gila basin collaborative modeling project 20 september 2005 kickoff workshop

15
Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Upload: hilary-collins

Post on 28-Dec-2015

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Gila BasinCollaborative Modeling Project

20 September 2005Kickoff Workshop

Page 2: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Agenda

• Introductions

• Project background

• Models and Collaboration

• Web-based communication tool

• Select model parameters

• Next Steps

Page 3: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Project Background

• Gila Settlement– Complicated – Arizona Water Settlements Act and

Consumptive Use and Forbearance Agreement (CUFA)

– 140,000 af/10 yrs– $66-128 million in federal funding– ISC has responsibility– ISC and Sandia agreed collaborative modeling a good

tool to address settlement

Page 4: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Project Background

• Collaborative modeling– NOT decision-maker – help understand complex systems– help ask better questions– help ensure diverse interests represented

Who is missing from our team?

Page 5: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Project Questions

• What questions will the model address?Examples:– Given various constraints, how much water is

available from where, when and to what purpose?– What are the tradeoffs among various approaches

to managing this water?

• Who should use the model?

• What role should the model play in making the final decision?

Page 6: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Models

Page 7: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Models and Collaboration

• Models– DO NOT provide THE answer– DO NOT replace human experience

– DO help clarify complexity– DO help identify tradeoffs among options– DO help users “see” differently

All models are wrong. Some models are useful.—G.E. Box, 1979

Page 8: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Models and Collaboration

• Models require data

• Understanding data– Importance of peer review– Importance of consensus– Anecdotal information

Page 9: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Models and Collaboration

• Team name?

• Preferred communication channels?

• Ground rules?

Page 10: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Ground Rules

1. Commitment is key. All team members will make every effort to attend all meetings. If someone misses a meeting, they need to review the notes and chat with Vince and/or Kristan about the meeting and decisions reached.

2. All team members agree to complete the “homework” between meetings.

3. All team members agree to participate and share their ideas and knowledge

4. All team members agree to ask for clarification when they do not understand something.

5. All team members agree to strive for the benefits of team synergy by listening openly to all perspectives and trying to see the issues from various perspectives.

Page 11: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Ground Rules

6. All team members understand that there will be difficult decisions to be made in this process and agree that decisions will be made by……(e.g. majority vote, consensus, unanimous, final arbiter)

7. This project must strike a balance between flexibility and stability. All team members agree that once a decision has been reached, using the agreed upon process, the topic is closed. However, the project will be flexible so that if the team agrees (by majority vote, consensus, unanimous) a topic can be revisited.

8. This project will include significant levels of uncertainty and all team members agree to work together to make progress despite the uncertainties. As an example, the team will address a lack of data in the following way……(educated estimates from team, deleting variable from model, multiple data estimates with toggle switches)

9. All team members agree to communicate with their constituencies about the project and obtain feedback to bring back to the team effort.

Page 12: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Web-based Communication Tool

Page 13: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Model Parameters

Page 14: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Next Steps

• Level of engagement– Develop or review causal loops?– Do data searches or review identified data?– Meeting schedule

• length?• frequency?

Page 15: Gila Basin Collaborative Modeling Project 20 September 2005 Kickoff Workshop

Homework

• Review Q and A from ISChttp://www.ose.state.nm.us/water-info/GilaSettlement/QnA-2005-01-17.pdf

• Think about project questions:– What should the model address?– Who should use the model?– What role should the model play in decision?

• Submit ideas to Kristan ([email protected]) for how to use the Gila Settlement money/water– Be honest with ideas– Ignore constraints temporarily