![Page 1: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/1.jpg)
1
2
3
4
.0 PURPO
The pur
A
This profor zero
.0 SCOPE
This proapplies
.0 REFERE
South A
South A
WHS C
Rail Saf
Rail Saf
GFG Al
QP02.0
AS/NZS
WI29.60
QP50.6
QP29.2
.0 DEFINIT
WorkerThis inctrainee; WHS Rinterest Embedsystem / Area.
Any PRINT
OSE
rpose of thisdescribe thApproach toto explain t
ocedure is co incidents a
ocedure apto plant and
ENCES
Australian W
Australian W
Code of Prac
fety Nationa
fety Nationa
liance Cod
01 The Deve
S3931 Risk
00 Service
64 Environm
28 – Critical
TIONS
r - A personcludes; an a student g
Representatts and conce
ded / Stratthat has be
SAF
TED copies o
s Safety Rishe applicato safety, anhe behavio
considered and zero inj
pplies to alld task safet
Work Health
Work Health
ctice – How
al Law (Sou
al Law Natio
de of Practic
elopment, C
analysis of
Providers S
mental Risk
WHS and E
n performinemployee;
gaining wor
tive - A meerns of that
tegic Contreen approve
GFG AllFETY RIS
of this proced
sk Managemtion of SIMnd urs and res
essential touries; name
l SIMEC Mty risks.
and Safety
and Safety
w To Manage
uth Australia
onal Regula
ce – WHS R
Control, Use
f technologic
Safe System
Manageme
Environmen
g a task wi a contrac
rk experienc
mber of a wt workgroup
ractor - A ced by SIME
liance WSK MANA
dure are UN
ment ProceMEC Mining
sponsibilities
o ensuring ely ‘Goal Ze
Mining and L
y (WHS) Ac
y (WHS) Re
e Health an
a) Act 2012
ations 2012
Risk Manag
e and Revie
cal systems
ms of Work
ent (ERM) S
nt Training
ithin an SIMctor or subcce or a volu
workgroup tp.
contractor wEC Mining a
Whyalla AGEMEN
CONTROLL
edure is to; g and Libe
s critical to
your personero’.
Liberty One
ct 2012.
egulations 2
nd Safety R
2
gement
ew of System
s – Applicat
Process
System
MEC Miningcontractor o
unteer.
that is electe
working undend Liberty O
NT
ED
erty OneSte
its success
nal safety, a
eSteel Why
2012.
isks
m Documen
tion guide
g and Libertor their em
ed and train
er their ownOneSteel W
QP29Revision
Safet
eel Whyall
and in achi
yalla sites.
nts
ty OneSteemployee; an
ned to repre
n safety maWhyalla for a
9.13 n 29 ty
Page: 1 of
a's Risk-ba
eving our q
This proce
el Whyalla sn apprentic
esent the sa
nagement a specific Pl
12
ased
quest
dure
sites. ce or
afety
lant
![Page 2: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/2.jpg)
Internaprovide Techno Hazard Hazardproperty Line of Plant – implemethings. vehicles Area – Plant / Aparticula Task - A Task Hhazard the dura Conseqhazardo Likeliho Risk - Toccur. Risk Ra
Likeliho Risk Asidentifie Barrier Contro
Any PRINT
al Service P centralised
ology)
- A potenti
Identificaty and/or pro
f Fire - The
– Includes aent and tooPlant includs, and powe
Work areas
Area Hazaar Plant / A
A task is an
azard – This introduceation of the
quence - Thous / risk sc
ood – The
The conseq
anking - A
ood, assess
ssessmented hazard
r of Defence
l - Anything
SAF
TED copies o
Provider - Ed services a
al source o
tion - The pocess.
path or pot
ny physicalol, and includes items aser tools.
s such as m
rd - An inheArea.
ny activity o
e potential ed to the Platask. These
he harm to cenario.
probability o
uence from
numeric va
ed from the
t - The proc
e - A contro
g that helps
GFG AllFETY RIS
of this proced
Employees oat various pl
f harm to pe
process of id
ential path
permanentdes any coms diverse as
mine or explo
erent, and o
r work unde
harm (dangant / Area be may be in
people, env
of the conse
m a hazardo
lue assigne
e risk rating
cess of eval
ol measure
to reduce o
liance WSK MANA
dure are UN
of SIMEC Mlant location
eople, envir
dentifying a
of danger/e
t facility, mamponent ors lifts, crane
oration site
ongoing, so
ertaken by a
ger/energy) by the personcluded in th
vironment, p
equence oc
us scenario
ed to a spec
definitions
uating the C
that protect
or eliminate
Whyalla AGEMEN
CONTROLL
Mining and Lns (e.g. Cen
ronment, pr
all sources o
energy proje
achinery, eqr anything fies, compute
s not consid
urce of pote
a worker in
associatedon(s) perforhe Plant / A
property an
ccurring whe
o and the lik
cific risk by
. RISK M
Consequen
ts personne
the risk pre
NT
ED
Liberty Onentral Engine
roperty and/
of harm to p
ected from a
quipment, atted or conn
ers, machin
dered to be
ential harm
fulfilment of
with execuming that ta
Area Risk Re
d/or proces
en exposed
kelihood tha
adding the
ANAGEM
ce and Like
el from expo
esented by
QP29Revision
Safet
eSteel Whyaeering and I
/or process
people, env
a hazard
appliance, cnected to aery, convey
e Plant.
(danger/en
of that worke
uting a specask, and is oegister.
ss resulting
d to the risk
at the conse
Consequen
MENT of 1
elihood of ex
osure to a h
the hazard
9.13 n 29 ty
Page: 2 of
alla who nformation
.
ironment,
ontainer, ny of these yor, forklifts
nergy) in a
er’s role
cific task. Thonly presen
from the
scenario.
equence wil
nce and
19
xposure to
hazard
.
