gc75 incorp doc - port phillip woollen mill development ... · note: * nidci natoes...

24
WARNING SERVICES SHOWN ON THIS DRAWING ARE APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR PRIOR TO COMMENCEMENT OF WORKS. TENDER 0 25 50 75m SCALE 1:2500 AT ORIGINAL SIZE Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W 6 ww 7 w.ghd.com DO NOT SCALE Drawn Designer Client Project Title Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose. Drafting D.TRUONG Check Design D.TRUONG Check Approved (Project Director) Date This Drawing must not be Scale AS SHOWN used for Construction unless signed as Approved Original Size A3 31-31686-C003 D Note: * indic N at o es si R gn e a v t i u s r i e o s n onoriginal issue of drawing or last revision of drawing Drawn Job Manager Project Director Date Plot Date: 6 May 2015 - 5:18 PM Plotted By: David Truong G:\31\31686\CCAaDdDF\iDleraNwoi:ngs\31-31686-C003.dwg TBM TABLE TBM NO. EASTING NORTHING R.L. DESCRIPTION 1 315397.511 5807045.416 6.634 RIVET 2 315469.685 5807155.670 5.095 RIVET 3 315496.312 5807293.853 3.652 NAIL 4 315203.282 5807257.980 7.522 RIVET 5 315302.425 5807284.400 6.018 NAIL 6 315411.217 5807317.136 4.542 RIVET 7 315493.798 5807339.138 3.153 NAIL 8 315553.108 5807365.040 2.395 RIVET 9 315717.844 5807391.374 1.115 NAIL 10 315696.346 5807309.325 2.280 RIVET 11 315738.429 5807269.914 2.886 NAIL

Upload: others

Post on 31-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

WARNING SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

TENDER

0 25 50 75m

SCALE 1:2500 AT ORIGINAL SIZE

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111

E [email protected] W 6ww7w.ghd.com

DO NOT SCALE Drawn Designer Client

Project

Title

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

Drafting D.TRUONG Check

Design D.TRUONG Check

Approved (Project Director)

Date

    This Drawing must not be

Scale AS SHOWN used for Construction unless signed as Approved

Original Size

A3 31-31686-C003 D  Note: * indicNatoes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job

Manager Project Director Date

Plot Date: 6 May 2015 - 5:18 PM Plotted By: David Truong

G:\31\31686\CCAaDdDF\iDleraNwoi:ngs\31-31686-C003.dwg

    

    

   

TBM TABLE TBM NO. EASTING NORTHING R.L. DESCRIPTION

1 315397.511 5807045.416 6.634 RIVET

2 315469.685 5807155.670 5.095 RIVET

3 315496.312 5807293.853 3.652 NAIL

4 315203.282 5807257.980 7.522 RIVET

5 315302.425 5807284.400 6.018 NAIL

6 315411.217 5807317.136 4.542 RIVET

7 315493.798 5807339.138 3.153 NAIL

8 315553.108 5807365.040 2.395 RIVET

9 315717.844 5807391.374 1.115 NAIL

10 315696.346 5807309.325 2.280 RIVET

11 315738.429 5807269.914 2.886 NAIL

Page 2: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Check

DO NOT SCALE

Drawn

T. GARDINER

Designer

Client

TENDER

0 5 10

SCALE 1:500 AT ORIGINAL SIZE

15m

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document)

Drafting D.TRUONG

Approved (Project Director) Date

Design Check

D.TRUONG

Project

Title

Note: * indicNatoes siRgneavtuisrieosnon original issue of drawing or last revision of drawing

Drawn

Job

Project

Date T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.6gh8d.com

for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

Scale AS SHOWN This Drawing must not be used for Construction unless

Original Size 31-31686-C011 D Manager Director signed as Approved A3

Plot Date: 6 May 2015 - 5:19 PM

Plotted By: David Truong Cad File No:

G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg

WARNING SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

Page 3: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

WARNING

SERVICES SHOWN ON THIS DRAWING ARE APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

TENDER

Plot Date: 6 May 2015 - 5:19 PM

Plotted By: David Truong Cad File No:

