geary street: mason street to stockton street · geary street: mason street to stockton street...
TRANSCRIPT
PROJECT DRAWINGS
Geary Rapid
EXISTING CONDITIONS
PROJECT PROPOSALS
No parking (red)
Accessible parking (blue)
30-minute parking (green)
Commercial loading (yellow)
General parking (gray)
Passenger loading (white)
Public parking
38 Geary stop
38R Geary Rapid stop
Transit-only lanes
Transit shelter
Sidewalk extension “bulb”
New curb ramp
Legend
38R
38
P
4
Geary Street: Mason Street to Stockton Street
Summary of Proposals
• Colorize existing transit-only lanes