© 2012 Generation mPower LLC All rights reserved. 1
Formal alliance between B&W Company and Bechtel Power
Corporation
• Executed July 14, 2010
• Substantial commitment by B&W and Bechtel
Recognized and established energy industry leaders
• B&W:
o 60+ years of nuclear engineering and manufacturing experience
o Exclusive B&W mPower™ reactor technology
• Bechtel Power:
o 60+ years of nuclear power industry experience
o Integrated engineering and project management leadership
Alliance objectives:
• Design, license and deploy world’s first commercially viable Gen III++ SMR
• Deliver greater project cost and schedule certainty
• Make nuclear power more accessible to utilities and energy providers
A “game changer” for the nuclear power plant industry
www.generationmpower.com
Generation mPower LLC
© 2012 Generation mPower LLC All rights reserved. 2
Modular ALWR with best of Generation III+ features … low risk, low cost and passively safe
B&W mPower™ Reactor Integral 530 MWt NSSS module
Core, CRDMs, SG, Pressurizer and Coolant Pumps
No penetrations below top of core
50-degree superheat in Secondary Loop
60-year design life, rail shippable
Passively safe design philosophy
Core remains covered during all DBAs
No active ECCS or safety-related AC power
Multiple defense-in-depth layers deliver ~10-8 CDF
4-Year fuel cycle with “standard” PWR fuel
69 fuel assemblies with <5% 235U enrichment
~40 GWD/T burn-up and no shuffling delivers economics
Burnable poisons, no chemical boron shim in coolant
Full reactivity control using 69 control rod assemblies
1. Pressurizer
2. Once-Through Steam Generator
3. Feedwater Inlet / Steam Outlet
4. Reactor Coolant Pumps
5. Electro- Hydraulic CRDMs
6. Upper Internals
7. Reactor Core
1
2
3
4
5
6
7
© 2012 Generation mPower LLC All rights reserved. 3
Simple solution to plant safety and O&M functions
Nuclear Island fully underground
• Lower overall seismic response
• Greater protection from external threats
Passive safety systems
• Passive cooling – AC power not required for
safety functions
• 72-hour battery supply for monitoring/control
• 14-day SBO coping time w/o outside intervention
• No Shared Safety Systems
Enhanced spent fuel pool configuration
• 20-year storage capacity
• Underground, inside protected structure
• Large heat sink, 30+ days boil-off protection
Nuclear Island Features
© 2012 Generation mPower LLC All rights reserved. 4
Achieving Competitive Levelized Cost of Electricity (LCOE)
Competitive LCOE range: $82-97/MWh
Key Assumptions: Fuel range = $4.00 - $10.0/MMBtu (NG); $2.20/MMBtu (Coal) CO2 price range = $0 - $30/ton Capacity factor = 92% (Large Nuclear and Coal); 95% (SMR); CCGT: 85% (Base Load); 40-60% (Intermediate Load) CAPEX range = $4600 - $6000/kW (Large Nuclear)
Minimize Overnight Cost
• Optimum power output (180 MWe)
• Simple standard plant layout and design
• Competitive global supply chain
• Innovative modularization
• Short construction schedule (3 years)
• Less than $5000/kW* for 360 MWe greenfield plant
Optimize Operating Costs
• “Plug and Play” design levers existing infrastructure
• 80%* reduction in security staff with normal DBTs
• 3 licensed operators/shift for “two-pack”
• Fleet O&M support enabled by standardization
• DCWG approach with IAC for utility-centric design
*Current estimates
LCOE Comparison US
© 2012 Generation mPower LLC All rights reserved. 5
Licensing Strategy Lead Plant (TVA Clinch River): 10CFR50
First U.S. site-specific SMR license application
10CFR50 license approach lowers FOAK risk
• Targeting mid-2014 CPA submittal by TVA
• Enables design changes in construction
CP is opportunity to identify NRC issues early
Manage regulatory risk with early engagement
Subsequent Plants: 10CFR52 with DC/COLA
Gain DCD efficiency by levering PSAR work
Submit DCA during 4Q13
Target Design Certification by NRC in 2017
Resolve all known FOAK issues before filing DCA
• 24 topical & technical reports planned pre-DCA
• Continue aggressive pre-DCA NRC engagement
Prepare CPA
NRC Review
Prepare OL / FSAR
NRC Review
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
CP CPA OL
Hearings
Submit DCA DC Issued
Milestones:
Design / Testing & DCD Preparation
2021
© 2012 Generation mPower LLC All rights reserved. 6
Events and Threats mPower Design Features
