to the north. The land is generally flat, being located on an alluvial plain. Soils on site are mapped in the Mineral Resources Tasmania (MRT) Geological Polygons, 1:25,000 mapping.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 11
The site is underlain by Quaternary sediments of the Undifferentiated Cenozoic sequences and the geology of the area is generally defined as Qhiv. Qhiv is described as estuarine deposits of clayey silt, silt, sand and subordinate gravel, supra-estuarine swamp and laterally derived alluvial, deposits, unmapped man-made deposits including silt dredgings; in environments inferred to lie above frequent tidal influence. The site is mapped as having a high probability (>70% chance) of occurrence of acid sulfate soils (ASS). In floodplains under 2m AHD, ASS are generally present within the upper 1 m. However, the site has been filled above the natural surface level and no activities are proposed which will expose acid sulfate soils.
3.4 Land use and zoning
The activity proposed is to be located within an existing building on the corner of Venture Court and Gilmore St, Invermay. The site has sealed access to Invermay Rd via Murphy St and Forster St. All services are connected to the site. The site has an area of 4,115 m2 and is approximately 94.5 m by 44 m in dimensions. The approved and existing buildings on site have a combined gross floor area of 1,583 m2. There are no easements or similar constraints shown on the title plan. The site is zoned General Industrial under the Launceston Interim Planning Scheme 2015 (the Planning Scheme) and was previously used as a depot for the housing and maintenance of buses (Sainty’s Coaches). The area is predominantly industrial in nature with the long term presence of the STP limiting the nature of development in the locality. The sports fields are used as required by the school, including on week days and weekends, when the proposed facility will not be in use. There is residential development (approximately 85 lots) within 500 m of the site, to the south and east. However, the latter is separated from the site by the highway. The nearest residential development is located approximately 180 m to the south off Weaving Place.
3.5 Climate
A weather station is located at the Ti-Tree Bend STP. Data for the period 1980 to 2017 from http://www.bom.gov.au/climate/averages/tables/cw_091237.shtml was accessed on 7 September 2017. The average summer maximum temperature is 24.6 oC and the average winter maximum temperature is 12.6 oC. The average summer minimum temperature is 12.3 oC and the average winter minimum is 2.3 oC. These records are consistent with patterns since 1980 as demonstrated in Figure 3 and Figure 4. The highest rainfall is recorded during July and August. The period between April and November typically averages a minimum of 50 mm a month as demonstrated in Figure 5. Winds are predominantly (approximately 50%) from the north and north east throughout the day and predominantly less than 30 km/hr in strength in the later portion of the day. Morning winds are predominantly less than 10 km/hr. Wind roses for 9:00 am and 3:00 pm are provided at Figure 6 and Figure 7.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 12
Figure 3 Mean maximum temperature over time (Source: Bureau of Meteorology)
Figure 4 Mean minimum temperature over time (Source: Bureau of Meteorology)
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 13
Figure 5 Average monthly rainfall over time (Source: Bureau of Meteorology)
Figure 6 Wind rose for Ti Tree Bend 9:00 am – 1980 to 2017 (Source: Bureau of Meteorology)
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 14
Figure 7 Wind rose for Ti Tree Bend 3:00 pm – 1980 to 2017 (Source: Bureau of Meteorology)
3.6 Map and site plan
The locality map at Figure 8 shows the site in the context of the nearest residential areas, access routes and other surrounding land use. The site plan and floor layout in Appendix A show the proposed internal fit out of the facility. No storage or processing is proposed outside the building. Vehicles associated with the activity will be parked within the building. There is no native vegetation on or near the site. There are no natural watercourses on or immediately adjacent the site. An open stormwater drain is located adjacent the site running along the boundary of Gilmore St which collects water from Venture Court and properties further along Gilmore St. This drain ultimately discharges to the Tamar River via a drain passing through the STP site.
3.7 Biodiversity values
The site is comprised entirely of hardstand and existing infrastructure and no remnant vegetation is present. TASVEG 3.0 identifies the site as (FUM) Extra-urban miscellaneous. Land in the locality has also been cleared and there is no native vegetation in close proximity other than limited riparian vegetation 300 m to the north. The site offers no suitable habitat for native flora or fauna.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 15
Figure 8 Locality map
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 16
3.8 Rationale and alternatives
The proposal involves the relocation of an existing oil recycling business to a new site. The facility will be established as new on this site and will better accommodate the operational and space requirements of the business. The processing will all be conducted under cover which reduces the potential for the movement of oils into stormwater and lowers the potential for odour and visual impacts. There is sufficient area on site for the manoeuvring of large vehicles and parking of all employee and client vehicles. The alternative is to leave the facility at its current location which is undesirable from operational and environmental perspectives. There is insufficient land area at the current site and some processes and storage are located in the open where they are exposed to the elements. The use proposed requires an industrial location and the proposed location is appropriately zoned and located near uses that will not be impacted by the operations.
4. Statutory context
Legislation exists at federal, state and local levels directed at the protection of the environment and the sustainable management of development. This legislation and its effect is summarised in Table 2 and relevant requirements discussed in this section. Table 2 Environmental legislation and its application to the proposal
Statute Requirement
Commonwealth
Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act)
This act provides for the protection of nationally significant species and ecological communities as well as compliance, enforcement and fines. All activities require consideration against this act.
An assessment against this act is included in this EER.
State
Aboriginal Relics Act 1975 This act relates to the protection of Aboriginal cultural heritage. The site has been developed and no additional ground disturbance is proposed. No impacts on Aboriginal cultural heritage are expected.
Environmental Management and Pollution Control Act 1994 (EMPCA)
The proposal is a Level 2 activity under Schedule 2 of EMPCA. The Board of the Environmental Protection Authority will assess the potential environmental impacts in accordance with this Act and, if it allows the project to proceed, will determine conditions for Council to include in the permit if the project is approved. Regulations and environmental protection policies made under EMPCA will also apply to the proposed activity.
This EER describes how the potential environmental impacts of the proposal will be managed and mitigated.
Forest Practices Act 1985 A Forest Practices Plan (FPP) is required under the Forest Practices Act 1985 where the clearing of forest is in excess of 1 hectare or 100 tonnes of timber (in areas of ‘vulnerable land’ these thresholds are lower).
No clearing in excess of 1 ha is proposed. No FPP is required.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 17
Statute Requirement
Historic Cultural Heritage Act 1995
This Act relates to the protection of European and other cultural
heritage. The site has been developed and no additional ground disturbance is proposed. No impacts on heritage are expected.
Land Use Planning and Approvals Act 1993 (LUPAA)
Under LUPAA, Councils are required to administer the development and use of land within their municipal boundary. The assessment of development and use is undertaken in accordance with the relevant planning scheme. This proposal will be the subject of a permit application under LUPAA to Launceston City Council.
Nature Conservation Act 2002 This act identifies and regulates threatened native vegetation communities.
The site is comprised entirely of hardstand and existing infrastructure and no remnant vegetation is present. There are no requirements under this act.
The State Policies and Projects Act 1993 established the process to put in place State policies under the RMPS of Tasmania.
Currently there are three State policies
• State Coastal Policy 1996
• State Policy on Water Quality Management 1997
• State Policy on Protection of Agricultural Land 2009
The Coastal Policy is applicable to State waters and land within one kilometre inland of the high-water mark. The site is not within the coastal zone. The site is not prime agricultural land and is not subject to the last of these policies. This report assesses the impact of the policy on water quality management.
Threatened Species Protection Act 1995
This act lists threatened species and regulates activities that may result in their disturbance. The requirements of this act are addressed in this EER.
The site and land in the locality has been cleared and there is no native vegetation in close proximity other than limited riparian vegetation 300 m to the north.
Weed Management Act 1999 This act declares certain plants as weeds and outlines measures for their control, including land owner obligations.
Local
Launceston Interim Planning Scheme 2015 (Planning Scheme).
The proposal is located within the boundaries of the Launceston local government area. The proposed use and development will be assessed in accordance with the Planning Scheme.
4.1 Commonwealth Environment Protection and Biodiversity Conservation Act 1999
Under the Commonwealth Government’s EPBC Act the proponent must determine whether or not the project is likely to be a ‘controlled action’ and require referral for approval from the Commonwealth Minister for the Environment. An action will require approval from the Minister if the action has, will have, or is likely to have a significant impact on Matters of National Environmental Significance (MNES), which encompass all species and communities listed under the EPBCA, certain activities and places of national importance. A ‘significant impact’ is an impact which is important, notable, or of consequence, having regard to its context or intensity.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 18
A search for MNES was conducted using the Protected Matters Search Tool on 4 July 2017 (http://www.environment.gov.au/webgis-framework/apps/pmst/pmst.jsf). A copy of the search results is attached in Appendix C. This search identified a number of MNES that could potentially occur within 1 km of the site; however, these are predominantly marine fauna and flora species associated with the Tamar River and nearby low lying or wetland areas (refer Appendix B). Some terrestrial carnivores (raptors, quolls and devils) have potential to occur within the wider locality outside Launceston urban area but the site does not offer any suitable habitat for these species or for the other species recorded throughout Launceston, the swift parrot. The site is comprised entirely of hardstand and existing infrastructure and no remnant vegetation is present. The proposed project is not expected to have any impact on matters of MNES and does not propose any MNES actions. Referral under the EPBC Act is therefore not required.
