global amani%partnership...

36
GLOBAL AMANI PARTNERSHIP APPLICATON TO EXTEND & THREE YEAR DEVELOPMENT PLAN 20132015 1.0 GENERAL PROJECT INFORMATION 1.1 Project Title, Location and Timing Project Name Hearts for Africa (Amani) Foundation/Amani Development Organization (referred to as “Amani”) GDG Reference Number J283 Country / Region / Province / Specific Location Tanzania Project Timing: Expected Start Date Continuing Expected Finish Date Ongoing Project Duration Ongoing 1.2 Agency Details Australian NGO Name Global Development Group Principal Contact Officer Carey Westwood Phone +61 7 3341 6475 Fax +61 7 3341 9783 After hours +61 7 3841 4509 Email [email protected] Australian Partner/Major Donor Name Hearts for Africa (Amani) Foundation (“Hearts”) Principal Contact Officer/email Ian Donaldson, [email protected] or [email protected] Australian Admin Person/email (if applicable) As above Australian Accounts Person/email (if applicable) As above Australian Partner’s Address PO BOX 8160, Sunnybank Qld 4109 Phone 07 33452506 Fax 07 33452506 Website if available www.heartsforafrica.org.au InCountry Partner Name of Implementing Organisation Amani Development Organization (“Amani”) Street Address of Organisation Amani Centre, Makang’wa, Chamwino district of Tanzania, East Africa Phone/Fax/Email Phone: 0011255713141150 Fax: Nil Email: John Naumann <[email protected]> Website if available http://amanitrust.homestead.com/ Type of Organisation(NGO/Foundation/CBO/etc) NGO Organisation registered with local government(Y/N) Yes Tanzania Name of Organisation Receiving Fund Amani Development Organization

Upload: others

Post on 14-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

         

GLOBAL-­‐  AMANI  PARTNERSHIP  APPLICATON  TO  EXTEND  &    THREE  YEAR  DEVELOPMENT  PLAN  2013-­‐2015  

1.0  GENERAL  PROJECT  INFORMATION  1.1  Project  Title,  Location  and  Timing    Project  Name   Hearts  for  Africa  (Amani)  Foundation/Amani  

Development  Organization  (referred  to  as  “Amani”)  GDG  Reference  Number    J283  Country  /  Region  /  Province  /  Specific  Location   Tanzania  Project  Timing:    Expected  Start  Date   Continuing                                                          Expected  Finish  Date   Ongoing                                                          Project  Duration   Ongoing    1.2  Agency  Details    Australian  NGO  Name   Global  Development  Group  Principal  Contact  Officer   Carey  Westwood  Phone   +61  7  3341  6475  Fax     +61  7  3341  9783  After  hours                                                   +61  7  3841  4509  Email     [email protected]    Australian  Partner/Major  Donor  Name   Hearts  for  Africa  (Amani)  Foundation  (“Hearts”)  Principal  Contact  Officer/email   Ian  Donaldson,  [email protected]  or  

[email protected]  Australian  Admin  Person/email  (if  applicable)   As  above  Australian  Accounts  Person/email  (if  applicable)   As  above  Australian  Partner’s  Address   PO  BOX  8160,  Sunnybank  Qld  4109  Phone   07  33452506  Fax       07  33452506  Website  if  available   www.heartsforafrica.org.au    In-­‐Country  Partner  Name  of  Implementing  Organisation     Amani  Development  Organization  (“Amani”)  Street    Address  of  Organisation   Amani  Centre,  Makang’wa,  Chamwino  district  of  

Tanzania,  East  Africa  Phone/Fax/Email   Phone:  0011255713141150  

Fax:  Nil  Email:    John  Naumann  <[email protected]>  

Website  if  available   http://amanitrust.homestead.com/  Type  of  Organisation(NGO/Foundation/CBO/etc)   NGO  Organisation  registered  with  local  government(Y/N)  

Yes-­‐  Tanzania  

Name  of  Organisation  Receiving  Fund   Amani  Development  Organization  

Page 2: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  2  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Street  Address  of  Organisation  Receiving  Fund   Amani  Centre,  Makang’wa,  Chamwino  district  of  Tanzania,  East  Africa  

In-­‐Country  Project  Manager/email   Rev  John  Naumann  Email:    John  Naumann  <[email protected]  

Home  address  of  Project  Manager   Amani  Centre,  Makang’wa,  Chamwino  district  of  Tanzania,  East  Africa  

In-­‐Country  Admin  Person/email  (if  applicable)   Dinna  Menda  In-­‐Country  Accounts  Person/email    (if  applicable)   [email protected]  

 

2.0  NEEDS  ANALYSIS  AND  PROJECT  DESIGN  

2.1  Brief  Background  to  the  Situation  Tanzania  is  located  in  Eastern  Africa,  bordering  the  Indian  Ocean,  between  Kenya  and  Mozambique.    It  covers  an  area  of  945,087  sq  km  (364,900  sq  miles)  stretching  from  the  Indian  Ocean  to  the  Great  Lakes  region  in  the  west  of  the  country.  The  population  is  approximately  37,000,000.  The  central  region  of  the  nation  is  semi-­‐arid.      

Dodoma,  the  capital  city  (population  approx.  200,000)  is  located  in  the  center  of  the  semi-­‐arid  central  region.  The  present  work  of  the  Amani  Trust  is  located  in  this  Dodoma  region,  mostly  to  the  south  of  the  city  in  the  Mvumi,  Makang’wa  and  Rift  valley  regions.  

Economy:    Tanzania  is  one  of  the  poorest  countries  in  the  world.  Many  of  its  people  live  below  the  World  Bank  poverty  line.    The  economy  depends  heavily  on  agriculture,  which  accounts  for  almost  half  of  GDP,  provides  85%  of  exports,  and  employs  80%  of  the  work  force.  Topography  and  climatic  conditions,  however,  limit  cultivated  crops  to  only  4%  of  the  land  area.  Industry  traditionally  featured  the  processing  of  agricultural  products  and  light  consumer  goods.  Average  weekly  wages  are    in  the  order  of  A$15-­‐20  per  week.  

The  World  Bank,  the  International  Monetary  Fund,  and  bilateral  donors  have  provided  funds  to  rehabilitate  Tanzania's  out-­‐of-­‐date  economic  infrastructure  and  to  alleviate  poverty.  Long-­‐term  growth  through  has  featured  a  pickup  in  industrial  production  and  a  substantial  increase  in  output  of  minerals,  led  by  gold.  Recent  banking  reforms  have  helped  increase  private-­‐sector  growth  and  investment.    

2.2  Statement  of  Development  Needs  /  Issues  A  lack  of  water  is  the  common  problem  for  the  many  thousands  of  people  living  in  this  region.  Ground  water  in  creeks  and  water  holes  is  commonly  contaminated  and  when  they  dry  up,  the  people  have  to  walk  miles  to  find  drinking  water  and  water  for  other  uses.  Agriculturally,  the  unreliable  wet  season,  from  November  through  to  March,  scarcely  provides  sufficient  moisture  to  produce  an  annual  harvest  of  maize  or  millet.  Cycles  of  famine  afflict  the  population.  

Outbreaks  of  cholera  and  typhoid  fever  are  common.  Malaria  is  a  constant  reality.  Eye  infections  are  common  due  to  lack  of  adequate  water  for  good  hygiene.  Malnutrition  results  in  stunted  growth  and  a  shortened  life  expectancy.  Aids  and  malaria  are  the  two  major  causes  of  premature  death,  hardship  and  a  growing  population  of  orphans.  

Page 3: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  3  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

The  daily  ‘Walk  for  Water’  or  “Walk  for  Fire-­‐wood”  dominates  family  life.  This  is  a  task  fulfilled  mostly  by  the  women.  A  round  trip  of  12  km  is  common.  This  means  that  the  women  may  be  away  from  the  home  and  family  for  a  considerable  portion  of  each  day.  It  also  means  that  they  tend  to  age  rather  quickly.  This  is  the  reality  of  life  for  many,  many  thousands  of  people  in  this  semi-­‐arid  region  of  central  Tanzania.      

The  rising  costs  of  imported  goods  such  as  fuel  are  a  serious  impediment  to  development  

To  break  the  cycles  of  famine  and  the  ever  present  poverty  there  is  a  great  need  in  the  following  community  development  projects  -­‐  Water  Resources,  Agricultural/Horticultural  Development,  Education,  Social  Development,  Health  and  Nutrition.      2.3  How  the  Project  will  Address  Development  Needs  /  Issues  The  project  will  address  development  needs  as  outlined  in  the  Project  Design  below  based  on  the  following  principles.  

Development  Principles  

Amani’s  Code  and  policies  are  based  on  best  practices  for  International  Development  NGOs  and  generally  accord  with  the  Code  of  Conduct  of  the  Australian  Council  of  International  Development  (“ACFID”)  and  similar  codes  in  the  USA.    

Amani  and  its  principal  partners  Amani  for  Africa  USA  Foundation,  The  Hearts  for  Africa  (Amani)  Foundation  in  Australia  and  Global  Development  Group  work  together  to  relieve  poverty  in  Tanzania  through:  

(a) Being  low  cost  organizations  run  by  volunteers  to  maximize  the  rewards  to  the  donating  public  and  the  benefits  to  the  poor  of  Tanzania  through  development  and  emergency  aid.      

