PROGRAM OUTLINE

Glazier

Page 2: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

To order additional copies please contact: Government Publications Services PO Box 9452 Stn Prov Govt Victoria, BC V8W 9V7 Phone: 250 387-6409 or Toll Free: 1 800 663-6105 Fax: 250 387-1120 www.publications.gov.bc.ca

Copyright © 2008 Industry Training Authority This publication may not be reproduced in any form without permission by the

Industry Training Authority Contact Director, Government Publications Services, Queen’s Printer at 250 356-6876

Page 3: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

GLAZIER

PROGRAM OUTLINE

August, 2008

Developed By Industry Training Authority

Province of British Columbia

Page 4: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority i

TABLE OF CONTENTS FOREWORD ................................................................................................................................. II ACKNOWLEDGEMENTS ........................................................................................................... III SECTION 1 OCCUPATION ANALYSIS CHART ........................................................................ 1 SECTION 2 GLAZIER PROGRAM OUTLINE ............................................................................ 4 SUGGESTED SCHEDULE OF TIME ALLOTMENT FOR GLAZIER ........................................... 6 PROGRAM OUTLINE FOR LEVEL 1 .......................................................................................... 8

LINE: A USE SAFE WORK PRACTICES ........................................................................... 9 LINE: B USE TOOLS AND EQUIPMENT ......................................................................... 19 LINE: C ORGANIZE WORK ............................................................................................. 30 LINE: D PERFORM FUNDAMENTAL GLAZING TASKS ................................................. 34 LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS..................................... 39

PROGRAM OUTLINE FOR LEVEL 2 ........................................................................................ 42 LINE: C ORGANIZE WORK ............................................................................................. 43 LINE: D PERFORM FUNDAMENTAL GLAZING TASKS ................................................. 45 LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS..................................... 50 LINE: F INSTALL RESIDENTIAL SYSTEMS ................................................................... 58

PROGRAM OUTLINE FOR LEVEL 3 ........................................................................................ 61 LINE: B USE TOOLS AND EQUIPMENT ......................................................................... 62 LINE: C ORGANIZE WORK ............................................................................................. 64 LINE: D PERFORM FUNDAMENTAL GLAZING TASKS ................................................. 68 LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS..................................... 70 LINE: G FABRICATE AND INSTALL SPECIALTY GLASS AND PRODUCTS ................. 71

SECTION 3 FACILITY REQUIREMENTS ................................................................................. 78 FACILITY REQUIREMENTS ...................................................................................................... 79 TOOLS AND EQUIPMENT ........................................................................................................ 80 FACULTY CREDENTIAL AND EXPERIENCE REQUIREMENTS ............................................ 82

Page 5: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority ii

FOREWORD

The revised Glazier Program Outline is intended as a guide for instructors, apprentices, and employers of apprentices, as well as for the use of industry organizations, regulatory bodies, and provincial and federal governments. It reflects updated standards based on the new Glazier Occupational Analysis (2008) and input from the British Columbia industry and instructor subject matter experts. Practical instruction by demonstration and student participation should be integrated with classroom sessions. Safe working practices, even though not always specified in each operation or topic, are an implied part of the program and should be stressed throughout the apprenticeship. The Program Outline was prepared with the advice and assistance of the Glazier Governance Committee. It will form the basis for further updating of the British Columbia Glazier Program and other trade-related learning resources. Practical Exercises are included for those competencies that require a practical component. The intent of including Practical Exercises is to ensure consistency in training across the many training institutions in British Columbia. Their purpose is to reinforce the theory and to provide a mechanism for evaluation of the learner’s ability to apply the theory to practice. It is important that these performances be observable and measureable and that they reflect the skills outlined in the competency as those required of a competent journeyperson. The conditions under which these performances will be observed and measured and the criteria by which the learner will be evaluated must be clear to the learner. The learner must also be given the level of expectation of success. The performance described in each Practical Exercise is a suggested performance and is not meant to stifle flexibility of delivery. Training providers are welcome to substitute other practical performances that measure similar skills and attainment of the competency. Multiple performances may also be used to replace individual performances where appropriate.

SAFETY ADVISORY Be advised that references to the WorkSafe BC safety regulations contained within these materials do not/may not reflect the most recent Occupational Health and Safety Regulation (the current Standards and Regulation in BC can be obtained on the following website: http://www.worksafebc.com. Please note that it is always the responsibility of any person using these materials to inform him/herself about the Occupational Health and Safety Regulation pertaining to his/her work.

Page 6: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority iii

ACKNOWLEDGEMENTS The Construction Industry Training Organization wishes to thank the following Subject Matter Experts for their assistance in the Glazier Program Outline workshop: Mike Guzauskas

Mark Longmore

Steve Squire

Page 7: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 1

SECTION 1 OCCUPATION ANALYSIS CHART

Page 8: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Program Overview

Glazier Program Outline • Industry Training Authority 2

Glazier Occupation Analysis Chart

Use Safe Work Practices A

Control Workplace Hazards A1

Locate OSH Regulations and WCB Standards A2

Use WHMIS A3

Use Personal Protective Equipment A4

Practice Fire Prevention A5

Attain First Aid Certification A6

1 1 1 1 1 1

Use Fall Protection Systems A7

1

Use Tools and Equipment B

Use Hand Tools B1

Use Portable Power Tools B2

Use Stationary Power Tools B3

Use Layout and Measuring Equipment B4

Use Ladders and Platforms B5

Use Rigging and Hoisting Equipment B6

1 1 1 1 3 1 1

Organize Work C

Interpret Drawings and Specifications C1

Use Codes, Regulations, and Standards C2

Use Manufacturer and Supplier Documentation C3

Use Mathematics C4

Handle Materials C5

1 2 3 3 3 1 2 3 1

Perform Fundamental Glazing Tasks D

Prepare the Worksite D1

Perform Glass Cutting and Edge Treatment D2

Install Building Envelope Membranes D3

Install Flashing D4

Use Caulking and Sealants D5

1 3 1 2 3 1 2 1 2

Fabricate and Install Commercial Systems E

Fabricate and Install Storefront Systems E1

Fabricate and Install Window Systems E2

Fabricate and Install Curtain Walls E3

Fabricate and Install Skylights and Sloped Glazing Systems E4

Fabricate and Install Commercial Entrance Systems E5

1 2 3 2 1 2 2 2

Page 9: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Program Overview

Glazier Program Outline • Industry Training Authority 3

Install Residential Systems F

Glaze Residential Windows and Doors F1

Install Showers, Mirrors, and Solariums F2

Install Skylights F3

2 2 2

Fabricate and Install Specialty Glass and Products G

Layout Specialty Glass and Products G1

Assemble Specialty Glass and Products G2

Install Specific Specialty Systems G3

Service and Maintain Glazing Systems G4

3 3 3 3

Page 10: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 4

SECTION 2 GLAZIER

PROGRAM OUTLINE

Page 11: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 5

GLAZIER INDUSTRY TRAINING MODEL

Glazier Apprenticeship

Level 1 (180 Hours)

Glazier Apprenticeship

Level 2 (180 Hours)

Glazier Apprenticeship

Level 3 (180 Hours)

Certificate of Qualification with

Interprovincial Red Seal Endorsement

Persons completing a formal apprenticeship also receive a Certificate of Apprenticeship

Page 12: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 6

SUGGESTED SCHEDULE OF TIME ALLOTMENT FOR GLAZIER

Level 1 Theory

% Practical

% Page

Line A Use Safe Work Practices 19 4 9 A-1 Control Workplace Hazards 10 11 A-2 Locate OSH Regulations and WCB Standards 10 13 A-3 Use WHMIS 18 A-4 Use Personal Protective Equipment 21 15 A-5 Practice Fire Prevention 10 16 A-7 Use Fall Protection Systems 31 18

Line B Use Tools and Equipment 27 70 19 B-1 Use Hand Tools 14 19 B-2 Use Portable Power Tools 2 21 B-3 Use Stationary Power Tools 5 23 B-4 Use Layout and Measuring Equipment 20 25 B-5 Use Ladders and Platforms 52 27 B-6 Use Rigging and Hoisting Equipment 7 29

Line C Organize Work 22 7 31 C-1 Interpret Drawings and Specifications 18 31 C-4 Use Mathematics 53 32 C-5 Handle Materials 29 33

