ISMT E-200 Trends in Enterprise Information Systems. GLOCO – Integrated Corporate Portal Final Presentation Presented by Team 3. Problem Statement. ISMT E-200 Trends in Enterprise Information Systems. - PowerPoint PPT PresentationTRANSCRIPT
1
GLOCO – Integrated Corporate Portal Final Presentation
Presented by Team 3
Team 3 Members: Joyce TorresKenneth KittredgePamela FisherRuzhena SaltiskyVishal Nath
Instructor:
Teaching Assistants:
Zoya Kinstler
Basem NeseimValar Jayaprakash
ISMT E-200 Trends in Enterprise Information Systems
2
ISMT E-200 Trends in Enterprise Information Systems
1. GLOCO’s acquisition of companies has resulted in an IT infrastructure that is maintaining multiple independent systems.
2. There are duplicate applications and services.
3. Employees currently must access multiple portals to perform their work.
4. GLOCO needs to provide a single access point to reduce costs and improve employee productivity.
Problem Statement
3
Business Requirements
ISMT E-200 Trends in Enterprise Information Systems
1. All GLOCO applications will be accessible through a single place, the portal
2. A single login will reduce the number of user ids and passwords
3. A user-configurable interface will present applications to user groups
4. Blogs, wikis and RSS feeds will provide employees with social-networking capabilities.
5. A Travel Search application, email and Order Management System will be accessible on the portal.
4
Scope
ISMT E-200 Trends in Enterprise Information Systems
The implementation of the portal will include the following:1. Implementation of the
Oracle WebCenter Suite• User configuration• Security Configuration
2. Configuration of WebCenter Services and WebCenter Spaces
3. Portalization of GLOCO applications currently in use, such as• Order Management System• Travel Search application• Microsoft Outlook• Timecard System, etc.
4. Training materials designed for the end user community.
Year 1
Year 2
Year 3
Year 4
Year 5
($1,000,000)
($500,000)
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
ROI Mapped Over 5 Years
5
AS-IS
ISMT E-200 Trends in Enterprise Information Systems
6
Architectural Approach
ISMT E-200 Trends in Enterprise Information Systems
7
TO-BE Process
ISMT E-200 Trends in Enterprise Information Systems
8
Security Structure
Web Security Layers (Source: Oracle)
How a Policy Grants Access to a Resource (Source: Oracle)
ISMT E-200 Trends in Enterprise Information Systems
9
Risk and Mitigation Risk 1: The owners of legacy
applications may have a difficult time accepting the perceived loss of their applications
Mitigation: The applications need to be manage by the same group that managed them before
Risk 2: Managing change is a crucial part of any transition
Mitigation: A training program on portal use will be instituted prior to, during, and after implementation to ease the users transition
ISMT E-200 Trends in Enterprise Information Systems
Risk 3: Delay in the response from the applications via WebCenter
Mitigation: Move applications and databases into corporate datacenter. And, use AJAX (or similar technologies) in application development
Risk 4: Security on the portal is a major concern
Mitigation: WebCenter’s robust security model mitigates the security risk
Risk 5: Delays by either GLOCO or A2TI could affect the timeline
Mitigation: Weekly meetings will enable the team to monitor progress and communicate concerns
10
The Travel Application
XML Query Sent
XML Response
QPX Airfare
Shopping & Pricing
Engine
ISMT E-200 Trends in Enterprise Information Systems
11
Deployment Process
ISMT E-200 Trends in Enterprise Information Systems
Install WebCenter & Setup Portals
•Portalize Applications
•Move all Applications to the Corporate Application Farm
•Set Up User Email
•Set Up Divisional Portals
Training
•Provide Training to End Users
•Provide Training to Support Staff
•Support Staff Complete Oracle University Training
Pilot Deployment
•Pilot Groups from Each Division •Incidents Reported to GLOCO Help Desk•A2TI Responds to Incidents
Full Deployment
•Incidents Reported to GLOCO Help Desk•A2TI and GLOCO Respond to Incidents
Warranty Period
•Incidents Reported to GLOCO Help Desk•A2TI and GLOCO Respond to Incidents
12
Operational Considerations
ISMT E-200 Trends in Enterprise Information Systems
1. Post production support is the responsibility of the GLOCO IT Operations department
2. Development support will remain with the existing development teams
3. Enhancement requests and incidents will be submitted to GLOCO’s internal ticketing system
4. Emergency fixes will be prioritized by the affected development and business leadership
5. Tickets can be opened at helpdesk intranet site or by sending them an email
13
ISMT E-200 Trends in Enterprise Information Systems
Prototype - My Gloco
14
Training
ISMT E-200 Trends in Enterprise Information Systems
•Online Training• Animated WebCenter Suite demonstration modules
topics• Navigation• use of blogs, wiki’s, RSS, group spaces• Search• collaboration tools• Configuration process•Modules available online prior to production•Help desk will be established simultaneously with
model• Employees will updated and notified about training and
timeline for implementation • Onsite training for programmers at corporate
headquarters
15
Success Metrics
ISMT E-200 Trends in Enterprise Information Systems
The introduction of portal will provide measurable benefits to GLOCO.
1. Applications will see a 100% adoption rate in the first year (assumption: all other access to migrated applications is removed)By tracking user visits to each page Web Center Analytics helps determine • portal adoption• application use• collaboration rates
2. Decrease in overall operation cost• Number of application can be consolidated
• Timesheet• Email
• Eventual reduction of IT support
16
Prototype - Gloco Common->Portal Management
ISMT E-200 Trends in Enterprise Information Systems
17