12
,
he nt for
l
an
![Page 3: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/3.jpg)
5
Reasonpractica
– – –
–
ALARPapplicatRisk Co SFAIRPduty ho
.0 THE RIS
5.1 Ris
A RtheWethis
A RfrombotPlaper
A R
Any PRINT
nably Practable’ includeThe level oThe availabThe cost aswhether theWhat the prisk and wa
P - As Low ation of controntrol Guide
P – So Far Alders are reto eliminateif it is not reis reasonab
SK-BASED
sk-based A
Risk-basede hazards ae then ensus way the A
Risk-basedm hazards ith. For a tasant and thersonnel are
Risk-based
Plant / Aare best
A Task is
Everyonperformi
Everyon
Everyon
Our uniqand lead
SAF
TED copies o
ticable - Fae:
of risk bility and effssociated we cost for therson conc
ays of elimin
as Reasonarols that areeline to help
As Is Reasoequired: e risks to saeasonably pbly practicab
D APPROAC
Approach to
d Approachassociated wre that the pproach mi
d approachinherent to sk to be pere Task haz
in the ‘Line
approach to
Area Hazardknown to th
s an activity
e needs tong tasks
e continuou
e will stop a
que contribudership. (Re
GFG AllFETY RIS
of this proced
actors that m
fectivenesswith availablhe organisaterned knownating or mi
ably Practicae reasonablp determine
onably Prac
afety so far apracticable tble.
CH TO SAF
o Safety
h to safety with the tasline of fire tigates the
h to safety rthe plant / Arformed wit
zards presee of Fire’ of t
o safety rec
ds are best he worker(s
y or work th
o be in a hei
usly judges
and reasses
ution to hazaefer Section
liance WSK MANA
dure are UN
may determ
s of ways to e ways of etion is gross
ws, or oughtinimising th
able; risks tly practicab the tolerab
cticable; und
as is reasonto eliminate
FETY
is being prsk and the risks for eapotential fo
recognisesArea or hazhout injury
ent, and hathe identifie
cognises tha
known to ps)
hat is assoc
ightened sta
which tools
ss if there h
ard identificn 8.0 Respo
Whyalla AGEMEN
CONTROLL
mine whethe
eliminate oeliminating osly dispropot reasonablye risk.
that are at ale. Use the
ble levels.
der section
nably practie risks to saf
racticed whesubsequen
ach hazard or personne
that the pozards introdor illness, t
ave Barriersed hazards
at:
lant / area p
iated with o
ate of ment
s and contro
has been ch
cation and consibilities.)
NT
ED
er something
or minimise or minimisinortionate to y to know, a
a tolerable leRisk Mana
46 of the R
cable; and fety, to mini
en our behnt risk of exhas adequal exposure t
otential for duced by thehe Worker s of Defencbefore com
personnel, w
our role
al alertness
ols are appr
hange or if t
control is ma)
QP29Revision
Safet
g is ‘reason
the risk ng the risk, the risk
about the ha
evel based agement Co
Rail Safety N
imise those
aviour is toxposure to ate barriersto harm.
illness or ine task, or amust be awce in place
mmencing th
while the Ta
s for hazard
ropriate for
they are uns
atched to o
9.13 n 29 ty
Page: 3 of
nably
including
azard or the
on the de of Pract
National Law
e risks so fa
o firstly Idethose haza
s of defence
njury can c combinatio
ware of bothe to ensurehe task.
ask Hazards
ds when
the hazard(
sure
ur role, skil
12
e
ice
w,
r as
entify ards. e. In
come on of h the e no
s
(s)
ls
![Page 4: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/4.jpg)
5.2 Em
An maMinConthisAreHaz
5.3 The
GFTheTheelimAdmas line
S
As
Any PRINT
mbedded / S
Embeddednagement s
ning and Libntactor muss procedureea and is rezards within
e Hierarchy
G Alliance e preferred e next levelmination is nministrativea last reso
e.
Eliminate t
Substitute use of less
Isolate thehandling, is
Engineerin
Administrasigns, supe
Personal P
HIGHES
LOWES
Leve
l of h
ealth
and
saf
ety
tti
SAF
TED copies o
Stategic Co
d / Strategicsystem. Thberty OneStst ensure the. The Embsponsible fon that Plant
y of Contro
advocates acontrol is ws of controlnot reasona
e and persort, after firs
the Hazard
the Hazarhazardous
e Hazard –solate by dis
ng Controls
ative Contrervision.
Protective E
ST
ST
prot
ectio
n
GFG AllFETY RIS
of this proced
ontractors
Contractorhis safety mteel Whyalla
heir risk manbedded / Stror the mana/ Area.
ol
a hierarchy where the ha
are substitably practicanal protectit taking all
– remove t
rd – substituchemicals)
– enclose tstance/time
s – for exam
rols – for e
Equipment
Person
liance WSK MANA
dure are UN
r is a contramanagement
a before it cnagement prategic Conagement of
y of control mazard is elimtution, isolaal. ve equipmereasonably
the hazard f
ute with a h)
the hazard .
mple, ventila
example, sa
t (PPE) – fo
Eliminat
Substitut
Isolate
nal Protect
Administr
Enginee
Whyalla AGEMEN
CONTROLL
actor that wot system mucan be usedprocesses mtractor is ththe risks as
measures (Bminated beftion and en
ent controlsy practical m
from the wo
hazard that
(e.g. barrie
ation, syste
afe work me
or example,
te the Haza
te the Haza
the Hazard
tive Equipm
rative Cont
ering Contr
NT
ED
orks under tust have bed. The Embmeet or excee Plant Owssociated w
Barriers of Dfore the taskngineering.
s (below themeasures to
orkplace/wo
t poses a lo
ers and fen
ms, machin
ethods, trai
hardhat, he
ard
ard
d
ment (PPE)
trols
rol
QP29Revision
Safet
their own saeen approvebedded / Streed the req
wner for the with Plant an
Defence) fok begins. These are
e line) shouo apply con
ork process
ower risk of
ncing enclo
ne guarding
ning, job ro
earing prote
)
9.13 n 29 ty
Page: 4 of
afety ed by SIMErategic quirements oagreed Pla
nd Task
or hazards.
preferred w
ld only be untrols above
.
f harm (e.g
osures), rem
.
otation, war
ection.
