genesis aviation inc. introduction location & facility company values strategies/expansion...

21
Genesis Aviation Inc. • Introduction • Location & Facility • Company Values Strategies/Expansion • Organization • Our People • How it Works • Metric Figures/Reporting • On-Time Performance • Turn-Around Time • Warranties • Ratings and

Upload: brian-johnston

Post on 21-Dec-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

Genesis Aviation Inc.

• Introduction• Location & Facility• Company Values• Strategies/Expansion• Organization• Our People• How it Works• Metric Figures/Reporting• On-Time Performance• Turn-Around Time• Warranties• Ratings and Capabilities • Closing

Introduction

Welcome

• Genesis will always be looking towards the future and towards providing superior service and technology.

• We welcome the opportunity your visit brings, because once again, we have the opportunity to learn, grow and strive to meet the needs of our customers.

Location & Facility

• 408 E-Gallimore Dairy Road • Greensboro, NC less than 5 minutes from Piedmont Triad

Int’l Airport (GSO) • Over 19,000 square feet• Expansion plans in the works to move to a new facility of

35,000 to 40,000 sq.ft. by 2008• Over 11,000 sq.ft. of shop space

Company Values

• Be a more Customer-Friendly Organization

• Be a “Focused” Organization

• Be a more Profitable Organization

• Have fun achieving our goals

Strategies/Expansion

• Innovative solutions are always explored using customer and vendor input while monitoring market and industry trends

• We are currently pursuing the purchase of a larger facility with plans to make the move in the latter part of 2008

Strategies/Expansion (cont’d)

• Acquisition of an additional hydraulic test bench will give us four test benches to increase productivity. Installation to be completed in June of this year

• New fuel test bench for fuel boost pumps, valves, and switches as well as a state of the art electro-mechanical test bench are also in the works for 2007

• Facility expansion for 2008 will put us in a new building and allow us to expand into high flow pneumatics, air cycle machines and possibly a plating facility

Organization

All department managers report directly to the President

Our People

• President-Santiago Lluhi:

-President and founder of Genesis -Involved in every aspect of operations -over 21 years of experience in Repair Station management.

Prior experience -General Manager of a repair station in Miami for 8 years -Upper management positions in other industries following his

graduation from the University of Florida in 1978.

Our People (cont’d)

• Chief Inspector-Tom Brown

-Chief Inspector since January 1999 with over 11 years at Genesis

-Over 24 years of experience in aviation hydraulics

-13 years in Tempco Hydraulics-Miami

-A pivotal figure in the growth of our Hydraulics Shop

How It Works

• Upon receiving a component the following action takes place on the date of receipt:

1. Receiving inspection.

2. Work Order opened & ID tag attached.

3. Technical data & tooling checked for currency and compliance.

4. Assignment to technician for designated workscope.

How It Works (cont’d.)

• Within 1 to 3 days (depending on work load)

– Component is evaluated and tested (if applicable).– Disassembled and cleaned (as required).– Individual parts or components inspected.– Work order completed for preliminary and teardown.– Inspection with a parts requisition completed (as

required) and reviewed/signed by a designated inspector.

– The work order is then processed into our system and delivered to purchasing for allocation and sourcing of parts required.

How It Works (cont’d.)

• Within 1 to 5 days– Parts will be allocated and sourced as required and

a written quotation sent for customer approval.

How It Works (cont’d.)

• Within 1 day of customer approval– Parts will be purchased and stock items segregated for

each individual work order. – Upon receipt of all required parts or if parts already

stocked unit will be scheduled for final assembly, testing and protective coatings (as required).

– Within 1 day of final testing, final acceptance will be accomplished by the Return-to-Service inspector assuring compliance with all ADs and SBs (as required) and completeness and accuracy of all documentation.

– The unit/component is then delivered to shipping for delivery to its final destination.

Metric/Figures/Reporting

At Genesis we use a variety of tools to assist in the overall accomplishment of our goals.

• Weekly status reports for each step of our processes.

• Individual customer status reports.• Monthly customer ranking reports.• Monthly departmental sales ranking reports.• Monthly warranty reports.• Various accounting reports including income

statement, balance sheet, and various others as needs arise.

On-Time Performance

• At Genesis, on-time performance is a critical factor and closely monitored through the use of various status reports.

• The loyalty of our customer base is a testament to our commitment to meeting our goals.

Turn-Around Time Though many components leave our facility within a week (5

working days) our current average TAT is 11-13 calendar days

Apr 06 May 06 Jun 06 Jul 06 Aug 06 Sep 06 Oct 06 Nov 06 Dec 06 Jan 07 Feb 07 Mar 07 Total

WO's Open 231 328 324 354 357 310 306 321 219 306 319 349 3724

TAT 15.2 12.0 13.4 10.2 13.2 12.5 12.7 13.2 10.3 9.9 11.4 11.8 12.1

Warranties

MonthTotal Wos Opened

Total Wos Avg/Day

Total Wos Customer

Customer Wos

Avg/DayTOTAL

Wos GAI

Total Warranties

Rec'dWarranties Accepted

% Warranties Accepted

Apr 06 231 11.55 179 8.95 52 13 4 1.73May 06 328 14.26 272 11.82 56 19 3 0.91June 06 324 14.72 259 11.77 65 20 5 1.54July 06 354 16.85 276 13.14 78 26 6 1.69Aug 06 357 15.52 294 12.78 63 11 2 0.56Sep-06 310 14.76 273 13 37 16 1 0.32Oct-06 306 13.9 260 11.81 46 16 4 1.31Nov-06 321 14.59 269 12.22 52 18 2 0.62Dec-06 219 10.95 181 9.05 38 13 6 2.74Jan-07 306 13.90 261 11.86 45 16 1 0.33Feb-07 319 15.95 268 13.4 51 9 0 0.00Mar-07 349 15.86 306 13.9 43 24 1 0.29Apr-07 358 17.04 309 14.71 49 9 4 1.12

Totals 4082 14.60 3407 12.19 675 210 39 0.96

Genesis prides itself on its warranty ratio of less than 1%

OUR RATINGS

• FAA Accessory Class 1, 2, 3 (unlimited)• Radio Class 1, 2 (unlimited)• Limited radio 3• Limited NDT (non-destructive-testing)• Magnetic particle and dye penetrant

inspections

• EASA/JAA: (Same as FAA ratings)

Air Agency Certificate

Capabilities (general)

• Our capabilities include unlimited Class 1, 2, & 3 covering electrical, electro-mechanical, fuel, hydraulic, pneumatic and electronic components.

• An unlimited Radio Class 1 & 2 in Avionics covering DMEs, transponders, Navs/VORs and Comms and a limited Class 3 Radio rating.

• And also a limited NDT rating for mag particle and dye penetrant testing.

In Closing…..

• We wish to thank you for the opportunity to present our facility and hope we have presented a comprehensive view of our organization.

• We look forward to working with you and serving your aircraft component needs.