Line D Perform Fundamental Glazing Tasks 16 12 35 D-1 Prepare the Worksite 12 35 D-2 Perform Glass Cutting and Edge Treatment 50 36 D-3 Install Building Envelope Membranes 13 37 D-5 Use Caulking and Sealants 25 39

Line E Fabricate and Install Commercial Systems 16 7 40 E-1 Fabricate and Install Storefront Systems 42 40 E-3 Fabricate and Install Curtain Walls 58 41 100% 100% The composite level mark consists of 30% theory and 70% practical. The final exam counts for 30% of the theory mark. Level 2 Theory

% Practical

% Page

Line C Organize Work 24 43 C-1 Interpret Drawings and Specifications 67 43 C-4 Use Mathematics 33 44

Line D Perform Fundamental Glazing Tasks 20 39 45 D-2 Perform Glass Cutting and Edge Treatment 67 45 D-4 Install Flashing 13 46 D-5 Use Caulking and Sealants 20 48

Line E Fabricate and Install Commercial Systems 42 61 50 E-1 Fabricate and Install Storefront Systems 29 50 E-2 Fabricate and Install Window Systems 15 51

Page 13: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 7

Level 2 Theory %

Practical%

Page

E-3 Fabricate and Install Curtain Walls 33 53 E-4 Fabricate and Install Skylights and Sloped Glazing Systems 14 55 E-5 Fabricate and Install Commercial Entrance Systems 9 57

Line F Install Residential Systems 14 58 F-1 Glaze Residential Windows and Doors 40 58 F-2 Install Showers, Mirrors, and Solariums 30 59 F-3 Install Skylights 30 60 100% 100% The composite level mark consists of 30% theory and 70% practical. The final exam counts for 30% of the theory mark. Level 3 Theory

% Practical

% Page

Line B Use Tools and Equipment 9 19 63 B-4 Use Measurement and Layout Tools 100 63

Line C Organize Work 27 15 65 C-1 Interpret Drawings and Specifications 54 65 C-2 Use Codes, Standards, and Regulations 15 66 C-3 Use Manufacturer and Supplier Documentation 31 67 C-4 Use Mathematics 69

Line D Perform Fundamental Glazing Tasks 11 22 68 D-1 Prepare the Worksite 34 68 D-2 Perform Glass Cutting and Edge Treatment 66 69

Line E Fabricate and Install Commercial Systems 14 44 70 E-1 Fabricate and Install Storefront Systems 100 70

Line G Fabricate and Install Specialty Glass and Products 39 71 G-1 Layout Specialty Glass and Products 22 71 G-2 Assemble Specialty Glass and Products 22 73 G-3 Install Specific Specialty Systems 22 74 G-4 Service and Maintain Glazing Systems 34 76 100% 100% The composite level mark consists of 30% theory and 70% practical. The final exam counts for 30% of the theory mark.

Page 14: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 8

PROGRAM OUTLINE FOR

LEVEL 1

Page 15: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 9

LINE: A USE SAFE WORK PRACTICES Competency: A1 Control Workplace Hazards Learning Objectives: Identify and describe workplace hazards.

Manage workplace hazards. Demonstrate emergency procedures. Describe non-emergency injury reporting procedures. Describe how worksite safety policies are established.

LEARNING TASKS CONTENT

1 Describe short term hazards in the glazier trade

Sharp objects-glass and metal Overhead hazards Electrical Lockout procedures Explosive material (dust) Lifting techniques Housekeeping Clear head Horseplay Respect for others safety Constant awareness of surroundings Safe attitude Safety line inspections Management of hazards

2 Describe long term hazards in the glazier

trade Respiratory disease

Paint fumes Silicosis

Asbestos Repetitive strain injuries Cleaning products: solvents, chemicals Caulking product toxicity Back injuries

3 Demonstrate emergency procedures Emergency shutoffs

Fire control systems Eye wash facilities Emergency exits Emergency contact/phone numbers Outside meeting place Disaster meeting place Emergency horn protocol

4 Describe non-emergency injury reporting

procedures First aid facilities

Reports Reports to first aid attendant

Page 16: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 10

5 Describe and interpret worksite safety policies

Site orientations Hazard assessment Conditions Meeting requirements Reporting hazards and incidents Investigations Committees Employee orientation First-aid Hearing Records and statistics Lock-out Non-compliance procedures

Tape identification (red, yellow) Minimum standards Acts and Regulations

Page 17: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 11

LINE: A USE SAFE WORK PRACTICES Competency: A2 Locate OSH Regulations and WCB Standards Learning Objectives: Locate the Occupational Health and Safety Regulations applicable to the workplace.

Interpret the Occupational Health and Safety Regulations applicable to the workplace. LEARNING TASKS CONTENT

1 Read the Occupational Health and Safety Regulations

Occupational Health and Safety Regulations.

2 Locate terms used in the Workers’ Compensation Act

Definitions, Section 1 of the Act

3 Locate the conditions under which compensation will be paid (Book 1)

Part 1, Division 2 of the Act

4 Locate the general duties of employers, employees and others (Book 1)

Part 2, Division 3, Sections 115-124 of the Act

5 Locate the Workers’ Compensation Act requirements for the reporting of accidents (Book 1)

Part1, Division 5, Sections 53 and 54 of the Act

6 Locate the “Core Requirements” of the Occupational Health and Safety Regulation (Book 1)

Definitions Application Rights and Responsibilities

Health and safety programs Investigations and reports Workplace inspections Right to refuse work

General Conditions Building and equipment safety Emergency preparedness Preventing violence Working alone Ergonomics Illumination Indoor air quality Smoking and lunchrooms

Page 18: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 12

6 Locate the “General Hazard Requirements” in the Health and Safety Regulation (Book 2)

Chemical and biological substances Substance specific requirements Noise, vibration, radiation and temperature Personal protective clothing and equipment Confined spaces De-energization and lockout Fall protection Tools, machinery and equipment Ladders, scaffolds and temporary work

platforms Cranes and hoists Rigging Mobile equipment Transportation of workers Traffic control Electrical safety

7 Interpret Occupational Health and Safety

information that is relevant to the worksite. As per documentation

Page 19: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 13

LINE: A USE SAFE WORK PRACTICES Competency: A3 Use WHMIS Learning Objectives: Describe the purpose of the Workplace Hazardous Materials Information System (WHMIS)

Regulations. Interpret material safety data sheets (MSDS). Interpret WHMIS labels. Apply WHIMIS regulations Locate appropriate WHMIS material in the workplace.

LEARNING TASKS CONTENT

1 State the purpose of the Workplace Hazardous Materials Information System (WHMIS)

Protection of Canadian workers from the adverse effects of hazardous materials through the provision of relevant information while minimizing the economic impact on industry and the disruption of trade

Recognition of rights Workers Employers Suppliers Regulators

2 Describe the key elements of WHMIS Material safety data sheets (MSDSs)

Labelling of containers of hazardous materials Worker education programs

3 Describe the responsibilities of suppliers under WHMIS

Provide MSDSs Labels

4 Describe the responsibilities of employers

under WHMIS Provide

MSDSs Labels Work education programs in the workplace

5 Describe information to be disclosed on a

MSDS Hazardous ingredients

Preparation information Product information Physical data Fire or explosion Reactivity data Toxicological properties Preventive measures First-aid measures

Page 20: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 14

6 Identify symbols found on WHMIS labels and describe their meaning

Compressed gases Flammable and combustible materials Oxidizing materials Poisonous and infectious materials

Materials Causing Immediate and Serious Toxic Effects

Materials Causing Other Toxic Effects Biohazardous Infectious Materials

Corrosive Materials Dangerously Reactive Materials

7 Apply WHMIS regulations as they apply to hazardous materials used in the shop

Use, storage and disposal of chemicals

Page 21: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 15

LINE: A USE SAFE WORK PRACTICES Competency: A4 Use Personal Protective Equipment Learning Objectives: Describe personal protective equipment requirements for Glaziers.

Demonstrate proper use of personal protective equipment. LEARNING TASKS CONTENT

1 Describe personal protective equipment requirements

Safety footwear Eye protection Ear protection Head protection Gauntlets Gloves Respiratory protection Fall protection

2 Demonstrate proper use of personal protective equipment

Use Inspection Maintenance Storage

Page 22: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 16

LINE: A USE SAFE WORK PRACTICES Competency: A5 Practice Fire Prevention Learning Objectives: Identify various classes of fires.

