gold investing 60% roi

9
Company LOGO High yield-low risk Investment Opportunity in Pre- sold Gold commodities trading contracts. This is by far one of the best investment opportunities that you will ever see in your life. Where else can you earn over 50% annualized return with virtually zero risk to capital. Unfortunately, availability of these contracts is limited and total investment is presently capped at $1,000,000.

Upload: ccapilla

Post on 23-Jun-2015

464 views

Category:

Economy & Finance


0 download

DESCRIPTION

Now accepeting waiting list for future membership openings for Gold Investors Club 60% ROI

TRANSCRIPT

Page 1: Gold Investing 60% Roi

Company

LOGO

High yield-low risk Investment Opportunity in Pre-sold Gold commodities trading contracts.

This is by far one of the best investment opportunities that you will ever see in your life. Where else can you earn over 50% annualized return with virtually zero risk to capital. Unfortunately, availability of these contracts is limited and total investment is presently capped at $1,000,000.

Page 2: Gold Investing 60% Roi

Company

LOGO

Pre-sold Gold commodities contracts involves virtually no risk due to pre-negotiated sell price.

Executive Summary:

This transaction is arranged by purchasing gold directly from directly through CVG-Minerven (the government agency in charge of gold exports in Venezuela). Our sister companies in that country have been registered with CVG-Minerven and have established a very close working relationship with high level officials at CVG. This presents us with the unique opportunity toobtain “Mining Direct Pricing”. Now in most parts of the world, buying directly from the mine would most typically generate a discount of approximately 3% to 5% and even at these discounts we could have a viable business model.

However, due to the currency exchange controls that have been imposed by the Chavez government and the existence of a “Parallel Currency Market” , an economic anomaly exist in the Venezuelan gold market that has enabled us to negotiate prices that result in discounts as high as 7.5% to 10% below the London Fix pricing on any given day. Combined this with our ability to “lock in” pre-determined sell prices with our refinery partners (this works like a PUT in stocks) and it is easy to see how this can become so lucrative. The only other risk factors involved were the quality of the product and the logistics and security of transporting the gold to the refinery. Both these issues have been overcome by contracting Insured Armored Car Services to transport the gold. We have also adopted internationally established procedures for Fire Assay Testing and Tamper proof security for the gold which will be explained in greater detail in the remainder of this presentation. The bottom line to keep in mind is that you as an investor can make over 50% annualized return with virtually no risk.

Page 3: Gold Investing 60% Roi

Overview

1. PROCESS MAP 1. PROCESS MAP

2. QUALITY ASSURANCE PROCEDURES2. QUALITY ASSURANCE PROCEDURES

3. Step by Step Transaction Details3. Step by Step Transaction Details

4. FINANCIAL PROJECTIONS4. FINANCIAL PROJECTIONS

Page 4: Gold Investing 60% Roi

INVESTORJOINS CLUB

GOLD ISSOURCED

BUY PRICEIS LOCKEDSELL PRICEIS LOCKED

Samples are taken for

Testing & AU place in

TamperproofBags

Wiretransferpayment made

and Security Co.insures AU untildelivery to the

refinery.The refinery

Advances 90%of the their priceand settles theother 10% in

5 days.

Project Manager will be on-site throughout

the entire process.

PROCESS MAPPROCESS MAP

Page 5: Gold Investing 60% Roi

Step 3Step 3

Once the wireOnce the wire--transfer has beentransfer has been

confirmed the gold then becomesconfirmed the gold then becomes

the responsibility of the the responsibility of the insuredinsured

armored car service until the pointarmored car service until the pointthat they deliver the gold safely tothat they deliver the gold safely to

our refinery they are on the hook forour refinery they are on the hook forthe entire the entire ““Full Market ValueFull Market Value”” of the of the

entire shipment. This means that entire shipment. This means that if there is any problem whatsoif there is any problem whatso--

ever they will cover, not only our ever they will cover, not only our purchase price, but also our profit.purchase price, but also our profit.Additional QC procedure imposedAdditional QC procedure imposed

by armored service include placingby armored service include placingtheir security seals on their security seals on TPBTPB’’ss and aand a

portable lockbox to secure the goldportable lockbox to secure the goldduring transport. Upon delivery to reduring transport. Upon delivery to re

--finery, our project manager will walkfinery, our project manager will walk

the gold through assaying process.the gold through assaying process.

