Activity ID Area Tube Activity Name Original Duration Total Float Start Finish Predecessors Successor General General Milestones General General Requirements A1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial Completion: East 0 -133 03-Nov-16 A1850, A135 A5740 A5790 GEN GEN Turnover to West Tube 0 -133 03-Nov-16 A1850, A176 A3480 A5720 GEN GEN Substantial Completion: West 0 -133 14-May-18* A5080, A522 A5740 A5740 GEN GEN Punch-list 120 -133 14-May-18 25-Sep-18 A5720, A202 A5730 A5730 GEN GEN Final Completion 0 -133 25-Sep-18 A5740 Mobilization General General Requirements A1000 GEN GEN Permitting 30 -68 01-May-14 12-Jun-14 A1040 A1010 A1020 GEN GEN HASP Submittals & Approvals 60 -98 01-May-14 24-Jul-14 A1040 A1030 A1080 GEN GEN Demolition plan 60 -107 01-May-14 28-Jun-14 A1040 A1030 A1010 GEN GEN Set up logistics: site offices & Facilities 38 -41 12-Jun-14 13-Jul-14 A1000 A1730 A1730 GEN GEN Surveys 38 -41 12-Jun-14 13-Jul-14 A1010 A1460 Roadway East Mobilization Roadway Highwaymen A1030 RW East MPT, effected 30 -141 24-Jul-14 13-Aug-14 A1020, A100 A1200 A2820 RW East MPT, duration (adjust at final) 1000 -126 13-Aug-14 30-Oct-16 A1030 A2020 A3510 RW East Demobilize, east 60 -126 13-Sep-16 30-Oct-16 A2820, A185 A2020 Roadway Demolition Roadway Existing Conditions A1170 RW East Power wash newly exposed concrete 90 -27 03-Aug-14 16-Oct-14 A1150, A113 A2010 A1130 RW East Demolition all tiles 80 -37 13-Aug-14 16-Oct-14 A1030 A2010 A1140 RW East Demolition polymer panels 80 -27 13-Aug-14 16-Oct-14 A1030 A1510 A1150 RW East Demolition all veneer panels & hardware 80 -27 13-Aug-14 16-Oct-14 A1140 A1990 A2140 RW East Demolition of existing light fixtures 30 223 13-Aug-14 04-Sep-14 A1140 A2000 Roadway Repairs Roadway General Requirements A2860 RW East Crack Monitoring 260 290 13-Aug-14 12-Mar-15 A1130 A5790 Concrete A1230 RW East Repair cracks in the roadway walls & ceilings 120 -37 04-Sep-14 11-Dec-14 A1130, A117 A1240 A1300 RW East Roadway structural concrete repair, walls & ceilings 90 -11 04-Sep-14 19-Nov-14 A1130, A313 A1320 A1330 RW East Repair ceiling spalls & hollow areas 116 -37 04-Sep-14 08-Dec-14 A1300, A123 A1340 A3130 RW East Repair structural I beams, plates, bolts, etc. 90 -11 04-Sep-14 19-Nov-14 A1230 A2010 A1340 RW East Repair exhaust air ports 60 -37 23-Oct-14 08-Dec-14 A1330 A1350 A1320 RW East X-passage structural concrete repair, walls & ceilings 28 181 25-Oct-14 19-Nov-14 A1300 A1310 A1240 RW East Refurbish existing drainage chases 56 209 26-Oct-14 11-Dec-14 A1230 A2930 Carpentry A1830 RW East Repairs to hanging-system 60 204 28-Oct-14 20-Dec-14 A1780, A182 A1810 Thermal & Moisture A1290 RW East Roadway wall active & inactive crack chasing 90 333 04-Sep-14 19-Nov-14 A1300 A1510 A1310 RW East X-Passage wall active & inactive crack chasing 60 181 25-Oct-14 14-Dec-14 A1320 A2930 A2930 RW East Apply waterproof membrane 120 173 20-Dec-14 28-Mar-15 A1290, A131 A2010 Finishes A2000 RW East Patch existing bolts 80 173 16-Oct-14 20-Dec-14 A1150, A121 A1990 A2010 RW East New ceramic tiles 242 83 28-Mar-15 06-Oct-15 A1130, A123 A1900 A1990 RW East Install ceiling veneer panels 115 143 07-Jul-15 06-Oct-15 A2000, A115 A1590 Benchwall (non-cat-walk side) Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 2017 2018 NTP Substantial Completion: East Turnover to West Tube Substantia Permitting HASP Submittals & Approvals Demolition plan Set up logistics: site offices & Facilities Surveys MPT, effected MPT, duration (adjust at final) Demobilize, east Power wash newly exposed concrete Demolition all tiles Demolition polymer panels Demolition all veneer panels & hardware Demolition of existing light fixtures Crack Monitoring Repair cracks in the roadway walls & ceilings Roadway structural concrete repair, walls & ceilings Repair ceiling spalls & hollow areas Repair structural I beams, plates, bolts, etc. Repair exhaust air ports X-passage structural concrete repair, walls & ceilings Refurbish existing drainage chases Repairs to hanging-system Roadway wall active & inactive crack chasing X-Passage wall active & inactive crack chasing Apply waterproof membrane Patch existing bolts New ceramic tiles Install ceiling veneer panels Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45 Actual Work Remaining Work Critical Remaining Work Milestone TASK filter: All Activities © Oracle Corporation

Upload: others

Post on 02-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

MilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

GeneraGeneral RequireGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsA1040 GEN GEN NTP 0 -119 01-May-14 A1000A2020 GEN GEN Substantial Completion: East 0 -133 03-Nov-16 A1850, A135 A5740A5790 GEN GEN Turnover to West Tube 0 -133 03-Nov-16 A1850, A176 A3480A5720 GEN GEN Substantial Completion: West 0 -133 14-May-18* A5080, A522 A5740A5740 GEN GEN Punch-list 120 -133 14-May-18 25-Sep-18 A5720, A202 A5730A5730 GEN GEN Final Completion 0 -133 25-Sep-18 A5740

MobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

GeneraGeneral RequireGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsA1000 GEN GEN Permitting 30 -68 01-May-14 12-Jun-14 A1040 A1010A1020 GEN GEN HASP Submittals & Approvals 60 -98 01-May-14 24-Jul-14 A1040 A1030A1080 GEN GEN Demolition plan 60 -107 01-May-14 28-Jun-14 A1040 A1030A1010 GEN GEN Set up logistics: site offices & Facilities 38 -41 12-Jun-14 13-Jul-14 A1000 A1730A1730 GEN GEN Surveys 38 -41 12-Jun-14 13-Jul-14 A1010 A1460

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayEastEastEastEastEastEastEastEastEastEast

MobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

HighwaHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenA1030 RW East MPT, effected 30 -141 24-Jul-14 13-Aug-14 A1020, A100 A1200A2820 RW East MPT, duration (adjust at final) 1000 -126 13-Aug-14 30-Oct-16 A1030 A2020A3510 RW East Demobilize, east 60 -126 13-Sep-16 30-Oct-16 A2820, A185 A2020

Roadway DRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA1170 RW East Power wash newly exposed concrete 90 -27 03-Aug-14 16-Oct-14 A1150, A113 A2010A1130 RW East Demolition all tiles 80 -37 13-Aug-14 16-Oct-14 A1030 A2010A1140 RW East Demolition polymer panels 80 -27 13-Aug-14 16-Oct-14 A1030 A1510A1150 RW East Demolition all veneer panels & hardware 80 -27 13-Aug-14 16-Oct-14 A1140 A1990A2140 RW East Demolition of existing light fixtures 30 223 13-Aug-14 04-Sep-14 A1140 A2000

Roadway RRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

GeneraGeneral RequireGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsA2860 RW East Crack Monitoring 260 290 13-Aug-14 12-Mar-15 A1130 A5790

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1230 RW East Repair cracks in the roadway walls & ceilings 120 -37 04-Sep-14 11-Dec-14 A1130, A117 A1240A1300 RW East Roadway structural concrete repair, walls & ceilings 90 -11 04-Sep-14 19-Nov-14 A1130, A313 A1320A1330 RW East Repair ceiling spalls & hollow areas 116 -37 04-Sep-14 08-Dec-14 A1300, A123 A1340A3130 RW East Repair structural I beams, plates, bolts, etc. 90 -11 04-Sep-14 19-Nov-14 A1230 A2010A1340 RW East Repair exhaust air ports 60 -37 23-Oct-14 08-Dec-14 A1330 A1350A1320 RW East X-passage structural concrete repair, walls & ceilings 28 181 25-Oct-14 19-Nov-14 A1300 A1310A1240 RW East Refurbish existing drainage chases 56 209 26-Oct-14 11-Dec-14 A1230 A2930

CarpenCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryA1830 RW East Repairs to hanging-system 60 204 28-Oct-14 20-Dec-14 A1780, A182 A1810

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA1290 RW East Roadway wall active & inactive crack chasing 90 333 04-Sep-14 19-Nov-14 A1300 A1510A1310 RW East X-Passage wall active & inactive crack chasing 60 181 25-Oct-14 14-Dec-14 A1320 A2930A2930 RW East Apply waterproof membrane 120 173 20-Dec-14 28-Mar-15 A1290, A131 A2010

FinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesA2000 RW East Patch existing bolts 80 173 16-Oct-14 20-Dec-14 A1150, A121 A1990A2010 RW East New ceramic tiles 242 83 28-Mar-15 06-Oct-15 A1130, A123 A1900A1990 RW East Install ceiling veneer panels 115 143 07-Jul-15 06-Oct-15 A2000, A115 A1590

BenchwaBenchwall (non-caBenchwall (non-cat-walk sBenchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

NTPSubstantial Completion: EastTurnover to West Tube

Substantia

PermittingHASP Submittals & Approvals

Demolition planSet up logistics: site offices & FacilitiesSurveys

MPT, effectedMPT, duration (adjust at final)Demobilize, east

Power wash newly exposed concreteDemolition all tilesDemolition polymer panelsDemolition all veneer panels & hardware

Demolition of existing light fixtures

Crack Monitoring

Repair cracks in the roadway walls & ceilingsRoadway structural concrete repair, walls & ceilings

Repair ceiling spalls & hollow areasRepair structural I beams, plates, bolts, etc.

