7/28/2019 Global APQP Matrix
1/3
Global Quality APQP Requirements MatrixActual" status symbol
key:
not
Target Actual TargetPreliminary DFMEA created for supplier
responsible components or supplier has
reviewed DFMEA. High RPNs have
action plans with timing
DFMEA reviewed and signed for
supplier responsible components
supplier has reviewed , DFMEA.
High RPNs have action plans wit
timing that meets tool kick-off dat
Initial design review complete with
supplier and per AIAG A-2 or equivalent
100% design concerns addressed. AIA
A-2 checklist or equivalent complete a
open issues resolved
Agreement with ( ) on performance and
functional validation plan; Identify key
dimensional characteristics for layout on
prototypes
Prototype testing and measurement is
100% complete.
Major program elements are documented
to meet the program deliverables.
Major program elements are
documented to meet the program
deliverables.Tool lead time/maker concept
gauge and fixture design concepts
Capacity study complete
Supplier manufacturing facility identified
Tool maker and lead time fixed w/
schedule
Gauge plan complete and approved by
), Machine/fixture plan complete and
approved
Control plan contains DV test plan
elements and prototype layout
requirements
Prototype build issues fed back into pre
launch control plan.
Prototype build requirements are
documented and agreed with ( ) (quantity,
dates, lead time)
prototype parts delivered on time at
quality level expected. Build issues ha
been addressed.
Surrogate test data submitted to ( )
Engineering and QA if available
DV failures were addressed in the
DFMEA and corrective actions
incorporated into the design.
DVP&R includes requirements fo
all ertinent s ecifications
preliminary list of critical characteristicsidentified and agreed with ( )
Surrogate capability data reviewed with ( )
Engineering
layout information complete, processcapability known and can meet drawing
tolerances or actions in place to resolv
CAD data reviewed for feasibility issues
and submitted to ( ).
Drawings and specifications released a
verified against CAD data
Drawings contain appropriate material
and performance requirements
Drawings contain critical and safety
characteristics
Team Feasibility Commitment has been
reviewed by team and signed off as
approved
Signed off to current design level
Initial process flow is complete; used to
develop PFMEA and Control Plan. AIA
checklist A-6 or equivalent initiated and
Supplier Champion:
phone/e-mail
Program:
Supplier Name:
Part Number(s)Part Name:
Comme
()Phase 1- date xx/yy/zz ()Phase 2- date xx
8. Design Verification Testing
9. Prototype Part Layout and
CPK/ Ppk, APQP Elements
6. Prototype Build Control Plan
7. Prototype Builds
12. Manufacturing Process Flow
10. Drawings and Specifications11. Team Feasibility
Commitment
APQP Elements
1. Design FMEA
4. Master Timing Plan
5. Facilities, Tool and Gauges
2. Design Review)
3. Design Verification Plan
-
7/28/2019 Global APQP Matrix
2/3
-
7/28/2019 Global APQP Matrix
3/3
CVGSR
Stage Target Actual
1 2 3 4 5 6 7 8 9101112131415161718192021
APQP Element
Key to "Status" symbols: "O" = item meets target (Shift + letter o); "D" = item does not meet target; plans exist
Gap Expla
Program Name:
Champion: