GENERAL NOTES
8
M. KAVANAUGH
M. KAVANAUGH
L. LINDEEN
2
G-002
DESCRIPTION OF ISSUE / REVISIONREVISION REVISED BY
M. KAVANAUGH
SPRUCE POINT
AIR INJECTION VAULT
DRAWING:
SHEET:
DRAWN BY:
OF
PROJECT: 171005.01
DESIGNER:
APPROVED BY:
DW
G: S
:\2
00
P
ro
je
cts\1
71
00
5.0
1-M
on
tro
se
A
ir In
je
ctio
n S
ta
tio
n\9
00
C
AD
\0
2-S
HE
ET
S\G
-0
02
.D
WG
U
SE
R: m
ka
va
na
ug
h
DA
TE
: O
ct 3
0, 2
01
9 1
:2
5p
m X
RE
FS
: G
-M
AI-B
D G
-M
AI-S
UB
MIT
IM
AG
ES
:
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
FINAL FOR BID
PROVIDENCE INFRASTRUCTURE CONSULTANTS
4901 EAST DRY CREEK ROAD, SUITE 210
CENTENNIAL, CO 80122
TEL: (303)997-5035
www.providenceic.com
10/11/2019
CITY OF MONTROSE
M
O
N
TROS
E
C
OLO
RA
D
O
M. KAVANAUGHADDENDUM NO. 110/30/2019
10/30/19
ADDENDUM NO. 1
GENERAL CONDITIONS & PRE-CONSTRUCTION NOTES:
2. THE CONCRETE SHALL MEET THE FOLLOWING:
a. CONFORM TO ASTM C94
b. PORTLAND CEMENT, ASTM C150, TYPE II
c. CEMENT: MAXIMUM TRICALCIUM ALUMINATE SHALL NOT EXCEED 8%.
THE MAXIMUM PERCENT ALKALIES SHALL NOT EXCEED 0.6%
d. WATER SHALL CONFORM TO THE REQUIREMENTS OF ASTM C94
e. AGGREGATES SHALL CONFORM TO THE REQUIREMENTS OF ASTM C33
f. AGGREGATE SIZE SHALL BE 3/4” MAXIMUM
g. FINE AGGREGATE SHALL CONSIST OF SAND
h. COARSE AGGREGATE SHALL BE WELL GRADED CRUSHED STONE,
NATURAL ROCK
i. AGGREGATES SHALL BE FREE FROM ANY SUBSTANCES THAT WILL
REACT WITH THE CEMENT ALKALIS, AS DETERMINED BY APPENDIX X-1
OF ASTM C33
j. COMBINED AGGREGATE GRADING SHALL BE AGGREGATE GRADE 67 PER
ASTM C33
k. DO NOT USE ANY ADMIXTURE THAT CONTAINS CHLORIDES
l. WATER-REDUCING ADMIXTURES ARE PERMITTED
m. ACCELERATING ADMIXTURES SHALL NOT BE USED
n. ADMIXTURES USED SHALL BE COMPATIBLE WITH EACH OTHER AND THE
AGGREGATES
3. CONCRETE WORK SHALL CONFORM TO ACI 301, ACI 318, AND ACI 350
4. CONFORM TO ACI 305R & ACI 306 FOR PLACING CONCRETE DURING HOT
OR COLD WEATHER, RESPECTIVELY.
5. CONCRETE SHALL BE BATCHED, MIXED, AND TRANSPORTED IN
ACCORDANCE WITH ACI 301. EACH TRUCK SHALL HAVE A TICKET SHOWING
ACTUAL BATCH WEIGHTS OF MATERIALS IN ADDITION TO THE MAXIMUM
AMOUNT OF WATER WHICH MAY BE ADDED AT THE SITE. THE TOTAL
WATER IN THE MIX AT THE TIME OF PLACING, INCLUDING WATER ADDED AT
THE SITE, SHALL NOT EXCEED THE AMOUNT PRE-APPROVED IN THE MIX
DESIGN.
6. REINFORCEMENT STEEL SHALL BE DEFORMED BARS CONFORMING IN
QUALITY TO THE REQUIREMENTS OF ASTM A615 OR A706, GRADE 60.
7. ALL DETAILING, FABRICATION, AND PLACING OF REINFORCING
BARS, UNLESS OTHERWISE INDICATED, SHALL BE IN ACCORDANCE WITH
ACI-315, “MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED
CONCRETE STRUCTURES”.
8. CONCRETE COVER FOR ALL REINFORCING BARS SHALL BE 3” UNLESS
OTHERWISE NOTED.
9. SHOP DRAWINGS SHALL BE REQUIRED ON REINFORCING STEEL, AND
SHALL BE REVIEWED PRIOR TO FABRICATION.
10. DIMENSIONS ARE TO THE CENTERLINES OF THE BARS UNLESS SHOWN
OTHERWISE.
11. CONFORM TO ACI 308 FOR CURING CONCRETE.
12. PROVIDE A MINIMUM OF FIVE CONCRETE TEST CYLINDERS FOR EACH
POUR. TEST CYLINDERS AS FOLLOWS: ONE AT SEVEN DAYS, TWO AT 28
DAYS, ONE SITE-CURED, AND ONE RESERVE. SUBMIT TEST RESULTS TO
THE ENGINEER.
13. CONCRETE CYLINDER SAMPLING AND TESTING: CONFORM TO ASTM
SPECIFICATIONS. ACCEPTANCE OF CONCRETE SHALL BE GOVERNED BY
THE PROVISIONS OF ACI 318 “BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE”. CONCRETE TESTING WILL BE PERFORMED BY
INDEPENDENT TESTING AGENCY AT CONTRACTOR EXPENSE.
CONCRETE NOTES (CONTRACTOR):
1. MIXES SHALL MEET OR EXCEED EACH REQUIREMENT SPECIFIED. WHERE
STRENGTH, MINIMUM CEMENT CONTENT, AND MAXIMUM
WATER/CEMENTITIOUS MATERIAL RATIO ARE SPECIFIED, THE MOST
STRINGENT SHALL APPLY. FOR EXAMPLE, A MAXIMUM WATER/CEMENTITIOUS
RATIO MIGHT RESULT IN A STRENGTH GREATER THAN THE MINIMUM
SPECIFIED. SUBMIT CONCRETE MIX DESIGNS FOR REVIEW.
MIX
DESIGN
TYPE
f
c
(PSI)
AT 28 DAYS
MAX W/CM
RATIO
STRUCTURAL
CONCRETE
4,000 0.45
MIX DESIGN NOTES:
1. FLY ASH SHALL NOT EXCEED 20% OF THE TOTAL CEMENTITIOUS CONTENT.
2. MIXES CONTAINING WATER REDUCERS SHALL HAVE A MAXIMUM SLUMP OF 6".
MINIMUM
CEMENTITIOUS
CONTENT (LB/YD
3
)
(NOTE 1)
560
MAXIMUM
SLUMP
(INCHES)
(NOTE 2)
4
AIR
ENTRAINMENT
(%)
6
'
1. ALL SPECIFICATIONS, DRAWINGS, AND DETAILS INCLUDED IN THESE DRAWINGS SHALL
FULLY APPLY TO THE WORK WHETHER SPECIFICALLY REFERENCED OR NOT.
2. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS THAT ARE PERTINENT TO THIS WORK.
3. THE CONTRACTOR SHALL HAVE ONE SIGNED COPY OF THE APPROVED PLANS AND
SPECIFICATIONS AND ANY ADDITIONAL REQUIRED CITY OF MONTROSE OR MONTROSE
COUNTY DESIGN STANDARDS AT THE JOB SITE AT ALL TIMES.
4. CONTRACTOR SHALL OBTAIN, COORDINATE AND PAY FOR THE SERVICES OF QUALITY
CONTROL TESTING FIRM(S) FOR ALL LABORATORY AND FIELD TESTING REQUIRED BY
THE SPECIFICATIONS.
5. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE
OWNER OR ENGINEER. THE OWNER OR ENGINEER RESERVES THE RIGHT TO ACCEPT
OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO
THE STANDARDS AND SPECIFICATIONS SHOWN IN THE CONTRACT DOCUMENTS.
6. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF
ANY FIELD CONDITION NOT CONSISTENT WITH THE CONSTRUCTION DOCUMENTS.
7. THE CONTRACTOR SHALL REFER TO THE CONTRACT DRAWINGS FOR DESCRIPTION OF
MATERIALS REFERRED TO BY SIZE, CLASS, TYPE, DESCRIPTION, OR OTHERWISE
SPECIFIED ON THE DRAWINGS.
8. CONTACT THE ENGINEER'S OFFICE IMMEDIATELY IF ANY CONFLICTS ARISE DURING
THE CONSTRUCTION OF ANY IMPROVEMENTS SHOWN ON THESE DRAWINGS.
9. THE CONTRACTOR SHALL REVIEW THE SITE TO DETERMINE EXISTING CONDITIONS
AND ANYTHING NOT SHOWN ON THESE DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND SHALL NOT CONSTITUTE AN EXTRA, UNLESS
APPROVED BY THE ENGINEER.
10. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
OBTAINING ALL NECESSARY CONSTRUCTION PERMITS FROM LOCAL, CITY, COUNTY
AND STATE JURISDICTIONS FOR ALL ASPECTS OF THE WORK (UNLESS OTHERWISE
DESIGNATED IN THE SPECIFICATIONS).
11. THESE PLANS DO NOT EXTEND TO OR INCLUDE DESIGNS OR SYSTEMS PERTAINING TO
THE SAFETY OF THE CONTRACTOR OR ITS EMPLOYEES, AGENTS, SUBCONTRACTORS,
OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF THE
REGISTERED PROFESSIONAL ENGINEER(S) HEREON DOES NOT EXTEND TO ANY SUCH
SAFETY SYSTEMS THAT NOW OR HEREAFTER MAY BE INCORPORATED IN THE WORK.
12. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE
CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY, DURING THE PERFORMANCE OF THE WORK. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO NORMAL
WORKING HOURS. THE DUTY OF THE OWNERS TO CONDUCT CONSTRUCTION REVIEW
OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF
THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN OR NEAR THE
CONSTRUCTION SITE.
13. ALL CONSTRUCTION OPERATIONS SHALL BE ACCOMPLISHED IN ACCORDANCE WITH
APPLICABLE REGULATIONS OF THE U.S. OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
14. ANY CONSTRUCTION DEBRIS OR MUD TRACKING ONTO THE PUBLIC RIGHT-OF-WAY,
RESULTING FROM THE PROJECT, SHALL BE IMMEDIATELY REMOVED BY THE
CONTRACTOR. THE CONTRACTOR SHALL IMMEDIATELY FIX ANY EXCAVATION, OR
PAVEMENT FAILURE CAUSED BY THE PROJECT, AND SHALL PROPERLY BARRICADE
ANY OPEN UTILITY TRENCHES OR CONSTRUCTION AREAS.
15. WASTE MATERIAL PRODUCED AS A RESULT OF THE CONTRACTOR'S OPERATIONS
SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF
OFF THE PROJECT SITE AT THE CONTRACTOR'S EXPENSE.
1. OWNER: THE OWNER FOR THE PROJECT SHALL BE THE CITY OF MONTROSE,
COLORADO.
2. CONTRACTOR: THIS SHALL BE THE INSTALLATION CONTRACTOR FOR THE AIR
INJECTION VAULT. THIS MAY EITHER BE A LOCAL CONTRACTOR HIRED BY THE OWNER
OR THE OWNER ITSELF MAY FUNCTION AS THE CONTRACTOR.
3. SUPPLIER: THIS SHALL BE THE COMPANY PROVIDING THE PRE-MANUFACTURED AIR
INJECTION VAULT AS A COMPLETE UNIT.
4. ENGINEER: THE ENGINEER FOR THIS PROJECT SHALL BE PROVIDENCE
INFRASTRUCTURE CONSULTANTS, INC. 300 PLAZA DRIVE, SUITE 320, HIGHLANDS
RANCH, CO 80129. PHONE NUMBER 303-997-5035.
DEFINITIONS:
1. AIR INJECTION VAULT SUPPLIER SHALL PROVIDE A COMPLETE PRE-ASSEMBLED UNIT
FROM THE FACTORY READY FOR PLACEMENT ON THE CONCRETE SLAB AT THE
PROJECT SITE.
2. SUPPLIER SHALL COORDINATE DESIGN OF AIR INJECTION COMPONENTS AND VAULT
INTERIOR HVAC, ELECTRICAL AND CONTROLS AND SHALL LOCATE COMPONENTS IN
ACCESSIBLE AREAS.
3. JOBSITE INSTALLATION SHALL BE LIMITED TO EXTERIOR ELECTRICAL AND PIPING
CONNECTIONS. NO INTERNAL INSTALLATION OF EQUIPMENT, ELECTRICAL PANELS,
WIRING OR APPURTENANCES WILL BE ALLOWED AT THE PROJECT SITE.
4. SUPPLIER SHALL PROVIDE SHIPPING TO THE PROJECT SITE. THE CONTRACTOR WILL
PROVIDE A CRANE FOR UNLOADING THE VAULT FROM THE DELIVERY TRUCK TO THE
CONCRETE FOUNDATION SLAB.
5. SUPPLIER SHALL PROVIDE COMPLETE SHOP DRAWINGS TO THE ENGINEER FOR
APPROVAL PRIOR TO THE START OF FABRICATION. SHOP DRAWINGS SHALL CONSIST
OF FABRICATION DRAWINGS, DESIGN CALCULATIONS, ELECTRICAL ON-LINE
DRAWINGS, ELECTRICAL SCHEMATICS AND AND CONTROL DIAGRAMS.
6. SUPPLIER SHALL PROVIDE ONE DAY OF STARTUP ASSISTANCE, COMMISSIONING AND
FACTORY TRAINING UPON START UP TO INCLUDE ONE REPRESENTATIVE OF
SUPPLIER AND ONE REPRESENTATIVE OF AIR PUMP VENDOR. TRAVEL TIME SHALL
NOT BE INCLUDED, REPRESENTATIVES SHALL ARRIVE THE PRIOR DAY AND BE READY
TO START ON THE MORNING OF THE AGREED UPON STARTUP DATE.
7. PROVIDE ALL EQUIPMENT IN THE INTERIOR OF THE VAULT AS SHOWN ON THESE
DRAWINGS. WHERE NAMES OF EQUIPMENT ARE USED, THAT NAMED ITEM OR AN
ENGINEER APPROVED EQUAL ARE ACCEPTABLE. “OR EQUAL” SUBSTITUTIONS MUST
BE SHOWN ON THE SHOP DRAWINGS AND APPROVED BY THE ENGINEER PRIOR TO
FACTORY INSTALLATION.
8. SUPPLIER IS RESPONSIBLE FOR THE CARE OF THE VAULT UNTIL IT IS REMOVED FROM
THE DELIVERY TRUCK DURING UNLOADING.
9. SUPPLIER SHALL PROVIDE WITH BID A SCHEDULE FROM NOTICE OF AWARD THROUGH
DELIVERY. SCHEDULE SHALL INDICATE PROJECTED LEAD TIME FOR DEVELOPMENT
OF SUBMITTALS AND FABRICATION OF AIR INJECTION VAULT AFTER RECEIPT OF
APPROVED SUBMITTALS. SUPPLIER SHALL ASSUME A TWO-WEEK REVIEW PERIOD
FOR SUBMITTALS.
AIR INJECTION VAULT GENERAL REQUIREMENTS (SUPPLIER):
INSTALLATION INSTRUCTIONS (CONTRACTOR/SUPPLIER):
1. CONTRACTOR SHALL FULLY COMPLY WITH ALL INSTALLATION INSTRUCTIONS
PROVIDED BY THE SUPPLIER.
2. CONTRACTOR SHALL INSTALL PIPING AND ELECTRICAL CONNECTIONS FROM THE AIR
INJECTION VAULT TO THE CONNECTION POINTS SHOWN ON THE DRAWINGS.
3. ELECTRICAL POWER SUPPLY SHALL BE FROM THE TRANSFORMER AT THE LIFT
STATION. CONTRACTOR SHALL PROVIDE ALL MATERIAL AND DISCONNECTS PER THE
NATIONAL ELECTRICAL CODE.
4. THE VOLTAGE TO THE VAULT SHALL BE 3 PHASE, 230 VOLT. TOTAL ESTIMATED
AMPERAGE LOAD WILL BE PROVIDED BY THE SUPPLIER WITH THE SHOP DRAWINGS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PHYSICAL PROTECTION AND ANY
DAMAGE TO THE VAULT FROM THE REMOVAL FROM THE DELIVERY TRUCK TO THE
ACCEPTANCE OF THE INSTALLATION BY THE OWNER.
1. SUPPLIER SHALL PROVIDE STRUCTURAL DESIGN FOR THE BURIED STEEL VAULT AND
SHALL SUBMIT STRUCTURAL CALCULATIONS STAMPED BY A PROFESSIONAL
ENGINEER FOR REVIEW.
2. VAULT IS NOT SUBJECT TO VEHICLE LOADING OVER THE TOP OF THE BURIED VAULT.
SUPPLIER SHALL DESIGN STEEL STRUCTURE TO SUPPORT ALL OTHER ANTICIPATED
DEAD AND LIVE LOADS ASSOCIATED WITH NORMAL MAINTENANCE ACTIVITIES.
3. SUPPLIER SHALL DESIGN STRUCTURE TO RESIST BUOYANCY IN FULL-DEPTH
SATURATED SOIL WITH A SAFETY FACTOR OF 1.5.
4. SUPPLIER SHALL DESIGN FOR ECONOMY OF VAULT SIZE. PRELIMINARY VAULT SIZING
OF 8-FOOT DIAMETER IS INTENDED AS A MAXIMUM.
5. SUPPLIER SHALL DESIGN INTEGRAL VAULT BASE ANCHOR PLATES FOR DRILLED,
EPOXY-SET ANCHOR STUDS. PROVIDE PLATES IN NUMBER AND CONFIGURATION
DICTATED BY SUPPLIER'S DESIGN. INDICATE RECOMMENDED ANCHOR STUD
DIAMETER ON SHOP DRAWING.
6. SUPPLIER SHALL DESIGN VAULT STRUCTURAL MEMBERS IN CONTACT WITH EARTH TO
INCLUDE 0.10 INCHES OF SACRIFICIAL THICKNESS FOR CORROSION BEYOND THAT
THICKNESS REQUIRED FOR STRUCTURAL INTEGRITY.
7. SUPPLIER SHALL PROVIDE A SINGLE MULTI-LAYER LIQUID EPOXY SYSTEM FOR ALL
FERROUS METAL SURFACES BOTH INTERIOR AND EXTERIOR. COATING SHALL BE
SHERWIN WILLIAMS MACROPOXY 646 OR APPROVED EQUAL. 10-12 MILS DFT MINIMUM.
8. SUPPLIER SHALL HOLIDAY TEST FACTORY COATING BOTH INTERIOR AND EXTERIOR
AND REPAIR HOLIDAYS WHERE IDENTIFIED IN ACCORDANCE WITH COATING
MANUFACTURER INSTRUCTIONS. SUBMIT PASSING HOLIDAY TEST FOR APPROVAL
PRIOR TO SHIPMENT.