4.2 State Policy on Water Quality Management 1997
The purpose of the Water Quality Policy is to achieve the sustainable management of Tasmania’s surface water and groundwater resources by protecting or enhancing their qualities while allowing for sustainable development in accordance with the objectives of the RMPS. The State Policy on Water Quality Management 1997 contains provisions that require consideration of erosion and stormwater controls during construction and use to ensure that best practice environmental management is implemented at development sites. It is considered that the planning scheme and EPA requirements, with input from TasWater, will ensure that a best practice approach to stormwater management is adopted. The proposed use will be conducted in a purpose-built facility with no exposure to rain, limiting the potential for any waterborne contaminants to enter stormwater systems. Any spills will be contained by bunding and collected for return to the processing facilities on site. The car park and turning areas will be sealed to prevent the generation of dust and transport of sediment into stormwater systems.
4.3 Existing activity details
Hagen Oil currently operates under the following:
• Environment Protection Notice 74804/1
• TasWater Agreement D13/72 – a new agreement for continued operations is being negotiated
• Controlled Waste Handler Registration No CWTEMP139TA. During the 2015 and 2016 reporting periods there were no complaints received and no incidences of non-compliance.
4.4 Local
The land is within the area covered by the Launceston Interim Planning Scheme 2015 (the Planning Scheme). The following Planning Scheme definitions apply to the proposed development:
• Recycling and waste disposal - which means the use of land to collect, dismantle, store, dispose of, recycle or sell scrap material. Examples include a recycling depot, refuse disposal site, scrap yard, vehicle wrecking yard and waster transfer station.
• Level 2 activity which means a use defined under the Environmental Management and Pollution Control Act 1994. Specifically, the activity is listed in Schedule 2 of EMPCA under Part 1. Petroleum and Chemical, (c) Oil refineries: the conduct of works at which crude petroleum oil or shale oil is refined, at which lubricating oil is produced or at which used oil is refined or reprocessed by filtration or physical or chemical separation.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 19
Figure 9 Zoning map
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 20
4.4.1 Zoning
The site is zoned General Industrial under the Planning Scheme as shown in Figure 9. Within the General Industrial zone recycling and waste disposal is generally a Permitted use; however, in this case there are overlays applicable to the site which alter the level of assessment to Discretionary.
4.4.2 Zone Purpose (numbers reflect clauses within Interim Planning Scheme)
Purpose statements applicable to the General Industrial zone are:
• 25.1.1.1 To provide for manufacturing, processing, repair, storage and distribution of goods and materials where there may be impacts on neighbouring uses.
• 25.1.1.2 To provide for uses that are complementary to and compatible with the above purpose. The proposed use is consistent with the purpose of the zone. The relocation of the facility to this site will allow for improved operating conditions and consequently improved environmental management outcomes. The site is located adjacent industrial land, playing fields and the STP with limited potential for impacts on residential uses in the locality. There are no local area objectives or desired future character statements for the General Industrial zone.
4.4.3 Use Table
Recycling and waste disposal facilities are a permitted use within the General Industrial zone where not for a refuse disposal site. No wastes are permanently stored on site and the proposed use meets this qualification.
4.4.4 Use Standards
Within the Interim Planning Scheme, the following use standards applicable to the General Industrial zone need to be considered:
Use standards
25.3.1 External storage of goods
To ensure that external storage of goods, materials and waste does not detract from the amenity of the area.
A1 Storage of goods and materials, other than for retail sale, or waste must not be visible from any road or public open space adjoining the site.
The relocation of the activity to this site will allow processing and storage facilities to be located within a building, thereby reducing the potential for impacts on visual amenity. The primary benefit of indoor operations are from an environmental management perspective (no rainfall on to operational surfaces, improved stormwater quality, etc). However, operations will be less visible and less audible when conducted indoors. The site is relatively flat which limits visibility into the facility and landscaping will be provided along the street frontage to minimise further the visual impacts. The proposal is considered to satisfy the performance criteria for this objective.
25.3.2 Emissions impacting sensitive uses
To ensure that emissions to air, land and water are not detrimental to the amenity of sensitive uses
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 21
A1 Uses must be set back from the site of a sensitive use a distance of no less than 100m.
A sensitive use is defined as a residential use or a use involving the presence of people for extended periods except in the course of their employment, such as in a caravan park, childcare centre, dwelling, hospital or school. The nearest residential development is more than 170 m to the south of the site of the proposed use. The intervening land has been developed for other industrial purposes and a road. It is considered that there is adequate separation between the proposed use and residential development in the locality. The land to the east of the site contains sports fields which are used during school hours and on weekends. Use during operating hours is generally for limited periods of time (school time constraints). There are no emissions from the site which are considered likely to impact on users of the sports fields. Land to the north of the site is occupied by the sewage treatment plant and land immediately adjoining the site is developed or zoned for industrial purposes. Workers adjacent the proposed use are unlikely to be impacted by any emissions generated by the proposed activity. The proposal is considered to satisfy the performance criteria for this objective.
4.4.5 Development Standards
The extension of the building which will accommodate the proposed facility was approved under a separate development application (DA0490/2016 approved on 10 January 2017). No development is proposed as part of this application other than the internal installation of tanks and processing equipment.
4.4.6 Overlays
The site is impacted by two Planning Scheme overlays:
• buffer area to the Ti-Tree bend sewage treatment plant
• Invermay/Inveresk Flood Inundation Area – Riveredge Industrial Level 2 activities assessed by the Board of the Environment Protection Authority are exempt from application of the Environmental Impacts and Attenuation Code. Issues associated with the construction of a building in a flood affected area were addressed in the DA for the building extension. The Invermay/Inveresk Flood Inundation Area Code also applies to use and is considered below.
4.4.7 Codes
Within the Interim Planning Scheme there are a number of Codes which need to be considered. These are addressed below and comments provided where applicable. The prefixes refer to the Codes as presented within the Interim Planning Scheme.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 22
Code Comment
E1.0 Bushfire-Prone Areas Code Not applicable
E2.0 Potentially Contaminated Land Code
Not applicable – the use proposed is not a sensitive use or a use specified in Table E2.2.1. The subject land has not been subject to a notice issued under the EMPC Act or issued a permit for a potentially contaminating activity. The use of the site as a bus depot is not one which is likely to result in site contamination however any materials present on site would be consistent with those likely to be present under the proposed use (e.g. oils, coolant, etc).
E3.0 Landslide Code Not applicable
E4.0 Road and Railway Assets Code See below
E5.0 Flood Prone Land Code Not applicable - This Code does not apply to use and development, including subdivision, on land shown within Code E16.0 Invermay/Inveresk flood inundation area on the planning scheme overlay maps
E6.0 Parking and Sustainable Transport Code
See below
E7.0 Scenic Management Code Not applicable
E8.0 Biodiversity Code Not applicable
E9.0 Water Quality Code Not applicable
E10.0 Open Space Code Not applicable – no subdivision proposed
E11.0 Environmental Impacts and Attenuation Code
Not applicable - level 2 activities assessed by the Board of the Environment Protection Authority are exempt from this code.
E12.0 Airports Impact Management Code
Not applicable
E13.0 Local Historic Cultural Heritage Code
Not applicable
E14.0 Coastal Code Not applicable - land shown within Code E16 Invermay/Inveresk Flood Inundation Area on the planning scheme overlay maps is exempt.
E15.0 Telecommunications Code Not applicable
E16.0 Invermay/Inveresk Flood Inundation Area Code
See below
E17.0 Cataract Gorge Management Area Code
Not applicable
E18.0 Signs Code Not applicable – no signs are proposed
E19.0 Development Plan Code Not applicable
E4.0 Road and Railway Assets Code
This code applies to all use and development that requires a new access or intensifies the use of an existing access. The development is on a site that was previously used as a bus storage and maintenance depot. Large vehicles used the site in large numbers on a daily basis. The site has two existing driveway crossovers which will be used to access the new use. A new access is required on the Gilmore St frontage to allow access for Tas Fire Service but this will not be used for daily operations. The following standards are required to be addressed.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 23
Use Standards
E4.5.1 Existing road accesses and junctions
To ensure that the safety and efficiency of roads is not reduced by increased use of existing accesses and junctions.
Acceptable solution Comment
A1 – applies to Category 1 and 2 roads Not applicable
A2 – applies to roads with a speed limit in excess of 60 km per hour
Not applicable
A3 The annual average daily traffic (AADT) of vehicle movements, to and from a site, using an existing access or junction, in an area subject to a speed limit of 60km/h or less, must not increase by more than 20% or 40 vehicle movements per day, whichever is the greater.
Complies Vehicle numbers will not increase by more than 20% or by 40 vehicle movements per day.
Development Standards
E4.6.1 Development adjacent to roads and railways
To ensure that development adjacent to category 1 or category 2 roads or the rail network: (a) ensures the safe and efficient operation of roads and the rail network; (b) allows for future road and rail widening, realignment and upgrading; and (c) is located to minimise adverse effects of noise, vibration, light and air emissions from roads and the rail network.
Acceptable solution Comment
A1.1 Except as provided in A1.2, the following development must be located at least 50m from the rail network, or a category 1 road or category 2 road, in an area subject to a speed limit of more than 60km/h: (a) new buildings; (b) other road or earth works; and (c) building envelopes on new lots.
