glast large area telescope: ioc subsystems wbs: 4.1.b david lung
DESCRIPTION
Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B David Lung Stanford Linear Accelerator Center IOC Subsystem Manager [email protected]. Topics. IOC Overview Key Events Interfaces Requirement flow Data path Commanding path - PowerPoint PPT PresentationTRANSCRIPT
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 1
GLAST Large Area Telescope:GLAST Large Area Telescope:
IOC SubsystemsWBS: 4.1.B
David LungStanford Linear Accelerator CenterIOC Subsystem Manager
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 2
TopicsTopics
• IOC Overview– Key Events– Interfaces– Requirement flow– Data path– Commanding path
• LAT Operations– Launch and turn on– A day in life
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 3
IOC OverviewIOC OverviewGamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 4
Key EventsKey Events
• IOC Subsystem Peer Review – November 2003• IOC Subsystem CDR – February 2004• IOC readiness dates to support the Mission Ground Readiness
Testing– Ground Readiness Testing #1: November 2004
• First transmission of Level 0 data from MOC to IOCs • IOC Ready by August 2004
– Ground Readiness Testing #5: September 2005• Required Level 1 processing with transfer of results to
SSC• IOC Ready by September 2005
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 5
Instrument Operations Center OverviewInstrument Operations Center Overview
• Receive Level 0 data telemetry packets from Mission Operations Center (MOC)
• Perform science data production to generate Level 1 products
• Build and verify commanding plan for LAT instrument
• Support housekeeping monitoring of the instrument for health and safety
• Verify instrument performance and trending
• Archive all Level 0 telemetry packets and Level 1 products
GBM IOC
MissionOperations
Center(MOC)
LAT IOC
LOFDPFSAS
ScienceSupportCenter(SSC)
Raw Data
Com mands
LAT Data
Instrument TableS/W Loads
Instrument HSK
Standard ProductsSchedules/Com mandingProcessing Algorithm sData Archival
Schedules/Com manding
GCN
RefinedAlerts
Alerts
GBM Data
W hite Sand Complex
USNM alindi
AlertsUploads
TDRSGLAST
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 6
IOC Functional ArchitectureIOC Functional Architecture
Mission Operations Center
Science AnalysisSoftw are Group
InstrumentPerformance
Evaluation Group
ScienceSupportCenter
Instrument Operations Center(IOC)
Data Processing Facility
HousekeepingData
Science DataProduction
Commanding
Level 1 Products
Instrument Monitoring
Flight Softw areSupport Group
Science Analysis
LAT Operations Steering Committee(Suggested)
LAT UserCommunity
Le
vel
0 &
HS
KT
ele
met
ryNom inal
Com manding
ContingencyCom manding
LAT TEAM
Operation Communication & Interfaces
Burst AlertMessages via GCN
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 7
Ground Operations – Data PathGround Operations – Data Path
Level 0Data
Storage
SciencePackets
HousekeepingPackets
HSK Data EUConversion
(Convert bits to values)EU CalibrationData
ReconstructionCalibration
(Dead strips)
ReconstructionCalibration
(X,Y,Z)
ReconstructionCalibration
(Energy)Reconstruction
SAS Processing SW
Portion HSK Data (T, V, I)
Level 1Products
Data Display(Display values & plots)
Performance Quick Look(Data & Plots)
Level 1Data
Storage
Level 0 Data
M onitoringFunction
ReportsGeneration
LAT Community
LAT PerformanceEvaluation Function
LAT IOC
InstrumentCommand
GLAST MOC GLAST SSC
Real Tim e TLM(During Contact)
ITOS Display (W eb)
Science Telemetry: 300 Kbps orbit average
20 Mbps X-band data rate
2.5 Mbps S-Band: Real-time telemetry (Housekeeping) , memory dumps, and engineering data dumps
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 8
Ground Operations – Commanding PathGround Operations – Commanding Path
2 Kbps Ground Network Command Rate
Timeline Info
LAT Com mandBuild & Review
GLAST TimelineCom mittee
GLASTObservation Plan
Science SupportCenter
M ission OperationCenter
LA
T P
erfo
rman
ce E
valu
atio
nG
rou
p
LAT CM D Simulationsand Verification
Activity Schedule
Flight SW Upload
Calibration Loads
Engineering Loads
LAT IOC
Instrument Cm d& M em ory Load
(Contigency)
IntegratedObservatory
Timeline
IntegratedObservatory
Timeline
InstrumentM em ory Load
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 9
• The command and telemetry database is being developed by Flight Software (FSW) for engineering model testing– The schema describing commands and telemetry will
written in a standard meta language (XML or MySQL)– The choice of meta language will be influenced by the ease
of creating/changing/maintaining the data base. – Schema design will be driven by the details of the ITOS and
AstroRT data bases - We must have the ability to translate to either
• Close coordination between FSW, I&T and IOC • IOC will build upon and maintain the software and
database produced by I&T.