G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg

CONT

INUE

D ON

DRA

WIN

G C0

11

0 5 10 15m

SCALE 1:500 AT ORIGINAL SIZE

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W ww6w.9ghd.com

DO NOT SCALE Drawn T. GARDINER Designer Client

Project

Title

           

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

Drafting D.TRUONG Check

Design D.TRUONG Check

            Approved (Project Director) Date            

    This Drawing must not be

Scale AS SHOWN used for Construction unless signed as Approved

Original Size

A3 31-31686-C012 D  Note: * indicNaotes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job

Manager Project Director Date

Page 4: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

WARNING SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

TENDER

Plot Date: 6 May 2015 - 5:19 PM

Plotted By: David Truong Cad File No:

G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg

0 5 10 15m

SCALE 1:500 AT ORIGINAL SIZE

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111

E [email protected] W ww7w0.ghd.com

DO NOT SCALE Drawn T. GARDINER Designer Client

Project

Title

           

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

Drafting D.TRUONG Check Design D.TRUONG Check             Approved

(Project Director)

Date                 This Drawing must not be

Scale AS SHOWN used for Construction unless signed as Approved

Original Size

A3 31-31686-C013 D  Note: * indicNatoes siRgneavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job

Manager Project Director Date

Page 5: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Check

CONTINUED ON DRAWING C012

DO NOT SCALE

Drawn

T. GARDINER

Designer

Client

TENDER

0 5 10

SCALE 1:500 AT ORIGINAL SIZE

15m

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document)

Drafting D.TRUONG

Approved (Project Director) Date

Design Check

D.TRUONG

Project

Title

Note: * indicNaotes siRgneavtiusrieosnon original issue of drawing or last revision of drawing

Drawn

Manager Director

Date

T 61 3 8687 8000 F 61 3 8687781111 for the purpose for which it was prepared person or for any other purpose.

This Drawing must not be

signed as Approved

Original Size A3 31-31686-C014 D Job Project E [email protected] W www.ghd.com and must not be used by any other Scale AS SHOWN used for Construction unless

Plot Date: 6 May 2015 - 5:19 PM

Plotted By: David Truong Cad File No:

G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg

WARNING SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

Page 6: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

WARNING SERVICES SHOWN ON THIS DRAWING ARE

APPROXIMATE ONLY. THE EXACT LOCATION IS TO BE CONFIRMED ON SITE BY CONTRACTOR

PRIOR TO COMMENCEMENT OF WORKS.

TENDER

Plot Date: 6 May 2015 - 5:19 PM

Plotted By: David Truong Cad File No:

G:\31\31686\CADD\Drawings\31-31686-C011_C015.dwg

CONT

INUE

D ON

DRA

WIN

G C0

14

0 5 10 15m

SCALE 1:500 AT ORIGINAL SIZE

Level 8, 180 Lonsdale Street, Melbourne VIC 3000 Australia

T 61 3 8687 8000 F 61 3 8687782111 E [email protected] W www.ghd.com

DO NOT SCALE Drawn T. GARDINER Designer Client

Project

Title

           

Conditions of Use. This document may only be used by GHD's client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

Drafting D.TRUONG Check

Design D.TRUONG Check

            Approved (Project Director) Date            

    This Drawing must not be Scale AS SHOWN used for Construction unless

signed as Approved

Original Size

A3 31-31686-C015 D  Note: * indicNaotes sRigenavtiusrieosnon original issue of drawing or last revision of drawing Drawn Job

Manager Project Director Date

Page 7: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

SCOPE OF WORKS 

CONSTRUCT NEW DRAINAGE PITS AND PIPE TO DRAIN COLE STREET AND PARKER  STREET. CONSTRUCT OUTFALL DRAINS THROUGH COMMONWEALTH RESERVE OUTLET DRAINS INTO HOBSONS  BAY. REINSTATE ROAD  PAVEMENT. EXCLUDES LANDSCAPING AND SERVICE  RELOCATIONS. EXCLUDES ANY COSTS ASSOCIATED WITH REMOVAL OF UNSUITABLE MATERIAL. EXCLUDES ANY ALLOWANCE FOR DRAINAGE OUTFALL TREATMENT INTO BAY. EXCLUDES ANY ALLOWANCE FOR  CONINGENCY. 

