golden quadrilateral road in india

5
Link: http://www.nhai.org/index.asp Chainage Chart of Corridor Delhi-Kolkata on NH 2 Status : 31st January, 2012 S.NO Stretch State Funded By NH Length (Km) Present Status Contractor & Nationality NH-2 : Delhi - Kolkatta 1 Delhi-Mathura km 0 - km 145 Delhi[12]/Haryana[74]/Uttar Pradesh[59] ADB 2 145 Completed MOSRTH through Haryana & UP PWD (IRCON) 2 Mathura - Agra km 145 - km 199 Uttar Pradesh JBIC 2 54 Completed MOSRTH through UP & Haryana PWD (ORIENTAL & PROGRESSIVE) 3 Agra-Shikohabad (GTRIP/I-A) km 199.66 - km 250.50 Uttar Pradesh WB 2 50.83 Under Implementati on Oriental Structural Engineers Pvt. Ltd.- Gammon India Ltd. (JV) Indian 4 Shikohabad-Etawah (GTRIP/I-B) km 250.5 - km 307.5 Uttar Pradesh WB 2 59.02 Completed Progressive Construction Ltd. Indian 5 Etawah Bypass km 307.5 - km 321.1 2 13.6 Completed PNC Construction Ltd Indian

Upload: ashok-kond

Post on 24-Apr-2015

30 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Golden Quadrilateral Road in India

Link: http://www.nhai.org/index.asp

Chainage Chart of Corridor Delhi-Kolkata on NH 2Status : 31st January, 2012

S.NOStretchStateFunded By

NH Length(Km)

Present Status

Contractor & Nationality

NH-2 : Delhi - Kolkatta

1 Delhi-Mathurakm 0 - km 145Delhi[12]/Haryana[74]/Uttar Pradesh[59]ADB

2 145 CompletedMOSRTH through Haryana & UP

PWD (IRCON)

2 Mathura - Agrakm 145 - km 199Uttar PradeshJBIC

2 54 CompletedMOSRTH through UP & Haryana

PWD (ORIENTAL & PROGRESSIVE)

3 Agra-Shikohabad (GTRIP/I-A)km 199.66 - km 250.50Uttar PradeshWB

2 50.83Under

Implementation

Oriental Structural Engineers Pvt. Ltd.- Gammon India Ltd. (JV)

Indian

4 Shikohabad-Etawah (GTRIP/I-B)km 250.5 - km 307.5Uttar PradeshWB

2 59.02 CompletedProgressive Construction Ltd.

Indian

5 Etawah Bypasskm 307.5 - km 321.1Uttar PradeshNHAI

2 13.6 CompletedPNC Construction Ltd

Indian

6 Etawah - Rajpur (GTRIP/I-C)km 321.1 - km 393Uttar Pradesh

2 72.825 Completed PATI - BEL (JV)Malaysian - Indian JV

Page 2: Golden Quadrilateral Road in India

WB

7 Sikandara-Bhaunti (TNHP/II-A)km 393 - km 470 through MDR route 16 km shorter.Uttar PradeshWB

2 62 CompletedIT Thai & Som Dutt Builders India

(JV)Thailand - Indian JV

8 Kanpur-Fatehpur (GTRIP/II-B)km 470 - 483(0) km 0 - km 38Uttar PradeshWB

2 51.5 CompletedSomdutt Builders- Nagarjuna

Construction Co. Ltd. - NEC (JV)Indian

9 Fatehpur - Khaga (TNHP/II-C)km 38 - km 115Uttar PradeshWB

2 77 CompletedCentrodorstroy Russia

Russian

10 Khaga - Kokhraj (TNHP/III-A)km 115 - km 158Uttar PradeshWB

2 43 CompletedIRCON International Ltd.

Indian

11 Allahabad Bypass Contract-I (Bridge)km 158 km - km 159.02Uttar PradeshWB

2 1.02 CompletedLarsen & Toubro Ltd.

Indian

12 Allahabad Bypass Contract-IIkm 158 km - km 198Uttar PradeshWB

2 38.987 CompletedHindustan Construction Company

Ltd.Indian

13 Allahabad Bypass Contract-IIIkm 198 km - km 242.708Uttar PradeshWB

2 44.708 Contract Terminiated

14 Handia - Varanasi (TNHP/III-C)km 245 - km 317Uttar PradeshWB

2 72 CompletedCentrodorstroy Russia

Russian

Page 3: Golden Quadrilateral Road in India

15 Varanasi - Mohania (GTRIP/IV-A)km 317 - 329(0) km 0 - km 65Uttar Pradesh[55]/Bihar[21]WB

2 76 CompletedProgressive Construction Ltd.-

Sunway Berhad (JV)Indian - Malaysian JV

16 Mohania - Sasaram (TNHP/IV-B)km 65 - km 110BiharWB

2 45 CompletedLG Engg. & Construction Ltd.

South Korean

17 Sasaram - Dehri on-sone (GTRIP/IV-C)km 110 - km 140BiharWB

2 30 CompletedSomdutt Builders- Nagarjuna

Construction Co. Ltd.(JV)Indian

18 Dehri - on-Sone - Aurangabad (TNHP/IV-D)km 140 - km 180BiharWB

2 40 CompletedSsangyong Korea - Oriental

Structural Engineers Pvt. Ltd.Korean - Indian JV

19 Aurangabad - Barachatti (TNHP/V-A)km 180 - km 240BiharWB

2 60 CompletedOriental Structural Engineers Pvt.

Ltd.- Gammon India Ltd. (JV)Indian

20 Barachatti - Gorhar (GTRIP/V-B)km 240 - km 320Bihar[10]/Jharkhand[70]WB

2 80 CompletedLarsen & Toubro Ltd. - Hindustan Construction Company Ltd. (JV)

Indian

21 Gorhar - Barwa Adda (TNHP/V-C)km 320 - km 398.75JharkhandWB

2 78.75 CompletedProgressive Construction Ltd.-

Sunway Berhad (JV)Indian - Malaysian JV

22 Barwa Adda - Barakarkm 398.75 - km 442JharkhandADB

2 43 CompletedBSC - RBM - PATI (JV)

Indian - Malaysian JV

23 2 33 Completed MOSRTH through WB PWD

Page 4: Golden Quadrilateral Road in India

Barakar - Raniganjkm 442 - km 475West BengalWB

24 Raniganj - Panagarhkm 475 - km 517West BengalADB

2 42 CompletedBSC - RBM - PATI (JV)

Indian - Malaysian JV

25 Panagarh - Palsitkm 517 - km 581West BengalAnnuity

2 64.457 CompletedGamuda Malaysia - WCT Malaysia

Malaysian

26 Palsit - Dankunikm 581 - km 646West BengalAnnuity

2 65 CompletedConsortium of Gomuda (Malaysia)

& WCT Engineering (Malaysia)Malaysian

27 Dankuni - NH-2/NH-6 Junction near Kolkata

West BengalMORTH

2 5 Completed MOSRTH

28 Vivekananda Bridge and Approach

West BengalBOT

2 6 Completed

SVBTG Consortium of Pacific Alliance Inc -PBIDC - STRADEC

Inc- CES & L & TUSA- Phillipines - India