MOST
LEAST
Reliability o
f control
12
C
of nt /
when
used e the
. the
mote
rning
![Page 5: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/5.jpg)
6
Imprev
.0 PROCE
6.1 Pla
6.1.1 K
a
b
6.1.2 P
Ggre
Thbu
Thse
B
Plant ri
Plant /
or Insp
Periodi
Risk Re
Plant /
throug
Any PRINT
plement theview during
EDURE
ant / Area H
Key Behavi
a) Each Plathe area
b) Workers area they
Process for
GFG Alliancuideline, thepresentativ
here are a nusiness unit
he default tets out the m
usiness Un
LibertAsses
SIME
isk assessme
Area walk th
ection
ic Review of
egister
Area walk
h or Inspecti
SAF
TED copies o
e control methe task to
Hazards
ours Displ
ant / Area h, and the coand visitor
y are enteri
r Plant / Are
e considershe risk asseves, worker
number of tt may ident
ool is availaminimum re
it specific to
ty OneSteessment Tem
EC Mining –
ent
hrough
ion
GFG AllFETY RIS
of this proced
easures or ensure that
ayed
has accessiontrol measrs are informng.
ea Risk Ide
s that a teamessment ters(s) and ma
tools availabify the appli
able in the Pequirement
ools:
l – Refer tomplate
– Refer to W
liance WSK MANA
dure are UN
Barriers of t they are w
ble, a regissures (barriemed of the
entification
m approacheam shouldanagement
ble to conduicable tools
Plant Risk Mfor busines
o FORM29.0
WI75.WHS.R
ManagemenCommitmen
Whyalla AGEMEN
CONTROLL
f Defence bworking as p
ster that ideers) in place plant haza
n
h to Plant / A be made t stakeholde
uct Plant / As in their saf
Managemensses using t
009 – Steelw
RSK.001 – R
nt nt
NT
ED
efore the taplanned.
ntifies the Pe to preventards and co
Area risk ideup of Subj
ers.
Area risk asfety manage
nt Toolkit (ahis procedu
works Plant
Risk Manag
R
P
(
L
H
R
QP29Revision
Safet
ask comme
Plant / Areat exposure. ontrols impl
entification ject Matter
ssessmentsement syste
attachment 3ure.
t Hazard an
gement Too
Risk Rating a
Prioritisation
(Attachment
Legislative re
Hierarchy of
Recording th
9.13 n 29 ty
Page: 5 of
ences, and
a hazards w
emented in
is optimal. AExperts, W
, and each em.
3). This To
nd Risk
ols
nd
n Table
t 1)
equirements
Controls
he risks
12
then
within
n the
As a WHS
oolkit
![Page 6: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/6.jpg)
St
St
St
St
6.1.3 A
Th
Any PRINT
tep 1 – Ide
The
N C A
tep 2 – Ass
PoteThisPrac
tep 3 – Con
Conthe the AlliaRailBus
Reg
tep 4 - Rev
Riskaccowith
A pr
Accessibilit
he register
SAF
TED copies o
ntify the Pl
requiremen
New plant oChange manAny other ev
sess Expos
ential risks as is in accctice.
ntrol Risks
nsidering thright barrierisk contro
ance WHS National Siness Areas
gister at leasA descrCurrent The riskRankingThe addThe riskNote; if be impleLow res
view Contro
k register ordance wit the GFG A
rompt for thInjuries Hazard ChangeSignificaTask baPolicy o
ty of the re
of Plant / A
GFG AllFETY RIS
of this proced
lant / Area
nt for a risk
r equipmennagement vent that ma
sure to Ris
are to be ascordance w
s associate
e legislativer to reduce
ol guidelinesRisk Manag
Safety Law s.
st: ription of thecontrols in
k ranking tag) ditional contk ranking withe residuaemented in sidual risk.
ol Measure
entries (hath the Risk
Alliance WH
e review of / IncidentsCards
e Managemeant Safety Oased risk asor procedura
gister of p
Area risks m
liance WSK MANA
dure are UN
Hazards
assessmen
nt
ay change t
sk and Line
ssessed usiwith the GF
ed with the
e requiremethe risk to
s in attachgement Coand Regula
e hazard place to coking curren
trols / barrieith the addital risk is still
line with th
es
azard and Control Gu
HS Risk Man
f the risk reg
ent Occurrencessessment ral changes
lant risks
ust be acce
Whyalla AGEMEN
CONTROLL
nt will be trig
the plant, or
e of Fire
ing the risk FG Alliance
hazard (Ba
ents and uas low as r
hment 2. Tde of Practation requir
ontrol the hat controls in
ers of defentional contro Moderate oe Risk Con
associateduideline in nagement C
gister can b
s or Safety reviews
essible to em
NT
ED
ggered by:
r the plant p
ranking tabe WHS Ris
arriers of D
sing the hiereasonably This is in atice. Consirements, wh
azard nto consider
nce to be imols in place or above thtrol Guidelin
d controls)attachment
Code of Pra
e from Haz
Briefs
mployees, c
QP29Revision
Safet
processes.
bles in attacsk Manage
Defence)
erarchy of practical in
accordanceideration mhere applic
ration (Curr
mplemented (Residual Ren further cne to lower
) are to bt 2. This isactice.
zards identif
contractors
9.13 n 29 ty
Page: 6 of
chment 1. ement Cod
controls, sen alignment with the G
must be givecable to spe
rent Risk
Risk Rankincontrols muthe risk to a
be revieweds in accorda
fied in:
and visitors
12
e of
elect with
GFG en to ecific
ng)st a
d in ance
s.