Repair exhaust air portsX-passage structural concrete repair, walls & ceilings

Refurbish existing drainage chases

Repairs to hanging-system

Roadway wall active & inactive crack chasingX-Passage wall active & inactive crack chasing

Apply waterproof membrane

Patch existing boltsNew ceramic tilesInstall ceiling veneer panels

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 2: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA1520 BEN East Demolish benchwall & curbs 90 117 28-Nov-14 03-Feb-15 A1030, A141 A1540A6890 BEN East Clean & refurbish air flues 60 117 19-Dec-14 03-Feb-15 A1520 A1540

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1270 BEN East Infill trench (pipe) with concrete 115 0 28-Mar-15 28-Jun-15 A1280, A290 A2010A1540 BEN East Construct Steel curb at benchwall 60 0 11-May-15 28-Jun-15 A1520, A689 A1550A1580 BEN East Cast benchwall 60 240 29-Sep-15 21-Nov-15 A6940 A1570

MasonrMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryA1570 BEN East Install polymer panels 60 240 21-Nov-15 07-Jan-16 A1580 A1550

PlumbiPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingA1250 BEN East Excavate and saw-cut pipe 115 75 04-Sep-14 07-Dec-14 A1140 A1260A1260 BEN East Expose & unbolt flanges, & install new pipe & valves 115 75 04-Sep-14 07-Dec-14 A1250 A1280A1280 BEN East Charge fire-line & test system 60 75 07-Dec-14 25-Jan-15 A1260 A2760

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA2900 BEN East Heat trace fire standpipe/mains 60 0 28-Mar-15 14-May-15 A1280, A193 A1270A6940 BEN East Way-finding conduit &wiring 120 240 28-Jun-15 28-Sep-15 A6890, A154 A1550A1550 BEN East Way-finding lights 60 240 21-Nov-15 07-Jan-16 A1140, A298 A5790

Cat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A1400 CATW East Remove and salvage safety railing 30 19 04-Sep-14 28-Sep-14 A1030 A1410A1410 CATW East Demolish catwalk to gutter 138 -79 28-Nov-14 18-Mar-15 A1400, A103 A2980A2980 CATW East Demolish Duct banks 69 -79 23-Jan-15 18-Mar-15 A1410 A1430A1440 CATW East Clean & refurbish air flues 60 -79 25-Jan-15 18-Mar-15 A2980, A141 A1510

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1430 CATW East Steel curb, w/angles & reinforcement 60 -79 25-Jan-15 18-Mar-15 A2980, A141 A1450A1450 CATW East Place walk-way concrete & cure (1) 60 -79 25-Jan-15 18-Mar-15 A1430, A144 A1490A1470 CATW East C-Box construction: concrete 72 -3 21-Feb-15 21-Apr-15 A1090, A145 A1460A1480 CATW East Reinforcement & water stops 60 -3 25-Feb-15 21-Apr-15 A1460, A298 A1490A1490 CATW East Place walk-way concrete & cure (2) 60 -21 18-Mar-15 28-Apr-15 A1450, A148 A1850

MasonrMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryA1510 CATW East Install polymer panels 60 325 30-May-15 16-Jul-15 A1140, A129 A6910

CarpenCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryA1850 CATW East Reinstall railing (inc. x-passages) 75 325 16-Jul-15 14-Sep-15 A1490, A151 A2020

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA1460 CATW East C-Box construction: electric 60 -3 25-Feb-15 21-Apr-15 A1470, A173 A1560A1380 CATW East Duct-banks, power cables & conduits & taps 148 -79 18-Mar-15 14-Jul-15 A1450 A2990A6950 CATW East Power cables & conduits & taps 148 90 21-Apr-15 18-Aug-15 A1460 A2030A2990 CATW East Duct bank splice chambers 90 -79 23-Jun-15 30-Aug-15 A1380, A584 A1500A5840 CATW East Core drilling (on-going) 30 -79 23-Jun-15 14-Jul-15 A2980, A138 A2990A6910 CATW East Way-finding lights 60 240 21-Nov-15 07-Jan-16 A5840, A299 A5790

Fresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A1090 FAD East Install new RGS feeders (FAD/CATWALK) 130 23 16-Oct-14 26-Jan-15 A1730, A103 A1120TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCS

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A1590 RW East Replace LUS signage (on-going) 120 132 14-Jul-15 21-Oct-15 A1560, A199 A2030TLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCS

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A1900 RW East Luminance detection cameras 60 42 10-Nov-15 24-Dec-15 A1500, A201 A3540Roadway PRoadway Pavement Roadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement Repair

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayHighwaHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymen

A1660 RW East Mill-out pavement 70 454 28-Apr-15 28-Jun-15 A1490 A1670A1670 RW East Resurface roadway 60 454 28-Apr-15 25-Jun-15 A1660, A123 A2970A2970 RW East Striping 36 454 25-Jun-15 23-Jul-15 A1670 A5790

WestWestWestWestWestWestWestWestWestWest

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Demolish benchwall & curbsClean & refurbish air flues

Infill trench (pipe) with concreteConstruct Steel curb at benchwall

Cast benchwall

Install polymer panels

Excavate and saw-cut pipeExpose & unbolt flanges, & install new pipe & valves

Charge fire-line & test system

Heat trace fire standpipe/mainsWay-finding conduit &wiring

Way-finding lights

Remove and salvage safety railingDemolish catwalk to gutterDemolish Duct banksClean & refurbish air flues

Steel curb, w/angles & reinforcementPlace walk-way concrete & cure (1)

C-Box construction: concreteReinforcement & water stopsPlace walk-way concrete & cure (2)

Install polymer panels

Reinstall railing (inc. x-passages)

C-Box construction: electricDuct-banks, power cables & conduits & taps

Power cables & conduits & tapsDuct bank splice chambers

Core drilling (on-going)Way-finding lights

Install new RGS feeders (FAD/CATWALK)

Replace LUS signage (on-going)

Luminance detection cameras

Mill-out pavementResurface roadway

Striping

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 3: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

MobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationMobilizationRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

HighwaHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenA3480 RW West MPT, effected 30 -133 03-Nov-16 23-Nov-16 A5790 A3650A5080 RW West MPT, duration (adjust at final) 500 -95 27-Nov-16 02-Apr-18 A3480 A5720

Roadway DRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadway DemolitionRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA3570 RW West Demolition all tiles 80 -45 27-Nov-16 31-Jan-17 A3480 A3740A3580 RW West Demolition polymer panels 80 -5 27-Nov-16 31-Jan-17 A3480, A579 A3950A4450 RW West Demolition of existing light fixtures 30 -45 27-Nov-16 18-Dec-16 A3570 A5720A5780 RW West Demolition all veneer panels & hardware 80 -95 27-Nov-16 31-Jan-17 A5790, A348 A4410A3610 RW West Power wash newly exposed concrete 90 -45 18-Dec-16 05-Mar-17 A3580, A357 A4430

Roadway RRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

GeneraGeneral RequireGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsGeneral RequirementsA5120 GEN West Crack Monitoring (on-going) 300 -15 27-Nov-16 20-Aug-17 A5780 A3740

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcrete

A3670 RW West Repair cracks in the roadway walls & ceilings 120 23 01-Feb-17 08-May-17 A3570, A578 A3680A3740 RW West Roadway structural concrete repair, walls & ceilings 90 -95 01-Feb-17 17-Apr-17 A3570, A512 A3760A3770 RW West Repair ceiling spalls & hollow areas (on-going) 116 113 01-Feb-17 03-May-17 A3740 A4110A5380 RW West Repair structural I beams, plates, bolts, etc. 90 83 01-Feb-17 17-Apr-17 A3670 A4430A3760 RW West X-passage structural concrete repair, walls & ceilings 28 211 25-Mar-17 17-Apr-17 A3740 A3750A3680 RW West Refurbish existing drainage chases 56 209 25-Mar-17 08-May-17 A3670, A357 A5190

CarpenCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryA4270 RW West Repairs to hanging-system 60 -15 18-Dec-16 12-Feb-17 A4220, A426 A5720

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA3730 RW West Roadway wall active & inactive crack chasing 90 220 01-Feb-17 17-Apr-17 A3740 A3950A3750 RW West X-Passage wall active & inactive crack chasing 60 243 26-Feb-17 17-Apr-17 A3760 A5190A5190 RW West Apply waterproof membrane 120 209 25-Mar-17 10-Jul-17 A3730, A375 A2870

FinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesA4420 RW West Patch existing bolts 80 15 18-Dec-16 26-Feb-17 A3650, A358 A4410A4410 RW West Install ceiling veneer panels 115 -15 13-Feb-17 15-May-17 A4420, A578 A4030A4430 RW West New ceramic tiles 242 23 25-Mar-17 20-Nov-17 A3670, A538 A4330

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA5180 RW West Roadway lighting (on-going w/ ceiling) 120 -15 13-Feb-17 19-May-17 A4410 A4030

BenchwaBenchwall (non-caBenchwall (non-cat-walk sBenchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)Benchwall (non-cat-walk side)ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A3960 BEN West Demolish benchwall & curbs 90 70 19-Feb-17 29-Apr-17 A3480, A371 A3980A6900 BEN West Clean & refurbish air flues 60 70 09-Mar-17 29-Apr-17 A3960 A3980

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA3710 BEN West Infill trench (pipe) with concrete 115 70 28-Jan-17 29-Apr-17 A3720, A516 A2870A3980 BEN West Construct Steel curb at benchwall 60 70 09-Mar-17 29-Apr-17 A3960, A690 A3990A7020 BEN West Cast benchwall 60 70 29-Apr-17 18-Jun-17 A3990 A4010

MasonrMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryA4010 BEN West Install polymer panels 60 70 23-Jul-17 28-Sep-17 A7020 A5720

PlumbiPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingPlumbingA3690 BEN West Excavate and saw-cut pipe 115 110 18-Dec-16 26-Mar-17 A3480 A3700A3700 BEN West Expose & unbolt flanges, & install new pipe & valves 115 110 18-Dec-16 26-Mar-17 A3690 A3720A3720 BEN West Charge fire-line & test system 60 110 18-Dec-16 12-Feb-17 A3700 A3710

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA5160 BEN West Heat trace fire standpipe/mains 60 70 28-Jan-17 15-Mar-17 A3720, A436 A3710A3990 BEN West Way-finding conduit &wiring 120 70 09-Mar-17 18-Jun-17 A1730, A348 A6930A6930 BEN West Way-finding lights 60 70 29-Apr-17 18-Jun-17 A3990 A5720

Cat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A3840 CATW West Remove and salvage safety railing 30 -133 27-Nov-16 18-Dec-16 A3480, A173 A3850

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

MPT, effectedMPT, duration

Demolition all tilesDemolition polymer panels

Demolition of existing light fixturesDemolition all veneer panels & hardware

Power wash newly exposed concrete

Crack Monitoring (on-going)

Repair cracks in the roadway walls & ceilingRoadway structural concrete repair, walls & c

Repair ceiling spalls & hollow areas (on-goinRepair structural I beams, plates, bolts, etc.X-passage structural concrete repair, walls &

Refurbish existing drainage chases

Repairs to hanging-system

Roadway wall active & inactive crack chasingX-Passage wall active & inactive crack chasi

Apply waterproof membrane

Patch existing boltsInstall ceiling veneer panels

New ceramic tiles

Roadway lighting (on-going w/ ceiling)

Demolish benchwall & curbsClean & refurbish air flues

Infill trench (pipe) with concreteConstruct Steel curb at benchwall

Cast benchwall

Install polymer panels

Excavate and saw-cut pipeExpose & unbolt flanges, & install new pipe & v

Charge fire-line & test system

Heat trace fire standpipe/mainsWay-finding conduit &wiringWay-finding lights

Remove and salvage safety railing

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 4: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A3850 CATW West Demolish catwalk to gutter 69 -133 27-Nov-16 28-Jan-17 A3840, A677 A5240A5240 CATW West Demolish Duct banks 69 -133 27-Nov-16 28-Jan-17 A3850, A173 A5250A3880 CATW West Clean & refurbish air flues 60 -133 23-Jan-17 05-Mar-17 A3870 A3890

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA3870 CATW West Steel curb, w/angles & reinforcement 60 -133 23-Jan-17 05-Mar-17 A3850, A524 A3880A3890 CATW West Place walk-way concrete & cure (1) 60 -133 13-Feb-17 26-Mar-17 A3880, A387 A3930A3910 CATW West C-Box construction (Concrete) 60 -120 25-Feb-17 11-Apr-17 A3740, A524 A3900A3920 CATW West Reinforcement & water stops 60 -60 21-Mar-17 02-May-17 A3910 A3930A3930 CATW West Place walk-way concrete & cure (2) 60 -60 21-Mar-17 02-May-17 A3890, A392 A4440

MasonrMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryMasonryA3950 CATW West Install polymer panels 60 165 11-Apr-17 24-May-17 A3580, A373 A4440

CarpenCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryCarpentryA4440 CATW West Reinstall railing (inc. x-passages) 75 135 02-May-17 17-Jul-17 A3950, A393 A5720

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3900 CATW West C-Box construction (electrical) 60 -120 25-Feb-17 11-Apr-17 A3910, A173 A4000A6000 CATW West Duct-banks, power cables & conduits & taps 148 -133 27-Apr-17 20-Sep-17 A5240, A389 A5250A5250 CATW West Duct bank splice chambers 90 -133 08-Jun-17 20-Sep-17 A5240, A600 A3940A5850 CATW West Core drilling 30 -47 16-Aug-17 20-Sep-17 A5240, A600 A4330A6920 CATW West Way-finding lights 60 17 20-Sep-17 27-Nov-17 A5250, A395 A5720

Fresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A3530 FAD West Install new RGS feeders (FAD/CATWALK) 130 -120 21-Mar-17 11-Jul-17 A1090, A385 A4040TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCS

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A4030 RW West Replace LUS signage (on-going) 120 -15 13-Feb-17 19-May-17 A4410, A518 A4050TLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCS

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A4330 RW West Luminance detection cameras 60 -73 31-Dec-17 07-Mar-18 A3940, A443 A5720Roadway PRoadway Pavement Roadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement Repair

RoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayHighwaHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymen

A4100 RW West Mill-out pavement 70 114 02-May-17 11-Jul-17 A3930 A4110A4110 RW West Resurface roadway 60 109 08-May-17 05-Jul-17 A4100, A377 A5220A5220 RW West Striping 36 109 05-Jul-17 14-Aug-17 A4110 A5720

Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctEastEastEastEastEastEastEastEastEastEast

FAD DemolFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA1700 FAD East Demolition debris from flues 48 201 24-Jul-14 30-Aug-14 A1030 A1710A1180 FAD East Demolition all lighting and branch wiring 40 329 13-Aug-14 14-Sep-14 A1030 A5790A1190 FAD East Demolition cathodic protection system 18 351 13-Aug-14 30-Aug-14 A1030 A1750A1200 FAD East Demolition sedimentation & debris 40 189 13-Aug-14 14-Sep-14 A1030 A5810

FAD RepairFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA5750 FAD East Power wash newly exposed concrete 90 189 13-Aug-14 25-Oct-14 A1200 A1740

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1690 FAD East FAD structural concrete repair 115 189 04-Sep-14 07-Dec-14 A1140, A575 A1720A1710 FAD East Repair flues 60 189 04-Sep-14 25-Oct-14 A1700, A169 A1720A1770 FAD East FAD active & inactive crack chasing: walls & ceiling 115 224 04-Sep-14 07-Dec-14 A1690, A114 A1740A1720 FAD East Repair cracking & spalling: walls & ceiling 120 189 28-Sep-14 05-Jan-15 A1710, A169 A1740

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA5810 FAD East Apply corrosion inhibitor 120 309 28-Sep-14 05-Jan-15 A1720, A120 A1740

FinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishes

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Demolish catwalk to gutterDemolish Duct banks

Clean & refurbish air flues

Steel curb, w/angles & reinforcementPlace walk-way concrete & cure (1)

C-Box construction (Concrete)Reinforcement & water stopsPlace walk-way concrete & cure (2)

Install polymer panels

Reinstall railing (inc. x-passages)

C-Box construction (electrical)Duct-banks, power cables & coDuct bank splice chambersCore drilling

Way-finding lights

Install new RGS feeders (FAD/CATWA

Replace LUS signage (on-going)

Luminance detec

Mill-out pavementResurface roadway

Striping

Demolition debris from fluesDemolition all lighting and branch wiring

Demolition cathodic protection systemDemolition sedimentation & debris

Power wash newly exposed concrete

FAD structural concrete repairRepair flues

FAD active & inactive crack chasing: walls & ceilingRepair cracking & spalling: walls & ceiling

Apply corrosion inhibitor

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 5: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A1760 FAD East Paint FAD MHs and APs 90 366 25-Jun-15 30-Aug-15 A1420 A5790ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A1420 FAD East Permanent FAD J boxes for C boxes 120 40 18-Mar-15 25-Jun-15 A1410 A3850ProcesProcess IntegraProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess Integration

A1750 FAD East Reinstall cathodic protection system 34 366 30-Aug-15 27-Sep-15 A1190, A174 A5790WestWestWestWestWestWestWestWestWestWest

FAD DemolFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFAD DemolitionFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA3620 FAD West Demolition all lighting and branch wiring 40 36 03-Nov-16 06-Dec-16 A4140 A5760A3630 FAD West Demolition cathodic protection system 18 58 03-Nov-16 19-Nov-16 A3480 A4190A3640 FAD West Demolition sedimentation & debris 40 36 03-Nov-16 06-Dec-16 A3480 A4130A4140 FAD West Demolition debris from flues 48 28 03-Nov-16 15-Dec-16 A3480 A4150

FAD RepairFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA5760 FAD West Power wash newly exposed concrete 90 28 15-Dec-16 25-Feb-17 A4140, A362 A4130

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA4160 FAD West Repair cracking & spalling: walls & ceiling 120 28 11-Dec-16 20-Mar-17 A4130 A4180A4130 FAD West FAD structural concrete repair 115 28 15-Dec-16 20-Mar-17 A3640, A348 A4160A4210 FAD West FAD active & inactive crack chasing: walls & ceiling 115 118 15-Dec-16 20-Mar-17 A4130 A4180A4150 FAD West Repair flues 60 118 29-Jan-17 20-Mar-17 A4140, A413 A5820

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA5820 FAD West Apply corrosion inhibitor 120 118 20-Mar-17 26-Jun-17 A4160, A421 A4180

FinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesFinishesA4200 FAD West Paint FAD MHs and APs 90 28 20-Mar-17 22-May-17 A4160 A5720

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3860 FAD West Permanent FAD J boxes for C & E boxes 120 -84 28-Jan-17 30-Apr-17 A3850 A4180A4180 FAD West Reinstall lighting system 120 -47 16-Aug-17 31-Dec-17 A4210, A416 A4190

ProcesProcess IntegraProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationProcess IntegrationA4190 FAD West Reinstall cathodic protection system 34 -47 31-Dec-17 06-Feb-18 A3630, A418 A5720

Exhaust Air DuExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctEastEastEastEastEastEastEastEastEastEast

EAD DemoEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionExhaust AExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air Duct

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA1210 EAD East Demolition all lighting and branch wiring 40 175 24-Jul-14 25-Aug-14 A1030 A1810A1220 EAD East Power wash newly exposed concrete 90 125 28-Sep-14 11-Dec-14 A1230 A1810

EAD RepairEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsExhaust AExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air Duct

