goal 1: acquire a mutual and better understanding of the funding systems of nuclear physics...
TRANSCRIPT
Goal 1 acquire a mutual and better understanding of the Funding systems of nuclear physics infrastructures and associated equipments in Europe that is needed for future collaborations
The communication between administrators in Europe needs to be intensified in order to effectively develop infrastructures of a fully European scope
Goal 2 Propose a set of joint trans-national activitiesa set of joint trans-national activities (based on the science priorities set in the Long range Plan of NuPECC)that can be launched by Funding Agencies thanks to the NuPNET coordination
Goal 3 Launch one or more of those proposed joint trans-national activities in the field of nuclear physics Infrastructures
Goal 4 Provide Europe with a sustainable scheme beyond the project duration
ERANET FP7 NuPNETERANET FP7 NuPNET
Sydney GALES (CNRSIN2P3)
Task leaders (CNRSIN2P3 I Reinhart GSIBMBF AB INFN J Benlliure (MEC)
NuPECCNuPECC
Kick-off meeting (Paris March 27 2008)
The Governing Council (18 institutions) representing the beneficiaries was present
NuPECC Brian Fulton and Gabriele-Elisabeth Koumlrner
Maria Douka from the Directorate General of Research of European Commission
Project Officer in Brussels Bernard Salanon
Meeting of the coordination Committee (Meeting of the coordination Committee (Frankfurt on May 19 2008)Frankfurt on May 19 2008)
Coordinators of WP (Irene Reinhart AB J Benlliure) + Nupnet Manager (S Gales and Dorotheacutee Peitzmann )+ S Harissopulos GSRT Greece Ioan Ursu IFIN-HH Romania
On the Agenda
Discussion on the preparation of the web-page Communication and electronic tools (by Ioan Ursu IFIN-HH)
Discussion on the preparation of the questonnaire necessary for the exchange of information
To be noted Definition and launching of joint transnational activities depends on the results of exchange of information
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
WP1 Management and transfer activity (+ communication and support tools)
WP2 Exchange of information
WP3 Definition of Joint transnational activities
WP4 Launching of Joint transnational activities
Sydney GALES NuPNET EC coordinatorSydney GALES NuPNET EC coordinator
QuestionnaireQuestionnaire
bull It will take into account the workquestionnaires done by other ERA-NETs such as Astronet and Aspera to elaborate a proper one for NuPNET Some members of NuPNET also adhere to or are in touch with these ERA-NETs which will prove helpful
bull CC members + IFIN-HH + GSRT to test it in June 2008
Deliverable D21 Census of existing funding programmes m12 (Feb 2009)
Concerning the definition of Nuclear Physics1048782 The definition indicated in NuPECCs Long-Range Plan will be used
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
Sydney GALES (CNRSIN2P3)
Task leaders (CNRSIN2P3 I Reinhart GSIBMBF AB INFN J Benlliure (MEC)
NuPECCNuPECC
Kick-off meeting (Paris March 27 2008)
The Governing Council (18 institutions) representing the beneficiaries was present
NuPECC Brian Fulton and Gabriele-Elisabeth Koumlrner
Maria Douka from the Directorate General of Research of European Commission
Project Officer in Brussels Bernard Salanon
Meeting of the coordination Committee (Meeting of the coordination Committee (Frankfurt on May 19 2008)Frankfurt on May 19 2008)
Coordinators of WP (Irene Reinhart AB J Benlliure) + Nupnet Manager (S Gales and Dorotheacutee Peitzmann )+ S Harissopulos GSRT Greece Ioan Ursu IFIN-HH Romania
On the Agenda
Discussion on the preparation of the web-page Communication and electronic tools (by Ioan Ursu IFIN-HH)
Discussion on the preparation of the questonnaire necessary for the exchange of information
To be noted Definition and launching of joint transnational activities depends on the results of exchange of information
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
WP1 Management and transfer activity (+ communication and support tools)
WP2 Exchange of information
WP3 Definition of Joint transnational activities
WP4 Launching of Joint transnational activities
Sydney GALES NuPNET EC coordinatorSydney GALES NuPNET EC coordinator
QuestionnaireQuestionnaire
bull It will take into account the workquestionnaires done by other ERA-NETs such as Astronet and Aspera to elaborate a proper one for NuPNET Some members of NuPNET also adhere to or are in touch with these ERA-NETs which will prove helpful
bull CC members + IFIN-HH + GSRT to test it in June 2008
Deliverable D21 Census of existing funding programmes m12 (Feb 2009)
Concerning the definition of Nuclear Physics1048782 The definition indicated in NuPECCs Long-Range Plan will be used
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
Meeting of the coordination Committee (Meeting of the coordination Committee (Frankfurt on May 19 2008)Frankfurt on May 19 2008)
