Gedling Colliery – Position Note February 2017
Following the identification of the Gedling Colliery/Chase Farm site as a strategic site in the Aligned Core Strategy (adopted December 2014) the key stakeholders have made significant progress towards site delivery. The project will deliver 1,050 dwellings in three major phases (see separate plan) and include a local centre, health centre and new primary school and network of footpath and cycle paths. The delivery of the first phase (1a) of 315 dwellings can take place prior to the delivery of the Gedling Access Road. The second phase (1b) will take the number of dwellings up to 506 and include a local centre, primary school and public open space. The final phase will bring the total number of dwellings to 1,050. A resolution to grant detailed planning permission for Phases 1 and 2 and outline permission for phase 3 has been secured with completion of S106 agreement imminent. The GAR is a 3.8km road which unlocks the Gedling Colliery / Chase Farm site. The principle objectives of the GAR are twofold:
1. to facilitate the redevelopment of the Gedling Colliery / Chase Farm site and accommodate additional traffic generated; and 2. to provide a ‘bypass’ link around Gedling, linking the area with the wider strategic road network to help ease traffic congestion on local roads.
Full planning permission was granted in December 2014 for the GAR, at which time construction was anticipated to take place in two phases. Subsequently permission was granted in June 2016 to enable the GAR to be constructed in a single phase providing flexibility construction to begin on either phase. A robust partnership is in place to bring forward integrated delivery of the site and the Gedling Access Road on which phases 2 and 3 are dependent. Significant progress has been achieved by the partnership which includes the Homes and Communities Agency as key land owners. A summary of key milestones is set out below:
• Resolution to grant Planning Permission May 2016; • Expertise secured from Nottingham City Council’s major project team and a
robust Project Management Plan is in place for delivery; • Operational Group and Executive Board in place and meeting regularly to
drive forward delivery with key stakeholders - HCA, Nottinghamshire County Council, Gedling Borough Council, Nottingham City Council and Keepmoat.
• A funding package is in place for the Gedling Access Road. Delivery of the road will directly facilitate the delivery of housing on the Gedling Colliery site. The scheme is supported by the HCA, Nottinghamshire Council and the D2N2 LEP all of which have committed funding to secure the delivery of the scheme alongside Keepmoat the development partners. The funding package for the scheme is set out below:
o £7m HCA (part to be recovered via agreement with developers Keepmoat)
o £5.4m Notts County Council o £17m Keepmoat o £10.8 D2N2 (Stage 1 Approval 2015)
• S106 for the development has been agreed in principle by all parties and final
sign off is imminent, which will enable planning permission to be issued and enabling start on site for the first phase;
• HCA final approvals are scheduled for February/March 2017; and • Nottinghamshire County Council’s Joint Venture ‘Via East Midlands Ltd’ is to
undertake land acquisition, design and construction of GAR. Approvals for Nottinghamshire County Council to initiate any highway CPOs (should they be required) is in place.
A summary of the key milestones following issue of the S106 agreement are set out below:
• Phase 1 enabling works anticipated to commence shortly. • D2N2 approval to full business case (anticipated April 2017). • Gedling Access Road mobilisation October 2017. • GAR works complete March 2018 (without CPO) March 2020 (with CPO). • Phase 1b start on site 2021. • Phase 2 start on site 2025.
B/S
G1
G1
G1
G1
1247As
1247Opp
1054V1As
764Opp
1247
As
1247
Opp
1247
As
1247
Opp
1247A
s
1247O
pp
1247
As
1247
Opp
1247
As
1247
Opp
1247A
s
1247O
pp
930
As
3
.
5
m
W
i
d
t
h
S
w
a
l
e
3
.
5
m
W
i
d
t
h
S
w
a
l
e
3
.
5
m
W
i
d
t
h
S
w
a
l
e
6.5m
W
idth S
w
ale
6
.
5
m
W
id
t
h
S
w
a
le
6
.
5
m
W
i
d
t
h
S
w
a
l
e
6
.
5
m
W
i
d
t
h
S
w
a
l
e
6
.
5
m
W
i
d
t
h
S
w
a
l
e
6
.
5
m
W
i
d
t
h
S
w
a
l
e
6.5
m W
idth
Sw
ale
6.5m Width Swale
6.5
m W
idth
Sw
ale
8
.
5
m
W
i
d
t
h
S
w
a
l
e
8
.
5
m
W
i
d
t
h
S
w
a
l
e
8
.
5
m
W
i
d
t
h
S
w
a
l
e
8
.
5
m
W
i
d
t
h
S
w
a
l
e
8
.