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1780 EAD East EAD structural concrete repair: floor 120 125 28-Sep-14 05-Jan-15 A1030, A121 A1790A1790 EAD East Repair cracking & spalling: floor 120 174 29-Nov-14 02-Mar-15 A1780, A168 A1800

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA1680 EAD East EAD active & inactive crack chasing 79 125 28-Oct-14 05-Jan-15 A1780 A1800A2910 EAD East Apply waterproof membrane 120 125 05-Jan-15 13-Apr-15 A1790, A168 A1800A1800 EAD East Apply corrosion inhibitor 120 215 26-Jan-15 04-May-15 A1680, A179 A1810

HVACHVACHVACHVACHVACHVACHVACHVACHVACHVACA1820 EAD East Repair exhaust air ports 60 204 28-Oct-14 20-Dec-14 A1680 A1830

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA5800 EAD East New branch wiring 90 143 18-Jan-15 29-Mar-15 A1210, A187 A1810A1810 EAD East Reinstall lighting fixtures 180 143 08-Feb-15 01-Jul-15 A1210, A122 A2200

WestWestWestWestWestWestWestWestWestWestEAD DemoEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD DemolitionEAD Demolition

Exhaust AExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A3650 EAD West Demolition all lighting and branch wiring 40 65 03-Nov-16 06-Dec-16 A3480 A4420

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Paint FAD MHs and APs

Permanent FAD J boxes for C boxes

Reinstall cathodic protection system

Demolition all lighting and branch wiringDemolition cathodic protection system

Demolition sedimentation & debrisDemolition debris from flues

Power wash newly exposed concrete

Repair cracking & spalling: walls & ceilingFAD structural concrete repairFAD active & inactive crack chasing: walls & ceRepair flues

Apply corrosion inhibitor

Paint FAD MHs and APs

Permanent FAD J boxes for C & E boxesReinstall lighting system

Reinstall cathodic p

Demolition all lighting and branch wiringPower wash newly exposed concrete

EAD structural concrete repair: floorRepair cracking & spalling: floor

EAD active & inactive crack chasingApply waterproof membrane

Apply corrosion inhibitor

Repair exhaust air ports

New branch wiringReinstall lighting fixtures

Demolition all lighting and branch wiring

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 6: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A3660 EAD West Power wash newly exposed concrete 90 -15 03-Nov-16 23-Jan-17 A3480 A4250EAD RepairEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD RepairsEAD Repairs

Exhaust AExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctExhaust Air DuctConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcrete

A4220 EAD West EAD structural concrete repair: floor 80 -15 27-Nov-16 31-Jan-17 A3480, A366 A4230A4230 EAD West Repair cracking & spalling: floor 120 15 18-Dec-16 26-Mar-17 A4220, A412 A4240

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA4120 EAD West EAD active & inactive crack chasing 79 -4 27-Nov-16 31-Jan-17 A4220 A4240A5170 EAD West Apply waterproof membrane 120 75 13-Feb-17 19-May-17 A4230, A412 A4240A4240 EAD West Apply corrosion inhibitor 120 15 27-Apr-17 20-Aug-17 A4120, A423 A4250

HVACHVACHVACHVACHVACHVACHVACHVACHVACHVACA4260 EAD West Repair exhaust air ports 60 -4 16-Dec-16 31-Jan-17 A4120 A4270

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3790 EAD West New branch wiring 90 15 27-Apr-17 17-Jul-17 A3650, A187 A4250A4250 EAD West Reinstall lighting fixtures (on-going) 180 15 19-May-17 29-Nov-17 A3660, A424 A5720

EAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEastEastEastEastEastEastEastEastEastEast

FAD RepairFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FAD

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA1740 EAD/F East Reinstall lighting system 120 189 05-Jan-15 13-Apr-15 A1770, A172 A1750A1930 EAD/F East Conduits & cable 180 0 01-Mar-15 26-Jul-15 A1140, A186 A2900

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmA1640 EAD/F East Mass Notification systems: East 120 135 25-Aug-15 22-Nov-15 A1560, A193 A1650

System InfrSystem InfrastructuSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FAD

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmA1650 EAD/F East Test & commission FA 180 42 10-Nov-15 03-Apr-16 A1640, A111 A2080

TVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FAD

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA1950 EAD/F East Air duct control panels 120 42 23-Jun-15 26-Sep-15 A2910, A150 A2560

WestWestWestWestWestWestWestWestWestWestFAD RepairFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD RepairsFAD Repairs

EAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A4360 EAD/F West Conduits & cable 120 5 07-Dec-16 15-Mar-17 A3480, A186 A4380A4370 EAD/F West Lighting & receptacles: EAD/FAD W 120 5 07-Dec-16 15-Mar-17 A4360 A6820

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmA4080 EAD/F West Mass Notification systems west 120 -133 13-Jul-17 27-Nov-17 A6810, A394 A6060

TVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FAD

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA4380 EAD/F West Air duct control panels 120 65 15-Mar-17 22-Jun-17 A4360 A5720

CommunicatioCommunicationCommunicationCommunicationCommunicationCommunicationCommunicationCommunicationCommunicationCommunicationE/WE/WE/WE/WE/WE/WE/WE/WE/WE/W

Bench TestBench TestingBench TestingBench TestingBench TestingBench TestingBench TestingBench TestingBench TestingBench TestingGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3490 GEN EW System Bench Tests TSCS 135 62 11-Dec-14 18-Jun-15 A6170, A633 A2610A6840 GEN EW System Bench Tests VMS 135 58 11-Dec-14 18-Jun-15 A6320, A647 A3340A6850 GEN EW System Bench Tests LUS 135 92 11-Dec-14 18-Jun-15 A6240, A640 A6490

TSCS LoopTSCS Loop B SwitcTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overTSCS Loop B Switch-overGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA4170 GEN EW Replace Loop B MMFO and test: TSCSB 120 -141 11-Dec-14 24-Mar-15 A6570, A696 A4280

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Power wash newly exposed concrete

EAD structural concrete repair: floorRepair cracking & spalling: floor

EAD active & inactive crack chasingApply waterproof membrane

Apply corrosion inhibitor

Repair exhaust air ports

New branch wiringReinstall lighting fixtures (

Reinstall lighting systemConduits & cable

Mass Notification systems: East

Test & commission FA

Air duct control panels

Conduits & cableLighting & receptacles: EAD/FAD W

Mass Notification systems

Air duct control panels

System Bench Tests TSCSSystem Bench Tests VMSSystem Bench Tests LUS

Replace Loop B MMFO and test: TSCSB

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 7: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A4280 GEN EW Splice Loop B into BVB/BSB patch panels: TSCSB 60 -141 24-Mar-15 04-May-15 A4170, A331 A4290A4290 GEN EW Continuity testing: TSCSB 60 -141 04-May-15 27-Jun-15 A4280 A2610

TSCS LoopTSCS Loop A SwitchTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overTSCS Loop A Switch-overGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6580 GEN EW Replace Loop A MMFO and test: TSCSA 120 -141 27-Jun-15 27-Sep-15 A6570, A429 A6590A6590 GEN EW Splice Loop A into BVB/BSB patch panels: TSCSA 60 -141 27-Sep-15 19-Nov-15 A6580, A330 A6600A6600 GEN EW Continuity testing: TSCSA 60 -141 19-Nov-15 04-Jan-16 A6590 A2610

Video SurvVideo Surveillance SVideo Surveillance Switch-ovVideo Surveillance Switch-overVideo Surveillance Switch-overVideo Surveillance Switch-overVideo Surveillance Switch-overVideo Surveillance Switch-overVideo Surveillance Switch-overVideo Surveillance Switch-overFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6610 FAD EW Connect temp FO at camera modem and patch panels 60 376 28-Sep-14 19-Nov-14 A1070, A620 A1600

Siemens ScSiemens Scalance ESiemens Scalance Ethernet LSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overSiemens Scalance Ethernet Loop B Switch-overFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6620 FAD EW Replace Siemens Loop B SMFO: SiemensB 120 125 05-Jan-15 13-Apr-15 A2370, A330 A6630A6630 FAD EW Splice Temp. E-Net FO: SiemensB 60 125 13-Apr-15 31-May-15 A3310, A330 A6640A6640 FAD EW Continuity testing: SiemensB 60 125 31-May-15 22-Jul-15 A6630 A6650

Siemens ScSiemens Scalance ESiemens Scalance Ethernet LSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overSiemens Scalance Ethernet Loop A Switch-overFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6650 FAD EW Replace Siemens Loop A SMFO: SiemensA 120 125 22-Jul-15 24-Oct-15 A2370, A330 A6660A6660 FAD EW Splice Temp. E-Net FO: SiemensA 60 125 24-Oct-15 13-Dec-15 A6650, A330 A6670A6670 FAD EW Continuity testing: SiemensA 60 125 13-Dec-15 31-Jan-16 A6660 A5790

TD, ISD, VeTD, ISD, Vent BuildiTD, ISD, Vent Buildings SwitTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overTD, ISD, Vent Buildings Switch-overGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA4300 GEN EW Replace SMFO for TD/ISD 120 166 05-Jan-15 13-Apr-15 A2370, A330 A4310A4310 GEN EW Splice TD/ISD connections 60 166 13-Apr-15 31-May-15 A4300, A331 A6680A6680 GEN EW Continuity testing: TD/ISD 60 166 31-May-15 22-Jul-15 A4310 A5790

Verizon SwVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overVerizon Switch-overGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6690 GEN EW Replace SMFO for Verizon 120 166 05-Jan-15 13-Apr-15 A2370, A330 A6700A6700 GEN EW Splice Verizon connections 60 166 13-Apr-15 31-May-15 A6690, A330 A6710A6710 GEN EW Continuity testing: Verizon 60 166 31-May-15 22-Jul-15 A6700 A5790

EastEastEastEastEastEastEastEastEastEastMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestones

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A6570 GEN East Continuity testing of temp FO: east 60 -79 01-Oct-14 28-Nov-14 A1110, A656 A4170A2040 GEN East Systems Integration complete: east 0 -133 03-Nov-16 A2080, A205 A2020

