Maßnahmenkatalog zur Energieeffizienzoptimierung bei Immobilien mit komplexen Eigentumsstrukturen Georgi Georgiev, 21. April 2015

Upload: others

Post on 13-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Inspiring change for people

and the environment

Maßnahmenkatalog zur

Energieeffizienzoptimierung bei

Immobilien mit komplexen

Eigentumsstrukturen

Georgi Georgiev, 21. April 2015

Page 2: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

# GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING

Integrated planning method for the synergistic power supply of settlement complexes

Urban policy and regulations + technical solutions + economy + society + STOCHASTIC

The three factors, used for the systemic assignment of the energy stakeholders on the analysis level in the

respective settlement area, are:

• Type and quality: Is the respective object an energy consumer or a producer, which scale does it have?

• Amount: detailed empiric analysis of every relevant stakeholder

• Topology, as energy transport distances lead to losses in efficiency and additional costs

Developing of a planning

process for the sustainable

energy supply of settlement

complexes

based on practical

experience in indiustry

complexes, industrial areas,

settlements with a mixed

usage (work, living,

industry), as well as

residential districts

Investigation of intelligent

common energy supply on a

district level: Heating,

electricity, combined

methods and systems.

Page 3: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

# GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING

Strategy for energy, functional and design renovation of five selected blocks in the Frankenberger Quarter in Aachen, Germany

Integral decision process for planning and building

1. 2.

Analysis Step 1.: Potentials for usage of renewables

Analysis Step 2.: Problems and potentials of the building

and urban spaces

3.

Page 4: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic
Page 5: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Aim = improve the energy efficiency of flats,

apartments and tenements

• Multi-occupancy properties

• Taking whole block approach

• April 2013 – March 2016

• Intelligent Energy Europe (IEE) funding

• Six partner countries

• 24 case study blocks – 240 apartments

About the project

Page 6: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

BACKGROUND

Page 7: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Drivers

Energy reduction

Carbon emissions

Fuel poverty

EU targets by 2020:

• 20% of energy from renewables

• 20% increase in energy efficiency

• Reduce greenhouse gases by 20%

Page 8: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

www.lowenergyapartments.eu

50% 44%

71%

41%

55%

19%

35%

0%

10%

20%

30%

40%

50%

60%

70%

80%

Austria France Germany Hungary Sweden England Scotland

% o

f h

ou

sin

g

% of multi-occupancy housing

Page 9: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

• Access to finance

• Payback expectations

• Competing purchase decisions

• Price signals

Financial

• Regulatory and planning issues

• Institutional

• Structural

• Multi-stakeholder issues

Institutional / admin

• Information barrier

• Awareness of benefits

• Skills & knowledge related to building professionals

Awareness & skills

Common barriers

Page 10: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Different contexts: EPCs

• Whole building EPCs available in

all partner countries except UK

• Individual apartment EPCs

provided in all partner countries

except Sweden and Germany

• Listed buildings can be exempt

• Quality of output

Page 11: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Different contexts: management

• Property managers or management boards

exist in all partner countries except the UK

– Often required to have annual meetings

• Various ownership models:

– Housing co-operatives

– Homeowner association

– Fully owned by one organisation

– Fully private owned (different owners)

• Decision procedures and voting rights vary

– Majority usually required for refurbishment

Page 12: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Scottish context

• Improvements more

likely in individual flats

than communally:

– Getting agreement and

securing finances is

difficult

• Tenements Act - further

clarity required

• Householders need to be

persuaded of the

benefits

Page 13: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

ABOUT THE PROJECT

Page 14: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

LEAF Partners

Page 15: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Toolkits T

EC

HN

ICA

L

TO

OL

KIT

• Reinforcing and beyond EPCs

• Info on:

• What EPCs are

• Descriptions of technical measures

• Cost, savings and subsidies

• User behaviour guidance

• Communal EPC tool (UK)

EN

GA

GA

EM

EN

T

TO

OL

KIT

• Step-by-step guidance for managers

• Info and advice on:

• Engaging and communicating with owners/ residents

• Decision-making

• Legal agreements

• Planning consents

• Signposting for further contacts

Both available in European-wide and national

specific versions

Page 16: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Project impacts C

AS

E S

TU

DIE

S

• 24 pilot projects in 6

countries (240+ flats)

• Whole building action

plans

• Targets (per year):

• 0.55t CO2 saved

• 2,300 kWh saved

• 280 kWh generated

OT

HE

R IM

PA

CT

S

• Toolkits publicly available for other organisations to use

• Learnings from case studies

• Policy recommendations at local, national and EU levels related to:

• EPCs

• Multi-occupancy housing

• Energy efficiency

Page 17: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

CASE STUDIES

Page 18: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

William Street, Edinburgh

• Built 1824/5

• Solid stone, single glazed

windows

• Four storeys, including

basement

• Mix of owner-occupied and

private rented

• Ground floor is shops and

offices

• Located within Edinburgh

New Town conservation area

and is ‘B’ listed

• Recent refurbishment work

Page 19: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

William Street, Edinburgh

EPC recommendations:

• Draught proofing

• Low energy light bulbs

• Heating controls

• Solid wall insulation

• Replace boiler

• Replace glazing

EPC ratings:

• Change from ‘D’ and

‘C’

• To all ‘C’

Page 20: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

• Nine flats - part owned by housing association

• Located in Pilrig conservation area

• Constructed pre-1919, solid stone construction

• EPCs currently underway. Recommendations

– Boiler and heating control upgrades

– Wall insulation

– Glazing improvements

Spey Terrace, Edinburgh

Page 21: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Visby, Sweden

• Built 1885

• 7 dwellings

• Private tenancy until 2005 –

now a housing co-operative

• Main building connected to

district heating - two smaller

buildings are not

• Part of Visby World Heritage

site

• Main recommendations –

triple glazing, wall insulation

• Residents want better comfort

and reduce energy bills

Page 22: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Lyon, France Bristol, England

• Built early 1900s

• Requires roof work

• Owners wanted to find

out how energy

efficiency could be

improved at the same

time

• Built pre 1900s

• Solid wall sandstone

• 3 student flats (private

rented) + 1 owner-occupier

• Looking at:

– Solid wall insulation – ECO

funding?

