general notes and specifications: material ......all plumbing works shall be installed in accordance...
TRANSCRIPT
25000
50005000500050005000
25000
5000500050005000
1400
0
7000
7000
5000
FEDCBA
3
2
1
FEDCBA
3
2
1
SANITARY SEWAGE LAYOUTS C A L E M1 : 200
WATERLINE LAYOUTS C A L E M1 : 200
SECTION
SEPTIC TANK DETAILSS C A L E 1:20 MTS
300
100
1000
150
INLETCOMPARTMENT
SECONDARYCOMPARTMENT COMPARTMENT
TERTIARY
25
51
51
AIR SPACE 300
AIR SPACE
AIR SPACE
WATER LEVEL
WATER LEVEL
WATER LEVEL
200
1200
200
1600
1800 200 900 200 900 200200
4400
1550
51
PLAN
P-11
09 10
JMG
CFQ/JCC
2016PROJECT SCOPE:
Total Sheet No.:
Sheet No.:
LOCATION :
PROJECT NAME :
MATI AIRPORT DEVELOPMENT PROJECT (C.Y. 2015)
/
Sheet Content: Revisions:
Engineer IV, Project Development Service
Approved by:
JULIUS C. CARLOS
Checked by:REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF TRANSPORTATION AND
COMMUNICATIONS
PROJECT DEVELOPMENT SERVICE
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK,
ORTIGAS AVENUE, MANDALUYONG CITY 1555
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.
DRAWN BY:
CHECKED BY:
DATE DRAWN:
DATE PRINTED:
DATE APPROVED:SCALE : AS SHOWNMATI, DAVAO ORIENTAL
2016
Prepared by:
2016
REHABILITATION OF EXISTING TERMINAL BUILDING1
WATERLINE LAYOUTS C A L E 1:50 MTS
ISOMETRIC
SANITARY SEWAGE LAYOUTS C A L E 1:50 MTS
ISOMETRIC
GENERAL NOTES AND SPECIFICATIONS:1. IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW EVERY PIPE
FITTING, VALVE AND APPURTENANCE. ALL SUCH ITEMS WHETHER SPECIFICALLY MENTIONED OR NOT, OR INDICATED ON THE DRAWINGSSHALL BE FURNISHED AND INSTALLED IF NECESSARY TO COMPLETE THESYSTEM TO THE SATISFACTION OF THE OWNER.
2. ALL PLUMBING WORKS SHALL BE INSTALLED IN ACCORDANCE WITH THEPROVISION OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES, THEREQUIREMENTS OF THE LOCAL PLUMBING INSPECTION OFFICE, PERTINENTPROVISIONS OF THE UNIFORM BUILDING CODE AND THE NATIONAL BUILDING CODE OF THE PHILIPPINES.
3. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS ANDSPECIFICATION. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANYDESCREPANCY FOUND THEREIN.
4. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED FOR PROPER EXECUTION OF OTHER TRADESHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER.
5. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES ANDSTRUCTURES AS VERIFIED BY THE CONTRACTOR.
6. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESSOTHERWISE SPECIFIED.
7. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCEWITH MANUFACTURER'S INSTRUCTIONS.
8. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT THE SITE,COORDINATE THE WORKS WITH THE SEWER LINE EFFLUENT DISPOSALPOINT AND WATER LINE SERVICE CONNECTING POINT, UNLESS OTHERWISESPECIFIED.
MATERIAL SPECIFICATIONS:COLD WATER LINE SHALL BE POLYPROPYLENE RANDOM (PPR) TYPE 3 PIPE, "WAVIN EKOPLLASTIK" BRAND OR APPROVED EQUAL.
VENT PIPES SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000, "NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL..
FITTING SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564.
SEWER LINES SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000,"NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL. FITTINGS SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564.
STORMDRAINAGE LINES/DOWNSPOUT SHALL BE POLYVINYL CHLORIDE (PVC) SERIES 1000,
"ATLANTA" BRAND OR APPROVED EQUAL. FITTING SHALL BESOLVENT CEMENT JOINT TO ASTM D 2564. 250mmØ & ABOVEMATERIAL SHALL BE CONCRETE DRAIN PIPE (CDP) TONGUE@ GROOVE, MORTAR JOINTS, REINFORCEDFOR 300mmØ & LARGER.
AHU/FCU LINES SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 600 II, "NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL.
FITTINGS SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564.
CHECK VALVES "GREAT VOLUME"," CRANE", "KITS", OR APPROVED EQUAL.
GATE VALVES "GREAT VOLUME","CRANE", "KITS", OR APPROVED EQUAL.
WATER METER "ARAD", "ASAHI" BRAND OR APPROVED EQUAL.
