gibela trencon presentation - 02june2016
TRANSCRIPT
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Page
The factory
7
Supplier park:• centre of train manufacturing excellence • 78ha site• R1 billion investment• maximum capacity end 2019:• two cars per day
• 1 500 workers employed on site
Training centre: • 4 000m2
• to train 19 500 peopleTesting centre:• static test buildings• 1.2 km test track
Manufacturing buildings• 31 500m2
2 June 2016Moving forward with Trencon and Black Jill JV
••••
••••••
•
•••••
••
Page
Key construction milestones
9
May Building construction
starts
OctoberTraining Centre
buildings ready to be equipped
MarchFirst manufacturingbuilding completed
SeptemberConstruction ends
Second QuarterTrain production
starts
2016 2017
2 June 2016Moving forward with Trencon and Black Jill JV
Page
Construction milestones
Overall construction programme will last approximately 18 months
2 June 2016Moving forward with Trencon and Black Jill JV 10
Note: Main construction Milestones for P0+1+2: black dot =complete, orange dot = planned.
Work package 2016 2017Dec
2015 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2018
Plant rescue, clearance, earthworks, infrastructure
RS site buildings
Rail infrastructure
Electrical reticulation and equipment
Electrical reticulation and equipment (traction)
Mechanical (HVAC, gas, air, water)
Cranes
Transborder and turn table
Non-statutory signage (Gibela visual identity)
Bulk electrical supply
Bulk roads and rails
Bulk potable water, sewerage pipelines
Bulk stormwater
Start of construction
Plant removal complete
Start of building package
CBS Portion 1 Beneficial occupationM07 Beneficial occupation
Permanent power supply
Progress: 67%
••
•
•
•
•
Page
Special thanks
2 June 2016Moving forward with Trencon and Black Jill JV 14
To the Executive Mayor of Ekurhuleniand the EMM Executive Committee and officials for their ongoing support of the project
“This project means that Ekurhuleni is no longer the historic leader in manufacturing – it affirms us as the future leader and puts us at the cutting edge of technology.”