Not applicable
A1.2 Buildings must be: (a) located within a row of existing buildings and setback no closer than the immediately adjacent building; or (b) an extension which extends no closer than:
(i) the existing building; or (ii) an immediately adjacent building.
Not applicable
E4.6.2 Road accesses and junctions
To ensure that the safety and efficiency of roads is not reduced by the creation of new accesses and junctions
Acceptable solution Comment
A1 No new access or junction to roads in an area subject to a speed limit of more than 60km/h.
Not applicable
A2 Complies
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 24
Development Standards
No more than one access providing both entry and exit, or two accesses providing separate entry and exit, to roads in an area subject to a speed limit of 60km/h or less.
The site has two access points and both are to be used to allow access to and from the site by large vehicles. Trucks will enter the northern access, accessing the building at the rear and exiting from the building on to Venture Court via the southern access. A fire access is required to be installed on the Gilmore St frontage but this is for emergency access only.
E4.6.3 New level crossings Not applicable
E4.6.4 Sight distance at accesses, junctions and level crossings
To ensure that accesses, junctions and level crossings provide sufficient sight distance between vehicles and between vehicles and trains to enable safe movement of traffic.
Acceptable solution Comment
A1 Sight distances at: (a) an access or junction must comply with the Safe Intersection Sight Distance shown in Table E4.6.4; and (b) rail level crossings must comply with AS1742.7 Manual of uniform traffic control devices - Railway crossings, Standards Association of Australia.
Not applicable – existing approved accesses are to be used
E6.0 Parking and Sustainable Transport Code
This Code applies to all use and development. The extensions to the building were considered against the requirements for the former use of a depot. The proposed use is considered against the following standards.
Use Standards
E6.5.1 Car parking numbers
To ensure that an appropriate level of car parking is provided to meet the needs of the use.
Acceptable solution Comment
A1 The number of car parking spaces must: (a) not be less than 90% of the requirements of Table E6.1 (except for dwellings in the General Residential Zone); or (b) not be less than 100% of the requirements of Table E6.1 for dwellings in the General Residential Zone; or (c) not exceed the requirements of Table E6.1 by more than 2 spaces or 5% whichever is the greater, except for dwellings in the General Residential Zone; or (d) be in accordance with an acceptable solution contained within a parking precinct plan. The code requires the provision of:
Satisfies performance criteria The site has an area of 4,115 m2 requiring 8 spaces with an additional 10 spaces required for staff (18 total). 14 car spaces are provided on site which is less than 90% of the above requirement. However, as the 10 employees working on site include part time and job/share workers it is not considered necessary for a space to be allocated for each. Additionally, the use proposed is restricted to the bunded and internal areas on site which have an area significantly less than the total site area (approximately 1583 m2). There is no capacity for the use to expand beyond the bunded area due to licensing requirements to meet environmental obligations. If calculated on the actual area to be
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 25
Use Standards
• 1 car space per 500m² of site area + 1 space per employee
used the requirements for parking would be 14 spaces (if ten employee spaces are provided). It is considered that the proposal satisfies the performance criteria for this standard.
A2 The number of accessible car parking spaces for use by persons with a disability for uses that require 6 or more parking spaces must be in accordance with Part D3 of the National Construction Code 2014, as amended from time to time.
Complies An accessible space is provided nearest the front entrance to the administration area of the building.
E6.5.2 Bicycle parking numbers
To ensure that an appropriate level of bicycle parking spaces are provided to meet the needs of the use.
Acceptable solution Comment
A1 The number of bicycle parking spaces must be provided on either the site or within 50m of the site in accordance with the requirements of Table E6.1. The code requires the provision of:
• 1 bicycle space per 5 employees
Complies Two bicycle spaces are required and can be accommodated on site
Development Standards
E6.6.1 Construction of parking areas
To ensure that parking areas are constructed to an appropriate standard.
Acceptable solution Comment
A1 All parking, access ways, manoeuvring and circulation spaces must: (a) have a gradient of 10% or less; (b) be formed and paved; (c) be drained to the public stormwater system, or contain stormwater on the site; (d) except for a single dwelling, and all uses in the Rural Resource, Environmental Management and Open Space zones, be provided with an impervious all weather seal; and (e) except for a single dwelling, be line marked or provided with other clear physical means to delineate parking spaces.
Complies
E6.6.2 Design and layout of parking areas
To ensure that parking areas are designed and laid out to provide convenient, safe and efficient parking
Acceptable solution Comment
A1.1 Car parking, access ways, manoeuvring and circulation spaces must:
Complies
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 26
Development Standards
(a) provide for vehicles to enter and exit the site in a forward direction where providing for more than 4 parking spaces; (b) have a width of vehicular access no less than the requirements in Table E6.2, and no more than 10% greater than the requirements in Table E6.2; (c) have parking space dimensions in accordance with the requirements in Table E6.3; (d) have a combined access and manoeuvring width adjacent to parking spaces not less than the requirements in Table E6.3 where there are 3 or more car parking spaces; and (e) have a vertical clearance of not less than 2.1 metres above the parking surface level. A1.2 All accessible spaces for use by persons with a disability must be located closest to the main entry point to the building. A1.3 Accessible spaces for people with disability must be designated and signed as accessible spaces where there are 6 spaces or more. A1.4 Accessible car parking spaces for use by persons with disabilities must be designed and constructed in accordance with AS/NZ2890.6 – 2009 Parking facilities - Off-street parking for people with disabilities.
E6.3.3 to E6.3.6 and E6.7 not applicable
E16.0 Invermay/Inveresk Flood Inundation Area Code
The proposal is consistent with the land use objectives of the Riveredge Industrial precinct. Clause E16.6.1 lists those uses which are unacceptable in the Invermay/Inveresk Flood Inundation Area. These do not include the proposed use.
Development Standards
E16.7.1 Intensification of residential development – not applicable
E16.7.2 Flood Impact.
To ensure that new buildings and infrastructure are sited and designed to avoid or mitigate the risk and minimise the impact of flooding
Acceptable solution Comment
A1 Floor levels of all habitable rooms within the Residential use class must be at least 3.7m AHD.
Not applicable
A2 Not applicable
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 27
Development Standards
Relates to buildings within the Residential use class in the Inveresk Cultural Precinct
A3 All buildings not in the Residential use class must have a: (a) floor level of at least 3.4m AHD; and (b) gross floor area of not more than: (i) 400 m²; or (ii) 10% more than that existing or approved on the 1st January 2008.
Not applicable – no buildings are proposed as part of this application – these were approved under the previous DA.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 28
Part C – Potential environmental effects
5. Potential impacts from the proposal
5.1 Stormwater management
Stormwater from the site currently enters two pits on site which connect to an underground pipe along the eastern boundary of the lot (which is within a 5 m wide drainage easement). Water from this pipe flows through an open drain along the northern frontage of the lot into a pit before passing under the road to the Ti-Tree bend sewage treatment plant (STP) site. Water is discharged from this pipe in to another open drain some distance inside the STP site which continues through and around the site to the Tamar River. Connection is via pits in the carpark and turning area. This discharge will continue but the hardstand areas will be sealed to reduce the transportation of sediment into stormwater. All processing will occur under cover to ensure that rain is not falling on stored materials or processing equipment. Internal areas where processing occurs will be bunded to ensure any spills are contained. The location of all operations under cover in bunded areas prevents the release of potential pollutants to stormwater systems. Pits in the operational/bunded areas will be pumped out and material processed through the facility to maximise recovery of oils. Residual water will be discharged in accordance with the TWA. Materials in the tanks on site will be undergoing different stages in the separation and recycling process and the tanks are not interconnected. The largest tank volumes in the bunded areas are 55,000 L and 22,000 L. The requirements are that the bunded area have a capacity equivalent to the greater of the following:
• at least 110% of the combined volume where tanks are interconnected – not applicable
• at least 110% of the volume of the largest vessel – 55,000 L tanks require 60,500 L; 22,000 L tanks require 24,200 L
• at least 25% of the total volume of all vessels in that bunded area – 41,250 L and 33,000 L required for the areas proposed
• the capacity of the largest tank plus the output of the firewater system over a 20 minute period (fire system output unknown)
The relevant volumes for the tank storage areas proposed are 60,500 L (three tank area) and 33,000 L (six tank area). The bunded capacity of these areas is 169,000 L and 158,000 L respectively. This exceeds the requirements for storage of hazardous substances (which includes fuels and oils) in tanks that are not interconnected. Processing predominantly occurs in closed tanks, all under cover which prevents any ingress of rainfall. Winds (and therefore rain drift) are predominantly from the northwest and north which are areas occupied by the truck access and three large tanks. Much of the process area is located behind the office/truck parking (existing building) section of the building. The site has been filled above the 1% ARI flood event and during flood events no material will be brought to the site for processing due to the disruption of transport routes. This will prevent the need for storage of materials outside covered areas.
5.2 Significant areas
The site of the proposed activity is located within an established industrial area opposite, the STP for Launceston. It is not located within or adjacent to an area reserved for the conservation or management of natural values. Land to the east is zoned for recreation, being part of the Grammar school playing fields. The
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 29
Tamar River and riparian zone is zoned Environmental Management; however, this is 260 m from the site boundary at its closest point.
