glitch group s5 activities laura cadonati for the glitch working group lsc meeting, hanford march...

23
Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

Upload: juliet-elliott

Post on 04-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

Glitch Group S5 Activities

Laura Cadonati for the Glitch Working Group

LSC meeting, HanfordMarch 21, 2006

G060071-00-Z

Page 2: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

2

S5 activities

The Glitch Group continued commitment in S5:» Off-site shifts» 2 weekly teleconferences » participation at S5-run-coordination and DetChar teleconferences.

Goals: » A quasi-online assessment (3-4 days delay) of transient features and correlation as the

run proceeds, using online tools developed over the past year. » Feedback to commissioning.» veto definition for online analysis (early stages).

Glitch-work related talks at this LSC meeting:» John Zweizig – S5 Data Quality (next talk)» Shourov Chatterji - Q Scan & Applications to Detector Characterization (this afternoon)» Jake Slutsky - S4 AS_I Veto for Inspiral Analysis (wed morning)» Shantanu Desai – S5 Loud Block-Normal Triggers & the Event Display (wed afternoon) » Erik Katsavounidis - S5 KleineWelle Glitch Studies (wed afternoon) » Soma Mukherjee - S5 Offline NoiseFloorMon Studies (wed afternoon) » Duncan Brown - S5 Online Inspiral Glitch Triggers (wed afternoon)

Page 3: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

3

Tools and Methods

Scan of loudest events Auto-correlogram and cross-correlogram of

triggers from different channels Standard veto search (Q-)spectrograms

BurstMon – DMT monitor for data “burstiness”, F.O.M.s (S. Klimenko) BlockNormal – loud events, above fixed threshold (S. Desai) KleineWelle – transients on a variety of aux channels (L. Blackburn) InspiralMon – 10 loudest BNS candidates/day (D. Brown) Event Display - see Shantanu Desai’s talk Q-scan – see Shourov’s Chatterji’s talk NoiseFloorMon – slow non-stationarity after line and transient removal (S.

Mukherjee)

Tools

The trigger production is automatized (DMT, ONASYS) Post-processing is at various levels of automatization (~1 day response) Interpretation in the hands of shifters

Analysis methods

Page 4: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

4

S5 off-site glitch shifts

E-notebook:http://www.lsc-group.phys.uwm.edu/glitch/investigations/s5index.html

Shift report:http://www.ligo.mit.edu/~cadonati/S5/glitch/glitch_report-LC-20060309-20060312.html

Weekly report:http://www.ligo.mit.edu/~cadonati/S5/glitch/WeeklyDC_20060305-20060312.html

Page 5: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

5

Participation

The next slides some of the many features so far identified in S5 data.

Plots and considerations are drawn from the work of several members of the glitch investigation team.

A. Di Credico, L. Blackburn, L. Cadonati, S. Chatterji, J. Dalrymple, S. Desai, J. Garofoli, G. Gonzalez, A. Gretaarson, E. Katsavounidis, S. Klimenko, S. Mukherjee, F. Raab, K. Riles,

P. Saulson, P. Shawhan, J. Slusky, M. Zanolin, J. Zweizig

Page 6: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

6

The Worst Glitching is at Low Frequency

L1 H1

H2 H1

Page 7: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

7

H1: pre-post commissioning

Day 1-103 :before commissioning break

Day 110-128 : after commissioning break

30-60 sec before lock loss

0-30 sec before lock loss0-30 sec before lock loss

30-60 sec before lock loss

Page 8: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

8

Veto studies are in early stages

PRC_CTRLtriggers

PRC_CTRLGood veto for Higher-freq eventsIn all 3 ifos

DARM_ERRtriggers

Day 1-103 :before commissioning break

Day 110-128 : after commissioning break

PRC_CTRLtriggers

H1

Page 9: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

9

H1 auto-correlation

This effect comes and goes, not microseismic (see e.g. march 3-4)

Auto correlogram for low significance triggers March 9, high microseismic

Day 1-103 :before commissioning break

Day 110-128 : after commissioning break

Auto-correlograms for high significance triggers (>35)

Page 10: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

10

H1 ASC-ETMX,Y_P

Page 11: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

11

H1 glitchiness often seen in magnetometers

100 sec+ of very noisy data producing many "inspiral glitches" during Mar 4, 2:14 UTC, with glitches having a very weird structure, concentrated in narrow ~200 Hz freq band

Page 12: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

12

H2 - ~ 6 sec periodicity

H2 jan 4Autocorrelogram for low significance triggers (>10) high microseismic

Always seen in low-significance auto-correlograms

Since the maintenance, they show up in loudest event scan

Page 13: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

13

H2

pix

el f

ract

ion

H2

freq

uen

cy

Microseismic (0.1-0.3Hz)

Anthropogenic (0.3-1Hz)

Page 14: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

14

H2 autocorrelations

Day 1-103 : before commissioning break

Day 110-128 : after commissioning break

Auto-correlograms for high significance triggers (>35)

Page 15: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

15

H2 glitches (examples)

This appears in the inspiral search; shows in other channels but nowhere as loud!

Page 16: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

16

light dips

ASC-QPDY_DC

Also showing in AS_I, POB_Q, POB_I, PRC_CTRL, REFL_Q, AS_DC, MICH_CTRL, WFS2 …

Page 17: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

17

H1 and H2

H2 when H1 is not locked H1 when H2 is not locked

Page 18: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

18

H1-H2 coincidence excess

A big transient seen in all magnetometersand volt-meters

Page 19: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

19

L1 autocorrelations

March 11Average microseismic Feb 14 – high seismic

Structures show in low-significance auto-correlogramsBut not in high-significance ones

Page 20: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

20

Day 1-103 : before commissioning break

Page 21: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

21

L1 – seismic

15 minutes before a train…

Page 22: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

22

L1 – planes and helicopters

seconds

seconds

BlockNormal outlier

Page 23: Glitch Group S5 Activities Laura Cadonati for the Glitch Working Group LSC meeting, Hanford March 21, 2006 G060071-00-Z

23

Conclusions

The glitch group is finding lots of features, the limit is only manpower.

The shift system is a way to do science monitoring offsite and learn about our data and provide feedback to commissioning/run coordination.

Contribution/help is welcome!