(b)  Ensuring  that  the  development  and  aid  work  of  Amani  empowers  the  people  of  Tanzania  and:  

• Gives  priority  to  the  needs  and  interests  of  the  people  in  the  community  (community  based);  

• Encourages  self  help  and  self-­‐reliance  among  beneficiaries  and  thus  avoids  creating  dependency    (a  “hand  up”  for  the  people  not  a  “hand  out”);    

• Involves  beneficiary  groups  to  the  maximum  extent  possible  in  the  design,  implementation  and  evaluation  of  projects  and  programs  (both  participative  and  inclusive  of  the  people);  

• Respects  and  fosters  internationally  recognised  human  rights,  both  socio-­‐economic  and  civil-­‐political;  

• Seeks  to  enhance  gender  equity;    • Is  based  on  an  understanding  of  the  history  and  culture  of  the  people  served.  

That  is,  all  development  is  in  harmony  with,  and  appropriate  to  the  local  customs,  practices  and  preferences;  and  

Steps  are  taken  to  ensure  that  the  development  is  sustainable  when  the  intervention  by  Amani  ceases      

Page 4: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  4  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

 In  addition  to  the  above  principles,  Amani’s  projects  have  been  developed  with  a  sharply  

defined  focus  based  on  the  following  principles:    • Developments  should  be  spread  throughout  the  region  and  so  benefit  as  many  people  as  

possible;    

• A  number  of  smaller  projects  is  likely  to  involve  and  benefit  far  more  people  than  one  centralized  project;  

• Each  activity  should  comprise  a  critical  mass;  • New  projects  should  where  possible  support  or  strengthen  existing  developments  

elsewhere  in  the  region;  

• Each  activity  needs  to  survive  a  period  of  trial  and  research.    The  lessons  learned  from  a  number  of  years  of  trialling  different  agricultural  pursuits  in  the  district,  support  the  planned  expansion  of  viticulture,  grain  milling  and  oil  production  from  seeds.      A  natural  synergetic  extension  of  grain  milling  and  oil  production  is  the  manufacture  of  fodder  from  the  bi-­‐products  of  these  processes.    These  can  be  sold  as  well  as  supporting  a  business  of  raising  of  pigs  and  chickens  at  Amani.  

• The  community  is  to  be  involved  in  all  projects  through  volunteer  work.  

• Water  projects  should  accommodate  the  needs  of  people  for  clean  water  and  also  provide  water  for  agriculture,  helping  to  sustain  the  infrastructure.  

 

2.4  Project  Design  2.4.1  Major  Development  Objectives  Amani’s  Programs  in  Tanzania  have  been  fashioned  in  consultation  with  community  leaders  to  best  serve  and  support  the  local  people  in  their  quest  to  defeat  poverty  and  sustain  a  satisfactory  standard  of  living.    The  key  areas  are:  

1.    Water  Wells:  fresh  water  for  drinking  and  Agriculture.  Water  is  a  vital  element  of  life  and  Amani  believes  that  a  reliable  supply  of  clean  fresh  flowing  water  is  the  major  cornerstone  to  a  better  future  for  the  local  people.  

2.    Adequate  Food  to  fight  hunger  When  starvation  is  prevalent,  nutritious  food  is  vital.  Amani  has  over  150  acres  of  agricultural  production  with  increasing  plantings  of  grapes  aimed  at  sustaining  all  operations  through  sale,  vocational  training  and  food  for  the  hungry.    It  also  supplies  drip  irrigation  equipment  for  local  vegetable  production.  Our  programs  now  extend  to  grain  milling,  oil  seed  processing  and  pig  production.    

3.    Education  Amani  believes  that  a  better-­‐educated  community  will  more  easily  overcome  poverty.    Amani’s  programs  include  building  and  operating  preschools,  kindergartens,  a  tuition  program  and  an  English  medium  primary  school.    Amani  also  sponsors  students  and  teachers  and  operates  a  vocational  training  centre  specialising  in  modern  agricultural  practices  and  construction  methods.  

Page 5: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  5  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

 4. Health  

Apart  from  the  diseases  referred  to  above,  eye  diseases  are  rife  and  Amani  is  in  partnership  with  a  local  hospital  to  treat  and  reduce  the  incidence  of  eye  diseases.      Amani’s  role  is  to  provide  funding  and  oversee  the  program  initiated  through  an  endowment  from  a  Queensland  charity,  the  Carr  Foundation.      In  addition  Amani  aims  to  tackle  one  of  the  greatest  sources  of  death  (respiratory  diseases)  through  the  replacement  of  open  fires  with  clean  stoves  fuelled  by  biomass  grown  locally.  

 5. Social  Development  

Amani  foresees  that  desirable  social  changes  will  be  a  bi-­‐product  of  all  its  programs  particularly  in  Education.  But  it  will  aid  this  process  with  special  programs  when  particular  opportunities  arise.  Amani’s  plans  include  the  introduction  into  the  community  of  an  environmentally  friendly  clean  stove  and  establishment  of  a  conference  centre.    The  promotion  of  clean  stoves  is  designed  to  help  provide  an  alternative  fuel  source  and  to:  (a) REDUCE  deforestation,  respiratory  problems,  eye  problems,  burning  of  timber  that  

is  denuding  the  countryside  and  cooking  cost  in  poor  villages;  and  (b) HELP  INCREASE  crop  production  of  biomass  as  a  fuel  and  quality  of  life.    

6. Emergency  Aid  A  major  part  of  Amani’s  Mission  of  Care  is  the  relief  of  suffering  to  the  hungry,  the  homeless,  the  bereaved  and  the  afflicted  and  a  daily  activity  is  to  care  for  these  disadvantaged  and  dispirited  people.    

 Homeless  and  Neglected  Children  including  Orphans.  The  ravages  of  malaria,  AIDS,  cholera  and  typhoid  fever  have  left  Makang’wa  with  over  500  orphans  and  neglected  and  homeless  children.    Amani  cares  for  over  250  of  these  at  Makang’wa  as  well  as  circa  50  homeless  (street)  children  in  Dodoma    

2.4.2  Significant  Project  Goals  Log  Frame    

Significant  Goals   Performance  Indicators   Sources  of  Evidence  

Risks  and  Assumptions  

Year  

1.  WATER          

With  Rotary,  provide  clean  water  through  6  additional  wells  

   

Dig  equip  and  make  operative  6  new  wells    including    4  located  in  new  villages/sub  villages  plus  one  new  well  at  POP  School    Mvumi  Makulu  and  one  

Village  statistics  

Funding  by  Rotary  International  and  USA  donors  

2013  

2014  

2015  

Page 6: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  6  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Significant  Goals   Performance  Indicators   Sources  of  Evidence  

Risks  and  Assumptions  

Year  

at  the  Amani  Center  

2.  AGRICULTURAL  

       

2.1  Continue  expanding  grape  production  

Increase  plantings,  grape  production  and  income  from  grapes  

Internal  records  

Seasonal  influences  

2013  2014  2015  

3.  EDUCATION          

3.1Continue  expansions  of  Amani  schools  

 

No  of  students  at:  

(a)POP  School  

(b)  COP  School  

(c)  St  Andrew’s  school  Makang’wa  

Physical  and  Accounting  Records  

Funding   2013  2014  2015  

3.2  Expand  Student  sponsorship  Program  to  students  other  than  at  Amani  schools  

An  increase  in  the  number  of  sponsored  students.    

Statistics  kept  by  Community  

Committee  

Funding   2013  2014  2015  

3.3  Expand  accommodation  to  cater  for  Volunteers  teachers/trainers,  visitors  and  a  future  conference  centre  

Physically  expand  accommodation  to  house  more  people.  

 

Physical     2013  2014  2015  

4.  HEALTH          

4.1.  Maintain  eye  disease  mitigation  program  

500  people  assisted  per  year  

Eye  Clinic  reports  

Funding   2013  2014  2015  

Page 7: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  7  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Significant  Goals   Performance  Indicators   Sources  of  Evidence  

Risks  and  Assumptions  

Year  

4.2.  Reduce  respiratory  diseases  by  replacing  open  fires  with  clean  stoves  

No  of  new  clean  stoves  in  use  

Physical  and  accounting  records  

Results  of  research  and  a  trial  

2013  2014  2015  

5.  SOCIAL  DEVELOPMENT  

       

5.1  Complete  trials  and  Research  Programs  for  introduction  of  clean  stoves  

Report  from  St  John’s  University  

Report  from  St  John’s  University    

Funding   2013  

5.3  Research  use  of  Micro  lending  program  to  finance  stoves  

Report  from  St  John’s  University  

Report  from    St  John’s  University  

Results  of  research  and  a  trial  

2014  

5.2  Supply  clean  stoves  to  community  

Supply  50  stoves  through  micro  lending  program  or  other  means  

Physical  and  accounting  records  

Results  of  research  and  a  trial  

2015  

6.  EMERGENCY  AID  

       

6.1  Maintain  Work  Relief  program  to  service  agricultural  activities  as  well  as  help  citizens  in  crisis  

Yearly  number  of  people  working  in  return  for  emergency  benefits  to  be  increased  from  1000  to  1,500  or  more  

Internal  work  relief  records  

Funding   2013  2014  2015  

6.2  Expand  the  capacity  to  assist  circa  50  Homeless  

Expansion  of  capacity  to  accommodate  

Physical  and  accounting  records  

Funding  by  Rotary  

2013  2014    

Page 8: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  8  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Significant  Goals   Performance  Indicators   Sources  of  Evidence  

Risks  and  Assumptions  

Year  

Children   and  educate  

 

2.4.3  Expected  Outputs  

Significant  Goals  

Performance  Indicators  

 

Sources  of  Evidence  

Risks  and  Assumptions  

Year  

1.  WATER          

Digging  and  equipping  6  new  wells.  