Earthquakes And Floods
• Seismic attenuation: Deeply embedded reactor building dissipates energy, limits motion
• “Water-tight” : Separated, waterproof reactor compartments address unexpected events
Loss of Offsite Power • Passively safe: AC power, offsite or onsite, not required for design basis safety functions
• Defense-in-depth: 2 back-up 2.50MWe diesel generators for grid-independent AC power
Station Blackout • 3-day batteries: Safety-related DC power supports all accident mitigation for 72 hours
• APU back-up: Auxiliary Power Units inside reactor building recharge battery system
• Long-duration “station keeping”: Space allocated for 7+-day battery supply for plant monitoring/control
Emergency Core Cooling
• Gravity, not pumps: Natural circulation decay heat removal; water source in containment
• Robust margins: Core heat rate (11.5kW/m) and small core (500MWth) limit energy
• Slow accidents: Maximum break small compared to reactor inventory (4.7x10-5m2/m3)
Containment Integrity and Ultimate Heat Sink
• Passive hydrogen recombiners: Prevention of explosions without need for power supply
• Internal cooling source: Ultimate heat sink inside underground shielded reactor building
• Extended performance window: Up to 14 days without need for external intervention
Spent Fuel Pool Integrity and Cooling
• Protected structure: Underground, inside reactor service building, located on basemat
• Large heat sink: 30+ days before boiling and uncovering of fuel with 20 years of spent fuel
Multi-layer defense … mitigates extreme beyond-design basis challenges
Protection against “Fukushima-type” Events
© 2012 Generation mPower LLC All rights reserved. 7
Center for Advanced Engineering Research (CAER)
Bedford, VA
Greater than $100M Investment in Component Testing Program and IST Facility
Component Tests
• Reactor Coolant Pump
• CRDM
• Fuel Mechanical Testing
• CRDM/Fuel Integrated Test
• Fuel Critical Heat Flux
• Emergency High Pressure Condenser
Integrated Systems Test (IST)
• Heat Transfer Phenomena
• Steam Generator Performance
• LOCA Response
• Pressurizer Performance
• Reactor Control
Development Testing Programs
© 2012 Generation mPower LLC All rights reserved. 8
B&W Integrated Supply Chain Currently operating “N” stamp and fuel
fabrication/manufacturing facilities for nuclear
components:
• Heavy component fabrication – up to 1000 tons
• Mt Vernon, Indiana
• Barberton, Ohio
• Cambridge, Ontario
• Control rod drive fabrication
• Euclid, Ohio
• Fuel fabrication
• Lynchburg, Virginia
Robust existing Approved Supplier List (ASL):
• Extensive experience with qualified vendors
• Regularly audited for compliance with relevant
codes/standards
• Ongoing interface regarding required capacity & supply
Critical NSSS Components… manufactured in existing B&W facilities
© 2012 Generation mPower LLC All rights reserved. 9
Process Development / Planning
GmP is positioned for
unprecedented
coordination between:
• sub-tier component suppliers
• fabrication plants
• field construction
Maximizing the benefits
of modularity
Outstanding execution of SMR modularity will be the technology “advantage” that leverages the U.S. nuclear industry into a leading role internationally
© 2012 Generation mPower LLC All rights reserved. 10
DOE FOA Application
Application has broad local, state and national support
DOE offering $452 million Public-Private
Partnership split among two vendors
mPower America Team • B&W
• Bechtel
• TVA
• Generation mPower
Project Goal • not only to pursue the design and licensing
requirements of the FOA program
• but also align with DOE’s broader goal of SMR
deployment with construction of the first SMR
unit at the Clinch River Site no later than 2022
© 2012 Generation mPower LLC All rights reserved. 11
mPower America Objectives
All supported by proven manufacturing facilities and supply chain
Design: Cost-competitive, passively safe
mPower SMR unit
Engineering: Achieve performance goals
for fully automated safe-shutdown, blackout
coping time, spent fuel pool cooling, etc.
Testing: Unique, high-fidelity, scaled test
facility to verify design
Analysis: Demonstrate Core Damage
Frequency expectations
Licensing: Construction Permit, Operating
License Design Certification on schedule to
support on-time deployment