![Page 7: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/7.jpg)
6.2 Pro
6.2.1 K
Aa
b
c
d
e
6.2.2 P
T
Liber‐ Tak‐ Haz
SIME‐ PTR‐ FataPlann
Take
Stop a
Safety
Obse
Any PRINT
ocedure – T
Key Behavi
All workers wa) Show wi
safety enb) Should b
identified) For Non-
risk man) For Rout
understae) Demonst
change o
Process for
The underly
Have
Ident
Ensufrom
Ensu
Use task
rty OneSteel e 2 zard Prompt
EC Mining RA (STAR) al Risk Mananing Tool
2 / STAR
and re‐asses
y Behaviour
rvations
SAF
TED copies o
Task Hazar
ours Displ
will: llingness tongagementsbe continuoud when perf-Routine tasagement totine work co
and the hazatrate the wor if challen
r Task Risk
ying proces
e an unders
tify the job s
ure there arthe risk ass
ure all worke
or be familiby all worke
gement
ss the task
GFG AllFETY RIS
of this proced
rds
ayed
o talk about s. usly judgingforming tasksks have on
ool for the taovered by aards and co
willingness ged by othe
k Identificat
ss for all tas
standing of t
steps and w
e effective csociated wit
ers underst
ar with the ers involved
liance WSK MANA
dure are UN
the hazards
g which tooks. n location, hask. a Work Instronversant into stop aner work coll
tion
sk risk ident
the inheren
work method
controls (bath the Plant
tand and fol
task risk mad in that tas
ManagemCommitm
Whyalla AGEMEN
CONTROLL
s they have
ls and contr
have signed
ruction, whin the Work nd re-asseseagues
ification req
t Plant / Are
d
arriers of det / Area Haz
llow the agr
anagementsk.
entent
NT
ED
e identified i
rols are app
d on to, and
ch has beeInstruction f
ss if the w
quires that w
ea hazards,
efence) in plzards and th
reed work m
t process / t
QP29Revision
Safet
in the task d
propriate for
d be convers
n risk assesfor the task
work method
we:
, risks and c
lace to prothe Task Ha
method and
tool as the f
PTRA (STAR
Safe System
Work Instru
Contractor A
Work
Codes Of Pr
High Risk Pr
High Risk Pe
Rules and St
9.13 n 29 ty
Page: 7 of
during work
r the hazard
sant in, the
ssed, know. d or condit
controls
tect personnazards
controls
first step of
)
ms of Work
uctions
Authority to
actice
ocedures
ermits
tandards
12
k or
d(s)
task
w and
tions
nel
a
![Page 8: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/8.jpg)
T
a
A
Scoc
6.2.3 T
Any PRINT
The Risk-barequired whand potentiincrease; a
Hazard com
1. The
2. Diffitrad
3. The
Tasks ptrade ha
Potential coinjury or illn
All workers performing hazard com
Select and consequenor the hazacertainty.
Task Risk M
SIMEC
Where in QP5
SAF
TED copies o
ased Approhen managial conseqund the task
mplexity sho
e environme
culty of thee/operator
e number of
performed inazards, by a
onsequenceness that is
need to betasks, and
mplexity.
follow the rce and/or h
ard complex
Managemen
C Mining – R
environme50.57 Enviro
GFG AllFETY RIS
of this proced
oach to safeng the risk ence increarisk manag
ould be judg
ent – office/w
task – withcompetenc
identified p
n an office oa single trad
e is judged apossible as
e in a heightcontinuous
risk manageazard comp
xity, choose
nt Tools (S
Refer to WI7
ntal risk is donmental Ri
liance WSK MANA
dure are UN
ety recognisassociated
ases, the riggement tool
ged by the w
workshop v
hin a single cies
plant and ta
or workshopde skill, are
as the maxs a result of
tened state ly judge the
ement proceplexity. If tha more rigo
SIMEC Mini
75.WHS.RS
dealt with inisk Manage
Whyalla AGEMEN
CONTROLL
ses there is with tasks.
gour applied be selecte
worker/s us
vs. plant or m
trade/opera
sk hazards
p environmelikely to be
imum reasoexposure t
of mental ae factors aff
esses / toolere is unceorous risk m
ng)
SK.001 – Ri
n shared risement.
NT
ED
a hierarchy As the lev
d to task risd according
ing criteria
mine site
ator compet
and the de
ent, with noe of low haza
onable conso an identif
alertness forfecting pote
s based on rtainty of th
managemen
sk Manage
k managem
QP29Revision
Safet
y to the levevel of hazardk managemgly.
including th
tency or req
egree of inte
o plant hazazard comple
sequence ofied hazard.
r hazards wential conseq
the judgedhe potential nt tool until t
ement Tools
ment tools th
9.13 n 29 ty
Page: 8 of
el of rigour d complexit
ment should
he following
quiring multi
eraction
ards and fewexity.
or severity o
when quence and
potential consequenthere is
s
his is descri
12
ty
:
iple
w
of
d
nce
ibed
![Page 9: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/9.jpg)
Ta
Task
New
Rowith
TaPro
6.2.4 T
a
W
WQ
Any PRINT
T
asks with a pote
ks where th
w or non-rou
utine Tasksh a known c
asks performovider or Ex
Task Risk M
Liberty(Attach
Note*: an Ehowever the
For the docmanageme
For the docbe competeand control
Each businWhere this be used.
