ITS South Africa AGM Gautrain Rapid Rail Link – From Dreams to Reality Jack van der Merwe (Pr. Eng) CEO : Gautrain Management Agency 25 August 2010

Upload: paul-vorster

Post on 27-May-2015

217 views

Category:

Business


8 download

DESCRIPTION

Presented by Jack van der Merwe at the ITS SA AGM - 25 August.

TRANSCRIPT

Page 1: Gautrain ITSSA 2010

ITS South Africa AGM Gautrain Rapid Rail Link –

From Dreams to Reality Jack van der Merwe (Pr. Eng)

CEO : Gautrain Management Agency 25 August 2010

Page 2: Gautrain ITSSA 2010

Scope

Currently one of the largest Green fields rail infrastructure project in the world (USA $ 4,0 b) Emphasising the integration of Gautrain with

existing public transport in Gauteng Was voted “Best Global Deal to Sign” by the International Public Finance Association in 2007

Page 3: Gautrain ITSSA 2010

Objectives of the Gautrain Project

Page 4: Gautrain ITSSA 2010

More than Just Another Transport Project

Page 5: Gautrain ITSSA 2010

Transportation Goals •  Alleviate severe traffic congestion (traffic volumes in corridor

growing at 7% pa.. for more than a decade) •  Show Government’s commitment to the promotion of

public transport (National Land Transport Act,) – Catalyst public transport project

•  Improve the image of public transport with this project and attract more car users to public transport

•  To link to the Tshwane Ring Rail Project, linking Mamelodi, Atteridgeville and Soshanguve / Mabopane

•  Part of holistic transport plan and network for Gauteng •  Catalyst public transport project of national importance

Page 6: Gautrain ITSSA 2010

Flagship Public Transport Project of National Significance

•  Gautrain is a flagship public transport project of national importance. It can be the catalyst to free existing resources or to generate new resources to promote public transport in a holistic fashion

•  Need to ensure Gautrain is integrated into the public transport system of Gauteng: –  Promotion of public transport –  Strategic integration –  Operational integration –  Funding strategy / process –  Gautrain governance structure –  TDM strategy

Page 7: Gautrain ITSSA 2010
Page 8: Gautrain ITSSA 2010

The Deal

Page 9: Gautrain ITSSA 2010

PPP - Project partners: Equity PUBLIC PRIVATE

25%

25% 17%

17% 8%

8%

Page 10: Gautrain ITSSA 2010

Concessionaire Bombela

Turnkey Contractor

Civil Contractor

E&M Contractor

E&M Maintainer

Operator

Contractual Structure

Lenders

Province

Shareholders Agreement

Loan Agreement

Concession Agreement

E&M Maintenance Sub Contract

Bombardier 90% SPG 10%

RATP Dev 51% SPG 25.1% M&R 23.9%

Bombardier 25% Bouygues 25% M&R 25% SPG 25%

Private Sector Finance

Bombela “Family”

Onshore Sub-

supplier

Offshore Sub-supplier

Bombardier 25% Bouygues 25% M&R 25% SPG 25%

Shareholders

Bouygues 45% M&R 45% SPG 10%

Bombardier SPG

Onshore Sub-

supplier

Offshore Sub-supplier

Onshore procure

Offshore procure

Feeder & Distribution

Co-operation Agreement

Onshore Sub-

supplier

Offshore procure

Offshore procure

Offshore Sub-supplier

Offshore Sub-supplier

Onshore procure

Onshore procure

Onshore Procure

Onshore Sub-

supplier

Offshore procure

Page 11: Gautrain ITSSA 2010

Complex problems have simple, easy to understand, wrong answers.

No. 4 Grossman’s Misquote

Page 12: Gautrain ITSSA 2010

The hidden flaw never remains hidden.

