gip monthly meeting may 2014

47
GIP Monthly Meeting May 2014

Upload: cole-wirpel

Post on 07-May-2015

302 views

Category:

Business


0 download

TRANSCRIPT

Page 1: GIP Monthly Meeting May 2014

GIP Monthly Meeting May 2014

Page 2: GIP Monthly Meeting May 2014

How are you doing??

Page 3: GIP Monthly Meeting May 2014

Agenda

Performance Updates

Consultancy Output

Matching Updates!

Operations & Transition

Quality for GIP Fruit

Peak

Myaiesec.net changes

Page 4: GIP Monthly Meeting May 2014
Page 5: GIP Monthly Meeting May 2014
Page 6: GIP Monthly Meeting May 2014

Indicator Last 90 days (completed)NPS 44 (38)RR 42% (30%)

% Promoters 59% (58%)Cases Open/Total Cases 51/83

Promoters Detractors

Communication by the Host LC (4%) Support by the host entity during the experience (8%)

Objectives of the Program (4%) Integration into the local chapter (5%)

The Selection Interview (4%) Accommodation (5%)

Net Promoter Score

Page 7: GIP Monthly Meeting May 2014

TopoGIP Ma Q2

TopiGIP

Ma Q2

Page 8: GIP Monthly Meeting May 2014

Global Realisation Forecast

Page 9: GIP Monthly Meeting May 2014

iGIP Consultancy Output

How can we stop iGIP members

from dropping out so quickly? How can we

get our LCPs more

committed to growing iGIP in their LCs?

How can we increase the

sales intensity of our LCs?

How can we increase the

sales intensity of our LCs?

How do we know if we

need to improve our

talent capacity to

grow in iGIP?

Page 10: GIP Monthly Meeting May 2014

What do the following images have in common?GIP Golden FormsGuaranteed responses. Faster Matching.

Page 11: GIP Monthly Meeting May 2014

GIP Golden Forms A google spreadsheet with top forms in marketing and teaching

from the top 8 TN suppliers for Summer 2014

Brazil, MoC, Colombia, Czech Republic, Germany, India, Mexico, Turkey

All EPs and EP Managers are welcome

How will this be faster? Everything is in one place, and we have rules to speed up communication and matching!!

Page 12: GIP Monthly Meeting May 2014

GIP Golden FormsRules for EPs and EP Managers

1. CC the MC of the iGIP entity on every email and the EP application

2. Apply only to TNs for which you meet the requirements3. Respond to all TN Manager emails within 48 hours4. Attend all interviews for TNs you apply to, unless you have

been matched5. You can have a maximum of 10 ongoing applications

If an EP breaks a rule, their EP form will be put on hold

Page 13: GIP Monthly Meeting May 2014

GIP Golden FormsRules for TN Managers

1. Respond to all EP emails and EP applications within 48 hours

2. When an EP applies for a TN, they must be given an interview with time and date or a rejection within 7 days

If a TN Manager doesn’t follow these rules, their TN will be kicked out of the Golden Forms

Page 14: GIP Monthly Meeting May 2014

GIP Golden FormsIf everyone is qualified for the TNs they are applying for . . .

And everyone is communicating with each other quickly . . .

And the interviews happen as soon as possible . . .

There’s no reason we can’t match our Marketing and Teaching forms for Summer Peak!!

Page 15: GIP Monthly Meeting May 2014

GIP Golden Forms Start using the Golden Forms today to match your

EPs!

If you have any questions or suggestions email [email protected]

If anyone breaks a rule email [email protected]

Even if you don’t have TNs on Golden Forms, you should start enforcing these rules in your entity

Page 16: GIP Monthly Meeting May 2014

Brazil TN Managers have to respond to EPs within 48 hours (tracked by

NST)

If TN Managers don’t respond to EPs within 48 hours or if the company or EPs complain about the TN Manager, then . . .