Command & Telemetry DatabaseCommand & Telemetry Database
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 10
Requirement FlowRequirement Flow
Mission SystemSpecification
433-SPEC-0001
ScienceRequirem ents
Docum ent433-SRD-0001
LAT-SC InterfaceRequirem ents
Docum ent433-IRD-0001
LAT Perform anceSpecification
LAT-SS-00010
LATEnvironm entalSpecification
LAT-SS-00778
LAT IOCPerform anceSpecification
LAT-SS-00015
ACD SubsystemSpecification
LAT-SS-00016
TKR SubsystemSpecification
LAT-SS-00017
CAL SubsystemSpecification
LAT-SS-00018
Trigger & DataflowSubsystem
SpecificationLAT-SS-00019
SASSubsystem
SpecificationLAT-SS-00020
LOFSubsystem
SpecificationLAT-SS-00021
PowerSubsystem
SpecificationLAT-SS-00136
MechanicalSubsystem
SpecificationLAT-SS-00115
Mis
sio
nL
AT
LA
T S
ub
syst
em
ScienceRqm ts
MissionRqm ts
Interface Rqm ts
Interface Rqm ts
TCS Perform anceSpecification
LAT-SS-00715
SAS DesignSpecification
LAT-SS-00505
CAL DesignSpecification
LAT-SS-00210
LAT TriggerSpecification
LAT-SS-00284
LAT TKR DesignSpecification
LAT-SS-00134
LAT OperationsFacility
SpecificationLAT-SS-01783
Tower PowerSupplies
SpecificationLAT-SS-01537
ACD DesignSpecification
LAT-SS-00352
De
sig
n S
pe
cifi
cat
ion
LAT DataflowSpecification
LAT-SS-00285
LAT Flight SWSpecification
LAT-SS-00399
LAT ReadoutE lectronic
SpecificationLAT-SS-00152
LAT IOC/MOC/SSC Interface
ControlDocum ents
Radiator DesignSpecification
LAT-SS-00394
X-LAT P lateDesign
SpecificationLAT-SS-01240
Grid Box DesignSpecification
LAT-SS-00775
LAT-SC InterfaceControl
Docum ents
Mission GroundSystem
Requirem entDocum ents
Changes since PDRChanges since PDR
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 11
LAT OperationsGamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 12
Launch ConditionsLaunch Conditions
• LAT instrument is OFF from pre-launch through spacecraft solar array deployment and thermal stabilization
• 96 telemetry points will be used for LAT monitoring via the spacecraft bus prior to LAT turned-on– Temperature– Voltages
• S/C unregulated survival feeds enabled the following LAT heaters
– Radiator Antifreeze– Grid Make-up
• Post S/A deployment and first contact, the S/C PRU will enable the regulated VCHP feed
– VCHP reservoir heaters
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 13
LAT Analog TelemetryLAT Analog Telemetry
LAT-SS-00890 Draft LAT Instrumentation Plan
PRELIMINARY - NOT YET APPROVED Rev Date: 03-Mar-02Print Date: 09-Apr-03
Description of Instrumentation Source of InstrumentationResistance Side of Spacecraft PDU
Description Group Type Part No. Min/Max Resolution Accuracy Range SS Location Shield SC-Pri SC-Sec
ACD Tiles Thermal RTD -100/100 1.0 C 0-5000 ACD Top/Sides of ACD on tiles Out 5 5Radiators Thermal RTD -100/100 1.0 C 0-5000 Mech On Radiator panels/VCHP's Out 8 8VCHP's Reservoir Htr Thermal RTD -100/100 1.0 C 0-5000 Mech VCHP reservoir htr's Out 12 12ACD TSA Shell (inside) Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K ACD Insides of ACD Shell facing TKR In 5 5ACD PMT Rail Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K ACD ACD PMT Rail structure in BEA Out 4 4SIU Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Elec SIU box at interface to X-LAT Pl In 2 2PDU Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Elec PDU box at interface to X-LAT Pl In 2 2GASU Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Elec GASU box at interface to X-LAT Pl In 2 2Grid-Radiator