QUALITY ASSURANCE PROCEDURES

Step 2Step 2

If the Fire Assay results areIf the Fire Assay results are

satisfactory to the buyer thensatisfactory to the buyer thenthe seller is to produce the T.the seller is to produce the T.

P.B.P.B.’’s in which the gold barss in which the gold barsthat were originally sampledthat were originally sampled

are stored. The buyer will then are stored. The buyer will then inspect all of the bags and theinspect all of the bags and thesecurity tape used to determinesecurity tape used to determine

if there is any possible evidence if there is any possible evidence of tampering. Note that the of tampering. Note that the TPB.sTPB.s

(Tamper Proof Bags) used where (Tamper Proof Bags) used where especially designed for these typesespecially designed for these typesof transactions and that it would beof transactions and that it would be

impossible for any tampering to beimpossible for any tampering to beable to go undetected. Also, this able to go undetected. Also, this

inspection would be done in theinspection would be done in thepresence of the security company.presence of the security company.

Step 1Step 1

Miners Gold bars are drilledMiners Gold bars are drilled

in random spots to obtain ain random spots to obtain across section of samples forcross section of samples for

the entire batch and are thenthe entire batch and are then

placed in tamper proof bagsplaced in tamper proof bags

which are then taken to thewhich are then taken to the

nearest metallurgic laboratorynearest metallurgic laboratoryto undergo to undergo ““Fire Assay TestFire Assay Test””

The gold bars are also put inThe gold bars are also put in

tamper proof bags and thentamper proof bags and then

put into a safe which remainsput into a safe which remains

in the sellers possession until in the sellers possession until the results of the fire assay isthe results of the fire assay is

received and the results arereceived and the results are

satisfactory to the buyersatisfactory to the buyer. .

Page 6: Gold Investing 60% Roi

Step by Step Transaction Details

Fire Assay testing is the most accurate test

available for determining the quality of a sample of gold. This method is able

to measure purity to within 2/10,000 of 1%

Once the result of the fire assay test are verified

the escrow agent orders final payment to the

seller and AU possession is given to

ACS (Armored Car Service).

456

ACS transports the Gold from POP to POS while fully insuring the value of our shipment. Also, they

will handle all import / export procedures in both countries. ACS has over $10M liability insurance.

Investor Funds Escrow Account and we tap our sources in the field to

send us offers and pricing for various quantities of gold

Offers are quickly analyzed to determine if an adequate spread is available. We contact

our refinery partners and negotiate a 5 day “Price Lock” for the amount we wish to sell the refinery.

Samples are collected for Assay testing and the Gold is secured in TPB’s

and placed in a vault.

1 2 3

Page 7: Gold Investing 60% Roi

Step by Step Transaction Details

Due to the remote nature of some of these mines it is sometimes necessary to

transport the gold by helicopter. However, the

additional cost is outweighed by the much lower prices

available in those locations.

7

ACS delivers the gold to our refinery partner. The

elapsed time from the price lock date is

between 48 to 72 hours, This allow us a 40%

margin for error on time.

8

The refinery completes an initial assay of the gold and

advances 90% of the “Locked in Sell price”, at

which time we can begin a new purchase cycle thus

achieving a weekly rollover.

9

The refining process is completed within 5

business days at which time we receive our final

from the refinery.

Within 48 hours of the final payment the

investors receive their portions of profits which will be like having your

money giving you a weekly paycheck.

1011

At any point prior to STEP 9 the investor may notify the company of their intent to

withdraw their funds from the program. If the investor has participated for less than1 month that shall forfeit any profit for the current cycle.