Apply preventative fire safety precautions. Use equipment to prevent various classes of fire.

LEARNING TASKS CONTENT

1 Describe the conditions necessary to support a fire

Air Fuel Heat Chemical chain reaction

2 Describe the classes of fires according to the materials being burned

Class A Class B Class C Class D Symbols and colours

3 Apply preventative fire safety precautions when working near, handling or storing flammable liquids or gases, combustible materials and electrical apparatus

Fuels Diesel Gasoline Propane Natural Gas

Ventilation Purging

Lubricants Oily rags Combustible metals Aerosols

4 Describe the considerations and steps to be taken in case of a fire

Training Personal method of egress Contacting fire department immediately Warning others Evacuation of others

5 Describe the procedure for using a fire

extinguisher Extinguisher selection

P.A.S.S. Pull Aim Squeeze Sweep

Page 23: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 17

LINE: A USE SAFE WORK PRACTICES Competency: A6 Attain First Aid Certification Learning Objectives: The learner will attain first aid certification. LEARNING TASKS CONTENT

1 Attain first aid certification Arrange first aid certification with a certified provider of first aid training. CPR

Page 24: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 18

LINE: A USE SAFE WORK PRACTICES Competency: A7 Use Fall Protection Systems Learning Objectives: Select appropriate fall protection equipment.

Use fall protection equipment and systems. LEARNING TASKS CONTENT

1 Describe fall protection equipment Fall arrest/restraint/work positioning equipment Harnesses Waist belts Hardware

Beamer Lanyard Caribiner Shock-absorbing devices Retractable devices Vertical line grab (fibre and wire) Cable/nylon tie-off slings

Standards (CSA) Inspection and maintenance Worksite awareness OHS regulations part 11

2 Describe fall protection systems Railings/scaffolds Nets Hardware Anchor points Assembly Ladder systems Vertical and horizontal systems

3 Demonstrate proper use of fall protection equipment and systems

OHS Regulations part 11 Daily inspection Assembly/disassembly Fall protection plan

Identify work area and risks List and choose equipment Rescue procedures

Fit test Achievement Criteria: Performance: The learner will perform a fit test. Conditions: The learner will be given:

A harness Criteria: The learner will score 70% or better on a rating sheet that reflects the following criteria:

D-ring position (between shoulders) Snugness of fit

Page 25: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 19

LINE: B USE TOOLS AND EQUIPMENT Competency: B1 Use Hand Tools Learning Objectives: Describe hand tools used by glaziers.

Select and use hand tools. Inspect and maintain hand tools.

LEARNING TASKS CONTENT

1 Describe hand tools

Hammers and mallets Saws Clamps Chisels Knives

Bent putty knife Drills and drill bits Punch Glass cutting tools

Hand cutters Circle cutters Hole drills Tube drills L-square Lip rule Production cutter Notch saw

Caulking gun Wrenches Snips Pliers Duck bill pliers Rivet gun Sanders Files Scoring tool Metal-cutting tools Hand-pump suction cups Tap and dies Vinyl roller *Refer to the tool list at the end of the document

2 Inspect and maintain hand tools

Storage Safety Maintenance procedures Manufacturer specifications

4 Use hand tools

Purpose Types and sizes Parts Operation Accessories Safety

Page 26: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 20

Adjustments

LINE: B USE TOOLS AND EQUIPMENT Competency: B2 Use Portable Power Tools Learning Objectives: Describe portable power tools used by glaziers.

Select and use portable power tools. Inspect and maintain portable power tools.

LEARNING TASKS CONTENT

1 Describe portable power tools Sanders Saws

Chop saw Circular saws Reciprocating saw Jig saw

Drills and bits Drill gun Screw gun Nibbler Shears Router Grinders Extension cords Rotary hammer Powder-actuated tools *Refer to the tool list at the end of the document

2 Use portable power tools Purpose Types and sizes Parts Operation Accessories Safety Adjustments

3 Inspect and maintain portable power tools

Storage Safety Maintenance procedures Manufacturer specifications

Page 27: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 21

Achievement Criteria: Performance The learner will demonstrate safe operating procedures for power tools.

Conditions The learner will be given: Power tools Safety and operation instructions Materials to work with

Criteria The learner will score 70% or better on a rating sheet that reflects the following

criteria: Proper set-up Handling equipment According to safety instructions Proper lubrications Cut quality and accuracy

Page 28: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 22

LINE: B USE TOOLS AND EQUIPMENT Competency: B3 Use Stationary Power Tools Learning Objectives: Describe stationary power tools used by glaziers.

Select and use stationary power tools. Inspect and maintain stationary power tools.

LEARNING TASKS CONTENT

1 Describe stationary power tools Sanders Saws

Radial arm saw Table saw

Drills and bits Guns Router Grinders Hand brake Polishing machine Milling machine Press

Punch Drill Sealed unit

Edging machine *Refer to the tool list at the end of the document

2 Use stationary power tools Purpose Safety Types and sizes Parts Operation Accessories Adjustments Lubricants

3 Inspect and maintain stationary power tools

Storage Safety Maintenance procedures Manufacturer specifications

Page 29: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 23

Achievement Criteria: Performance The learner will demonstrate safe operating procedures for stationary power tools.

Conditions The learner will be given: Power tools Guidelines and safety protocols Materials to work with

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Proper set-up Handling equipment According to safety instructions Proper lubrications Cut quality and accuracy

Page 30: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 24

LINE: B USE TOOLS AND EQUIPMENT Competency: B4 Use Layout and Measuring Equipment Learning Objectives: Describe layout and measuring equipment used by glaziers.

Select and use layout and measurement equipment. Inspect and maintain layout and measurement equipment.

LEARNING TASKS CONTENT

1 Describe layout and measuring equipment Levels Torpedo Hand Builder’s Laser Transit

Measurement and alignment tools tape measure metre stick plumb bob chalk line edges and squares architectural scale ruler protractor squares sliding T bevel callipers

2 Use layout and measuring equipment Purpose Types and sizes Parts Operation Accessories Safety Adjustments

3 Inspect and maintain layout and measurement equipment

Storage Safety Maintenance procedures Manufacturer specifications

Page 31: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 25

Achievement Criteria: Performance The learner will use layout and measuring equipment to determine, communicate

and draft accurate flashing, glass and metal profiles. Conditions The learner will be given:

Layout and measuring equipment Instructions Safety protocols Materials to work with

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Proper set-up Handling equipment Measurement accuracy Understanding and following instructions Transfer of accurate measurements and angles

Page 32: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 26

LINE: B USE TOOLS AND EQUIPMENT Competency: B5 Use Ladders and Platforms Learning Objectives: Describe ladders and elevated platforms.

Select and use ladders and elevated platforms. LEARNING TASKS CONTENT

1 Describe ladders and elevated platforms Ladders Extension Step Ladder jacks

Scaffolds Tower Outriggers Baker Frame Sectional Tubular

Aerial work platforms Boom and scissor lifts (employer

responsibility for certification) Swing stage

Fulcrum point Uses Parts Safety Fall arrest equipment Hazard recognition Government regulations

2 Use ladders and elevated platforms Selection Operating procedures Limitations Securing Inspection Maintenance Storage

Page 33: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 27

Achievement Criteria: Performance The learner will erect tower scaffold.

Conditions The learner will be given:

Scaffolding components Fall protection if required

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Inspection procedure followed Ladders aligned Safety pins installed Cross brace properly installed Locked wheels Layout according to site conditions and public safety (control zone)

Page 34: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 28

LINE: B USE TOOLS AND EQUIPMENT Competency: B6 Use Rigging and Hoisting Equipment Learning Objectives: Describe hoisting, rigging, and lifting equipment.

Tie knots, bends and hitches. Select and use hoisting, lifting, and rigging equipment.

