getting to yes 2015 final - woodworks...getting to yes i codes: section 104.11 approval is required...
TRANSCRIPT
![Page 1: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/1.jpg)
Getting to
Michael F. Malinowski AIA Applied Architecture Inc © Sacramento CA
Disclaimer:+This+presenta1on+was+developed+by+a+third+party+and+is+not+funded+by+WoodWorks+or+the+So=wood+Lumber+Board.!
![Page 2: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/2.jpg)
“The Wood Products Council” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES), Provider #G516. Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. __________________________________
Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
![Page 3: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/3.jpg)
Copyright MaterialsThis presentation is protected by US and
International Copyright laws. Reproduction, distribution, display and use of the presentation
without written permission of the speaker is prohibited.
© Michael F Malinowski 2015
![Page 4: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/4.jpg)
• This session will cover principles and strategy for effective navigation of the building permit process when materials or designs don’t comfortably fit with conventional code application, as well as the use of permit streamlining for more effective and efficient processing.
• Alternate Materials and Means Requests (AMMR) can be used for various reasons including: use of innovative products and systems, new design concepts, complex geometries, code conundrums, political problem solving and the resolution of interpretation differences. Successful project examples will be used to demonstrate how to approach the AMMR process and demystify the concept of an alternate design.
• In addition, the landscape of permit streamlining concepts will be outlined, with a focus on streamlining approaches that can engage design professionals on the ‘public’ side of the counter in a project's ultimate success.
![Page 5: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/5.jpg)
At the end of this program, participants will be able to:
• Understand the differences between discretionary entitlements and ministerial entitlements, and what that means for project approval strategies.
• Develop an understanding of principles and strategies for use of the Alternate Materials and Means Request (AMMR) process in navigating permit approvals
• Improve cooperation and dialogue between plan review professionals and design professionals to allow for great efficiency, better work product, improved code compliance, and reduced professional liability exposure.
• Engage design professionals as effective and innovative partners in the
code and regulatory arenas in which they work.
![Page 6: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/6.jpg)
Design!Professionals!!typically!work!with!
Two!different!kinds!of!En9tlements!!
! Discretionary
Ministerial MAYBE Yes … No …
BUT YES …
Getting to YES © 2015 MFMalinowski
![Page 7: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/7.jpg)
Ministerial Code Can’t Cover Everything so sometimes …
a MAYBE enters the picture
Performance Code Provision within our typical Prescriptive Code Framework
The ability to consider Alternate Materials, Design, and Methods of Construction
Alternate A Materials M Methods M Request R
![Page 8: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/8.jpg)
Getting to YES
I Codes: Section 104.11
Approval is required
Approval must be based on Satisfactory Compliance with intent of code Alternate is AT LEAST the equivalent in quality, strength, effectiveness, fire resistance, durability and safety. Fire resistance defined > chap 2 > 702.1 : “that property of materials or their assemblies that prevents or retards the passage of excessive heat, hot gases or flames under conditions of use” In commentary: fire resistance is evaluated by testing in accordance with ASTM E119 Interpretive manual: Building official is expected to use sound technical judgement
![Page 9: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/9.jpg)
Getting to YES
104.11.1 Supporting data where necessary … shall consist of valid research reports from approved sources (reliability and accuracy)
104.11.2 Tests: Bldg official can require tests, by an approved agency; reports retained in the public records
Approvals cannot WAIVE code requirements
Burden of proof lies with applicant
Data is required: referenced standards, calculations, research reports;
![Page 10: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/10.jpg)
Getting to YES
Alternate Means restriction might also be in other places in code
– CBC section 1.8.7; has limitations restricting use for mobile homes and factory built housing; and scripted requirements
Case by Case basis required (no blanket approvals). – PEX / Aquatherm examples: must be requested by each applicant
Evidence to substantiate claims for equivalent protection of life safety and health
– Accessibility AMR must meet threshold for ‘equivalent facilitation’
![Page 11: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/11.jpg)
Getting to YES
When an AMMR may be a good choice – Innovations: new materials; or new uses / patterns for existing
materials
• Example: CLT – “New Material” ?
