End Show Architect: Ottolini Booth & Associates eGM - 475 Brannan Street - San Francisco, CA. The design strategy focused on the client's objective to create a space that gave visitors an immediate feeling of entering a cutting-edge technology company. General Motors Corporation recently launched its e-commerce division in San Francisco.

Upload: btharp

Post on 25-Dec-2014

327 views

Category:

Documents


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: GM San Francisco, CA

End Show

Architect: Ottolini Booth & Associates eGM - 475 Brannan Street - San Francisco, CA.

The design strategy focused on the client's objective to create a space that gave visitors an immediate feeling of entering a cutting-edge technology company.

General Motors Corporation recently launched its e-commerce division in San Francisco.

Page 2: GM San Francisco, CA

End Show

eGM - 475 Brannan Street - San Francisco, CA.

MobileCompany Name Title Address Phone # Phone # Fax # E-Mail Address

General Motors Corp. Mike Wick 248-797-0140eGM 313-556-4956

Parsons Brinckerhoff Patricia Ryan Project Coordinator 2nd Flr - 480-101-210 810-986-8876 810-459-8302 810-986-5272 [email protected] Services 6250 Chicago Road 810-947-1622

Warren, MI. 48090-9020

Ottolini & Booth Stephanie Hubbard 415-777-0768 [email protected]

OP Contract, Inc.400 Second Street Ann Marie Project Manager 1983 A Davis Street 510-383-3630 415-716-6579San Francisco, CA 94107 Chris Harris Project Manager San Leandro, CA 94577 510-430-0621 415-716-9280 510-639-3499 [email protected] 415 974 1677Fax 415 974 5930 Warehouse 1983 A Davis Street

San Leandro, CA 94577Bodkins& Assoc. Noel Bodkins 616-949-8845(Davis Webb) Chris

TracyContract Source Group Frank Bonner 2384 Franklin Rd 248-745-9990 248-745-9994Nienkamper Bloomfield Hills, MI

Patricia Reid 416-298-5700 416-298-9535Swinerton & Walberg John Biale Project Manager 415-495-0414 415-730-5217 415-495-0484Gerneral Contractor Bill Green Project Superintendent

Maryanne Chille Administrator

Clover Technologies Mark Katchever Systems Engineering One Clover Ct 248-449-4797 800-253-0395 248-449-9900 [email protected] Wixom, MI 48393 www.clover.com

Project Structure Mike Wick

Patricia Ryan

Sherri Carter

Chris Harris

David Daugherty

YaShan Young Bruce Tharp

General Motors

FMG

FMG

FMG

FMG

OP

PB

FMG resources are organized as cross functional teams which serve to align all members focus on client objectives.

Page 3: GM San Francisco, CA

End Show

Open Office Area (Room No. 302) •  (47) 6’-0” x 6’-6” Workstations -

•  Panel height to allow “visual management”

•  Single B/B/F Pedestal

•  Workstation to accommodate (1) LAN Line for Lap Top Computer and (1) Telephone)

•  Allow for Collaborative Work Environment

•  Hoteling Situations

•  Task Lighting

•  (47) Ergonomic Task Chairs

•  (7) Round Teaming Tables w/ Castered Chairs

Project Rooms (Room Nos. 312, 313, 315, 316) •  Lounge type furniture – “Fun, Functional, Flexible”

•  Casual, collaborative setting

•  Credenza for Storage

•  Small, moveable side tables

•  Round, low work tables, possibly with electrical and tele/data hook-up

File/Reading Room (Room No. 306) •  Lounge type furniture – “Fun, Functional, Flexible”

•  Casual, collaborative setting

•  Credenza for Storage

•  Magazine Storage

•  CD/Media Storage

•  Round, low work tables, possibly with electrical and tele/data hook-up

3rd Floor

Galley •  Stools

•  (3) Round Tables w/ chairs

Terrace •  (4) Round Outdoor Dining Tables w/ seating

eGM - 475 Brannan Street - San Francisco, CA.

Needs Assessment

Page 4: GM San Francisco, CA

End Show

eGM - 475 Brannan Street - San Francisco, CA.

Manufacturer and Furnishings Evaluation

Passage Desking System

Aeron Chair Meridian Storage

Page 5: GM San Francisco, CA

End Show

eGM - 475 Brannan Street - San Francisco, CA.

Furniture Layout

eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits.

3rd Floor West

Furniture Specifications

Typical Workstation Cluster

Drawing & Specification Development

Page 6: GM San Francisco, CA

End Show

eGM - 475 Brannan Street - San Francisco, CA.

Furniture Layout

Typical Workstation Cluster

eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits.

4th Floor East

Furniture Specifications

Drawing & Specification Development

Page 7: GM San Francisco, CA

End Show

Furniture Layout

eGM provided the programming data and building shell and FMG developed workstation typicals and conducted furniture layout test fits.

4th Floor West

eGM - 475 Brannan Street - San Francisco, CA.