Coordinators of WP (Irene Reinhart AB J Benlliure) + Nupnet Manager (S Gales and Dorotheacutee Peitzmann )+ S Harissopulos GSRT Greece Ioan Ursu IFIN-HH Romania
On the Agenda
Discussion on the preparation of the web-page Communication and electronic tools (by Ioan Ursu IFIN-HH)
Discussion on the preparation of the questonnaire necessary for the exchange of information
To be noted Definition and launching of joint transnational activities depends on the results of exchange of information
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
WP1 Management and transfer activity (+ communication and support tools)
WP2 Exchange of information
WP3 Definition of Joint transnational activities
WP4 Launching of Joint transnational activities
Sydney GALES NuPNET EC coordinatorSydney GALES NuPNET EC coordinator
QuestionnaireQuestionnaire
bull It will take into account the workquestionnaires done by other ERA-NETs such as Astronet and Aspera to elaborate a proper one for NuPNET Some members of NuPNET also adhere to or are in touch with these ERA-NETs which will prove helpful
bull CC members + IFIN-HH + GSRT to test it in June 2008
Deliverable D21 Census of existing funding programmes m12 (Feb 2009)
Concerning the definition of Nuclear Physics1048782 The definition indicated in NuPECCs Long-Range Plan will be used
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
The Work plan of NuPNET follows the general ERANET scheme and applies a three step approach
It involves a grant of euro 13 millionDorotheacutee Peitzmann is the co-ordination manager of NuPNET
WP1 Management and transfer activity (+ communication and support tools)
WP2 Exchange of information
WP3 Definition of Joint transnational activities
WP4 Launching of Joint transnational activities
Sydney GALES NuPNET EC coordinatorSydney GALES NuPNET EC coordinator
QuestionnaireQuestionnaire
bull It will take into account the workquestionnaires done by other ERA-NETs such as Astronet and Aspera to elaborate a proper one for NuPNET Some members of NuPNET also adhere to or are in touch with these ERA-NETs which will prove helpful
bull CC members + IFIN-HH + GSRT to test it in June 2008
Deliverable D21 Census of existing funding programmes m12 (Feb 2009)
Concerning the definition of Nuclear Physics1048782 The definition indicated in NuPECCs Long-Range Plan will be used
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
QuestionnaireQuestionnaire
bull It will take into account the workquestionnaires done by other ERA-NETs such as Astronet and Aspera to elaborate a proper one for NuPNET Some members of NuPNET also adhere to or are in touch with these ERA-NETs which will prove helpful
bull CC members + IFIN-HH + GSRT to test it in June 2008
Deliverable D21 Census of existing funding programmes m12 (Feb 2009)
Concerning the definition of Nuclear Physics1048782 The definition indicated in NuPECCs Long-Range Plan will be used
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
Actions for documents and FinancesActions for documents and Finances
The assembly (Governing Council) decided that the NuPNET management should propose a draft Consortium Agreement in April 2008
The EC confirmed to send a draft Grant Agreement to CNRSIN2P3
June 2008 - Signature of the Grant Agreement by CNRSIN2P3
- Signature of the Grant Agreement by CNRSIN2P3- Transmission of the signed originals to the EC and a copy to the beneficiaries- Signature of the Grant Agreement by the EC- Transmission of the Form A by CNRSIN2P3 to the 17 beneficiaries- Form A signed by each NuPNET beneficiary to be received by CNRSIN2P3 JulyAugust 2008 The pre-financing is expected to be perceived at CNRSIN2P3
August 2008 Planned distribution of the pre-financing amount by CNRSIN2P3 to those NuPNET beneficiaries who have signed and returned the Form A
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
DATES of Next meetings
1st meeting of the Governing CouncilDate of the meeting 13 October 2008Place MadridDraft agenda To be sent in JulyAugust
The next meeting of the CC will take place in Germany on October 31st 2008
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-
Kick-Off Meeting (Paris) march 27-2008
Maria Douka (MD) highlighted the role of the EC as a facilitator to develop a European vision of research infrastructure rather than being the main stakeholder
ERA-NETs is a political wish of funding agenciesof the countries involved to coordinate their actions and policies on specific topics
Research Infrastructures are part of the Capacities programme under the FP7 They have a budget of euro 1715 million whereas the total FP7 budget is about euro 50521 million The budget for RI is decided by the Council of Ministers
- Slide 1
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
-