5
m
W
i
d
t
h
S
w
a
l
e
7m
W
idth S
w
ale
7m
W
idth S
w
ale
7m
W
idth S
w
ale
8
.
5
m
W
i
d
t
h
S
w
a
l
e
BLO
CK
4
BLO
CK
2
955 Opp
1178O
pp
1178Opp
1178O
pp
1178
As
1178As
G1
G1
1178A
s
752
651651
As
As
Opp
1224
V3O
pp
1224
V3As
G1
1393OPP
764
764
As
Opp
867Opp
1224
V3As
651
651
As
Opp
867Opp
930As
1224V3Opp
1224
V3
Opp
651
651
As
Opp
1244AS
1393AS
1393OPP
1650Opp
1054V1
1054V1
As
Opp
930A
s
1224V3
Opp G1
955A
s955A
s
1178A
s
1178A
s
849V2
849V2
As
Opp
1393AS
1178
Opp
1650O
pp
1650As
1178
Opp
G1
G1
G1
1224V3 Opp
930As
1244AS
764
764
As
Opp
1244OPP
1244AS
G1
1393
AS
1393
AS
1244OPP
867As
G1
G2
1244 OPP
1244 AS
651
651
As
Opp
G1 1054V11054V1
As
OppG2
1244OPP
1244AS
1393AS
G1
G2
1393OPP
1244AS
764
764
As
Opp
764
764
As
Opp
849V
2
849V2
As
Opp
849V2
849V
2
As
Opp
G1
G1
G1
1650Opp
1650Opp
867 As
B/S
1224V3Opp
930
930
As
Opp
867
As
G1651
651
As
Opp
930
930
As
Opp
930
930
As
Opp
849V
2
849V2
As
Opp1216V1As
1178
As
G2
955A
s
580Opp
G1
1272
1054V11054V1
AsAsOpp
930As
1650Opp
G1
764 764As Opp
651 651As Opp
1054V11054V1
As
Opp1244OPP
651
651
651
752
As
As
As
Opp
G11157V2
1157V2
As
Opp
G21054V1
1054V1
As
Opp
930
930
Opp
Opp
1157V21157V2
As
Opp
1157V21157V2
As
Opp
1272
1054V11054V1
As
As
Opp
G2
1224
V3O
pp
G1
1224V3Opp
G1
930 Opp
930
Opp
G2
867O
pp
G2
651
651
As
Opp
867 Opp
1216
V1
As
1216V1 As
G2
G1
1178O
pp
955As
930As
G1
1393
AS
857As
G1
955 Opp
955 Opp
955 Opp
1178 Opp
1178 Opp
930 Opp
G2
849V2
849V2
As
Opp
G2
1216V1As
1216V1As
G1
1224V3O
pp
G1
1216V1As G1
1054V11054V1
As
Opp
G2
1224
V3As
1157
V211
57V2
As
Opp
1157
V2O
pp
1224V3 As
G1
1054
V110
54V1
As
Opp
1054
V110
54V1
As
Opp
G2
G2
G2
930
930
Opp
Opp
764
764
As
Opp
867
Opp
G1930As
G1867Opp
G1
1054V11054V1
As
Opp
G2
1054V11054V1
As
Opp
G2
857As
G1
857O
pp
G1
930
930
Opp
Opp
G1
G1
849V2
849V2
As
Opp
930Opp
764
764
As
Opp
764
764
As
Opp
G1
867As
1224
V3O
pp
G1
1054V11054V1
As
Opp
G3
1157V21157V2
As
Opp1157V2
1157V2
As
Opp
1272
1054V11054V1
As
As
Opp
G3
G2
1224V3As
849V
2
849V2
As
Opp
G1
930
As
955
As
G1
1224
V3
As
1178Opp
G1
955Opp
955Opp
867A
s
1054V11054V1
As
Opp
G2
1054V11054V1
As
Opp
1054V11054V1
As
Opp
G1
G2
1224V3 Opp
1054V11054V1
As
Opp
G2
867 As
G1
BLOC
K 3
BLOC
K 1
764 764
AsOpp
867
Opp
B/S
G2
B/S
B/S
G1
651
651
651
752
As
As
As
Opp
651
651
651
752
As
As
As
Opp
651
651
651
752
As
As
As
Opp
867 Opp
G1
1224V3
Opp
G2
G1
G1
867Opp
930
930
As
Opp
867
As
G1
G3
G2
1272
1054
V110
54V1
As
As
Opp
G2
955As
1272
1054V1 1054V1
AsAs Opp
867
Opp
G1
G3
930930
Opp
Opp
G2
G2
G3
G2
1157V2
1157V2
As
Opp
G2
1272
1054V1
1054V1
As
As
Opp
930Opp
651
651
651
752
As
As
As
Opp