5.3 Air emissions
No heating processes are involved. Oils and other substances are recycled using filtration and gravity separation with no chemical or mechanical treatment. The materials and processes involved generate very little in terms of volatile substances and there is little potential for any air emissions. Most of the separation and distillation processes will occur within enclosed tanks. Processing will occur in the rear of the site (refer to Appendix A) which is an open structure. This allows any odours to disperse freely with no concentration or point source. Any potential odours should also be considered in light of the STP which is located directly opposite and is a continuous source of odours significantly greater than the odour of oil. No mitigation is considered necessary.
5.4 Liquid effluent
Hagen Oil currently operates under a draft TWA with TasWater pending relocation to the proposed site. 1.9 million litres of waste water was discharged to sewer under this agreement in 2016 and 31,800 L of coolant. These figures are expected to be similar for the 2017 reporting period. This includes water extracted from processed oil and waste water from truck and drum washout. Discharge water contains hydrocarbons, oils and grease, glycol, salts, organics and limited amounts of metals. Water is passed through a number of filtration and separation processes to recover as much oil / grease as possible. No chemical treatment (flocculent, etc) is applied to waste water however additional detention and processing is proposed to reduce levels of these contaminants to suitable concentrations for discharge to sewer. Prior to commencement of operations at the new site all equipment will be installed and tested to ensure proper operation. During commissioning of the facility monitoring of all proposed discharges will be undertaken prior to release to ensure compliance criteria are met. During operations, ongoing monitoring will be carried out to ensure continued compliance including monthly and quarterly testing for biological factors such as pH, nutrient levels, BOD, chemical oxygen demand, salts, suspended solids, glycol, sulphides, dissolved solids and metals. A new TWA is being developed in consultation with TasWater. Details of a trade waste management plan will be part of that process. No discharge to the environment is proposed. Waste water is stored in tanks within bunded areas to prevent any accidental escape to the environment. During times of high pressure on the treatment plant (e.g. flooding) deliveries to the facility will be limited by road closures. Materials delivered can only be accommodated in tanks so there is no uncontrolled storage of substances on site. No mitigation or changes are considered necessary.
5.5 Solid wastes
Solid wastes include plastic bottles and drums, metal drums, oil filters, other wastes that come in deliveries (rags, bags, etc) and operational waste from the facility (office and staff generated waste). Wastes are stored in a skip bin until sufficient volume is available for collection and disposal to a waste management facility. In the 2016 reporting year 21.6 tonnes of solid wastes were disposed of to the waste management facility plus 40.5 tonnes of oil filters. These are drained of oil prior to disposal. Wastes are recycled where possible and in the same period 282 steel drums were cleaned and crushed on site for recycling. The current waste management arrangements will continue at the new facility. No mitigation or changes are considered necessary.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 30
The wastes disposed of to the Launceston landfill includes plastic drums, paper towels, paper air filters, etc and will be stored under cover. In the last reporting periods these wastes were assigned the following waste categories by Council:
• C&I – 1
• C&I – 3
• C&I – 4
• C&I – 5
• C&D – 5
• C&D – 4
• C&D – 2 These categories fall within the Commercial and Industrial Waste and the Construction and Demolition Waste groups.
5.6 Noise emissions
Noise generated by the facility is primarily related to vehicle movements. In an industrial area and on a site previously used as a bus depot this is not considered to be a potential issue. Twenty truck movements a day are expected plus the light vehicle movements generated by 10 FTE employees. Processing involves filtration and gravity separation with no mechanical equipment other than pumps involved. The nearest sensitive receptor is located approximately 180 m to the south off Weaving Place and separated from the site by a bus depot and other industrial activities. No mitigation is considered necessary.
5.7 Transport impacts
Wastes will be delivered to the site in the proponent’s own tankers and in other vehicles. The number of vehicle movements is not expected to increase above those currently experienced at the current facility. The site is located near the current Murphy St operations and vehicles will use the same transport route for the majority of their journey. The additional length of travel passes predominantly past undeveloped industrial land. This route is used by vehicles accessing the STP and buses accessing the depot at the end of Venture Court. The impacts associated with traffic generated by the use are discussed in the assessment under the Planning Scheme and, being not significantly greater than those experienced under the previous use, were determined not to require mitigation.
5.8 Other off-site impacts
The site is located immediately adjacent sports fields used by the local Grammar school. This is used periodically and will be used at times when the facility is operational. There are no air emissions or noise likely to impact on students or staff. The grass area surrounding the nearest playing field is located approximately 30 m from the building which will house the facility and is separated by an internal driveway and the access and car parking on the sports field. A vegetated buffer extends along the boundary between the industrial estate and sports fields. No mitigation is considered necessary.
5.9 Hazardous substances
No Dangerous Good licence is required as the liquids processed are not Class 3 Flammable Liquids based on flash point testing. Class 3 Flammable Liquids are classified as:
Liquids, or mixtures of liquids, or liquids containing solids in solution or suspension (for example, paints, varnishes, lacquers, etc., but not including substances otherwise classified on account of their dangerous characteristics) which give off a flammable vapour at temperatures of not more than 60°C, closed-cup test, or not more than 65.6°C, open-cup test, normally referred to as the flash point.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 31
Liquids are delivered to site in tankers or in containers in other vehicles. Materials are tested and if acceptable pumped into tanks for further assessment or processing. Liquids contain grease and oils and petrochemicals which are recovered as far as possible. Material stored on site includes material that is settling, accumulating in drums, pending sale, etc. Some oil (as much as 10% solids) is sold over winter so is stockpiled on site until then. Steel drums and tanks and large plastic containers are used for storage and processing liquids. Processed materials are packaged in new containers, labelled and stockpiled for sale. The terms hazardous waste, prescribed waste and controlled waste are used by various Australian environment protection agencies and to all intents and purposes are interchangeable. Tasmania has adopted the terminology of the National Environment Protection (Movement of Controlled Waste between States and Territories) Measure 2004 (NEPM) which uses the term controlled waste. Controlled waste includes those wastes that exhibit toxicity, chemical or biological reactivity, environmental persistence, or the ability to bio-accumulate or enter the food chain. These wastes may be produced in a gaseous, liquid or solid state. Controlled wastes are listed in the regulations and the handling of them requires the approval of the Director of the EPA. Gourmet Oil (Australia) Pty Ltd hold a current Controlled Waste Handler Certificate of Registration (CWTEMP139TA) and any controlled waste generated from treatment or pre-treatment will be managed under this certificate. This certificate registers Gourmet Oil as a controlled waste agent and transporter and covers the following:
• Acidic solutions or acids in solid form
• Basic Solutions or bases in solid form
• Waste from the production, formulation and use of inks, dyes, pigments, paints, lacquers and varnish
• Waste from the production, formulation and use of resins, latex, plasticisers, glues and adhesives
• Waste oil/water, hydrocarbons/water mixtures or emulsions
• Containers which are contaminated with residues of substances referred to in this list*
• Soils contaminated with a controlled waste
• Encapsulated, chemically-fixed, solidified or polymerised wastes referred to in this list*
• Filter cake contaminated with residues of substances referred to in this list*. *Note that “in this list” means in Schedule A – List 1: Waste Categories, of the NEPM as varied November 2010.
5.10 Site contamination (historical)
The previous use of the site as a bus maintenance depot is not one which is listed in Council’s potentially contaminated land code as an activity likely to result in contamination. Any residues in the site soils resulting from this use would be consistent with the nature of materials which will be stored and processed on site. The site will be sealed and all processing conducted under cover in bunded areas. There is limited potential for pollution of the soil as a result of the proposed activity and limited risk to workers during construction or operation.
5.11 Climate change
The facility will recycle waste oil and contaminated liquids to produce a range of useable products. The availability of re-cycled alternatives to new petrochemical products will help lessen demand for new oil. The processes involved are simple and by their nature use low amounts of energy (vehicle emissions, pumps and staff/office amenities).
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 32
5.12 Sites of high public interest
The site is within an established industrial site recognised as part of the Invermay industrial precinct. There are no sites of high public interest in the area in terms of natural values and the STP is located immediately to the north. This proposal represents an opportunity for the productive use of a site in close proximity to the STP which will not impact on the STP or be impacted by it.
5.13 Monitoring
During commissioning of the facility monitoring of all proposed discharges will be undertaken prior to release to ensure compliance criteria are met. Ongoing monitoring will be carried out to ensure continued compliance, as outlined in the self-monitoring program requirements in the draft transitional agreement for the current Murphy St site of the facility. This includes testing of biological factors such as pH, nutrient levels, BOD, chemical oxygen demand, salts, suspended solids, dissolved solids, glycol and metals.
5.14 Rehabilitation
The site is already developed and the current proposal is not expected to have any significant impact on the nature of the site or the surrounding land. In the event that the facility ceases to operate there will be significant infrastructure on site available for future users. However, there are no environmental features that will warrant rehabilitation. The permit issued is expected to outline decommissioning requirements and a Decommissioning and Rehabilitation Plan will be required to be prepared.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 33
Part D – Management commitments
6. Commitments
The following commitments are proposed to ensure that operations do not result in environmental impacts. Commitments
No. Commitment Completion date
1 All parking and access areas are to be finished with a sealed surface and drained through a triple interceptor.
Prior to commencement of operations
2 Preparation of protocols for management of spills and accidents on site
Prior to commencement of operations
3 Develop a new trade waste agreement with TasWater. Prior to commencement of operations
4 All unloading and loading activities and all processing
and storage is to occur within covered, bunded areas. Ongoing
5 All equipment is to be maintained in good working order to minimise emissions and noise generation.
Ongoing
6 Preparation of a Decommissioning and Rehabilitation
Plan Prior to decommissioning
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc 34
Part E – Public and stakeholder consultation
7. Consultation
No consultation has been undertaken with the community or adjoining land owners. This proposal represents an opportunity to relocate the existing facility from a site which is no longer suitable and is the outcome of several years of discussions with Council and the EPA. There will be a statutory public consultation period once the application is lodged with Council.
