genesee county freight and connectivity study
DESCRIPTION
Genesee County Freight and Connectivity Study. Genesee County Freight and Connectivity Study Employment Assumptions. Current Conditions. Possible Baldwin Road Area Land Use Trends in the Future. Land Use/Zoning. Concept of Baldwin Road. Preferred Alternative. Concept of Medical Campus. - PowerPoint PPT PresentationTRANSCRIPT
Genesee CountyFreight and Connectivity Study
Genesee County Freight and Connectivity StudyEmployment Assumptions
Year Manufacturing Other Transportation/Utilities Finance Retail Wholesale Service Government Total
2005 24,433
12,677
5,768
14,400
27,984
7,244
92,713
26,443 211,662
2011 22,934
13,221
6,063
15,316
28,496
7,093
106,601
26,484 225,729
2018 19,566
13,799
6,156
15,726
28,283
6,613
115,472
26,427 232,042
2025 17,550
13,779 6,021
15,575
27,314
6,096
120,898
26,366 233,988
2035 14,763
13,838 5,768
15,319
26,185
5,333
128,174
26,511 235,891
Net Change (9,670) 1,161 - 919 (1,799) (1,911) 35,461 68 24,229
-39.58% 9.16% 0.00% 6.38% -6.43% -26.38% 38.25% 0.26% 11.45%
Land Use/ZoningCurrent Conditions
Possible Baldwin Road Area Land Use Trends in the Future
Concept of Baldwin Road
Preferred Alternative
Concept of Medical Campus
Source: The Corradino Group of Michigan, Inc.
Genesee CountyFreight and Connectivity Study