Where enviQP50.57 E
SAF
TED copies o
Types of T
low level ofntial conseq
e complexitis uncerta
utine Tasksemployee
s performedcomplexity a
med by an xternal Cont
owner*
Managemen
y OneSteel –hments 4 an
Embedded /ey are cons
cumented toent tool befo
cumented toent in the tas associate
ess unit canhas not bee
ironmental nvironment
GFG AllFETY RIS
of this proced
asks
f complexityquence
ty or conseqin
s performede
d by an empand conseq
Internal Sertractor for a
nt Tools (L
– the defaund 5)
Strategic Csidered the
ool for new/ore commen
ool for routinask outlined ed with the t
n identify then identified
risk is dealtal Risk Man
liance WSK MANA
dure are UN
y and
quence
d by an
ployee quence
rvice a Plant
Liberty One
lt tools are
Contractor isPlant owne
non-routinencing the ta
ne tasks coin the work
task before
heir applicabd by the bus
t with in shanagement.
Whyalla AGEMEN
CONTROLL
R
Me
Ha
Safe Sys
Safe Sys
Wo
Au
eSteel)
available in
s not consider for their d
e tasks, worsks.
vered by a k instructionconducting
ble tools forsiness unit,
ared risk ma
NT
ED
Risk Mana
ental “Take
azard Promp
stem of Wo(Attachme
stem of Wo(Attachmen
ork Instructio
thority to W
the Task R
dered an Exefined Plan
rkers must s
work instrucn and under the task.
r conducting the default
anagement
QP29Revision
Safet
agement T
2” (Attachm
pt (Attachm
rk Electricaents 4.4 & 4
rk Electricants 4.4 & 4.on (Attachm
Work (Attach
Risk Manag
xternal Connt / Area.
sign on to th
ction, the wrstand the h
g task risk at hierarchy a
tools this is
9.13 n 29 ty
Page: 9 of
Tool
ment 4.1)
ment 4.2)
al / Mechani4.5)
al / Mechani.5) or
ment 4.6)
hment 5)
ement Tool
tractor;
he risk
worker shouhazards, risk
assessmentand tools ca
s described
12
cal
cal
lkit
ld k
ts. an
in
![Page 10: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/10.jpg)
7
8
6.2.5 T
A
sAt
6.2.6 R
TD
Ata
T
HP
.0 RECOR
Each Dand kep
a m in a in a
Risk asrecord.
.0 RESPO
Genera
Departm
Any PRINT
Training
All personshazards anshould be inAll personsto the type Environmen
Review Freq
Tasks that Developmen
All other tasask or cond
Task based
Hazards idePlant / Area
RD KEEPIN
epartment /pt for;
minimum of taccordance accordance
ssessments Any chang
NSIBILITIE
al Manager
Set the s Define th Ensure e Ensure t Monitor t
ment / Bus
Ensure ttools thahierarchy
Ensure tregardin
Ensure w
SAF
TED copies o
entering a d controls. ncluded in t conductingof risk assental Training
quency
are coverent, Control,
k risk asseditions chan
risk assess
ntified in thrisk assess
G
/ Business
the durationwith the relwith QP02.
s entered iges or histo
ES (unique
standard of he metrics teffective systhe businesthe effective
siness Area
the safety mat facilitate hy of controlthe Departmg Plant andwhen signifi
GFG AllFETY RIS
of this proced
Plant / Area The Departhe businesg risk assesessment toog)
d by a WoUse and Re
ssments shge.
sments shou
e task basesment as re
Area, must
n specified oevant code.12 Records
nto the IRMorical data w
contributio
acceptableto measure stems and ps is adequaeness of the
a Manager
managemenhazard idens
ment / Busind Task Hazaicant incide
liance WSK MANA
dure are UN
a should bertment / Busss unit inducssments shool they are u
ork Instructeview of Sy
hould be rev
uld be revie
ed risk asseequired.
t ensure tha
on the forme of practices Managem
MS Risk Rwill automat
on of the ro
e hazard excompliance
processes tately resoure Risk Man
or Embedd
nt system contification, ri
ness Area aards
ents occur th
Whyalla AGEMEN
CONTROLL
e made awasiness Areaction. ould be trainusing. (see
tion shouldystem Docum
viewed eac
ewed after r
essment rev
at any risk a
m used (whee, or ment System
Register datically be arc
ole)
posure ande to give effecrced to comagement sy
ded / State
overs both Psk assessm
applies the s
hat the risk
NT
ED
are of the spa Plant / Are
ned. The trQP29.28 C
be reviewments’.
ch time the
elevant inju
view should
assessment
re they exis
m.
tabase will chived.
acceptable
ct to the staply with theystem
gic Contra
Plant and Aments and th
safety mana
assessmen
QP29Revision
Safet
pecific Planea /hazards
raining shouCritical WHS
wed as per
task is con
ury/incidents
d be update
ts carried o
st), or
be automa
e behaviour
andards e standard
actor’s Man
Area Hazardhe applicati
agement sy
nt is conside
9.13 n 29 ty
Page: 10 of
t / Area and contro
uld be relevS and
QP02.01
nducted or if
s.
