getting started in lean manufacturing in flexible ...aimcal 2009 fall technical conference...

31
AIMCAL 2009 Fall Technical Conference A li Il d Fl id Amelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate Coating and Converting By Dave Schoellerman

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

AIMCAL 2009 Fall Technical ConferenceA li I l d Fl idAmelia Island, Florida

Getting Started in Lean Manufacturing in Flexible Substrate Coating and Converting

By Dave Schoellerman

Page 2: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean Manufacturing

Using the right process…..

2B

takt timeX O X O

To get the right results

OP

1

OP

3

OP

2AO

P 2

L

RLowest CostHighest Quality

To get the right results

A B C

MATERIALSFINISHED

GOODS

Highest QualityShortest Leadtime

f

10/7/2009 AIMCAL 2009 Fall Technical Conference 2

Through elimination of waste

Page 3: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean “tools” versus “thinking”

Lean tools (what you see)

Lean thinking (what you don’t see)

10/7/2009 AIMCAL 2009 Fall Technical Conference 3

Page 4: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean House

Safety Quality Cost Delivery People“Zero “Zero “Lowest “100% “100%

5 Objectives

Incidents” Defects” Cost” On-time” Involved”

JidokaPeopleJust-in-Time

Jidoka

Level & Stable Operations

Jidoka• Prevent defects, STOP if a

problem occurs• Countermeasure the problem

S t l f hi

10/7/2009 AIMCAL 2009 Fall Technical Conference 4

Level & Stable Operations• Separate people from machines

Page 5: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Toyoda Loomworks: First example of “Jidoka”

Floaters positioned on each thread provide continuous verification that each thread is NOT broken.

10/7/2009 AIMCAL 2009 Fall Technical Conference 5

Page 6: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

A dropped floater jams the bar which causes a cam to causes a cam to disengage the clutch and stop the machine.

10/7/2009 AIMCAL 2009 Fall Technical Conference 6

Page 7: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Li hts i di t hi h

Toyota more recent exampleLights indicate which parts to pick for this model / option.

10/7/2009 AIMCAL 2009 Fall Technical Conference 7

Page 8: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Jidoka example in coating: Proper base material used 100% of time

Five Layers of Quality

Coater

LAYER 1: PREVENTION LAYER 2 DETECTION LAYER 3 INSPECTIONLAYER 1: PREVENTIONBarcode verification that correct base roll is loaded

LAYER 2: DETECTIONColor sensor verifies

100% of product

LAYER 3 INSPECTION: Functional check

verification

Layer 4: SPC Control charting verifies the process

10/7/2009 AIMCAL 2009 Fall Technical Conference 8

Layer 4: SPC Control charting verifies the process Layer 5: Quality system

Page 9: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

PREVENTION: Barcode verification makes it impossible to run wrong roll

10/7/2009 AIMCAL 2009 Fall Technical Conference 9

Page 10: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

DETECTION: Color sensor provides continuous detection during coating

10/7/2009 AIMCAL 2009 Fall Technical Conference 10

Page 11: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Visual and just in time information for operators

Red indicates non-mixable rolland machine will automatically cutoff at winder

Time to next roll change

10/7/2009 AIMCAL 2009 Fall Technical Conference 11

Page 12: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

All problems escalated to morning market

MORNING MARKET QUESTIONS:

What was the problem?pHow was it contained?What was the root cause?What countermeasure was

i l t d t dd thimplemented to address the root cause?

How did you verify that the countermeasure was effective?

Have you standardized the countermeasure?

A problem is not “DONE” until all of these questions are answered!answered!

10/7/2009 AIMCAL 2009 Fall Technical Conference 12

Page 13: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

“Five Layers” of Quality

10/7/2009 AIMCAL 2009 Fall Technical Conference 13

Page 14: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean House

Safety Quality Cost Delivery People“Zero “Zero “Lowest “100% “100%

5 Objectives

Incidents” Defects” Cost” On-time” Involved”

JidokaPeopleJust-in-Time

J t i Ti

Level & Stable Operations

Just in Time• Produce only what is needed, in

the amount needed, when needed

10/7/2009 AIMCAL 2009 Fall Technical Conference 14

Level & Stable Operations

Page 15: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

The Pull System at Toyota

Toyota’s pull system Toyota s pull system often uses a Kanban, or “signal” card

10/7/2009 AIMCAL 2009 Fall Technical Conference 15

Page 16: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Kanban in coating & converting operations

These cards determine

Kanban cards removed from

pallet as product is sold from the

what is made nextis sold from the “supermarket”

10/7/2009 AIMCAL 2009 Fall Technical Conference 16

Page 17: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Coating Value Stream Map

MixingChemLeveling Box

CoaterFIFO ConvertCustomer

BaseBaseSupplier Features:

1. Production leveling2. Kanban pull throughout value stream3. Supermarkets used as controlled “buffers”4 B i f i i

10/7/2009 AIMCAL 2009 Fall Technical Conference 17

4. Basis for continuous improvement

Page 18: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

How many kanban do you need?

The Eight Components of Inventory

8 Information Cycle: How much time

P

P

W

Supplier

8. Information Cycle: How much time to get information through the system?

1. Mfg Leadtime/Lot Size: How much time does it take manufacturing to fill an order, considering changeover and other factors?