 

Complete  the  following  7  wells.  

Year   Village   Population  

Cost  $  

2013   Mloda   8,000   20,000  

2014   Chalua   13,500   25,000  

 

2014   Amani  Center  

1,000   22,000  

2014   POP  Mvumi  Makulu  

3,000   20,000  

2015   Makang’wa   2,000   22,000  

2015   Chamwino   3,000   20,000  

2015   Chololo   4,000   28,000  

  TOTAL   34,000   157,000    

Village  statistics  

Funding  by  Rotary  International  and  USA  donors  

2013  

2014  

2015  

Increase  population  served  by  clean  water  

Population  serviced  by  new  wells  to  increase  by  30,000  people  

Physical  Count  

Funding  availability  

2013  

2014  

2015  

Increase  population  served  by  clean  

Provide  water  for  agriculture  as  well  as  for  human  consumption.    

Capacity  of  wells  

Funding  availability  

2013  

2014  

Page 9: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  9  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

water   2015  

2.  AGRICULTURE  

       

2.1  Continue  expanding  grape  production  

Increase  plantings  by  10,000  vines  

Year   Amani  Cente  

Igon-­‐dola  

Makulu  Mvumi  

Total  

2013   1,300   1,000   1,000   3,300  

2014   1,300   1,000   1,000   3,300  

2015   1,400   1,000   1,000   3,400  

TOTAL  

4,000   3,000   3,000   10,000  

 

Internal  records  

Seasonal  influences  

2013  

2014  

2015  

Increase  Grape  Production  

Increase  grape  production  to:  

Year   Amani  Cente  kgs  

Igon-­‐dola    kgs  

Makulu  Mvumi  kgs  

Total  

kgs  

2013         8,500  

2014         12,750  

2015         17,000  

TOTAL         38,250    

Sales  Records  

Seasonal  influences  

2013  

2014  

2015  

Increase  Grape  sales  

 

 

Sales  to  increase  to:  

Year   Amani  Cente  $  

Igon-­‐dola    $  

Makulu  Mvumi  $  

Total  

$  

2013         10,000  

2014         16,000  

2015         26,000  

TOTAL         52,000    

Sales  Records  

Seasonal  influences  

2013  

2014  

2015  

Increase  employment    in  viticulture  

10    Full  Time  Equivalent  (FTE)  additional  jobs  created  over  3  years  

Payroll  Records  

Seasonal  influences  

2013  

2014  

2015  

Page 10: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  10  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Year   Amani  Cente    

Igon-­‐dola      

Makulu  Mvumi  

 

Total  

 

2013         1  

2014         1  

2015         1  

TOTAL         3    

3.  EDUCATION          

3.1Expand  school  buildings  at:  

POP  School  

COP  School  

(St  Andrew’s  school    

(a)Complete  POP  administration  &  expand  POP  Primary  buildings  to  cater  for  intakes  of  students  to  years  3,4,&5,  expand  POP  Kindergarten  at  Prechool,  expand  primary  school  buildings  at  COP  and  build  and  equip  new  preschool  at  Chiwona  a  sub  district  of  St  Andrews  .  

Year   POP    

‘000’s  

$  

COP  

‘000’s    

$  

St  Andrew‘000’s  

$  

Total  

‘000’s    

$  

2013   53   3     56  

2014   39       39  

2015   41   31     72  

TOTAL   133   34     167    

Physical  and  Account-­‐ing  Records  

Funding   2013  

2014  

2015  

EDUCATION    

Increase  Nos  of  Students  

(b)  Increase  in  number  of  students  at  Amani  schools  over  a  three  year  period  by  280.  

Year   POP  No  

 

COP  

No    

St  Andrew  No  

Total  

No  

2013   50     0   50  

2014   110   50   10   170  

School  Records  

Funding   2013  

2014  

2015  

Page 11: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  11  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

2015   50     10   60  

TOTAL   210   50   50   280    

Increase  Employment  

(c)  Increase  FTE  staff  by  14  over  3  year  period  

Year   POP  Kindy  

COP  No    

St  Andr    No  

Total  No  

2013   4   1   1   6  

2014   3   1   1   5  

2015   3       3  

TOTAL   10   2   2   14    

School  Records  

Funding   2013  

2014  

2015  

3.2  EDUCATION  Expand  Student  sponsorship  Program    

Increase  total  sponsored  students  by  150  over  3  year  period  

Year   2013  

No  

2014  

No    

2015  

No  

Total    

No  

POP-­‐&COP  

Rotary  

  200   200   400  

 

Others   10   25   25   60  

TOTALS   10   225   225   460    

Statistics  kept  by  Commun-­‐ity  

Committ  ee  

Funding   2013  

2014  

2015  

3.3  Increase  education  sponsorships  of  former  street  children    

Many  of  these  are  now  of  secondary  school  and  tertiary  education  age.    Increase  expenditure  on  education  from  about  $10,000  a  year  to  $90,000  for  3  years  

  Funding    

 

2013  2014    

3.4  Expand  accommodation  to  cater  for  Volunteers  teachers/trainers  and  a  future  conference  centre  

Physically  complete:  

Detail   2013  

$  

‘000’s  

2014  

$    

‘000’s  

2015  

$  

‘000’s  

Total  

$  

‘000’s  

Physical  and  Account-­‐ing  Records  

Funding   2013  

2014  

2015  

Page 12: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  12  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Julia’s  House  

  19     19  

Ndliito  House  &  Gate  House  

11       11  

Quart-­‐ers  Maku-­‐lu  

    25   25  

TOTAL   11   19   25   55    

         

4.  HEALTH          

4.1.  Maintain  eye  disease  mitigation  program  

 

Over  1,000  people  assisted  per  year   Eye  Clinic   Funding   2013  

2014  

2015  

4.2.  Reduce  respiratory  diseases  by  replacing  open  fires  with  clean  stoves  

No  of  new  clean  stoves  in  use   Physical  and  accounting  records  

Results  of  research  and  a  trial  

2013  

2014  

2015  

5.  SOCIAL  DEVELOPMENT  

       

5.1  Complete  trials  and  Research  of  clean  stoves  

Report  from  St  John’s  University   Report  St  John’s  University    

Funding   2015  

5.2  Research  use  of    Micro  lending  program  to  finance  stoves  

Report  from  St  John’s  University   (a)Report  St  John’s  University  (b)  Own  Trial  Micro  lending  

  2015  

Page 13: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  13  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

5.3  Supply  clean  stoves  to  community  

Supply  50  stoves     Records   Funding   2015  

6.  EMERGENCY  AID  

       

6.1  Expand  Work  Relief  program  to  service  agricultural  activities  as  well  as  help  citizens  in  crisis  

Yearly  number  of  people  working  in  return  for  emergency  benefits  to  be  increased  on  average  from  1000  to  1500  per  year  

Internal  work  relief  records  

  2013  

2014  

2015  

6.2  Complete  existing  accommod-­‐ation  for  homeless  children  in    Mahoma  Makulu  

Physical   Physical   Funding  by  Rotary  Spain  

2014  

6.2  Build  new    Accommodation  facilities  for  circa  50  Homeless  Children  and  erect  a  new  storage  shed  

 

Program  is  as  follows:  

Detail   2013  

$  

‘000’s  

2014  

$    

‘000’s  

2015  

$  

‘000’s  

Total  

$  

‘000’s  

Building    

etc  

3   92     95  

TOTAL   3   92     95    

Physical  and  accounting  records  

Funding  by  Rotary  

2013  

2014  

 

 

EXPECTED  MAJOR  OUTCOMES  

WATER  

• Population  serviced  by  potable  water  to  increase  by  30,000  from  30,000  to  60,000  

• No  of  villages  or  sub-­‐villages  that  are  serviced  by  Amani  water  increased  by  4  from  5  to  9  

Page 14: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  14  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

 AGRICULTURE  

• A  further  important  step  in  sustaining  the  Amani  operations  will  be  in  place  with  an  increase  in  grape  production  through  planting  a  further  10,000  vines.    

• Increase  in  grape  production  through  maturing  of  grape  vines  and  corresponding  sales.  

• Staffing  to  increase  by  at  least  3  people.    