ed back into
ut are reco
atically kep
r
nager
ds and incluon of a
ystem
ered for rev
f 12
ols
ant
‘The
f the
o the
rded
pt on
udes
view
![Page 11: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/11.jpg)
9
Manage
Superv
Worker
Safety
.0 DOCUM
Attachm
Attachm
Attachm
Any PRINT
er
Ensure tthe plant
Ensure P Ensure t
manage
visor / Team
Select th Verify th Ensure w Make pe
r
Comply for the ta
Ensure Ptask com
Participaapplicab
Individuatask or c
Where wshould thmeasure
Manager
Developneeds o
Coach a Provide
MENTATION
ment No. 1
ment No. 2
ment No. 3
SAF
TED copies o
the Plant/ At risk registePlant / Areathat superviment tools
m Leader /
he appropriae quality of workers undeople availa
with this proask Plant / Areammences. (ate in requirble als must stoconditions cworkers joinhoroughly faes (barriers
p and maintof the businand assist l
e expert adv
N
- GFGPrio
- GFGCon
- Placom
GFG AllFETY RIS
of this proced
Area Hazarder
a risk registesors and w
Contractor
ate risk manapplication
derstand theable for train
ocedure by
a Hazards a(consult thered training,
op, re-asseshange a task afteamiliarise thof defence)
tain risk maess ine manage
vice on risk
G Alliance Woritisation T
G Alliance Wntrol Guidel
nt Hazard Implex plant)
liance WSK MANA
dure are UN
ds associate
er is accessworkers are t
r Controlle
nagement tn of the risk e risks and
ning
applying th
are considere plant risk r, and contri
ss and upda
er the risk mhemselves w) before com
anagement s
ement in themanageme
WHS Risk MTable
WHS Risk Mline
dentification) (Include a
Whyalla AGEMEN
CONTROLL
ed with the
sible to all etrained, com
r
ool for the tmanagemecontrols in
he risk mana
red, in conjuregister as rbute to the
ate the docu
managementwith the jobmmencing
systems, pr
e applicatioent strategy
Manageme
Manageme
n and Risk hyperlink to
NT
ED
managers d
employees, mpetent and
task being uent tool usedthe Hazard
agement to
unction withrequired) Risk Asses
umented ris
t process hab steps, haz
rocesses an
n of the tooand techniq
nt Code of P
nt Code of P
Assessmeno the actual
QP29Revision
Safet
discipline ar
contractorsd utilise the
undertaken d for the tas
d Register
ool that has
h Task Haza
ssment proc
sk managem
as been cozards, risks
nd tools tha
ols ques
Practice – R
Practice – W
nt Checklistl tool)
9.13 n 29 ty
Page: 11 of
re identified
s and visitorrequired ris
sk
been selec
ards, before
cess where
ment tool if
mpleted, thand control
at meet the
Risk Rating
WHS Risk
t (Large and
f 12
d in
rs sk
ted
e a
the
ey l
and
d
![Page 12: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/12.jpg)
Attachm
Attachm
(Note: W
Any PRINT
ment No. 4
ment No. 5
WI29.600 - S
SAF
TED copies o
- Libe
4
4
4
4
4
4
– Aut
Safe Systempro
GFG AllFETY RIS
of this proced
erty OneSte
4.1 Men
4.2 Haza
4.3 Star
4.4 SSO
4.5 SSO
4.6 Wor
thority to Wo
m of Work Pcess)
liance WSK MANA
dure are UN
eel Task Ris
ntal “Take 2
ard Prompt
r Booklet (R
OW Mechan
OW Electrica
rk Instructio
ork (REMO
Process pro
Whyalla AGEMEN
CONTROLL
sk Managem
”
t
REMOVED)
nical
al
n Template
OVED)
ovides full d
NT
ED
ment Toolki
(REMOVE
etail for the
QP29Revision
Safet
it
ED)
e Authority t
9.13 n 29 ty
Page: 12 of
o Work
f 12
![Page 13: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/13.jpg)
GFG Alliance WHS Risk Management Code of Practice – Risk Rating and Prioritisation Table
Attachment No.1
QP29.13/1 17/05/2011 Page: 1 of 1
Consequence Categories Level Rating Description
1 Negligible Negligible Low-level short-term subjective inconvenience or symptoms. No measurable physical effects. (E.g. minor laceration, burn or abrasion requiring basic first aid treatment).
2 Minor Objective but reversible disability / impairment. (E.g. laceration, sprain/strain, burn etc. that requires medical treatment and/or modified duties)
3 Medium Moderate short-term or irreversible disability or impairment. (E.g. fracture, crush injury, burns etc. requiring specialist medical and/or hospital treatment).
4 Major Near fatality, Single fatality or severe irreversible disability or impairment. (E.g. loss of life, loss of limbs, loss of bodily function such as major paralysis)
5 Extreme Short or long term health effects leading to multiple fatalities. (E.g. as for 4 but with multiple victims).
Likelihood Categories Level Rating Description
1 Rare The event may occur only in exceptional circumstances. May Happen, but it would be a shock.
2 Unlikely The event could occur at some time. Surprised if it happens.
3 Possible The event might occur at some time. Would not be surprised either way: whether it happens or not.
4 Likely The events will probably occur in most circumstances. Not surprised if it happens.
5 Almost Certain The event is expected to occur in most circumstances. Almost expect it to happen.
Note: Add consequence and likelihood to achieve risk rating
Risk Ranking Table
Likelihood Consequence
Negligible Minor Medium Major Extreme 1 2 3 4 5
Almost Certain 5 6 7 8 9 10 Likely 4 5 6 7 8 9 Possible 3 4 5 6 7 8 Unlikely 2 3 4 5 6 7 Rare 1 2 3 4 5 6
Risk Prioritisation Risk Level Suggested Actions
2-4 Low Manage by routine procedures
4-5 Moderate Responsibility and action dates must be specified
5-7 High Reduce as soon as possible
7-10 Very High Immediate action to reduce risk, stop work as soon as practicable
![Page 14: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/14.jpg)
GFG Alliance WHS Risk Management Code of Practice – WHS Risk Control Guidelines
Attachment No.2
QP29.13/2 8/09/2017 Page: 1 of 2
Identification, Planning & Implementation of Risk Controls The GFG Alliance WHS Risk Management CoP requires that corrective actions be implemented for identified risks and each business shall have a program for those controls that systematically addresses their risk profile. The key principle is that sites are to have an active risk register and be able to demonstrate that they are actively addressing the highest rated risks. The key philosophy is that the risk management process is a method of determining priorities and items to address first, thus sites are encouraged to focus on the top priority risks rather than all risks. Control measures implemented to manage a risk should be reviewed and monitored to determine if changing circumstances have altered the control measures required to effectively manage the risk. When reviewing risks, it is good practice to review each of the risks for a particular hazard based on review period for the highest ranked risk. The following table outlines the risk control priorities, timeframes to assess and decide on controls, and timeframes for review of risk control effectiveness.
