gold investment symposium 2012 - company presentation - macphersons resources
DESCRIPTION
Morrie Goodz, Managing DirectorTRANSCRIPT
Corporate Update – Gold Symposium - Sydney
23 October 2012
Corporate Update – Gold Symposium – Sydney – October 2012
Cautionary Advice on Forward
Looking Statements The information contained in this presentation has been prepared by MacPhersons Resources Ltd (MRP).
This presentation is not an offer, invitation, solicitation or other recommendation with respect to the
subscription for, purchase or sale of any securities in MRP. This presentation has been made available for
information purposes only and does not constitute a prospectus, short form prospectus, profile statement or
offer information statement. This presentation is not subject to the disclosure requirements affecting
disclosure documents under Chapter 6D of the Corporations Act.
While the information contained in this presentation has been prepared in good faith, neither MRP nor any
of its directors, officers, employees, agents or advisors give any representation or warranty, express or
implied, as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. Accordingly, to the maximum extent permitted by law, none of
MRP, its directors, officers, employees, agents, advisers, nor any other person accepts any liability whether
direct or indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of the accuracy
or completeness of the information or for any of the opinions contained in this presentation or for any errors,
omissions or misstatements or for any loss, howsoever arising, from the use of this presentation.
This presentation may contain statements that may be deemed ‘forward looking statements’. Forward risks,
uncertainties and other factors, many of which are outside the control of MRP, can cause actual results to
differ materially from such statements. Such risks and uncertainties include, but are not limited to,
commodity price volatility, increased production costs and variances in ore grade recovery rates from those
assumed in mining plans, as well as political and operational risks and governmental regulation and judicial
outcomes. MRP makes no undertaking to update or revise such statements, but has made every endeavour
to ensure that they are fair and reasonable at the time of making the presentation.
Investors are cautioned that any forward looking statements are not guarantees of future performance and
that actual results or developments may differ materially from those projected in any forward looking
statements made.
Exploration targets are conceptual in nature and drilling may not convert these to resources.
2
Corporate Update – Gold Symposium – Sydney – October 2012
Strategic Achievements
3
What have we achieved in 12 mths? Silver, Gold & Zinc mine acquisition Silver/Gold mill acquisition/expansion 73,400m drilled; 352,880m in review
Silver Eq 0 12.5 Moz $340M
Gold 100 300 koz $320M
Zinc 0 35 kt $70M
Value added in 12 mths $730M 44% Return to Shareholders Exploration – Copper/nickel upside Gold Assets/Tenements increased 800% Operations Management Team Road to Production
Corporate Update – Gold Symposium – Sydney – October 2012 4
Kalgoorlie / SuperPit 100 Moz Gold Combined
Production / Resource
Corporate Update – Gold Symposium – Sydney – October 2012
Corporate
ASX Code: MRP
ASX Listed: 24 December 2010
Ordinary Shares: 239 million
Unlisted Options: 22 million
Market Cap: A$93m at 39 cents
Cash: A$16m
Debt: Nil
Projects
100% Nimbus Silver-Gold-Zinc VHMS
100% Boorara/Coolgardie Gold Assets
Substantial Shareholders
Directors/Management: 37%
RK Mine Finance: 8.5%
5
XSO
MRP
Experienced Management Team
6
Chairman (Executive)
Ashok Parekh
BBus, FCA, AIMM, FTIA
Chartered Accountant
33 years experience
Coordinates assets for IPOs
Managing Director (Executive)
Morrie Goodz
MSc (Mining Geo), MBA, FAIMM
Cert Mine Manager
Geologist – 34 years experience
Discovered/designed 4 decline mines
Non-Executive Director
Jeffrey Williams
BSc (Mining Eng), MBA, FAIMM
Mining Engineer – 39 yrs experience
Founder – Mineral Deposits (MDL)