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc
Appendix A
Plans of the proposed development Title
BUILDING DRAWINGS
No DRAWING01 SITE PLAN02 FLOOR PLAN03 PERSPECTIVES
GENERAL PROJECT INFORMATIONTITLE REFERENCE: 1/155196
DESIGN WIND SPEED: N3SOIL CLASSIFICATION: H1
CLIMATE ZONE: 7ALPINE AREA: NO
CORROSIVE ENVIRONMENT: NOBAL RATING: N/A
OTHER KNOWN HAZARDS: FLOOD INUNDATION AREABUILDING CLASS: 5
PROPOSED WAREHOUSE 1064.24 m2EXISTING WAREHOUSE 364.31 m2EXISTING OFFICES 22.00 m2STAGE 1 OFFICES 133.13 m2
1583.68
p+
Accredited Building Practitioner: Frank Geskus -No CC246A
10 Goodman Court , Invermay Launceston 7248
info@ primedesigntas.com.au primedesigntas.com.au03 6332 3790 f+ 03 6332 3798
JUNE 2017
GOURMET OIL (AUSTRALIA)PTY LTD
FLOOR AREAS
TOTAL m2
EXIT
ENTRY
5m E
ASEM
ENT
GILMORE STREET
VENTUR
E CO
URT
ENTRY
EXIT
EX. PIT
7289
BOUNDARY 94.83 m
BOUNDARY 85.48 m
BO
UND
ARY 4
2.8
8 m
BO
UND
ARY 4
4.0
0 m
BOUNDARY 8.92 m
EXISITNG WAREHOUSE
PROPOSED RECYCLINGCENTRE UNDER STAGE 1
COVERED AREA
LAND
SCAPIN
G
LAND
SCAPIN
G
LAND
SCAPIN
G
STAGE 1 -
PREVIOUSLY
APPROVEDBOL
BOL
BOL
BOL
1
2
3
4
5
6
7
8
9
10
13
14
EXISTING SURFACE TO REMAIN
BOL
12.5m HEAVY RIGIDTURNING CIRCLE
7289
2270
1320
4120
EXISTING SEWER MANHOLE
EXIS
TING
SEWER P
IPE
3150
2270
INSTALL NEWGATES FOR TASFIRE ACCESS
11
12
PROPOSED NEW INLINE FIREPLUG IN ROAD RESERVE TOBE INSTALLED BY TAS WATERAT DEVELOPERS EXPENSE
EX. W
ATE
R M
AIN
20000
EX. WATER MAIN
EX. WATER MAIN
F.P.
3000
3000
LEGENDBOLLARDS TO DETAILBOL
NO
TE
: D
O N
OT
SC
ALE
OF
F D
RA
WIN
GS
Drafted by: Approved by:
Scale:
Revision:
Date:
Project/Drawing no:
Drawing:
Project:
Client name:
Accredited building practitioner: Frank Geskus -No CC246A
10 Goodman Court, Invermay Tasmania 7248,p+ 03 6332 3790 f+ 03 [email protected] primedesigntas.com.au
As indicated @ A1
PROPOSED RECYCLING CENTRE1 VENTURE COURT,INVERMAY
F.G.G.B.S.L.
SITE PLAN
PD16213 - 01
29/06/2017
GOURMET OIL (AUSTRALIA) PTYLTD
04
1 : 200
SITE PLAN
GENERAL NOTES• CHECK & VERIFY ALL DIMENSIONS & LEVELS ON SITE• WRITTEN DIMENSIONS TO TAKE PREFERENCE OVER SCALED• ALL WORK TO BE STRICTLY IN ACCORDANCE WITH NCC, ALL S.A.A..
CODES & LOCAL AUTHORITY BY-LAWS• ALL DIMENSIONS INDICATED ARE FRAME TO FRAME AND DO NOT
ALLOW FOR WALL LININGS• CONFIRM ALL FLOOR AREAS• ALL PLUMBING WORKS TO BE STRICTLY IN ACCORDANCE WITH A.S.
3500 & APPROVED BY COUNCIL INSPECTOR• BUILDER/PLUMBER TO ENSURE ADEQUATE FALL TO SITE
CONNECTION POINTS IN ACCORDANCE WITH A.S. 3500 FORSTORMWATER AND SEWER BEFORE CONSTRUCTION COMMENCES
• THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE ENGINEER'SSTRUCTURAL DRAWINGS
• ALL WINDOWS AND GLAZING TO COMPLY WITH A.S. 1288 & A.S. 2047• ALL SET OUT OF BUILDINGS & STRUCTURES TO BE CARRIED OUT BY
A REGISTERED LAND SURVEYOR AND CHECKED PRIOR TOCONSTRUCTION
• IF CONSTRUCTION OF THE DESIGN IN THIS SET OF DRAWINGS DIFFERFROM THE DESIGN AND DETAIL IN THESE AND ANY ASSOCIATEDDOCUMENTS BUILDER AND OWNER ARE TO NOTIFY DESIGNER
• BUILDER'S RESPONSIBILITY TO COMPLY WITH ALL PLANNINGCONDITIONS
• BUILDER TO HAVE STAMPED BUILDING APPROVAL DRAWINGS ANDPERMITS PRIOR TO COMMENCEMENT OF CONSTRUCTION
• CONSTRUCTION TO COMPLY WITH AS 3959, READ IN CONJUNCTIONWITH BUSHFIRE ATTACK LEVEL (BAL) ASSESSMENT REPORT.
SITE DETAIL
HORIZONTAL DATUM IS ARBITRARY
VERTICAL DATUM IS ARBITRARY
WARNINGS:THE DETAIL SHOWN / RECORDED• MAY ONLY BE CORRECT AT THE DATE OF SURVEY.• IS NOT A COMPLETE REPRESENTATION OF ALL SURFACE AND
UNDERGROUND DETAIL.• SHOULD ONLY BE USED FOR THE PURPOSES INTENDED.
THE LOCATIONS OF UNDERGROUND SERVICES AREAPPROXIMATE ONLY AS INDICATED BY SURFACE FEATURES.
PRIOR TO ANY CONSTRUCTION REFER TO RELEVANT AUTHORITIESFOR DETAILED LOCATION OF ALL SERVICES.
CONTOUR INTERVAL 0.1m
B
A
1 2 3 4 5 6 7
4500 4500 4500 4500 4500 4500 4500
32854
EX C
OL
EX C
OL
EX C
OL
EX C
OL
EX C
OL
EX C
OL
EX C
OL
EX COL
EX COL
EX COL
EX COL
EX COL
EX COL
EX COL
EX C
OL
EX C
OL
EX C
OL
EX COL
EX C
OL
EX C
OL
EX C
OL
EX COL
10
EX C
OL
32050
EX. COL.
EX. COL.
EX. COL.EX
. COL.
EX. C
OL.
EX. COL.
EX. C
OL.
EX. C
OL.
EX. C
OL.
EX. C
OL.
FHR
EX. R
OLLER
SHUT
TER
EX. R
OLLER
SHUT
TER
FHR
PIT
PIT
2000
20
00
150
015
00
EX C
OL
PITPIT
30
00
ø30
00
ø30
00
ø
10000
22,000L WATERTANK - UPRIGHT
55,000 LITRE OIL TANKON GROUND
55,000 LITRE OIL TANKON GROUND
55,000 LITRE OIL TANKON GROUND
500 HIGH BUNDING WALLS
50
0 H
IGH B
UND
ING
WALLS
500 HIGH BUNDING WALLS
50
0 H
IGH B
UND
ING
WALLS
50
0 H
IGH B
UND
ING
WALLS
500 HIGHBUNDING WALLS
50
0 H
IGH B
UND
ING
WALLS
500 HIGH BUNDING WALLS
BUNDED AREA VOLUMECAPACITY - 169m3OR 169,000 LITRES
BUNDED AREA VOLUMECAPACITY - 158m3OR 158,000 LITRES
DRIV
E OVER
BUN
DIN
G F
LAP
DR
IVE O
VER
BUN
DIN
G F
LAP
WORK AREA
22,000L WATERTANK - UPRIGHT
22,000L WATERTANK - UPRIGHT
22,000L WATERTANK - UPRIGHT
22,000L WATERTANK - UPRIGHT
22,000L WATERTANK - UPRIGHT
TRUCK ON-LOAD AREA4000 LITRE CAPACITY
EXHAUST FAN-VENT TOOUTSIDE AIR.