EDUCATION  

• Students  in  Amani  schools  increased  by  280  from  741  to  1021  

• Staffing  in  schools  to  increase  by  14  from  28  to  42  • One  new  school  to  be  developed  –  St  Andrews  Makang’wa  

preschool  and  kindergarten,  providing  that  extra  funding  other  than  is  in  this  budget  can  be  found  

• No  of  students  whose  education  we  sponsor  will  increase  by  460  from  246  to  706  

• A  significant  number  of  the  circa  50  former  homeless  street  children  of  Dodoma  are  requiring  secondary  or  tertiary  education  so  provision  is  made  for  an  extra  $30,000  per  annum  to  be  spent  to  ensure  the  proper  education  of  these  students,  some  of  whom  are  high  achievers.      

HEALTH  

• Eye  disease  program  to  be  maintained  • A  start  made  on  reducing  incidence  of  respiratory  &  eye  

disease  from  open  fires  • Refurbish  the  Solar  Light  System  and  the  termite-­‐eaten  

ceilings  at  the  Makang’wa  Village  Medical  Clinic  •  

SOCIAL  DEVELOPMENT  

• Complete  trial  and  research  on  introduction  of  clean  stoves    

EMERGENCY  AID  

• Increase  work  relief  program  to  about  1,500  workers  a  year  

• Complete  accommodation  for  approx.  50  homeless  children  (orphans)  

   2.4.4  Project  Activities  and  Resources  Required    

Page 15: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  15  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

DETAILS  2013   2014   2015  

TOTAL  $  ‘000  $  

000   $  ‘000    $  ‘000  

1.  WATER  Resources.  (a)  Wells  including  equipping  with  generators,  pumps    &  water  storage  tanks  at:  

       

Mloda   20           20  Amani  Centre       22       22  Chalua       25          POP  Mvumi  Makulu,  Makang’wa       42       42  

Chamwino,  Chololo           48   48  (b)  Clean  Well  at  Amani  Centre   4           4  

Sub-­‐total   24   89   48   161  

 2.  AGRICULTURE  

(a)  Grapes  Grape  trellis’s  plants  wire  etc  labour,  Irrigation  

8   8   8   24  

Renew  50%  old  grape  area  –  Amani  Centre  

0.8           0.8  

Complete  new  grape  area  –  Amani  Centre   1           1  

(b)  Piggery-­‐  Delivery  room   2.5           2.5  

       Sub-­‐total  $  ‘000   12.3   8   8   28.3  

 3.  EDUCATION  Resources.      (a)  POP  Primary  School  –  Administration  Building  including  water  

43   0   0   43  

New  Classroom        8    41   49  Furnishing   7   5   8   20  Text  books,  incidentals   3   3   3   9  

Additional  People  including  Teachers   10   18   15   43  

Page 16: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  16  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

DETAILS  2013   2014   2015  

TOTAL  $  ‘000  $  

000   $  ‘000    $  ‘000  

       Sub-­‐total  $  ‘000   63   34   67   164    

(b)  POP  Kindergarten  and  Preschool  –    

               

Expansion  new  Building       18  

      18  

Furnishings       5       5  Text  books       2       2  2nd  in-­‐ground  water  tank       4       4  

Electrical  for  tanks,  pumps       2,5       2.5  

Extra  teachers  &  Aids  (2013-­‐4  @  640,000/=  per  month  20mil&  3@550,00/=per  month  in  2014  and  2015)13mil  

10   16.5   13   39.5  

Sub-­‐total  $  ‘000   10   48   13   71    

(c)  COP  School  –    Expand  Buildings  including  water  to  cater  for  intake  of  students  in  Primary  Program/seminar  centre  use  

      23     23  

Pathways   1.3           1.3  Solar   1.8           1.8  -­‐  Furnishing          5.0   5.0  –  Text  books,  incidentals          2.5   2.5  

–  Extra  teachers  (One  in  2013  and  one  in  2014  @90,000/=  per  month)  

.35   .70   .35   1.4  

Sub-­‐total  $  ‘000   3.45   .70   30.85   35  

(d)  ST  Andrews  School  /Chiwona–  Building  including  water  (Contingent  on  funding.  Not  in  budget)  

   

Contingent  on  funding.  Not  in  budget  

 18  

 18  

School  -­‐  Furnishing         5.0   5.0  

Page 17: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  17  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

DETAILS  2013   2014   2015  

TOTAL  $  ‘000  $  

000   $  ‘000    $  ‘000  

School  –  Text  books,  incidentals         2.5   2.5  

School  –    Extra  teachers  (One  in  2013  and  one  in  2014  @90,000/=  per  month)  

0.35   0.7   0.35   1.4  

Sub-­‐total  $  ‘000   0.35   0.7   25.85   26.9  

 4.  INCREASE  STUDENT  SPONSORSHIPS  

Clerical,  computer  and  general   5   5   5   15  

Additional  Sponsorship  fees  paid  to  Educational  Institutions  including  for  Dodoma  Children  net  of  students  finishing  education  

               

Less  paid  by  Rotary     40   40   80  Net  paid  by  Amani     30   30   60      

  10   10   20  

Sub-­‐total  $  ‘000   5   15   15   35  

 5.  ACCOMMODATION  &  BUILDINGS      (a)  Complete  Julia’s  House                    

Building           11.0       11.0  Power           5.0       5.0  Water  Tanks  for  Office  &  Julia  ‘s  House  (one  half)  

    1.5       1.5  

General       1.5       1.5  

Sub-­‐total  $  ‘000       19.0       19.0  

(b)  Refurbish  Ndilito  House  Makuku                  

Building   1.5           1.5  Power   1.8           1.8  Water                  General   0.7           0.7  

Page 18: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  18  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

DETAILS  2013   2014   2015  

TOTAL  $  ‘000  $  

000   $  ‘000    $  ‘000  

Sub-­‐total  $  ‘000     4.0              

4.0  

(c)  Refurbish  South  Gate  House                  

Building  including  septic  tanks   7           7  

General                  

Sub  Total  $  ‘000   7           7  

(d)  AMANI  CENTRE  General                  

New  Office  Building       13.0       13.0  Water  Tanks  for  Office  &  Julia  ‘s  House  (one  half)       1.5       1.5  

Guest  Staff  Toilet   6.5           6.5  

               Sub  Total  $  ‘000   6.5   14.5       21  

(e)Erect  new  Multi-­‐Unit  Quarters  Makulu  (contingent  extra  funding)  

       

 Contingent  on  funding.  Not  in  budget  

   

Building           25   25  

Sub  Total  $  ‘000           25   25  

(f)  Erect  Shed  at  Mvumi    Makulu                  

Building   3           3  

Sub  Total  $  ‘000   3           3  

(g)  Children’s  Multipurpose  Mahoma  Makulu  

               

Complete  House  with  water,  electricity  and  furnish,    

    5       5  

Build  new  storage  shed   3           3  

Construct  New  Quarters       50       50  

Furnishing       5       5  Power       5       5  Water       3       3  

Page 19: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  19  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

DETAILS  2013   2014   2015  

TOTAL  $  ‘000  $  

000   $  ‘000    $  ‘000  

Vehicle  for  transport       17       17  Tractor       7       7  

Sub-­‐total  $  ‘000   3   92      

 95  

HEALTH  (a)  Ongoing  Program  to  treat  Eye  Disease  Resources.  

Any  additional  special  programs  over  and  above  existing  treatment  of  eye  disease  will  respond  to  additional  funding  from  the  Carr  Foundation  not  included  in  this  3  year  plan.  

(b)  Respiratory  Disease  -­‐  See  Social  Development  below  

-­‐   -­‐   -­‐-­‐   -­‐  

 7.SOCIAL  DEVELOPMENT  Resources  

Clean  stove    research  at  $10,000  a  trial   15   20   55   90  

Sub-­‐total  $  ‘000   15   20   55   90  

8.  EMERGENCY    Resources  Upon  completion  of  Accommodation  for  Dodoma  Children  there  will  be  additional  resourcing  required  of  :  

         20    20  

Sub-­‐total  $  ‘000       20   20  

GRAND  TOTAL    $  ‘000   233.6   420.9   275.7   930.2  

                     2.5  Project  Activity  Description  As  per  2.4.1  and  elsewhere  in  this  report  2.6  Project  Activity  Schedule  (Attached  –  Appendix  3)      2.7  Direct  &  Indirect  Beneficiaries  We  estimate  that  the  direct  beneficiaries  are  30,000,  based  on  the  populations  of  villages  that  rely/use  clean  water  from  wells  financed  by  Amani  and  indirect  beneficiaries  20,000  representing  people  outside  the  villages  with  Amani  water  who  occasionally  use  our  water  and  other  facilities.  The  beneficiaries  are  families:  men,  women  and  children.    

Page 20: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  20  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

3.0  PROJECT  CROSS  -­‐  CUTTING  ISSUES  3.1  Gender  Analysis    Women  and  girls  are  given  equal  opportunity  and  there  is  no  discrimination  evident  within  the  community.    All  programs  of  Amani  are  entered  into  after  detailed  discussions  with  local  elected  Committee  leaders  and  these  do  not  discriminate  against  women.  