Temp. FO DTemp. FO DistributioTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA1070 FAD East Temp. SMFO for CCTV 60 -79 13-Aug-14 28-Sep-14 A3310, A330 A1100A1110 FAD East Temp. FO Terminations 60 -79 13-Aug-14 28-Sep-14 A1070, A314 A1650A2270 FAD East Temp. MMFO for TSCS 60 -79 13-Aug-14 28-Sep-14 A3310, A330 A1070A3140 FAD East Temp. SMFO for TVCS 60 -79 13-Aug-14 28-Sep-14 A3300, A331 A2470A1100 FAD East Temp. SMFO for Tech. & ISD 60 -79 13-Aug-14 28-Sep-14 A2370, A107 A3590A6560 FAD East Temp. SMFO for Verizon 60 -11 13-Aug-14 28-Sep-14 A3140 A2040

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3520 GEN East Install building VOIP & E-box 120 102 10-Nov-15 22-Feb-16 A6190, A111 A2550A3590 GEN East Install access control 120 192 10-Nov-15 22-Feb-16 A6180, A111 A2040

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Splice Loop B into BVB/BSB patch panels: TSCSBContinuity testing: TSCSB

Replace Loop A MMFO and test: TSCSASplice Loop A into BVB/BSB patch panels: TSCSA

Continuity testing: TSCSA

Connect temp FO at camera modem and patch panels

Replace Siemens Loop B SMFO: SiemensBSplice Temp. E-Net FO: SiemensB

Continuity testing: SiemensB

Replace Siemens Loop A SMFO: SiemensASplice Temp. E-Net FO: SiemensA

Continuity testing: SiemensA

Replace SMFO for TD/ISDSplice TD/ISD connections

Continuity testing: TD/ISD

Replace SMFO for VerizonSplice Verizon connections

Continuity testing: Verizon

Continuity testing of temp FO: eastSystems Integration complete: east

Temp. SMFO for CCTVTemp. FO TerminationsTemp. MMFO for TSCSTemp. SMFO for TVCSTemp. SMFO for Tech. & ISDTemp. SMFO for Verizon

Install building VOIP & E-boxInstall access control

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 8: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A1610 GEN East Test & Commission VMS, LUS, TSCS & CCTV (on-going) 180 -79 22-Feb-16 13-Jul-16 A1560, A225 A6010SystemSystems IntegraSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems Integration

A2590 GEN East Coordination with NYPD, NYDOT, & Verizon (on-going) 180 132 10-Nov-15 03-Apr-16 A6390, A150 A2040A2540 GEN East Systems integration: DPCS 90 143 17-Jan-16 27-Mar-16 A2660, A238 A2040A2050 GEN East Systems integration: CCTV 90 67 17-Mar-16 28-May-16 A2350, A230 A2040A2530 GEN East Systems integration: TLCS 90 48 28-Mar-16 13-Jun-16 A2890, A219 A2040A2080 GEN East Systems integration: FA 90 42 03-Apr-16 21-Jun-16 A2690, A274 A2040A2560 GEN East Systems integration: TVCS 90 42 03-Apr-16 21-Jun-16 A2280, A195 A2040A3110 GEN East Systems integration: Mass Notification Systems 90 42 03-Apr-16 21-Jun-16 A2080, A164 A2040A2060 GEN East Systems integration: VMS 90 -79 13-Jul-16 24-Sep-16 A1610, A334 A2040A2130 GEN East Systems integration: LUS 90 -79 13-Jul-16 24-Sep-16 A1610 A2040A2550 GEN East Systems integration: Building VoIP 90 -79 13-Jul-16 24-Sep-16 A3520, A206 A2040A2920 GEN East Systems integration Win/Barco 90 -79 13-Jul-16 24-Sep-16 A1610, A205 A2040A3040 GEN East Systems integration TSCS 90 -133 27-Aug-16 03-Nov-16 A1610, A309 A2040

Cat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A1500 CATW East C-Box Equipment Panels 180 -79 23-Jun-15 10-Nov-15 A1460, A149 A1900A1560 CATW East C-Box FO wiring & termination 180 0 28-Jun-15 21-Nov-15 A1460, A138 A1610

System InfrSystem InfrastructuSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3290 GEN East Test & Troubleshoot existing TLCS 60 -79 13-Aug-14 28-Sep-14 A1030 A2160A6200 GEN East Test & Troubleshoot : CCTV 60 376 13-Aug-14 28-Sep-14 A1030 A2570A6320 GEN East Test & Troubleshoot: VMS 60 102 13-Aug-14 28-Sep-14 A1030 A3340A6220 GEN East Test & Troubleshoot : FA 60 710 13-Aug-14 28-Sep-14 A1030 A2670A6250 GEN East Test & Troubleshoot: NYPD 60 815 13-Aug-14 28-Sep-14 A1030 A5150A6260 GEN East Test & Troubleshoot: NYSDOT 60 815 13-Aug-14 28-Sep-14 A1030 A5150A6310 GEN East Test & Troubleshoot Verizon 60 815 13-Aug-14 28-Sep-14 A1030 A5150A6240 GEN East Test & Troubleshoot LUS 60 155 13-Aug-14 28-Sep-14 A1030 A2030A6210 GEN East Test & Troubleshoot DPCS 60 394 13-Aug-14 28-Sep-14 A1030 A2660A6190 GEN East Test & Troubleshoot : Building VoIP 60 605 13-Aug-14 28-Sep-14 A1030 A3520A6300 GEN East Test & Troubleshoot: TVCS 60 -141 13-Aug-14 28-Sep-14 A1030 A2470A6170 GEN East Test & Troubleshoot TSCS 60 106 13-Aug-14 28-Sep-14 A1030 A2640A6180 GEN East Test & Troubleshoot : Access Control 60 695 13-Aug-14 28-Sep-14 A1030 A3590A6270 GEN East Test & Troubleshoot: Power Monitoring 60 815 13-Aug-14 28-Sep-14 A1030 A2040A6390 GEN East Test & Troubleshoot Mass Notification Systems 60 317 13-Aug-14 28-Sep-14 A1030 A2850

TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2030 GEN East Install LUS 60 -19 10-Nov-15 24-Dec-15 A6240, A111 A1610A3340 GEN East Install VMS 120 -79 10-Nov-15 22-Feb-16 A6320, A111 A2060

Cat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A1600 CATW East Replace CCTVs 60 0 21-Nov-15 07-Jan-16 A1560, A107 A1610WestWestWestWestWestWestWestWestWestWest

MilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6960 GEN West Continuity testing of temp FO: west 60 -111 19-Nov-14 05-Jan-15 A6770 A4170A6480 GEN West Systems Integration complete: west 0 -133 14-May-18 A6010, A603 A5720

Temp. FO DTemp. FO DistributioTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionTemp. FO DistributionFresh Air Fresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air DuctFresh Air Duct

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA6730 FAD West Temp. SMFO for CCTV 60 -141 28-Sep-14 19-Nov-14 A6740, A636 A6760A6770 FAD West Temp. FO Terminations 60 -141 28-Sep-14 19-Nov-14 A6730, A675 A6780A6740 FAD West Temp. MMFO for TSCS 60 -141 28-Sep-14 19-Nov-14 A3300, A331 A6730A6750 FAD West Temp. SMFO for TVCS 60 -141 28-Sep-14 19-Nov-14 A6730, A630 A6770A6760 FAD West Temp. SMFO for Tech. & ISD 60 -141 28-Sep-14 19-Nov-14 A6730, A681 A6770A6780 FAD West Temp. SMFO for Verizon 60 -111 28-Sep-14 19-Nov-14 A6740, A677 A6480

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Test & Commission VMS, LUS, TSCS & CCTV (on-going)

Coordination with NYPD, NYDOT, & Verizon (on-going)Systems integration: DPCS

Systems integration: CCTVSystems integration: TLCSSystems integration: FASystems integration: TVCSSystems integration: Mass Notification Systems

Systems integration: VMSSystems integration: LUSSystems integration: Building VoIPSystems integration Win/Barco

Systems integration TSCS

C-Box Equipment PanelsC-Box FO wiring & termination

Test & Troubleshoot existing TLCSTest & Troubleshoot : CCTVTest & Troubleshoot: VMSTest & Troubleshoot : FATest & Troubleshoot: NYPDTest & Troubleshoot: NYSDOTTest & Troubleshoot VerizonTest & Troubleshoot LUSTest & Troubleshoot DPCSTest & Troubleshoot : Building VoIPTest & Troubleshoot: TVCSTest & Troubleshoot TSCSTest & Troubleshoot : Access ControlTest & Troubleshoot: Power MonitoringTest & Troubleshoot Mass Notification Systems

Install LUSInstall VMS

Replace CCTVs

Continuity testing of temp FO: westSystems In

Temp. SMFO for CCTVTemp. FO TerminationsTemp. MMFO for TSCSTemp. SMFO for TVCSTemp. SMFO for Tech. & ISDTemp. SMFO for Verizon

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 9: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA4050 GEN West Test & Commission VMS, LUS, TSCS & CCTV (on-going) 120 -120 06-Sep-17 18-Jan-18 A4040, A403 A6080A6520 GEN West Install building VOIP & E-box 120 -120 06-Sep-17 18-Jan-18 A6350, A353 A6030A6830 GEN West Install access control 120 -30 06-Sep-17 18-Jan-18 A6760, A677 A6480

SystemSystems IntegraSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationSystems IntegrationA6820 GEN West Systems integration: Mass Notification Systems 90 5 15-Mar-17 21-May-17 A4370 A6480A6050 GEN West Systems integration: DPCS 90 165 26-Mar-17 12-Jun-17 A2660, A238 A6480A6800 GEN West Coordination with NYPD, NYDOT, & Verizon systems 180 5 21-May-17 11-Dec-17 A6820 A5720A6130 GEN West Systems integration: TLCS 90 65 22-Jun-17 04-Oct-17 A2160, A220 A6480A6140 GEN West Systems integration: TVCS 90 65 22-Jun-17 04-Oct-17 A2470, A340 A6480A6040 GEN West Systems integration: CCTV 90 -120 18-Jan-18 30-Apr-18 A4050 A6480A6160 GEN West Systems integration: VMS 90 -120 18-Jan-18 30-Apr-18 A6500, A405 A6480A6080 GEN West Systems integration: LUS 90 -120 18-Jan-18 30-Apr-18 A1610, A405 A6480A6030 GEN West Systems integration: Building VoIP 90 -120 18-Jan-18 30-Apr-18 A6520, A353 A6480A6010 GEN West Systems integration TSCS 90 -120 18-Jan-18 30-Apr-18 A1610, A405 A6480A6060 GEN West Systems integration: FA 90 -133 01-Feb-18 14-May-18 A4090, A275 A6480