CAVITY SLIDING DOOR
LEGEND
CSD
NEW STEEL COLUMNCOL
NEW STUD WALLS
COL 2 90x3.5 SHS COLUMN
EX. COL EXISTING STEEL COLUMN
FHR FIRE HOSE REEL
EX. FHR EXISTING FIRE HOSE REEL
1 : 100
FLOOR PLAN
PROPOSED WAREHOUSE 1064.24 m2EXISTING WAREHOUSE 364.31 m2EXISTING OFFICES 22.00 m2STAGE 1 OFFICES 133.13 m2
1583.68
NO
TE
: D
O N
OT
SC
ALE
OF
F D
RA
WIN
GS
Drafted by: Approved by:
Scale:
Revision:
Date:
Project/Drawing no:
Drawing:
Project:
Client name:
Accredited building practitioner: Frank Geskus -No CC246A
10 Goodman Court, Invermay Tasmania 7248,p+ 03 6332 3790 f+ 03 [email protected] primedesigntas.com.au
1 : 100 @ A1
PROPOSED RECYCLING CENTRE1 VENTURE COURT,INVERMAY
F.G.G.B.S.L.
FLOOR PLAN
PD16213 - 02
29/06/2017
GOURMET OIL (AUSTRALIA) PTYLTD
04
FLOOR AREAS
TOTAL m2
NOTE:DIMENSIONS DO NOT INCLUDE CLADDING
NO
TE
: D
O N
OT
SC
ALE
OF
F D
RA
WIN
GS
Drafted by: Approved by:
Scale:
Revision:
Date:
Project/Drawing no:
Drawing:
Project:
Client name:
Accredited building practitioner: Frank Geskus -No CC246A
10 Goodman Court, Invermay Tasmania 7248,p+ 03 6332 3790 f+ 03 [email protected] primedesigntas.com.au
@ A1
PROPOSED RECYCLING CENTRE1 VENTURE COURT,INVERMAY
F.G.G.B.S.L.
PERSPECTIVES
PD16213 - 03
29/06/2017
GOURMET OIL (AUSTRALIA) PTYLTD
04
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc
Appendix B
Title documents
FOLIO PLANRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Nov 2017 Search Time: 09:30 AM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 1 of 1
SEARCH DATE : 08-Nov-2017SEARCH TIME : 09.29 AM
DESCRIPTION OF LAND City of LAUNCESTON Lot 1 on Sealed Plan 155196 Derivation : Part of Lot 4, 4A-3R-28Ps. Gtd. to Patrick Dargan Prior CT 142279/2
SCHEDULE 1 M592815 TRANSFER to GOURMET OIL (AUSTRALIA) PTY LTD Registered 05-Oct-2016 at 12.02 PM
SCHEDULE 2 Reservations and conditions in the Crown Grant if any SP155196 EASEMENTS in Schedule of Easements SP155196 FENCING PROVISION in Schedule of Easements SP142279 FENCING PROVISION in Schedule of Easements SP132667 FENCING COVENANT in Schedule of Easements E65981 MORTGAGE to Australia and New Zealand Banking Group Limited Registered 05-Oct-2016 at 12.03 PM
UNREGISTERED DEALINGS AND NOTATIONS No unregistered dealings or other notations
SEARCH OF TORRENS TITLE
VOLUME
155196FOLIO
1
EDITION
7DATE OF ISSUE
05-Oct-2016
RESULT OF SEARCHRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 1 of 1
SCHEDULE OF EASEMENTSRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Jan 2018 Search Time: 02:47 PM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 1 of 5
SCHEDULE OF EASEMENTSRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Jan 2018 Search Time: 02:47 PM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 2 of 5
SCHEDULE OF EASEMENTSRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Jan 2018 Search Time: 02:47 PM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 3 of 5
SCHEDULE OF EASEMENTSRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Jan 2018 Search Time: 02:47 PM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 4 of 5
SCHEDULE OF EASEMENTSRECORDER OF TITLES
Issued Pursuant to the Land Titles Act 1980
Search Date: 08 Jan 2018 Search Time: 02:47 PM Volume Number: 155196 Revision Number: 01
Department of Primary Industries, Parks, Water and Environment www.thelist.tas.gov.auPage 5 of 5
pitt&sherry ref: LN16198L001 Rep 31P Rev 2 - Environmental Effects Report.docx/LK/tc
Appendix C
Protected Matters Search Results
EPBC Act Protected Matters Report
This report provides general guidance on matters of national environmental significance and other mattersprotected by the EPBC Act in the area you have selected.
Information on the coverage of this report and qualifications on data supporting this report are contained in thecaveat at the end of the report.
Information is available about Environment Assessments and the EPBC Act including significance guidelines,forms and application process details.
Other Matters Protected by the EPBC Act
Acknowledgements
Buffer: 1.0Km
Matters of NES
Report created: 04/07/17 09:52:54
Coordinates
This map may contain data which are©Commonwealth of Australia(Geoscience Australia), ©PSMA 2010
CaveatExtra Information
DetailsSummary
Summary
This part of the report summarises the matters of national environmental significance that may occur in, or mayrelate to, the area you nominated. Further information is available in the detail part of the report, which can beaccessed by scrolling or following the links below. If you are proposing to undertake an activity that may have asignificant impact on one or more matters of national environmental significance then you should consider theAdministrative Guidelines on Significance.
Matters of National Environmental Significance
Listed Threatened Ecological Communities:
Listed Migratory Species:
None
Great Barrier Reef Marine Park:
Wetlands of International Importance:
Listed Threatened Species:
None
41
None
None
National Heritage Places:
Commonwealth Marine Area:
World Heritage Properties:
None
None
21
The EPBC Act protects the environment on Commonwealth land, the environment from the actions taken onCommonwealth land, and the environment from actions taken by Commonwealth agencies. As heritage values of aplace are part of the 'environment', these aspects of the EPBC Act protect the Commonwealth Heritage values of aCommonwealth Heritage place. Information on the new heritage laws can be found athttp://www.environment.gov.au/heritage
This part of the report summarises other matters protected under the Act that may relate to the area you nominated.Approval may be required for a proposed activity that significantly affects the environment on Commonwealth land,when the action is outside the Commonwealth land, or the environment anywhere when the action is taken onCommonwealth land. Approval may also be required for the Commonwealth or Commonwealth agencies proposing totake an action that is likely to have a significant impact on the environment anywhere.
A permit may be required for activities in or on a Commonwealth area that may affect a member of a listed threatenedspecies or ecological community, a member of a listed migratory species, whales and other cetaceans, or a member ofa listed marine species.
Other Matters Protected by the EPBC Act
None
None
None
Listed Marine Species:
Whales and Other Cetaceans:
32
Commonwealth Heritage Places:
None
None
Critical Habitats:
Commonwealth Land:
Commonwealth Reserves Terrestrial:
NoneCommonwealth Reserves Marine:
Extra Information
This part of the report provides information that may also be relevant to the area you have nominated.
None
1State and Territory Reserves:
Nationally Important Wetlands:
1Regional Forest Agreements:
Invasive Species: 27
NoneKey Ecological Features (Marine)
Details
Listed Threatened Species [ Resource Information ]Name Status Type of PresenceBirds
Tasmanian Wedge-tailed Eagle, Wedge-tailed Eagle(Tasmanian) [64435]
Endangered Species or species habitatlikely to occur within area
Aquila audax fleayi
Australasian Bittern [1001] Endangered Species or species habitatknown to occur within area
Botaurus poiciloptilus
Curlew Sandpiper [856] Critically Endangered Species or species habitatmay occur within area
Calidris ferruginea
Tasmanian Azure Kingfisher [25977] Endangered Species or species habitatmay occur within area
Ceyx azureus diemenensis
Antipodean Albatross [64458] Vulnerable Species or species habitatlikely to occur within area
Diomedea antipodensis
Gibson's Albatross [82270] Vulnerable Species or species habitatlikely to occur within area
Diomedea antipodensis gibsoni
Southern Royal Albatross [89221] Vulnerable Species or species habitatlikely to occur within area
Diomedea epomophora
Wandering Albatross [89223] Vulnerable Species or species habitatlikely to occur within area
Diomedea exulans
Northern Royal Albatross [64456] Endangered Species or species habitatlikely to occur within area
Diomedea sanfordi
Swift Parrot [744] Critically Endangered Species or species habitatmay occur within area
Lathamus discolor
Bar-tailed Godwit (baueri), Western Alaskan Bar-tailedGodwit [86380]
Vulnerable Species or species habitatlikely to occur within area
Limosa lapponica baueri
Northern Siberian Bar-tailed Godwit, Bar-tailed Godwit(menzbieri) [86432]
Critically Endangered Species or species habitatmay occur within area
Limosa lapponica menzbieri
Southern Giant-Petrel, Southern Giant Petrel Endangered Species or speciesMacronectes giganteus
Matters of National Environmental Significance
Name Status Type of Presence[1060] habitat likely to occur within
area
Northern Giant Petrel [1061] Vulnerable Species or species habitatmay occur within area
Macronectes halli
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitatmay occur within area
Numenius madagascariensis
Fairy Prion (southern) [64445] Vulnerable Species or species habitatlikely to occur within area
Pachyptila turtur subantarctica
Gould's Petrel, Australian Gould's Petrel [26033] Endangered Species or species habitatmay occur within area
Pterodroma leucoptera leucoptera
Buller's Albatross, Pacific Albatross [64460] Vulnerable Species or species habitatmay occur within area
Thalassarche bulleri
Northern Buller's Albatross, Pacific Albatross [82273] Vulnerable Species or species habitatmay occur within area
Thalassarche bulleri platei