No. 7 Law of Revelation

Page 13: Gautrain ITSSA 2010

Funding

Page 14: Gautrain ITSSA 2010

Funding

•  Gautrain has 5 sources of funding – DoRA (Division of Revenue Act) money from central

government via the Department of Transport – MTEF (Medium Term Expenditure Framework) from

Gauteng Provincial Government – Private Sector Equity – Private Sector Borrowing – Provincial Borrowing

Page 15: Gautrain ITSSA 2010

Project Financing

MTEF 26.1%

DoRA 44.2%

Equity 1.8%

Private Debt 9.5%

Provincial borrowing

18.4%

Page 16: Gautrain ITSSA 2010

Signaling System adopted for the Gautrain

Page 17: Gautrain ITSSA 2010

Signalling

•  In-cab signalling is being used •  The recommended speed and distance to go

displayed in cab. •  Speed monitored. •  Brake intervention if over speeding •  This system is called ATP (Automatic Train

Protection)

Page 18: Gautrain ITSSA 2010

Signalling

•  The signalling system conforms to ERTMS(European Rail Traffic Management System) level 1.    

•  Track to train communication via balise (transponder).

•  Track occupancy by means of Track Circuits •  Swing nose points are being used •  Allows for higher speeds over turnouts.

Page 19: Gautrain ITSSA 2010

19

Driver Supported by ATP

Brakes!

Travel direction!Controlled Balise

ATP!

Interlocking!

CAU

Page 20: Gautrain ITSSA 2010

20

What Can ATP Do?

•  Is fail safe •  Supports and supervises the driver •  Warns the driver and applies the brakes in all

dangerous situations •  Never intervenes unless the driver fails to

respond to given warnings •  Makes it possible to increase traffic capacity

Page 21: Gautrain ITSSA 2010

Distance-to-go Signalling

S1 S2

Page 22: Gautrain ITSSA 2010

22

Speed (Ceiling) Supervision

80!

90!

V max!V max + 3!V max + 6!

V!

V max + 9!Service Brake!

Emergency Brake!

Audible!

FSB���Applied FSB���

Released FSB���

Applied

EB���Applied

EB Not Released ���until stationary

Page 23: Gautrain ITSSA 2010
Page 24: Gautrain ITSSA 2010

24

Target Supervision

40 80 80 80 80 - 00

00 00 00

Allowed speed

Target speed

80

60

20

First���warning

Application of the service brakes by

Second ���warning

Full service brake curve Emergency brake curve

Page 25: Gautrain ITSSA 2010

25

Typical Example (Park to Rosebank)

Dynamic Data Fixed Data

Gradient

Train Speed

Speed Profile

Page 26: Gautrain ITSSA 2010

Telecommunication Systems

Page 27: Gautrain ITSSA 2010

Telecommunications

•  Monitoring of any ground settlement that might take place in the dolomitic areas around Centurion.

•  Surveillance of the total rail system using CCTV cameras

•  Cameras monitored and controlled from stations and the OCC.

•  The Operations Control Centre situated in Midrand

•   

Page 28: Gautrain ITSSA 2010

Main Subsystems

•  Fibre Optic Communications System (FOCS) •  Supervisory Control and Data Acquisition (SCADA) •  Telephone System •  Closed Circuit Television (CCTV) •  Public Address (PA) and Passenger Information (PI) •  Control Room Consoles

Page 29: Gautrain ITSSA 2010

Locations of Communications Subsystems

•  Train Depot •  Stations •  MPS and APSs •  Tunnels, Tunnel Rooms, Evac Shafts &

Portal •  Guideway •  Bus Depots (subject to VO)

Page 30: Gautrain ITSSA 2010

Fibre Optic Communications Subsystem

•  Transports voice, video and data over fibre optic media

•  Major Components: –  Fibre Optic Add Drop Multiplexer (ADM) –  Network Manager –  Fibre Cable –  LAN Switches and Routers –  Fibre Optic Transceivers –  GPS Network Time Server (NTS) –  LAN and Fibre patch panel

Page 31: Gautrain ITSSA 2010

Fibre Optic Communications Subsystem

•  Interfaces: – 1Gb/s Ethernet with VLANs supporting

SCADA, CCTV, PA/PI, AFC, Telephone, Radio and CJV systems (STMS, BMS & SAMS)