Roadway RRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-Walk

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA4000 CATW West C-Box FO wiring & termination 180 -120 21-Mar-17 06-Sep-17 A3900, A103 A4050A3940 CATW West C-Box Equipment Panels 180 -133 08-Jun-17 31-Dec-17 A3900, A393 A4330

System InfrSystem InfrastructuSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureSystem InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA6360 GEN West Test & Troubleshoot : CCTV 60 -141 13-Aug-14 28-Sep-14 A1030 A2570A6470 GEN West Test & Troubleshoot: VMS 60 -141 13-Aug-14 28-Sep-14 A1030 A6500A6380 GEN West Test & Troubleshoot : FA 60 -141 13-Aug-14 28-Sep-14 A1030 A2670A6400 GEN West Test & Troubleshoot LUS 60 -141 13-Aug-14 28-Sep-14 A1030 A6490A6370 GEN West Test & Troubleshoot DPCS 60 -141 13-Aug-14 28-Sep-14 A1030 A5860A6350 GEN West Test & Troubleshoot : Building VoIP 60 -141 13-Aug-14 28-Sep-14 A1030 A6520A6450 GEN West Test & Troubleshoot: TVCS 60 -141 13-Aug-14 28-Sep-14 A1030 A6750A6330 GEN West Test & Troubleshoot TSCS 60 -141 13-Aug-14 28-Sep-14 A6360 A2610A6340 GEN West Test & Troubleshoot : Access Control 60 -141 13-Aug-14 28-Sep-14 A1030 A6480A6430 GEN West Test & Troubleshoot: Power Monitoring 60 -141 13-Aug-14 28-Sep-14 A1030 A6480A6810 GEN West Test & Troubleshoot Mass Notification Systems 60 -141 13-Aug-14 28-Sep-14 A6430 A6480

EAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADEAD/FADFire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm

A4090 EAD/F West Test & commission FA 180 -133 13-Jul-17 01-Feb-18 A4080 A6060TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCS

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A6490 GEN West Install LUS system 60 0 02-May-17 28-Jun-17 A6400, A353 A4050A6500 GEN West Install VMS 120 -120 02-May-17 06-Sep-17 A6470, A353 A6160

Cat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkCat-WalkComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A4040 CATW West Replace CCTVs 60 -30 02-May-17 28-Jun-17 A4000, A353 A4050Brooklyn PlazBrooklyn Plaza Pump Brooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump StationBrooklyn Plaza Pump Station

+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+GradeBuilding InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding Infrastructure

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A2360 GEN +Grade Demolish equipment & cabling 23 368 27-Jan-15 26-Feb-15 A2400, A258 A5790A2400 GEN +Grade Demolish pump rooms & equipment 30 368 27-Jan-15 10-Mar-15 A2420, A588 A2360A2410 GEN +Grade Demolish pump rooms & equipment 30 360 27-Jan-15 10-Mar-15 A2420, A588 A5790

MechanMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalA2420 GEN +Grade Install pump room equipment 96 210 15-Sep-14 27-Jan-15 A1730, A288 A2380

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Test & Commission VInstall building VOIP Install access contro

Systems integration: Mass Notification SysSystems integration: DPCS

Coordination with NYPDSystems integration: TLCSSystems integration: TVCS

Systems intSystems intSystems intSystems intSystems intSystems in

C-Box FO wiring & terminationC-Box Equipment Pan

Test & Troubleshoot : CCTVTest & Troubleshoot: VMSTest & Troubleshoot : FATest & Troubleshoot LUSTest & Troubleshoot DPCSTest & Troubleshoot : Building VoIPTest & Troubleshoot: TVCSTest & Troubleshoot TSCSTest & Troubleshoot : Access ControlTest & Troubleshoot: Power MonitoringTest & Troubleshoot Mass Notification Systems

Test & commission

Install LUS systemInstall VMS

Replace CCTVs

Demolish equipment & cablingDemolish pump rooms & equipmentDemolish pump rooms & equipment

Install pump room equipment

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 10: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A5880 GEN +Grade Install temp pump system (P 3, 4, 5) 96 230 15-Sep-14 27-Jan-15 A2880 A2410ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A2880 GEN +Grade Conduit & wiring 90 210 04-Aug-14 05-Dec-14 A1730 A2420DPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCS

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralComm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A2580 GEN +Grade Install new DPCS system 60 210 27-Oct-14 16-Jan-15 A2420, A621 A2380A2390 GEN +Grade DPCS Testing & Commissioning 60 210 19-Jan-15 10-Apr-15 A5880, A258 A2380A2380 GEN +Grade DPCS programming 120 247 20-Jul-15 24-Oct-15 A2420, A258 A6050

Brooklyn ServBrooklyn Service BuildBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service BuildingBrooklyn Service Building+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Building InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3150 GEN +Grade Install new RGS feeders 60 110 04-Aug-14 24-Oct-14 A1730 A2330A2330 GEN +Grade Install new cabling 60 110 27-Oct-14 16-Jan-15 A3150, A688 A2610A6880 GEN +Grade New power & lighting panels 60 110 27-Oct-14 16-Jan-15 A3150 A2330

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA2320 GEN +Grade Demolish conduit, cabling, & equipment 60 192 24-Dec-15 22-Feb-16 A1030, A318 A5790

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3300 GEN +Grade Patch panels: BSB 30 -47 13-Aug-14 24-Sep-14 A1730, A103 A1120A1120 GEN +Grade FO core switches 60 134 26-Jan-15 20-Apr-15 A3300, A109 A1620A1620 GEN +Grade WinCC & Barco systems 60 40 31-Aug-15 23-Nov-15 A1560, A233 A2350A2570 GEN +Grade CCTV Networks 60 40 31-Aug-15 20-Nov-15 A1620, A233 A2350A3180 GEN +Grade Testing & Commissioning: CCTV/WinCC & Barco 120 67 31-Aug-15 09-Dec-15 A1620, A257 A2320A2350 GEN +Grade Programming: CCTV/WinCC & Barco 120 67 09-Dec-15 17-Mar-16 A1620, A257 A2050

TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3080 GEN +Grade TSCS Wiring 60 110 19-Jan-15 10-Apr-15 A6330, A315 A3090A2610 GEN +Grade Install new TSCS 60 -80 04-Jan-16 28-Mar-16 A2330, A308 A3090A3100 GEN +Grade Testing & Commissioning: TSCS 120 -133 16-Feb-16 23-May-16 A3080, A261 A3090A3090 GEN +Grade TSCS Programming 120 -133 23-May-16 27-Aug-16 A3080, A261 A3040

TVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2620 GEN +Grade Install new TVCS 60 194 19-Jan-15 10-Apr-15 A2330, A330 A2340A2340 GEN +Grade Testing & Commissioning: TVCS 120 132 26-Sep-15 24-Dec-15 A2620, A111 A3400A3400 GEN +Grade TVCS programming 120 132 24-Dec-15 03-Apr-16 A2620, A234 A6140

Brooklyn VentBrooklyn Ventilation BBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation BuildingBrooklyn Ventilation Building+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Building InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA3170 GEN +Grade Demolish conduit, wiring, & equipment 60 375 02-Aug-15 24-Sep-15 A2700, A269 A2020A3190 GEN +Grade Demolish FACPs 20 415 02-Aug-15 23-Aug-15 A2690, A270 A2020A2670 GEN +Grade Demolish fire standpipe & riser system 60 170 13-Dec-15 31-Jan-16 A2680, A271 A5790A2430 GEN +Grade Demolish existing MDP,s, DPs, MCCs, DPCSs & wiring 45 170 31-Jan-16 03-Mar-16 A1860, A306 A5790

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA1960 GEN +Grade Concrete repair 45 140 14-Jul-14 12-Sep-14 A1730 A2680

Fire SuFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionA2680 GEN +Grade Install new fire standpipes & risers 60 166 15-Sep-14 05-Dec-14 A1960, A173 A2690

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA1860 GEN +Grade Replace LPs at BVB, new cabling to EAD 60 90 04-Aug-14 24-Oct-14 A1030, A173 A1910A3160 GEN +Grade Install new RGS feeders 60 90 01-Sep-14 21-Nov-14 A1730, A103 A3050

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Install temp pump system (P 3, 4, 5)

Conduit & wiring

Install new DPCS systemDPCS Testing & Commissioning

DPCS programming

Install new RGS feedersInstall new cablingNew power & lighting panels

Demolish conduit, cabling, & equipment

Patch panels: BSBFO core switches

WinCC & Barco systemsCCTV Networks

Testing & Commissioning: CCTV/WinCC & BarcoProgramming: CCTV/WinCC & Barco

TSCS WiringInstall new TSCS

Testing & Commissioning: TSCSTSCS Programming

Install new TVCSTesting & Commissioning: TVCS

TVCS programming

Demolish conduit, wiring, & equipmentDemolish FACPs

Demolish fire standpipe & riser systemDemolish existing MDP,s, DPs, MCCs, DPCSs & wiring

Concrete repair

Install new fire standpipes & risers

Replace LPs at BVB, new cabling to EADInstall new RGS feeders

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 11: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A2440 GEN +Grade New power & lighting panels 60 90 24-Nov-14 13-Feb-15 A1860, A196 A1920A2850 GEN +Grade New FA cabling 60 116 05-Jan-15 27-Mar-15 A3160, A639 A2690