INTERSECTION OF ELECTRA STREET / PARKER STREET ‐ FACING   EAST 

NOT FOR CONSTRUCTION

SMEC AUSTRALIA PTY LTD

INFORMATION DOCUMENT COLE STREET / PARKER STREET

AT A3 SIZE DRAWING C ABN 47 065 475 149

73 LEVEL 4 71 QUEENS ROAD

MELBOURNE VIC. 3004 PH 03 9514-1500 FAX 03 9514-5566

DRAINAGE WORKS 30041313-ID-0002-20160106

FOR DISCUSSION PURPOSES ONLY

This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.

Page 8: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

74

Page 9: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 10

Cost $962,903

Notional timing 2017-20

Description Electra Street is an important connector road in Williamstown. It provides an important connection for residents in the southern parts of Williamstown with access to the Williamstown Civic and Commercial Precinct, and with many community facilities such as the Williamstown Town Hall, Dennis Reserve, Mechanics Institute, Williamstown Primary School.

Scope of Works New underground drain and road rehabilitation from Parker Street to Ferguson Street Concept Design Only Refer to SMEC Australia Pty Ltd Information Sheet

Location DCP Map Reference 10 Melway Map 56 C8, C9

Strategic Basis for Project

Road Asset Management Plan

Catchment Travel Zones 176, 177, 178, 1281, 1282

Cost Source Independent Costing by SMEC Australia Pty Ltd Hobsons Bay City Council Engineering Department Hobsons Bay City Council Annual Supply Contract

Design Standards Hobsons Bay City Council Roads and Drainage Construction Standard

75

Drainage Electra Street, Williamstown

FPPWM

Developm

entContribution

Plan2015-25

Page 10: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

76

Page 11: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

SCOPE OF WORKS 

MILL AND REPLACE EXISTING ASPHALT BETWEEN FERGUSON STREET AND PARKER STREET. TRAFFIC LANES ONLY. (APPROXIMATELY 500m LENGTH. ASSUMED 15% REHABILITATION) CONSTRUCT NEW DRAINAGE PITS AND PIPE TO DRAIN ELECTRA STREET. DRAINAGE TO OUTLET INTO PASCOE STREET AND PARKER STREET (WORKS BY OTHERS ‐ ASSUMED TO PROVIDE SUFFICIENT DRAINAGE CAPACITY) CONSTRUCT NEW/REINSTATE EXISTING BLUE STONE EDGE STRIP DEFINING CARRIAGEWAY EXTENTS. LINEMARKING. EXCLUDES LANDSCAPING, SERVICE RELOCATIONS, PASCO STREET ROUNDABOUT WORKS, PARKER STREET ROUNDABOUT WORKS, FERGUSON STREET INTERSECTION WORKS. ESTIMATE EXCLUDES ANY ALLOWANCE FOR CONTINGENCY AND DESIGN COSTS. 

INTERSECTION OF PARKER STREET / ELECTRA STREET ‐ FACING NORTH 

BLUE STONE EDGE STRIP 

NOT FOR CONSTRUCTION

SMEC AUSTRALIA PTY LTD

INFORMATION DOCUMENT ELECTRA STREET

AT A3 SIZE DRAWING C ABN 47 065 475 149 ROAD AND DRAINAGE WORKS LEVEL 4 71 QUEENS ROAD

MELBOURNE VIC. 3004 PH 03 9514-1500 FAX 03 9514-5566

77 30041313-ID-0001-20160115

FOR DISCUSSION PURPOSES ONLY

This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.

