goal : setup and monitor “chambers” with resolution of < 200 m demonstrate system redundancy...

13
Goal : Setup and monitor “chambers” with resolution of < 200 m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate Analog Sensors (Temp, Proximity) Analysis : 5000+ Events Taken 1500+ Events Reconstructed Test of EMU ISR System June-Sept 2000 at CERN ISR Tunnel

Upload: rudolph-blair

Post on 04-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Goal : • Setup and monitor “chambers” with

resolution of < 200 m• Demonstrate System RedundancyTest Setup :• 1 SLM Line• 1 Transfer Line • 1 Transfer Plate• Analog Sensors (Temp, Proximity)Analysis :• 5000+ Events Taken• 1500+ Events Reconstructed

Conclusions are not final … … but we are

close !

Test of EMU ISR SystemJune-Sept 2000 at CERN ISR Tunnel

Page 2: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Assumptions :• Sensors et2, et3, and es10 are known• Transfer Plate definition is defined• Rotations of sensors are known within error limits of photogrammetry

Prototype Test SetupJune-Sept 2000 at CERN ISR Tunnel

Page 3: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

SLM Line (Laser 302) Results of COCOA Reconstruction for July/August and September Runs Using es10 as the Final Reference Sensor

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

SLM Line (Laser 303) Results of COCOA Reconstruction for

July/August and September Runs Using es10 as the Final

Reference Sensor

COCOA Reconstruction Results(ISR Test Results – es10 Reference)

Page 4: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

SLM Line (Laser 302) Results of COCOA Reconstruction for July/August and September Runs Using es9 as the Final Reference Sensor

SLM Line (Laser 303) Results of COCOA Reconstruction for July/August and September Runs Using es9 as the Final Reference Sensor

COCOA Reconstruction Results(ISR Test Results – es9 Reconstruction)

Page 5: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Sample September Laser 302 Results (1 sensor)

Sample September Laser 303 Results (1 sensor)

COCOA Reconstruction Results(ISR Test Results – es9 Reconstruction)

Page 6: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Note :• Large survey errors

• 60 m local 120 m global• ~ 220 m Systematic Errors• < 15 m Statistical Errors

General Conclusions : • 4 CCD measurements on

reference Sensors are critical• Reconstruction is roughly

independent of laser choice (within error)

• Reconstruction is independent of laser motions

COCOA Reconstruction ResultsGeneral Remarks

Page 7: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Distribution of raw CCD means in es4 during the July/August Run. Jump of 30 pixels = 420m

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Distribution of COCOA Reconstructed location of es4 in the ISR hall during the July/August Run. (y = 10 m, z = 8 m)

Conclusion : Shift in Laser not seen in Reconstruction

30 pixels

COCOA Reconstruction Results(Laser Independence)

Page 8: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

COCOA Reconstruction ResultsThoughts on COCOA

• Comparison of COCOA Results to ‘Hand Calculations’– We have verified operation in simple

EMU type systems to < 100 m– We cannot verify in ISR EMU system

to <400 m (rotations, calibration errors, transfer plate errors)

• Evidence of COCOA Accuracy– Prediction of et3 dowel location direct

from PG agrees within 10 m from CERN PG group determination

– Prediction of et1-es1 separation on Transfer Plate within 30 m of CMM determination (full EMU simulation)

• Concerns– Convergence of fit to local minima

(false solutions)– Degenerate rotations possible

Page 9: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

COCOA Reconstruction ResultsThe Bottom Line (March 2001)

• We can demonstrate reconstruction of sensor positions within 220 m of CERN PG

• We can make redundant measurements

• Real CMS Data Can Be Better Than March 2001 Results– 3 CCDs only on Reference Sensors

(4 CCDs improve results)– Calibration Errors larger than expected,

no calibration prior to installation (better results with better calibration)

– More Constraints on COCOA Fits (Calibrated X-Hair Laser, Inclinometer

Data on Transfer Plate)

Page 10: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Extra Slides

Page 11: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

Title:

Creator:ROOT Version2.24/04Preview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.

Sample September Laser 302 Results (1 sensor)

Sample September Laser 303 Results (1 sensor)

COCOA Reconstruction Results (ISR Test Results)

Page 12: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

FLAP takes raw data and finds centroid of chargedistribution in each CCD

Laser Instability : CDD centroids were found to‘jump’. Problem can be traced to laser diode.

COCOA Reconstruction Results(Laser Independence)

Page 13: Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate

FLAP Fitting RoutinesCCD Peaks in es9 from laser 302 …

CCD Peaks in es9 from laser 303 taken immediately after laser 302 data…