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmA2690 GEN +Grade Install new FACPs 60 116 30-Mar-15 19-Jun-15 A2680, A285 A2700A2700 GEN +Grade Program FACPs 60 199 11-May-15 31-Jul-15 A2690, A128 A3170A2710 GEN +Grade Testing & Commissioning: FA 180 170 22-Jul-15 13-Dec-15 A2690, A268 A3070

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3310 GEN +Grade Patch panels: BVB 30 -47 13-Aug-14 24-Sep-14 A1730, A103 A3280A3280 GEN +Grade FO core switches 60 229 26-Jan-15 20-Apr-15 A3310, A109 A2040A2600 GEN +Grade WinCC & Barco systems 60 75 23-Nov-15 12-Feb-16 A1560, A244 A3070A3070 GEN +Grade Testing & Commissioning: Win/Barco 120 126 03-Jan-16 10-Apr-16 A2600, A271 A2040

TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3460 GEN +Grade TSCS conduit 60 90 16-Feb-15 08-May-15 A2440, A333 A3050A3050 GEN +Grade TSCS Wiring 60 90 30-Mar-15 19-Jun-15 A1890, A316 A3470A3470 GEN +Grade TSCS equipment 60 90 11-May-15 31-Jul-15 A3050, A331 A1910

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA3060 GEN +Grade Testing & Commissioning: TSCS 120 132 14-Jul-15 21-Oct-15 A3470, A111 A2430A1910 GEN +Grade TSCS Programming 120 132 21-Oct-15 29-Jan-16 A1860, A187 A6010

TLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3330 GEN +Grade TLCS conduit 60 170 27-Oct-14 16-Jan-15 A1860 A1890A1890 GEN +Grade TLCS Wiring 60 110 02-Mar-15 22-May-15 A3330, A324 A2160

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2160 GEN +Grade Install TLCS 60 109 13-Apr-15 06-Jul-15 A1890, A186 A1920A1920 GEN +Grade Testing & Commissioning: TLCS 120 143 01-Jul-15 06-Oct-15 A2160, A244 A2890A2890 GEN +Grade Programming: TLCS 120 143 06-Oct-15 14-Jan-16 A2160, A192 A2530

Governors IslaGovernors Island VentGovernors Island Vent BuildinGovernors Island Vent BuildingGovernors Island Vent BuildingGovernors Island Vent BuildingGovernors Island Vent BuildingGovernors Island Vent BuildingGovernors Island Vent BuildingGovernors Island Vent Building+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Building InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureGovernmGovernment IslanGovernment Island Vent BGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent Building

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA2520 GIVB +Grade Demolish existing MDP,s, DPs, MCCs, control panels &wirin 23 35 08-Dec-14 07-Jan-15 A1730, A231 A5790A3360 GIVB +Grade Demolish RGS feeders 10 327 13-Apr-15 24-Apr-15 A5910 A5790A5960 GIVB +Grade Demolish drainage pump rooms & equipment 30 301 21-Apr-15 01-Jun-15 A5930, A594 A5790A2240 GIVB +Grade Demolition existing TEL/COMM DATA systems 15 292 25-May-15 12-Jun-15 A2300 A5790A3010 GIVB +Grade Demolish fire standpipe & riser system 10 267 06-Jul-15 17-Jul-15 A3030, A622 A5790A2220 GIVB +Grade Demolish san pump rooms & equipment 30 232 27-Jul-15 04-Sep-15 A5900, A343 A5790A6860 GIVB +Grade Demolish TVCS 15 138 24-Dec-15 14-Jan-16 A2290 A5790

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA3120 GIVB +Grade Concrete repair 45 35 08-Dec-14 06-Feb-15 A1730, A252 A3020

Fire SuFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionA3020 GIVB +Grade Install new fire standpipes & risers 60 114 09-Feb-15 01-May-15 A3120 A3030A3030 GIVB +Grade Testing & Commissioning: Fire Suppression 45 114 04-May-15 03-Jul-15 A3020, A111 A3010

MechanMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalA5900 GIVB +Grade Install temp san pump system (P 13, 14, 25, 26, 27, 28) in se 96 200 08-Dec-14 21-Apr-15 A2260 A2220A5930 GIVB +Grade Install temp drainage pump system (P 9-12) in series 96 140 08-Dec-14 21-Apr-15 A2260 A5960A2230 GIVB +Grade Install san pump room equipment (on-going) 96 200 19-Jan-15 02-Jun-15 A1870, A226 A3430A5940 GIVB +Grade Install drainage pump room equipment (on-going) 96 140 19-Jan-15 01-Jun-15 A2260, A593 A5910

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3350 GIVB +Grade New RGS feeders 30 0 04-Aug-14 12-Sep-14 A1730 A2250A2260 GIVB +Grade New conduit and wiring 60 80 15-Sep-14 05-Dec-14 A2310, A335 A2230A2310 GIVB +Grade New MDP, DPs, & MCCs 60 0 15-Sep-14 05-Dec-14 A1730, A335 A2280

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

New power & lighting panelsNew FA cabling

Install new FACPsProgram FACPs

Testing & Commissioning: FA

Patch panels: BVBFO core switches

WinCC & Barco systemsTesting & Commissioning: Win/Barco

TSCS conduitTSCS Wiring

TSCS equipment

Testing & Commissioning: TSCSTSCS Programming

TLCS conduitTLCS Wiring

Install TLCSTesting & Commissioning: TLCS

Programming: TLCS

Demolish existing MDP,s, DPs, MCCs, control panels &wiringDemolish RGS feeders

Demolish drainage pump rooms & equipmentDemolition existing TEL/COMM DATA systems

Demolish fire standpipe & riser systemDemolish san pump rooms & equipment

Demolish TVCS

Concrete repair

Install new fire standpipes & risersTesting & Commissioning: Fire Suppression

Install temp san pump system (P 13, 14, 25, 26, 27, 28) in seriesInstall temp drainage pump system (P 9-12) in series

Install san pump room equipment (on-going)Install drainage pump room equipment (on-going)

New RGS feedersNew conduit and wiringNew MDP, DPs, & MCCs

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 12: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A6970 GIVB +Grade Install new FACPs 45 114 06-Jul-15 04-Sep-15 A2260, A303 A6980A6980 GIVB +Grade Program FACPs 60 114 07-Sep-15 27-Nov-15 A6970 A2080

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGovernmGovernment IslanGovernment Island Vent BGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent Building

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2370 GIVB +Grade Patch panels: GIV 30 -45 13-Aug-14 24-Sep-14 A1730, A103 A2300A2250 GIVB +Grade Install new TEL/COMM DATA systems 60 249 08-Dec-14 27-Feb-15 A2260, A335 A1610A2300 GIVB +Grade Testting & Commisioning TEL/COMM 60 249 02-Mar-15 22-May-15 A2250, A237 A2240

DPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSGovernmGovernment IslanGovernment Island Vent BGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent Building

MechanMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalA5910 GIVB +Grade Testing & Commissioning: Drainage 120 247 12-Apr-15 20-Jul-15 A5940 A3360A3430 GIVB +Grade Testing & commissioning, san system 120 354 25-Apr-15 26-Jul-15 A2230 A2220

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2660 GIVB +Grade DPCS programming 120 247 20-Jul-15 24-Oct-15 A2260, A621 A2540

TLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSGovernmGovernment IslanGovernment Island Vent BGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent Building

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA2180 GIVB +Grade Demolish TLCS 15 222 28-Aug-15 18-Sep-15 A2190, A221 A5790

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA1870 GIVB +Grade Replace LPs at GIV, new cabling to EAD 60 0 08-Dec-14 27-Feb-15 A2310 A1910

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2190 GIVB +Grade Install TLCS 60 110 02-Mar-15 22-May-15 A1870, A329 A2200A2210 GIVB +Grade Testing & Commissioning: TLCS 120 199 24-May-15 28-Aug-15 A2190, A111 A2180A2200 GIVB +Grade Programming: TLCS 120 199 28-Aug-15 24-Nov-15 A2190, A221 A2530

TVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSGovernmGovernment IslanGovernment Island Vent BGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent BuildingGovernment Island Vent Building

HVACHVACHVACHVACHVACHVACHVACHVACHVACHVACA5980 GIVB +Grade Repairs to vent equipment and distribution layers 45 35 09-Feb-15 10-Apr-15 A1730, A226 A5970

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA5970 GIVB +Grade Install TVCS 60 35 09-Feb-15 01-May-15 A2260, A598 A2290A2290 GIVB +Grade Testing & Commissioning: TVCS 120 42 26-Sep-15 24-Dec-15 A5970, A111 A2280A2280 GIVB +Grade TVCS programming 120 42 24-Dec-15 03-Apr-16 A2310, A229 A2560

Manhatan BloManhatan Blower BuilManhatan Blower BuildingManhatan Blower BuildingManhatan Blower BuildingManhatan Blower BuildingManhatan Blower BuildingManhatan Blower BuildingManhatan Blower BuildingManhatan Blower Building+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Building InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA2510 GEN +Grade Demolish pump rooms & equipment 30 267 08-Jun-15 17-Jul-15 A2500, A589 A5790A3210 GEN +Grade Demolish conduit & cabling 30 267 08-Jun-15 17-Jul-15 A2500, A587 A5790A3230 GEN +Grade Demolish MDPs, PPs, & MCCs 30 267 08-Jun-15 17-Jul-15 A2500, A587 A5790A2720 GEN +Grade Demolish fire standpipe & riser system 30 187 28-Sep-15 06-Nov-15 A2730, A276 A5790

ConcreConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteConcreteA5920 GEN +Grade Concrete repair 45 87 15-Sep-14 14-Nov-14 A5890 A3000

ElevatoElevatorsElevatorsElevatorsElevatorsElevatorsElevatorsElevatorsElevatorsElevatorsA3000 GEN +Grade Elevator replacement 60 87 17-Nov-14 06-Feb-15 A1730, A592 A3420A3420 GEN +Grade Elevator testing & commissioning 60 87 09-Feb-15 01-May-15 A3000 A2750A3500 GEN +Grade Elevator programming, FD tie-in 60 87 04-May-15 24-Jul-15 A3420 A5790

