gorman neighbourhood structure plan lda16-0502 welcome ... · gorman neighbourhood structure plan...
TRANSCRIPT
CITY OF EDMONTON – Sustainable Development
WELCOME RESIDENTS
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
AGENDA & CONTACT INFO
CITY OF EDMONTON – Sustainable Development
City of EdmontonFile Planner Information
Sarah Ramey, File Planner
Planning Coordination SectionCity Planning BranchSustainable Development Department
Phone: 780.496.6214
Email: [email protected]
Registration and
Open House
Presentation
6:30 – 8:30 PM
7:00 PM
Tonight’s Agenda
Gorman Neighbourhood Structure PlanLDA16-0502
www.edmonton.ca/gormanneighbourhoodplan
Municipal Development Plan - The Way We Grow
Pilot Sound Area Redevelopment Plan
Edmonton Zoning Bylaw
PLANNING FRAMEWORK
CITY OF EDMONTON – Sustainable Development
MDP
ARP
ZONING
DEVELOPMENT PERMIT
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
CITY OF EDMONTON – Sustainable Development
LAND USE PLANNING STEPS
Gorman Neighbourhood Structure PlanLDA16-0502
Development& BuildingPermits
StrategicPlans, Policies& Guidelines
• Strategic Plans provide high
level objectives to guide
development of the entire City (ex.
Municipal Development Plan)
• Policies and Guidelines provide
further direction on how to achieve
objectives (ex. Winter City
Guidelines)
• A long-term plan for how a group
of neighbourhoods will develop
• Includes information on arterial
roads, major servicing and the
general location of land uses
Zoning &Subdivision &Servicing Agreements
• Zoning establishes development
rights including uses, building
heights, landscaping and parking
• Subdivision divides land into
smaller parcels
• Servicing Agreements identify
municipal improvements to be built
by the developer (sewers, water,
roads, etc.)
• Allows for the construction and
operation of new homes, buildings,
parks and facilities based on the
Edmonton Zoning Bylaw and the
Alberta Building Code.
WE AREHERE
Area Structure Plans
• A more detailed design of how a
neighbourhood will develop
• Includes information on staging,
collector roadways, infrastructure
and servicing, land uses and
population densities, parks and
schools
Neighbourhood Structure Plans
* Vic
toria T
rail
167
18
Str
ee
t153 Aveue
Utility Corridor
Canadia
n N
ational R
ailw
ay
S
Can
adia
n Nat
iona
l Rai
lway
Can
adia
n Nat
iona
l Rai
lway
The Orchardsat Ellerslie
91 S
T S
.W.
Summerside
Sum
mers
ide
Lin
k
SK-9
70 S
T.S
.W.
STANTONDR. SW
SUMMERSIDE GRANDE BLVD. SW
Parso
ns R
d.S
.W.
91 S
t.S.W
.
Gat
eway
Bo
ule
vard
88
ST
SW
SUMMDR
ERSIDE
Savaryn
PK-8
SK-9
PK 8
SK 9
Dr.
F
SW
30 Ave. S.
Rail
Lin
e
edmonton.ca/gormanneighbourhoodplan
REZONING PROCESS CHART
ApplicationReceived
Pre-Consultation
PublicMeeting
Draft BylawRecommendations
WE AREHERE
OPPORTUNITY FOR PUBLIC PARTICIPATION & INPUT
Notice ofPublic
Hearing
PublicHearing
Decisionby Council
Notice Sentto PropertyOwners &
Stakeholders
TechnicalReview by City Departments& Agencies
EvaluateInput
CITY OF EDMONTON – Sustainable Development
APPROXIMATELY 2-6 MONTH TIME FRAME FROM TODAY
(DEPENDANT ON INFORMATION PROVIDED FROM THE APPLICANT AND REVIEW TIME BY THE CITY)
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
CITY OF EDMONTON – Sustainable Development
EXISTING PILOT SOUND AREA STRUCTURE PLAN
Area Structure Plans (ASP) identify neighbourhoods and the location of residential
areas, parks, recreation centres, major roads, and storm facilities
Gorman Neighbourhood Structure PlanLDA16-0502
NE
171
sh
6
P
P
P
P
P
School/Park Site2 Residential Neighbourhood
Possible Collector Roadway
Storm Retention Pond
*
*
*
*
NE8091
NE
8096
NE8097pejh
sejh
pjh
pe
sejh
pejh
BYLAW 17491
N
1
5
23
4
FP
PP
P
P
P
P
P
P
P
Man
ning
Driv
e
50 S
T
66 S
T
Anthony Henday Drive
Transportation Utility Corridor Boundary
LittleMountainCemetery
Vic
toria
Tra
il
C.N
.R.
