gc75 incorp doc - port phillip woollen mill development ... · note: * nidci natoes...
TRANSCRIPT
WARNING SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
TENDER
0 25 50 75m
SCALE 1:2500 AT ORIGINAL SIZE
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111
E [email protected] W 6ww7w.ghd.com
DO NOT SCALE Drawn Designer Client
Project
Title
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
Drafting D.TRUONG Check
Design D.TRUONG Check
Approved (Project Director)
Date
This Drawing must not be
Scale AS SHOWN used for Construction unless signed as Approved
Original Size
A3 31-31686-C003 D Note: * indicNatoes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job
Manager Project Director Date
Plot Date: 6 May 2015 - 5:18 PM Plotted By: David Truong
G:\31\31686\CCAaDdDF\iDleraNwoi:ngs\31-31686-C003.dwg
TBM TABLE TBM NO. EASTING NORTHING R.L. DESCRIPTION
1 315397.511 5807045.416 6.634 RIVET
2 315469.685 5807155.670 5.095 RIVET
3 315496.312 5807293.853 3.652 NAIL
4 315203.282 5807257.980 7.522 RIVET
5 315302.425 5807284.400 6.018 NAIL
6 315411.217 5807317.136 4.542 RIVET
7 315493.798 5807339.138 3.153 NAIL
8 315553.108 5807365.040 2.395 RIVET
9 315717.844 5807391.374 1.115 NAIL
10 315696.346 5807309.325 2.280 RIVET
11 315738.429 5807269.914 2.886 NAIL
Check
DO NOT SCALE
Drawn
T. GARDINER
Designer
Client
TENDER
0 5 10
SCALE 1:500 AT ORIGINAL SIZE
15m
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document)
Drafting D.TRUONG
Approved (Project Director) Date
Design Check
D.TRUONG
Project
Title
Note: * indicNatoes siRgneavtuisrieosnon original issue of drawing or last revision of drawing
Drawn
Job
Project
Date T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.6gh8d.com
for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
Scale AS SHOWN This Drawing must not be used for Construction unless
Original Size 31-31686-C011 D Manager Director signed as Approved A3
Plot Date: 6 May 2015 - 5:19 PM
Plotted By: David Truong Cad File No:
G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg
WARNING SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
WARNING
SERVICES SHOWN ON THIS DRAWING ARE APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
TENDER
Plot Date: 6 May 2015 - 5:19 PM
Plotted By: David Truong Cad File No:
G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg
CONT
INUE
D ON
DRA
WIN
G C0
11
0 5 10 15m
SCALE 1:500 AT ORIGINAL SIZE
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W ww6w.9ghd.com
DO NOT SCALE Drawn T. GARDINER Designer Client
Project
Title
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
Drafting D.TRUONG Check
Design D.TRUONG Check
Approved (Project Director) Date
This Drawing must not be
Scale AS SHOWN used for Construction unless signed as Approved
Original Size
A3 31-31686-C012 D Note: * indicNaotes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job
Manager Project Director Date
WARNING SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
TENDER
Plot Date: 6 May 2015 - 5:19 PM
Plotted By: David Truong Cad File No:
G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg
0 5 10 15m
SCALE 1:500 AT ORIGINAL SIZE
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111
E [email protected] W ww7w0.ghd.com
DO NOT SCALE Drawn T. GARDINER Designer Client
Project
Title
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
Drafting D.TRUONG Check Design D.TRUONG Check Approved
(Project Director)
Date This Drawing must not be
Scale AS SHOWN used for Construction unless signed as Approved
Original Size
A3 31-31686-C013 D Note: * indicNatoes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job
Manager Project Director Date
Check
CONTINUED ON DRAWING C012
DO NOT SCALE
Drawn
T. GARDINER
Designer
Client
TENDER
0 5 10
SCALE 1:500 AT ORIGINAL SIZE
15m
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document)
Drafting D.TRUONG
Approved (Project Director) Date
Design Check
D.TRUONG
Project
Title
Note: * indicNaotes siRgneavtiusrieosnon original issue of drawing or last revision of drawing
Drawn
Manager Director
Date
T 61 3 8687 8000 F 61 3 8687781111 for the purpose for which it was prepared person or for any other purpose.