First time they get a warning

Second time their LC loses points in Brazil’s challenge

Third time the TN gets rejected and the LC can’t raise TNs until they solve the issues

Page 17: GIP Monthly Meeting May 2014

Matching Updates!

Golden Forms!

Matching Mania

Teaching

S&D Knowledge

GCP: Greece & Ukraine

GCP: Brazil

Page 18: GIP Monthly Meeting May 2014

Matching Mania

Teaching

Page 19: GIP Monthly Meeting May 2014

• Bring TN and EP forms with start date of July or August

• Ensure ALL LCs that are doing the Teaching sub product (Specifically 3 month and 6 month English teaching) are at the MATCHING MANIA

• iGIP Entities can bring promotion booklet for their teaching TNs and upload them here - Promotion Booklets for Teaching TNs

• iGIP MCs and LCs can upload their reception information/toolkits here - Reception information

• oGIP LCs can have EP Managers and EPs on the chat space as well

• Be aware of Product, duration, start and end date and language requirements while bringing TN forms, EP forms/EPs

Preparation for Matching Mania!

Page 20: GIP Monthly Meeting May 2014

How will the space run?

We will showcase top

TN forms across each

teaching product

Email LCs clear

action steps on

how to match faster

Track matches of LCs

attending matching

mania

Page 21: GIP Monthly Meeting May 2014

What will be the follow up by AI?

Email MCs a list

of LCs that attended

Email LCs clear

action steps on

how to match faster

Track matches of LCs

attending matching

mania

Page 22: GIP Monthly Meeting May 2014

S&D Knowledge

S&D for Global Product is updated!

Fill out your search tool and find others!

AFT Updated! (Live and Offline ones)

Match Wiki for continuous updates

Page 23: GIP Monthly Meeting May 2014

Matching in PartnershipsClassify your

current supply in products. Use AFT

Classify the products in your LC’s

Classify your partners supply in products

Connect your & your

partner entity’s LC’s

Track the matches in

LC’s

Communicate with your partner (MC VP or NST)

Page 24: GIP Monthly Meeting May 2014

Greece raised a large marketing contract with a hotel chain for Ukrainian EPs—there was no partnership before, so they had to make one fast!

Greece contacted LCs in Ukraine and gave very specific EP profiles for them to raise

Communication between the LCs was daily, with Skype meetings and emails

The LCs in Ukraine started visa paperwork in advance so that delivery would be easy

Three Tips for Matching from Greece:

1) Clear product – TN requirements and EP profiles

2) Daily communication

3) Clarify visa processes and requirements at the very beginning

Greece – Ukraine Partnership: 40 GIP Matches in 2014

Page 25: GIP Monthly Meeting May 2014

Quality for GIP

Page 26: GIP Monthly Meeting May 2014

What Are We Trying to Achieve?

NPS = 48

Page 27: GIP Monthly Meeting May 2014

Integration

What’s Keeping Us from NPS of 48?

Our NPS for GIP is 38

16% of our passive and detractors

recommend we improve integration

JD ClarityAccommodati

on

15% of our passive and detractors

recommend we improve JD clarity

12% of our passive and detractors

recommend we improve

accommodation

Page 28: GIP Monthly Meeting May 2014

If we eliminate these three

issues, our NPS will be 48

2015 NPS Goal

Achieved!!

Page 29: GIP Monthly Meeting May 2014

How Can We Improve Integration?

Understand the EP’s integration expectations between match and realization

Make an integration plan with each EP upon reception of what activities they’d like to do and be involved with

On the EP’s first day, run a 1-day integration agenda with the TN-taker, the EP Manager, and the EP

EP buddies with clear JD, training, and tracking

Page 30: GIP Monthly Meeting May 2014

How Can We Improve JD Clarity?

Ensure a professional working environment for the EP with a clear MoS for the EP

Ensure the company provides training and support for the EP to do their JD

Give a suggested working agenda to the TN-taker for the first two weeks

Make sure the salary payment process is clear and always followed

Page 31: GIP Monthly Meeting May 2014

How Can We Improve Accommodation?