9. SUPPLIER SHALL FURNISH TOUCH-UP PAINT FOR REPAIR OF COATING ON SITE BY
CONTRACTOR.
10. SUPPLIER SHALL DESIGN A SACRIFICIAL GALVANIC ANODE SYSTEM WITH INTERNAL
VAULT TEST STATION FOR CORROSION PROTECTION OF STEEL VAULT.
AIR INJECTION VAULT STRUCTURE DESIGN REQUIREMENTS (SUPPLIER):
1. ENGINEER'S LAYOUT OF PROCESS COMPONENTS (EQUIPMENT AND PIPING) IS
PRELIMINARY. SUPPLIER MAY DESIGN AIR INJECTION COMPONENT LAYOUT AS
DESIRED IN CONCERT WITH REQUIREMENTS OF HVAC, ELECTRICAL AND OTHER
APPURTENANCES.
2. DEPICT ACTUAL PROPOSED EQUIPMENT DIMENSIONS AND CLEARANCES IN FINAL
SHOP DRAWING LAYOUT SUBMITTED FOR APPROVAL.
3. SUPPLIER SHALL PROVIDE DESIGN CALCULATIONS FOR AIR INJECTION EQUIPMENT
STAMPED BY A PROFESSIONAL ENGINEER. CALCULATIONS SHALL BE BASED UPON
ACTUAL PROPOSED COMPONENT AND PIPING CHARACTERISTICS AND GEOMETRY
INDICATED IN THE SHOP DRAWINGS AND SHALL REPRESENT PRESSURE LOSS FROM
CLAW PUMP DISCHARGE TO POINT OF AIR INJECTION. (SEE DESIGN CRITERIA AT
INJECTION POINTS ON SHEET I-101)
4. SUPPLIER SHALL PROVIDE 316 STAINLESS STEEL AIR PIPING AND VALVES WITHIN
VAULT. INDICATE SELECTED SIZE ON SHOP DRAWINGS.
5. INCLUDE, AT A MINIMUM, THOSE ISOLATION VALVES AND DISASSEMBLY UNIONS
SHOWN WHETHER ON PROCESS PLANS AND SECTIONS OR PROCESS AND
INSTRUMENTATION DIAGRAM FOR MAINTENANCE ACCESS.
6. AFTER INSTALLATION, NOISE FROM THE OPERATING AIR INJECTION VAULT SHALL
NOT EXCEED 65 dBA AS MEASURED 50 FT FROM NEAREST VENT PIPE.
AIR INJECTION VAULT PROCESS DESIGN REQUIREMENTS (SUPPLIER):
AIR INJECTION VAULT ELECTRICAL DESIGN REQUIREMENTS (SUPPLIER):
1. SUPPLIER SHALL PROVIDE DESIGN AND SIZING OF ALL ELECTRICAL COMPONENTS
AND WIRING REQUIRED TO SERVE THE VAULT IN ACCORDANCE WITH THE 2017
NATIONAL ELECTRIC CODE.
2. SUPPLIER SHALL DESIGN AND FURNISH ALL ELECTRICAL EQUIPMENT AND
COMPONENTS FROM SERVICE THROUGH ABOVE-GROUND MAIN VAULT DISCONNECT,
POWER PANEL, VAULT INTERIOR DISCONNECT, VAULT EQUIPMENT AND CONTROL
POWER AND WIRING. CONTRACTOR SHALL FURNISH PLC/RTU AND PROGRAMMING.
3. COORDINATE ELECTRICAL DESIGN WITH REQUIREMENTS AND SPECIFICATIONS OF
SUPPLIER FURNISHED EQUIPMENT.
4. ALL ELECTRICAL AND CONTROL WIRING INSIDE VAULT SHALL BE IN CONDUIT SIZED
TO CARRY THE CONDUCTORS IN ACCORDANCE WITH 2017 NEC.
5. SUPPLIER DESIGN SHALL INCLUDE CONDUIT PENETRATIONS AND CONNECTIONS FOR
ELECTRICAL AND CONTROL WIRING CONDUIT AT VAULT EXTERIOR. CONDUIT SIZE
AND NUMBER SHALL BE AS DETERMINED BY SUPPLIER DESIGN PLUS 1 SPARE OF
EACH SIZE.
6. SUPPLIER SHALL TERMINATE ALL WIRING CONNECTIONS WITHIN THE VAULT AT THE
FACTORY AND SHALL TEST INSTALLATION PRIOR TO SHIPPING.
7. PROVIDE AN ADDITIONAL 40 FEET OF CONTINUOUS CABLE AT VAULT EXTERIOR ON
ALL WIRES FOR CONTRACTOR TO CONNECT TO ABOVE GROUND ELECTRICAL AND
CONTROL EQUIPMENT.
8. SUPPLIER SHALL IDENTIFY ALL WIRES WITH IDENTICAL UNIQUE LABEL TAGS ON EACH
END FOR CONTRACTOR REFERENCE AND TERMINATION.