Low Risk Moderate High Very High
Risk Control Priorities
Manage by routine
procedures
Responsibility and action dates
must be specified
Reduce as soon as possible
Immediate action to reduce risk, stop work as soon as practicable
Time to Assess and Decide on Controls
60 days 60 days 10 days 24 hours
Implement Additional Controls
12 months 60 days 30 days 24 hours
Review of Risk Control Effectiveness
36 months 24 months 12 months
Not applicable (risks to be reduced)
Qualifying Notes Low Risk – Manage by routine procedures The level of risk is such that resources are most probably better directed at addressing higher rated risks. When a risk is identified and rated as a low risk, and the business context warrants additional controls then a reasonable timeframe would be for implementation of the controls to be performed using routine methods within 365 days.
![Page 15: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/15.jpg)
GFG Alliance WHS Risk Management Code of Practice – WHS Risk Control Guidelines
Attachment No.2
QP29.13/2 8/09/2017 Page: 2 of 2
Moderate Risk - Responsibility and action dates must be specified Resources should be allocated to higher rated risks first. An action plan that outlines planned controls or steps to determine planned controls and allocates responsibility should be developed within 60 days. High Risk - Reduce as soon as possible Where a risk scenario has been rated as high risk, the existing controls should be reviewed and any further controls that are reasonably practical identified and implemented as soon as possible, preferably within 30 days. There may be situations where a risk has been identified and rated as high risk and after due consideration no further controls are reasonably practicable or known (ALARP), in such cases the Executive General Manager shall determine whether the risk scenario is to be tolerated. Similarly, there may be cases where additional controls may take longer than 30 days, in such cases the Executive General Manager shall confirm that the timeframe is acceptable within the context of the specific risk scenario. Very High Risk - Immediate action to reduce risk, stop work as soon as practicable Immediate (within 24 hours) interim controls should be implemented to protect persons from the hazard. Prior to the stopping of work assessment should be made to check whether any additional risks might be introduced by stopping the process and appropriate controls implemented. Given the subjective nature of the risk rating method, good practice is to seek a greater understanding of the hazard and risk and confirm the level and nature of risk prior to establishing further controls once initial controls have been implemented.
![Page 16: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/16.jpg)
Plant Hazard Identification and Risk Assessment Checklist Attachment No.3
QP29.13/3 23/06/2014
PLANT HAZARD IDENTIFICATION AND RISK ASSESSMENT CHECKLIST (LARGE AND COMPLEX PLANT)
Location:
Plant name:
Plant sub name:
Hazard Description Applicable Current Controls/Comments
Risk assessment Current controls Proposed Control measures
Risk Assessment Future controls Overall
Ranking Yes No C L R C L R
1. Entanglement
2. Crushing
3. Trapping or confining
4. Cutting, stabbing or puncturing
5. Shearing, abrasion, tearing, stretching or friction
6. Striking
7. Stored Energy (Pressurised content, hydraulic, pneumatic and vacuum)
8. Electrical
9. Noise and Vibration
10. Fire and Explosion
11. Temperature, moisture
12. Vapour, gases, dusts
Key C - Consequence L - Likelihood R - Risk Rating Low Moderate High Very High Page: 1 of 3
Prompt questions for each hazard description are listed in the full Plant Hazard Identification and Risk Assessment Checklist on the Intranet
![Page 17: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/17.jpg)
Plant Hazard Identification and Risk Assessment Checklist Attachment No.3
QP29.13/3 23/06/2014
PLANT HAZARD IDENTIFICATION AND RISK ASSESSMENT CHECKLIST (LARGE AND COMPLEX PLANT)
Location:
Plant name:
Plant sub name:
Hazard Description Applicable Current Controls/Comments
Risk assessment Current controls Proposed Control measures
Risk Assessment Future controls Overall
Ranking Yes No C L R C L R
13. Radiation
14. Slips, Trips and Falls
15. Access and Egress
16. Lighting
17. Manual Handling , Ergonomics
18. Failure of Plant
19. Asbestos
20. Persons and Equipment moved by Plant
21. Automatic mobile plant
22. Operators competency
23. Stability of Plant
24. Hazardous and Dangerous Substances
25. Biological Hazards
26. Confined Spaces
27. Water or Liquid tanks
28. Other Hazards
Key C - Consequence L - Likelihood R - Risk Rating Low Moderate High Very High Page: 2 of 3
![Page 18: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/18.jpg)
Plant Hazard Identification and Risk Assessment Checklist Attachment No.3
QP29.13/3 23/06/2014
PLANT HAZARD IDENTIFICATION AND RISK ASSESSMENT CHECKLIST (LARGE AND COMPLEX PLANT)
Location:
Plant name:
Plant sub name:
References WORK HEALTH AND SAFETY ACT, 2012 Work Health and Safety Regulations, 2012
Summary:
Risk Assessment Team Team Leader:
Occupation:
Signature:
Date:
Facilitator:
Occupation:
Signature:
Date:
Name:
Occupation:
Signature:
Date:
Name:
Occupation:
Signature:
Date:
Name:
Occupation:
Signature:
Date:
Plant owner:
Business Unit Manager:
Assessment period:
Key C - Consequence L - Likelihood R - Risk Rating Low Moderate High Very High Page: 3 of 3
![Page 19: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/19.jpg)
Plant Risk Management Toolkit – Mental “Take 2” Attachment No.4.1
QP29.13/4.1 23/06/2014 Page: 1 of 1
![Page 20: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/20.jpg)
QP2
Locatio
Task:
Is there a
If so, lis
P1. Do I u
stepstask?
