    Generally followed Implementation Activities: Cutover Plan & Activities in implementation.

    TO Be Phase

    As Is and To Be Documentation

    Gap Analysis

    To Be Sign Off

    Closing of Gaps as per scope

    Unit Testing

    Preparation of test cases

    Unit testing

    Changes to configuration for any errors

    Integration Testing

    Integration Testing and Test Script Documentation

    Indentification of Gap

    Priortization of Gaps which are sure stopper for Go Live

    Sign Off on Integration Testing

    Closing of remaining gaps and processes

    Basis Activities

    List of Users for User Creation

    Testing of Roles created for SMB Proejcts on ECC 5.0

    Ensure Availability of PC with SAP Front end, LAN, Printer at each required end user place at all locations

    Front End loading and Testing of SAP transactions at each locations

    Completeness of Connectivity between HO and other locations.

    Strategy for Authorization Profile, roles and User Creation

    Testing of Authorisations

    Client Copy from Dev to Quality & production / New Client Preparation

    Master Data Activities

    Preparation of Master Data

    Validation of Master Data by Bcone Team and Core Team

    Sign off on Master Data Prepared

    Preparation of LSMW for Master Data

    Preparation of BDCs for Specific Master Data

    Test Upload on Test

    Upload of Master Data in Sequence on Test

    Cutover Activities

    Communication to Vendor, Customer and Excise etc

    User Training by Core Team

    Cost Roll ups and Validations - Test

    Upload of Master Data in Sequence on Test

    Start entry of Open Sales Orders, Quotation, Enquiries, Purchase Orders in Prod

    Stock Taking Activity at Plant

  • 7/25/2019 Generally Followed Implementation Activities

    2/4

    Stock Upload with SAP Material Code, Qty, Value and Storage Location as on Go-Live Date

    Enter Cash Balances as of Go-Live Dates

    Enter Excise balances as of Go-Live Dates with monthly duty payment for March

    Configure Cut off Excise Number Range (Excise Invoice, RG registers) as on Go-Live Dates

    Back up of Loaded Production Server

    Go LiveAvailability of all balances

    FI Balance uploads (For both ledgers/ subledgers/ assets/ customers/ vendors)

    Cutover is The process of transitioning from one system to a new one

    Cut over Plan is All documentation related to planning, preparing and executing cutover, describing how to lock

    down the system from a technical change management perspective, preparing the the system for its new role

    and rolling out the SAP graphical user interface to all future end users.

    CUTOVER PLAN describes all cutover tasks that have to be performed before the actual go-live

    Examples of cutover tasks are:

    Review and update all systems-related operations procedures like backup policies and system monitoring

    Assign ownership of SAPu2019s functional processes to individuals

    Let SAP AG do a GoingLive check, to get their blessing to go live with the system

    Lock down the system, i.e. do not make any more changes to the SAP system

    Planning the Master data Migration Process is also a Cutover Task.

    Cutover Activities or Master Data Uploading Strategies Depending upon the when we are going live. As per

    that, you have to give the information to your core team. If you goling live at the middle you have to upload the

    all P&L Account items and B/S Items. If you going live at the financial year start, you have to only Upload the

    B/S Items. Activities for Golive:

    1. G/L Master Upload Thru BDC or LSMW (TC-Fs00 and extended one co code to another company code

    Fs01)

    2. Vendor Master Upload Thru BDC Or LSMW (Will be Taken Care By MM)

    3. Customer Master Upload Thru BDC or LSMW (Will be Taken Care By SD)

    4. Asset Master Upload(Thru As90)

    5. Cost Element Master Upload

    6. Cost Center Master Upload

    7. Profit Center Master Upload

    8. G/L Balances Thru F-02

    10. Vendor Balances thru F-43

    11. Customer Balances thru F-22

    12. Customer Advances thru f-29

    13. Vendor Advances thryu F-48

    Before uploading Vendor Balances you have to take care of WHT(TDS) Information.

    Hi Friends, PP cycle is simple- Here i am summarizing MTO & MTS. I have already shared the same in my

    integration document. Requesting to go thru' the same.