• May be only approach
– New Design concept • Atrium hotel; enclosed shopping mall; pedestrian bridge • May eventually end up in regular code
– Complex geometries: multiple construction types or simultaneous use of separate code provisions
![Page 12: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/12.jpg)
Getting to YES
• Conundrums: existing conditions; immovable objects
• Size of an elevator; width of an existing stair
• Six story open stair • Buildings built abutting with no seismic separation
• Building built with windows on the property line
Other paths for resolving such conundrums • Existing building code provisions (Chapter 34)
• 2012 International Existing Building Code;
• Alternative Compliance approach of 3412 (point system)
• Historic Considerations
– POB vs Historic Building: 50 years old; significant character? – List/Registry ? Create One (Public/Private Partnership) ?
![Page 13: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/13.jpg)
Getting to YES
• Solving ‘political’ problems – Examples: Buried conflicts (buried sewer line runs under building); property
line runs through building; past changes done without permits
• Resolving Interpretation Differences Other Options besides AMMR’s
– Bring in a consulting Expert
– Appeals Board
– Negotiation
![Page 14: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/14.jpg)
Getting to YES
When an AMMR may not help
• Solving budget problems – Cost can’t be a basis for alternative; code official’s mandate is to protect the
public
• Solving time problems – Time to process an AMMR request may be substantial; uncertainty involved as
the path is not ‘scripted’; incentive to invest time/money on public side to evaluate and consider options may be a factor
– Example: SOVENT plumbing system and union financed study
• When meeting the intent of the code just does not seem possible
– Some things should just plain not be built!
![Page 15: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/15.jpg)
• Follow the Script • Local AHJ (authority having jurisdiction) form, steps, criteria
![Page 16: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/16.jpg)
• Follow the Script • Local AHJ (authority having jurisdiction) form, steps, criteria
![Page 17: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/17.jpg)
© 2015 MFMalinowski
![Page 18: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/18.jpg)
• Adjust your Perspective
• Change from Designer hat (weighing code, appearance, function, cost, construction schedule, … etc) to Code Official Hat (protect the public health safety welfare).
• Conservative.
• Documents.
• Testing.
• Adopted standards.
• Innovation not part of the mix; or happy client …
![Page 19: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/19.jpg)
• Find a foundation in the adopted code • Interpretive manual
• Published reports : Code Corner for example
• Find similar situations in the code: windows in fire resistive elements: how are they addressed?
• Code ‘tricks’
– Special Provisions such as for Podium geometry – Horizontal exit – Imaginary Lines – Pedestrian Bridge – Atriums
Getting to YES Copyright 2015 MFMalinowski
![Page 20: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/20.jpg)
• Find examples that have been approved • Open book: public vs private information
• Peers
• Built projects
• Experts: Has it been done before in some fashion?
Getting to YES Copyright 2015 MFMalinowski
![Page 21: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/21.jpg)
![Page 22: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/22.jpg)
![Page 23: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/23.jpg)
• Start with an outline • Applicable code sections
• What is intent
• How else can intent be met
![Page 24: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/24.jpg)
• Get in Agreement before getting in too deep • Meet and discuss ideas for approach
• Examples
![Page 25: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/25.jpg)
![Page 26: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/26.jpg)
![Page 27: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/27.jpg)
![Page 28: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/28.jpg)
100#suit# 1000#suit#
![Page 29: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/29.jpg)
Exposed Unprotected Wood in a One Hour building
• Type V vs IV Construction
• Mixing construction types ?