Before realization, clarify with every EP the plan for their accommodation

Set accommodation standards with your LCs

Only have EPs housed in safe neighborhoods

Page 32: GIP Monthly Meeting May 2014

Quality for GIP

If you have more suggestions or materials for these detractor issues, email [email protected]

Stay tuned for the Quality Wiki to have more content on these issues in the next week!

Address these issues with your VPs now!

Page 33: GIP Monthly Meeting May 2014

Operations management & transition

Page 34: GIP Monthly Meeting May 2014

Who has already started MC transition?

Page 35: GIP Monthly Meeting May 2014

Which of you has your elects running most operations?

Page 36: GIP Monthly Meeting May 2014

Add your MC VPs 1415 to the Global MC VP Contact List!!

Page 37: GIP Monthly Meeting May 2014

Have working time to make it happen!

Be clear when your

successor is taking over and make

sure he/she is directly

driving it!

Plan key activities to

support from MC level until

end of your term

Have a clear direction and mandate for

LC level, starting with knowing your

RE for Q3!

What to do to keep running operations?

Page 38: GIP Monthly Meeting May 2014

Aiesec.net Changes

Page 39: GIP Monthly Meeting May 2014

What is happening during making a match?

Match! Upload TN

and EP ILs & ANs

Adjust Field of Work to 1

primary and 1 secondary in for TN and 2&2 for EP

forms

Page 40: GIP Monthly Meeting May 2014
Page 41: GIP Monthly Meeting May 2014

What information can I access?

Page 42: GIP Monthly Meeting May 2014

How does it work? Capacity indicators

Page 43: GIP Monthly Meeting May 2014

How does it work?

Capacity indicators

• You can check % of people in functions – Both exchange and exchange support

• You can check % of people by process – In Raise, Match, Delivery, Re-integration, Re-raising

• You can check % of people by process for ALL teams or for teams in SPECIFIC FUNCTION

Page 44: GIP Monthly Meeting May 2014

How does it work?

Productivity

Page 45: GIP Monthly Meeting May 2014

How does it work?

• You can check the formula used everywhere by clicking on the i (for information) tab

• To be able to have accurate information around productivity and capacity indicators ALL TEAMS being created starting TODAY will have to assign exchange process and exchange function

• There is also a small modification while doing role assignment so that for every member in a team we can assign specific exchange processes

Page 46: GIP Monthly Meeting May 2014

Work with the MCVP TM to ensure ALL GIP teams are on myAIESEC.net

You can choose to modify roles of existing teams if you want the data to be more accurate

Start tracking your focus LCs in GIPs productivity, number of members and % supporting exchange process through myAIESEC.net

Educate LCs on how to use these changes

Track your talent planning and manage talent pipeline using capacity indicators

Page 47: GIP Monthly Meeting May 2014

Golden Forms:https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/13ueLxM6V_cAifVMIe7aFnSoF_AJYYIA_cBuDKdzil1Q/editS&D: https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0Ap6bTNYUAcwbdEg0cmZQTTRGSmJON0phRS05a3NWeVE&usp=drive_web#gid=9Live AFT:http://live.myaiesec.net/aft/aft.phpOffline AFT:http://www.myaiesec.net/content/viewfile.do?contentid=10304189Match GIP Wiki:http://www.myaiesec.net/content/viewwiki.do?contentid=10303308Global 1415 Contact List:https://docs.google.com/a/ai.aiesec.org/spreadsheet/ccc?key=0AooK2vHYB3emdG5lMHg4c0lHMlg3c1dUQkNkWC1FX1E&usp=docslist_api#gid=1Global Realization Forecast:https://docs.google.com/a/ai.aiesec.org/spreadsheets/d/1l3T6GO9S3AasRKFE1xeS6Tr7y_1Iauv05GzzDYk3hUI/edit#gid=0

Links