• Taking effective, proven and market–ready technologies and getting them into widespread use
www.fhwa.dot.gov/everydaycounts
EDC
![Page 3: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/3.jpg)
Definitions
• GRS - Geosynthetic Reinforced Soil – An engineered fill of closely spaced (< 12” )
alternating layers of compacted granular fill material and geosynthetic reinforcement
• IBS - Integrated Bridge System – A fast, cost-effective method of bridge support that
blends the roadway into the superstructure using GRS technology
GRS Fundamentals
![Page 4: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/4.jpg)
Cross-Section of GRS-IBS
GRS Fundamentals
![Page 5: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/5.jpg)
Summary of Benefits • Reduced construction cost (25 - 60%)
• Reduced construction time
• Construction less dependent on weather conditions
• Flexible design - easily field modified for unforeseen site conditions (e.g. obstructions, utilities, different site conditions)
• Easier to maintain (fewer bridge parts)
• QA/QC Advantages
GRS Fundamentals
![Page 6: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/6.jpg)
Site Selection
• Single span (currently 140 ft)
• 30 ft abutment height
• Grade separation
• Water crossings with low scour potential
• Steel or concrete superstructures
• New or replacement structures
GRS Fundamentals
![Page 7: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/7.jpg)
GRS
• Composite Structure
• Friction Connections
• Close Spacing
Composite Behavior
![Page 8: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/8.jpg)
Performance Tests
Before After
GRS Fundamentals
![Page 9: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/9.jpg)
Performance Test 2400 lb/ft @ 8” Spacing
Before After
![Page 10: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/10.jpg)
0.5 ksf (25 kPa)
![Page 11: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/11.jpg)
4.1 ksf (196 kPa)
![Page 12: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/12.jpg)
6.8 ksf (326 kPa)
![Page 13: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/13.jpg)
10.3 ksf (493 kPa)
![Page 14: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/14.jpg)
13.9 ksf (666 kPa)
![Page 15: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/15.jpg)
18.1 ksf (867 kPa)
![Page 16: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/16.jpg)
0
2
4
6
8
10
12
14
16
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Ve
rtic
al s
trai
n (
%)
Applied load (psf)
![Page 17: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/17.jpg)
Performance Test Results
0
1
2
3
4
5
6
7
8
0 500 1000 1500 2000Vertical Stress (kPa)
Vert
ical
Str
ain
(%
)
FHWA pier
Vegas mini pier
Defiance mini pier
GRS performance test
![Page 18: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/18.jpg)
Vertical Deformation Continued
0
1
2
3
4
5
6
0 5 10 15 20 25 30
Ver
tica
l S
tra
in (
%)
Applied Vertical Load (ksf)
Envelope
Huber
Vine
Bowman
Stever
Glenburg
Design of GRS-IBS
![Page 19: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/19.jpg)
GRS IBS Reports
![Page 20: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/20.jpg)
![Page 21: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/21.jpg)
![Page 22: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/22.jpg)
![Page 23: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/23.jpg)
![Page 24: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/24.jpg)
CONSTRUCTION Youtube Video
![Page 25: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/25.jpg)
![Page 26: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/26.jpg)
![Page 27: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/27.jpg)
![Page 28: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/28.jpg)
![Page 29: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/29.jpg)
User Perspective Defiance County, Ohio
![Page 30: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/30.jpg)
Open to Traffic: 47 days
Construction Costs: 80’x32’-$266,000 - 2005
![Page 31: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/31.jpg)
Construction Costs: 28’x20’-$68,000 - 2008
![Page 32: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/32.jpg)
Construction Costs 28’x20’-$88,000 - 2009
![Page 33: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/33.jpg)
Construction Costs: 32’x10’-$51,000 - 2010
![Page 34: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/34.jpg)
Construction Costs: 28’x20’-$70,000 - 2010
![Page 35: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/35.jpg)
Construction Costs: 28’x20’-$65,000 - 2010
![Page 36: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/36.jpg)
Construction Costs: 28’x32’-$85,000 - 2010
![Page 37: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/37.jpg)
Construction Costs: 36’x20’-$71,000 - 2010
![Page 38: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/38.jpg)
Construction Cost: 140’x40’-$620,000 - 2009
![Page 39: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/39.jpg)
User Perspective St. Lawrence County, NY
![Page 40: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/40.jpg)
CR 12 - 40’x33’- Material Cost $160,000 Construction costs $240,000
![Page 41: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/41.jpg)
CR 24 - 47’x33’- Material Cost $110,500
![Page 42: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/42.jpg)
CR 31 - 56’x33’- Material Cost $165,000
![Page 43: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/43.jpg)
CR 35 - 67’x33’- Material Cost $180,500 Construction Cost $310,000
![Page 44: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/44.jpg)
CR 38 - 63’x32’- Material Cost $175,000
![Page 45: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/45.jpg)
User Perspective Huston Township, Pennsylvania
![Page 46: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/46.jpg)
![Page 47: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/47.jpg)
User Perspective Ottawa County , Oklahoma
![Page 48: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/48.jpg)
![Page 49: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/49.jpg)
User Perspective National Park Service
![Page 50: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/50.jpg)
Disney Bridge in Sequoia NP
![Page 51: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/51.jpg)
Strawberry Creek Great Basin National Park - NV
![Page 52: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/52.jpg)
PROGRESS TOWARD 2012 EDC GRS IBD GOALS
![Page 53: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/53.jpg)
2012 Deployment Goals
• December 2012:
– 30 bridges have been designed and/or constructed using GRS-IBS on the NHS within 20 states
– 75 bridges have been designed and/or constructed using GRS-IBS off the NHS
Steps to Move Forward
![Page 54: GEOSYNTHETIC REINFORCED SOIL INTEGRATED BRIDGE SYSTEM](https://reader031.vdocuments.us/reader031/viewer/2022012300/61e0f373d770673713678eb6/html5/thumbnails/54.jpg)
CA
AZ
CO
NM
TX
OK AR
LA
MO KY
AL GA
FL
VA
OH
MI
VT AK
MT
NV
ME
WA
OR
UT
KS
ID WY
ND
SD
MN
NE
WI
IA
IL IN
MS
TN
SC
NC
WV
PA
NY
CT
NJ DE MD DC
MA NH
PR
HI
RI
State DOT Deployment
1
2
1
1
5
7
7
2
4
2
2
1
1
1 1
1
Total of 56 project in 28 states at some stage of development from conceptual to construction