Shy Albatross, Tasmanian Shy Albatross [82345] Vulnerable Species or species habitatlikely to occur within area
Thalassarche cauta cauta
White-capped Albatross [82344] Vulnerable Species or species habitatlikely to occur within area
Thalassarche cauta steadi
Grey-headed Albatross [66491] Endangered Species or species habitatmay occur within area
Thalassarche chrysostoma
Campbell Albatross, Campbell Black-browed Albatross[64459]
Vulnerable Species or species habitatlikely to occur within area
Thalassarche impavida
Black-browed Albatross [66472] Vulnerable Species or species habitatlikely to occur within area
Thalassarche melanophris
Salvin's Albatross [64463] Vulnerable Species or species habitatlikely to occur within area
Thalassarche salvini
Masked Owl (Tasmanian) [67051] Vulnerable Breeding known to occurwithin area
Tyto novaehollandiae castanops (Tasmanian population)
Crustaceans
Mount Arthur Burrowing Crayfish [66778] Vulnerable Species or species habitatmay occur within area
Engaeus orramakunna
Fish
Australian Grayling [26179] Vulnerable Species or species habitatknown to occur within area
Prototroctes maraena
Frogs
Growling Grass Frog, Southern Bell Frog, Green andGolden Frog, Warty Swamp Frog [1828]
Vulnerable Species or species habitatlikely to occur within area
Litoria raniformis
Mammals
Spotted-tail Quoll, Spot-tailed Quoll, Tiger Quoll(Tasmanian population) [75183]
Vulnerable Species or species habitatknown to occur within area
Dasyurus maculatus maculatus (Tasmanian population)
Name Status Type of Presence
Eastern Quoll, Luaner [333] Endangered Species or species habitatknown to occur within area
Dasyurus viverrinus
Eastern Barred Bandicoot (Tasmania) [66651] Vulnerable Species or species habitatlikely to occur within area
Perameles gunnii gunnii
Tasmanian Devil [299] Endangered Species or species habitatlikely to occur within area
Sarcophilus harrisii
Plants
Native Wintercress, Riverbed Wintercress [12540] Endangered Species or species habitatlikely to occur within area
Barbarea australis
Tailed Spider-orchid [17067] Vulnerable Species or species habitatlikely to occur within area
Caladenia caudata
Matted Flax-lily [64886] Endangered Species or species habitatknown to occur within area
Dianella amoena
South Esk Heath [19879] Endangered Species or species habitatknown to occur within area
Epacris exserta
Clover Glycine, Purple Clover [13910] Vulnerable Species or species habitatmay occur within area
Glycine latrobeana
Basalt Pepper-cress, Peppercress, Rubble Pepper-cress, Pepperweed [16542]
Endangered Species or species habitatmay occur within area
Lepidium hyssopifolium
Midland Greenhood [64535] Critically Endangered Species or species habitatmay occur within area
Pterostylis commutata
Reptiles
Green Turtle [1765] Vulnerable Foraging, feeding or relatedbehaviour likely to occurwithin area
Chelonia mydas
Listed Migratory Species [ Resource Information ]* Species is listed under a different scientific name on the EPBC Act - Threatened Species list.Name Threatened Type of PresenceMigratory Marine Birds
Fork-tailed Swift [678] Species or species habitatlikely to occur within area
Apus pacificus
Southern Royal Albatross [89221] Vulnerable Species or species habitatlikely to occur within area
Diomedea epomophora
Wandering Albatross [89223] Vulnerable Species or species habitatlikely to occur within area
Diomedea exulans
Southern Giant-Petrel, Southern Giant Petrel [1060] Endangered Species or species habitatlikely to occur within area
Macronectes giganteus
Northern Giant Petrel [1061] Vulnerable Species or species habitatmay occur within area
Macronectes halli
Name Threatened Type of Presence
Buller's Albatross, Pacific Albatross [64460] Vulnerable Species or species habitatmay occur within area
Thalassarche bulleri
Tasmanian Shy Albatross [89224] Vulnerable* Species or species habitatlikely to occur within area
Thalassarche cauta
Grey-headed Albatross [66491] Endangered Species or species habitatmay occur within area
Thalassarche chrysostoma
Black-browed Albatross [66472] Vulnerable Species or species habitatlikely to occur within area
Thalassarche melanophris
Migratory Marine Species
Green Turtle [1765] Vulnerable Foraging, feeding or relatedbehaviour likely to occurwithin area
Chelonia mydas
Porbeagle, Mackerel Shark [83288] Species or species habitatlikely to occur within area
Lamna nasus
Migratory Terrestrial Species
White-throated Needletail [682] Species or species habitatknown to occur within area
Hirundapus caudacutus
Satin Flycatcher [612] Species or species habitatknown to occur within area
Myiagra cyanoleuca
Migratory Wetlands Species
Common Sandpiper [59309] Species or species habitatknown to occur within area
Actitis hypoleucos
Sharp-tailed Sandpiper [874] Species or species habitatknown to occur within area
Calidris acuminata
Curlew Sandpiper [856] Critically Endangered Species or species habitatmay occur within area
Calidris ferruginea
Pectoral Sandpiper [858] Species or species habitatmay occur within area
Calidris melanotos
Latham's Snipe, Japanese Snipe [863] Species or species habitatmay occur within area
Gallinago hardwickii
Bar-tailed Godwit [844] Species or species habitatlikely to occur within area
Limosa lapponica
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitatmay occur within area
Numenius madagascariensis
Common Greenshank, Greenshank [832] Species or species habitatmay occur within area
Tringa nebularia
Listed Marine Species [ Resource Information ]* Species is listed under a different scientific name on the EPBC Act - Threatened Species list.Name Threatened Type of PresenceBirds
Common Sandpiper [59309] Species or species habitatknown to occur within area
Actitis hypoleucos
Fork-tailed Swift [678] Species or species habitatlikely to occur within area
Apus pacificus
Great Egret, White Egret [59541] Species or species habitatlikely to occur within area
Ardea alba
Cattle Egret [59542] Species or species habitatmay occur within area
Ardea ibis
Sharp-tailed Sandpiper [874] Species or species habitatknown to occur within area
Calidris acuminata
Curlew Sandpiper [856] Critically Endangered Species or species habitatmay occur within area
Calidris ferruginea
Pectoral Sandpiper [858] Species or species habitatmay occur within area
Calidris melanotos
Antipodean Albatross [64458] Vulnerable Species or species habitatlikely to occur within area
Diomedea antipodensis
Southern Royal Albatross [89221] Vulnerable Species or species habitatlikely to occur within area
Diomedea epomophora
Wandering Albatross [89223] Vulnerable Species or species habitatlikely to occur within area
Diomedea exulans
Gibson's Albatross [64466] Vulnerable* Species or species habitatlikely to occur within area
Diomedea gibsoni
Northern Royal Albatross [64456] Endangered Species or species habitatlikely to occur within area
Diomedea sanfordi
Latham's Snipe, Japanese Snipe [863] Species or species habitatmay occur within area
Gallinago hardwickii
White-bellied Sea-Eagle [943] Species or species habitatknown to occur within area
Haliaeetus leucogaster
White-throated Needletail [682] Species or species habitatknown to occur within area
Hirundapus caudacutus
Swift Parrot [744] Critically Endangered Species or species habitatmay occur within
Lathamus discolor
Other Matters Protected by the EPBC Act
Name Threatened Type of Presencearea
Bar-tailed Godwit [844] Species or species habitatlikely to occur within area
Limosa lapponica
Southern Giant-Petrel, Southern Giant Petrel [1060] Endangered Species or species habitatlikely to occur within area
Macronectes giganteus
Northern Giant Petrel [1061] Vulnerable Species or species habitatmay occur within area
Macronectes halli
Satin Flycatcher [612] Species or species habitatknown to occur within area
Myiagra cyanoleuca
Eastern Curlew, Far Eastern Curlew [847] Critically Endangered Species or species habitatmay occur within area
Numenius madagascariensis
Fairy Prion [1066] Species or species habitatlikely to occur within area
Pachyptila turtur
Buller's Albatross, Pacific Albatross [64460] Vulnerable Species or species habitatmay occur within area
Thalassarche bulleri
Tasmanian Shy Albatross [89224] Vulnerable* Species or species habitatlikely to occur within area
Thalassarche cauta
Grey-headed Albatross [66491] Endangered Species or species habitatmay occur within area
Thalassarche chrysostoma
Campbell Albatross, Campbell Black-browed Albatross[64459]
Vulnerable Species or species habitatlikely to occur within area
Thalassarche impavida
Black-browed Albatross [66472] Vulnerable Species or species habitatlikely to occur within area
Thalassarche melanophris
Salvin's Albatross [64463] Vulnerable Species or species habitatlikely to occur within area
Thalassarche salvini
Pacific Albatross [66511] Vulnerable* Species or species habitatmay occur within area
Thalassarche sp. nov.
White-capped Albatross [64462] Vulnerable* Species or species habitatlikely to occur within area
Thalassarche steadi
Common Greenshank, Greenshank [832] Species or species habitatmay occur within area
Tringa nebularia
Reptiles
Green Turtle [1765] Vulnerable Foraging, feeding or relatedbehaviour likely to occurwithin area
Chelonia mydas
State and Territory Reserves [ Resource Information ]Name StateTamar TAS
Regional Forest Agreements [ Resource Information ]
Note that all areas with completed RFAs have been included.