• Calculated fire resistance
© 2015 MFMalinowski
![Page 30: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/30.jpg)
I Joists
I Joists
Glulam Beam
GypBd Clg
![Page 31: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/31.jpg)
Messy Historic Building Conditions:
Windows on property line Interior Light Wells Missing Egress windows Four story open stair Wood structure over Unreinforced masonry base Seismically weak front Projections over Property Line Existing Conditions that do not meet code
![Page 32: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/32.jpg)
© 2015 MFMalinowski
![Page 33: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/33.jpg)
![Page 34: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/34.jpg)
![Page 35: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/35.jpg)
![Page 36: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/36.jpg)
![Page 37: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/37.jpg)
© 2015 MFMalinowski
![Page 38: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/38.jpg)
Complex / Mixed Construction types, Occupancies, Proximity to Property line or Assumed Property lines
![Page 39: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/39.jpg)
Historic 6 story Classified as Type 1B
New Construction Type VA Three story with mezzanines Over Two level 1A Podium
![Page 40: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/40.jpg)
Historic 6 story Classified Type 1B
New Construction Type VA Three story with mezzanines
Over Two level 1A Podium
![Page 41: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/41.jpg)
© 2015 MFMalinowski
![Page 42: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/42.jpg)
![Page 43: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/43.jpg)
CLT: New Material
![Page 44: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/44.jpg)
© 2015 MFMalinowski
![Page 45: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/45.jpg)
© 2015 MFMalinowski
![Page 46: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/46.jpg)
© 2015 MFMalinowski
![Page 47: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/47.jpg)
Code References
Interpretive Manual Steve Winkel Book
HUD reference On Line Resources
Ara Sargasian Spreadsheet tool (now Woodworks.org) Ara4help Code Corner
Portland Online Library of AMMR’s Consultants
Preview Group RSWL Peers
WoodWorks.Org Team
![Page 48: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/48.jpg)
![Page 49: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/49.jpg)
![Page 50: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/50.jpg)
![Page 51: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/51.jpg)
http://www.specsandcodes.com/
![Page 52: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/52.jpg)
![Page 53: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/53.jpg)
![Page 54: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/54.jpg)
![Page 55: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/55.jpg)
![Page 56: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/56.jpg)
![Page 57: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/57.jpg)
![Page 58: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/58.jpg)
![Page 59: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/59.jpg)
![Page 60: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/60.jpg)
![Page 61: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/61.jpg)
![Page 62: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/62.jpg)
![Page 63: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/63.jpg)
![Page 64: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/64.jpg)
![Page 66: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/66.jpg)
![Page 67: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/67.jpg)
© 2015 MFMalinowski
![Page 68: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/68.jpg)
![Page 69: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/69.jpg)
![Page 70: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/70.jpg)
![Page 71: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/71.jpg)
![Page 72: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/72.jpg)
![Page 73: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/73.jpg)
![Page 74: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/74.jpg)
![Page 75: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/75.jpg)
© 2015 MFMalinowski
![Page 76: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/76.jpg)
![Page 77: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/77.jpg)
Design#Professionals##typically#work#with#Two#different#kinds#of#En<tlements#!
!
Discre9onary!
Ministerial!
Permits: Entitlements
Focus!is!on!Ministerial!En9tlements!
30,000!jurisdic9ons!use!similar!building!
code;!but!vastly!different!planning!codes!
![Page 78: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/78.jpg)
![Page 79: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/79.jpg)
Bill!Seider!FAIA!Oregon! Thad!Kelley!AIA!Arkansas!
![Page 80: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/80.jpg)
Permit Streamlining
its not just about speed
#
##
More#efficient#More#effec<ve#processes#
!
!
The#objec<ve##
![Page 81: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/81.jpg)
!
![Page 82: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/82.jpg)
Permit Streamlining
The#Benefits!Time!and!Money!
Economic!Development!S9mulus!!
Community!Benefits!
High!performance!built!environment!
Sustainability!
Energy!conserva9on!!
!
![Page 83: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/83.jpg)
The#Economic#Impact#of#Accelera<ng#Permit#Processes#on#Local#Development#and#Government#Revenues#
National Economic Consulting
December#7,#2005#
![Page 84: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/84.jpg)
Delays#in#Building#Permit#Approvals#Cause#Millions#in#Lost#Revenue#for#Communi<es!
Report+Finds+Opportuni1es+to+Increase+Development+Ac1vity+and+Local+Tax+Revenue!
Washington,#D.C.#–#January#25,#2006#–#At!the!U.S.!Conference!of!Mayors,#The!American!Ins9tute!of!Architects!(AIA)!today!released!a!report!showing!
that!communi9es!with!a!more!efficient!building!permiSng!process!can!gain!
millions!of!dollars!in!tax!revenues!and#significantly!bolster!their!economic!
development.!The!AIA!commissioned!PricewaterhouseCoopers!LLP!to!study!
the!rela9onship!between!building!permit!processes,!local!economic!ac9vity,!
and!government!tax!revenues.!!The!study!concluded!that!the!
implementa9on!of!a!more!responsive!permit!process!over!a!five!year!period!
could!result!in!a!16.5!percent!increase!in!property!taxes!and!a!5.7!percent!
increase!in!construc9on!spending.!!!
Delays#in#Building#Permit#Approvals#Cause#Millions#in#Lost#Revenue#for#Communi<es!