9. SUPPLIER SHALL DESIGN AND FURNISH VAULT LIGHTING.
10. SUPPLIER SHALL PROVIDE VAULT ELECTRICAL LOAD CALCULATIONS TO OWNER FOR
SITE SERVICE EVALUATION.
AIR INJECTION VAULT HVAC DESIGN REQUIREMENTS (SUPPLIER):
1. SUPPLIER SHALL DESIGN VAULT HVAC SYSTEMS TO PROVIDE CODE REQUIRED
VENTILATION FOR CLASSIFICATION AS NON-CONFINED SPACE ENTRY.
2. HVAC DESIGN SHALL BE CAPABLE OF MAINTAINING VAULT INTERIOR BETWEEN 60
AND 80 DEGREES FAHRENHEIT DURING ALL SEASONS.
3. ACCOUNT FOR HEAT GENERATED BY EQUIPMENT AND HOT COMPRESSED AIR PIPING.
PROVIDE PIPING INSULATION WHERE INDICATED.
4. PROVIDE ELECTRICAL UNIT HEATER AND EXHAUST FAN FOR PERIODS WHEN VAULT
IS NOT OPERATING. AIR CONDITIONING SHALL NOT BE REQUIRED.
5. PROVIDE FAN AND LIGHT SWITCH AT HATCH ENTRY ACCESSIBLE FROM THE GROUND
SURFACE ABOVE.
AIR INJECTION VAULT CONTROL DESIGN REQUIREMENTS (SUPPLIER):
1. SUPPLIER SHALL FURNISH AND INSTALL ALL CONTROL WIRING AND CONDUIT SHOWN
OR IMPLIED TO BE NECESSARY BY THESE DRAWINGS.
2. PROVIDE AN ADDITIONAL 40 FEET OF CONTINUOUS CABLE AT VAULT EXTERIOR ON
ALL WIRES FOR CONTRACTOR TO CONNECT TO ABOVE GROUND CONTROL
EQUIPMENT.
3. ALL PROCESS CONTROL AND INTEGRATION PROGRAMMING SHALL BE FURNISHED BY
CONTRACTOR.
4. SUPPLIER SHALL TERMINATE AND TEST ALL INTERNAL ELECTRICAL AND CONTROL
WIRING AT THE FACTORY PRIOR TO SHIPMENT.
5. SUPPLIER SHALL IDENTIFY ALL WIRES WITH LABEL TAGS ON EACH END FOR
CONTRACTOR REFERENCE AND TERMINATION.
1
1
1
1.5" WALL PENETRATION
W/ LINK SEAL
EL 5854.00
8" SDR 21 PVC
FORCE MAIN
8" PVC GRAVITY INLET
EL 5851.90
5846.18
3/4" PIPE SUPPORT
L 5855.00
C
2
-
1
-
3/4" EPMD AIR HOSE
1.5x
3
4
" REDUCER
3/4" STRAIGHT CPLG
EYE BOLT
LIFTING CHAIN
3/4" 316 SST PIPE
3/4" 316 SST QUICK
DISCONNECT AIR
FITTING
NPT HOSE ADAPTOR
6" 316 SST CL 125
BLIND FLANGE
6" 316 SST BLIND
FL W/ 3/4" TAP
EDI COARSE
BUBBLE DIFFUSER
OR EQUAL(TYP)
3/4" 316 SST CROSS
3/4" EPDM HOSE
NEOPRENE
FLANGE GASKET
PROVIDE 90° EYE BOLT OR
FLANGE HARNESS LUG FOR
LIFTING CHAIN ATTACHMENT
3/4" 316 SST NIPPLE
3/4" 316 SST NIPPLE
1
1
2
" WASHED ROCK FROM
UNDISTURBED EARTH,
VIBRATE TO COMPACT TO
70% RELATIVE DENSITY
CONC GRADE RINGS
3" INSULATION
60"Ø PRECAST CONC MH
SECTION FIELD VERIFY
DEPTH
1
1
2
" PVC BALL VALVE
/ CORP STOP
NEW 1
1
2
" TAP W/
TAPPING SADDLE
#6 REBAR
60"Ø PRECAST
FLAT MH COVER
SEAL ALL JOINTS
24"Ø MH RING AND COVER
NEENAH, R-1510 OR EQUAL
3"
2"
(TYP)
1
1
2
" PVC CHECK VALVE
CORE PENETRATION &
GROUT ANNULUS
8" DR21 PVC FORCE MAIN
1
1
2
" SCH 80 PVC
NOTE: CONTRACTOR OPTION FOR USE OF ALTERNATIVE ENCLOSURE
SUCH AS HDPE METER PIT.