Particular  programs  that  assist  women  are:  

Nutrition  Programs  where  Amani  provides  the  water,  irrigation  and  other  infrastructure  for  local  women  (mainly)  to  grow  nutritious  vegetables  for  school  children,  single  mothers  and  aids  victims;  

At  least  50%  of  sponsored  students  are  female;  

A  majority  of  Amani’s  schoolteachers  and  staff  are  female;  

An  Amani  project  that  was  completed  in  2010  was  the  building  of  a  women’s  health  centre  in  the  village  of  Makang’wa  to  provide  facilities  and  support  for  pregnant  women  and  women  with  other  health  needs.  

3.2  Environmental  Assessment  and  Management  The  community  served  by  Amani  is  a  rural  one  where  the  basic  environmental  services  (water,  sanitation,  waste  management,  energy  and  infrastructure)  are  primitive.  Environmental  causes  of  poverty  (and  Amani’s  response  in  brackets)  include:    

(a) The  high  incidence  of  tropical  diseases  such  as  malaria,  cholera  and  typhoid;  (b) A  high  incidence  of  insect  borne  diseases  such  as  malaria;    (c) Poor  roads  and  little  public  infrastructure;  (d) High  incidence  of  eye  disease  (direct  program);    (e) A  chronic  shortage  of  potable  water  with  water  borne  diseases  prevalent  (sinking  wells  

and  reticulating  water);  (f) Little  access  to  clean  energy  with  high  incidence  of  respiratory  disease  from  inhaling  

smoke  from  open  fires  (clean  stove  project)      (g) Insufficient  water  for  agriculture  (sinking  wells  and  drip  irrigation);      (h) The  clearing/denuding  of  the  country  side  for  fuelling  home  fires  (clean  stove  project);  

and  (i) Also,  being  a  subsistence  economy  where  families  grow  their  own  food,  incomes  are  low,  

and  the  opportunities  for  employment  and  education  are  very  limited  (emergency  work  relief  for  over  1,000  people  in  need  annually,  employment  of  over  50  permanent  staff  at  Amani,  vocational  training  to  improve  productivity,  and  a  heavy  investment  in  education  generally)  

 Please  note  that  Amani’s  programs  target  directly  all  the  above  problems  but  for  items  (a),  (b)  and  (c).    

3.3  Australia’s  Assistance  for  Family  Planning  Activities  Not  applicable  3.4  Other  Indicators.  See  Appendix  6.  

Page 21: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  21  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

3.5  Sustainability  of  Development  Activities    (a)  Development  Principles  

• Amani’s  agricultural  projects  have  been  developed  based  on  the  following  Principles:  • Developments  should  be  spread  throughout  the  region  and  so  benefit  as  many  people  as  

possible;    • A  number  of  smaller  projects  is  likely  to  involve  and  benefit  far  more  people  than  one  

centralized  project;  • Each  activity  should  comprise  a  critical  mass;  • New  projects  should  where  possible  support  or  strengthen  existing  developments  

elsewhere  in  the  region;  • Each  activity  needs  to  survive  a  period  of  trial  and  research.    And  so  the  lessons  learned  

from  a  number  of  years  of  trialling  different  agricultural  pursuits  in  the  district  support  the  planned  expansion  of  viticulture,  grain  milling  and  oil  production  from  seeds.  And  a  natural  synergetic  extension  of  grain  milling  and  oil  production  is  the  manufacture  of  fodder  from  the  bi-­‐products  of  these  processes  that  can  be  sold  as  well  as  supporting  a  business  of  raising  of  pigs  and  chickens  at  Amani.  

• The  community  is  to  be  involved  in  all  projects  through  volunteer  work.  • Water  projects  should  accommodate  the  needs  of  people  for  clean  water  and  also  

provide  water  for  agriculture  that  can  help  sustain  the  infrastructure.  

Strategic  Plan  

For  the  first  five  years  of  Fr.  John’s  work  in  Tanzania  he  was  living  in  the  USA  and  the  focus  was  on  developing  water  resources.    

After  moving  to  Tanzania  in  2005,  he  devoted  the  next  five  years  to  establishing  the  Amani  Center  as  the  headquarters  for  all  development  programs  to  relieve  poverty.    

In  this,  the  third  phase,  the  goals  are  to:  

1. consolidate   programs   and   to   expand   the   education   and   other   relief   programs   to   other  villages  in  the  district,  

2.  develop  leadership  plans  for  Fr  John’s  succession  and  3.  establish  a  cash  flow  to  sustain  operations  mainly  from  Tanzanian  sources.  

 (b)  Sustainability  Plan  

People  

In  order  to  facilitate  succession  and  sustainability  Amani  is  training  and  sponsoring  the  education  of  its  future  leaders  and  all  divisional  heads  at  Amani  are  native  Tanzanians  as  are  also  a  permanent  staff  of  over  fifty.          

All   the   Divisional   leaders   at   Amani   including   a   cadet  manager   have   been   chosen   (and   in  some  cases,  hand  picked)  as  part  of  a  plan  for  on-­‐going  leadership  and  sustainability  in  all  levels  of  governance  from  the  Board  and  CEO  down,  and  all  are  receiving  on-­‐going  training.      

Page 22: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  22  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Income  

It  is  planned  that  sustaining  income  will  be  derived  from  school  fees,  student  sponsorships,  viticulture,  grain  and  oil  seed  milling,  and  the  production  of  fodder  for  sale  and  the  raising  of  pigs  and  chickens.  

School  Fees  

Amani  heavily  subsidises  the  education  of  the  students  in  its  schools  but  those  receiving  subsidies  provide  equivalent  manual  labour  at  schools  or  other  Amani  projects.    It  is  planned  to  increase  the  cash  component  of  fees  paid  for  tuition  over  time.  

Student  Sponsorships    It  is  planned  that  sponsorships  will  be  a  source  of  on-­‐going  support  in  Education  of  students.    Viticulture  

This  is  earmarked  as  a  major  activity  to  provide  income  to  sustain  operations    

This  is  one  of  the  few  regions  in  the  world  that  produces  two  grape  crops  per  year  on  the  one  vine  and  this  is  a  critical  success  factor.  And  the  climate  is  suitable.  Therefore  there  is  a  growing  viticulture  industry  in  Tanzania  and  in  the  surrounding  countries  and  considerable  investments  in  the  industry  by  South  African  companies.    In  addition  there  is  much  encouragement  by  the  Tanzanian  Government  that  has  provided  Amani  with  new  varieties,  the  benefits  of  its  research  and  technology,  and  trained  and  overviewed  the  work  of  our  vineyard  staff.  The  plan  is  for  the  Amani  Centre  to  become  a  leader,  a  vocational  trainer  and  a  resource  centre  for  the  developing  grape  industry  in  the  district.    

A  further  2,430  grape  vines  were  planted  in  the  six  months  to  30  June  2012  making  a  total  of  4550  for  the  year  ended  30  June  2012  (last  year  6433).    Income  is  currently  being  earned  from  a  relatively  small  number  of  vines  that  are  now  bearing.    It  provides  significant  employment.  

Grain,  Fodder,  Pigs  and  Chicken  Production  

Besides  viticulture,  Amani  ‘s  other  commercial  operations  aimed  at  sustainability  are  the  farming  and  milling  of  grains  including  maize  and  millet  and  also  groundnuts  and  sunflowers.  These  crops  are  popular  with  the  farming  community  and  so  Amani  has  built  a  processing  plant  to  produce  oil  from  ground  nuts  and  sunflowers  and  two  grain  mills  to  produce  Ugali  flour    (a  local  staple  food)  from  various  grain  crops  one  of  which  was  commissioned  during  the  period.  These  mills  process  Amani’s  crops  as  well  as  those  of  local  growers.  

The  second  mill  in  the  village  of  Mvumi  Makulu  was  built  to  maximize  the  production  of  fodder.  Amani  produces  fodder  (ideal  as  feedstock  for  chickens  and  pigs)  from  by-­‐products  of  its  two  milling  processes,  and  is  raising  pigs  for  the  retail  market  that  are  largely  fed  on  Amani’s  own  feedstock.  

Page 23: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  23  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

It  is  planned  for  pigs  to  become  an  income  earner  in  the  future.  

3.6  Local  Community  Participation  All  Amani’s  programs  in  Tanzania  have  been  fashioned  in  consultation  with  community  leaders  to  best  serve  and  support  the  local  people  in  their  quest  to  defeat  poverty  and  sustain  a  satisfactory  standard  of  living.  This  partnership  was  forged  from  the  very  beginning  with  either  party  initiating  a  project.    In  the  case  of  emergency  relief,  the  parties  work  closely  together.    In  addition:  

• The  local  communities  of  Tanzania  provide  volunteer  work  on  all  community  projects;  

• The  Makatupuro  Grape  research  Center  (VRTC,  to  the  north  of  Dodoma)  ,  a  government  agency  provides  encouragement  and  free  agricultural  extension  programs  (particularly  vocational  training  and  technology).  

• Distell  Group  Limited,  P.O.  Box  778,  Stellenbosch  7599,  South  Africa,  a  major  manufacturer,  marketer  and  distributor  of  wine  in  South  Africa  that  has  local  viniculture  investments  near  Amani,  is  mentoring  Amani  and  providing  free  training  and  technology  in  viniculture.    www.distell.co.za    

• The  Sokoine  University  of  Agriculture  at  Morogoro  is  collaborating  on  pig  production  with  a  secondment  of  students  working  at  Amani  and  providing  free  staff  training.  