This Drawing must not be
signed as Approved
Original Size A3 31-31686-C014 D Job Project E [email protected] W www.ghd.com and must not be used by any other Scale AS SHOWN used for Construction unless
Plot Date: 6 May 2015 - 5:19 PM
Plotted By: David Truong Cad File No:
G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg
WARNING SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
WARNING SERVICES SHOWN ON THIS DRAWING ARE
APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO COMMENCEMENT OF WORKS.
TENDER
Plot Date: 6 May 2015 - 5:19 PM
Plotted By: David Truong Cad File No:
G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg
CONT
INUE
D ON
DRA
WIN
G C0
14
0 5 10 15m
SCALE 1:500 AT ORIGINAL SIZE
Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia
T 61 3 8687 8000 F 61 3 8687782111 E [email protected] W www.ghd.com
DO NOT SCALE Drawn T. GARDINER Designer Client
Project
Title
Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
Drafting D.TRUONG Check
Design D.TRUONG Check
Approved (Project Director) Date
This Drawing must not be Scale AS SHOWN used for Construction unless
signed as Approved
Original Size
A3 31-31686-C015 D Note: * indicNaotes sRigenavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job
Manager Project Director Date
SCOPE OF WORKS
CONSTRUCT NEW DRAINAGE PITS AND PIPE TO DRAIN COLE STREET AND PARKER STREET. CONSTRUCT OUTFALL DRAINS THROUGH COMMONWEALTH RESERVE OUTLET DRAINS INTO HOBSONS BAY. REINSTATE ROAD PAVEMENT. EXCLUDES LANDSCAPING AND SERVICE RELOCATIONS. EXCLUDES ANY COSTS ASSOCIATED WITH REMOVAL OF UNSUITABLE MATERIAL. EXCLUDES ANY ALLOWANCE FOR DRAINAGE OUTFALL TREATMENT INTO BAY. EXCLUDES ANY ALLOWANCE FOR CONINGENCY.
INTERSECTION OF ELECTRA STREET / PARKER STREET ‐ FACING EAST
NOT FOR CONSTRUCTION
SMEC AUSTRALIA PTY LTD
INFORMATION DOCUMENT COLE STREET / PARKER STREET
AT A3 SIZE DRAWING C ABN 47 065 475 149
73 LEVEL 4 71 QUEENS ROAD
MELBOURNE VIC. 3004 PH 03 9514-1500 FAX 03 9514-5566
DRAINAGE WORKS 30041313-ID-0002-20160106
FOR DISCUSSION PURPOSES ONLY
This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.
74
Project 10
Cost $962,903
Notional timing 2017-20
Description Electra Street is an important connector road in Williamstown. It provides an important connection for residents in the southern parts of Williamstown with access to the Williamstown Civic and Commercial Precinct, and with many community facilities such as the Williamstown Town Hall, Dennis Reserve, Mechanics Institute, Williamstown Primary School.
Scope of Works New underground drain and road rehabilitation from Parker Street to Ferguson Street Concept Design Only Refer to SMEC Australia Pty Ltd Information Sheet
Location DCP Map Reference 10 Melway Map 56 C8, C9
Strategic Basis for Project
Road Asset Management Plan
Catchment Travel Zones 176, 177, 178, 1281, 1282
Cost Source Independent Costing by SMEC Australia Pty Ltd Hobsons Bay City Council Engineering Department Hobsons Bay City Council Annual Supply Contract
Design Standards Hobsons Bay City Council Roads and Drainage Construction Standard
75
Drainage Electra Street, Williamstown
FPPWM
Developm
entContribution
Plan2015-25
76
SCOPE OF WORKS
MILL AND REPLACE EXISTING ASPHALT BETWEEN FERGUSON STREET AND PARKER STREET. TRAFFIC LANES ONLY. (APPROXIMATELY 500m LENGTH. ASSUMED 15% REHABILITATION) CONSTRUCT NEW DRAINAGE PITS AND PIPE TO DRAIN ELECTRA STREET. DRAINAGE TO OUTLET INTO PASCOE STREET AND PARKER STREET (WORKS BY OTHERS ‐ ASSUMED TO PROVIDE SUFFICIENT DRAINAGE CAPACITY) CONSTRUCT NEW/REINSTATE EXISTING BLUE STONE EDGE STRIP DEFINING CARRIAGEWAY EXTENTS. LINEMARKING. EXCLUDES LANDSCAPING, SERVICE RELOCATIONS, PASCO STREET ROUNDABOUT WORKS, PARKER STREET ROUNDABOUT WORKS, FERGUSON STREET INTERSECTION WORKS. ESTIMATE EXCLUDES ANY ALLOWANCE FOR CONTINGENCY AND DESIGN COSTS.