interface Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Mech Rad Mnt Bkt end, base, Grid corner Out 4 4Grid Make-up Heaters Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Mech Corners of Grid at thermostat location Out 4 4VCHP-XLHP interface Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Mech VCHP-XLHP at bolted joint Out 4 4X-LAT Plate Thermal Thermistor YSI-44909 -40/60 0.25 C +/- 1.0 % R 7599 -884.6K Mech Top side of X-LAT Plate on heat pipes Out 4 4SIU Pri/Sec 3.3/5V V Voltage Elec SIU Pri/Sec 3.3/5V V In 2 2PDU Pri/Sec 3.3V V Voltage Elec PDU Pri/Sec 3.3V V In 2 2GASU Pri/Sec 3.3/28V/3.3VA VVoltage Elec GASU Pri/Sec 3.3/28V/3.3VA V In 2 2VCHP Reservoir Htr Pri/Sec Voltage Mech VCHP Reservoir Htr Out 4 4LAT SIU Bus V Pri/Sec Voltage Elec SC Output to SIU Bus Out 2 2LAT VCHP Bus V Pri/Sec Voltage Elec SC Output to VCHP Bus Out 2 2Spare Voltage Channels Voltage 18 18Spare Temp. Channels Thermal Thermistor 8 8Total 96 96For Thermistors, zero power resistance @25 C is 30000 ohmsTest Plug is for fly-away instrumentation (used only for ground test but not removed for flight)Light green shading indicates LAT-relevent monitoring performed internally by the spacecraft.All voltages are 0-5V or 0-x V, wait til SA suggests what is convenient for them.
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 14
LAT Turn On State DiagramLAT Turn On State Diagram
Off Pre-deployLAT
SurvivalLAT Hardware Safe T&DF On Detectors On Standby Observing
Off Pre-deploy
0100200300400500600700
TCS Safe NominalOp
era
tin
g M
od
es
LA
TT
he
rma
l
Orb
it-A
ve
rag
eP
ow
er
Dra
w (
W)
VCHP Surv TotLAT
0100200300400500600700
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
SIU
PDU
GASU
TKR
ACD
CAL
TEM VCHP
Surv
EPU
0W 50W 270W 320W 560W 650W 650W
Indefinite
VCHP = VCHP Htr. BusSurv = Survival Htr. Bus
LAT= LAT Main Power BusTot = LAT Total Power
OffOn
Transition
-20-10010203040
-30-20-10010203040
-30-20-10010203040
-30
Ob
s.
Launch andAscent
Standby/EngineeringEarly Orbit Engineering Sky Survey
Survival
LaunchFairing Separation
Fairing Sep + TBD min
Solar ArrayDeploy
Initiate LAT Turn-onDetectors on
LAT Boot Up
<TBD min
Te
mp
era
ture
(oC
)S
tatu
s
Transition
Pwr Bus VCHP Surv TotLAT VCHP Surv TotLAT VCHP Surv TotLAT VCHP Surv TotLAT VCHP Surv TotLAT VCHP Surv TotLAT
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 15
Instrument Turn-On SequenceInstrument Turn-On Sequence
• Once the spacecraft has establish power positive, thermal stabilization, and out-gassing - the LAT instrument shall be turned-on
• The LAT turn-on is a set of ground command with verification sequences
– Verify telemetry prior to the next operation
• Temperatures• Voltages/Currents• Turn-on profiles• State
• Additional monitoring telemetry are available as the PDU, GASU, and TEMs are turned-on
– PDU: 157– GASU: 57– TEM: 640
HEATERSRadiator Antifreeze
Grid M ake-upVCHP
SIU A On
PDU A On
GASU A On
EPU A/B On
TEM (s) On
ACD On
Tracker Tower 1 On
Tracker Tower 16 On
CAL M odule 1 On
CAL M odule 16 On
TLM CheckVerify Turn-On Profile
TLM CheckVerify Turn-On Profile
TLM CheckVerify Turn-On Profile
TLM CheckVerify Turn-On Profile
Turn-On SequenceSee Turn On Sequence Note
Turn-On SequenceBEA On
ACD FEE Individual Turn-On
Turn-On SequenceSee Turn-On Sequence Note
Turn-On SequenceSee Turn On Sequence Note
Spacecraft PowerFeed 5, 7 & 8
Enabled
Spacecraft PowerFeed 1 & 2
Enabled
Spacecraft PowerFeed 3 & 4
Enabled
Spacecraft LAT
Group 1
Group 2
Group 3
Note:Turn On Sequence (Proposed)