2. Do I htraini
3. Do I n
4. Is thedepreenerg
5. Are hintrod
6. Do yo
ConfiPerm
EN
7. Haare
eg: Others i
Weathe
Housek
Lighting
9.13/4.2
on:
QP / WI / SOP
st hazards ide
ROCEDURunderstand ts required to ? Yes � No �
have appropng for this ta
Yes � No �
need to isola
Yes � No �
e mechanicalessurised / sgy released?
Yes � No �
hazards goingduced to the
Yes � No �
ou require a ined Space
mit?
Yes � No �
NVIRONMEN
as anything ea changed w
needs to bconsidered
in area?
Yes � No �er conditions?
Yes � No �keeping?
Yes � No �g?
Yes � No �
Plant Ris
for this task?
entified in pro
RE the do the
�
priate ask?
�
ate?
�
l system stored ?
�
g to be area?
�
�
NT
in the which
be d?
� ?
�
�
�
8
9
10
1
12
13
14
DB S O H
sk Managem
Take 5TicWr
Y N ocedure on p
PP. Is extra PP
Yes �
. Are there aedges?
Yes �
0. Do you neany personadornments
Yes �
1. Is respiratneeded?
Yes �
2. Do you remonitor?
Yes �
3. Do you repads for kn
Yes �
MANUAL H
4. Are there handling ha
Yes
Do you need tend / twist?
tretch?
Over-reach?
Handle heavy
ment Toolkit
23/0
5 to 10 minuk ‘YES’ or ‘
rite control m
Ref. Nu
page 2.
PE E required?
� No � ny sharp
� No �
eed to removal s?
� No �
tory protectio
� No � quire a gas
� No � quire knee eeling?
� No �
HANDLING
any manual azards?
� No � to:
Y � N �
Y � N �
Y � N �
y objects? Y � N �
t – Hazard
06/2014
utes to spotNO’ for all qmeasures o
mber: _______
PHYS
ve
on
�
�
�
�
15. Is thmob
16. Is thpinc
17. Is thfalli
18. Slip
19. Tem
20. Is thStre
21. Wor
22. Mateg rstee
23. Are haz
24. Do yMS
Prompt - St
t the hazardquestions
on page 2
______________
SICAL HAZhere any riskbile equipme
Yes � No �
here any riskch points?
Yes � No �
here any riskng?
Yes � No �
pping / TrippinYes � No �
mperature ex
Yes � No �
here a risk ofess? Yes � No �
rk Item FallinYes � No �
terial above frefractory, coelwork Yes � No �
there chemi
zards? Yes � No �
you need anDS?
Yes � No �
teelworks
Date:
ds
_____
ARDS Tk from ent?
�
k from
�
k of
�
ng? �
xtremes?
�
f Heat
�
ng? �
falling? oncrete,
�
cal
�
�
25
26
27
28
29
30
If no
3
32
33
Attach
TOOLS & E5. Do you ha
correct toYes �
6. Does portequipmentag?
Yes �
7. Is mobile a safe con
Yes �
8. Is lighting Yes �
9. Do you resigns?
Yes �
LIFT
0. Is this a coYes �
f yes, use theo, use a dog
1. Are you trthis lift?
Yes �
2. Risk of loaCaptive?
Yes �
3. Is the liftindesigned purpose?
Yes �
ment No.4
Page: 1 of
EQUIPMENave all the ols?
� No �
table nt have curre
� No � equipment inndition?
� No � good?
� No �
equire warnin
� No �
TING
ontrolled lift?� No � e procedure, gger / rigger
rained to do
� No �
ad being
� No �
ng device for this
� No �
.2
f 2
NT
ent
n
ng
?
if
![Page 21: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/21.jpg)
Plant Risk Management Toolkit – Hazard Prompt - Steelworks Attachment No.4.2
QP29.13/4.2 23/06/2014 Page: 2 of 2
OTHER POTENTIAL HAZARDS TO CONSIDER Confined Space Isolation Working at Heights Welding / Cutting Access / Egress Electricity Fire / Explosion Fumes / Vapours / Mists
Engulfment Machinery Tools Road / Rail Traffic Explosive atmosphere Pinch Points Piped Services Weather
Gas Lifting Loads Noise Demolition Atmospheric contaminants
Suspended Loads Dust Interaction with others
Chemical / Biological Hot Work Excavation/Puncture of
Surface
ENVIRONMENTAL IMPACTS
Dust Waste disposal Spills
HAZARDS IDENTIFIED IN PROCEDURE:
a
b
c
d
e
f
OTHER HAZARDS:
A
B
C
D
E
F
CONTROLS: Measures taken to overcome the hazards.
Is there a hazard that requires follow up? Yes No
If yes, report to supervisor or complete a Hazard / Near Miss / Incident Report Card.
Names:
![Page 22: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/22.jpg)
QP29.13/4.4
4 8/05/2018
8 Paage: 1 of 1
![Page 23: GFG Alliance Whyalla QP29.13 ETY RISK MANAGEMENT … · d hazards t: lant / area p iated with o te of ment and contro as been ch ation and c nsibilities.) T ED r something r minimise](https://reader031.vdocuments.us/reader031/viewer/2022020305/5c04750f09d3f2ff398bd22b/html5/thumbnails/23.jpg)
QP29.13/4
4.5 8/05/20018 PPage: 1 of 1