Page 1: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Toward a wireless cityGianni Campatelli18 Novembre 2013

Page 2: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

2

The total HEV and BEV

market value in 2024

Commercial vehicles

are the winners!

Page 3: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

3

The total HEV and BEV

market value in 2024

Commercial vehicles

are the winners!

Working to have a “market ready” technologyMajor limit to mass introduction is the infrastructure

Ferrite

Vehicle

Infrastructure

Resonance Magnetic Field

Page 4: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Solution sustainability

› Business model

› Ease of use

› Service level

› Safety

4

1. Static wireless city

2. Static en-route

3. Dynamic en-route

Page 5: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static wireless city

› Reduced cost of infrastructure (commercial solution already on the market)

› Ease of use

5

Page 6: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route wireless city

› For personal vehicles: high number of infrastructure needed in order to satisfy the user needs

6

Tested Maneuvers

Not aided Audio/visual aided- “Radar” obstacle detection

system -

Visual system aided

- External reference alignment -

Feasibility of the approach to charge the vehicle while not moving (i.e. traffic light)

Page 7: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route wireless city

› For personal vehicles: high number of infrastructure needed in order to satisfy the user needs

› Advanced services available for the users thanks to V2G communication

7

Page 8: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route wireless city

› For personal vehicles: high number of infrastructure needed in order to satisfy the user needs

› Advanced services available for the users thanks to V2G communication

› Public service with terminal stop charging

8

Page 9: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route charging for busses

› Drastic reduction of battery size for urban busses

9

Line C1-C2-C3

Page 10: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route charging for busses

› Drastic reduction of battery size for urban busses

› Reduction of ownership cost

10

Page 11: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Static en-route charging for busses

› Drastic reduction of battery size for urban busses

› Feasible approach for a whole city’s transport (Firenze-IT case with 232 charging spots)

11

High speed train ETR5002 x 4.4 MW engines

Power grid of Firenze could be improved to support the whole

bus system with reduced investments (about 1.5 M€)

Page 12: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Dynamic wireless city

› Infrastructure must be intensively used in order to reach quickly the BEP (bus routes, highways principal feasible applications)

12

No need to recharge during all the travelled

path: optimization needed

Page 13: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

DrivingDrivingDrivingDriving cyclecyclecyclecycle Urban Urban Urban Urban infrastructureinfrastructureinfrastructureinfrastructure

BatteryBatteryBatteryBattery statusstatusstatusstatus OptimizationOptimizationOptimizationOptimization

Dynamic wireless city

Page 14: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Dynamic wireless city

› Infrastructure must be intensively used in order to reach quickly the BEP (bus routes, highways principal feasible applications)

14

Page 15: Gianni Campatelli - papers.evs27.org Working to have a “market ready” technology Major limit to mass introduction is the infrastructure Ferrite Vehicle ... -External reference

Follow the project

15

See you at the demo site in Saragozza!

www.unplugged-project.eu

[email protected]

@FP7UNPLUGGED

“Unplugged FP7 project” group