getting ready for at your with frank martin and jamal abdul-wali

45
GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Upload: nicholas-nichols

Post on 27-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

GETTING READY FORAT YOUR

WITHFRANK MARTIN

AND JAMAL ABDUL-WALI

Page 2: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Presented byFrank Martin, Custodial

Training Specialist

Part 1

You only get one chance to make a first impression!

Page 3: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Mr. Frank Martin,Custodial Training Specialist(301) [email protected]

Page 4: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

What is “Curb Appeal”

Page 5: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

ANSWER: It is the very first impression of your property that anyone gets who is visiting for the purpose of leasing, visiting a friend/relative or for service on the site.

Page 6: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Which members of your staff have the most

impact on “curb appeal”?

Page 7: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

ANSWER: Property Maintenance Technicians, and in some instances Maintenance Technicians.

Page 8: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Y?

Page 9: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

ANSWER: They are the staff members who routinely perform the surface trash removal and debris removal from your site.

Page 10: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

How often do you perform surface trash

removal?

Page 11: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

ANSWER: At a minimum, Daily, first thing in the morning; 7:00 or 8:00 a.m. What ever is the earliest start time for the staff.

Some properties may do an additional removal in the afternoon, i.e. 3:00 or 4:00 P.M.

Page 12: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

How many days a week should you perform

surface trash removal?

Page 13: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

ANSWER: It is recommended that a seven (7) day a week regime be established. This minimizes the impact on any given day, i.e. Monday, of having an extraordinary amount of trash on site.

Page 14: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

What tools do I use in surface trash removal?

?

Page 15: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: Niffty Nabber, five(5) gallon bucket & leather palm work gloves. Do not use the broom and dust pan or the fifty five (55) gallon rolling trash cans for surface trash removal.

Page 16: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Where can I purchase/find the Niffty Nabber, five (5) gallon bucket and leather palm gloves?

Page 17: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: The Niffty Nabber ($27.45) & leather palm gloves ($2.05) are available from Daycon (800) 394-0019, extension 7014 for Debbie Beals. Replacement tips for the Niffty Nabber are $3.25 each. The five gallon buckets are readily available from your painting contractor (generally free) or Home Depot for $4.00 to $5.00 each. Remember to check with your Regional Property Manager for approval BEFORE purchasing any non-budgeted item.

16001 Trade Zone AvenueUpper Marlboro, MD 20774

 Toll Free: 800.394.0019 Local: 301.218.1000 Fax: 301.218.6000

Page 18: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

EMC Policy ManualVolume III, MaintenanceSection E, LandscapePages E-24 & E25“Trashing Procedures”This is available on the EMC Intranet at: http://www.emcnet.biz/SiteForms/Policy%20Manual/Vol%20III%20Section%20E.pdf

Page 19: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Surface trash removal includes the property perimeter, hillsides/natural vegetation areas on the perimeter, etc., all surface areas, i.e., turf, paved areas, etc., window/stair wells, plant material & trees, i.e. bags in trees. Only pick up paper, cans, bottles, etc.; do not pick up any little items, i.e. cigarette butts, bottle caps, etc.

Page 20: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

2009 Landscaping Calendar on the EMC Intranet. The calendar can be found at:http://www.emcnet.biz/SiteForms/LandscapeCal-2009.pdf

Page 21: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: Complete number of man-hours used daily in surface trash removal. Check reminders, i.e., “Check/Clean all gutters & downspouts”, “Clean up, define & mulch all beds…”

Page 22: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

How often do you perform debris removal?

Page 23: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: Develop a site map dividing the property into section to assist staff in completing the site in a five day cycle. Staff should complete a section daily, spending 1 to 2 hours. The debris removal operation can be carried out in most all weather conditions, including light rain, provide rain gear (available from Daycon). Do not operate in extreme weather conditions, i.e., thunder storms, etc.

Page 24: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

What tools and equipment do I use for debris

removal?

Page 25: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: Back pack blower, billy goat, ear and eye

protection, leather palm gloves, broom and flat

shovel. Do not use the broom and dust pan for

debris removal.

Page 26: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Where can I purchase the back pack blower, billy

goat, eye & ear protection?

Page 27: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

16001 Trade Zone AvenueUpper Marlboro, MD 20774

 Toll Free: 800.394.0019 Local: 301.218.1000 Fax: 301.218.6000Debbie @ ext 7014

Back Pack Blower - $453.26Billy Goat - $2,732.00 – self propelled

$660.00 –non-self propelledEar Protection - $38.55 (200 pack disposable)Eye Protection - $3.16 (goggles)

Remember to check with your Regional Property Manager for approval BEFORE purchasing any non-budgeted item.

Page 28: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

EMC Policy ManualVolume III, MaintenanceSection E, LandscapePages E-24 & E25“Trashing Procedures”This is available on the EMC Intranet at: http://www.emcnet.biz/SiteForms/Policy%20Manual/Vol%20III%20Section%20E.pdf

Page 29: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Debris removal includes all surface areas, i.e., turf, mulch beds, paved areas, etc. Using the site map dividing the property in to sections, remove debris from the turf areas & mulch beds, starting at the buildings and blowing toward the paved area, i.e., parking lots in the designated area for the day. Blow debris into piles for pick up in to dumpster areas as much as possible.

Page 30: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Use the broom & shovel to dispose of debris into dumpsters.If you have a billy goat, use, it as much as possible, to remove the debris from turf & paved areas. It can also be used together with the back pack blower. The absolute key to a clean property is to completely remove all debris in the assigned section, i.e., under wheel stops, expansion joints in concrete & parking lots, etc.

