International Civil Aviation Organization Global ATM Operational Concept WP 02 François SALAMBANGA Workshop on ADS-B (Dakar, 21-23 July 2014)

Upload: others

Post on 19-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

International Civil Aviation Organization

Global ATM Operational Concept WP 02

François SALAMBANGA

Workshop on ADS-B

(Dakar, 21-23 July 2014)

Page 2: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

“Do we know where to go?”

2 ASECNA Workshop ADS B

Page 3: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

YES.

3 ASECNA Workshop ADS B

Page 4: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

“Vision without Action is a day-dream,

Action without Vision is a nightmare.”

4 ASECNA Workshop ADS B

Page 5: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

The Gap

5 ASECNA Workshop ADS B

Page 6: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Objective

To present the ICAO vision and the steps/actions towards the implementation of the “future” Air Navigation System focusing on the global drivers expressed in the GANP.

6 ASECNA Workshop ADS B

Page 7: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Presentation Outline

• History and Background

• Vision

• Expectations

• How to get there

7 ASECNA Workshop ADS B

Page 8: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

History and Background

• FANS

• Tenth Air Navigation Conference

• Global Air Navigation Plan for CNS/ATM Systems (Doc 9750)

• Planning and Implementation Regional Groups embarked on an extensive effort

• SARPs, PANS, Guidance material

• Eleventh Air Navigation Conference.

8 ASECNA Workshop ADS B

Page 9: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Vision statement

To achieve an interoperable global air traffic management system for all users during all phases of flight, that

• meets agreed levels of safety;

• provides for optimum economic operations;

• is environmentally sustainable; and

• meets national security requirements.

9 ASECNA Workshop ADS B

Page 10: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Guiding principles

10 ASECNA Workshop ADS B

• Safety

• Humans

• Technology

• Information

• Collaboration

• Continuity

Page 11: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Concept components

11 ASECNA Workshop ADS B

• Airspace organization and management(AOM)

• Aerodrome operations(AO)

• Demand and capacity balancing(DCB)

• Traffic synchronization(TS)

• Airspace user operations(AUO)

• Conflict management(CM)

• ATM service delivery management(ATM/SDM)

Page 12: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Transition

• Technology is not an end in itself

• Based on clearly-established operational requirements

• Integrated system

12 ASECNA Workshop ADS B

Page 13: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Integration

13

People Systems

Concept components

Management

ATM

Service provider

Aircraft

operations

Maintenance

Engineering

ATM service delivery

management

Communications

Navigation

Surveillance

Airspace User

Aerodrome

Operator

Conflict Management

Information rich environment

Traffic synchronisation

Aerodrome

operations

Airspace user

operations

Demand capacity

balancing

Airspace

organization

and Management

ASECNA Workshop ADS B

Page 14: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Expectations

• Access and Equity • Capacity • Cost-effectiveness • Efficiency • Environment • Flexibility • Global interoperability • Participation by the ATM community • Predictability • Safety • Security

14 ASECNA Workshop ADS B

Page 15: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Global System

15 ASECNA Workshop ADS B

Page 16: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Global System

meeting safety objectives

operate along preferred 4D trajectories

environmental objectives

other business requirements

16 ASECNA Workshop ADS B

Page 17: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

How to get there

• The GANP as a catalyst for change

• Provides a global interoperability framework

• Allows adaptation to efficiently meet regional and local needs

17 ASECNA Workshop ADS B

Page 18: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

How to get there

• Partnering with industry

• Delivering transitional benefits while we continue our evolution

18 ASECNA Workshop ADS B

Page 19: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

How to get there

• Modules

• Elements as options for improvements

• Result in direct performance enhancements

• Based on Industry Roadmaps and current regional activities

• Bring near- and medium-term benefits

19 ASECNA Workshop ADS B

Page 20: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

GANP

20

•Represents the initiatives that will contribute to attend the expectations of the aviation community •Main drivers towards the seamless system.

ASECNA Workshop ADS B

Page 21: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

Summary

• We needed a vision: the operational concept

• Gap

• Address the KPAs

• Lots of ongoing work

• GANP one of the main drivers.

21 ASECNA Workshop ADS B

Page 22: Global ATM Operational Concept WP 02 · • Global Air Navigation Plan for CNS/ATM Systems (Doc 9750) ... Guiding principles ASECNA Workshop ADS B 10 ... Aircraft operations Maintenance

We know where to go, but…

“Vision without Action is a day-dream, Action without Vision is a nightmare.”

22 ASECNA Workshop ADS B