![Page 1: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/1.jpg)
National Validation Forum
Control Strategy
John Montalto
![Page 2: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/2.jpg)
Linking ICH Q8, Q9 and Q10 to develop a control strategy
Identify all quality attributes based on current process
and product understanding
Risk assessments – identify Critical Quality Attributes
(CQAs)
Control Strategy – design, develop and implement
Continual improvement
Dynamic process as product knowledge and process understanding increase
![Page 3: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/3.jpg)
Control Strategy – what’s important?
![Page 4: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/4.jpg)
Risk assessment – identify Critical Quality Attributes (CQAs)
Appearance Performance Comfort Stopping Heating/
Cooling Transmission
Severity (impact on quality)
L H L H L L
Probability (risk likelihood)
L M M
M
L M
Detectability H M H
M
H H
Total L H L
H
L L
![Page 5: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/5.jpg)
Risk assessment – identify CQAs
Appearance Performance Comfort Stopping Heating/ Cooling
Transmission
Colour
Brake assembly
Acceleration
Suspension
Seat covering
Tyres
Fuel type
![Page 6: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/6.jpg)
Developing Control Strategy
Stopping
Brake assembly
Stopping
Vehicle gradually stops by application of a foot peddle at 10m/s/s
Control Strategy
Qualification of manufacturing equipment
Assembly Process Validation
Control Strategy
Raw materials, lubricants and oils
Feedback systems
Maintenance Life Plans - Brake pressure switch calibration, inspection regime, anchor bolts, return springs, adjustor screws
![Page 7: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/7.jpg)
Validation context
![Page 8: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/8.jpg)
What is Control Strategy?
“It is everything that we do already to control the process to produce acceptable quality product”
• A great starting point for validation
![Page 9: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/9.jpg)
An ongoing process
Jacques Morenas, PIC/S Chair, April 2011
“While design space is optional, Control Strategy is never optional”
![Page 10: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/10.jpg)
An ongoing process
ICH Q10 The Pharmaceutical Quality System
“Management review should provide assurance that process performance and product quality
are managed over the lifecycle.”
![Page 11: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/11.jpg)
CQA and CPP
• A CQA is a physical, chemical, biological, or microbiological property or characteristic that should be within an appropriate limit, range, or distribution to ensure the desired product quality
• Drug substance, excipients, intermediates
Critical Quality Attribute
• A process parameter whose variability has an impact on a critical quality attribute and therefore should be monitored or controlled to ensure the process produces the desired quality
Critical Process Parameter
![Page 12: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/12.jpg)
Knowledge
• Product understanding is required to design the process
• CQAs define the process
Product
Process
![Page 13: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/13.jpg)
Quality Risk Management
Product knowledge drives Process development
Develop Control Strategy
Continual improvement
![Page 14: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/14.jpg)
An ongoing process
Annex 15, PIC/S Guide to Good Manufacturing Practice for Medicinal Products Annexes, January, 2009
“It is a requirement of GMP that manufacturers identify what validation work is needed to prove control of the critical aspects of their particular
operations.”
![Page 15: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/15.jpg)
Control Strategy
• Planned set of controls
• Derived from current product and process understanding
– Assurance of process performance and product quality
![Page 16: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/16.jpg)
Control Strategy is not…
Is NOT a new concept
Your products and processes already have control strategies
Control Strategy Is NOT just a list
of specifications for QC testing requirements
Control Strategy
Is NOT optional
Control Strategy
![Page 17: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/17.jpg)
Implement Control Strategy
• Every process and product has an associated control strategy:
– Overall strategy for a product
– Discrete control strategy for an operation
![Page 18: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/18.jpg)
Various approaches
Control strategy approaches
• In-process testing
• Real time release testing
• End-product testing
Localised Control strategy approaches
• Controls on raw and starting material attributes, intermediates and reagents
• Sequence of purification steps
• Order of addition of reagents
• Training and personnel matters
• Gowning and clean room behaviours
![Page 19: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/19.jpg)
Batch release
• Control Strategy and batch release decisions are separate
• Control Strategy is not the only consideration when batch release decisions are determined
![Page 20: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/20.jpg)
Establish, document, implement, maintain
Change management
Knowledge management
Process understanding and experience
Product knowledge development and technology transfer
Dim
inish
ing va
riable
s
![Page 21: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/21.jpg)
Traditional approach
• Emphasis on end-product testing
• Operating ranges set on observed process data
– Generally narrow target range
– Process capability (or lack of capability)
![Page 22: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/22.jpg)
In process approach
• In process determination that a CQA is within an appropriate range or limit
• A high degree of Assurance
– Documented evidence
• In the not so distant future
– Process Analytical Technologies (PAT)
– Real Time Release Testing (RTRT)
![Page 23: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/23.jpg)
What’s your perspective?
Industry Regulators
Analytical testing sensitivity Has risk been adequately identified and controlled?
Equipment limitations Quality Management System adequacy to support the Control Strategy
Cost Locally, compliance with Annex 15
![Page 24: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/24.jpg)
Summary
• Product Quality and Process Performance Monitoring:
– Ensure a state of control is maintained (control inter and intra batch variability)
– Plan and execute a system for monitoring CQAs and CPPs
![Page 25: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/25.jpg)
Summary
Use QRM to establish Control Strategy
Control Strategy facilitates timely feedback/feed forward and appropriate CAPA
Provide tools for measurement and analysis of parameters and attributes within Control Strategy
Identify sources of variation affecting process performance and product quality – focus continuous improvement here
Use internal and external feedback
Provide and manage knowledge to enhance process understanding
1
2
3
4
5
6
![Page 26: GMP Training Synopsis · “Management review should provide assurance ... Equipment limitations Quality Management System adequacy to support the Control Strategy Cost Locally, compliance](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e73c06109b00f232c61f16a/html5/thumbnails/26.jpg)
National Validation Forum
Any answers?
John Montalto