4" GALVANIZED POST (PROVIDE
ADDITIONAL VERTICAL
SUPPORTS AS REQUIRED)
CONDUITS (PER
SUPPLIER DESIGN,
CONTRACTOR
FURNISHED )
ADJUST SEPARATION
TO FIT WIDTH OF
ENCLOSURE
5'-6
" M
AX
IM
UM
30" BELOW
FINISHED
GRADE
CONCRETE 15" DIA
SERVICE DISCONNECT
(SUPPLIER FURNISHED)
POWER PANEL
(SUPPLIER
FURNISHED)
PLC/RTU (FURNISHED BY
CONTRACTOR)
CONDUITS
(PER SUPPLIER DESIGN,
CONTRACTOR FURNISHED)
FROM SITE SERVICE
TO VAULT
VFD-101 (SUPPLIER
FURNISHED)
1
CIVIL DETAILS
8
M. KAVANAUGH
M. KAVANAUGH
L. LINDEEN
4
C-002
DESCRIPTION OF ISSUE / REVISIONREVISION REVISED BY
M. KAVANAUGH
SPRUCE POINT
AIR INJECTION VAULT
DRAWING:
SHEET:
DRAWN BY:
OF
PROJECT: 171005.01
DESIGNER:
APPROVED BY:
DW
G: S
:\2
00
P
ro
je
cts\1
71
00
5.0
1-M
on
tro
se
A
ir In
je
ctio
n S
ta
tio
n\9
00
C
AD
\0
2-S
HE
ET
S\C
-0
02
.d
wg
U
SE
R: m
ka
va
na
ug
h
DA
TE
: O
ct 3
0, 2
01
9 1
:0
4p
m X
RE
FS
: G
-M
AI-B
D G
-M
AI-S
UB
MIT
C
-M
AI-S
P C
-M
AI-H
A 0
41
81
B-B
A0
1 IM
AG
ES
:
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
FINAL FOR BID
PROVIDENCE INFRASTRUCTURE CONSULTANTS
4901 EAST DRY CREEK ROAD, SUITE 210
CENTENNIAL, CO 80122
TEL: (303)997-5035
www.providenceic.com
10/11/2019
CITY OF MONTROSE
M
O
N
TROS
E
C
OLO
RA
D
O
M. KAVANAUGHADDENDUM NO. 110/30/2019
10/30/19
ADDENDUM NO. 1
SCALE:
WETWELL DIFFUSER DETAIL
3"=1'-0"
2
-
SCALE:
AIR INJECTION TAP MANHOLE
NTS
3
-
SCALE:
LIFT STATION WETWELL AERATION DETAIL
3/4"=1'-0"
1
-
SCALE:
ELECTRICAL PANEL FRAME
NTS
4
-
1-1/4" x 1"
CK-101
1"
10 HP CLAW PUMP (BLOWER)
FLOW RATE: 11 - 50 SCFM
PRESSURE: 20 - 36 PSI
HOA
HS
101
VFD-101
YS
101
REMOTE/LOCAL
STATUS
CLAW PUMP VFD
M
VFD
P-101
1" SST AIR
M
AFTERCOOLER
DESIGN FINISH TEMPERATURE:
WITHIN 20 DEGREES F OF AMBIENT
AIR TEMP
AC-101
1"
1"
LOCAL CONTROL
SCADA/PLC/HMI
FIELD
HOA
HS
201
FAN
STATUS
YI
201
WASTE SUMP
SV-102
1/2"
1"
1"
SUBMERSIBLE SUMP PUMP
FLOW RATE: 5 GPM
PRESSURE: 5 PSI
P-102
M
1. ALL STAINLESS STEEL (SST) PIPING AND VALVES SHALL BE TYPE 316. STAINLESS STEEL PIPING SHALL BE SCHEDULE 40 THICKNESS.
2. VAULT SUPPLIER SHALL COORDINATE DESIGN OF PIPING AND COMPONENTS TO MINIMIZE PRESSURE LOSSES SUCH THAT MAXIMUM DESIGN AIR
INJECTION FLOW IS ACHIEVABLE.
3. SHOULD ANY CONFLICT EXIST BETWEEN PROCESS DRAWINGS AND THIS SCHEMATIC THE SUPPLIER SHALL PROVIDE ALL COMPONENTS SHOWN
ON EACH IN THE PRICING AND CLARIFY FINAL CONFIGURATION VIA SHOP DRAWING.
GENERAL NOTES:
SPRUCE POINT LIFT
STATION (EXISTING)
PI-101
8" SDR 21 PVC FM
(EXISTING)
DESIGN PRESSURE: 22 PSI
1.5" MAIN AIR INJECTION (SCH 80 PVC)
LS
101
1/2" SST DRAIN
8" PVC SAN SEWER
(EXISTING)
1" DR21 IPS PVC
AIR INJECTION VAULT
INTERIOR
1" SST AIR
SV-101
1/2"
CK-104
TO GRAVITY MANHOLE
OUTLET
1" SCH 80 PVC
1. PUMP P-101 SHALL BE CALLED TO RUN BY A TIMER CIRCUIT WITHIN THE PLC. TIMER SHALL BE
OPERATOR ADJUSTABLE.