Page 31: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

2009 Landscaping Calendar on the EMC Intranet. The calendar can be found at:http://www.emcnet.biz/SiteForms/LandscapeCal-2009.pdf

Page 32: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: Complete number of man-hours, and section of property used daily in debris removal. Check reminders, i.e., “Check/Clean all gutters & downspouts”, “Clean up, define & mulch all beds…”

Page 33: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

The 2009 EMC Grounds Maintenance Contract and Fertilization Contract can

be found at:http://www.emcnet.biz/

LandscapingResources.asp#CONTRACT

Page 34: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Answer: A signed contract must be on site; the

Community Manager & Supervisor should be familiar with entire

contents for enforcement with contractor, i.e., number of additional

mulchings for site, leaf removals, etc.

Page 35: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

If you have a question, please raise your hand using the hand icon on

your screen. We will un-mute you and you can ask your question

Page 36: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Part IIPreventative Maintenance

With

Jamal Abdul-Wali,Edgewood’s

Total Maintenance Service Training Specialist

Page 37: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Mr. Jamal Abdul-WaliTotal Maintenance Service Training Specialist(301) [email protected]

Page 38: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Given the state of the economy these days there has never been a time when preventative maintenance is more important. There is less money available in property budgets to replace costly equipment, which if properly maintained and serviced regularly, will perform better, break down less often and will not need to be replaced to fequently.

Page 39: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Today’s presentation will focus on two key tools to Preventative Maintenance:

•OneSite•Edgewood’s Preventative Maintenance Manual

Page 40: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

OneSite To access the Maintenance Section of OneSite follow these steps:•Go to administration tab•View settings•Recurring requests•New•Buildings•Service category (Preventive Maintenance)•Item (service maintenance)•Set priority (other)•Service comment•Frequency•Start date•End date

Page 41: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

Edgewood’s Preventative Maintenance Manual can be found on EMC’s Intranet at the following location: http://www.emcnet.biz/SiteForms/preventivemaintenancemanual.pdf

The Preventative Maintenance Manual is broken into 3 sections:

1.Gives definitions of important terms used throughout the “Manual” plus a detailed description of the basic parts of the program.

2.Explains how the program works at your particular site and describes the various responsibilities of personnel for the performance and management of preventative maintenance activities.

3. Lists the unique features of your particular site, including grounds, structures and equipment and the minimum preventative maintenance activity required to maintain the property as a viable asset.

Page 42: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

For the purposes of this presentation we will be focusing on Section III of the Preventative Maintenance Manual.

Section III contains:•The Master Inventory List•Preventative Maintenance Task List

Page 43: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

MASTER INVENTORY LIST Garden Mid/High

Rise PM01 HVAC Units III-4 III-24 PM02 Water Heaters III-5III-25 PM03 Laundry Room Water Heaters I II-6 III-26 PM04 Shop HVAC Units III-7 III-27 PM05 Pool Equipment III-8 III-28 PM06 Building Interiors III-9 III-29 & 30 PM07 Building Exteriors and Roofs III-10III-31 PM08 Grounds III-11 III-32 PM09 Grounds Equipment III-12 III-33 PM10 Commercial Area Air Handlers III-13III-34 PM11 Roof Top Exhaust Fans III-14III-35 PM12 Compactor and Motor III-15III-36 PM13 Domestic Water Heaters III-16III-37 PM14 Main Circulating Pumps III-17III-38 PM15 Domestic Hot Water Circulating Pumps III-18III-39 PM16 Sump Pumps III-19 III-40 PM17 Sewage Ejector Pumps III-20III-41 PM18 Building Heaters (through the wall) III-21III-42 PM19 Apartment Interiors III-22 III-43 NOTE: The corresponding "Preventive Maintenance Tasks List" associated with each PM listed above, is located in the following pages of this Manual. Match the page noted above beside the PM, according to your property type, to the appropriate Recurring Work Order.

Page 44: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

PREVENTIVE MAINTENANCE TASK LIST PM01 HVAC Units PERFORM THE FOLLOWING TASKS COMPLETED

Yes No Weekly 1. Observe all safety precautions while performing all tasks ( ) ( ) 2. Clean evaporator coils ( ) ( ) 3. Clean air intake ( ) ( ) 4. Change filter ( ) ( ) 5. Check condition of gas pipes and valves ( ) ( ) 6. Check condition and operation of gas regulator ( ) ( ) 7. Inspect and clean burners and heat exchange ( ) ( ) 8. Check blower motor for noise and vibration ( ) ( ) 9. Clean motor vents and HVAC unit enclosure (furnace room/closet) ( ) ( ) 10. Check condensate drain pan for proper drainage; clean as needed ( ) ( ) 11. Check flexible duct connectors ( ) ( ) 12. Secure any loose guards or access panels ( ) ( ) 13. Check condition of flue ( ) ( ) 14. Check condition, operation and setting of pilot light ( ) ( ) 15. Check condition of electrical hardware and connections ( ) ( ) 16. Check condition and operation of thermostat ( ) ( ) 17. Clean condenser fan motor; insure that the grease ports are free of dust and debris ( ) ( ) 18. Clean condenser air intake ( ) ( ) 19. Check condition of refrigerant piping and installation ( ) ( ) 20. Check operation of condenser unit ( ) ( ) 21. Replace fluid master seals , as needed (Oct., Nov., Dec.) ( ) ( )  STAFF SIGNATURE_____________________________ DATE__________________________________________

Page 45: GETTING READY FOR AT YOUR WITH FRANK MARTIN AND JAMAL ABDUL-WALI

If you have a question, please raise your hand using the hand icon on

your screen. We will un-mute you and you can ask your question