LEARNING TASKS CONTENT

1 Describe the principles of lifting and hoisting

Mechanical advantage Balance points

2 Describe hoisting, lifting and rigging

equipment Lifting and Hoisting

Power cups Cranes Boom trucks Engine hoist (Cherry Pick) Loaders Tirfors Come-alongs Tuggers Chain falls

Accessories Slings/chokes Shackles Chains Tag lines Spreader bars Snatch blocks Turnbuckles

3 Describe lifting and hoisting communication

Purpose of proper communication Types

Hand signals Communication with the operator Communication with others

4 Tie knots, bends and hitches Types Half hitch Clove hitch Figure of eight Bowline Trucker’s hitch

Purposes Limitations

Page 35: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 29

5 Use hoisting, lifting and rigging equipment Safety Certification requirements Estimation of weights Equipment capacities Equipment selection Lifting location Operating procedures Securing of loads Equipment inspection Equipment maintenance Equipment storage Disposal procedures

Achievement Criteria: Performance The learner will tie the appropriate knot for a given application:

Half hitch Clove hitch Figure of eight Bowline Trucker’s hitch

Conditions The learner will be given: Rope Instructions (application)

Criteria The learner will score 70% or better on a rating sheet that reflects the following

criteria: Properly tied knots. Appropriate knot for given application

Page 36: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 30

LINE: C ORGANIZE WORK Competency: C1 Interpret Drawings and Specifications Learning Objectives: Describe architectural, shop, and fabrication drawings. LEARNING TASKS CONTENT

1 Describe purpose of drawings Uses Types

Architectural, shop, fabrication

2 Describe components of drawings Floor plan

Cross section Elevation Details Scale Schedules Symbols

Page 37: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 31

LINE: C ORGANIZE WORK Competency: C4 Use Mathematics Learning Objectives: Apply mathematical principals to solve problems. LEARNING TASKS CONTENT

1 Use fractions to solve problems Add, subtract, multiply divide Express in higher terms. Simplify fractions

2 Use decimal fractions to solve problems Add, subtract, multiply divide Convert between decimals and fractions Decimal notation

3 Solve problems of ratio Ratio equivalent

4 Calculate weights for glass Lites of glass Sealed units

5 Use metric and imperial measurements Convert between metric and imperial

Feet, inches/metres, millimetres Pounds, tons

Use conversion tables

Page 38: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 32

LINE: C ORGANIZE WORK

Competency: C5 Handle Materials Learning Objectives: Describe how to handle and store glass and aluminum.

Demonstrate proper handling and storage of glass and aluminum. Describe how to use equipment to move glass, sealed units and aluminum. Use equipment to move glass, sealed units, and aluminum. Describe how to ship and receive glass products and aluminum. Demonstrate how to handle and store flashings. Demonstrate proper communication for lifting and transporting glass and other materials.

LEARNING TASKS CONTENT

1 Demonstrate proper lifting techniques for glass, sealed units and aluminum

Carrying glass and sealed units Ergonomics Hazards associated with lifting glass Lifting tools

Suction cups Gloves Slings

2 Use equipment to move glass, sealed

units and aluminum Glass dollies

Glass trucks Slings and webs Suction cups

3 Describe how to crate glass Skeleton crate

Cardboard Squash board Metal strapping

4 Describe how to un-crate glass Proper lean

Wedged safely Opening correct side Checking for broken glass

5 Describe how to safely store glass,

aluminum and flashings on the jobsite Temporary racks

Bearing walls

6 Describe how to safely store glass and glass units in a shop

Envelope racks Glass racks Glass cases Protecting the public Cut off racks Securing loose glass on dollies

7 Describe how to ship and receive glass

products Detecting flaws in glass products

Page 39: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 33

8 Demonstrate proper communication protocols for lifting, transporting and installing glass and other materials

Communication protocols Lifting limitations Emergency procedures Developing a safety backup plan for

transporting glass

Achievement Criteria: Performance The learner will transport glass with a partner by using a plate dolly.

Conditions The learner will be given:

Equipment Instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following

criteria: Safe lifting technique with appropriate communication. Use of cups

Page 40: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 34

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency: D1 Prepare the Worksite Learning Objectives: Describe inspection of the worksite.

Prepare the worksite. LEARNING TASKS CONTENT

1 Describe inspection of the work area Site orientation Power supply access Equipment requirements

Storage for tools and materials Set up areas for equipment and scaffolding Lifting and hoisting equipment

Problem areas Access considerations Onsite utilities

Electrical Water

Safety requirements Fall protection First aid location Hazard assessment Muster stations

2 Prepare the worksite Location of jobsite Site orientation Blueprint review Layout of job materials required for the job Hazards Utility requirements

Power supply

Preparation of storage areas Unloading building materials

Control site access PPE

Hardhat

Safety glasses

Steel-toe boots

Page 41: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 35

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency: D2 Perform Glass Cutting and Edge Treatment Learning Objectives: 1 Describe composition of glass.

Describe the types of glass. Describe tools and cutting equipment. Describe glass cutting theory. Describe glass cutting and edge treatment procedures.

LEARNING TASKS CONTENT

1 Describe composition of glass History of glass Properties Glass ingredients Evolution of glass

2 Describe the types of glass Float Laminate Tempered Heat-strengthened GPW Sealed units Mirror Glass coatings Obscure pattern glass

3 Describe tools and cutting equipment Glass cutters Pliers Cutting tables Squares Circle cutters Hole cutters Notching saw Arissing sander Methyl hydrates

4 Describe glass cutting theory Measuring Straight edges Cutters (sharp and dull) Completing cuts

Pressure points

Running

Snapping

Storage and disposal of cut offs 5 Describe glass cutting and edge treatment

procedures Arising

Grinding and polishing Bevels Corners

Page 42: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 36

LINE: D PERFORM PREPARATORY GLAZING TASKS Competency: D3 Install Building Envelope Membranes Learning Objectives: Describe preparation of materials for installation.

Describe procedures for installing building envelope membranes. Install building envelope membranes.

LEARNING TASKS CONTENT

1 Describe the purpose of membranes Water and air seal

2 Describe preparation of materials for installation

Types of materials Application of materials Selection and use of appropriate tools and

equipment Preparation methods for specific materials General preparation of materials

Cleaning Measuring Priming Corner sealing and lapping

3 Describe compatibilities of membranes Peel and stick

Sizes 3 in, 4 in., 6 in., 12 in., 3 ft.

Specifications of compatibility of adjoining membranes

4 Describe types of substrates Metal Concrete Wood

5 Describe rain screen principles Airtight seal to the interior

Rain barrier weeped to the exterior Pressure equalization Pressure differential

6 Install building envelope membranes Tools and equipment

Materials Fasteners and sealants Product compatibility Manufacturer recommendations

Installation sequencing of membranes for watershed

Laying down of membrane Install building envelope membranes according

to job specifications

Page 43: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 37

Achievement Criteria: Performance The learner will measure and apply primer and membrane to specifications.

Conditions The learner will be given: Instructions Materials Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Condition of the substrate

Clean

Dry

Positive slope

Lapping coordination 2 in. minimum

Adhesion Primer neatness Excess build-up reduction Safety

Eye and skin protection

Respirator (charcoal)

Page 44: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 38

LINE: D PERFORM PREPARATORY GLAZING TASKS Competency: D5 Use Caulking and Sealants Learning Objectives: Describe the types of sealants used in the glazing trade.

Describe sealing and caulking methods. Install vinyls.

LEARNING TASKS CONTENT

1 Describe types of sealants Classification High performance Medium performance Low performance

Types Silicone Oil base Butyl Polysulfide Urethane

One part Two part

Tapes Caulking Gaskets

2 Describe tapes and shims Butyl tape

Pre-shim tape Foam tape Sponge gaskets Dense wedge gaskets Spacer shims

3 Describe backup materials Types

Closed-cell polyethylene rod Open-cell polyethylene rod Bond breakers

Procedures for application Size Parallel joint faces Width to depth ratio

4 Apply gaskets and vinyl Sizing Cutting Installation

Back gaskets Face gaskets

Page 45: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 39

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E1 Fabricate and Install Storefront Systems Learning Objectives: Describe storefront profiles.

Describe doors and pivot systems. Describe fastener and screw types. Perform primary assembly of storefront.