Report+Finds+Opportuni1es+to+Increase+Development+Ac1vity+and+Local+Tax+Revenue!
Washington,#D.C.#–#January#25,#2006#–#At!the!U.S.!Conference!of!Mayors,#The!American!Ins9tute!of!Architects!(AIA)!today!released!a!report!showing!
that!communi9es!with!a!more!efficient!building!permiSng!process!can!gain!
millions!of!dollars!in!tax!revenues!and!significantly!bolster!their!economic!
development.!The!AIA!commissioned!PricewaterhouseCoopers!LLP!to!study!
the!rela9onship!between!building!permit!processes,!local!economic!ac9vity,!
and!government!tax!revenues.!!The!study!concluded!that!the!
implementa9on!of!a!more!responsive!permit!process!over!a!five!year!period!
could!result!in!a!16.5!percent!increase!in!property!taxes!and!a!5.7!percent!
increase!in!construc9on!spending.!!!
Delays#in#Building#Permit#Approvals#Cause#Millions#in#Lost#Revenue#for#Communi<es!
Report+Finds+Opportuni1es+to+Increase+Development+Ac1vity+and+Local+Tax+Revenue!
Washington,#D.C.#–#January#25,#2006#–#At!the!U.S.!Conference!of!Mayors,#The!American!Ins9tute!of!Architects!(AIA)!today!released!a!report!showing!
that!communi9es!with!a!more!efficient!building!permiSng!process!can!gain!
millions!of!dollars!in!tax!revenues!and!significantly!bolster!their!economic!
development.!The!AIA!commissioned!PricewaterhouseCoopers!LLP!to!study!
the!rela9onship!between!building!permit!processes,!local!economic!ac9vity,!
and!government!tax!revenues.!!The!study!concluded!that!the!
implementa9on!of!a!more!responsive!permit!process!over!a!five!year!period!
could!result!in!a!16.5!percent!increase!in!property!taxes!and!a!5.7!percent!
increase!in!construc9on!spending.!!!
![Page 85: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/85.jpg)
“Inefficient#permiUng#processes#are#equivalent#to#a#drain#on#economic#development.##Project#delays#lead#to#higher#costs#that#either#will#be#passed#through#to#occupants#or#will#discourage#new#construc<on.##Less#new#construc<on,#by#reducing#the#total#supply#of#buildings#in#a#community,#will#tend#to#lead#to#higher#rents#for#everyone,”#said#Linden#Smith,#Managing#Director,#PricewaterhouseCoopers.##“Conversely,#a#municipality#with#an#efficient#and#predictable#permiUng#process#will#aYract#investment#by#reducing#the#risk#of#scheduling#delays#and#cost#overruns.##All#else#equal,#investment#dollars#will#be#drawn#to#these#municipali<es.”#
Figure A. Present Value of Cash Flows: 10 Percent Rental Income
$580,578
$619,036
$560,000
$570,000
$580,000
$590,000
$600,000
$610,000
$620,000
$630,000
Net
Pre
sent
Val
ue
Baseline (22 mo.) Accelerated (19 mo.)
![Page 86: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/86.jpg)
![Page 87: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/87.jpg)
!