– Dedicated independent LANs for Signalling and O&M (Train & Bus VLANs)

– Voice Interface (4-Wire) supporting Radio – Fibre connections supporting ACSA, PS&D,

Signalling and CJV systems

Page 32: Gautrain ITSSA 2010

Fibre Optic Communications Subsystem

•  Two FOCS rings with a total bandwidth of 2.5Gb/s each

•  Cable loop via two separate conduits •  OTN Multiplexer with 1G Ethernet Uplinks •  Main FOCS backbone fibre single-mode cable 24

cores •  FOCS fault tolerant for cable breaks, main

processor, power supplies and Signalling interfaces

•  Secondary multi-mode and single-mode fibre cables for point to point signal distribution

Page 33: Gautrain ITSSA 2010

Fibre Optic Communications Subsystem

•  Dual Ring Structure

Page 34: Gautrain ITSSA 2010

FOCS •  Fast Reconfiguration of SDH Multiplexer < 50ms

Page 35: Gautrain ITSSA 2010

FOCS - Cabinet

Page 36: Gautrain ITSSA 2010

SCADA

•  SCADA provides a user interface to monitor and/or control various subsystems;

•  SCADA Remote Terminal Units (RTU) located in the Depot, station EERs, traction power disconnects, tunnel EERs, the MPS and in each APS;

•  Interface with NTS for time stamping of events •  Interfaces with CJV’s BMS, SAMS, and STMS

Page 37: Gautrain ITSSA 2010

SCADA – Monitoring & Control •  The SCADA System will allow the Central Control

Operators (CCO) to control and monitor: – MPS and APSs; – Motorised Traction Power Disconnects; – Predefined CJV Tunnel Ventilation Scenarios

[auxiliary control]; – CJV 11kV Tunnel Power System [auxiliary

control], and – CJV tunnel drainage and pumps [auxiliary

control].

Page 38: Gautrain ITSSA 2010

SCADA – Monitoring & Control •  SCADA will monitor the status of:

– AFC, CCTV, Radio, PA/PI, PBX, ETELs; – Fire Alarm Detection and Suppression System

[auxiliary monitoring]; – CJV Building Management System (Lifts,

Escalators, HVAC, Lighting); – CJV Security Access Management System

(Building Access Control); – Workshop Equipment (if applicable).

Page 39: Gautrain ITSSA 2010

SCADA – Depot Equipment

•  SunFire V445 Server

Page 40: Gautrain ITSSA 2010

SCADA – System Diagram

Page 41: Gautrain ITSSA 2010

SCADA – RTU

Page 42: Gautrain ITSSA 2010

Closed Circuit Television System (CCTV)

•  Major Components – Fixed and Pan Tilt Zoom (PTZ) Cameras – Networked Server Based Recorders – Operator Workstations provide live and pre-

recorded video of assigned cameras – Fibre Transceivers – Camera Power Supply

Page 43: Gautrain ITSSA 2010

CCTV - Guideway Cameras

•  Cameras: mostly PTZ with some fixed •  Pole mounted •  Provides surveillance of open guideway space •  Excludes tunnel sections due to lack of

permanent lighting •  Spacing between 500 to 1000m •  Low lux cameras but limited to ambient lighting

only

Page 44: Gautrain ITSSA 2010

Guideway Camera View

•  PTZ Cameras are installed every 500 to 1000 metres along the alignment. •  Each camera can only monitor a portion of its coverage at any given time. •  There will most likely exist blind spots in this coverage. •  This coverage will not work in low to no ambient lighting.