INTERSECTION OF PARKER STREET / ELECTRA STREET ‐ FACING NORTH
BLUE STONE EDGE STRIP
NOT FOR CONSTRUCTION
SMEC AUSTRALIA PTY LTD
INFORMATION DOCUMENT ELECTRA STREET
AT A3 SIZE DRAWING C ABN 47 065 475 149 ROAD AND DRAINAGE WORKS LEVEL 4 71 QUEENS ROAD
MELBOURNE VIC. 3004 PH 03 9514-1500 FAX 03 9514-5566
77 30041313-ID-0001-20160115
FOR DISCUSSION PURPOSES ONLY
This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.
78
Project 11
79
Cost $401,643.25
Notional timing 2020-22
Description New Drainage in Hanmer Street from Ann Street to Thompson Street and from Cole Street to Electra Street
Scope of Works New drainage – see concept plan attached
Location Hanmer Street, WilliamstownDCP Map Reference 11 Melway Map 56 C10, E10
Strategic Basis for Project
Road Asset Management Plan
Catchment Travel Zones 177, 178
Cost Source Independent cost provided by SMEC Australia Pty LtdHobsons Bay City Council Engineering Department Hobsons Bay City Council Annual Supply Contract
Design Standards Hobsons Bay City Council Engineering Standards
Drainage Hanmer Street, Williamstown
FPPWM
Developm
ent ContributionPlan
2015-25
FPPWM Development Contribution Plan 2015-25
80
F P P W M D
e v e l o p m e n t C o n t r i b u t i o n P l a n
2 0 1 5 - 2 5
SCOPE OF WORKS
CONSTRUCT NEW DRAINAGE PITS AND PIPE TO DRAIN HANMER STREET BETWEEN ELECTRA STREET & COLE STREET, AND THOMPSON STREET & ANN STREET. (APPROXIMATELY 400m COMBINED LENGTH) DRAINAGE TO OUTLET INTO COLE STREET AND THOMPSON STREET (WORKS BY OTHERS ‐ ASSUMED TO PROVIDE SUFFICIENT DRAINAGE CAPACITY.) REINSTATE ROAD PAVEMENT. EXCLUDES LANDSCAPING, SERVICE RELOCATIONS AND WORKS BETWEEN COLE STREET AND THOMPSON STREET. EXCLUDES ANY ALLOWANCE FOR CONTINGENCY AND DESIGN COSTS.
INTERSECTION OF ELECTRA STREET / HANMER STREET ‐ FACING EAST
NOT FOR CONSTRUCTION
SMEC AUSTRALIA PTY LTD
INFORMATION DOCUMENT HANMER STREET
AT A3 SIZE DRAWING C ABN 47 065 475 149
81 LEVEL 4 71 QUEENS ROAD MELBOURNE VIC. 3004
PH 03 9514-1500 FAX 03 9514-5566
DRAINAGE WORKS 30041313-ID-0003-20160106
FOR DISCUSSION PURPOSES ONLY
This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.
LIM
IT O
F W
OR
KS
LIM
IT O
F W
OR
KS
LIM
IT O
F W
OR
KS
LIM
IT O
F W
OR
KS
FPPWM Development Contribution Plan 2015-25
82
Project 12 Coastal Trail
Cost $500,000
Timing 2016-25
Description The Coastal Trail is a 23km off road shared bicycle and walking sealed trail, which runs along the foreshore of the City of Hobsons Bay from the West Gate Bridge in Spotswood to Skeleton Creek in Seabrook. The Williamstown section of the trail provides the community with a safe and enjoyable access to the maritime historical precinct of Williamstown, the Warmies Boat ramp, the botanic gardens, The Strand and Williamstown beach. The trail also provides the Williamstown community with a sustainable transport option to the CBD via connections to other trails and The Punt Yarra Crossing.
Scope of Works Preparation of detailed designs and renewal of sections within the Coastal Trail from Williamstown beach to The Strand.