Company Secretary
Stephen Hewitt-Dutton
BBus, CA, SA Fin
Chartered Acct – 18 years experience
Specialist – Mergers & Acquisitions
Operations Management
Ron Ellis
BSc (Mining Eng)
Cert Mine Manager
25 years experience
Manager of Operating Mines
Mining Advisor
Ray Wright
Cert Mine Manager
45 years experience
Owner/Operator of 4 producing mines
Corporate Update – Gold Symposium – Sydney – October 2012 7
Nimbus Historical Production Tonnes: 318,992 tonnes Average Grade: 352 g/t silver Production: 3.6 Moz silver Operating Cost: $6.54 / oz Average Sell Price: $9.07 / oz
Cost Metrics: Reduce Labour/Energy by 50-70%
2012 Price: $27-$37 / oz = up 300 - 400% 12.5 Moz Silver Eq* & 34,300 tonnes Zinc 9 additional Ag and polymetallic deposits
Corporate Update – Gold Symposium – Sydney – October 2012
Nimbus Video / New Gold Zone 54g/t Au
8
1
2
3
4
5
28m @ 896g/t Ag
73,400m Drilled This Year
6
Corporate Update – Gold Symposium – Sydney – October 2012
New Lens 4 and 54g/t Gold Intercept
9
2m @ 54.3g/t Au
Discovery Pit
Ag – Zn Lens 4
2m @ 54.3g/t Au
from 40m depth
Extension to the Western
Domain (Lens 4)
Quartz vein association
Separate from breccia
associated Ag-rich
mineralisation (Lens 4)
Within a wide Ag-bearing
alteration halo
6m @ 120g/t Ag 8m @ 82g/t Ag
Corporate Update – Gold Symposium – Sydney – October 2012 10
1
Corporate Update – Gold Symposium – Sydney – October 2012
Grade is King – Recent Intersections
Sulphide intercepts include:
28m @ 896g/t Ag in NBRC216 from 200m;
o Includes 17.0m @ 1427g/t Ag plus 26.3% Zn and 4.7% Pb from 205m;
o Includes 11.0m @ 1666g/t Ag from 205m;
29m @ 202g/t Ag-Eq* (139g/t Ag plus Credits) in NBRC203 from 176m;
o Includes 9.0m @ 328g/t Ag and 7.9% Zn from 177m;
o Includes 5.0m @ 164g/t Ag from 200m;
7m @ 561g/t Ag-Eq (400g/t Ag plus Credits) in NBRC202 from 196m;
o Includes 7m @ 400g/t Ag and 8.7% zinc from 196m;
Oxide intercepts include:
9m @ 302g/t Ag-Eq (258g/t Ag plus Credits) in NBRC178 from 81m;
6m @ 120g/t Ag in NBRC168 from 27m depth;
8m @ 82g/t Ag in NBRC196 from 51m depth;
19m @ 93g/t Ag in NBRC078 from 14m depth;
11
Corporate Update – Gold Symposium – Sydney – October 2012
NBDH009 Confirmation & Extension
12
14m Zone of
Massive and
Matrix Primary
Mineralisation
50m beneath zone
28m @ 896g/t Ag
in NBRC216
(already 80m DD)
130m Total Depth
Extension
Gold-bearing Quartz Mineralisation adjacent to Lens 4 and 30m below NBRC033 intersection of 2m @ 54 g/t gold (downhole quartz zone thickness 11m in NBDH008)
Lens 4 Silver – Zinc zone from oxide through Transitional to Primary Sulphide Zone both Hanging wall and Footwall of Gold Zone (downhole thickness 47m).
New hole - NBDH008
Corporate Update – Gold Symposium – Sydney – October 2012
14
Massive Sulphides with grades up to DSO - 3200g/t Ag, 41% Zn, 14% Pb
14
Corporate Update – Gold Symposium – Sydney – October 2012
15
What Does Silver Highgrade Mean?
15
Today’s Sale Price/oz $33 Current MRP Pit Optimisation Cost Price/oz $10 Net Margin 70% $23 Target Production (2014-2015) 2Mozpa Target Margin on current model/spot price $46M
Corporate Update – Gold Symposium – Sydney – October 2012
16
Pit No. 1 (Discovery) - drilled to 3rd June 12 Opportunities - 9 deposits - 50 lenses
16
JORC Compliant Minerals Resource 12.5Moz Ag-Aq Mineral Resource Tonnes Grade Grade Ounces Ounces
Category (g/t Ag) (g/t Ag-Eq*) Ag Ag-Eq*
Measured 142,000 65 76 0.30Moz 0.35Moz
Indicated 1,053,000 123 158 4.16Moz 5.36Moz
Inferred 1,597,000 110 131 5.63Moz 6.75Moz
TOTAL 2,792,000 112 139 10.1Moz 12.5Moz
& 34,300 tonnes Zn, Au-Hg-Cu-Pb Credits
* Silver Equivalent - discounted to represent recoverable equivalent of silver ounces
3
6 Discovery
East
Corporate Update – Gold Symposium – Sydney – October 2012
17
Future Resource Growth
17
-260m RL
5 28m @ 896g/t Ag
6
3
2m @ 54.3g/t Gold
Corporate Update – Gold Symposium – Sydney – October 2012
Existing Nimbus Process Plant
Pregnant Leach Liquor
Crushing Plant
ROM Stockpile
Stockpile Clarification
Filtration
Smelting
Vacuum Deaeration
Solid / Liquid Separation Ball Mill
Leaching