Turn On group A (the center fourTEMs/Trackers/CAL Modules)
Turn On group B (the +Y face) Turn On group C (-Y face) Turn On group D (+X face) Turn On group E (-X face)
A A
A A
B B B
CCC
D
D
D
E
E
E
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 16
• Data acquisition– Rocking– Pointed observation– Repoint
• Prior to entering the pre-defined South Atlantic Anomaly (SAA) event, the spacecraft sends LAT a signal safing the high-voltage power supplies within the ACD PMT
• Return to data acquisition upon exiting SAA
• Approximately 6 contacts per day, less than 10 minutes per pass
A Day In Life of LATA Day In Life of LAT
Station Hour Min Sec Hour Min Sec Dur(sec)
MAL 0 24 22.51 0 29 43.81 321.302MAL 7 13 37.42 7 21 29.75 472.326MAL 8 53 48.46 9 4 7.8 619.338MAL 10 36 15.08 10 44 15.15 480.072MAL 19 11 38.69 19 16 8.46 269.762MAL 20 50 18.79 21 0 18.87 600.075MAL 22 31 50.49 22 41 20.96 570.473
AOS LOS
Typical Contact Schedule for Typical Contact Schedule for a 24 hour perioda 24 hour period
(Example is Malindi)(Example is Malindi)
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 17
LAT Operation ModesLAT Operation Modes
• LAT operation modes are simple– Observation modes
• Instrument is acquiring data• Valid science data
– Standby Modes
• Instrument is acquiring data
• Invalid science data
– Safing Modes
• Instrument in HW Safe or OFF
Pointed &Repoint
Sky Survey
Observing Modes
Engineering
SAA
Standby Modes
Calibration
Survival
Hardw areSafe
Launch & EarlyOrbit
A = Autonomous
C = Commanded
C C
C
C
C
C
C
A, C
A, C
A, C
Safing
Launch
A, CA, C
SC ModeLAT Modes TCS Modes
Pre-Launch Off Off
Launch/Ascent Off Pre-Deploy
Early Orbit Deployment/Activation LAT Survival TCS Survival
Engineering Transition
Calibration
SAA
Sky Survey Sky Survey Sky Survey Nominal
Pointed and Repointed
Pointed and RepointedPointed and Repointed
Nominal
Observatory Safemode
Independent Safemode
Power Safe Survival Survival
Re-Entry Re-Entry Off Off
Mis
sio
n M
od
es
Instrument
Launch
Standby/Engrg
Safemode
Engineering
Hardware Safe TCS Safe
Nominal
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 18
Cost and Schedule SummaryGamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 19
Budget, Cost, PerformanceBudget, Cost, Performance
Budget vs Actuals vs PerformanceDOE + NASA Project Expenditures4.1.B Instrument Operations Center
0
1
2
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FY00 FY01 FY02 FY03 FY04 FY05
$M
, T
hen
-Year
Do
llars
Actual Commitments
ACWPBCWP
BCWS+ Planned CommitmentsBCWS
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 20
Cost/Schedule StatusCost/Schedule Status
Item In k$
Budget at Complete 2,512
Budgeted Cost of Work Scheduled (a) 542
Budgeted Cost of Work Performed (b) 486
Actual Cost of Work Performed 262
Cost Variance 224 46.1% of (b)
Schedule Variance -56 -10.3% of (a)
• Status as of March 31, 2003:
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 21
CCB Actions Affecting 4.1.BCCB Actions Affecting 4.1.B
Change Request # Description Status
LAT-XR-01752-02 SLAC/HEPL Labor Escalation Rates
Approved -$40K
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003
Document: LAT-PR-01967 Section 5 IOC Subsystem 22
ProcurementsProcurements
• Long-Lead Procurements• Major Upcoming Procurements Near-Term (< 4 months)
– none• Major Upcoming Procurements Long-Term (>4 months)
– IOC Facility Procurements– Servers, Workstations, Peripherals– Test Equipment
• Minor Upcoming Procurements– none