2. MOTOR OPERATED BALL VALVES CV-101 AND CV-102 SHALL BE NORMALLY CLOSED AND SHALL BE
ENERGIZED TO OPEN UPON PUMP RUN COMMAND AND REMAIN OPEN WHILE PUMP IS IN RUNNING
STATUS. THE VALVES SHALL FAIL CLOSED AND SHALL EACH BE ABLE TO BE RUN IN HAND, OFF OR
AUTOMATIC MODE.
3. EXISTING SPRUCE POINT LIFT STATION PUMPS RUN STATUS SHALL CAUSE AIR INJECTION STATION
TO TURN OFF DURING RUN TIME OF LIFT STATION PUMPS.
4. AFTERCOOLER AC-101 FAN SHALL START UPON AIR INJECTION PUMP RUN COMMAND.
5. SOLENOID VALVES SV-101 AND SV-102 SHALL BE NORMALLY CLOSED. SV-101 AND SV-102 SHALL BE
OPENED AT TIMED INTERVAL AND FOR OPERATOR SELECTED DURATION. EACH SHALL OPEN
SIMULTANEOUSLY TO DRAIN CONDENSATE TO SUMP. OPENING SHALL OCCUR ON OPERATOR
SELECTED TIME SCHEDULE.
6. FLOAT SWITCH LS-101 SHALL CONTROL SUMP PUMP P-102.
7. FLOOD SWITCH LSH-102 SHALL BE USED TO ALARM TO SCADA AND ALERT ON-CALL STAFF OF
IMMINENT STATION FLOOD VIA COMMUNICATION SYSTEM.
8. THE FOLLOWING ALARMS SHALL BE COMMUNICATED VIA SCADA SYSTEM TO ON-CALL PERSONNEL.
A. ZA-101 UNAUTHORIZED ENTRY
B. YA-101 GENERAL PUMP/BLOWER FAULT
C. LAH-102 FLOOD ALARM
D. FAL-101 LOW AIR FLOW ALARM (WHILE PUMP IS IN RUN STATUS)
CONTROL NARRATIVE:
LSH
102
LEVEL
ALARM
LAH
102
0-60 PSI
NCNC
NC
1"
YL
101
PUMP RUN
STATUS
SI
101
SPEED
INDICATION
SC
101
SPEED
COMMAND
HATCH SENSOR
INTRUSION ALARM
ZS
101
YA
101
GENERAL FAULT
ALARM
ZA
101
FE
101
FIT
101
TI
101
TEMPERATURE
INDICATION
IN-LINE AIR
FLOW METER
MAX. FLOW:
110 SCFM
PI
101
PRESSURE
INDICATION
SPRING
CHECK
1"
1.5" WETWELL AERATION LINE (SCH 80 PVC)
CV-101
1"
NC
M
1"
CK-102
BALL
CHECK
1"
1/2"
1/2"
AIR INJECTION VAULT
EXTERIOR
WETWELL AERATION
DIFFUSER
FLOW RATE: 5 CFM
PRESSURE: 20 PSI
DF-101
FI
101
FLOW RATE
FQI
101
FLOW TOTALIZATION
NV-101
NEEDLE
VALVE
PVC BALL
CHECK
1" x 1-1/2"
1" x 1-1/2"
CV-102
1"
NCM
EUH
101
TEMPERATURE
SETTING
SWITCH
TC
201
ELECTRIC UNIT
HEATER, FIELD
MOUNT
1" SST AIR
FAL
101
LOW FLOW ALARM
1
DESCRIPTION OF ISSUE / REVISIONREVISION REVISED BY
M. KAVANAUGH
SPRUCE POINT
AIR INJECTION VAULT
DRAWING:
SHEET:
DRAWN BY:
OF
PROJECT: 171005.01
DESIGNER:
APPROVED BY:
DW
G: S
:\2
00
P
ro
je
cts\1
71
00
5.0
1-M
on
tro
se
A
ir In
je
ctio
n S
ta
tio
n\9
00
C
AD
\0
2-S
HE
ET
S\I-1
01
.d
wg
U
SE
R: m
ka
va
na
ug
h
DA
TE
: O
ct 3
0, 2
01
9 1
:0
4p
m X
RE
FS
: G
-M
AI-B
D G
-M
AI-S
UB
MIT
IM
AG
ES
:
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
FINAL FOR BID
PROVIDENCE INFRASTRUCTURE CONSULTANTS
4901 EAST DRY CREEK ROAD, SUITE 210
CENTENNIAL, CO 80122
TEL: (303)997-5035
www.providenceic.com
10/11/2019
CITY OF MONTROSE
M
O
N
TROS
E
C
OLO
RA
D
O
M. KAVANAUGHADDENDUM NO. 110/30/2019
PROCESS & INSTRUMENTATION
DIAGRAM 8
M. KAVANAUGH
M. KAVANAUGH
L. LINDEEN
8
I-101
10/30/19
ADDENDUM NO. 1