LEARNING TASKS CONTENT

1 Describe storefront profiles. Single glaze Double glaze Thermally-broken and non-thermally-broken

2 Describe fasteners, screw s and plugs. Fasters

Sheet metal

Machine

Nuts and bolts

Pop rivets

Riv nuts

Screws Wood

Tek screws

Self-drillers

Flat head

Round head

Security

Plugs Qwik-bolt

Concrete

Wall

Steel inserts

Butterfly

Composition Stainless

Plated

Galvanized

Nickel cadmium

Aluminum

Page 46: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 40

3 Describe doors and pivot systems.

Single glazed Double glazed Glass doors Sliders Types of pivots

Offset, butt, continuous hinge, centre hung

4 Perform primary assembly of storefront. Screw spline assembling Setting block applications Glazing and vinyling

Achievement Criteria: Performance The learner will screw assemble and glaze a small frame.

Conditions The learner will be given:

Instructions Materials Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following

criteria: Overall size Proper joints Setting block procedure Overall aesthetics

Page 47: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 41

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency E3 Fabricate and Install Curtain Walls Learning Objectives: Describe curtain wall types and components.

Describe curtain wall fabrication. Glaze curtain wall.

LEARNING TASKS CONTENT

1 Describe curtain wall components Curtain wall components Pressure plate, SSG, vertical and horizontal

mullion, slip brackets, static and non-static anchors, beauty caps, corner mullions, two-part screw spline curtain wall

2 Describe curtain wall fabrication

Taping and vinyling pressure plate and curtain wall

Drilling or punching vent and drain holes Installing pressure plates

3 Describe anchor systems Aluminum angles

Slip brackets Static anchors Dynamic anchors

4 Glaze curtain wall Corner blocking and sealants

Glass installation Setting blocks Temporaries (Dutchmen) Vertical pressure plate installation Horizontal pressure plate installation (clearance

tolerances) Sealants Beauty cap installation

Page 48: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 42

PROGRAM OUTLINE FOR

LEVEL 2

Page 49: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 43

LINE: C ORGANIZE WORK Competency: C1 Interpret Drawings and Specifications Learning Objectives: Identify symbols and abbreviations.

Interpret shop, and fabrication drawings Describe door and window schedules. Use a drawing to prepare a material list.

LEARNING TASKS CONTENT

1 Identify symbols and abbreviations Legend Symbols Abbreviations Cross sections Details Language of lines Grid lines

2 Interpret shop, and fabrication drawings Glazing-specific Sizes and dimensions Flashings and fasteners

3 Describe door and window schedules Metal type and finish Handing Hardware Glass type and size

4 Use a drawing to prepare a material list Quantities (caulking, vinyls, metal) Overall dimensions Optimizing Glass sizes

Page 50: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 44

LINE: C ORGANIZE WORK Competency: C4 Use Mathematics Learning Objectives: Solve geometric problems.

Solve problems using trigonometry. Use math to revise optimizing sheets.

LEARNING TASKS CONTENT

1 Solve geometric problems

Area Perimeter Volume Angles Arc Radius and diameter Formulas for area of:

Square and rectangles Triangles Parallelogram Trapezoid Circle Sector Segment Other relevant geometric shapes

2 Solve problems using trigonometry

Pythagorean theorem Sine Cosine Tangent

3 Use mathematics to revise optimizing sheets

Calculator Cutting kerf evaluation

Page 51: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 45

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency: D2 Perform Glass Cutting and Edge Treatment Learning Objectives: Cut different types of glass.

Describe and install sealed units. Use tools and cutting equipment. Perform edge treatment procedures.

LEARNING TASKS CONTENT

1 Review Level 1. As per Level 1 content

2 Describe and install sealed units. Lowe High-performance Spacer bars Laminated Triple glazed Gases Breather tubes

3 Cut different types of glass. Float

Laminate GPW Mirror Obscure pattern glass

4 Use tools and cutting equipment. Glass cutters Pliers Cutting tables Squares Arissing sander Belt sanders Methyl hydrates

5 Perform edge treatments. Arissing Grinding

Achievement Criteria: Performance The learner will cut glass to specifications.

Conditions The learner will be given:

Instructions Material Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy Trueness to 1/32 inch. Proper edge treatment Use of PPE (particulate mask and safety glasses) Safety precautions

Page 52: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 46

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency: D4 Install Flashing Learning Objectives: Describe types of flashing.

Describe shear and break flashing. Describe the purpose of flashing. Describe installation considerations. Install flashing.

LEARNING TASKS CONTENT

1 Describe types of flashing material Types Aluminum Galvanized steel Bituminous Painted steel

Thicknesses

2 Select types of flashing Types Head

Sill and parapet

Corner

Column

Splice

Counter

2 Describe purpose of flashing Prevention of water entry Protection for membrane Continuity of framing

3 Describe installation considerations Overlap requirements Expansion and contraction allowances Sealant location Slope and drainage requirements Plumbing and levelling Heel beading Bedding bead Fastener selection

4 Install flashing Tool selection Snips Rivet gun Combination square Duck bill pliers Power shears

Procedures Measure Layout Shear and bend Dry fit Fasten

Install flashing according to job specifications

Page 53: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 47

Achievement Criteria: Performance The learner will measure, draw, build and install flashing.

Conditions The learner will be given:

Instructions Material Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy Aesthetics Functionality

Positive slope

Angles

End dams

End caps

Splice joints

Safety precautions PPE

Page 54: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 48

LINE D: PERFORM FUNDAMENTAL GLAZING TASKS Competency: D5 Use Caulking and Sealants Learning Objectives: Select sealants.

Describe mixing procedures Describe sealing methods Apply caulking and sealants.

LEARNING TASKS CONTENT

1 Select sealants Factors to consider Movement potential Adhesion Weathering Compatibility with substrate Structural

2 Describe mixing procedures Three-part caulking

Base Hardener Colour pack Follow plate

3 Describe sealing methods Dry

Wet Wet/dry Dry/dry

4 Apply sealant Surface preparation

Priming and cleaning

Substrate considerations Wood Concrete Metal Glass

Structural silicone joints Joint design/dimensions

Joint preparation Personal protection

Gloves Respirator Eye protection

Tools Loading the caulking gun Loading the bulk gun Applying Cleaning

Page 55: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 49

Achievement Criteria: Performance The learner will caulk a vertical caulking bead and a silicone butt joint.

Conditions The learner will be given: Tools Equipment Instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Visual result (aesthetics) Joint configuration Tooling Clean up

Page 56: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 50

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E1 Fabricate and Install Storefront Systems Learning Objectives: Use presses and jigs to fabricate door and sidelight.

Perform routering and lock cut-outs. Install door and glass. Perform door adjustment. Split sidelight horizontally into two lights.

LEARNING TASKS CONTENT

1 Use presses and jigs to fabricate door and sidelight.

Drilling Assembly of storefront frame Installation of offset pivot doors

2 Perform routering and lock cut-outs.

Router safety and lubrication

Lock layout Lock cut-outs using routers

3 Install door and glass.

Glazing door (letter slot) Installing door and sidelight glass Hardware installation Plumbing, levelling and squaring frame

4 Perform door adjustment. Door clearance adjustment

Closure adjustment Lock and key adjustment

5 Split sidelight horizontally into two lights. Layout

Spigot fabrication Glass cutting

Achievement Criteria: Performance The learner will perform door and sidelight fabrication and installation.

Conditions The learner will be given:

Tools Equipment Instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Safety Accuracy of door opening size, lock cut-out and adjustment Overall aesthetics (no scratches) Proper hardware adjustment Different closure applications Plumbing, levelling and square frames

Page 57: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 51

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E2 Fabricate and Install Window Systems Learning Objectives: Describe commercial window systems.

Describe the layout of commercial window systems. Fabricate commercial window systems. Install commercial window systems.

LEARNING TASKS CONTENT

1 Describe commercial window systems Types of window systems Strip, punched opening

Types of operable windows Casement, awning, hopper, tilt turn

Components Spigots, screw spline, hardware, glazing

2 Describe the layout commercial window

systems Location of roof and wall structural members

Locating benchmarks and gridlines Layout of anchoring systems Transferring lines from floor to ceiling and roof

3 Fabricate commercial window systems

and vent installations Types of sealants

Types of finish Thermal breaks Part and component fabrication

Proper milling and stops

Assembly techniques for window systems Assembly of components

Jambs, headers and sills Sealing joints at head and sill and

intermediate horizontals

4 Install commercial window systems Flashing installations Weather seal membranes Deflection channel Assembly methods

Pre-glazed Sight-glazed

Installation procedures Dividing caulking clearances Expansion joints Installing setting blocks Securing window systems Installation of on-site glazing Modifying windows in final locations Insulating and seal frames Verifying operation of windows

Installation of preassembled structures Installation of stick built structures

Page 58: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 52

Achievement Criteria: Performance The learner will describe, mill, assemble and glaze a window frame.