Nimbus Historical Production Tonnes: 318,992 tonnes
Average Grade: 352 g/t silver
Production: 3.6 Moz silver
Operating Cost: 6.4/oz
Average Sell Price: $9.07/oz
2012 Price: $27-$37/oz
12.5Moz Silver Eq* & 34.3KT Zinc
9 additional Ag & Polymetallic deposits
Key Projects Met test work (oxide,
transition, sulphides)
Process water
TSF 3
Mill construction
Permitting TSF 3 Works approval – DEC
Mining proposal – DMP
Native vegetation
clearing permit - DMP
Process Flowsheet
Corporate Update – Gold Symposium – Sydney – October 2012
19
Target – Leading Silver Producer
19
2013
– Mill Expansion
– 480ktpa
2014
– Sulphide Plant
– Zinc Concentrate
P r o d u c t i o n T a r g e t
2 0 1 2 T a r g e t 2 0 1 3 T a r g e t 2 0 1 4 T a r g e t 2 0 1 5 T a r g e t
0 . 5
1 . 0
1 . 5
2 . 0
2 . 5
F u t u r e y e a r s
Corporate Update – Gold Symposium – Sydney – October 2012
20
Pit Optimisation Studies
20
5
Discovery
East
Corporate Update – Gold Symposium – Sydney – October 2012
21
Nimbus Exploration Potential
21
Q1 2013
Cu
Cu
Cu
Cu
Corporate Update – Gold Symposium – Sydney – October 2012
22
Silver Resource Target
22
T a r g e t R e s o u r c e
5
1 0
J u n - 1 1 D e c - 1 1 M a r - 1 2 M a y - 1 2 J u l y - 1 2 2 0 1 2 T a r g e t R a n g e
F u t u r e Y e a r s
1 5
2 0
2 5
R e s o u r c e T a r g e t
Corporate Update – Gold Symposium – Sydney – October 2012
Exploration Upside
Maiden silver resource – Nimbus
main zone – 6 lenses being drilled
4 VHMS lenses at Nimbus
(not yet classified)
9 other silver-zinc prospects
2012 – drillout of Nimbus
2012 – JORC resource updates
Nimbus and Coolgardie
2012 – commence drillout of
Boorara gold and adjacent lenses
2013 – commence drillout of other
silver deposits
23
Corporate Update – Gold Symposium – Sydney – October 2012 24
Boorara Gold Project – 2km from Mill
Corporate Update – Gold Symposium – Sydney – October 2012
25
Boorara Proposed Open Pit
25
Corporate Update – Gold Symposium – Sydney – October 2012
Coolgardie Gold Project
Coolgardie Gold Projects
50% upgrade in gold
resources (>1.7g/t)
MacPhersons Pit 1
optimisation – 76,000oz
Tycho Pit 1 optimisation
– 43,000oz
A-Cap Deeps Discovery
100% increase in
tenement holding
Nickel Projects
26
Corporate Update – Gold Symposium – Sydney – October 2012
Target Plan to Production
Nimbus Silver-Gold-Zinc Mines
New Merrill Crowe Expansion – 2013
Pit cutbacks and tailings processing
10 Massive Sulphide lenses at Nimbus
9 other Silver-Zinc deposits on tenements
Boorara – Coolgardie Gold Projects
Multiple deposits on Boorara – Kanowna shear zones
MacPhersons Optimised Pits and A-Cap Deeps
Tycho pit optimisation and mine plan in progress
27
Corporate Update – Gold Symposium – Sydney – October 2012
Strategic Achievements
28
What have we achieved in 12 mths? Silver, Gold & Zinc mine acquisition Silver/Gold mill acquisition/expansion 73,400m drilled; 352,880m in review
Silver Eq 0 12.5 Moz $340M
Gold 100 300 koz $320M
Zinc 0 35 kt $70M
Value added in 12 mths $730M 44% Return to Shareholders Exploration – Copper/Nickel upside Gold Assets/Tenements increased 800% Operations Management Team Road to Production
Corporate Update – Gold Symposium – Sydney – October 2012
Key Assets – Points of Difference
Grade is King
Move to Producer
Polymetallic
Silver - Gold - Zinc
29
www.MRPresources.com.au
ASX: MRP
Price: 39 cents Mkt Cap: A$93m Nimbus Silver Bars
Corporate Update – Gold Symposium – Sydney – October 2012
Competent Person Statement
The information in this presentation that relates to mineral resources and
exploration results is based on information compiled by Mr Morrie Goodz,
who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr
Morrie Goodz is a full time officer of MacPhersons Resources Ltd and has
sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration, and to the activity which he is
undertaking, to qualify as a Competent Person as defined in the 2004
edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Goodz has given his consent
to the inclusion in this presentation of the matters based on the
information in the form and context in which it appears.
30