  • 7/25/2019 Generally Followed Implementation Activities

    3/4

    The Made TO Order Cycle:

    The sale department passes on the Made to order-Sales Order to the Material department so that material

    requirement is analyzed. This is done in SAP by carrying on an MRP Run for all the levels of the product BOM.

    This MRP Run would create Planned Orders for the shortages. Here the planned orders for fert sub

    assemblies, Components etc, are created. This planned orders for materials produced in house are converted

    in to Production order and planned orders for materials Procured from outside are converted in to Purchase

    order. The creation of Production order through the planned orders will convert all the dependant requirements

    in to dependant reservations.

    The dates of production or purchase are decided through the total replenishment time mentioned in the material

    master, If it is, in-house production, then the Route times precede over the total replenishment time entered in

    the material master. And the availability of all the components is ruled by the availability checking rules and by

    availability checking scopes. Thus whenever the system declares a product to be ready or available by a date it

    implies that the system has checked the availability of the material with respect to the Ware house stock, in

    coming stock (Receipts) and all other planned orders already existing for the product or material.

    In the Made to order production, sales order produced for Fert and Sub assemblies are converted in to

    production order during MRP run. The production orders created have a specific quantity, specific Basic start

    date and a specific Basic Finish Date, a set of operations and a set of component attached from the BOM. In

    course of production the quantities produced in the operation for an order should be confirmed so that the

    current status of work is available in real time situation. The components required for production are issued to

    the production order through goods issue by a movement type 261 and the issue is always made to the

    reservations or to the order, thereby clearing the reservations. Issues of unplanned components are made as

    new items issue and not as order issue. The quantities, for an order which are produced completely are the put

    in to stock i.e. a Goods Receipt is done.

    Thus the made to order cycle starts with the sales orders and converting them to Production Orders through

    MRP Run and there off confirming produced quantities for an order and finally putting the order in to stock.The Cycle of Made to order: Steps: MTO Scenario

    1. Material Creation (Made To order Material with major changes of: Item Category: 0004-make to

    order/assem.,or 0001-make to order)

    2. Route Creation

    3. Creation of BOM

    4. Sales order

    5. Production order Scheduling, Costing, Release and Save

    6. Production order Quantity confirmations for operations, Parallel task of material issue to order or to

    reservations (261)

    7. Fully Produced Production Quantities will be put into stock (GR)8. Delivery against sales order

    9. Invoicing.

    The Made To Stock Cycle

    The Made to stock scenario will start from Demand Management here we can create Planed independent

    requirements manually or by using data from SOP. After MRP run system will create planned orders which we

    can convert to Production order As the Stocks produced there off are not customer stock or the stock is not

  • 7/25/2019 Generally Followed Implementation Activities

    4/4

    attached to any specific customer. Further confirmations are done and issues of material are carried out to the

    production order. Finally the production is put in to stock (GR). Here at any point of time a sales order might

    come in and delivery to the customer is done from the existing stock.

    Production Master Data:-The Production Master Data consists of Material Master, Bill of Material, Work Center,

    Route, and Production Line Design.

    The Material Master is created first for all components involved in making the Final product. Then these

    components are put in a product relationship i.e. a list of materials required to make the final product are put in

    a hierarchy, this is called a Bill of Material. The next task is to identify the work centers required to produce the

    product; if the work centers are already created then they can be readily put in a sequence, which would be a

    sequence of work centers required to produce the product. This sequence of work centers one after the other

    (in the sequence of work to be done) is called a Route.

    The Cycle of Made to stock: Steps: MTS Scenario

    1. Material Creation (Made To Stock Material with major changes of: Item Category: NORM )

    2. Creation of BOM

    3. Route Creation

    4. Demand requirements

    5. MRP Run

    6. Creation/conversion of Production order (Made To stock), Scheduling, Costing, Release and Save

    7. Production order Quantity confirmations for operations, Parallel task of material Issue to order or to

    reservations (261)

    8. Fully Produced Production Quantities will be put into stock (GR)

    9. Sales order Creation

    10. Delivery against sales order

    11. Invoicing.