Typical Workstation Cluster

Furniture Specifications

Drawing & Specification Development

Page 8: GM San Francisco, CA

End Show

Room MFGNumber Cat Qty Part Number Part Description Unit Sell $ Total Sell $

3/20/01 Lead Time 12 WeeksRevised Proposal: BT41001-002

Project Room NIEK 2 V100/2CC Vox Vista Shaped Table - V shape - 160-15/16"L x 60-111 1/16"W x 28 1/2"H $12,658.25 $25,316.50312 & 316 With 13" Partial Modesty Panel

In Line Book Match Venner 15% Up $1,898.74 $3,797.48Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Drawing End Pieces: Champagne01.119.3 Edge Detail: Facet Edge

10 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $5,445.00Project Room NIEK 4 20810/2 Vox Table - Wave Shape - 120"W x 48"D x 28-1/2"H $3,113.00 $12,452.00

313 & 315 Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Vendor Conf Rms Drawing End Pieces: Champagne413 & 414 01.119.0 Edge Detail: Facet Edge

8 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $4,356.00Project Room NIEK 1 VA200/2 VOX Arena Shaped Table - 192"W x 97-13/16"D x 28-1/2"H $12,111.00 $12,111.00

314 With 13" Partial Modesty PanelIn Line Book Match Venner 15% Up $1,816.65 $1,816.65Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Drawing End Pieces: Champagne01.119.4 Edge Detail: Facet Edge

3 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $1,633.50Vendor NIEK 2 24724/2 VOX Arenea Shaped Table - 192"W x 120"D x 28-1/2"H $17,374.50 $34,749.00

Conference Rm With 13" Partial Modesty PanelIn Line Book Match Venner 15% Up $2,606.18 $5,212.35

412 & 415 Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Drawing End Pieces: Champagne01.119.1 Edge Detail: Facet Edge

16 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $8,712.00Main NIEK 1 27423/2 VOX Arenea Shaped Table - 132"W x 144"D x 28-1/2"H $11,720.50 $11,720.50

Conference Rm With 13" Partial Modesty PanelIn Line Book Match Venner 15% Up Charge $1,758.08 $1,758.08

416 Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Drawing End Pieces: Champagne01.118.0 Edge Detail: Facet Edge With Natural Figured Anagre - 15% Up Charge $1,758.08 $1,758.08

3 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $1,633.50Main NIEK 1 VA100/2 VOX Arenea Shaped Table - 284-9/16"W x 339-11/16"D x 28-1/2"H $23,273.25 $23,273.25

Conference Rm With 13" Partial Modesty PanelIn Line Book Match Venner 15% Up Charge $3,490.99 $3,490.99

416 Top Finish: Dark MahoganyBase Finish: Dark Mahogany

Drawing End Pieces: Champagne01.118.0 Edge Detail: Facet Edge With Natural Figured Anagre - 15% Up Charge $3,490.99 $3,490.99

8 Custom Custom VOX Forum Faceplate - 2 data, 1 voice, 2 power - Amp Terminations? $544.50 $4,356.00

475 Brannan StSan Francisco, CA

Zone 1, 2 & 3 Nienkamper Tables Proposal

eGM - 475 Brannan Street - San Francisco, CA.

Document Preparation and Acquisition Once basic agreements with the selected manufacturers have been made, we will:  

-  Verify pre-negotiated discounts against product

specifications.

- Submit final purchase orders for client approval.

- Prepare and release orders.

-  Coordinate the acquisition of the furniture and

accessories.

- Coordinate payments.

-  Administer manufacturer pricing and

warranty agreements.

Product Warranty

Manufacturers

Page 9: GM San Francisco, CA

End Show

Issue Date: 3/2/2001 Revised: April 23, 2001Vendor

GM MFR MFR Order Vendor Ship ShipPhase Location MFG. Description Rel. # QUOTE P.O. # Date Ack. # Date To

Current OrdersZone 1 3rd Floor

HMISeating Caper Seating SC-egm-001-R1 44-2101387-1 2/9/2001 225574 5/29/2001 SiteSeating Aeron Seating SC-egm-001-R1 44-2101387-1 2/9/2001 225574 5/29/2001 Site

Meridian Desks, Screens, Electrical & Files SC-egm-001-R1 34-23540-2 2/20/2001 2298340 5/21/2001 Site

Zone 2 4th FloorHMI

Seating Caper Seating SC-egm-002 4/23/2001 SiteSeating Aeron Seating SC-egm-002 4/23/2001 Site

Meridian Desks, Screens, Electrical & Files SC-egm-002 4/23/2001 Site

Outstanding Proposals

Proposal Location Description Status

btegmz1 Zone 1,2 &3 Davis Webb Seating PO Release # Pending

bt41001-002 Zone 1,2 &3 Nienkamper Tables PO Release # Pending

Outstanding Issues

Phase Location Description Status

Zone 3 HMI, Meridian

eGM - 475 Brannan Street - San Francisco, CA.

Document Preparation and Acquisition

Page 10: GM San Francisco, CA

End Show

eGM - 475 Brannan Street - San Francisco, CA.

Delivery Scheduling

- Create a master schedule and critical path plan.

 

- Develop phasing plans to match your occupancy dates.

 

- Issue status reports to keep you advised of progress and to ensure that production and shipping dates are on schedule.