Conditions The learner will be given:

Tools Equipment Instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Fabricate to industry standards (1/32”) Proper joint sealing Proper taping, vinyling and heel and toe bead procedures

Page 59: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 53

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E3 Fabricate and Install Curtain Walls Learning Objectives: Fabricate curtain walls.

Install curtain walls. Glaze curtain walls.

LEARNING TASKS CONTENT

1 Fabricate curtain walls Consider wind load charts Steel and fastening requirements

Fabrication sheets Cutting and milling Labelling material for framing positioning Layout and spigot drilling Manufacturer’s specifications related to

expansion and contraction Fabrication process

Cutting curtain wall parts and components from stock length and prefabricated materials.

Spigot application

Assembling and sealing components Squaring frames Notching head components for slip

brackets Notching head and sill nosings for blue skin

application Thermal breaks Types of sealants, gaskets and tapes

2 Install curtain walls Shop drawings

Layout Installation of anchors at proper locations Expansion joints Installation process

Install starter track and welded anchors according to layouts

Level and plumb and align frames Install corner blocks for stick built systems Blue skin applications Install air and vapour barriers Secure metal back pans, glazing adapters,

insulation corner blocks and glazing gaskets

Notch the bulb vinyl for ventilation escape Installation of pressure plate equalizing

adaptors Secondary sealing of corner blocks at

vertical pressure plate

Page 60: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 54

3 Glaze curtain walls Glazing process Cut and locate setting blocks

Glaze heel bead corners and glaze glass

Install glass

Apply temporary Dutchman

Apply any secondary flashings

Apply vertical pressure plate

Apply horizontal pressure plate

Seal horizontal pressure plate after applying vertical caps

Finish frames, glass, caps and sealants

Achievement Criteria: Performance The learner will build, assemble and glaze a curtain wall frame.

Conditions The learner will be given: tools, equipment, instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following

criteria: Fabricate to industry standards (1/32”) Proper joint sealing Proper taping, vinyling procedures Correct installation sequence

Page 61: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 55

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E4 Fabricate and Install Skylights and Sloped Glazing Systems Learning Objectives: Describe the purpose, function and components of skylights.

Fabricate skylights. Install skylights. Install sloped glazing systems.

LEARNING TASKS CONTENT

1 Describe the purpose, function and components of skylights

Types of skylights Ridge, hip, pyramid, barrel vault

Components Purlins, spigots, splice plates, pressure

plates, gutters, sleeve anchors Weather seal materials

Tapes, sealants, flashings, and rubber gaskets

Types of anchors Types of flashings

Primary, secondary Types of membranes

EPDM rubber, peel-and-stick

2 Fabricate skylights Assembly Notching, cutting and assembling

components Steel-aluminum separation requirements Determining the degree of required slope

3 Install skylights Preparing skylights and glazing systems for

flashings and roof membrane tie-ins Types of sealant applications Placement of purlins Location and placement of anchors for skylights Securing anchors Placement and assembly of condensation

gutters and frame members Squaring skylights Confirming measurements for skylights Modifying skylights in final location Securing anchors using fasteners Installing insulation between primary and

secondary flashing Installing on-sight glazing, pressure plates and

caps

Page 62: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 56

4 Install sloped glazing systems. Location and placement of anchors for sloped glazing systems.

Sloped glazing construction techniques Squaring sloped glazing systems. Confirming measurements for sloped glazing

systems. Installation techniques Install self-supporting sloped glazing system

into structural opening using the grid system Achievement Criteria: Performance The learner will measure, fabricate and install skylights and flashings.

Conditions The learner will be given:

Equipment Materials Instructions

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Weatherproofing Appearance Safety considerations

Page 63: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 57

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E5 Fabricate and Install Commercial Entrance Systems Learning Objectives: Describe the types and applications of different commercial entrance systems.

Describe the parts required for fabricating commercial entrance systems. Fabricate and Install entrance systems.

LEARNING TASKS CONTENT

1 Describe the types and applications of different commercial entrance systems.

Types of entrance systems Swing, bifold, revolving, sliding

Types of automatic operators Mag locks

Handicap panels

Card readers

Key pad operators

Automatic mats

Auto sensors

Auto headers Sliding doors

Pocket doors

Bypass doors

Portals Vestibules

2 Describe the parts required for fabricating

commercial entrance systems Parts

Types of hardware Types of framing material

Flush glaze, curtain wall with door adaptor

Compatibility and performance for types of specified hardware for aluminum doors

Creating and using templates to prepare doors for hardware

Assembly of components Handles, closures, thresholds, flush, bolts,

locksets, electric strikes, panic hardware Assembly of entrances

Fastening entrance system components Running feed wires and pass holes Finger guards Toe guards Thresholds Astragals

3 Fabricate and install entrance systems. As per job requirements.

Shop project determined by instructor

Page 64: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 58

LINE: F INSTALL RESIDENTIAL SYSTEMS Competency F1 Glaze Residential Windows and Doors Learning Objectives: Replace broken glass.

Measure and order residential windows and doors. Upgrade existing windows.

LEARNING TASKS CONTENT

1 Describe the different types of residential windows and doors

Nail-on flange Equal leg Rebate

Tilt and turn

Aluminum, PVC, wood and fibreglass Doors

French, sliding, double

Mouldings and trim

2 Describe measurement of residential

windows Heel dimension (interior flange)

Exterior rebate ¾ and 2”

Shimming and clearance tolerances Hinging, sliding and fixed abbreviations

3 Replace broken glass Removal of broken glass

Measuring of replacement glass Glass thicknesses Types of residential stops

4 Describe upgrading of existing windows Removing window systems

Installation of new window systems Installation of trims and mouldings Sealants and vapour barrier considerations Caulkings and flashings

Page 65: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 59

LINE F: INSTALL RESIDENTIAL SYSTEMS Competency: F2 Install Showers, Mirrors and Solariums Learning Objectives: Measure for shower enclosures, mirrors and solariums.

Install shower enclosures, mirrors and solariums LEARNING TASKS CONTENT

1 Measure for shower enclosures, mirrors and solariums

Measuring openings Measuring out of square Clearance tolerances Residential codes

2 Describe installation of shower

enclosures, mirrors and solariums Sealants and adhesives

Patch hardware Vancouver clips U-channels J-molds Cut-outs

3 Install mirror Measuring

Fasteners Attachment to wall

Page 66: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 60

LINE: F INSTALL RESIDENTIAL SYSTEMS Competency: F3 Install Skylights Learning Objectives: Verify sub-trade preparation.

Describe types of roofing. Attach flashing to existing roofing. Install skylights.

LEARNING TASKS CONTENT

1 Verify sub-trade preparation

Worksite preparation Verification of opening completion Coordination with owners for installation

2 Describe types of roofing Types

Asphalt shingles

Shake

Metal

Torch-on

Tar-and-gravel

Tile

Care and safety while applying skylight

3 Attach flashing to existing roofing Flashing size criteria Configuration Caulkings Compatibility with rubber membrane

4 Install skylights Fastening and sealing

Page 67: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 61

PROGRAM OUTLINE FOR

LEVEL 3

Page 68: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 62

LINE: B USE TOOLS AND EQUIPMENT Competency: B4 Use Layout and Measuring Equipment Learning Objectives: Perform on site measuring off gridlines.

Layout of radius frame. Transpose RO’s, frame sizes and flashing to drawings. Communicate frame sizes and material requirements to fabrication shop.

LEARNING TASKS CONTENT

1 Perform on site measuring off gridlines.

Interpretation of architectural drawings Frame locations

Communication with job site superintendant Laser and level equipment

2 Layout of radius frame.

Interpretation of shop drawings

Geometric shapes

3 Transpose RO’s, frame sizes and flashing to drawings.

Mathematical proficiency Verbal and written communication proficiency Clearance tolerances

4 Communicate frame sizes and material

requirements to fabrication shop. Communication process from field to shop

Verbal and written information Communications Proficiency

Achievement Criteria: Performance The learner will:

Perform differential levelling by measuring multiple stations and comparing the height different. The learner will set up a second situation and measure the same stations, comparing secondary levelling numbers to primary levelling numbers.