PLUMBING LEGEND:
M
WC
LAV
FD
CO
KS
CB
GATE VALVE
CHECK VALVE
WATER METER
COLD WATERLINE
WASTE PIPE
SOIL PIPE
VENT PIPE
CATCH BASIN
WATER CLOSET
LAVATORY
FLOOR DRAIN
CLEAN OUT
KITCHEN SINK
HOSE BIBBHB
SHOWER VALVESV
STORM DRAIN PIPE
LT LAUNDRY TRAY
FAUCETFSD SHOWER DRAIN
VENT PIPEVP
WP WASTE PIPE
SP SOIL PIPE
MV MAIN VENT
VENT STACK THRU ROOF
BT BATH TUB
CWR COLD WATER RISER
CWL
CP CONDENSATE PIPE
HRP HORIZONTAL
RAINWATER PIPING
DS DOWNSPOUT
FB FOOT BATH
VAC VENT ABOVE CEILING
FCO FLOOR CLEANOUT
UNDER FLOOR VENTUFV
VSTR
9. ALL FIXTURES SHALL BE INDIVIDUALLY VENTED.10. THE INVERT OF THE INLET PIPE OF A SEPTIC TANK SHALL BE AT A LEVEL
NOT LESS THAN 50.8mm (2") ABOVE THE INVERT OF THE OUTLET PIPE.11. TO PREVENT CONTAMINATION OF UNDERGROUND WATER SOURCE NO
SEPTIC TANK SHALL BE CONSTRUCTED LESS THAN 1.20m ABOVE THEWATER TABLE LEVEL.
12. ALL PIPE SIZE ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERSUNLESS OTHERWISE SPECIFIED.
13. MINIMUM SEWAGE PIPE SIZE SHALL BE AS FOLLOWS:SOIL PIPE 110mmØ (4"Ø)WASTE PIPE 63mmØ (2"Ø)VENT PIPES 63mmØ (2"Ø)DOWNSPOUT 63mmØ (2"Ø)
14. ALL PLUMBING INSTALLATION INCLUDED HEREIN SHALL BE UNDER THEDIRECT SUPERVISION OF A DULY REGISTERED AND LICENSED MASTERPLUMBER.
DS DOWNSPOUT
RD ROOF DRAIN
25000
5000 5000 5000 5000
1400
0
7000
7000
5000
5000
44004300
A B C D E F
FOUNDATION PLANS C A L E M1 : 150
PROPOSED
1
2
3
ROOF BEAM PLANS C A L E M1 : 150
PROPOSED
1
2
3
25000
5000 5000 5000 5000 5000
A B C D E F
COLUMN 1 DETAILS C A L E M1 : 10
BEAM 1 DETAILS C A L E M1 : 10
FOUNDATION PLANS C A L E M1 : 20
FOUNDATION SECTIONS C A L E M1 : 20
03
/ 10
Office of the Director
DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015)
REHABILITATION OF EXISTING TERMINAL BUILDING
S-
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made
P
S
R
A
F
N
A
R
T
M
T
O
T
N
E
O
O
C
D
N
AT
R
A
N
O
I
T
P
C
I
N
U
A
E
D S
N
O
I
T
M
M
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
* AS SHOWN *
Approved by:
DEO LEO N. MANALOJULIUS C. CARLOS
Checked / Submitted by:
Engineer IV, Project Development Service
Prepared by:
Director, Project Development Service
101
06
TRUSS 1 DETAILS C A L E M1 : 50
TRUSS 2 DETAILS C A L E M1 : 50
TRUSS 3 DETAILS C A L E M1 : 50
TRUSS 4 DETAILS C A L E M1 : 50
TRUSS 5 DETAILS C A L E M1 : 50
TRUSS 6 DETAILS C A L E M1 : 50
03
/ 10
Office of the Director
DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015)
REHABILITATION OF EXISTING TERMINAL BUILDING
S-
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made
P
S
R
A
F
N
A
R
T
M
T
O
T
N
E
O
O
C
D
N
AT
R
A
N
O
I
T
P
C
I
N
U
A
E
D S
N
O
I
T
M
M
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
* AS SHOWN *
Approved by:
DEO LEO N. MANALOJULIUS C. CARLOS
Checked / Submitted by:
Engineer IV, Project Development Service
Prepared by:
Director, Project Development Service
202
07
UNDER 600
UNDER 800
OPENING SIZE
REINFORCING BAR FOR SLAB OPENINGVERTICAL & HORIZONTAL
2-Ø12
4-Ø12
NOTE:
03
/ 10
Office of the Director
DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015)
REHABILITATION OF EXISTING TERMINAL BUILDING
S-
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made
P
S
R
A
F
N
A
R
T
M
T
O
T
N
E
O
O
C
D
N
AT
R
A
N
O
I
T
P
C
I
N
U
A
E
D S
N
O
I
T
M
M
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
* AS SHOWN *
Approved by:
DEO LEO N. MANALOJULIUS C. CARLOS
Checked / Submitted by:
Engineer IV, Project Development Service
Prepared by:
Director, Project Development Service
303
09