Re-‐envisioning I-‐280 and the Caltrain
Corridor
January 10, 2013
Outline
1. Exis@ng Condi@ons 2. Project Impetus 3. Grade Separa@on and Rail Alignments 4. Boulevard + Railyards Proposal 5. Financing Opportuni@es and Next Steps
Exis%ng Condi%ons
Exis@ng Condi@ons
• Railyards and I-‐280 freeway consume 37 acres
• Noise, shadow, pollu@on
• 1.2-‐mile barrier separates Mission Bay from SoMa, Showplace Square and Potrero Hill
• Only two crossings
N
PROJECT IMPETUS
California High Speed Rail
Source: CaHSRA
Caltrain Downtown Extension (DTX)
Land Use Plans Eastern Neighborhoods
West SoMa
Central Corridor
UCSF
Mission Bay
An@cipated Growth through 2035
Increase in Households Increase in Jobs
Source: EN TRIPS Final Study
Transporta@on Plans Mission Bay Grid
Central Subway
16th Street Bus Rapid Transit
16th Street Bus Rapid Transit