– Secondary glazing

Page 23: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

1950 – 80s concrete blocks / pre-fab

Hungary

Page 24: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Germany

1950 – 80s concrete blocks / pre-fab

Page 25: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Folie

3

Quelle: Google Maps

Case Study Stuttgart

Stuttgart, Schlüsselwiesen 29-33

Built 1965

34 Flats

Rough analysis of the building example (saving potentials,

investments, LCC)

Discussion with the administration preparing a presentation to the owners.

Goal: Start of a detailled study

Planned start of the reconstruction 2014

Page 26: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic
Page 27: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Berlin

Berlin - Hansaviertel,

Bartningallee 16

Built in 1957, listed building

Architect Hans Schwippert

60 Flats

Page 28: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Berlin

2-story flats

Facade = energetic desaster, bur protected (listed building)

Thin concrete walls

Large glass surfaces

Large unused roof area

New heating system in the cellar

District heating

Page 29: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Berlin

Cogeneration in the future is possible Contracting i an interesting topic for the residents

Page 30: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Aachen

Aachen- Burtscheid,

Klosterweiher 2-14

Built in 1970

60 Flats

Page 31: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Aachen

Page 32: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Aachen

Problems

Non-insulated inner walls flat/staircase

Large glass surface in the staircase area

Non insulated basement ceiling

Non insulated roof ceiling

Large garden area owned

Perspectives

Cogeneration

Insulation in the problematic building areas

Solar energy usage – thermal and electric

District heating

Page 33: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

© Fraunhofer

Case Study Aachen

Roof warm loft insulation is planned for the next year, in order to reach the required energy efficiency by the national regulations. An extraordinary full owner community meeting will be scheduled for November 2014, to take decision by the owner community. I should be there.

Page 34: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Bonn

Bonn - Bad Godesberg,

Zanderstraße 2-14

Built in 1970

59 Flats

Page 35: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Bonn

The facade The housekeeper

Heating system The facade inside

Page 36: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Case Study Bonn

Large glass surfaces in the facade area Old heating system Not any kind of insulation in the facade area Very thin walls behind the heating radiators Average age of the owners – over 65 (former residents since it was

built) Non insulated cellar ceiling over the underground garage Decision for the energetic refurbishment of the cellar area

Page 37: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

© Fraunhofer

Case Study Bonn

New gas central heating will be installed in the complex. It has been discussed also about installing a pellet heating system, the idea was mainly supported by the investors in the owner community (owners of more than one flat in the complex, who rent their flats). The reason was, that the start invest would be higher than the one for the gas heating system. About 60 % of the flats in the complex are owned by owners, who live there and own one flat each. In connection to the heating system exchange, the owners are thinking about smart heating control by individual room climate based valves. For both actions they became from our team a lot of explanations and recommendations during their last Annual Full Owner Community Meeting and the time after.

Page 38: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

© Fraunhofer IBP

Technical Development – Intelligent Heating Automation for the Smart Home of tomorrow

Page 39: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

© Fraunhofer IBP

Technical Development – Intelligent Heating Automation for the Smart Home of tomorrow

Arguments pro an individual heating automation system

• Easy-to-set daily home usage schedule

• Good energy usage overview

• Strong reducement of the energy usage by heating only in the times needed

• Usage of the thermal mass of the building as an energy tank

• Indiv idual measure for the improvement of the energy efficiency of existing buildings and flats , especially for multi-occupancy houses with owner communities

• Fraunhofer IBP works on the development of self-learning smart home systems, in order to provide energy saving techniques to the society and the markets

Page 40: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Edinburgh

1950 – 80s concrete blocks / pre-fab

Page 41: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

France

Austria

1950 – 80s concrete blocks / pre-fab

Page 42: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Emerging lessons - engagement

• Time intensive!

• Challenges:

– Private rented properties

– Social relationships between owners

– Lack of interest / awareness

– Finding contact details

• Successes:

– Working with trusted, known organisations,

where formal management arrangements

exist e.g. property managers

– Resident meetings

• Maintenance works – present

challenges & opportunities

Page 43: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

EPC recommendations

• Limited impact on energy rating

• Planning restrictions

• Residents don’t want disruption of install

Finance

• Major issue

• Availability varies across Europe

• Uncertainty in funding programmes can make planning

difficult

• Maintenance funds exist in some countries – but

insufficient

Emerging lessons

Page 44: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

• Tackling flats is challenging across Europe

• We need better technical tools - EPCs are a

starting point

• Robust and flexible frameworks are needed to

secure the support of owners from project

initiation to installation

• Scotland’s EPC regime, tenure split and system

for regulating maintenance in communally owned

buildings is especially challenging

• Case studies are needed to illustrate success

stories

Conclusions

Page 45: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

www.lowenergyapartments.eu

Page 46: Georgi Georgiev, 21. April 2015€¦ · Georgi Georgiev, 21. April 2015 # GEORGI GEORGIEV BREAKING THE WALL OF THE COMMON SETTLEMENT PLANNING Integrated planning method for the synergistic

Georgi Georgiev