gdc$technics$triples$capacity,$completes...

3
GDC TECHNICS TRIPLES CAPACITY, COMPLETES INTERNAL CAPABILITIES DEVELOPMENT, CONTINUES TO EXPAND ITS GLOBAL PRESENCE AND FURTHERS ITS LEAD IN THE 787 DREAMLINER MODIFICATION MARKET BY WINNING ITS THIRD CONTRACT GENEVA, May 18, 2015 – EBACE GDC Technics announced winning its third Boeing B787 cabin modification contract making it the industry leader with regards to modifying next generation aircraft. The Company also announced that it is continuing to expand its global presence and expand its USA operations into a new 80,000 square meter (850,000 ft 2 ) facility located at Fort Worth, Texas. In addition, the Company announced that its 20 million USD internal capabilities development and restructuring program has been completed on time. “It has been two years since we acquired GDC Technics; during these two years we made substantial investments in our operations, facilities, manufacturing capabilities, manpower and we drastically expanded our engineering and certifications capabilities enabling us to develop leading edge solutions that benefit our customers” said GDC Technics General Partner Mohammed Alzeer. “In addition we developed and executed our global expansion strategy. Today, in addition to our San Antonio and Fort Worth facilities we exist in Europe, Middle East and next year we will be in Africa” Alzeer said. GDC Technics continues its healthy growth on all fronts; during the last 6 months it received its fourth aircraft, a B777300ER, and today GDC Technics announced winning its third B787 Dreamliner modification contract hence leading the industry in the number of B787 aircraft under modification and ensuring a continuously expanding engineering and production knowledge base on next generation aircraft. “Winning our third B787 contract is a game changer as it involves developing a new prestigious first class cabin that integrates new cutting edge technologies with maximum luxury found only in VVIP aircraft and is testimony to the success of our strategy of focusing on next generation airplanes enabling us to maintain our lead in the B787 modification market while offering cutting edge innovative technologies to our customers; that explains how we were able to compete against some of the industry leaders and win” Alzeer said. In March of this year GDC Technics signed a 25year lease with the City of Fort Worth for the aircraft modifications facility. The company’s new 80,000 m 2 Alliance Fort Worth (AFW) facility is state of the art in terms of design and capabilities; “with our success in market we have

Upload: hoangdan

Post on 23-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

   

GDC  TECHNICS  TRIPLES  CAPACITY,  COMPLETES  INTERNAL  CAPABILITIES  DEVELOPMENT,  CONTINUES  TO  EXPAND  ITS  GLOBAL  PRESENCE  AND  FURTHERS  ITS  LEAD  IN  THE  787  

DREAMLINER  MODIFICATION  MARKET  BY  WINNING  ITS  THIRD  CONTRACT  

 

GENEVA,  May  18,  2015  –  EBACE  

GDC  Technics  announced  winning  its  third  Boeing  B787  cabin  modification  contract  making  it  the  industry  leader  with  regards  to  modifying  next  generation  aircraft.    

The  Company  also  announced  that  it  is  continuing  to  expand  its  global  presence  and  expand  its  USA  operations  into  a  new  80,000  square  meter  (850,000  ft2)  facility  located  at  Fort  Worth,  Texas.    In  addition,  the  Company  announced  that  its  20  million  USD  internal  capabilities  development  and  restructuring  program  has  been  completed  on  time.  

“It  has  been  two  years  since  we  acquired  GDC  Technics;  during  these  two  years  we  made  substantial  investments  in  our  operations,  facilities,  manufacturing  capabilities,  manpower  and  we  drastically  expanded  our  engineering  and  certifications  capabilities  enabling  us  to  develop  leading  edge  solutions  that  benefit  our  customers”  said  GDC  Technics  General  Partner  Mohammed  Alzeer.    “In  addition  we  developed  and  executed  our  global  expansion  strategy.  Today,  in  addition  to  our  San  Antonio  and  Fort  Worth  facilities  we  exist  in  Europe,  Middle  East  and  next  year  we  will  be  in  Africa”  Alzeer  said.  

GDC  Technics  continues  its  healthy  growth  on  all  fronts;  during  the  last  6  months  it  received  its  fourth  aircraft,  a  B777-­‐300ER,  and  today  GDC  Technics  announced  winning  its  third  B787  Dreamliner  modification  contract  hence  leading  the  industry  in  the  number  of  B787  aircraft  under  modification  and  ensuring  a  continuously  expanding  engineering  and  production  knowledge  base  on  next  generation  aircraft.    

“Winning  our  third  B787  contract  is  a  game  changer  as  it  involves  developing  a  new  prestigious  first  class  cabin  that  integrates  new  cutting  edge  technologies  with  maximum  luxury  found  only  in  VVIP  aircraft  and  is  testimony  to  the  success  of  our  strategy  of  focusing  on  next  generation  airplanes  enabling  us  to  maintain  our  lead  in  the  B787  modification  market  while  offering  cutting  edge  innovative  technologies  to  our  customers;  that  explains  how  we  were  able  to  compete  against  some  of  the  industry  leaders  and  win”  Alzeer  said.  

 In  March  of  this  year  GDC  Technics  signed  a  25-­‐year  lease  with  the  City  of  Fort  Worth  for  the  aircraft  modifications  facility.    The  company’s  new  80,000  m2  Alliance  Fort  Worth  (AFW)  facility  is  state  of  the  art  in  terms  of  design  and  capabilities;  “with  our  success  in  market  we  have  

   outgrown  our  San  Antonio  facility  so  in  order  to  accommodate  our  growing  backlog  we  had  to  expand  our  facilities.  The  new  AFW  facility  ensures  that  we  can  execute  our  operations  more  efficiently  and  can  support  our  future  growth”.  

About  GDC  Technics        GDC  Technics  is  an  aircraft  modifications  company  with  very  strong  capabilities  in  designing,  engineering,  manufacturing,  installing,  testing  and  certifying  structural  and  systems  modifications  to  narrow  and  wide  body  airplanes.  GDC  Technics  also  have  very  extensive  engineering  capabilities  through  its  subsidiary  GDC  Engineering  in  Munich,  Germany.  The  company  established  a  satellite  facility  in  the  Middle  East  and  is  in  the  process  of  establishing  its  fifth  facility  in  Morocco.    

Contact      Mohammad  Alzeer  for  GDC  Technics  [email protected]  or  210-­‐712-­‐0845  -­‐  See  more  at:  http://www.gdctechnics.com  

 

 

Two  B787-­‐8  Dreamliners  Join  B777-­‐300  In  Work  at  GDC  Technics  /  Alliance  in  Fort  Worth,  Texas  USA  

 

   

 

 

New  80,000  square  meters  GDC  Technics  Facility  in  Alliance  Airport  in  Fort  Worth,  Texas  USA