930
As
867
As
1224V3
As
930O
pp
1224
V3
As
G2
849V2849V2
AsOpp
651
651
651
752
As
As
As
Opp
764
891
764
As
As
Opp
849V
2As
BLO
CK
1
BLOCK 3
1224
V3
Opp
BLO
CK
3
1178 Opp
1178 Opp
1178 Opp
955 As
955 As
955 As
G1
867O
pp
G1
1157V21157V2
As
Opp
G21054V1
1054V1
As
Opp
G2
580 As
764
764
As
OppG
2
G3
955 As
955 As
955 As
G1
1224V3As
G1
930
930
Opp
Opp
867 As
G2
857 As
G112
24V3
Opp
G3
764
891
764
As
As
Opp
G1
G2
1272
1054V11054V1
As
As
Opp
G2
1272
1054V11054V1
As
As
Opp
1157V21157V2
As
Opp
1157V21157V2
As
Opp
G1
G1
G2
1244OPP
1244OPP
1393AS
G3
1244OPP
G3
764764
As
Opp
1178
As
1244OPP
G2
1244OPP
1244OPP
651651 AsOpp
G1
1244OPP
1244OPP
764
891
764
As
As
Opp
867O
pp
764
764
As
Opp
764As
752
651
651
As
As
Opp
752
651
651
As
As
Opp
580As
651
651
651
752
As
As
As
Opp
651
651
651
752
As
As
As
Opp
764764 AsOpp764As
G1
BLOCK 5
G1
G1
764764
AsOpp
764764
AsOpp
G1
867A
s
1224V3As
1178
Opp
G1
1157V21157V2
As
Opp
1224V3 As
764
764
As
Opp
849V2
849V
2
As
Opp
1224V3Opp
G1
G1
G1
930 Opp
1224V3As
1178As
955As
764764
As
Opp
1054V1
1054V1
As
Opp
752
651651
As
As
Opp
G1
G2
1272
1054V11054V1
As
AsOpp
G1
G1
G1
G1
B/S
1224V3O
pp
1054V1Opp
1224V3O
pp
1054V1Opp
1224V3
As
1054V1As
1224
V3
As
1054V1As
1224V3 Opp
1054V1O
pp
764 Opp
867
As
764
As
867Opp
580 Opp
651 Opp
867
As
BLOCK 6
G1
867Opp
G1
B/S
G1
G1
B/S
B/S
14052_P2
KEEPMOAT HOMES
CHASE FARM, GEDLINGPROPOSED RESIDENTIAL DEVELOPMENT
Phasing PlanDRAWING TITLE
PROJECT
CLIENT
SCALE DATE
DRAWN BY CHECKED BY
STATUS
LC
FORPLANNING
ARMSTRONG BURTON ARCHITECTS MILFORD HOUSE 260 LICHFIELD ROAD FOUR OAKS SUTTON COLDFIELD WEST
M I D L A N D S B 7 4 2 U H T : 0 1 2 1 3 2 3 2 3 3 2 W : W W W . A R M S T R O N G B U R T O N . C O M
REV DATE DESCRIPTION REVISED BY CHECKED BY
DRAWING NO
PS
1:1250@A0 09.2015
THIS DRAWING AND THE BUILDING WORKS DEPICTED ARE THE COPYRIGHT OF ARMSTRONG BURTON
A R C H I T E C T S A N D M A Y N O T B E R E P R O D U C E D E X C E P T B Y W R I T T E N P E R M I S S I O N .
THE CONTRACTOR IS TO CHECK AND VERIFY ALL BUILDING AND SITE DIMENSIONS, LEVELS AND SEWER
INVERT AT CONNECTION POINTS AND ALL DISCREPANCIES TO BE REPORTED TO THE ARCHITECT.
THE DRAWING MUST BE READ IN CONJUNCTION WITH AND CHECKED AGAINST RELEVANT STRUCTURAL OR
OTHER SPECIALIST DRAWINGS.
U S E O N L Y W R I T T E N D I M E N S I O N S - D O N O T S C A L E D R A W I N G S .
N O T E
A R M S T R O N G B U R T O N A R C H I T E C T S
Phases
Units Plots
1A315 units 1 - 315
1B191 units 316 - 506
2 544 units 507 - 1050
EXTENT OF GAR
PHASE 2
PHASE 1B
PHASE 1A
A 15/04/16 Phase no. revision as requested LC PS