Fire SuFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionA2730 GEN +Grade Install new fire standpipes & risers 60 147 17-Nov-14 06-Feb-15 A1730, A592 A2740

MechanMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalA5890 GEN +Grade Install temp pump system (P 19, 20, 21), in series 96 76 15-Sep-14 27-Jan-15 A3200 A2510A2500 GEN +Grade Install pump room equipment 96 76 08-Dec-14 21-Apr-15 A5890, A320 A2470

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3200 GEN +Grade New RGS feeders 30 76 04-Aug-14 12-Sep-14 A1730 A3220A1880 GEN +Grade Replace LPs at MBB new cabling to EAD 60 110 15-Sep-14 05-Dec-14 A3200 A1910A2460 GEN +Grade New MDPs, PPs, & MCCs 45 125 15-Sep-14 14-Nov-14 A3200 A2470

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Install new FACPsProgram FACPs

Patch panels: GIVInstall new TEL/COMM DATA systems

Testting & Commisioning TEL/COMM

Testing & Commissioning: DrainageTesting & commissioning, san system

DPCS programming

Demolish TLCS

Replace LPs at GIV, new cabling to EAD

Install TLCSTesting & Commissioning: TLCS

Programming: TLCS

Repairs to vent equipment and distribution layers

Install TVCSTesting & Commissioning: TVCS

TVCS programming

Demolish pump rooms & equipmentDemolish conduit & cablingDemolish MDPs, PPs, & MCCs

Demolish fire standpipe & riser system

Concrete repair

Elevator replacementElevator testing & commissioning

Elevator programming, FD tie-in

Install new fire standpipes & risers

Install temp pump system (P 19, 20, 21), in seriesInstall pump room equipment

New RGS feedersReplace LPs at MBB new cabling to EAD

New MDPs, PPs, & MCCs

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 13: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A2450 GEN +Grade New conduit & cable trays 60 147 27-Oct-14 16-Jan-15 A2460, A320 A3220Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm

A3220 GEN +Grade New cabling 45 147 19-Jan-15 20-Mar-15 A3200, A245 A2740A2740 GEN +Grade Install new FACPs 60 147 23-Mar-15 12-Jun-15 A2730, A322 A2750A2760 GEN +Grade Testing & Commissioning: FA 90 163 25-Jul-15 28-Sep-15 A2740, A128 A2720A2750 GEN +Grade Program FACPs 60 99 28-Sep-15 18-Dec-15 A2740, A342 A2080

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2960 GEN +Grade New patch panel: MBB 45 151 15-Sep-14 14-Nov-14 A3200 A5870

DPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSDPCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

MechanMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalMechanicalA5870 GEN +Grade Testing & Commissioning: pump equipment (on-going) 120 128 01-Mar-15 07-Jun-15 A2500, A111 A5860

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA5860 GEN +Grade Install DPCS 60 77 08-Jun-15 28-Aug-15 A5870, A637 A6050A7010 GEN +Grade Testing & Commissioning DPCS 120 140 19-Jul-15 23-Oct-15 A5860 A7000A7000 GEN +Grade DPCS programming 60 79 23-Oct-15 15-Jan-16 A5860, A238 A6050

TLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSTLCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA2150 GEN +Grade Demolish TLCS 15 177 30-Oct-15 20-Nov-15 A1030, A217 A5790

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3240 GEN +Grade TLCS New conduit & wiring 60 110 08-Dec-14 27-Feb-15 A1880, A246 A2170

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2170 GEN +Grade Install TLCS 60 135 28-Aug-15 20-Nov-15 A1880, A246 A2480A2480 GEN +Grade Testing & Commissioning: TLCS 120 230 11-Oct-15 20-Jan-16 A2170, A111 A5790A6990 GEN +Grade Programming: TLCS 120 798 20-Jan-16 23-Apr-16 A2480

TVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSTVCSGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA6870 GEN +Grade Demolish TVCS 15 215 08-Sep-15 29-Sep-15 A3440 A5790

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA2470 GEN +Grade Install TVCS 60 104 21-Apr-15 14-Jul-15 A2460, A250 A6140A3440 GEN +Grade Testing & Commissioning :TVCS on-going) 120 180 02-Jun-15 08-Sep-15 A2960, A247 A4060A4060 GEN +Grade TVCS Programming 120 162 26-Sep-15 24-Dec-15 A3440, A195 A2560

Manhattan UGManhattan UG ExhausManhattan UG Exhaust BuildinManhattan UG Exhaust BuildingManhattan UG Exhaust BuildingManhattan UG Exhaust BuildingManhattan UG Exhaust BuildingManhattan UG Exhaust BuildingManhattan UG Exhaust BuildingManhattan UG Exhaust Building+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Building InfBuilding InfrastructuBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureBuilding InfrastructureGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsA3250 GEN +Grade Demolish RGS Feeders 20 422 17-Nov-14 12-Dec-14 A3260, A339 A5790A2770 GEN +Grade Demolish fire standpipe & riser system 30 207 31-Aug-15 09-Oct-15 A2790, A622 A2020

Fire SuFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionFire SuppressionA2780 GEN +Grade Install new fire standpipes & risers 60 176 04-Aug-14 24-Oct-14 A1730 A2810

ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalA3260 GEN +Grade New RGS feeders 30 110 04-Aug-14 12-Sep-14 A1730 A3390A3390 GEN +Grade New PPs, LP, MCCs 45 116 15-Sep-14 14-Nov-14 A3260 A3380

Fire AlaFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire AlarmA3380 GEN +Grade New FA conduit 60 116 15-Sep-14 05-Dec-14 A3390 A3270A3270 GEN +Grade FA Wiring 60 116 27-Oct-14 16-Jan-15 A3380 A2810A2800 GEN +Grade Install new FACPs 60 116 19-Jan-15 10-Apr-15 A2780, A327 A2810A2790 GEN +Grade Testing & Commissioning: FA 180 199 12-Apr-15 31-Aug-15 A2780, A280 A2810A2810 GEN +Grade Program FACPs 60 119 31-Aug-15 20-Nov-15 A2800, A278 A6060

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

New conduit & cable trays

New cablingInstall new FACPs

Testing & Commissioning: FAProgram FACPs

New patch panel: MBB

Testing & Commissioning: pump equipment (on-going)

Install DPCSTesting & Commissioning DPCS

DPCS programming

Demolish TLCS

TLCS New conduit & wiring

Install TLCSTesting & Commissioning: TLCS

Programming: TLCS

Demolish TVCS

Install TVCSTesting & Commissioning :TVCS on-going)

TVCS Programming

Demolish RGS FeedersDemolish fire standpipe & riser system

Install new fire standpipes & risers

New RGS feedersNew PPs, LP, MCCs

New FA conduitFA Wiring

Install new FACPsTesting & Commissioning: FA

Program FACPs

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone

TASK filter: All Activities© Oracle Corporation

Page 14: General Milestones General GenerGeneral RequirGeneral ...repone.net/wp-content/uploads/2013/11/BB28-11.11.131.pdfA1040 GEN GEN NTP 0 -119 01-May-14 A1000 A2020 GEN GEN Substantial

Activity ID Area Tube Activity Name OriginalDuration

Total Float Start Finish Predecessors Successor

A3370 GEN +Grade Patch panels: MUEB 45 110 15-Sep-14 14-Nov-14 A3260, A173 A2790TSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCSTSCS

GeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralExistingExisting ConditiExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting ConditionsExisting Conditions

A2630 GEN +Grade Demolish, coordinate TSCS 90 86 23-Nov-15 28-Mar-16 A2640 A5790ElectricElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectricalElectrical

A2650 GEN +Grade New conduit and wiring 60 165 17-Nov-14 06-Feb-15 A3390 A2640Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm Systems

A2640 GEN +Grade Install TSCS 60 -70 04-Jan-16 28-Mar-16 A2650, A617 A3450A3450 GEN +Grade Testing & Commissioning: TSCS 60 -70 15-Feb-16 09-May-16 A2640, A337 A3540A3540 GEN +Grade Program TSCS 120 -120 09-May-16 16-Aug-16 A2640, A345 A6010

Manhattan PlaManhattan PlazaManhattan PlazaManhattan PlazaManhattan PlazaManhattan PlazaManhattan PlazaManhattan PlazaManhattan PlazaManhattan Plaza+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

CommunicaCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsCommunicationsRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

Comm Comm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsComm SystemsA5150 RW +Grade Cellular Structure 120 214 28-Jan-17 30-Apr-17 A6260, A631 A5720

Roadway PRoadway Pavement Roadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadway Pavement RepairRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadwayRoadway

HighwaHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenHighwaymenA2870 RW +Grade Mill-out pavement 6 178 29-Apr-17 30-Apr-17 A3710, A519 A5140A5140 RW +Grade Resurface roadway 18 144 24-May-17 14-Jun-17 A4100, A287 A5720A2950 RW +Grade Striping 18 144 14-Jun-17 05-Jul-17 A5140 A5720

PortalsPortalsPortalsPortalsPortalsPortalsPortalsPortalsPortalsPortals+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade+Grade

Roadway RRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsRoadway RepairsGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneral

ThermaThermal & MoistThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureThermal & MoistureA1350 GEN +Grade Expansion joints at Brooklyn Portal 40 529 18-Mar-15 20-Apr-15 A1340 A2020A1360 GEN +Grade Leak repairs at Brooklyn portal 40 529 20-Apr-15 24-May-15 A1040, A135 A2020

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016 2017 2018

Patch panels: MUEB

Demolish, coordinate TSCS

New conduit and wiring

Install TSCSTesting & Commissioning: TSCS

Program TSCS

Cellular Structure

Mill-out pavementResurface roadway

Striping

Expansion joints at Brooklyn PortalLeak repairs at Brooklyn portal

Battery Park Tunnel Rehabilitation, Ph II BB-28 11-Nov-13 13:45

Actual WorkRemaining Work

Critical Remaining WorkMilestone