Conditions The learner will be given: Instructions Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy of measurement Accuracy of layout Accuracy of trigonometry

Page 69: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 63

Achievement Criteria: Performance The learner will perform radius layout with reference to the gridline.

Conditions The learner will be given:

Instructions Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy of measurement Accuracy of layout Accuracy of trigonometry

Page 70: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 64

LINE: C ORGANIZE WORK Competency: C1 Interpret Drawings and Specifications Learning Objectives: Interpret architectural drawings relating to shop, and fabrication drawings

Use door and window schedules. Use a drawing to prepare a material list. Coordinate with sub-trades through architectural drawings

LEARNING TASKS CONTENT

1 Interpret architectural drawings to confirm shop and fabrication drawings

Glazing-specific Sizes and dimensions Flashings and fasteners

2 Use door and window schedules Metal type and finish Handing Hardware Glass type and size

3 Use a drawing to prepare a material list Quantities (caulking, vinyls, metal) Overall dimensions Optimizing Glass sizes

4 Coordinate with sub-trades through

architectural drawings to determine order of tasks

Legend Symbols Abbreviations Cross sections Details Language of lines Grid lines

Achievement Criteria: Performance The learner will use architectural drawings to solve installation problems from shop

drawings that are lacking in detail.

Conditions The learner will be given: Instructions (scenario) Drawings

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Define the problem Locate information on the drawing that is relevant to solving the problem. Confirm information with the general contractor Confirm the information solution with the shop Acquire written amendments, if necessary.

Page 71: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 65

LINE: C ORGANIZE WORK Competency: C2 Use Codes, Regulations and Standards Learning Objectives: Identify organizations responsible for codes, regulations and standards related to the Glazier

trade. Interpret and apply codes, regulations and standards in the context of the Glazier trade.

LEARNING TASKS CONTENT

1 Identify bodies responsible for codes, regulations and standards related to the Glazier trade

National Fire Protection Association (NFPA) National Building Code and British Columbia

Building Code (NBC and BCBC) Municipal Bylaws Canadian Standards Association (CSA) Underwriters Laboratories of Canada (ULC)

2 Describe how codes, regulations and standards affect the Glazier trade

Material selection Construction and installation methods Design characteristics

3 Interpret and apply codes, regulations and standards

Door lights Skylights and canopies Side lights Office divisional to floor Fire-rated glass Smoke baffles

Page 72: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 66

LINE: C ORGANIZE WORK Competency: C3 Use Manufacturer and Supplier Documentation Learning Objectives: Describe documentation encountered in the Glazier trade.

Describe information contained in manufacturer and supplier documentation. LEARNING TASKS CONTENT

1 Describe documentation encountered in the Glazier trade.

Tool and equipment documentation Material Safety and Data Sheets System component documentation Proprietary product documentation Certification agencies

2 Describe information contained in manufacturer and supplier documentation.

Installation instructions and requirements Operation and maintenance manuals Product specifications Warranty information

3 Use manufacturer and supplier documentation for installation purposes

Hardware Windows Doors

Page 73: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 67

LINE: C ORGANIZE WORK Competency: C4 Use Mathematics Learning Objectives: The learner will:

Calculate costs Use mathematics to revise optimizing sheets.

LEARNING TASKS CONTENT

1 Review Level 2 As per Level 2 content

2 Calculate costs Materials

3 Use mathematics to revise optimizing sheets

Calculator Cutting kerf evaluation

Page 74: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 68

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency: D1 Prepare the Worksite Learning Objectives: Assess specific job requirements

Prepare tool and material list Determine building envelope specifications. Copy a fabrications list Determine installation priorities

LEARNING TASKS CONTENT

1 Assess specific job requirements Blueprints detail analysis Fall protection

2 Prepare tool and material list Primers, membranes Caulking and cleaners Fastener specifications Flashing specifications Ladders and lifts Job-specific tools Personal tools PPE

3 Determine building envelope

specifications Drawing details

Coordination with general contractor Coordinate with building envelop specialist

4 Coordinate with the fabricating department Copy a fabrications list Acquire fabrication drawings and cutting

lists

Identify available pre-fabricated materials

Jigs and fabricating screws

5 Determine installation priorities Coordination with general contractor Review installation details Review shop drawing Coordinate access of job site Confirm rough openings and frame sizes

Page 75: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 69

LINE: D PERFORM FUNDAMENTAL GLAZING TASKS Competency D2 Perform Glass Cutting and Edge Treatment Learning Objectives: Cut different shapes of glass.

Use tools and cutting equipment. Perform edge treatment procedures.

LEARNING TASKS CONTENT

1 Cut different shapes of glass Mail slot Speak hole Holes – 2 in., 4 in. Arcs Templates Plug outlets Notches Island (for large plug outlets) Circles

2 Use tools and cutting equipment Glass cutters Pliers Cutting tables Squares Hole saw Notch saw Spear point bit Arissing sander Belt sanders Methyl hydrates

3 Perform edge treatments Arissing Grinding

Achievement Criteria: Performance The learner will fabricate cut outs to specifications.

Conditions The learner will be given:

Instructions Material Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy Trueness to 1/32 inch. Proper edge treatment Use of PPE (particulate mask and safety glasses) Safety precautions

Page 76: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 70

LINE: E FABRICATE AND INSTALL COMMERCIAL SYSTEMS Competency: E1 Fabricate and Install Storefront Systems Learning Objectives: Fabricate jigs.

Fabricate concealed overhead closures. Fabricate and build a pair of doors with butt hinges. Install panic hardware.

LEARNING TASKS CONTENT

1 Describe jigs Types

2 Fabricate jigs Screw spline jig Concealed overhead closure jig Butt hinge jig

2 Fabricate concealed overhead closures Choice of metal

Layout and installation of cut-out Installation of closure

3 Fabricate and build a pair of doors with butt hinges

Layout and installation of cut-outs Installation of backing plates Installation of butt hinges Installation of doors and adjustments

4 Install panic hardware Layout and installation of panics

Adjustment of panics and flush bolts

Achievement Criteria: Performance The learner will build jigs and will ensure that the door closure panic and butts work

accurately.

Conditions The learner will be given: Instructions (and divided into groups Material Tools

Criteria The learner will score 70% or better on a rating sheet that reflects the following criteria: Accuracy of fit to industry standards (1/32”).

Page 77: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 71

LINE: G FABRICATE AND INSTALL SPECIALTY GLASS AND PRODUCTS

Competency: G1 Layout Specialty Glass and Products Learning Objectives: Describe specialty glass and products.

Describe the purpose of specialty glass and products. Layout specialty glass and products.

LEARNING TASKS CONTENT

1 Describe types of specialty glass Curved Multi-coloured Multi-laminate Pattern Mirrors Sandblast Fireproof Low iron Heat-treated (fire-resistant) High performance coatings Filming Reflective Low E (low emissivity)

2 Describe specialty products Pass-through windows

Shower doors Handrail

Channel grouting

Spider glass walls Sun shades Demountable partition Smoke baffle Display cases Glass floors Vehicle glass Marine craft glass Heavy equipment flat glass Bullet-resistant glass

Page 78: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 72

3 Layout specialty glass and products Templates Procedures Benchmarks and gridlines Measurements Anchoring systems Hardware and patch fittings Sealants Silicone butt joints

Total vision installations

Spider glazing

Office dividers

Smoke baffles

Tools and equipment Safety

Page 79: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 73

LINE: G FABRICATE AND INSTALL SPECIALTY GLASS AND PRODUCTS

Competency: G2 Assemble Specialty Glass and Products Learning Objectives: Describe specialty products.

Layout and assemble specialty glass and products.