Page 45: Gautrain ITSSA 2010

CCTV - Server Based Video Recorder

•  Provides means for live and stored video playback

•  Video transmitted over Ethernet VLAN •  Storage of all camera images for a minimum 7

days at 4CIF (704x576), 4 frames/sec. •  Screen pops on designated CCTV

workstations of alarmed station ETEL locations •  Interface with NTS for time stamping

Page 46: Gautrain ITSSA 2010

Passenger Announcement and Information System (PA/PI)

•  Major Components: – Redundant servers – Station Controllers – Amplifiers – Speakers – Ambient noise sensors – LED Signs and LED Clocks – OCC Workstations

Page 47: Gautrain ITSSA 2010

Public Address

•  Broadcasting of operational messages in stations; 1 zone for the platforms and 1 for the concourse

•  OCC will be capable of making live or pre-recorded announcements to any combination of stations including the Depot

•  Combination of suspended, flush and recess mounted speakers

•  Ambient noise compensation to adjust speaker volume under varying noise levels

•  Station Control Panel for live or selected pre-recorded messages

Page 48: Gautrain ITSSA 2010

Passenger Information Signs

•  Two-double sided signs per platform edge •  Displays:

•  Time of next service departing from the platform; •  Destination of next train; •  Details of its stopping pattern - 4 or 8 car; •  Time of second train calling at the platform, when the first train is

at the station;

•  Display in 4 languages as needed – 2 Lines scrolling •  Manual pre-recorded or adhoc messages via OCC

consoles can be sent to any combination of stations (one time or timed messages). Messages can be coordinated with PA message.

•  Separate digital clock at both ends of platform

Page 49: Gautrain ITSSA 2010

Passenger Information Signs

Page 50: Gautrain ITSSA 2010

Platform Time Clock

Page 51: Gautrain ITSSA 2010

Telephone System – ETEL (typical)

Page 52: Gautrain ITSSA 2010

Operations control centre

Page 53: Gautrain ITSSA 2010

Bus Depots (VO to be issued)

•  CCTV, PA, Telephone •  Cameras for the yard and entrances •  DVRs to record images •  Main Bus Depot telephones connected to Train Depot

PBX via fibre optics •  Radios for buses •  Bus Tracking computer in Main Bus Depot •  Fibre from Train Depot to Main Bus Depot for O&M

LAN

Page 54: Gautrain ITSSA 2010

Automatic Fare Collection

Page 55: Gautrain ITSSA 2010

All Electronic Automatic Fare Collection

•  Use of modern Contactless Smart Card (CSC) as ticket medium

•  CSC used complies with International contactless ticket standards (ISO 14443) and other standards

•  Ability to integrate Gautrain rail travel, Feeder bus travel and Gautrain parking using same CSC

• 

Page 56: Gautrain ITSSA 2010

All Electronic Automatic Fare Collection

•  Use of world class Ticket Vending Machines for self service

•  Ability for ticket interoperability with other operators based on agreement and compatible technology

Page 57: Gautrain ITSSA 2010

Level  2  

Comms  

Level  1  

Fron

t  Office  

Level  0  

Fare  M

edia  

Level  3  

Ope

rator  

Integrated

 FMS   Operator  Back  Office  

Transit  Ticket  

Database  

Kiosk  

On/Off-­‐Board  Card  Readers  

On  Board  Equipment  

Buy  Transit  Ticket  

Check  In  

Check  Out  

Update  TransacMon  InformaMon  

Revenue  Management  

ReporMng  

Travel  

Fare  Data  

TVM  

AFC  Process  

ApplicaMon  

Revenue  Management  

Fare    Rules  

ReporMng  

Gautrain  AFC  structure  

Page 58: Gautrain ITSSA 2010

SYSTEM  CONFIGURATION  –  Sta;on  

WAN  

Page 59: Gautrain ITSSA 2010

SYSTEM  CONFIGURATION  –  Central  System  

WAN  

Page 60: Gautrain ITSSA 2010

Ticket vending machines

Page 61: Gautrain ITSSA 2010

Fare gates

Page 62: Gautrain ITSSA 2010

Electrification

Page 63: Gautrain ITSSA 2010

Electrification

•  The traction voltage is 25KV. •  Balanced feed from the Main Propulsion

Substation (MPS) at +25KV and -25KV to the Auto Paralleling Substations (APS) along the line.

•  There are seven APSs. •  Only one feed point from ESKOM comprising

two independent transmission lines. •   

Page 64: Gautrain ITSSA 2010

Electrification

•  In order to balance the voltage between the two rails a number of impedance bonds have been used.

