-gori no.1 reactor - rd20 · 10/4/2019  · microsoft powerpoint -...

13

Upload: others

Post on 07-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM
Page 2: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

2

- Gori No.1 Reactorpermanent shutdown

- Wolsung No.1 Reactorclosure

Demolished 3 old coal power plants

Other

SolarWind

Renewable energy supply (Q2 2018)

1.67GW of renewable energy as of Q2 2018, twice the amount in 2017

Page 3: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

3

Energy SecurityEffective management of primary energy & infra infrastructure reliability

Energy SecurityEffective management of primary energy & infra infrastructure reliability

Energy EquityAccessibility and price suitability of energyEnergy EquityAccessibility and price suitability of energy

Environmental SustainabilityNew & renewables low-carbon energy sourcesEnvironmental SustainabilityNew & renewables low-carbon energy sources

Environmental sustainability should be improved through increasing the portion of renewable energy

Energy Security

Energy EquityEnergy Sustainability

Page 4: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

4

Personnel : 570 employeesBudget : $161M

Page 5: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

5

Page 6: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

Urban BIPV1)

Salinity Electric Generation(RED)

Energy Plus Solar House

1) BIPV: Building Integrated Photo Voltaic

Urban Fuel Cell SystemHydrogen Production System

Renewable Energy Resource Map

Page 7: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

Clean Fuel Technology

Clean Power Generation Technology

GHGs Capture Technology

Supercritical CO2 Power Generation System

Battery, electrode active material

Ceramic Membrane for Oxygen Separation

Page 8: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

8

Total: $ 30 Million

Battery

Solar Power

Page 9: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

9

Page 10: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

10

(Korea) Manufacturing of Innovative 2D heterostructure materials (Harvard) Atomically well-defined manipulation & measurements

Theoretical design & Discovery

Large-scale novel 2D materials development

Electronic & optoelectronic devices

Energy storage & conversion devices

MoS2

Graphene

BN

BN

Solution-based exfoliation process

Fabrication of 2D heterostructures

Performance prediction modeling & Automatized platform

Atomically well-defined manipulation & measurements

Page 11: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

11

(Korea) CO2 capture, (USA) CO2 storage and conversion- Site : Colstrip PC power plant (2020~ )- Partners : Montana State University, Colstrip coal power plant, KIER

Demonstration on Samcheonpo coal power plant (Korea) (2019~)- Demonstration with the real power plant in Korea- Delivery from Korea to Montana, USA

Colstrip power plant

Coal Power Plant(Talen Energy)

CO2 Capture1 tCO2/d(KIER)

CO2 Storage(MSU)

This project

SamcheonpoPC Power plant1 tCO2/d(KIER)

(2017.1-2020.2)

(2020.3-2020.4)

(2019.10-2021.12)

Page 12: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

12

(Korea) COMB dry technology, (Indonesia) Biomass supply, operationDemonstration site (Indonesia) will be constructed for 1 village-1 Megawatt project

Pellets produced from lubber wood

Page 13: -Gori No.1 Reactor - RD20 · 10/4/2019  · Microsoft PowerPoint - 20191004_Presentation_File_RD20_Korea Author: SangjinChoi1 Created Date: 10/4/2019 4:49:45 PM

13

Thank You