general.docx
DESCRIPTION
dgTRANSCRIPT
General Chapter of TS (Section-1)S.NOClause noSJVNs CommentSJVN reply on replies of WAPCOS dated 30.01.2015
11.0, 1.1,1.3,1.9.1Competent authority wherever occurring as Engineer may be corrected as Employer.To be changed in TS
21.1 xiiRecommended spares are to be deleted from this clause.To be discussed with WAPCOS as no bidder in RHEP quoted for recommended spares
31.5The criteria for selected transportation weight limit and dimension is to be provided.ok
41.8 As per this clause, bidder has to carry out studies for design parameters. If the same are conducted after the award of contract, the various out coming parameters will affect the ratings of various equipments. This needs to be clarified.As per contract of WAPCOS , System studies are to be carried out by WAPCOS & same may be expedited
51.8.2The criteria for selecting voltage and frequency variation is to be provided.Ok.
61.8.7.2The criteria for selecting various stresses in this clause is to be provided.Supporting documents to be furnished
71.9.1.2 vi.Auto desk of latest edition is to be provided. The prices are to be quoted in the bid document.Above needs to be included in the clause.TS to be revised accordingly
81.10.5The criteria for selecting value of impact resistance for steel castings and for plate steel is to be provided.Supporting documents to be furnished
91.10.7.1.3Provision of any IS/IEC standard may also be kept in addition to DIN standard.To be included in TS
101.10.16.5The semi-flush mounted type Wh & VArh meters shall be change to digital meters.To be included in TS
111.15The prices for software included are to be quoted in the bid document.To be included in TS