At the Headwaters of
Sustainable Water
Management in Georgia Gil Rogers
Southern Environmental Law Center
July 26, 2012
![Page 2: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/2.jpg)
• Tri-State Water Wars – history and
current status
• State of Georgia’s water management
Overview
![Page 3: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/3.jpg)
Tri-State Water Wars
![Page 4: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/4.jpg)
• Litigation began in 1990 when Alabama sued the Army
Corps of Engineers
• Georgia, Florida, various local governments,
hydropower customers and Alabama Power all got
involved.
• At issue is Corps’ management of ACF and ACT
systems, and whether Lakes Allatoona and Lanier can
be used for water supply by metro Atlanta.
• District Court said “no” to second question in 2009,
overturned by 11th Circuit in 2011; Supreme Court
declined to hear an appeal in June 2012.
Tri-State Water Wars
![Page 5: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/5.jpg)
• Supreme Court has original jurisdiction in controversies
between states
• Alabama and Florida will have to show direct
interest and negative impacts for Supreme Court to
accept case
• If the Supreme Court agrees and accepts case,
Georgia has to show benefits of its water use outweigh
harm to FL and AL
• Standard that GA will have to meet is clear and
convincing evidence
Legal Option for Future Interstate
Litigation: Supreme Court Litigation
![Page 6: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/6.jpg)
• Question the Supreme Court would answer is:
How well is each state managing its water
resources? Who has their house in order?
• Corps will be revising its water control manuals
over the next year: more fodder for litigation.
• Other statutes in play include Clean Water Act,
National Environmental Policy Act, Endangered
Species Act
Future Interstate Litigation
![Page 7: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/7.jpg)
South Carolina v. North Carolina –
recently in U.S. Supreme Court
Transfer proposed between Catawba and Yadkin Basins
![Page 8: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/8.jpg)
![Page 9: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/9.jpg)
• Water withdrawals over 100,000
gallons per day require a permit from
EPD – “regulated riparian” system
• 2008 State Water Plan
• 2010 Water Stewardship Act
• 2011 Interbasin Transfer Rules
Water Management in Georgia
![Page 10: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/10.jpg)
• Created in 2001 pursuant to the
Metropolitan North Georgia Water
Planning District Act.
• 15 county area
• No interbasin transfers into the District.
![Page 11: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/11.jpg)
![Page 12: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/12.jpg)
Source: Metropolitan North Georgia Water Planning District Water Supply and Water Conservation Management Plan, September 2003
![Page 13: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/13.jpg)
• 2011 rulemaking for interbasin transfer
water withdrawal permits
• List of 22 factors to be considered
when evaluating proposals
• Factors include economic costs, water
quality impacts, interstate impacts, and
cumulative impacts
Interbasin Transfers in Georgia
![Page 14: Gbr ge panel 07 26-12](https://reader031.vdocuments.us/reader031/viewer/2022020207/5550e113b4c90513798b48cd/html5/thumbnails/14.jpg)
• Water resources and population centers
are separated in Georgia.
• Must evaluate growth areas and
patterns in order to insure sustainable
future.
• Energy sources and their water
use/discharge practices are important
pieces of the puzzle.
Conclusions