1260% Annualized

ROI

Page 8: Gold Investing 60% Roi

FINANCIAL PROJECTIONSFINANCIAL PROJECTIONS

PARTICULARS Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12

No. of Kilos of Au available 30 35 40 45 50 55 60 65 70 70 70 70

Price Per Kilo of AU $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275 $21,275

Total Cost of Gold $638,250 $744,625 $851,000 $957,375 $1,063,750 $1,170,125 $1,276,500 $1,382,875 $1,489,250 $1,489,250 $1,489,250 $1,489,250

PROJECTED TOTAL INCOME

Sale of Refined Gold $682,928 $796,749 $910,570 $1,024,391 $1,138,213 $1,252,034 $1,365,855 $1,479,676 $1,593,498 $1,593,498 $1,593,498 $1,593,498

TOTAL INCOME $682,928 $796,749 $910,570 $1,024,391 $1,138,213 $1,252,034 $1,365,855 $1,479,676 $1,593,498 $1,593,498 $1,593,498 $1,593,498

PROJECTED OPERATING EXPENSES

Variable of Insurance (.5%) & Refining (1%) = 1.5% total $9,574 $11,169 $12,765 $14,361 $15,956 $17,552 $19,148 $20,743 $22,339 $22,339 $22,339 $22,339

Transportation and Security Cost $10,300 $10,350 $10,400 $10,450 $10,500 $10,550 $10,600 $10,650 $10,700 $10,700 $10,700 $10,700

Travel and Misc. Expenses. $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750 $2,750

Government Duty Taxes / Export Permits 1.5% $9,574 $11,169 $12,765 $14,361 $15,956 $17,552 $19,148 $20,743 $22,339 $22,339 $22,339 $22,339

TOTAL OPERATING EXPENSES $32,198 $35,439 $38,680 $41,921 $45,163 $48,404 $51,645 $54,886 $58,128 $58,128 $58,128 $58,128

NET INCOME $12,480 $16,685 $20,890 $25,095 $29,300 $33,505 $37,710 $41,915 $46,120 $46,120 $46,120 $46,120

MONTHLY ROI CALCULATIONS MONTH 1 MONTH 2 MONTH 3

TOTAL INCOME $75,150 $142,430 $180,275

INVESTOR SHARE @ 60% ROI $39,891 $61,166 $74,463

INVESTOR SHARE AT 25% OF PROFITS $18,788 $35,608 $45,069

BROKER COMMISSIONS 10% OF GROSS PROFITS $7,515 $14,243 $18,028

Company Gross before Venezuela Payouts $27,744 $67,021 $87,785

Phase 1

PROJECTED PROFITABILITY ANALYSIS - 90 Days

Page 9: Gold Investing 60% Roi

FINANCIAL PROJECTIONSFINANCIAL PROJECTIONS

Assumptions

•Our suppliers will consistently be able to deliver gold to us with a margin of no less than 7% FOB Mining Operation.

•Insurance for Shipments will be billed at .5% of Value.

•Transport cost from POP (Point Of Purchase) to POS (Point Of Sale) will average $10,000 in worse case helicopter scenario + $10 per Kilo.

•Available quantities will be limited to 30 Kilos per week for the first 30 days then rising to 50 Kilos for 30 days then topping off at 70 Kilos per week.

•Margin account at the refinery must have at least 10% of the amount we wish to negotiate "Price Lock" for, (only valid for up to contract weight amount. )

•Refinery will pay 99% of SPOT PRICE based on the second London fixed for the 5 business day period following the lock-in.

•The investor will receive no compensation for monies deposited into the escrow account unless a transaction is consummated.

•Assay test can verify purity to 99.997% and pricing will be based on 99.9% to be safe.

•Elapsed time from Price Lock to delivery should not exceed 72 hours.

•In the event that unforeseen delays cause us to loose a lock price, the company would any profits to first cover expenses, then pay investors prior to receiving any retained earnings.

•With the current logistical plan we should be able to turn the escrow account over a minimum over once per week.

•Investors will be paid the greater of 25% of the profits according to their pro-rata share of the investment or a 60% Annualized ROI.

•Company shall be responsible for all incidental expenses if a deal does not close.

•ACHIEVING A 15 DAY ROLLOVER STILL GENERATES MORE THAN 30% ANNUALIZED ROI!