Name StateTasmania RFA Tasmania
Extra Information
Invasive Species [ Resource Information ]Weeds reported here are the 20 species of national significance (WoNS), along with other introduced plantsthat are considered by the States and Territories to pose a particularly significant threat to biodiversity. Thefollowing feral animals are reported: Goat, Red Fox, Cat, Rabbit, Pig, Water Buffalo and Cane Toad. Maps fromLandscape Health Project, National Land and Water Resouces Audit, 2001.
Name Status Type of PresenceBirds
Skylark [656] Species or species habitatlikely to occur within area
Alauda arvensis
Mallard [974] Species or species habitatlikely to occur within area
Anas platyrhynchos
European Goldfinch [403] Species or species habitatlikely to occur within area
Carduelis carduelis
European Greenfinch [404] Species or species habitatlikely to occur within area
Carduelis chloris
Rock Pigeon, Rock Dove, Domestic Pigeon [803] Species or species habitatlikely to occur within area
Columba livia
House Sparrow [405] Species or species habitatlikely to occur within area
Passer domesticus
Spotted Turtle-Dove [780] Species or species habitatlikely to occur within area
Streptopelia chinensis
Common Starling [389] Species or species habitatlikely to occur within area
Sturnus vulgaris
Common Blackbird, Eurasian Blackbird [596] Species or species habitatlikely to occur
Turdus merula
Name Status Type of Presencewithin area
Mammals
Domestic Cattle [16] Species or species habitatlikely to occur within area
Bos taurus
Domestic Dog [82654] Species or species habitatlikely to occur within area
Canis lupus familiaris
Goat [2] Species or species habitatlikely to occur within area
Capra hircus
Cat, House Cat, Domestic Cat [19] Species or species habitatlikely to occur within area
Felis catus
Feral deer species in Australia [85733] Species or species habitatlikely to occur within area
Feral deer
Brown Hare [127] Species or species habitatlikely to occur within area
Lepus capensis
House Mouse [120] Species or species habitatlikely to occur within area
Mus musculus
Rabbit, European Rabbit [128] Species or species habitatlikely to occur within area
Oryctolagus cuniculus
Brown Rat, Norway Rat [83] Species or species habitatlikely to occur within area
Rattus norvegicus
Black Rat, Ship Rat [84] Species or species habitatlikely to occur within area
Rattus rattus
Plants
Madeira Vine, Jalap, Lamb's-tail, Mignonette Vine,Anredera, Gulf Madeiravine, Heartleaf Madeiravine,Potato Vine [2643]
Species or species habitatlikely to occur within area
Anredera cordifolia
Bridal Creeper, Bridal Veil Creeper, Smilax, Florist'sSmilax, Smilax Asparagus [22473]
Species or species habitatlikely to occur within area
Asparagus asparagoides
Boneseed [16905] Species or species habitatlikely to occur within area
Chrysanthemoides monilifera subsp. monilifera
Broom, English Broom, Scotch Broom, CommonBroom, Scottish Broom, Spanish Broom [5934]
Species or species habitatlikely to occur within area
Cytisus scoparius
Montpellier Broom, Cape Broom, Canary Broom,Common Broom, French Broom, Soft Broom [20126]
Species or species habitatlikely to occur within area
Genista monspessulana
Blackberry, European Blackberry [68406] Species or species habitatlikely to occur within area
Rubus fruticosus aggregate
Willows except Weeping Willow, Pussy Willow andSterile Pussy Willow [68497]
Species or species habitatlikely to occur within area
Salix spp. except S.babylonica, S.x calodendron & S.x reichardtii
Gorse, Furze [7693] Species or speciesUlex europaeus
Name Status Type of Presencehabitat likely to occur withinarea
- non-threatened seabirds which have only been mapped for recorded breeding sites
- migratory species that are very widespread, vagrant, or only occur in small numbers
- some species and ecological communities that have only recently been listed
Not all species listed under the EPBC Act have been mapped (see below) and therefore a report is a general guide only. Where available datasupports mapping, the type of presence that can be determined from the data is indicated in general terms. People using this information in makinga referral may need to consider the qualifications below and may need to seek and consider other information sources.
For threatened ecological communities where the distribution is well known, maps are derived from recovery plans, State vegetation maps, remotesensing imagery and other sources. Where threatened ecological community distributions are less well known, existing vegetation maps and pointlocation data are used to produce indicative distribution maps.
- seals which have only been mapped for breeding sites near the Australian continent
Such breeding sites may be important for the protection of the Commonwealth Marine environment.
Threatened, migratory and marine species distributions have been derived through a variety of methods. Where distributions are well known and iftime permits, maps are derived using either thematic spatial data (i.e. vegetation, soils, geology, elevation, aspect, terrain, etc) together with pointlocations and described habitat; or environmental modelling (MAXENT or BIOCLIM habitat modelling) using point locations and environmental datalayers.
The information presented in this report has been provided by a range of data sources as acknowledged at the end of the report.Caveat
- migratory and
The following species and ecological communities have not been mapped and do not appear in reports produced from this database:
- marine
This report is designed to assist in identifying the locations of places which may be relevant in determining obligations under the EnvironmentProtection and Biodiversity Conservation Act 1999. It holds mapped locations of World and National Heritage properties, Wetlands of Internationaland National Importance, Commonwealth and State/Territory reserves, listed threatened, migratory and marine species and listed threatenedecological communities. Mapping of Commonwealth land is not complete at this stage. Maps have been collated from a range of sources at variousresolutions.
- threatened species listed as extinct or considered as vagrants
- some terrestrial species that overfly the Commonwealth marine area
The following groups have been mapped, but may not cover the complete distribution of the species:
Only selected species covered by the following provisions of the EPBC Act have been mapped:
Where very little information is available for species or large number of maps are required in a short time-frame, maps are derived either from 0.04or 0.02 decimal degree cells; by an automated process using polygon capture techniques (static two kilometre grid cells, alpha-hull and convex hull);or captured manually or by using topographic features (national park boundaries, islands, etc). In the early stages of the distribution mappingprocess (1999-early 2000s) distributions were defined by degree blocks, 100K or 250K map sheets to rapidly create distribution maps. More reliabledistribution mapping methods are used to update these distributions as time permits.
-41.41977 147.12547
Coordinates
-Environment and Planning Directorate, ACT-Birdlife Australia-Australian Bird and Bat Banding Scheme
-Department of Parks and Wildlife, Western Australia
Acknowledgements
-Office of Environment and Heritage, New South Wales
-Department of Primary Industries, Parks, Water and Environment, Tasmania
-Department of Land and Resource Management, Northern Territory-Department of Environmental and Heritage Protection, Queensland
-Department of Environment and Primary Industries, Victoria
-Australian National Wildlife Collection
-Department of Environment, Water and Natural Resources, South Australia
This database has been compiled from a range of data sources. The department acknowledges the followingcustodians who have contributed valuable data and advice:
-Australian Museum
-National Herbarium of NSW
Forestry Corporation, NSW-Australian Government, Department of Defence
-State Herbarium of South Australia
The Department is extremely grateful to the many organisations and individuals who provided expert adviceand information on numerous draft distributions.
-Natural history museums of Australia
-Queensland Museum
-Australian National Herbarium, Canberra
-Royal Botanic Gardens and National Herbarium of Victoria
-Geoscience Australia
-Ocean Biogeographic Information System
-Online Zoological Collections of Australian Museums-Queensland Herbarium
-Western Australian Herbarium
-Tasmanian Herbarium
-Northern Territory Herbarium
-South Australian Museum
-Museum Victoria
-University of New England
-CSIRO
-Other groups and individuals-Tasmanian Museum and Art Gallery, Hobart, Tasmania
-Museum and Art Gallery of the Northern Territory
-Reef Life Survey Australia-Australian Institute of Marine Science-Australian Government National Environmental Science Program
-Australian Tropical Herbarium, Cairns
-Australian Government – Australian Antarctic Data Centre
-Queen Victoria Museum and Art Gallery, Inveresk, Tasmania
-eBird Australia
-American Museum of Natural History
© Commonwealth of Australia
+61 2 6274 1111
Canberra ACT 2601 Australia
GPO Box 787
Department of the Environment
Please feel free to provide feedback via the Contact Us page.
transport | community | mining | industrial | food & beverage | energy
E: [email protected] W: www.pittsh.com.au
incorporated as Pitt & Sherry (Operations) Pty Ltd ABN 67 140 184 309
Brisbane Level 2 276 Edward Street Brisbane QLD 4000
T: (07) 3221 0080 F: (07) 3221 0083 Devonport Level 1
35 Oldaker Street PO Box 836 Devonport TAS 7310 T: (03) 6424 1641
F: (03) 6424 9215 Hobart 199 Macquarie Street
GPO Box 94 Hobart TAS 7001 T: (03) 6210 1400 F: (03) 6223 1299
Newcastle Level 1 81 Hunter Street
Newcastle NSW 2300 T: (02) 4910 3600
Sydney Suite 902, Level 9, 1-5 Railway Street Chatswood NSW 2067 PO Box 5487
West Chatswood NSW 1515 T: (02) 9468 9300
Launceston Level 4 113 Cimitiere Street
PO Box 1409 Launceston TAS 7250 T: (03) 6323 1900 F: (03) 6334 4651
Melbourne Level 1, HWT Tower 40 City Road
Southbank VIC 3006 PO Box 259 South Melbourne VIC 3205 T: (03) 9682 5290
F: (03) 9682 5292
Now part of the pitt&sherry group
Contact Leigh Knight [email protected] 0498 844 347