 • The  Tanzanian  Government  has  provided  encouragement  and  praise,  new  crop  

varieties  for  planting,  voluntary  labor  (by  the  Tanzanian  army),  gifts  of  school  uniforms  and  access  to  World  Bank  funding.  

 3.7  Capacity  Building    Amani’s  philosophy  is  to  continually  seek  and  encourage  the  use  of  native  staff  and  volunteers  and  to  increase  their  capacities  through  education  and  training.  

The  headquarters  of  Amani  is  a  vocational  training  Centre  that  has  employed  over  5,000  people  from  the  local  community  over  the  past  five  years  or  so.    The  Centre  currently  employees  50  permanent  and  semi  permanent  employees,  all  of  whom  apart  from  the  Managing  Director  (Rev  John  Naumann)  are  local  people  from  the  community  including  10  Divisional  heads.    There  are  also  28  staff  employed  in  our  schools  including  19  teaching  staff  and  9  others  (2  of  whom  are  part  time).  

Training  is  provided  to:  

Permanent  staff.    This  is  done  through  an  internal  training  system  that  is  working  well.  Amani  now  operates  efficiently  without  close  supervision  of  staff  by  the  Managing  Director.  

Short-­‐term  employees.    These  include  those  who  are  working  at  the  Centre  in  consideration  of  benefits  received  such  as  food  or  paying  for  school  student  sponsorships.    These  people  are  supervised  and  trained  by  the  permanent  staff.    In  the  last  six  months  1,034  relief  workers  (previous  6  months  540)  have  been  employed  at  Amani.  

Page 24: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  24  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Viticulture  staff.      An  agency  of  the  Tanzanian  Government  (VRTC  Makatupora)  is  encouraging  Amani  to  specialize  in  viticulture  and  to  become  a  local  viticulture  industry  leader.  There  is  now  an  overall  supervisor  and    three  separate  teams  of    in  all  16  permanent  staff  working  at  the  three  grape-­‐  growing  locations  and  receiving  training  from  the  Government  and  a  commercial  producer.  

Community  Groups.  Almost  all  community  programs  operate  on  the  basis  that  Amani  facilitates  projects  through  the  supply  of  materials  and  professional  support  and  the  community  will  run  the  programs  and  provide  the  labour  (often  under  the  supervision  of  Amani  personnel).    Such  volunteer  programs  include  the  laying  of  pipelines  for  community  water,  the  control  of  weeds  in  agriculture,  and  the  staffing  (other  than  professionals  such  as  teachers)  of  the  Igondola  Education  Centre  at  Igondola  for  orphans.  

Sponsoring  of  Education.  Amani  is  sponsoring  the  higher  education  of  31  students  (previous  period  29)  many  of  whom  will,  on  graduation  and  gaining  the  requisite  experience  be  employed  in  leaderhip  positions  by  the  local  community,  local  government  or  Amani.    These  students  (or  their  families)  work  at  Amani  in  return  for  their  sponsorships.  In  addition  there  are  100  (previous  period  100)  partly  sponsored  secondary  school  children  who  work  at  Amani  to  pay  for  their  fees.  

Amani  employs  28  staff  employed  in  our  schools  including  19  teaching  staff  and  9  others  (2  of  whom  are  part  time).  

A  total  of  16  school  teachers  and  aids  have  completed  their  education  under  the  sponsorship  of  Amani  and  are  working  in  our  schools  .  

 3.8  Strategies  for  Management  of  Identified  Risks    Risk   Severity   How  likely?   Action  

Succession  Planning  for  CEO/Managing  Director  

High   Medium   Recruitment  made  of  possible  successors  

All  Managers  are  indigenous  

Sponsoring  education/trialling  of  successors  

Funding  sources  cease  before  operations  are  self  sustaining  

high   low   Big  accent  on  sustainability  and  raising  local  income  sources  

Attempting  to  widen  support  base  

Meet  our  targets/goals  and  provide  much  feed-­‐back  to  funders  

Government  changing  its   Medium   high   Being  vigilant  

Page 25: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  25  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

requirements  

 3.9  Protection  of  Children  and  Other  Beneficiaries  with  Disability  Amani  does  not  discriminate  against  people  living  with  disabilities.    Amani  employs  two  permanent  workers  at  the  Center  and  four  semi  ・  permanent  employees  with  disabilities.  There  is  a  sympathetic  local  culture  to  respect  and  protect  the  rights  of  those  with  disabilities    3.10  

Protection  of  Children  and  Other  Beneficiaries  with  HIV/AIDS  Amani  does  not  provide  any  particular  programs  that  support  HIV/AIDS  although  some  of  the  circa  50  former  Dodoma  Street  children  in  the  partial  care  of  Amani  have  aids  and  receive  appropriate  treatment  and  care.  It  is  our  policy  to  provide  unconditional  acceptance  of  HIV/Aids  sufferers  regardless  of  how  the  virus  was  contracted  and  without  discrimination  and  irrespective  of  color,  class  or  creed.  

 

4.0  PROJECT  MANAGEMENT  AND  COORDINATION    4.1  The  Role  of  Partners  4.1.1 The  Role  of  Global  Development  Group  (GDG)  

• Global  Development  Group  works  with  Amani  and  Hearts  for  Africa  (Amani)  Foundation  in  designing  the  Project,  ensuring  that  it  meets  all  necessary  criteria  for  development  activities.    

• Global  Development  Group  ensures  that  the  Project  is  in  accordance  with  Australian  Taxation  Office  and  AusAID,  with  specific  reference  in  operating  in  accordance  to  OAGDS  Guidelines.  

• Global  Development  Group  provides  a  governance  role  to  ensure  that  the  Project  is  carried  out  to  GDG’s  Policies  &  Procedures  and  Expectations,  and  ACFID’s  Code  of  Conduct.  

• Global  Development  Group  arranges  to  transfer  Project  funds  to  the  bank  account  nominated  for  the  Project.        

• Global  Development  Group  is  responsible  for  monitoring,  auditing  and  evaluating  the  Project.  This  will  be  a  schedule  developed  by  GDG.  

• Global  Development  Group  has  the  discretion  to  stop  sending  funds  to  project  if    o Scheduled  progress  report  upon  request  is  not  submitted  within  a  period  of  2  

months  o not  operating  to  approved  project  description  or  amended  project  description  

• Global  Development  Group  has  the  discretion  to  cancel  approved  project  at  any  time  if  there  is  no  funding  activity  for  12  months  or  a  requested  report  is  not  received  within  a  period  of  one  year.  

•  Global  Development  Group  earns  the  trust  of  Project  sponsors  and  stakeholders  by  being  effective,  ethical,  professional  and  integrity-­‐centred.  

4.1.2  The  Role  of  the  Australian  Partner    

• Hearts  assists  Amani  with  the  proposed  design  if  needed.  • Hearts  complies  with  the  documents  “Expectations  of  GDG”  and  “GDG  Policies  and  

Procedures.”  

Page 26: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  26  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

• Hearts  promotes  and  raises  funds  for  the  Project  and  fundraising  activities  should  meet  fundraising  requirements.  

• Hearts  acts  as  a  resource  centre  and  assists  with  governance,  accounting,  computer  and  reporting  requirements  

• Hearts  organises  volunteers  from  Australia  if  required.  • Hearts  cooperates  in  evaluations,  monitoring  &  audits  if  required.  • Hearts  is  responsible  to  inform  Global  Development  Group  of  any  major  negative  and  

positive  issues/developments  relating  to  the  project.  • Hearts  may  assist  in  supervising  the  Project  and  may  also  be  involved  in:    

• Advocacy  • Raising  and  training  volunteers  

 4.1.3  The  Role  of  the  Amani  ,  the  In-­‐Country  Partner  

• Amani  agrees  to  collaborate  with  GDG  in  the  design  of  the  Project,  with  final  approval  by  GDG  prior  to  funding.    

• Amani,  on  behalf  of  GDG,  takes  primary  responsibility  for  the  administration  and  operational  tasks  (implementation)  according  to  approved  Project  Description  and  budget.  

• Amani  has  the  responsibility  for  accountability  and  distribution  of  funds  on  behalf  of  Global  Development  Group.  

• Amani  complies  with  GDG  Policies  &  Procedures,  Partnership  Expectations  and  In-­‐Country  government  requirements  

• Amani  maintains  adequate  systems  for  proper  accounting  and  record  keeping.  • Amani  submits  Progress  &  Financial  Reports  on  a  quarterly  or  six  monthly  basis  to  Global  

Development  Group.    • Amani  cooperates  in  monitoring,  audits  and  evaluations  conducted  by  GDG  personnel.  • Amani  is  responsible  to  inform  Global  Development  Group  of  any  major  negative  and  

positive  issue/development  relating  to  the  project.    