Page 12: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

78

Page 13: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 11

79

Cost $401,643.25

Notional timing 2020-22

Description New Drainage in Hanmer Street from Ann Street to Thompson Street and from Cole Street to Electra Street

Scope of Works New drainage – see concept plan attached

Location Hanmer Street, WilliamstownDCP Map Reference 11 Melway Map 56 C10, E10

Strategic Basis for Project

Road Asset Management Plan

Catchment Travel Zones 177, 178

Cost Source Independent cost provided by SMEC Australia Pty LtdHobsons Bay City Council Engineering Department Hobsons Bay City Council Annual Supply Contract

Design Standards Hobsons Bay City Council Engineering Standards

Drainage Hanmer Street, Williamstown

FPPWM

Developm

ent ContributionPlan

2015-25

Page 14: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FPPWM Development Contribution Plan 2015-25

80

Page 15: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

F P P W M D

e v e l o p m e n t C o n t r i b u t i o n P l a n

2 0 1 5 - 2 5

SCOPE OF WORKS 

 

CONSTRUCT NEW DRAINAGE PITS AND PIPE TO  DRAIN HANMER STREET BETWEEN ELECTRA STREET & COLE STREET, AND THOMPSON STREET & ANN STREET. (APPROXIMATELY 400m COMBINED LENGTH) DRAINAGE TO OUTLET INTO COLE STREET  AND THOMPSON STREET (WORKS BY OTHERS ‐ ASSUMED  TO PROVIDE  SUFFICIENT  DRAINAGE CAPACITY.) REINSTATE  ROAD PAVEMENT. EXCLUDES LANDSCAPING, SERVICE RELOCATIONS AND WORKS BETWEEN COLE STREET AND  THOMPSON STREET. EXCLUDES ANY ALLOWANCE FOR CONTINGENCY AND DESIGN COSTS. 

                                  

 

INTERSECTION OF ELECTRA STREET / HANMER STREET ‐ FACING  EAST 

    

 

NOT FOR CONSTRUCTION

SMEC AUSTRALIA PTY LTD

INFORMATION DOCUMENT HANMER STREET

AT A3 SIZE DRAWING C ABN 47 065 475 149

81 LEVEL 4 71 QUEENS ROAD MELBOURNE VIC. 3004

PH 03 9514-1500 FAX 03 9514-5566

DRAINAGE WORKS 30041313-ID-0003-20160106

FOR DISCUSSION PURPOSES ONLY

This draft plan has been prepared to show a concept for discussion purposes only and has no formal or official status.

LIM

IT O

F W

OR

KS

LIM

IT O

F W

OR

KS

LIM

IT O

F W

OR

KS

LIM

IT O

F W

OR

KS

Page 16: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FPPWM Development Contribution Plan 2015-25

82

Page 17: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 12 Coastal Trail

Cost $500,000

Timing 2016-25

Description The Coastal Trail is a 23km off road shared bicycle and walking sealed trail, which runs along the foreshore of the City of Hobsons Bay from the West Gate Bridge in Spotswood to Skeleton Creek in Seabrook. The Williamstown section of the trail provides the community with a safe and enjoyable access to the maritime historical precinct of Williamstown, the Warmies Boat ramp, the botanic gardens, The Strand and Williamstown beach. The trail also provides the Williamstown community with a sustainable transport option to the CBD via connections to other trails and The Punt Yarra Crossing.

Scope of Works Preparation of detailed designs and renewal of sections within the Coastal Trail from Williamstown beach to The Strand.

Location The Strand and Nelson Place DCP Map Reference 13 Melway Map 56

Strategic Basis for Project

Hobsons Bay Planning Scheme Hobsons Bay Strategic Bike Plan

Catchment Municipality of Hobsons Bay

Cost Source Hobsons Bay City Council Parks Department

Design Standards Hobsons Bay City Council Engineering Standards

83

FPPWM

Developm

ent ContributionPlan

2015-25

Page 18: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FP P WMDe ve

l o pmen t Co n tr i b ut i o nPl an

2 015 25

Map showing the location of the Hobsons Bay Coastal Trail

84

Page 19: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 13

Cost $605,000

Notional timing Annually

Description There are over 3,000 heritage Elm trees in Williamstown that are an integral part of the history, landscape and streetscape character of the area.

The Dutch Elm disease has the potential to devastate the entire tree population of elms.