![Page 88: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/88.jpg)
![Page 89: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/89.jpg)
![Page 90: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/90.jpg)
![Page 91: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/91.jpg)
Permit#Streamlining#is#not#“One#Size#Fits#All”#What#works#in#New#York#City#may#not#be#right#for#Minneapolis#or#Sacramento###
![Page 92: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/92.jpg)
Effective, Positive Streamlining Requires Creativity, Persistence, Communication, Insight, Knowledge of codes, regulations and standards
And
Leadership
![Page 93: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/93.jpg)
![Page 94: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/94.jpg)
• Professional certification The buck stops here
• The Huddle Permit in a day
• On Schedule Zero bin time: schedule plan check at prelims
• PreQualification Docs designed for fast plan review win win
• Rolling review Plan check concurrent with CD’s
• Over the counter Plan review while you wait
• PreQualification Docs designed for fast plan review win win
• Electronic plan review Paperless permit processing
• E-Permit Web based portals for process and tracking • Attitude Adjustment Common ground across the counter
• Regional Processing Centralize for consistency
• AutoCodes Automated plan review in the bim model
Getting to YES Copyright 2015 MFMalinowski
![Page 95: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/95.jpg)
![Page 96: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/96.jpg)
Plan Chk
CD C
D
WA
IT
WA
IT
Plan Chk
CD
Permit
“Regular” Process Example
WA
IT
WA
IT
© 2015 MFMalinowski
![Page 97: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/97.jpg)
Plan Chk
CD C
D
Permit
“The Huddle” Process Example © 2015 MFMalinowski
![Page 98: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/98.jpg)
![Page 99: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/99.jpg)
Rolling Review Outline
Getting to YES Copyright 2015 MFMalinowski
![Page 100: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/100.jpg)
![Page 101: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/101.jpg)
![Page 102: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/102.jpg)
Transparancy DASHBOARDS
![Page 103: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/103.jpg)
![Page 104: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/104.jpg)
PreQualified Architectural Submittal System
Based on Submittal Document Content and Organization
© 2015 MFMalinowski
![Page 105: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/105.jpg)
PASS & the TSA PRECHECK Analogy • PreCheck does NOT mean “no check”
– It’s a privilege; and it’s voluntary – With PreCheck you can go through either line
• PreCheck customers have been ‘prequalified’ for an expedited treatment
– If you bring a water bottle through it will be flagged in either line. – If you get flagged repeatedly, you will be bumped from the PreCheck
program
©!2015!MFMalinowski!
![Page 106: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/106.jpg)
In A Nutshell A more efficient and effective plan review process based on clear and concise standards for document content and organization. Implementation of this program requires only minor adjustments for both public and private sector in their internal processes. It is completely voluntary. How will this program save time and money? • By creating a clear set of voluntary document standards that allow for more efficient and effective plan
review, participating jurisdictions will be able to do their jobs more efficiently, saving time and money.
Participating design professionals will have a faster and more predictable plan review experience. The Development and Construction Community will save time and money, and enjoy more consistent code interpretation and application. The Community at large will benefit from increased economic development, as it fosters new investments in the shaping of a high performance buildings and spaces that meets current energy, sustainability and design standards. The program is designed to be win – win – win.
Does this program require any changes in roles and responsibilities for either the public or private sector? • No changes in roles and responsibilities for either public sector or private sector participants is required
to implement this program.
•
©!2015!MFMalinowski!
![Page 107: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/107.jpg)
How complex is the program? • The program is intended to be based on simple minimum requirements. Design
professionals currently have a wide variety of approaches to how they prepare their documents; there will still be a wide variety of approaches for participants in the program, since complying with the minimum standards will still allow for considerable flexibility. There will for example be no requirement to adopt specific CAD standards for document sheet numbering, sheet layout, or symbols.
Will this program have any impact on the processes used by either jurisdictions or Design Professionals to protect the public health safety and welfare? • Because the PASS program increases the effectiveness of the plan review
process by fostering more consistent, complete and and clear submittals, it will increase the protection of Public Health Safety and Welfare
•
In A Nutshell
©!2015!MFMalinowski!
![Page 108: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/108.jpg)
©!2015!MFMalinowski!
![Page 109: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/109.jpg)
1. Timely 2. Efficient 3. Accurate 4. Great Customer Service
![Page 110: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/110.jpg)
Process versus Project Principals versus People and Problems
![Page 111: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/111.jpg)
© 2015 MFMalinowski
![Page 112: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/112.jpg)
© 2015 MFMalinowski
![Page 113: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/113.jpg)
©!2015!MFMalinowski!
![Page 114: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/114.jpg)
![Page 115: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/115.jpg)
![Page 116: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/116.jpg)
![Page 117: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/117.jpg)
The#Streamline#Ins<tute##A#501c3#dedicated#to#suppor<ng#more#efficient#and#effec<ve#permit#processing#!
StreamlineIns<tute.Org#Contact#Us:#admin@streamlineins<tute.org#
![Page 118: Getting to Yes 2015 final - WoodWorks...Getting to YES I Codes: Section 104.11 Approval is required Approval must be based on Satisfactory Compliance with intent of code Alternate](https://reader033.vdocuments.us/reader033/viewer/2022051813/6031295a7d86225bed278072/html5/thumbnails/118.jpg)
This concludes The American Institute of Architects Continuing
Education Systems Course
Questions?
Michael F. Malinowski AIA [email protected]
Streamline Institute: [email protected]
Wood Products Council 866.966.3448 [email protected]