4.2  The  In-­‐Country  Partner  (Amani)  and  Coordinating  Arrangements  The  GDG  process  for  undertaking  Partnerships  is  tied  to  each  new  Project  approval.    This  process  has  been  developed  to  ensure  Partners  are  well  informed  about  the  requirements  of  undertaking  aid  and  development  activities  with  GDG  and  is  recognised  as  a  significant  step  in  the  project/partnership  management  cycle.        Global  Development  Group  has  documented  arrangement  and  documentation  that  confirms  partnership  with  partners.    This  includes  Entity  Agreement  with  In-­‐Country  Partner,  Entity  Agreement  with  Australian  Partner  if  appropriate,  Expectation  of  GDG,  GDG  Policies  and  Procedures  and  a  Project  Description  specifically  detailing  the  requirements  of  this  Project.        The  administrative  arrangements  for  Partnership  and  Projects  are  tied  together.  This  is  to  ensure  each  proposed  partnership  and  project  is  assessed  in  a  comprehensive  manner  and  considered  for  suitability  in  line  with  GDG  requirements  documented  under  Global  Development’s  Project  Administration  Standard  Procedures.    Global  Development  Group  and  Amani  will  undertake  financial  management  of  the  Project.  Global  Development  Group  will  monitor  all  funds  directed  to  this  organization.    Funds  will  be  distributed  directly  to  Amani’s  bank  account  in  Tanzania  where  it  will  be  distributed  and  accounted  for  as  the  project  requires  and  determined  by  GDG.    

Page 27: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  27  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

Amani  will  report  on  a  six-­‐monthly  basis  (both  narrative  and  financial)  to  Global  Development  Group,  and  commits  to  meeting  the  necessary  requirements  of  partnership  with  GDG.    Global  Development  Group  will  conduct  monitoring  and  evaluation  with  full  access  to  Project  records  provided  to  GDG  personnel.  GDG  will  carry  out  financial  auditing  according  to  the  organisation’s  risk  management  procedures  as  specified  by  the  Australian  industry  body  –  ACFID.    Global  Development  Group  will  provide  additional  support  in  project  management  and  implementation  to  the  Project  where  necessary.    It  should  be  recognised  that  the  Australia  public  –  directly  and  through  taxation  funding  is  a  major  contributor  to  the  project  and  Global  Development  Group  is  their  representative.        4.3  Project’s  clear  accountabilities  Amani  is  aware  that  there  is  a  significant  history  of  corruption  in  Tanzania  and  so  Amani’s  policy  is  for  its  funding  agencies  to  retain  surplus  funds  in  Australia  or  USA  and  these  are  remitted  to  Amani’s  bank  account  on  application.    In  addition  the  bank  authority  provides  for  funds  to  be  drawn  with  the  signatures  of  two  Amani  Board  members.  In  practice  the  Managing  Director  is  one  signatory  to  all  withdrawals  except  in  emergencies.  

 4.4  Monitoring  and  Reporting  Roles  of  the  In-­‐Country  Partner  Amani  will  give  regular  six  month  reports  against  output  and  objectives  to  Global  Development  Group  including  financials.    The  narrative  report  will  include  photographs  and  describe  exactly  what  happened  with  the  funds  that  came  from  Australia,  what  has  been  achieved  and  what  is  expected  to  be  achieved  in  the  next  six  month  period.    A  completion  report  is  to  be  submitted  upon  project  completion.    The  final  evaluation  will  be  conducted  by  Global  Development  Group  to  determine  whether  the  project  met  its  objectives  and  make  recommendation  for  future  expansion/extension  when  necessary.    4.5  Strategy  for  Promoting  Australian  Identity  Amani  will  ensure  that  if  this  project  is  approved:      

• Amani  will  acknowledge  through  signage,  display  or  plaque  that”  This  project  was  developed  by  a  partnership  between    Amani  Development  Organization    (Tanzania)    Hearts  for  Africa  Amani  Foundation  (Australia)  and  Global  Development  Group  (Australia)  in  conjunction  with  Amani  for  Africa  USA  Foundation  (USA)  and  Donors  in  Australia  and  USA”.  

• Hearts  will  acknowledge  in  newsletters,  promotional  materials,  website  and  fundraising  activities  that  This  project,  J283,  between  Hearts  for  Africa  (Amani)  Foundation  and  Amani  Development  Organization  is  an  approved  aid  and  development  project  of  Global  Development  Group  (ABN  57  102  400  993),  an  Australian  AusAID  approved  NGO  that  carries  out  quality  humanitarian  projects  and  provides  long  term  solutions  to  poverty.  Australian  donations  for  eligible  development  activities  are  tax  deductible.  For  more  information  about  Global  Development  Group,  visit  http://www.globaldevelopment.org.au      

4.6  Other  Existing  Programs  in  the  Area  There  are  none.    

5.0  BUDGET  DESIGN  AND  FINANCIAL  ISSUES  

Page 28: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  28  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

5.1  Presentation  of  Budget    (All  figures  should  be  in  Australian  $)  

Activity  Year   Other  Donors  outside  Australia  

Other  Donors  from  Australia  

Through  Global  Development  Group  

Total  

Year  One    235,000   20,000    300,000   555,000  

Year  Two   476,000     10,000     370,000     856,000    

Year  Three   404,000      10,000   400,000     814,000    

Total   1,115,000     40,000     1,070,000     2,225,000    

NB  The  above  figures  are  estimates  and  are  subject  to  change.  The  targeted  amount  of  funds  to  be  raised  will  be  approximately  the  figure  above  for  three  years  depending  upon  donations  being  available.  This  amount  is  not  legally  binding  but  a  target  set  by  Partner  to  achieve  desired  outcomes.    5.2  Sources  of  Funding  The  principal  funding  is  from:  1.Global  Development  Group:    Hearts  for  Africa  (Amani)  Foundation  from:  

• Donations  • Operating  a  Thrift  shop  in  Sunnybank  • 50%  proceeds  of  vegetable  stalls  at  markets  • Fundraising  events  such  as  fabric  sales,  concerts  etc  

 2.  Other  Donors  from  Australia:  

• Rotary    3.Other  Donors  from  Outside  Australia    

• Amani  for  Africa  USA  Foundation,  a  sister  organisation  in  USA  to  Hearts  for  Africa  (Amani)  Foundation.  

• Rotary  International      5.3  Project  Assets  and  Their  Disposal    Besides  land,  the  assets  of  Amani  comprise  mainly  development  assets  such  as,  schools,  kindergartens,  wells,  growing  crops,  grain  mills  (2)  an  oil  pressing  plant  and  a  pigsty.    Many  of  these  have  been  constructed  on  community  owned  land.    Amani  Development  Organization  is  an  NGO  registered  in  Tanzania  and  in  accordance  with  its  Constitution,  all  assets  must  be  used  to  relieve  poverty  or  on  winding  up  transferred  to  another  organization  with  the  same  objects.    The  intention  is  eventually  to  either  gift  Amani’s  land  and  other  assets  direct  to  the  local  community  or  to  an  NGO  on  their  behalf.  There  are  no  other  contractual  arrangements  at  this  stage.        5.4 Exit strategy

Page 29: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  29  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

There  is  no  definite  exit  strategy  at  this  stage.    This  will  be  reconsidered  when  projects  aimed  at  sustaining  operations  are  further  advanced.    

6.0  DECLARATION      Six-­‐Monthly  Reports  Reporting  is  an  important  part  of  the  project  and  therefore  we  require  periodic  reports  both  on  the  project  and  the  finances  every  six  months.  Amani  is  expected  to  send  to  Global  Development  Group  Six-­‐Monthly  Reports  during  the  life  of  the  project.      The  Australian  Partner  may  assist  if  needed.  

Evangelism  Policy  Evangelistic/missions  activities  cannot  form  part  of  our  approved  aid  and  development  projects.    Funds  designated  for  the  purposes  of  aid  and  development  will  be  used  only  for  those  purposes  and  will  not  be  used  to  promote  a  particular  religious  adherence.          Political  Policy  GDG  has  many  examples  of  good  relationships  with  government  including  certifications,  approvals,  joint  agreements  and  requests  to  carry  out  projects.  GDG  expects  a  positive  relationship  between  its  projects  and  government  at  all  levels  within  the  country  where  we  work  but  no  political  activity  is  allowed.    Funds  designated  for  the  purposes  of  aid  and  development  will  be  used  only  for  those  purposes  and  will  not  be  used  to  support  a  political  party,  candidate,  or  organisation  affiliated  to  a  political  party.        Welfare  Policy  Global  Development  Group  (GDG)  and  Partners  exist  to  facilitate  development,  aid  and  relief  projects,  not  to  create  or  perpetuate  an  environment  or  culture  of  welfare  dependency.  GDG  do  not  undertake  welfare  activities  with  tax-­‐deductible  funds  from  Australia.  

Difference  between  Development,  Relief  and  WelfareDevelopment  aims  at  the  constant  improvement  of  the  well-­‐being  of  the  entire  population  and  of  all  individuals  on  the  basis  of  their  active,  free  and  meaningful  participation  in  development  and  in  the  fair  distribution  of  the  benefits  that  result  from  this  process.    It  aims  to  produce  benefits  that  are  sustainable  that  will  endure  after  development  assistance  has  ceased.    