The progressive removal and replacement of up to 700 elm trees throughout the suburb of Williamstown is an important strategy to control and protect the elms from the Dutch Elm disease and ensure that there is an acceptable level of risk to the public from trees in decline. The heritage elms make a significant aesthetic and economic contribution to real estate values.

Scope of Works Removal and replacement of approximately 15 existing large heritage Elm trees each year for ten years. Replacement works will often include the construction of a new bluestone tree bay. The replacement tree will be of specially grown semi-advance stock and include a two year establishment program of watering and mulching.

Location All areas within Williamstown, as needed DCP Map Reference 13 Melway Map 56

Strategic Basis for Project

Hobsons Bay Heritage Study The Williamstown Elms Discussion Paper & Management Plan 2007 Street Tree Asset Management Plan Hobsons Bay Streets and Laneways Plan

Catchment Suburb of Williamstown

Cost Source Hobsons Bay City Council Parks Department, based on historical costs. Cost for removal and replacement of tree is estimated at $3,000 per tree. A bluestone tree bay costs between $1,000 - $2500. It is estimated that 40% of trees will require a tree bay.

Design Standards

Hobsons Bay City Council Street Tree Planting Specification The Williamstown Elms Discussion Paper and Management Plan 2007 Standard Tree Bay for Elms in Road Shoulders

85

Public Realm Heritage Elm Tree Replacement Program

FPPWM

Developm

ent ContributionPlan

2015-25

Page 20: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FPPWM Development Contribution Plan 2015-25

Figu

re 1

. Tre

e pr

otec

tion

bay.

86

Page 21: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 14

Cost $500,000

Notional timing Annually 2015-25

Description Planting of new trees in various parks and streets in Williamstown.

Scope of Works Planting and establishment of 1,000 new trees throughout street and parks in Williamstown over the next ten years. This equates to the planting of an average of 100 trees per annum. Trees are semi-advance stock and cost includes post planting watering for a two-year establishment period.

Location All areas within Williamstown, as needed DCP Map Reference 14 Melway Map 56

Strategic Basis for Project

Street Tree Asset Management Plan Street Tree Policy Hobsons Bay Street Tree Strategy Hobsons Bay Open Space Plan Hobsons Bay Heritage Study

Catchment Suburb of Williamstown

Cost Source Hobsons Bay City Council Parks department, based on historical costs of $500 per tree, including a two year establishment program of watering and mulching.

Design Standards Hobsons Bay City Council Engineering and Landscape street tree planting detail / standard specification Relevant master plans for the street/park Hobsons Bay Heritage Study

87

Public Realm Park and Street Tree - Planting Program

FPPWM

Developm

ent ContributionPlan

2015-25

Page 22: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FPPWM Development Contribution Plan 2015-25

88

Page 23: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

Project 15

Cost $10,000

Notional timing 2015-16

Description This Development Contributions Plan was prepared in accordance with the State Government’s Development Contributions Guidelines March 2007.

Scope of Works The following professional services were required to prepare

this Development Contributions Plan:

SGS Economics and Planning Pty Ltd Preparation of the Development Contributions Plan, including the economic modeling and compliance with the Development Contributions Guidelines

SMEC Australia Pty Ltd Preparation of Independent Costings for the following Roads and Drainage Projects

Location Not applicable

Strategic Basis for Project

Hobsons Bay Planning Scheme Clause 45.06 - Development Contributions Plan Overlay Schedule 1

Catchment Area covered by the Development Contributions Plan Overlay – Schedule 1 at Clause 45.06 of the Hobsons Bay Planning Scheme.

Cost Source Invoices - actual costs incurred

Design Standards Victorian Government Development Contributions Plan Guidelines March 2007

89

Planning Development Contributions Plan Preparation Professional Services

FPPWM

Developm

ent ContributionPlan

2015-25

Page 24: GC75 Incorp Doc - Port Phillip Woollen Mill Development ... · Note: * nidci Natoes siRgneavtiusrieosnon ori ginal issue of drawing or last revision of drawing Manager Drawn Job Project

FPPWM Development Contribution Plan 2015-25

90