•  Regenerative braking •  Regenerated Power can be used by other trains

or fed back into the system • 

Page 65: Gautrain ITSSA 2010

Construction update & stations

Page 66: Gautrain ITSSA 2010

On the test track in Midrand ....

Page 67: Gautrain ITSSA 2010
Page 68: Gautrain ITSSA 2010
Page 69: Gautrain ITSSA 2010

Inside the train depot

Page 70: Gautrain ITSSA 2010
Page 71: Gautrain ITSSA 2010

Sandton Station

Page 72: Gautrain ITSSA 2010

Sandton Station

Page 73: Gautrain ITSSA 2010

Sandton Station

Page 74: Gautrain ITSSA 2010

Sandton Station platform

Page 75: Gautrain ITSSA 2010

Gautrain at Sandton Station

Page 76: Gautrain ITSSA 2010
Page 77: Gautrain ITSSA 2010
Page 78: Gautrain ITSSA 2010
Page 79: Gautrain ITSSA 2010

Centurion Station

Page 80: Gautrain ITSSA 2010

Supersport Park

Centurion Station

Viaduct 5 towards Centurion Station

John Vorster interchange

Page 81: Gautrain ITSSA 2010

Supersport Park

Centurion Station

Centurion Station John Vorster interchange

Page 82: Gautrain ITSSA 2010

Viaduct 5, John Vorster Ave

Page 83: Gautrain ITSSA 2010

Pier 76 27 January 2009

Jean Avenue Viaduct 5d - Balanced Cantilever

Page 84: Gautrain ITSSA 2010

Viaduct 5, Jean Ave

Page 85: Gautrain ITSSA 2010

Dolomite Area: U-shaped ground bridge

North of OvP24 (K103) U-shape (U10) Elements

23 January 2009

Page 86: Gautrain ITSSA 2010

Launching Girder

Page 87: Gautrain ITSSA 2010

Viaduct 5 launching crane

Page 88: Gautrain ITSSA 2010

P 6

P 7

P 8

Piers 6, 7 & 8 20 January 2009

John Vorster Viaduct 5b – Balanced Cantilever

Page 89: Gautrain ITSSA 2010

Airport Link

Page 90: Gautrain ITSSA 2010

OR Tambo station platform & concourse

Page 91: Gautrain ITSSA 2010

OR Tambo station platforms

Page 92: Gautrain ITSSA 2010

OR Tambo station

Page 93: Gautrain ITSSA 2010

Viaduct 5, Jean Ave

Page 94: Gautrain ITSSA 2010

Viaduct 5, Jean Ave

Page 95: Gautrain ITSSA 2010
Page 96: Gautrain ITSSA 2010

The Seven Stages of a PPP Project •  Enthusiasm •  Promises & Programmes •  Disillusionment •  Panic •  Hunt for the guilty •  Punishment of the innocent •  Reward for those who had nothing to do with

it

Page 97: Gautrain ITSSA 2010

Whatever it is that hits the fan will not be evenly distributed.

No. 2 Law of Probable Dispersal

Page 98: Gautrain ITSSA 2010

Thank You www.gautrain.co.za

“The Future is not for the faint hearted.”

R Reagan

“The philosophers have only interpreted the world, the point

however is to change it” Karl Marx

Page 99: Gautrain ITSSA 2010

Rhodesfield Station

Page 100: Gautrain ITSSA 2010

Viaduct 15 towards airport

Rhodesfield Station parking area

Page 101: Gautrain ITSSA 2010

OR Tambo station

Page 102: Gautrain ITSSA 2010

OR Tambo station

Page 103: Gautrain ITSSA 2010

Opportunity always knocks at the least opportune moment.

No. 11 Ducharme’s Precept

Page 104: Gautrain ITSSA 2010

There’s always one more bug. No. 2 Lubarsky’s Law of Cybernetic Entomology

Page 105: Gautrain ITSSA 2010

Park Station