Relief  aims  to  provide  basic  support  to  people  in  emergency  situations  such  as  earthquakes,  or   chronic  disasters   like   famine  or   conflict.     Relief  measures  are  usually   temporary  and  are  directed  at  providing   life   -­‐   sustaining  assistance  or  short-­‐term  recovery  assistance  aimed  at  putting  people  'back  on  their  feet'.    Welfare   aims   to  give  assistance   to  maintain   individuals   in   a  particular   condition  on  a   long-­‐term   basis.   Welfare   includes   no   strategy   for   integration   into   a   broader,   community  development  program.    Welfare  gives  funds  directly  to  children  or  their  families.              

Page 30: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  30  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

 I,  The  Reverend  John  Frederick  Naumann,    Managing  Director  of  Amani  Development  Organization,submits  this  Proposal  and  undertakes  that  all  funds  provided  will  be  expended  for  the  purposes  for  which  they  are  provided. Signature  

   Date  31  July  2012    -­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐      I,  Ian  William  Donaldson  ,  Chairman  of  the  Hearts  for  Africa  (Amani)  Foundation,submits  this  Proposal  and  undertakes  that  all  funds  provided  will  be  expended  for  the  purposes  for  which  they  are  provided.  

   Signature          Date  31  July  2012    -­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐-­‐      I,  (authorised  officer)  ………………………………………………………….………………………        (Position  in  GDG)  ………………………………………………..……………………………………    Submit  this  Proposal  and  undertake  that  all  funds  provided  will  be  expended  for  the  purposes  for  which  they  are  provided.    Signature  ………………………………………………………….………………………    Date  ___/___/___      

Page 31: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  31  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

                                   Project  Checklist  Attachments:    Appendix   Please  include  the  following  attachments  1    Photos  2    Map  3    Project  Activity  Schedule  4    Gender  and  Development  Indicators  5    Environmental  Indicators  6    Other  Indicators  7      Budget  8    Budget  Notes  

APPENDIX  1  -­‐PHOTOS  See  Dropbox  (Global  photos  file)  

Page 32: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  32  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

APPENDIX  2  -­‐  MAP  

 

     APPENDIX  3  -­‐  PROJECT  ACTIVITY  SCHEDULE    

1 July 2012 to 30 June 2013 Tasks   July  

1  

 

2  

 

3  

4

5

Dec

6

7

8

9

10

11

June

12

POP  Administration     x   x   x   x x x

Ndilito's  House   x   x   x  

Southgate  House   x   x   x  

COP  School         x   x x x

Dodoma  Childrens          

POP  Kindergarten        

POP  Primary        

Grape  Planting                          

Office  Building                 x   x   x      

 

Page 33: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  33  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

1  July  2013  to  30  June  2014  

Tasks   July  

1  

 

2  

 

3  

 

4  

 

5  

Dec  

6  

 

7  

 

8  

 

9  

 

10  

 

11  

June  

12  

POP  Administration    

                       

Ndilito's  House                          

Southgate  House  

                       

COP  School                            

Dodoma  Childrens    

                  x   x   x  

POP  Kindergarten  

    x   x   x   x              

POP  Primary       x   x                  

Grape  Planting                          

Office  Building                     x   x   x  

 

1  July  2014  to  30  June  2015  

Tasks   July  

1  

 

2  

 

3  

 

4  

 

5  

Dec  

6  

 

7  

 

8  

 

9  

 

10  

 

11  

June  

12  

POP  Administration    

                       

Ndilito's  House                          

Southgate  House  

                       

COP  School         x   x   x   x   x            

Dodoma  Childrens    

x   x   x                    

POP  Kindergarten  

                       

Page 34: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  34  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

POP  Primary       x   x   x   x   x            

Grape  Planting                          

Office  Building                          

 

Page 35: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  35  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

APPENDIX  4  -­‐  GENDER  AND  DEVELOPMENT  INDICATORS       Yes/

No  Comments  

Q1   Is  the  promotion  of  equality  between  women  and  men  the  main  objective  of  the  whole  activity?  (principal)  The  activity  may  target  women  specifically,  men  specifically  or  both  women  and  men  as  long  as  the  main  objective  is  the  promotion  of  equality  between  women  and  men.    For  example,  support  to  legal  literacy  for  women,  or  support  to  male  networks  against  gender  violence.    Note:  an  activity  such  as  a  maternal  health  project  would  qualify  for  this  indicator.  

Yes  

 

Q2   Is  promoting  equality  between  women  and  men  an  objective  of  one  or  more  components  of  the  activity?  (significant)  Answer  ‘yes”  if  one  of  the  components  has  an  objective  which  promotes  equality  between  women  and  men.  The  objective  may  target  women  specifically,  men  specifically  or  women  and  men,  for  example,  women’s  literacy  activities  within  a  forestry  project.  

Yes  

 

Q3   Will  gender  sensitive  consultation  be  incorporated  into  the  activity?  Answer   ‘yes’   if   systematic   gender   consultation   with  local   people   has   been   or   will   be   part   of   the   activity.    This   involves   having  a  dialogue  with  both  women  and  men   on   their   perceptions   and   priorities,   and   making  sure  the  views  of  both  are  made  visible  in  the  planning  process.    For  example,  consulting  with  both  women  and  men   in  a  micro-­‐financing  activity  which  mainly   targets  women  or  women  and  men  in  an  infrastructure  activity  such  as  road  building.  

Yes  

 

Q4   Will  there  be  strategies  to  help  overcome  identified  barriers  to  full  participation  of  women  and  men?  Answer   ‘yes’   if   specific   barriers   to   participation   have  been  or  will  be   identified  through  gender  analysis,  and  strategies  to  help  overcome  these  barriers  have  been  or  will   be   designed.     Gender   analysis   involves   examining  the   different   roles   and   responsibilities   of   women   and  men.  

Yes  

 

Q5   Will  there  be  strategies  to  help  promote  equitable  participation  of  women  and  men  in  decision  making  roles?    Answer  ‘yes’  if  steps  are  being  taken  to  improve  gender  equality  in  decision-­‐making.    This  does  not  necessarily  mean  50%  women  and  50%  men.    

Yes  

 

Q6   Will  there  be  gender  sensitive  indicators  in  place  for  monitoring  and  evaluation?  Such  gender  sensitive  indicators  will  measure  the  positive  and  negative  consequences  of  the  activity  for  women  and  men.    Indicators  may  be  quantitative  or  qualitative.  

Yes  

 

Q7   Will  the  budget  include  an  allocation  for  specific   Yes                                                                    

Page 36: GLOBAL AMANI%PARTNERSHIP GENERAL’PROJECT’INFORMATIONamanitrust.homestead.com/Global_20Partnership_20Applic... · 2012. 8. 8. · GLOBAL!!AMANI%PARTNERSHIP" APPLICATON!TO!EXTEND!&!!THREEYEAR!DEVELOPMENT!PLAN!201372015!

       

J283  Amani  Development  Organization  &  Hearts  for  Africa  (Amani)  Foundation                                                                                                                                                                                                                    Page  36  of  36      Template Revision Date: Nov 2010 Date: 31 July 2012        ©  Copyright  2002-­‐2010  by  Global  Development  Group  (ABN  57  102  400  993).  All  rights  reserved.  No  reproduction  in  any  form  is  allowed  without  permission.  

activities  promoting  gender  equality?  Answer  ‘yes’  if  there  is  a  budget  allocation  for  specific  activities  that  have  a  main  objective  of  promoting  equality  between  women  and  men.    Enter  an  estimated  percentage  in  the  percentage  of  budget  box.  

5  Percentage  of  Budget          

   The  above  table  has  been  completed  on  the  basis  that  generally  speaking  there  are  no  significant  gender  equality    Issues  in  the  Makang’wa  district  of  Tanzania    

APPENDIX  5  -­‐  ENVIRONMENTAL  INDICATORS                       Yes/No  

Q1   Is  this  activity  in  an  environmentally  sensitive  location  or  sector?    

No  

Q2   Is  the  activity  likely  to  have  an  impact  on  the  environment?    

No  

Q3   Is  the  environment  a  specific  objective  of  the  activity?    

Yes  

Q4   Is  the  activity  relevant  to  international  environment  conventions?    

Do  not  believe  so  

     APPENDIX  6  -­‐  OTHER  INDICATORS       Yes/No  Q1   Does  the  activity  promote  human  rights?   Yes  Q2   Has  the  impact  on  health  been  considered?   Yes  Only  select  ‘Yes’  when  activities  explicitly  promote  awareness  and  adherence  to  human  rights  in  the  activity  design.    For  all  other  activities  –  although  they  may  indirectly  contribute  to  broader  human  rights  objectives  –  ‘No’  should  be  selected    APPENDIX  7  -­‐  DETAILED  BUDGET  See  attached  file    APPENDIX  8  –  BUDGET  NOTES    Amani  has  received  confirmation  that  Rotary  International  and  Rotary  in  Spain  will  provide  funding.  However  the  timetable  has  not  been  agreed  and  until  this  is  in  place  a  doubt  exists.  The  budget  includes  funding  from  rotary  in  the  areas  of  sinking  wells,  student  sponsorships  and  accommodation  of    orphans.