got migration? - oracle transportation...
TRANSCRIPT
Got Migration?Exploring the Migration Project Tool in the Context of an Oracle
Cloud Hosted Environment
www.egiusa.com
2 9/1/2015
A G E N D A
Introduction
Overview
Why Migrate?
Advantages/Disadvantages
Migration in the Cloud
3 9/1/2015
O V E RV I E W
AKA Promote to Prod
Configure in Dev.. How do we get this to Production?
How do we reduce the time needed to move around data?
4 9/1/2015
W H Y M I G R AT E ?
New Project Implementation
New Configuration
Master Data/Rate migration
5 9/1/2015
P R O M O T I O N PAT H
Dev Test Prod
Master Domain
• Can use a “Master Domain” to hold all approved configuration
• This can be on separate server
Dev
• Use for new configuration
• Can have multiple projects
Test
• Test new Configuration that was approved in Dev
• User acceptance testing
• Full end to end with Integration testing
Prod
• Only fully tested and approved configuration moved to Production
6 9/1/2015
W H AT M I G R AT I O N D O E S W E L L
Ease of Use
Migration Project Logging
Clear the Cache
Clear Results
Format Correction
Send Project to other Parties
Supported by Oracle
7 9/1/2015
S H O RT C O M I N G S
Download Issues
Additional Scripts Needed
Manager Layouts
Sequencing
Customizations
UI Limited to 1000 objects
9 9/1/2015
M I G R AT I O N I N T H E C L O U D
Initial Move to Production
Migration Project is Best Option
Lets You Move from Non-Cloud to the Production Cloud Environment
Limited Number of Projects for total Migration
10 9/1/2015
M I G R AT I O N I N T H E C L O U D
Upgrades and Monthly Patches
Upgrades Occurs Every 4 Months
Scheduled by Oracle
Regression testing
Any Configuration Associated with Upgrade/Patches Need to be Migrated
11 9/1/2015
C R E AT I N G A M I G R AT I O N P R O J E C T
Header
Project ID
Name
Description
Type
Manual Sequence
Commit Scope
Refresh Cache
Raise Lifetime Event
12 9/1/2015
C R E AT I N G A M I G R AT I O N P R O J E C T
Detail
Screen set ID
Transaction Code
Object
13 9/1/2015
E X P O RT I N GMigration Project Export
Notify Type
FTP
Contact Notification
File Format (.zop)
14 9/1/2015
I M P O RT I N G
Migration Project Import
File Format (.zip)
Tie to Import Migration Project
Action on Error (Stop/Continue)
Schedule
15 9/1/2015
O B J E C T S N O T H A N D L E D
Additional CSV’s Required
Regions
Equipment
Contacts
Business Monitors
ACR Role and Role Grants
User Access
16 9/1/2015
C O N C L U S I O N
Migration project offers a strong solution for moving data between environments
Ease of Use, Issue Identification and Correction
Not all Objects Supported
Room For Improvement