Location The Strand and Nelson Place DCP Map Reference 13 Melway Map 56
Strategic Basis for Project
Hobsons Bay Planning Scheme Hobsons Bay Strategic Bike Plan
Catchment Municipality of Hobsons Bay
Cost Source Hobsons Bay City Council Parks Department
Design Standards Hobsons Bay City Council Engineering Standards
83
FPPWM
Developm
ent ContributionPlan
2015-25
FP P WMDe ve
l o pmen t Co n tr i b ut i o nPl an
2 015 25
Map showing the location of the Hobsons Bay Coastal Trail
84
Project 13
Cost $605,000
Notional timing Annually
Description There are over 3,000 heritage Elm trees in Williamstown that are an integral part of the history, landscape and streetscape character of the area.
The Dutch Elm disease has the potential to devastate the entire tree population of elms.
The progressive removal and replacement of up to 700 elm trees throughout the suburb of Williamstown is an important strategy to control and protect the elms from the Dutch Elm disease and ensure that there is an acceptable level of risk to the public from trees in decline. The heritage elms make a significant aesthetic and economic contribution to real estate values.
Scope of Works Removal and replacement of approximately 15 existing large heritage Elm trees each year for ten years. Replacement works will often include the construction of a new bluestone tree bay. The replacement tree will be of specially grown semi-advance stock and include a two year establishment program of watering and mulching.
Location All areas within Williamstown, as needed DCP Map Reference 13 Melway Map 56
Strategic Basis for Project
Hobsons Bay Heritage Study The Williamstown Elms Discussion Paper & Management Plan 2007 Street Tree Asset Management Plan Hobsons Bay Streets and Laneways Plan
Catchment Suburb of Williamstown
Cost Source Hobsons Bay City Council Parks Department, based on historical costs. Cost for removal and replacement of tree is estimated at $3,000 per tree. A bluestone tree bay costs between $1,000 - $2500. It is estimated that 40% of trees will require a tree bay.
Design Standards
Hobsons Bay City Council Street Tree Planting Specification The Williamstown Elms Discussion Paper and Management Plan 2007 Standard Tree Bay for Elms in Road Shoulders
85
Public Realm Heritage Elm Tree Replacement Program
FPPWM
Developm
ent ContributionPlan
2015-25
FPPWM Development Contribution Plan 2015-25
Figu
re 1
. Tre
e pr
otec
tion
bay.
86
Project 14
Cost $500,000
Notional timing Annually 2015-25
Description Planting of new trees in various parks and streets in Williamstown.
Scope of Works Planting and establishment of 1,000 new trees throughout street and parks in Williamstown over the next ten years. This equates to the planting of an average of 100 trees per annum. Trees are semi-advance stock and cost includes post planting watering for a two-year establishment period.
Location All areas within Williamstown, as needed DCP Map Reference 14 Melway Map 56
Strategic Basis for Project
Street Tree Asset Management Plan Street Tree Policy Hobsons Bay Street Tree Strategy Hobsons Bay Open Space Plan Hobsons Bay Heritage Study
Catchment Suburb of Williamstown
Cost Source Hobsons Bay City Council Parks department, based on historical costs of $500 per tree, including a two year establishment program of watering and mulching.
Design Standards Hobsons Bay City Council Engineering and Landscape street tree planting detail / standard specification Relevant master plans for the street/park Hobsons Bay Heritage Study
87
Public Realm Park and Street Tree - Planting Program
FPPWM
Developm
ent ContributionPlan
2015-25
FPPWM Development Contribution Plan 2015-25
88
Project 15
Cost $10,000
Notional timing 2015-16
Description This Development Contributions Plan was prepared in accordance with the State Government’s Development Contributions Guidelines March 2007.
Scope of Works The following professional services were required to prepare
this Development Contributions Plan:
SGS Economics and Planning Pty Ltd Preparation of the Development Contributions Plan, including the economic modeling and compliance with the Development Contributions Guidelines
SMEC Australia Pty Ltd Preparation of Independent Costings for the following Roads and Drainage Projects
Location Not applicable
Strategic Basis for Project
Hobsons Bay Planning Scheme Clause 45.06 - Development Contributions Plan Overlay Schedule 1
Catchment Area covered by the Development Contributions Plan Overlay – Schedule 1 at Clause 45.06 of the Hobsons Bay Planning Scheme.
Cost Source Invoices - actual costs incurred
Design Standards Victorian Government Development Contributions Plan Guidelines March 2007
89
Planning Development Contributions Plan Preparation Professional Services
FPPWM
Developm
ent ContributionPlan
2015-25
FPPWM Development Contribution Plan 2015-25
90