gc scholars - final presentation event - 2014 08 22...microsoft powerpoint - gc scholars - final...

5
MEHDI BAGHERI ENGINEERING - WATERWORKS Predicting the internal corrosion in cast iron drinking water mains. 29 CLEAN WATER Time

Upload: others

Post on 03-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • MEHDI BAGHERI ENGINEERING - WATERWORKS

    Predicting the internal corrosion in cast iron drinking water mains.

    29

    CLEA

    N W

    ATER

    Time

  • • Source waters from all three watersheds serving the lower mainland are naturally corrosive.

    • Focus of research study was to look at the chemical & physical parameters affecting the corrosion rate of water mains in the City, specifically cast iron.

    30

    DRINKING WATER GOAL

    Corrosive waterNon-Corrosive water

  • 1. Developing predictive models to assess the waterpotential for corrosion and iron concentration level

    2. Providing a visual user-friendly computational tool toconsistently monitor the water corrosivity with minimuminput requirement

    31

    MAIN DELIVERABLES

    The City can integrate these deliverables to prioritize proactive actions in drinking water mains

  • 32

    MODELING SOFTWARE – WATER CORROSION ANALYZER

  • 33

    SAMPLE ANALYSIS RESULTS

    2869W (KE)

    408E (34th)

    23

    33

    69

    7669

    8165

    33

    70

    76

    30

    27

    34

    44

    75

    69

    76

    27

    3622

    28

    34

    35

    40

    82 48

    31

    74

    39

    24

    73

    26

    76

    84

    89

    88

    70

    38

    26

    25

    69

    7968

    71

    7374

    90

    2427

    30

    127

    104

    Corrosivity study of the water

    City of Vancouver

    Exp. Iron Level (ppb)

    Ryznar Corrosivity index (round 2)Prediction Map

    Water pressure zones

    1

    10

    50

    100

    (Capilano + Seymour + Coquitlam)

    12.7 – 13.1

    13.1 – 13.6

    13.6 – 14.1

    14.1 – 14.6

    14.6 – 15