P

Prod.Customer CustomerSupplier

7. Demand Variability: How much demand variation from our customer

2. Supply Variation: How reliable is your process?

BufferCustomerStore

Customer

3. Geography: How long to physically transport from Point A to Point B?

4. Shipping Lot Size : How big a batch must go in the container?5. Shipping Frequency: How often do we ship?6.Lane Variability: How much variation in the shipping lane do we need to cover for?

fdo we need to protect against?

10/7/2009 AIMCAL 2009 Fall Technical Conference 18

Page 19: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Components of Inventory Example

Code # 8389

Item Takt = 1.14 Rolls/Day8.0 Rolls/week

Components of Inventory# kanbans

4 D 4 6 Ti t T t th it f th S li t th C tGeography 4 Days 4.6 Time to Transport the item from the Supplier to the Customer (includes receipt & put-away time, if any)

Lane Variability 1 Days 1.1 Variability of transportation time

Shipping Interval 1 Days 1.1 Time between shipments

Shipping Lot Size 1 1.0 Minimum # of units (with fixed shipping interval this is usually 0)

Demand Variability 15 15.0 Demand Variability in units

Information Flow 1 Days 1.1 Frequency of returning cards to Box 1 + Frequency of loading Box 2(time for diagramming normally included in information flow) (time for diagramming normally included in information flow)

Total Withdrawal Cards = 24

Ahead 22.9 23 Total withdrawal cards - information flowBehind 6.8 7 Geography + Lane Variability + Shipping Interval

10/7/2009 AIMCAL 2009 Fall Technical Conference 19

Page 20: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean House

Safety Quality Cost Delivery People“Zero “Zero “Lowest “100% “100%

5 Objectives

Incidents” Defects” Cost” On-time” Involved”

JidokaPeopleJust-in-Time

Level & Stable Operations

10/7/2009 AIMCAL 2009 Fall Technical Conference 20

Level & Stable Operations

Page 21: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Production Leveling, or “Heijunka”

What sales sees What production wants

120 120120

100

80

120

100

80Model A

60

40

60

40

Model B

Model C

O r d e r s

oduc

tion

20

0

20

0

Total Pro

Date Date

4/12 4/13 4/14 4/15 4/16 4/19 4/20 4/21 4/12 4/13 4/14 4/15 4/16 4/19 4/20 4/21

How do we get from here...…to here?

10/7/2009 AIMCAL 2009 Fall Technical Conference 21

Page 22: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Example of coating machine leveling box

10/7/2009 AIMCAL 2009 Fall Technical Conference 22

Page 23: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Leveling example

Coating Shipping

Time Product A Product B Product C Time Product A Product B Product C0:00 X 0:00 X1:00 X Supermarket 1:00 X2:00 X 2:00 X3:00 X 3:00 X4:00 X 4:00 X5:00 X 5:00 X6:00 X 6:00 X7:00 X 7:00 X8:00 X 8:00 X9:00 X 9:00 X9:00 X 9:00 X10:00 X 10:00 X11:00 X 11:00 X12:00 X 12:00 X13:00 X 13:00 X14:00 X 14:00 X15:00 X 15:00 X16:00 X 16:00 X17:00 X 17:00 X17:00 X 17:00 X18:00 X 18:00 X19:00 X 19:00 X20:00 X 20:00 X21:00 X 21:00 X22:00 X 22:00 X23:00 X 23:00 X

Kaizen

Can I afford 3 changeovers per shift?

Level shipping to minimize leadtime & logistics cost

Kaizen

10/7/2009 AIMCAL 2009 Fall Technical Conference 23

changeovers per shift? leadtime & logistics cost

Page 24: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Example: Coater Product Change Kaizen

NowBefore: 375 feet waste each change

10/7/2009 AIMCAL 2009 Fall Technical Conference 24

Page 25: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

CB Coater: Product ChangesExample: Coater Product Change Kaizen

NowAfter: 90 feet waste each change

BEFORE VS. NOW DIFFERENCE = 285 FT ANNUAL COST SAVINGS = $190K/YR

10/7/2009 AIMCAL 2009 Fall Technical Conference 25

Page 26: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Coater Process Control Room

Building precision into the system, not the setup

10/7/2009 AIMCAL 2009 Fall Technical Conference 26

Page 27: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Changeover kaizen golden rules

1. Shift internal elements to external

2. Eliminate, simplify, automate (in that order)

3. One way, the right way, the same way, every time

4. Build precision into the system not the setup

10/7/2009 AIMCAL 2009 Fall Technical Conference 27

Page 28: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Coating 5S & TPM Visual Control

Standard tasks doneeach shift (Day/Night)( y g )

Standard tasks doneeach crew rotationeach crew rotation (A,B,C,D)

10/7/2009 AIMCAL 2009 Fall Technical Conference 28

Page 29: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean House

Safety Quality Cost Delivery People“Zero “Zero “Lowest “100% “100%

5 Objectives

Incidents” Defects” Cost” On-time” Involved”

JidokaPeopleJust-in-Time

Level & Stable Operations

10/7/2009 AIMCAL 2009 Fall Technical Conference 29

Level & Stable Operations

Page 30: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Lean is about people:Building a culture of continuous improvement

Safety FirstyTraining & developmentKaizen teamsSuggestion system

Suggestion systemsSuggestion systemPeople recognitionEmployee wellnessCCommunications

10/7/2009 AIMCAL 2009 Fall Technical Conference 30

Page 31: Getting Started in Lean Manufacturing in Flexible ...AIMCAL 2009 Fall Technical Conference AliIldFlidAmelia Island, Florida Getting Started in Lean Manufacturing in Flexible Substrate

Thank YouThank You