global design effort main linac technology system kick-off meeting cavity summary 20 sept 2007 desy...
DESCRIPTION
Global Design Effort Fermilab GDE Meeting Please prepare & post parallel session agenda! At the Fermilab GDE meeting there will be 2 hours of closing plenary presentation for these critical systems. –ACD R & D and its goals/achievements The role of XFEL in the ILC; The differences –focus on difficult/complex issues (the kick off meeting discussions) Compatibility Interface specification Validation New initiatives, cost reduction, ?TRANSCRIPT
![Page 1: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/1.jpg)
Global Design Effort
Main Linac TechnologySystem Kick-off Meeting
CavitySummary
20 Sept 2007DESYMarc Ross
![Page 2: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/2.jpg)
Global Design Effort
Cavity Kick-off Meeting
• 2 SCRF EDR Kick Off meetings: – Cryomodule & Cryomodule– Cavity – production, processing and
integration• Hosted by KEK and DESY
– (Thanks!)
![Page 3: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/3.jpg)
Global Design Effort
Fermilab GDE Meeting 22-26.10
• Please prepare & post parallel session agenda!• At the Fermilab GDE meeting there will be 2 hours of
closing plenary presentation for these critical systems. – ACD R & D and its goals/achievements
• The role of XFEL in the ILC;• The differences
– focus on difficult/complex issues• (the kick off meeting discussions)• Compatibility• Interface specification• Validation• New initiatives, cost reduction, ?
![Page 4: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/4.jpg)
Global Design Effort
Findings from this meeting - integration
• It should be possible to construct a CM with a choice of key components from different suppliers – (also a linac, also a cavity assembly)– ‘plug compatibility’Develop a schematic plan for how this would be managed
• There are valid reasons to explore this possibility, even while retaining a ‘unified design’ goal– New shapes, cost cutting List these reasons and develop supporting arguments
• Definition – requires interface and performance specificationsDevelop mechanics, and actual specifications to enable
• Some of the interface and performance specifications require development– ‘reliability’ and ‘maintainability’Identify ‘difficult’ specifications and draft
![Page 5: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/5.jpg)
Global Design Effort
Findings – ‘S0’
• Gradient R & D remains top priorityReview the justification for this priority, and its
impact• DESY ‘production’ 4 results represent the
largest systematically prepared set of cavities to date– (to be published SRF 07)– Encouraging and stimulating resultsReview and summarize these results for basis of
coming work
![Page 6: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/6.jpg)
Global Design Effort
Findings – ‘S0’• Taken together with US and KEK ’07 results,
we have substantial, new, information to guide EDR R &D– Field emission generally reduced!How should the program take this into account
• US and KEK cavity processing and testing capacity is coming online in late 07/early 08.What is planned for commissioning and initial
program• Steady progress in diagnostics and analysis
of cavity processing and interior surfaceReview and summarize these developments;
prioritize directions
![Page 7: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/7.jpg)
Global Design Effort
Findings - Organizational
• A preliminary functional WBS exists and appears appropriateComplete this using project format (to be
delivered!)• The ‘down-selection’ process effort appears
to be includedDevelop an example such process
• Validation tests are expected to be time consuming and may be ‘critical path’– Time for new R & D initiatives?Develop and recommend a testing plan
![Page 8: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/8.jpg)
Global Design Effort
Findings - Industrialization
• XFEL Production plan, based on in-kind contributions from EU, is nearing maturity– Very exciting start for the project and for new
infrastructure (SACLAY)Review this plan and summarize strategic
implementation• Substantial opportunities for mutually
beneficial activities– But this will take ongoing discussions and
effortPlan for these discussions - schedule
![Page 9: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/9.jpg)
Global Design Effort
Findings - Industrialization
• Lessons for ILC mass production are valid, even with design differencesEvaluate ‘plug-compatibility’ suggestions v/v
industrialization plan• Design differences are interesting and should
be discussedThis should be part of the upcoming GDE /
collab meetings
![Page 10: Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross](https://reader036.vdocuments.us/reader036/viewer/2022082602/5a4d1b937f8b9ab0599c25a2/html5/thumbnails/10.jpg)
Global Design Effort
Thanks to DESY & ILC Main Linac Tech Hosts!
We look forward to the Fermilab meeting – and getting
Comments from our community concerning these findings / recommendations.