LEARNING TASKS CONTENT

1 Describe specialty product materials Types Plastic Wood Vinyl Aluminum Stainless steel Lead

Characteristics Properties Applications

2 Describe and select materials required for assembly

Hardware Patch fittings Closers Pivots

Fasteners Screws Gussets Clips Spigots Anchors

Mouldings Base shoes U-channels

Gaskets Vinyl Rubber Weather-stripping

Sealants, adhesives, quick-set cement

3 Assemble glass and specialty products Tools Manufacturer specifications Assembly procedures

Cut and measure materials Level and square materials Fasten materials Torque patch fittings and cables to accurate

tensions

Page 80: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 74

LINE: G FABRICATE AND INSTALL SPECIALTY GLASS AND PRODUCTS

Competency: G3 Install Specific Specialty Systems Learning Objectives: Install Spider glazing.

Install smoke baffles. Install recessed floor closures. Install sloping canopies. Install sunshades Install auto headers. Install automotive and commercial machinery glass. Install handrails/balustrades

LEARNING TASKS CONTENT

1 Describe spider glazing installation process

Physical properties Components Layout and measurement procedures Structural steel relative to brackets

2 Install Spider glazing Layout brackets

Glass measurement Tools for installation Glass installation Structural silicon joints

3 Install smoke baffles Describe the purpose

Apply fastening hardware Measuring and templating Installing and siliconing

4 Install recessed floor closures Sub-trade preparation confirmation

Layout and clearances Installation and adjustments

5 Install sloping canopies Measuring and templating

Fasteners and structural tape Hoisting and placement

Glass and steel separation

6 Install sunshades Description and purpose of application

Fabrication of sunshade arms Alignment of installation Installation and fastening

7 Describe auto header installation Purposes and applications

Electrical accesses Positioning of access panels Fastening procedures Components of door installation

Page 81: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 75

8 Install auto headers Specifications and clearances Fabrication

Electrical pass holes

Feed wires

Access panel operation Coordinate with auto door specialists Floor pivoting installations

9 Install automotive and commercial

machinery glass Identify specialty tools

Identify vehicle type and model Verify manufacturer specifications and

procedures Make templates if required Removal of existing glass Clean and prepare opening Install glass Install mouldings, trims and vinyls Proper use of protective covering and clean up

10 Install handrails/balustrades Templates if required

Interpretation of drawings Minimum depth into U-channel Bolt-on system Patch plates

Suspended

Height (refer to specifications) Installation materials

Grouts

Caulking

Gaskets

Fasteners

Grommets

Alignment and anchoring Posting/cautionary information

Page 82: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 76

LINE: G FABRICATE AND INSTALL SPECIALTY GLASS AND PRODUCTS

Competency: G4 Service and Maintain Glazing Systems Learning Objectives: Service broken and failed glass.

Service doors Service hinges and pivots. Service and replace locks. Service closures. Service damaged aluminum.

LEARNING TASKS CONTENT

1 Service broken and failed glass Identify specific unit of glass Identify type, colour, or coating of glass Identify safety factors Pre-measure replacement unit Ensure safety access (public) Removal and disposal safety Installation and clean up

2 Service doors Indentify door problem

Identify door manufacturer Accessibility considerations Availability of replacement parts Public access control Adjustment and verification of function with the

customer

3 Service hinges and pivots Identify problem Confirm part Bushing replacement Lubrication Hinge or pivot replacement Clearances and adjustments Shimming and reinforcing back plates (custom

backing plates) Fastening door hinges to building structure Door and window blocking Adjust manual locking devices (vent hand

locks) 4 Service and replace locks.

Identify the problem

Identify type and manufacturer Manufacturer component and installation sheet Discuss components of locks Communicate with customer on site Removal and adjustments Lubrication and clearances Door adjustments Adjustment and verification of function with the

customer

Page 83: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 77

5 Service closures Identify the problem

Confirm problem with customer Visual leak inspection Confirm installation to manufacturer

specification drop plate necessities

Re-tapping, drilling and mounting Adjust door and closure, and verify function with

the customer

6 Service damaged aluminum Identify the damaged areas Confirm damage and the extent of the repair

necessary with the customer Identify part manufacturer and colour Matching flashing profiles and colour Confirm tools, jigs, metal, and fasteners

required to complete the job Public access control Glass removal and storage Removal, repair, flash, and caulking Fastening to existing (spigots and fasteners) Glass installation and clean up Verify function with the customer Record repair time

Page 84: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 78

SECTION 3 FACILITY REQUIREMENTS

Page 85: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 79

FACILITY REQUIREMENTS Classroom Areas

Comfortable seating and tables suitable for learning Compliance with the local and national fire code and occupational safety requirements Overhead and multimedia projectors with a projection screen Whiteboard with marking pens and erasers Lighting controls to allow easy visibility of the projection screen while allowing students to take

notes Windows must have shades or blinds to adjust sunlight Heating/Air conditioning for comfort all year round In-room temperature control to ensure comfortable room temperature Acoustics in the room must allow audibility of the instructor Classroom space with internet access Library with reference material and installation manuals for student and instructor use

Shop Areas

10000 square foot mock-up/storage area which includes: 20 feet high workshop Classroom: 25 sq.ft. per student, based on 16 students Tool crib Lockers

Adequate lighting and lighting control Ventilation as per WorkSafeBC standards Refuse and recycling bins for used shop materials First-aid facilities as per WorkSafe regulations Hand and eye wash stations as per WorkSafe BC regulations Fire prevention equipment as per WorkSafe BC regulations

Student Facilities

Adequate lunch room as per WorkSafeBC requirements Adequate washroom facilities as per WorkSafeBC requirements Personal Storage lockers

Instructor’s Office Space

Desk and filing space Computer

Page 86: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 80

TOOLS AND EQUIPMENT

Hand Tools Allen keys Angle finder bulk caulking gun caulking gun C-clamp centre punch chalk line chisel – cold chisel – wood combination square core tool countersinks (# 8, 10, 12) dead-blow hammer drill bits – high speed steel fibre stick files – bastard files – half moon files – round glass cup glass cutter glass pliers glass wedge glazing bar hack-out knife hacksaw hammer – claw levels levels locking pliers

locking pliers – duck-billed nail set nut driver set (imperial and metric) ofal knife open end wrenches (imperial and metric) paint brush pens, pencils, markers pouch/apron protractor (degree finder) pry bars putty knife – bent, straight ratchet set rivet tool mallet (plastic, rubber) running glass pliers scoring tool screwdrivers – flat screwdrivers – Philips screwdrivers – Robertson side cutters standard pliers string line taps and dies tin snips – straight, left, right tool box utility knife vinyl glazing roller wrench – adjustable

Portable Power Tools belt sander chop saw circular saw cordless drill electric drill electric nibbler (shears) glass drilling machine and drill bits grinders

hammer drill jig saw portable glass notching saw portable mitre saw reciprocating saw router screw gun wet sander

Stationary Power Tools

cutting table band saw bench grinder drill press flashing brake

flashing shear glass cutting table radial arm saw table saw upright belt sanders

Page 87: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 81

Measuring and Layout Equipment builder’s level calculator laser distance measurer laser level measuring tape

plumb bob sliding T bevel squares – combination squares – steel

Specialty Tools Callipers glass clamp offset drill offset hook tool plate running pliers

point driver Circle cutter Riv-nut tool Step drill

Scaffolding and Access Equipment Boom lift (rental) ladder jacks ladders (extension and step

scaffolding (baker, frame, sectional, tubular) Swing Scissor lift (rental) stage (rental)

Rigging, Hoisting and Lifting Equipment

Block and tackle gator dolly glass dolly

ropes (fibre and synthetic) winches

Personal Protective Equipment ear protection fall arrest equipment gloves hard hat

respirator ( particulate mask) rubber gloves safety footwear safety glasses safety vest

Page 88: Glazier PO May 09 rb - ITA BC PO May...It reflects updated standards based on the new Glazier Occupational Analysis ... Occupation Analysis Chart Use Safe Work Practices A ... Hazard

Glazier Program Outline • Industry Training Authority 82

FACULTY CREDENTIAL AND EXPERIENCE REQUIREMENTS

The instructor must possess:

A BC Certificate of Qualification with a Red Seal Endorsement, or Certificate of Qualification from another Canadian jurisdiction complete with Red Seal Endorsement only.

A minimum of 5 years experience working in the industry as a journeyperson. It is preferred that the instructor also possesses or is currently working towards:

An Instructors Diploma or equivalent, or a Bachelors Degree in Education