C.N
.R. P
ote
ntia
l F
utu
re A
cce
ss
Mannin
g D
rive
153 AVE
Powerline
SlovenianCanadian
Association
167 AVE
Evergreen MemorialGarden Cemetery
T
2 Residential Neighbourhood
Commercial
Community Commercial Site
Community Commercial (DC1)
Community Commercial (DC2)
Convenience Commercial
Industrial
Cemetery
Powerline Corridor
*
BYLAW 17491
APPROVED
PILOT SOUND
Area Structure Plan(as amended)
School/Park Site
District Park
Potential Pedestrian Overpass
Multi-Use Trail
Multi-Use Trail Access
Transit Oriented Development (Mixed Use)
Light Rail Transit (LRT) Station
Light Rail Transit (LRT)
T
SUSTAINABLE DEVELOPMENT
P
Man
ning
Driv
e
ransit Oriented Development (Mixed Use)
Possible Collector Roadway
Storm Retention Pond
Possible Future Storm Retention Pond
Natural Areas
Natural Area Management Plan
Fire Station
ASP Boundary
F
V T
edmonton.ca/gormanneighbourhoodplan
CITY OF EDMONTON – Sustainable Development
AERIAL MAP
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
PROPOSED NEIGHBOURHOOD STRUCTURE PLAN
CITY OF EDMONTON – Sustainable Development
*
Vriend L
ake
Vic
toria T
rail
34
Str
ee
t
167 Avenue
Mannin
g D
rive
18
Str
ee
t
153 Avenue
153 Aveue
167 Avenue
PROPOSED GORMAN
Neighbourhood Structure Plan (NSP)
TransportationUtility Corridor
Ca
na
dia
n N
atio
na
l R
ailw
ay
Anthony H
enday Drive
EBBERS
KIRKNESS FRASER
S
Can
adia
n Nat
iona
l Rai
lway
Can
adia
n Nat
iona
l Rai
lway
*
Low Density Residential
Medium Density Residential
High Density Residential
Commercial
Industrial
Transit Oriented Development (Mixed Use)
School/Park Site
Park
Institutional (Cemetary)
Natural Area
*
Wetlands/Stormwater Ponds
Light Rapid Transit/
CN Railway
LRT Station
Linear Park Connection
Proposed Neighbourhood Structure Plan Boundary
Proposed High School
Transportation Utility Corridor (Anthony Henday Drive)
S
18 S
treet
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
CITY OF EDMONTON – Sustainable Development
TRANSPORTATION NETWORK
Gorman Neighbourhood Structure PlanLDA16-0502
DRAFT
Victoria Trail
Manning Drive
Manning Drive
Manning Drive
34 Street
153 Avenue
167 Avenue
18 Street
Anthony H
enday Drive
CY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKERCY BECKER
BRITNELLLLBRITNELLBRITNEBRITNEBRITNEBRITNELLBRITNEBRITNEBRITNEBRITNE
EBBERSEBBE
KIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESSKIRKNESS FRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASERFRASER
200.0 m
400.0 m
Metre
0 500
Anthony Henday Drive
transportation utility corridor
LRT station
LRT line
Rail line
NSP boundary
Arterial roadway
Collector roadway
Shared use pathways
Pedestrian-oriented streets
Enhanced pedestrian crossings
On-street bike route
Future ETS routing
edmonton.ca/gormanneighbourhoodplan
• A future LRT stop, connecting from Clareview Station, and a temporary park and ride
• A Town Center, located around the LRT stop, with a mix of commercial and residential
development and an urban plaza
• A district park (big) in the west and a pocket park (small) in the east
• Space for a future community league building and high school
• Connecting greenways and pathways to support walking & biking
• A mix of housing types, from high rise apartments to single-detached homes
• Business industrial uses to the north
• A future population of approximately 8,200 people
CITY OF EDMONTON – Sustainable Development
GORMAN NSP HIGHLIGHTS
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan
CITY OF EDMONTON – Sustainable Development
After tonight’s open house:
• File Planner (Sarah Ramey) will send a summary of what we heard tonight, if
you supplied your email on the sign-in sheet
• Summary will also be sent to the Councillor and the Applicant
• You can contact the File Planner at any time
When the review is complete and the file can go to Council:
• You will recieve a notice about the Public Hearing
• You can attend council to register to speak in front of Council or listen online
NEXT STEPS
Gorman Neighbourhood Structure PlanLDA16-0502
edmonton.ca/gormanneighbourhoodplan